Document Number: EDS 06-0014C

Version: 3.0

Date: 28/07/2014

SECONDARY SUBSTATION EARTHING DESIGN AND CONSTRUCTION FORM

Substation Details

Substation Name Project Reference Designer/Planner Name Date

Designer Notes

Source Substation

Name Feeder Earth Fault Level kA Neutral Earthing Earth Resistance EPR Site Classification (HOT or COLD)

Secondary Substation

Earth Fault Level kA Overall HV Electrode Resistance  EPR V Site Classification (HOT or COLD) COLD / HOT

Touch Voltage

Fault Clearance Time s Touch Voltage Limit V Touch Voltage V

© UK Power Networks 2014 All rights reserved 1 of 3 Design and Construction FormDocument Number: EDS 06-0014C

Version: 3.0

Date: 28/07/2014

Touch Voltage Acceptable ()

© UK Power Networks 2014 All rights reserved 2 of 3 Design and Construction FormDocument Number: EDS 06-0014C

Version: 3.0

Date: 28/07/2014

Earthing Construction

The earthing shall be constructed in accordance with ECS 060023

HV Earth Requirements

Earthing Arrangement Earthing Arrangement Drawing Estimated Soil Resistivity m Standalone Substation HV Earth  Resistance Additional HV earthing details (e.g. length/number of any additional electrode/rods):

Target HV Earth Resistance  (before connection to the network) Overall HV Earth Resistance  (after connection to the network) HV Earth Electrode and Bonding Conductor Type/Size:

HV/LV earths to be combined? YES / NO

If NO, install LV earth electrode and apply LV earthing requirements detailed below

LV Earth Requirements

LV Earth Electrode Maximum Resistance 

LV earthing design details (e.g. length/number of electrode/rods):

Other Requirements

Specify any other special requirements:

© UK Power Networks 2014 All rights reserved 3 of 3