Lockview High School Contec 10 Mr

Total Page:16

File Type:pdf, Size:1020Kb

Lockview High School Contec 10 Mr

Name______

Lockview High School

Construction Technology -10

(Cover Page) Teacher: Mr. Shreenan

Mr. Pat Shreenan Technology Education Department Lockview High School 148 Lockview Road Fall River, N.S. B2T 1J1 Phone: 902.860.6000 Ext.7721272 Fax: 902.860.6005 Email: [email protected]

Construction Technology Package

Course Info / Projects / Assignments / Homework

Term 1 2011

Lockview High School Construction Technology 1 Table of Contents WebPages: http://hrsbstaff.ednet.ns.ca/pshreen/

Page Topic Due Dates 1 Cover Page N/A 2 Table of Contents N/A 3 Outline N/A 4 Portfolio Organization N/A 5 Term 1 Checklist N/A

6 The Construction Industry Chapter # 1 Due: ______

7 Designing For Construction Chapter # 2 Due: ______

8 Construction Tools Chapters # 9, 10, 11, and 12 Due: ______

9 Site Work Preparation Chapter #13 Due: ______

11 Foundation Systems Chapter #14 Due: ______

* Mid-Term TEST *And Portfolio (Binder) Check

13 Floor Framing Systems Chapter #15 Due: ______

15 Wall Framing Systems Chapter #16 Due: ______

16 Garage Construction Video Questions Due: ______

17 Woodworking Machine Safety Assignment Due: ______

21 2 Production Lab Safety Power Points Due: ______

23 House Plans (3D Home) Due: ______

*Mid-Semester Test * And Portfolio (Binder) Check Note: *Additional class work, computer assignments, and Drawings are given to you as we start each topic and may not be part of this package.

*Be sure that you record your work on the “Term Checklist” in your binder.

Lockview High School Construction Technology 2 Mr Shreenan Lockview High School Contec 10

Course Outline Welcome to Construction Technology at Lockview High School

As students in this class you will learn about the various areas of Construction Technology, in both a classroom and a lab setting.

The purpose of this course is to help you understand all aspects of construction (how it is organized, how it is controlled, it's impact on society and the opportunities it offers). In one Unit you will study the basic concepts of Frame House Construction and its’ relationship to the building industry, emphasizing building terms, building practices, building materials and the practical applications. In a Lab activity you will design a house floor plan and in another activity you will build a scale model of a house or a garage.

Some sample Units of study will include: Residential blueprint reading, applications of drafting and home design, an introduction to CAD, communications, environmental studies, building code, foundations, framing, electrical, plumbing, HVAC systems, and research of alternative building materials and methods.

Bridges, domes, skyscrapers, dams, tunnels: We use them every day, but how were they built? This is another area that we will explore.

This course will also reveal careers in Engineering, Architectural Design, and the Building Trades. You will be researching, authoring and publishing multimedia presentations of sample Careers at the Professional Level, Technical Level, and the Entry Level as part of the course. Post Secondary Opportunities and Certificate Programs at Community/Technical Colleges and Vocational/Technical Centers will also be discussed.

Emphasis will be placed on hands-on activities in the lab, critical thinking, problem solving, skill development, technical literacy, and safety while working in the lab with tools and equipment.

Semester Evaluation •Assignments 20% •Portfolio 15% •Tests 15% •Lab 40% •Class Mark 10% Total 100%

TERM 1 35% TERM 2 35% EXAM 30% 100%

Lockview High School Construction Technology 3 Portfolio (How to organize your binder)

Lockview High School Construction Technology 10 Mr.Shreenan

Introduction

Your portfolio will be your “greatest asset” in this course, as I will explain in class. So…. be sure that it is organized from the beginning of the course, this makes it easier to find the resources that you will need to be successful in Contec 10.

Method

First you will need a 1-inch (25mm) 3 ring binder for ‘only Contec 10 work’. Next you need 4 section dividers. Label these (in order): NOTES, ASSIGNMENTS, RESOURCES, TEST / QUIZ. Paper: Lined, Unlined, Graph Flash Drive optional CD-R The very first page in your Portfolio will be the ‘handout page’ given to you the first day of class this Semester (Binder Front Page)…Portfolio)

Evaluation

Your Portfolio evaluation is found on the back of the Binder Front Page.

