Please Complete the Top Portion of This Form (Must Be Saved As a Microsoft Word Document)

Total Page:16

File Type:pdf, Size:1020Kb

Please Complete the Top Portion of This Form (Must Be Saved As a Microsoft Word Document)

Huntington Beach Fire Department 2000 Main Street • Huntington Beach, CA 92648 (714) 536-5411 Fire Flow Information

Please complete the top portion of this form (must be saved as a Microsoft Word document) and e-mail it to:  James Brown [email protected]

Contact Name: Date:

Company:

Phone: Email:

Property Owner:

Project Name:

Project Address:

Fire Hydrant Location (describe nearest):

Type of Project: Multi-Family

Estimated water required: (gpm) @ Minimum Residual (psi):

WATER INFORMATION BELOW WILL BE COMPLETED BY THE PUBLIC WORKS DEPARTMENT WITHIN APPROXIMATELY 10 WORKING DAYS.

Static (psi): Residual (psi): Flow (gpm):

Water Main Size: 2-inch Water Main Pipe Type: AC

NOTE: All water information is provided using the City’s current hydraulic water model simulated under maximum day demand conditions. The pressure provided reflects at street level elevations unless noted otherwise. Water pipeline and type provided is informational only and must be field verified by the contractor prior to construction.

Public Works Engineering Staff: Duncan Lee Date:

FD096 (08/14) FP D:\Docs\2017-07-20\0049f19c91aa9387184c64784f549d27.doc

Recommended publications