Minutes ETC Meeting, February 18Th and 19Th, 2010
Total Page:16
File Type:pdf, Size:1020Kb
Minutes ETC meeting, February 18th and 19th, 2010 European forum for energy Business Information eXchange February 22nd, 2010 ETC - ebIX® Technical Committee
Minutes ETC meeting, February 18th and 19th, 2010
Date: Thursday and Friday, February 18th and 19th, 2010 Time: 9:00 - 17:00 and 9:00 - 16:00 Place: SvK, Sundbyberg (Stockholm) Participants: Jan Owe (SvK) Kees Sparreboom (TenneT) Ove Nesvik (EdiSys) Attachments:
Stakeholder Survey-78745.pdf , see item 14, UN/CEFACT survey, under AOB
0 Summary The meeting concentrated on finalisation of the ebIX® profiles and the principles for modelling. Finally all modelling issues seem to be solved. However, ETC still needs to verify the agreed homework on the next ETC meeting before a common ebIX® CuS and EMD model can be presented for the ebIX® forum and thereafter published.
1 Approval of agenda The agenda was approved with the following additions: UN/CEFACT , see 14 under AOB Publication, distribution and national customisations of ebIX® models, see new item 10
2 Minutes from previous meetings The minutes from the previous meeting was approved with the following comments: Jan have noted that there was an “a” too much under item 5, i.e. "However the Use of OCL constraints will moved to a a new topic in the ebIX® methodology, …."
3 Report from meeting with TMG/ATG (Kees) Kees went through the presentation he showed for TMG. Thereafter the report distributed by Kees was reviewed. The only consequence, on short term, is that ebIX® needs to update the UPCC profile published on the UMM development web site.
4 UMM2 BCV, BIV and XML schemas for CuS and EMD - Main item for the meeting
5 Review of the CuS BIV Ove had made a new proposal for the CuS UMM2 Business Information View for the Request Change-of Supplier Document and had the following comments and questions to the ebIX MagicDraw profiles: In the EnergyParty ABIE, both Identification and Role are optional [0..1], why? Conclusion:
ETC - ebIX Technical Committee Page: 1 We merge the MP-Party and EnergyParty ABIE, calling it Energy_Party, adding a name and keeping all three attributes optional (using OCL to constraint the content).
In the EnergyDocument ABIE, the cardinality of all three BBIEs are stated as [1]. Within UN/CEFACT the cardinality of 1 is the default and not shown. Conclusion: We will ask Christian Huemer for the right solution. For the time being we keep [1].
The ABIE Service is missing in the “ebIX Profile / ebIX ABIE” package. Conclusion: The ebIX® profile for MagicDraw was updated with the Service ABIE, together with other ABIEs needed in the CuS and EMD projects.
According to UPCC, we should use an underscore “_” between a qualifier term and a ACC name, e.g. Energy_Party. Conclusion: We change all BBIE, ABIE and ASBIE to include the underscore between the qualification term and the CC name, which is according to UPCC,
Where should the Identification attribute from the CuS UMM2 Business Requirements View be mapped? To the EnergyDocument_dentification or the Payload_Event_Identification. Conclusion: The Identification attribute will be mapped to Payload_Event_Identification.
How to specify that either the Transport Capacity Responsible Party or the Balance Responsible Party is to be used? Conclusion: The OCL statements were updated.
6 Content of the Service and Energy document classes The content of the Service and Energy document classes ware discussed and agreed, see example in C.
7 ebIX BIE/QDT Library The ebIX BIE/QDT Library was updated.
8 New modelling features Kees showed a proposal for mapping to EDIFACT in ebIX UMM-2 models.
The proposal includes the creation of an UML structure reflecting the EDIFACT message. Classes are made for UNSM, Segment groups, Segments, Data elements (DE) and Composites. Association end names are used to specify number of repetitions and line number in the EDFACT message. The ebIX® documents are mapped to the UML EDIFACT structure. For mapping associations the tagged values from the stereotype <
Kees also showed a nice word table, which he expects can be derived from the UML model.
The discussion related to Harmonised Role Model discussion one step further was postponed due to lack of time.
ETC - ebIX Technical Committee Page: 2 9 Proposal for updated and simplified ebIX® Methodology Including addition of a chapter in the ebIX® Methodology related to the Use of OCL constraints was postponed.
10 Publication, distribution and national customisations of ebIX® models It was discussed how to publish the model: We will publish the MagicDraw model in XMI format (.mdxml). However Kees will send a question to MD asking if there are any consequences of doing this (currently the model is saved in MDZIP format). The current model still needs some verification, i.e. verification if the CCs, ABIEs, UMM stereotypes etc are in line with the latest UN/CEFACT versions. National extensions also needs special care: o It is important to stress that national additions are based on UN/CEFCAT ACCs and ABIEs for CCL and customised by OCL statements. o National extensions must be published separately from the ebIX models and include an identification of the responsible agency for the extension. o We keep the possibility to have national code lists within the ebIX® model. o Kees will ask TMG (Christian), if he can support the creation of a mechanism for specifying the responsible agency for a customisation of an envelope. I.e. how to specify national deviations in the OCL statements.
During this item it was noted that there are some old EMD documents under the Document page, which should be removed.