Lockview High School Construction Technology 4 Mr Shreenan Lockview High School Contec 10

Term 1 Checklist

Lockview High School Construction Technology 5 CONSTRUCTION TECHNOLOGY Check these off If you have completed Description of work to be completed for this the work. Term in Contec 10. (1) √ A Contec 10 Binder, Organized with 4 section dividers.

Chapter #1 Questions and worksheets finished

Chapter #2 Questions and worksheets finished

Chapter #13 Questions and worksheets finished

Chapter #14 Questions and worksheets finished

Chapter #15 Questions and worksheets finished

Chapter #16 Questions and worksheets finished

‘Production Lab Machines’ Safety PowerPoint complete

‘Portable power tools’ Safety PowerPoint complete

My IMP Mail is working and I have used it.

Review of Tools: Chapters # 9,10,11,and 12 Complete

3 Drawings Each (3 Isometric and 3 Orthographic) Sheds

Isometric House Drawing In Color Done

‘Halifax’ floor plan Drawing Complete

House Plans (All Drawings & Components) Done

Labelled The House Framing Diagrams Done

Your Lab Work on the ‘Scale Model Garage’ Recorded.

I have been checked on ‘Production Lab Safety’ Questions on Garage Construction Video Done

2 Binder Checks for this Term Done

Lockview High School Construction Technology 6 Chapter #1 Contec 10

Pages 1-17 Name: ______

**Answer the following Questions in complete sentences In the “Notes Section” of your Binder / Portfolio.

1. Discuss the importance of “technological advancement” in the areas related to the construction industry. (Give examples) (Tools, Building materials, machines, communication, etc.)

2. How does the economy affect the construction industry? (Banking, Loans, cost of materials, construction starts…etc.) 3. Name and describe various occupations / Jobs in the construction Industry. Name the 4 categories and give examples.

4. Explain and give examples of the 4 different Types of Construction: Light, Commercial, Industrial, and Civil construction.

5. Define the “key terms” found on page 2 of our book.

6. Do the review sections A and B on page 17 in our book. (Write them out)

Lockview High School Construction Technology 7 Lockview High School Contec 10 Name______

Designing for Construction

Chapter 2 Page 18 Answer the following questions In Your “Notes”

1. List and explain the “needs” to be served by a construction project. Example: “Wheelchair Access”

2. Explain the “elements of a structures design” that serve specific needs.

3. Why must we consider the impacts of construction design on the environment and society? Give examples

4. Define these key terms: Need, function, aesthetic, brainstorming, impact, building code, zoning law?

5.Answer ‘Review questions 1-9 on page 27.

Lockview High School Construction Technology 8 Construction Tools Chapters # 9, 10, 11, and 12

Introduction: Construction Technology Tools

Outcomes:

Students should be able to identify tools used in Construction Technology related activities, and the safety that applies to the use of these tools.

Task:

*Check the WebPages: http://hrsbstaff.ednet.ns.ca/pshreen/Contec%2010.htm

Method:

1.Create in your “notes section”, a series of charts that are found at our website.

2.Review the chapters and tell what each tool is used for.

3.Give safety for each tool where you can.

4.Find these tools in “Google Images”.

5Copy > Paste them into a Word doc.

6.Name and identify the tools.

7.Print a copy for this assignment (Put it in your notes.)

Conclusion:

As we work in the Production Lab your TecEd Teachers expect you to call each tool by its name and to know what it is used for. We hope that this has helped you to do that.

Thanks!

Lockview High School Construction Technology 9 Lockview High School Contec 10

Site Analysis ENERGY-EFFICIENT STRUCTURES Chapter 13 Pg 190 SITE WORK

Homes should be sited to take advantage of natural features of the terrain, which offer energy conservation help. For example, a home site may offer windbreaks or summer shade. You have probably heard how one can use the sun’s energy to heat a home. To benefit from the winter sun’s heat, trees near the south wall of your home should be deciduous. Use your personal knowledge to share your ideas with your ‘house construction group’ and then we will share your answers with the class.

Summer Sun and Winter Sun The drawings show the benefits of planting deciduous trees to the South and West of your home. A well-placed mature, deciduous tree can produce enough shade to cool the roof and walls of the home, while blocking heat rays from entering through the home's windows. In the winter, leaves drop allowing the sun's rays to penetrate the branches, warming the roof, walls, and windows of the home just when winter warmth is needed.

