OUC Transmission Customers
OUC transmission service rates fall into two categories, OATT rates and Contract rates. Contract rates are also commonly referred to as ‘pre-existing contracts’ and ‘pre-FERC Order No. 888 contracts’. This letter addresses both rates.
OATT Rates OUC filed updated Transmission Rates with the Federal Energy Regulatory Commission (FERC) and received approval for those rates to be effective Oct 1st 2017.
DURATION FIRM NON-FIRM YEARLY $18,786 / MW * Not Offered MONTHLY $1,565 / MW $1,565 / MW WEEKLY $361 / MW $361 / MW DAILY $51 / MW $51 / MW HOURLY Not Offered $2.14 /MWH
* The monthly charge for Yearly service was calculated at $18,785.61 which for the Tariff filing was rounded up to $18,786. When $18,785.61is divided by 12 and rounded to the nearest dollar it results in a rounded monthly charge of $1565. So when charged on an annual basis the Yearly rate would actually be 18780 per year.
Ancillary Service #2: Reactive Supply and Voltage Control from Generation or Other Sources Effective Oct 1 2017 OUC will waive the charge for this service for all customers. All transmission customers are receiving Ancillary Service #1 “Scheduling, System Control and Dispatch” and #2 “Reactive Supply and Voltage Control from Generation and Other Sources” even though they are not shown as line items on the reservations.
ORLANDO UTILITIES COMMISSION Reliable Plaza at 100 West Anderson St | P O Box 3193 | Orlando, FL 32802 | 407.423.9100 Tel | 407.236.9616 Fax | www.ouc.com OUC Transmission Customers 11/3/2017 Page 2 of 2
Contract Rates Below is a table showing current FMPA contracts and KUA contracts that include firm transmission services provided by OUC under Contract Rates. Effective October 1, 2017, the monthly charges for these services will be increased from $1,383.43/MW to $1,504.36/MW.
Florida Municipal Power Agency and Kissimmee Utility Authority Pre-Order 888 Contracts
Entity Contract Name Unit MW Charge FMPA FMPA ALR-Stanton Stanton 1 29 $43,626.44 KUA KUA Stanton Stanton 1 21 $31,591.56 FMPA Tri-City Project Stanton 1 23 $34,600.28 FMPA FMPA Stanton 1 Project Stanton 1 65 $99,287.76
FMPA SEC2 All Requirements Stanton 2 23 $34,600.28 FMPA SEC2 Project Stanton 2 105 $157,957.80
KUA KUA IR A&B 12 $18,052.32 FMPA ARP (Billed by MWH used) IR A&B 29
FMPA ARP IR C&D 53 $79,731.08
FMPA KUA portion of St Lucie St Lucie 8 $12,034.88
Please feel free to contact me with any questions or if you need additional information.
12/11/2017: Edit: Corrected the FMPA Stanton 1 Project billing to 65 MW
Respectfully,
Aaron Staley Manager Transmission Planning and Reliability 407.434.4161 [email protected]