Detentions in Port of Koper in the Year 2009 s1
Total Page:16
File Type:pdf, Size:1020Kb
![Detentions in Port of Koper in the Year 2009 s1](http://data.docslib.org/img/ffa67bc1fc75e7500bdd8b90b833135a-1.webp)
DETENTIONS IN PORT OF KOPER IN THE YEAR 2011
1 2 3 4 5 6 Date & Vessel Name, Flag Owners Classification Summary Place of Type, IMO No & Operator Society Detention GT Charterers 8/01/2011 KHALIFEH Honduras Sea Shipping Croatian Detained for 3 days. LIVESTOCK Register of 20 recorded deficiencies. Koper Syria Shipping In TD 8 frames heavily General cargo wasted. Abandon drill failed. On compressor 7026871 belts protection missing. On FCSL bell missing. 3.356 The additional connections on the sludge pump to be removed. Crew does not use personal protective equipment. In paint room air vent missing. On rope store cover inner package holder corroded through. On boatswain cabin and 2nd engineer cabin bulkheads corroded through. Doors thresholds on captain deck alleyway and boat deck alleyway corroded through. Magnetic compass deviation -11°. Compass correction log missing. ISM failure. Flange on sea chest air pipe to be welded to prevent illegal discharge. In FCSL 3 frames bracket corroded through, 2 frames bent. Bow stem corroded through and temporary repaired with concrete. In FCSL main fire line corroded through. Wheelhouse bulkhead corroded through. The ship has no updated ORB. 27/01/2011 ALLCARGO iNDIA Accord Indian Detained for 2 days. LAXMI Marine Register of 7 recorded deficiency. Koper Shipping Bunker certificate General cargo India missing. Ism failure. Grey line corroded through. 9008067 Gyro compass inoperative. All ballast air 4.860 pipes improperly bolted. Gangway corroded through. Weekly entries in ORB missing. 29/01/2011 SORMOVSKIY- Russia Western Russian Detained for 8 days. 42 Shipping Maritime 16 recorded deficiencies. Koper Register of ISM failure. Abandon drill General cargo Russia Shipping failed. ER bilge dirty. Base on bilge pump 7833119 corroded through. Illegal discharge flange fitted. 2.478 Base on winch for opening hatch cover corroded through. In FCSL one extinguisher empty. PS lifeboat insufficient speed. Fore peak manhole can not be closed. STB sewage discharge line corroded through. Stern navigational light and anchor light with improper corrugated glasses. Battery room door corroded through. Wheelhouse bulkhead corroded through. Flanges on both standard discharge connections improper. 7/02/2011 JULIA Bolivia Safe Fleet Guardian Detained for 5 days. Maritime Co. Bureau of 27 recorded deficiencies. Koper General cargo Shipping ISM failure. Funnel Bolivia damper corroded 7413842 through. Satellite EPIRB inoperative. Draft marks 1.746 not visible. Gangway wheels twisted. 2 ropes damaged. Bridge electrical heater improper. Hatch cover on hold 1 corroded through. Bridge deck corroded through. Several air pipes corroded through. Fire hydrants damaged. Pilot ladder damaged. Frames in steering gear room bent. Windlass brake not as required. FCSL store cover corroded through. Charts missing. Bunker samples missing. Harbour generator belt protection missing. FWD paint room door missing. Bunker delivery note not as required. Bilge tank used as fuel tank. New edition of ORB missing. AIs inoperative. 10/02/2012 SEA Malta Mediterranea Bureau Veritas Detained for 2 days. COQUETTE n Car 8 recorded deficiencies. Koper Carriers ISM failed. Proper shaft Ro - Ro leaking. Emergency fire Malta pump inoperative. Fire 7920675 line corroded through. Air pipes corroded through. 2.823 Windlass support corroded through. Windows frames corroded through. Bridge bulkhead corroded through. 