72.5Kv Maximum, 69Kv Nominal Transmission Line

Total Page:16

File Type:pdf, Size:1020Kb

72.5Kv Maximum, 69Kv Nominal Transmission Line

For new petitions and amendments you Maximum and nominal voltages must be provided must list all counties involved in the project

Exhibit A County name must be provided PowerCo Any termini in other 72.5kV Maximum, 69kV Nominal Transmission Line counties must be provided. Locate in Cass County, Iowa

This line begins at the PowerCo’s Galveston Substation being the south terminus located in the northwest corner of the Southwest Quarter of Section One (1), T-76N, R-35W. The line proceeds north and ends at the Cass-Audubon County lines and ultimately terminates at an interconnection with a PowerCo 69 kV transmission line in Section Thirty (30), T-78N, R-34W in Audubon County, Iowa.

Beginning at the PowerCo Galveston Substation being located in the northwest corner of the Southwest Quarter of Section One (1), T-76N, R-35W thence east on private right-of- way through Section 1, said township and range and Section 6, T-76N, R34W in the Provide township and range. May south margin of Galveston road for a distance of 1.50 miles. The line then proceeds north reference previous T&R if same on public right-of-way through Sections 6, said township and range and Sections 31 and 30, T-77N, R-34W in the west margin of 725th street for a distance of 1.65 miles crossing the Southeast Quarter of the Southwest Quarter, the Northeast Quarter of the Southeast Quarter, and the Northeast Quarter of Section 30 said township and range into the Southwest Quarter of the Southwest Quarter of Section 20, said township and range Right-of-way Beginning andcrossing ending Eastland Road, a distance of 1.25 miles. Thence north on public right-of-way type must be points must bealong identified the east line of Section 20, said township and range in the east margin of 730th provided for Street a distance of 0.9 mile. Thence west crossing 730th Street and into private right-of- each segment way in the south margin of Dallas Road in Sections 20 and 19, said township and range to a interconnection at PowerCo’s Anita Substation, a distance of 0.15 mile. The line then proceeds east as the second circuit of the double circuit segment on private right-of-way in Sections 19 and 20, T-77N, R-34W along the south margin of Dallas Road for a distance of 0.15 mile crossing 730th Street. Then north on public right-of-way in Sections 20 and 17, said township and range along the east margin of 730th Street, a distance of 0.20 mile. Thence northwesterly on public right-of-way following the irregular road Crooked Creek Road through the Southeast Quarter and the North Half of Section 18, said township and range to the northeast corner of said Section, a distance of 1.57 miles. Thence north in public right-of-way of Crooked Creek Road in Section 18 and 7, said township and range, a distance of 0.03 mile. Thence north in private right-of- way along the west line of Sections 7 and 6, said township and range crossing Boston SummationRoad, of segments Highway 6 to the center of Akron Road, the line ending at the Cass – Audubon must equalCounty circuit milesborder, a distance of 2.0 miles in petition form

Information on the public lands survey system can be found at: http://www.nationalatlas.gov/articles/boundaries/a_plss.html

Page numbers must be correct 1