1. List in your notes: several terrain features that can help to make a home more energy efficient.

2. Explain in your notes: how each feature can contribute to energy efficiency.

3. Think about the site of a new house or housing development that you have seen. What can you say about the site of the home(s). You can draw this map showing compass

Lockview High School Construction Technology 10 directions, new home, and natural features that make the new home more energy efficient. The map doesn’t have to be elaborate.

Tree height and shade candles The diagrams above illustrate the angle and height of the sun in July, and the amount of shade generated by trees of varying heights. Since summer rays are at their strongest and most direct, planting shade trees to directly impact the heat of the roof and windows can reduce energy bills by as much as 25 percent. To promote winter warmth, keep lower branches pruned (left).

4. After some discussion; describe this new home site in a few sentences in your notes. Consider that you are describing it to someone who has not yet seen your building lot.

5. Using a different colour pen or pencil, add to your map any landscaping changes you would make to improve the home’s energy efficiency.

6. Now consider various forms of homes from apartments to single family dwellings. What information can you now offer to the group and to the class on ‘ENERGY- EFFICIENT STRUCTURES’? Answer this in a paragraph or two.

7. Define the key terms on page 190.

7. Now do the Site Plan activity on the 11 X 17 “Plot Plan” Provided to you.

Lockview High School Construction Technology 11

Chapter # 14 Pg 203 Contec 10

Foundation Systems Name: ______

Place this information in your ‘note section’.

1. DRAW: Fig 14-1 Pg. 203 Foundation and superstructure

Fig 14-7 Pg. 206 Footings

2. Define: The key terms on page 203. Write them out in your notes.

3. What important things must be considered in designing a basement that may be used as a living space? It may be an apartment or a bedroom.

4. Do the multiple-choice review on page 214. Write out the question then select and write your answer in a sentence.

5.Do this worksheet:

Contec 10 How It Works: ‘Concrete’

Look at what the real construction world is made of. In there with wood, steel and glass you’ll find another material quietly holding it all up. You’ll find concrete, and a lot of it. *Explore this site and answer the following Questions. http://www.popularmechanics.com/home_journal/how_your_house_works/ 1275111.html

Lockview High School Construction Technology 12

1.How is Portland cement produced? 2. What factor allows concrete to be trucked to the job site and still be ready to pour? 3. Concrete is a mixture of water, ______, ______, and______. 4. Improving Performance Concrete suppliers often use additives such as… 5. One problem with concrete is a tendency for freeze/thaw cycles to cause cracks. How can suppliers help prevent this? 6.In the yellow pages of a phone book, find three local suppliers of concrete. Write out their phone numbers, WebPages, and locations. Check out: www.411.ca 7. The form in which you buy concrete depends on the size and nature of your job. Concrete is normally measured in ______. How do you determine how much you’ll need to lay a slab for a garage floor? 8. For small jobs in the back yard for the do it your selfer, An average 1:2:3 mix contains one part ______, two parts ______and three parts ______.

Lockview High School Construction Technology 13 Chapter 15 Pg 216 Floor Systems Name______

Lockview High School Contec 10

Place this information in your ‘ Note section ’.

Internet Resource: http://www.hometips.com/hyhw/structure/structure1.html

1. Look at the DRAWINGS: Figures 15-2, 15-3 and tell in your own words what they mean.

2. A) Can you describe what a sill is, where it is located and how it is constructed? B) How are sills anchored to foundations? http://www.hometips.com/hyhw/structure/106found.html

3. Why are beams used in floor framing construction? 4. What is another name for a beam, and what are they made of? 5. What are piers and pipe columns? 6. Describe what floor joists are and what their purpose is in floor framing. 7. What is a joist header and where is it located? 8. A) Why are double framing members used around openings for stairs and chimneys? B) What are the parts called? Fig 15-13 www.hometips.com/hyhw/structure/116detail.html

9. A) What is a stringer joist? B) Where might you find one?

10.A) What sizes are floor joists? B) What does 16 inches on centre mean? www.hometips.com/hyhw/structure/116frame.html

11. Define what sub flooring and underlayment means in floor framing construction. 12. Look at figure 15-19 on page 226 for floor framing details. ****Also refer to the two sheets in the ‘Resource section’ of your binder about: Floor Framing # 1 and #2 *KNOW what the parts are and where they are located.