04/03/2011 MEGANISI Malta Muya Russian Detained for 2 days. Denizcilik Maritime 15 recorded deficiencies. Koper General cargo Register of Hull damaged due to Turkey Shipping collision in port. ISM non 8605480 conformity. Lost stability. FCSL hatchways cover 1.616 two closing handles missing. Bulkhead between ER and cargo old heavily corroded. Ballast tank sounding pipes missing closing covers. In ER one frame bent. All air condition cables improperly installed through cabins bulkheads. Funnel casing not properly tightened. Cargo securing manual missing. FCSL STB chain pipe cracked. Bulwark railing on RS bent. PS portable gangway damaged. FCSL boatswain’s store hull buckled, 2 frames bent. 06/03/2011 LEVANTES Panama Newport SA Polish Detained for 4 days. Register of 26 recorded deficiencies. Koper Bulk carrier Greece Shipping ISM major non conformities. In ER 1 7366128 EEBD empty. Rubber pipe installed between 15.627 bilge and bilge pump. Cooling line for DGs temporary repaired with clamps. Wings tanks bulkhead corroded through. Possible illegal discharge installed on ME expansion outboard line. On hull in ER several butterfly or ball valves installed on outboard lines. On DG2 and DG3 jacketed lines detached from HP fuel lines. Top of the tank in hold 2 holed. Longitudinal beams in hold 2 corroded through. FWD beams in hold 1 corroded through. In hold 1 STB ten frames brackets bent. Sounding pipe in hold 4 detached. Both glasses on FW ejector tank cracked. In hold 2 ladder platform missing. In all holds on PS all bilge suctions welded. STB wing tank in hold 4 leaking. Hatch cover side on hold No2 bent. Gasket holder on entrance door to hold 2 corroded through. Frames on front bridge window corroded through. On PS 2 tst3 air pipes heads corroded through. Save all under DT3 corroded through. PS fuel tank air pipe corroded through. Two red lights for ship not under command with improper corrugated glasses. 04/04/2011 RED TOWER St. Reem International Detained for 4 days. Vincent & Maritime Naval Survey 22 recorded deficiencies. Koper General cargo Grenadine Bureau In steering gear several s. Syria gray water lines 7627625 temporary repaired. Twin deck in hold 2 aft 3.984 corroded through. ISM major non conformity. In steering gear and in ER 4 flanges can be used for illegal discharge. In Twin deck on middle bulkhead 2 brackets detached form deck. Bulkhead between hold 1 and 2 corroded through. On DO tank air pipe ball protection corroded through. On poop deck food hatchway cover corroded through. In hold 2 top of the tank 8 corroded through. On poop deck base of the mooring winch corroded through. In hold 2 aft PS 6 consecutive frames corroded through. In hold 2 aft both air vents trunks corroded through. STB DBT 4 air pipe corroded through. On lifeboat deck PS alleyway bulkhead corroded through. Hospital bulkhead corroded through. Two red lights for ship not under command with improper glasses. Wheelhouse bulkhead corroded through. Battery room door and threshold corroded through. In wheelhouse 1 clear screen window inoperative. ORB with old instruction. Chart 1471 missing. 19/04/2011 ABDOUL Cambodia Rasha International Detained for 3 days. RAHMAN – B shipping Naval Survey 11 recorded deficiencies. Koper Bureau In inside alleyway ER General cargo Turkey bulkhead corroded through. In FCSL one 8028682 frame bracket corroded through. Working 4.369 platform on head mast corroded through. In hold 1 four beams corroded through. Tank’s 3 sounding pipe temporary repaired with concrete. In hold 2 on both sides several frame brackets bent and detached. Toilet bulkhead on poop corroded through. Glass on side scuttle window cracked. Bases on aft mooring winches corroded through. Two red lights for ship not under command with improper glasses. Magnetic compass with big air bubble. 