Line Break Permit
Total Page:16
File Type:pdf, Size:1020Kb
Form 000.653.F0129 Line Break Permit
Project Name Project No./Contract No. -
Project Location Requestor Name Date
Description of Work
Special Instructions
Personal Protective Equipment Check Check Other Protective Measures (PPE) Required Yes No Yes No
Air Pack – Approved Barricade - ______Radius (above/ below) Boots – Rubber Boots Blanks to be Installed Coveralls -Tyvek Block Valve Shut Film Badge Blower Gloves – Long Gloves Fire Extinguisher Gloves – Leather Gloves Grating, Floor Opening Covered Gloves – Rubber Gloves Lockout Plan Required Goggles Piping Support Installed/Needed
Hood – Acid Hood Planning (Line Break Planning Items Page 2 completed and distributed to all personnel0 Respirator – Full-Face Respirator involved) Respirator – Half-Face Respirator Pump Locked Out Shield – Face Shield Spark Proof Tiles Shield – Special Shielding Standby Person Suit – Acid Suit System Less Than 212 °F (100 °C).
Suit – Hot Suit System Vented Suit - Rain Valve Locked Out Other: Water Hose Other: Other: Other: Other: Other Other: Other: Other:
Copyright © 2009, P2S. All Rights Reserved. Page 1 of 2 Health, Safety, and Environmental Form Date: 01May2009 Form 000.653.F0129 Line Break Permit
Planning Items for Line Breaks
1. Depressurizing, Cleaning, and Venting Check
Nearest Safety Shower Location (if greater than 50 feet 2. [15.2 meters], water hose must be provided)
3. Nearest Eyewash Location
4. Cold Pak Location
5. Scott Air Pak Location
6. Fire Extinguisher Location
7. Fire Alarm Location
8. Stretcher Location
9. Planned Escape Route
Relaxing PPE Requirements Date Time
PPE reduced to items shown below:
Approval Name Signature Date Client Representative
P2S Supervisor
Person Making Break
Person Making Break
Line Break Permit Issuer
Note: This form is referenced in Practice 000.653.3320.
Copyright © 2009, P2S. All Rights Reserved. Page 2 of 2 Health, Safety, and Environmental Form Date: 01May2009