Solar Keymark Physical Inspection

Report reference:

SKN_N0122R0

Checks and controls for solar collectors

– Initial Type Test (Reference) –

Test Date: Test Report: Drawings: Model: Collector classification Collector type  Flatplate  ETC  unglazed  PVT  ……..

– Physical inspection – Result of inspection Conformity Yes/No

Absorber . Material(s) . Thickness . Joining technique . Surface treatment / coating . Material of fluid channels . Spacing of fluid channels . Type/geometry of tubing . Dimensions (length / width) . Manufacturer . . . Glazing(s) . Material . Thickness . Structure . Manufacturer . Coating . Structure inside / outside . . .

Solar Keymark Physical Inspection, collectors Page : 1/3 Solar Keymark Physical Inspection

Report reference:

SKN_N0122R0

Result of inspection Conformity Yes/No Casing . Dimension (Length / Width / Height) . Material(s) of frame elements . Shape / Cross section of the profiles . Material of rear panel . Gaskets at hydraulic conections . Gaskets and sealing for the casing . . Insulation . Material(s) . Manufacturer(s) . Rear insulation (thickness coating) . Side insulation (thickness coating) . . Hydraulic connection . Dimensionen . Typ . . Labels and documentation . Label (check conformity) . Installer manual (check conformity) . . Others . Ventilation concept . Mounting parts . Reflectors (shape / material) . Heat transfer sheets . Heat Pipes . . . .

Solar Keymark Physical Inspection, collectors Page : 2/3 Solar Keymark Physical Inspection

Report reference:

SKN_N0122R0

Result of inspection Conformity Yes/No Major failures according to the EN12975-1 Chap 5.3.1

Comments and Remarks

Result. Conformity rating of the inspected product with the initially tested type

Degree of deviation Decision / Recommended action

No Deviations OR Deviations which have Continue certification if all other conditions are 1 been approved by the certifier upon acceptable notification of the manufacturer.

Limited number of minor deviations. Manufacturer has to inform the certifier about the Conformity is acceptable but the certifier technical modifications. Based on this assessment 2 has to be informed about the deviations it is recommended to accept these modifications. found. Continue certification.

Certification shall be declared void. To reanimate the certificate one of the following actions followed Major deviations. The product can’t be 3 by another Physical inspection is recommended: considered the same anymore. - Partial Retest to approve the design changes - Revert to the initial design

Place / Date

Test Lab

Name

Signature