19/04/2011 GHEWA B Syria B&B Shipping Russian Detained for 4 days. Maritime 20 recorded deficiencies. Koper General cargo. Syria Register of ISM major non Shipping conformity. Stability book not approved. General pump line temporary repaired. PS ER air vent corroded through. Top of the FP tank corroded through. On FCSL anchor ball improper size. Bow thrusters air vent cover corroded through. On FCSL hatchway entrance in hold 1 corroded through. Upper platform in FP tank corroded through. In FCSL 1 longitudinal beam corroded through. Paint stowed in FCSL. In hold 2 PS and STB hopper tanks cracked. In hold 2 six frames bent. In hold 2 on FWD bulkhead 1 frame corroded through. Dogs for closing covers of the opening on bulkhead in hold 1 missing. On hold 1 hatch cover handle cracked. Inside hatch covers plates corroded through. Bulkhead between hold 1 and 2 corroded through. Wheelhouse bulkhead corroded through. Magnetic compass with big air bubble. 11/05/2011 REINA 1 Malta Armador Bureau Veritas Detained for 2 days. Gemi 6 recorded deficiencies. Koper Ge. Cargo Ship's company on DOC Turkey and SMC not the same. 8802478 Bilge suction lines connected to hold bilge 2.345 pumps. On hold bilge pump sea water line ball valve installed which can be used as illegal discharge. FWD hold entrance one dog missing. All navigational lights with improper corrugated glasses. 12/05/2011 CHLOE Panama Medusa SA Bulgarski Detained for 7 days. Koraben 30 recorded deficiencies. Koper Gen. cargo Greece Registar On hull 2 obsolete valves can be used as illegal 8223098 discharge. ISM. Oil filtering equipment 989 outboard line temporary repaired with rubber pipe. Oil filtering equipment inoperative. ME cooling water line temporary repaired with rubber hose. ME several electrical boxes with exposed wires. Bilge pump lines temporary repaired with rubber pipes. Lighting in ER workshop insufficient. Main engine dirty. AP tank fresh water line made of rubber. ER bilge to be dried and cleaned. ME fuel leaking alarm inoperative. ER air vent trunk holed. Twoo EEBD empty. In FCSL 3 frames and bulkhead bent. DBT2 ball protection on air pipe corroded through. Bell on FCSL to small. Standard discharge connection improper. Some crew members without bed shits and blankets. Air vent on generator room corroded through. Sanitary facilities not as required. Crew does not have personal protective equipment. Master cabin air vent corroded through. After peak tank air pipe corroded through. Accommodation air vent sized. Chart No. 1471 missing. One crew member medical fitness certificate missing. Air condition room bulkhead corroded through. ORB – old edition. 01/06/2011 TUZLA Belize Med moriak Russian Detained for 7 days. Maritime 23 recorded deficiencies. Koper Gen. cargo Istanbul Register of ISM – MNC. PS FWD shipping hold entrance corroded 79203664 Turkey through. PS wing tank air pipe corroded through. 2.485 Emergency fire pump insufficient pressure. In FCSL air vent trunk corroded through. Electrical cable improperly installed through FCSL entrance trunk. On FCSL bell's clapper missing. Both anchor chain stores bulkheads corroded through. Sounding pipe inside FP detached. Chain pin cover corroded through. STB wing tank bulkhead repaired with plastic steel. Fore peak air pipe corroded through. STB chain pipe holed. STB FWD 2 frames corroded through. Aft hatch covers frames corroded through. On steering gear air vent gasket missing. Secon engineer cabin bulkhead corroded through. Front bridge bulkhead corroded through. Air condition room bulkhead 8 artificially made holes. In wheelhouse one wiper inoperative. Main entrance door threshold corroded through. Chart 1471 missing. 10/06/2011 PANAMAX Panama Chain Spirit Lloyd's Detained for 4 days. PEPPOU Register 13 recorded deficiencies. Koper Maritime Flashback arrestor an Bulk carrier acetylene and oxygen Greece cylinders missing. 