Homework: Ove will update the EEM-Structure BCV and BIV part of the model, with all possible class diagrams, i.e. all but Metering point characteristics diagrams. Kees will update the EEM-Measure BCV and BIV part of the model, with all possible class diagrams, according to EMD road map. Kees will make available a list over national codes available in the current model, which will be presented to CuS, EMD and ETC. Kees will update the UPCC profile according to latest version available for UPCC. Jan will verify and update the UMM base and foundation profiles according to latest version available for UMM, including: o Changing the base class for initFlow and reFlow from Dependency to Flow. o Verify if <
Items for next ETC meeting: A final review (before publication) of the new UMM2 version of the complete ebIX® model Review of a first draft document, meant for the ebIX® forum, for how to publish, distribute and make national customisations of the ebIX® models. Review of possible national code lists for inclusion in the ebIX® profiles.
11 If time items (candidates for items, but only if proposals for discussion are available) Postponed
ETC - ebIX Technical Committee Page: 3 12 Next meeting(s), including start and end time. March Tuesday 16th and Wednesday 17th, Oslo April Tuesday 13th and Wednesday 14th, Vienna (before next ebIX® Forum spring meeting)
13 AOB
14 UN/CEFACT survey A UN/CEFACT survey related to stakeholder awareness of UN/CEFACT standards was answered, see attachment.
ETC - ebIX Technical Committee Page: 4 APPENDIX A THE TASKS OF THE GENERAL ETC AND THE ETC MODELLING EXPERT GROUP
Task Group Priority Planned Maintain the ebIX® technical documents: General ETC ebIX® Modelling Methodology (Draft for v2.0A) Urgent Q1 2009 ebIX® Modelling Methodology (Draft for v2.1A) To be done o Evaluate if a paragraph related to OO modelling is needed when the first complete ebIX® UMM compliant model is available. o National customisation using the Business realisation View ebIX® common rules and recommendations (v1r1D) When need ebIX® Recommendations for acknowledgement and To be done Q2 2009 error handling (v1r0C) When need ebIX® Recommended identification schemes for the European energy industry (v1r1D) Maintain ebIX profile for MagicDraw, including: ETC Q2 2009 Core Components Modelling (after EMD Code lists expert group and CuS Templates, etc. RSM) Participation/representation in the ETSO, EFET and ebIX® Participants Harmonisation group from General Maintaining harmonised role model ETC Core Components Information exchange between participation organisations Participation in: Participant(s) UN/CEFACT from ETC o TBG1 Modelling o TMG expert group ETSO/TF-EDI IEC/TC57/WG16 Input of information for the ebIX® web site General ETC Urgent Organise implementation support, such as: General ETC When need ebIX® course Implementation support for participating countries, such as inserting/updating codes. Supporting ebIX® projects, i.e.: ETC Urgent Q1 2009 Develop and maintain the UMM Business Modelling Choreography View and Business Information View expert group from the CuS and EMD working groups. Develop and maintain XML schemas based on the Business Information View from the CuS and EMD working groups Integration of the ebIX® model for acknowledgement and error handling into ebIX® models (UMM compliant) Maintain ebIX® Domain model Maintaining EMD and CuS models when standards of ETC When need relevance are updated, i.e.: Modelling
ETC - ebIX Technical Committee Page: 5 Task Group Priority Planned UMM expert group NDR CCL (and CCTS) UPCC Harmonised European role model Follow up on request to UPCC project: ETC Continuous Proposal for addition of the property Status to the Modelling follow up CodelistEntry stereotype. expert group
ETC - ebIX Technical Committee Page: 6 APPENDIX B PARTICIPANTS IN ETC
Name Company Telephone Mobile E-mail Alexander Pisters (vice E WIE +49 234 515-2442 +49 162 257 5428 [email protected] convenor) EINFACH Strom & Gas GmbH Christian Odgaard Energinet.dk +45 76 22 44 63 +45 23 33 85 55 [email protected] Filip Drijkoningen Infrax/ UMIX +32 11 26 64 95 +32 4 9558 6471 [email protected] Jan Owe SvK +46 705 396 930 [email protected] Jon-Egil Nordvik Statnett +47 22 52 70 00 +47 975 36 303 [email protected] Kees Sparreboom TenneT +31 622 66 7911 [email protected] Lucy Sarkisian (Convenor) TenneT +31 613 643 092 [email protected] Christoph Ruffing swissgrid +41 58 580 21 37 +41 76 313 15 63 [email protected] Ove Nesvik (Secretary) EdiSys +47 22 42 13 80 +47 928 22 908 [email protected]
For information: Adrian Fuchs swissgrid [email protected] Cynthia Bonne Eandis/ UMIX [email protected] Rudolf Baumann swissgrid [email protected]
Observers: Daniele Bui EDF Distribution [email protected] Heli Anttila Fingrid [email protected] Juraj Horvat VSE Kosice [email protected] Lembit Sünt Estonian Energy [email protected] Radoslav Haluska VSE Kosice [email protected] Riina Heinimäki Finish energy [email protected] Svein Olsen Navita [email protected] Sylvie Mallet EDF R&D [email protected] Terje Nilsen Nord Pool +47 67 52 80 44 +47 930 34 100 [email protected] Thilo.Lombardo EDNA +49 241/9671 194 +49 172/7181742 [email protected] Tor Åge Halvorsen Nord Pool [email protected] Willem Strabbing KEMA [email protected]
ETC - ebIX Technical Committee Page: 7 APPENDIX C CUS REQUESTCHANGEOFSUPPLIER
ETC - ebIX Technical Committee Page: 8