SPECIAL PROVISIONS PROJECT No. ______Sponsor Name INSERT COUNTY, ALABAMA

The following Special Provisions are supplementary requirements and amendments to the 2012 Standard Specifications for Highway Construction, which apply to this project. The requirements and amendments given in these Special Provisions shall take precedence over the requirements given in the Standard Specifications. In case of conflict, the first three Special Provisions listed below shall take precedence over the remaining Special Provisions.

S.P. CODE SPECIAL PROVISION 003/94 Form FHWA-1273 12-LPA2 General Provisions for Projects let by LPA (with prequalification) 12-LPA4 Acceptance for Projects let by LPA 12-0095(2) Disadvantaged Business Enterprise (DBE) 12-0101 Award & Execution of Contract (State Projects Only) 12-0325(2) Working Drawings 12-0426(3) Liquidated Damages 12-0604 Extension of Contract Time 12-0769(2) Extra and Force Account Work 12-0879 Award and Execution of Contract 12-1385 Steel and Iron Products (Buy America) 12-1625 Award and Execution of Contract 12-1657(3) Weight (Mass) Measure for Payment 12-1726 Cargo Preference Act 12-1799 Mobilization

Also, the current list of the 2012 General Application Special Provisions accessible on the ALDOT Construction Bureau’s webpage should be reviewed to determine if any of the special provisions listed are applicable for this project. These special provisions represent updates to the existing specifications, and their inclusion will all depend upon the items of work in the specific contract. Applicable special provisions shall be listed on the SP.doc form and included in their entirety in the contract documents. An ALDOT Division representative will review and concur with the special provisions selected by the designer.

For any work, pay items, or requirements not covered by existing ALDOT specifications, designer shall compose additional Special Provisions. Special Provisions shall address:  .01 Description of Work  .02 Materials to be used  .03 Construction Requirements  .04 Method of Measurement  .05 Basis of Payment

If specifying by manufacturer, model no., etc., at least three (3) different manufacturers (plus “or approved equal”) shall be listed. The use of “Proprietary Products” will require written justification and approval by the FHWA and ALDOT.

List the additional Special Provisions here, and insert into proposal package in the order listed.

12/19/2016 Note: The instructions directly above should be deleted from the list included in the contract documents.