8024272 Lifeboat speed less than one knot. Abandon drill 34.446 failed. Sides and stern navigational lights with improper corrugated glasses. ME fuel leaking alarm inoperative. Mast house door gasket protection channel corroded through. Lub oil air pipe ball protection corroded through. STB drinking water air pipe ball protection corroded through. Funnel corroded through. Funnel door corroded through. On FCSL bell missing. Air condition casing corroded through. 12/06/2011 GIORGIOS B Malta AB Maritime Bureau Veritas Detained for 3 days. 3 recorded deficiencies. Koper Bulk carrier Piraeus Lifeboat speed insufficient 1,5 knot. 9100293 Greece Abandon drill failed. Lifeboat engine 26.062 inoperative. 21/06/2011 NIKA Malta Pic Shipping Russian Detained for 6 days. Maritime 23 recorded deficiencies. Koper General cargo Odessa Register of STB aft hull artificially Shipping made holes. ISM – MNC. 8222408 Ukraine On PS lifeboat FWD tricing line ring damaged. 5.931 More than half bulbs of the emergency lights system inoperative. ME fuel leaking alarm inoperative. Fuel leaking alarm on DG No. 2 inoperative. Possible illegal discharge line fitted behind obsolete OFE. On DG No. 3 cooling water leaking. In chain store all electrical cables exposed. Steering gear oil leaks. On FCSL windlass oil leaks. Steering gear floor slippery. Crew does not use personal protective equipment. On FCSL one self igniting light inoperative. PS engine room air vent on main deck corroded through. 3rd engineer cabin bulkhead corroded through. Steward cabin bulkhead corroded through. Cook cabin bulkhead corroded through. Saloon bulkhead corroded through. Chief engineer cabin bulkhead corroded through. Alleyway bulkhead on bridge deck corroded through. Chart 1471 missing. 28/06/2011 MARDEN Panama Marden Phoenix Detained for 7 days. Shipping & Register of 32 recorded deficiencies. Koper General cargo Trading Co. Shipping PS lifeboat engine inoperative. In ER ballast 8128937 Istanbul air pipe corroded through. Settling tank 4.322 Turkey gauge made of plastic. CO" line from CO" room to ER corroded through. On main engine 3 jacketed lines detached. Emergency fire line insufficient pressure. PS on hull one scupper valve inoperative. Bulkhead on CO2 room corroded through. Doors on both chain lockers corroded through. On paint room air vent missing. ISM – MNC. Both suction sea valves leaking. Surroundings of buster pump dirty. STB deck lighting inoperative. On FCSL store air vent corroded through. Paint room bulkhead corroded through. FWD hatch covers frames corroded through. On main deck both covers on ballast valve tunnels corroded through. Provision store bulkhead corroded through. Provision store air vent corroded through. Hydraulic oil leaks on all hatch covers lines. Deck slippery. Air condition tank air pipe corroded through. Void area bulkhead on main deck corroded through. Void area door on main deck corroded through. PS top of funnel with two holes. Ventilation covers on both funnels corroded through.. Iner package holders on 2 bridge alleyways doors corroded through. Captain's cabin and alleyway windows glasses cracked. Both crane heads corroded through. One radar inoperative. Galley bulkhead corroded through. Inner package holder on laundry air vent cover corroded through. 05/07/2011 DANIELA Malta Pic Shipping Russian Detained for 4 days. Maritime 19 recorded deficiencies. Koper General cargo Odessa Register of ISM – MNC. On main Shipping engine 3 jacketed lines 9014640 Ukraine detached. Fuel leaking alarm inoperative. On 6.036 main engine fuel leaks. Diesel generator cooling line made of rubber. All 3 diesel generators dirty. On all 3 diesel generators fuel leaks. Compressors for starting engine not as required. Gyro cooling line in ER temporary repaired. Stand by piston cooling pump inoperative. In ER one EEBD empty. Quick closing valves on DO tank inoperative. On boiler cascade tank sight glass missing. DG room air vent head detached. Boiler safety valve remote operation wires missing. One hose heavily leaks. Air condition cables improperly installed through cabins bulkheads. In galley electric cables exsposed. All navigational lights with improper corrugated glasses. Sludge tanks No. 15 and 17 full. 06/07/2011 FEGULUS Cook SIA Regulus Nippon Kaiji Detained for two days. Island Kyokai 19 recorded deficiencies. Koper Reefer Lub oil overflow air pipe ball protection corroded 9055709 through. On FOT air pipe corroded through. 