FORM OF TENDER for the Peak District National Park Authority

(To be completed by the Tenderer) Article I. Article II. RELATING TO THE SUPPLY OF PRILLED LIME FOR AERIAL APPLICATION (DARK PEAK AND SOUTH PENNINES)

We offer to execute the whole of the Works described in your Specification dated 25 November 2010.

Total Tender Price excluding VAT: [ ]

**Period required for completion: We confirm: 1. That we have not communicated and will not communicate to any person under any agreement or arrangement, the amount of this Tender; 2. That the amount of this Tender has not been adjusted under any agreement or arrangement with any person; 3. Having examined the Conditions and Specification for the above mentioned Works we offer to complete the whole of the Works for such sum as may be ascertained in accordance with the said Conditions; 4. We undertake to complete the Works comprised in the Contract within the time stated in this Tender; 5. Unless and until a formal Agreement is prepared and executed this Tender, together with your written acceptance thereof, shall constitute a binding contract between us; 6. We understand that you are not bound to accept the lowest or any Tender you may receive.

Name of Firm:………………………………………………………….

Of:………………………………………………………………………...

If a Limited Company, please state address of Registered Office;

The Tender should be submitted in an official tender envelope by 28th February 2011 FORM OF TENDER - ITEMISED COSTS - THE SUPPLY OF PRILLED LIME FOR HELICOPTER APPLICATION 2011 Dark Peak Area

General Items and Preliminaries:- Work Required Cost Total No. Rates £'s (ex VAT Cost £'s VAT) Items Contractual Requirements 1 Insurance of the Works Item

2 Insurance against damage to persons or property Item (£5,000,000).

3 Preparation of Pre-Tender Method Statements, Item Operational Risk Assessments, Safety Policy.

4 Preparation of Site Risk Assessments, COSHH Item Assessments.

Additional Items: A B C D E Total carried forward to collection Total

Specification Costs:- Work Required Unit No. Rates £'s Total Cost £'s

Granulated Lime as N/A N/A per specification Tonne 1. 2011 Required 1747 750kg bag 2329 Please price for bag sizes 600kg that you can supply bag 2912 500kg bag 3494 Granulated Lime as N/A N/A per specification 2. 2012 Tonne 1875 Please price for bag sizes 750kg bag 2500 that you can supply 600kg 3125 bag 500kg bag 3750 Granulated Lime as N/A N/A per specification 3. 2013 Tonne 128 750kg bag 171 Please price for bag sizes 600kg that you can supply bag 213 500kg 256 bag 4. Granulated Lime for hand N/A N/A application as per specification 2011 Kg 10,000 25kg bag 400 Granulated Lime for hand N/A N/A application as per specification 2012 Kg 10,000 25kg bag 400

Description of Constituents: 1.1. Name of fertiliser: 1.2. Liming effect:

1.3. Caustic (Yes/No) 1.4. Additional Information: Additional Information: Work Required Unit No. Rates £'s Total Cost £'s

2. Delivery Total 3770 Tonne s 2.1. Delivery of Materials to Glossop 2011 Tonne 707

2012Tonne 835

2013 Tonn 128 e

2.4. Delivery of Materials to Greenfield Tonne 2011 534

2012 534 2.6. Delivery of Materials to Tonne Ripponden 438 2011

2012 438

2.8. Delivery of Materials to Hebden Tonne Bridge 78 2011

2012 78

3. Removal of Waste Materials 3.1. Method of waste disposal

3.2. Removal of waste materials from Delivery Item Sites 4. Handling Cost / Profit 4.1. Handling cost per tonne Tonne 3770

Total carried forward to Total collection

Work Required Unit No. Rates £'s Total Cost £'s 22 Additional Items Required to Complete Contract A item

B

Collection:C

D

E

Total carried forward to collection Total Cost Total Rates (ex VAT) VAT Cost No. £'s £'s ItemsContractual Requirements (as per specifications)

Preliminaries Item Contractual Items Item

Total carried forward to collection Total SUB CONTRACTORS (To be completed by the Tenderer) The Tenderer shall indicate the names and addresses of those firms to whom he proposes to sub-let any portion of the work included in this tender, including any road haulage. The Tenderer is to include copies of all relevant insurance certificates for those Sub-Contractors listed below. No Sub Contractor may be used without the written consent of the Authority, or without the insurance documents required by the Conditions having been vetted and approved by the Authority. Any other Sub Contractor must not be utilised without the prior consent of the Nominated Officer. Only Sub Contractors with substantial experience of remote and sensitive working and with prior experience in this particular type of work may be considered.

The Authority reserves the right to reject any proposed Sub Contractors.

IF NO SUBCONTRACTING IS TO BE UNDERTAKEN STATE NONE BELOW.

Sub-Contractor Section or nature of the work to be Sub-let Names and Address

Signature ......

Address ......

Date ……………………………......

Recommended publications