10.374 Forecastle store entrance ladder not fixed. Upper platform on flag mast cracked. Chain locker bulkhead corroded through. On FCSL deck air vent corroded through. STB bilge No. 3 air pipe head cracked. Hold No. 3 air vent corroded through. Funnel tank air pipe corroded through. DO service tank air pipe corroded through. Purifier air vent cover packing holder corroded through. Entry door corroded through. ER escape trunk door packing holder corroded through. ER air vent PS corroded through. Funnel corroded through. Funnel door package holder corroded through. Accommodation air vent corroded through. 13/07/2011 FARWA Libya NAMCO Guardian Detained for 4 days. Bureau of 20 recorded deficiencies. Koper General cargo Libya Shipping ISM – MNC. Engine room contain asbestos. 7633193 Galley and crew cabins infected with parasites. 2.003 Meat room temperature -12°C. Galley hood dirty. Main engine manoeuvring problems. Air bottles alarms inoperative. Air compressors not as required. Emergency fire pump insufficient pressure. On DG sea water outlet line additional valve installed, which can be used as illegal discharge. On sewage plant overflow line corroded through. Rubber pipe for cooling gear installed. Some small brackets on hatch covers corroded through. In ER after peak air pipe corroded through. Steering gear room floor slippery. Fore peak air pipe corroded through. Steering gear air vent cover sized. ER air vent package holder corroded through. Wheel house bulkhead corroded through. DOC annual survey missing. 16/07/2011 LIM St. Anamila Germanischer Detained for 3 days. Vincent & Lloyd 13 recorded deficiencies. Koper General cargo Grenadine Croatia Stem valves leaks. Wing tank manhole cover in 8407747 ER not properly closed. Air condition compressor 8.639 inoperative. Ball protection on DB4 air pipe corroded through. On hold No. 1 hatch coaming corroded through. On FCSL bell improperly fixed. Waste oil air pipe corroded through. Funnel corroded through. Funnel locked from inside with pad lock. Stern navigational light glass cracked. DOC invalid. PS STK! Air pipe corroded through. On green side light glass cracked. 12/08/2011 GOLD STAR Georgia Anglian Ship Maritime Lloyd Detained for 4 days. Management 24 recorded deficiencies. Koper General cargo FCSL deck holed. Crew United does not use safety 7393860 Kingdom helmets. ISM – MNC. Illegal discharge fitted. 2.438 On DO SR tank QCV inoperative. On all fuel tanks gauges blocked with wires. In ER 1 drain line holed, 1 temporary repaired with rubber. Outboard flange on obsolete oil filtering equipment to be welded. In ER tank 21 air pipe corroded through. Drain line in steering gear room temporary repaired with rubber. In ER 8 consecutive frames bent and 3 consecutive beams bent. Air condition cables improperly installed through cabins' bulkheads. Package holder on STB deck store door corroded through. PS FCSL door corroded through. On emergency generator belts protection missing. On PS aft hold entrance cover cracked. On 3 stores on poop deck air vent covers packages missing. Deck on both bridge sides bent. Glass on 2nd engineer cabin window cracked. Cover on ER emergency exit corroded through. No records in compass correction log. Main magnetic compass with air bubbles. Both MOB expired. All navigational lights with improper corrugated glasses. 22/08/2011 TARA Cambodia Syrian Ship International Detained for 5 days. management Naval Survey 23 recorded deficiencies. Koper General cargo Bureau ISM – MNC. Brake on Syria PS lifeboat winch and 7607417 davit wheels sized. Port side davits and their 2.622 reinforcement corroded through. On grey water air pipe additional connection fitted. Belts protections on hydrophore pumps missing. In air condition room 4 frames and frames brackets bent. In air condition room obsolete flange to be welded. In steering gear room 3 frames bent. Tween deck hatch covers bent. In tween deck three frames bent, one cracked. In TD hand rails for safe access to hold missing. Tween deck corroded through in several places. In TD FWD 2 longitudinal beams bent. In hold PS 3 frames bent. In TD PS No. 1 air pipe corroded through. Asbestos containing material find on board. In fore peak tank longitudinal beams corroded through. In fore peak tank first platform severely wasted. In ship's hospital floor damaged, electric lights inoperative. Washing basin missing. Toilet bulkhead on bridge deck corroded through. Funnel corroded through in several places. Glass on PS wheelhouse door cracked. On bow one rope spliced. 31/08/2011 PLOVDIV Bulgaria Navigation Germanischer Detained for 4 days. Maritime Lloyd 18 recorded deficiencies. Koper General cargo Bulgare ISM –MNC. Speed on STB lifeboat insufficient. 8912479 Bulgaria Main sea water cooling line temporary repaired. 11.982 On fresh water generator pump outlet and inlet lines leaking. Lifeboat embarkation ladder improperly posted. On oil filtering equipment 2 lines temporary repaired. Fuel lines on all three diesel generators made of rubber. Main sea water outboard valve leaks. On FCSL bell missing. Braking pad on PS rope winch worn out. Air condition room bulkhead holed. One fire sensor covered with plastic bag. Cooling water line on emergency diesel generator leaks. Daily DO tank air pipe and incinerator fuel tank air pipe corroded through. On ER several air vent covers inner packing holders corroded through. Asbestos containing material in bad condition found on board. Air condition cables improperly installed through wheelhouse bulkheads. On PS hull 3 scuppers welded. 21/09/2011 ZUZANNA Saint Jan Polish Detained for 2 days. Vincent & Stepniwskiy Register of 20 recorded deficiencies. Koper General cargo Grenadine Shipping Crew does not use Poland personal protective 8203555 equipment. On sewage tank manhole cover 299 valve installed. On fresh water hydrophore pump belts defence missing. Gauges on sludge and bilge tanks made of plastic. On STB air pipes DB2, DB4, DB5, FW and DB5 aft corroded through. On both diesel generators cooling lines made of rubber. On FCSL STB DB1 air pipe corroded through. In bow thruster room QCV on fuel tank cannot be promptly used. In bow thruster room electrical cables exposed. In bow thruster room on hull overboard valve missing. In bow thruster room illegal discharge line installed. In FCSL 3 frames bent. On FCSL bell missing. On FCSL hold entrance cover inner packing holder corroded through. On funnel both air vent covers frames artificially holed. On PS air pipes 2DB, 4DB and 2DB fwd corroded through. On ER sky light air vent cover inner packing holder corroded through. Flag consulted on SMD. 13/10/2011 ESTEEM C Liberia Cosmoship Lloyd's Detained for 5 days. Management Register 37 recorded deficiencies. Koper General cargo ISM – MNC. Valve on Greece sewage outboard line 7516149 temporary repaired. On all 3 diesel generators 17.527 fuel leaking alarms missing. Provision quantity insufficient. Two FWD ropes spliced. In ER life jackets lights batteries expired. On several lights glass covers damaged. Meat room temperature insufficient. One washing machine inoperative. Hatch cover on hold No. 3 corroded through. On FCSL STB hold No. 1 hatchway cover corroded through. On FCSL bell missing. On FCSL 3 store air vents corroded through. In FCSL PS fore peak tank air pipe corroded through. PS anchor washing line corroded through. Aft main fire line connected with rubber pipe. Inner packing holder on both chain locker doors corroded through. In PS chain locker on frame corroded through. Chain locker outboard line corroded through. In FCSL hold No. 1 bulkhead corroded through. Hatch cover on hold No. 6 not watertight. Steering gear room hatchway corroded through. Damaged asbestos containing material found on board. One self-igniting light inoperative. On bulwark panama eye reinforcement corroded through. On poop deck store air vent corroded through. Brake lining on cargo winches for hold No. 6 worn out. Alleyway bulkhead on deck A corroded through. ER trolley bar bent. Air conditions cables improperly installed through cabins' bulkheads. Office bulkhead on deck B corroded through. BATTERY ROOM BULKHEAD corroded through. Air vent pipe inside funnel holed. Two ER air vent covers on bridge deck corroded through. Three ER air vent bulkheads on bridge deck corroded through. Bulkheads over back wheelhouse windows corroded through. Deck over ER corroded through. VDR in constant alarm. 24/10/2011 PINE Marshall Haci Ismail Nippon Kaiji Detained for 3 days. Islands Kyokai 10 recorded deficiencies. Koper General cargo Turkey On PS lifeboat engine inoperative. On OFE 8908765 outboard line after OCM additional valve installed. 39.145 Main engine LO pump leaks. Valve on fuel line for DG No. 1 leaks. Piston rings and one liner missing. On all three diesel generators fuel leaking alarms inoperative. PS anchor fluke sized. On FCSL bell missing. On bow one rope worn. Ball protection on PS WBT 5 air pipe not as required. 14/11/2011 FEDEL MOON Panama Deniz Panama Detained for 3 days. Maritime SA Maritime 11 recorded deficiencies. Koper General cargo Surveyor Meet room temperature Turkey Bureau Inc. is inadequate; Hold 7639599 (fwd/stb one frame Russian bracket bent & one 2.351 Maritime detached, On p/s two Register of frames brackets bent, Shipping one corroded trough; in f'cstle stb/s all frames brackets bent; Sewage plant pump leaks; spare stern nav. Light with improper corrugated glass; all air cond. Cables improperly installed trough cabin's bulkhead; two head lines spliced; mag. Compass with air bubbles; On Bridge two wipers inoperative; Internal Audit required within 3 months from last inspection was not performed – objective evidence of serious failure or lack of effectiveness of the implementation of the ISM Code. 22/11/2011 SKY HOPE Rep. of Leaders Dromon Detained for 3 days. Moldova Marine Ltd. Bureau of 24 recorded deficiencies. Koper General cargo Shipping M.E. cylinder No.6 leaks Syria cooling water; In E.R. 7702920 overtop deck under galley and messroom 1.954 corroded trough; On diesel gen. No.2 cooling water lines temporary repaired and leaking; On P/s generator Asbestos insulation not as required; P/s generator cooling water leaking; F.P DB.1 & 4 p/s air pipes corroded trough; DBT No.2, 3, 4 stb/s air pipes corroded trough; Rescue boat engine inoperative; Frames on Bulkhead between H. No. 1. & 2. Bent and detached; Hold No2.- faces frames bent; Hold No2.- Hoper bulkhead cracked and holed in three places; Hold No2.- aft H.Covers frames corroded trough; Hold No2.- stb. Air vent. Corroded trough; Hatch way cover an Aux. D.g. room on poop deck corroded trough; E.R. Air vent. Cover corroded trough; Air cond. Door corroded trough; Funnel corroded trough on several places; Co2 main valve box & alarm switch not properly maintained; Several windows frames on bridge detached due to corrosion; On signal mast signal yards corroded trough; GMDSS batteries not properly maintained; Spare Nav. Light glass on signal mast cracked; P/s wheel house bulk head corroded trough;