Lockview High School Construction Technology 14 FLOOR FRAMING SYSTEM

FRAMING FOR STAIRS

Lockview High School Construction Technology 15 Chapter 16 Pg 235 Wall Framing Systems Contec 10 Name______Date______

Place this information in your ‘Notes’ section.

1.Define the following key terms for Chapter 16: Load bearing wall, partition, plate, rough opening, header, trimmer stud, Cripple stud, sheathing.

Internet Resource check : www.hometips.com/hyhw/structure/108frame.html AND www.hometips.com/hyhw/structure/115wall.html

**There are two basic wall-framing methods: ______and______. Answers at: http://www.hometips.com/hyhw/structure/108frame.html

2. Review Figures: 16-1, 16-2, and 16-3. (In your own words Tell what they mean.) Also check: www.hometips.com/hyhw/structure/114wall.html

3. Describe the complete step-by-step process of constructing the walls and partitions (page 238) ***be sure to keep your description in the order that the construction takes place.

4. Draw and label Figure 16-13 and describe the main purpose of this diagram.

5. Name a few “special wall-framing considerations” that carpenters are faced with when building a house.

6. From page 245: *** This is located on the handout Work Sheet.

A) ID the parts.

B) Match the words from column II to the correct sentence from column I that best matches it.

C) Wall Framing # 1 and # 2 sheets: You need to know the names of the parts and where they are located. 7. Do an Internet search and report on four good sites that discuss: “Wall Construction Technology”. Include the URL’s (www.)

Lockview High School Construction Technology 16

Lockview High School Name______Date: ______

Contec 10 Garages

Place in the ASSIGNMENT section of your binder

A) Explore this site and answer the following questions in MS Word, you may do this assignment with a partner. www.hometime.com/Howto/projects/garage/garage_1.htm

B) When you have finished, print a copy for the two of you and then have Mr.Shreenan check you off for having completed the assignment. (Hand It In To Be Marked) This information will be on the final exam. Questions 1. What is needed to get a local building permit? 2. What are some things to consider when planning? 3. Once the plan is worked out what needs to be done? 4. What inspections are done during construction? 5. What were some ‘Excavating Issues’ regarding this construction? 6. Explain what procedures had to be followed for their ‘Footings & Foundation’. 7. Pouring the Slab involved a number of steps what happens first? 8. Their contractor finished the concrete sections by what methods? 9. Framing Walls: What are the steps? 10. Garage Door Framing: What are the steps? 11. Raising Trusses: What considerations were necessary for installing the trusses? 12. Fascia and Soffits: On their garage they insisted on detail what were the steps to the installation of these construction items? 13. Roofing: Although labour intensive this was a nice roof…what was the procedure? 14. Cupola: What 2 purposes did this serve? 15. House wrap: Name a common brand for this material. What is the purpose? 16. Installing Lap Siding: Why did they choose this type? 17. Paint and Stain: Why do we need to consider this in finishing this exterior? 18. The electrical contractor performed what steps in wiring their garage? 19. Why did they use plywood flooring with tongue-and-groove joints? 20. What is a pull-down stairway? 21. Garage doors can be classified in two styles, what are they? 22. Installing a Sectional Garage Door: What are the steps? PRINT A COPY OF YOUR ANSWERS

Lockview High School Construction Technology 17

Production Lab Safety Contec 10

Woodworking Machine Safety Assignment Name______

Check this site: http://www.ccohs.ca/oshanswers/safety_haz/woodwork/

*These safety rules apply to the use of machines in the Production lab. Write 5 good safety rules for each machine.

**Write these in your assignment section of your binder and have them checked by your Teacher. (10 Points)

This is an Individual assignment…. you will need this information for a future TEST.

Table Saw (Rip cutting and Cross cutting)

http://www.general.ca/

Jointer Planer

Lockview High School Construction Technology 18

Thickness Planer

Drill Press

Lockview High School Construction Technology 19 Band saw

Wood Lathe

Mitre Saw

Lockview High School Construction Technology 20 DISC AND BELT SANDER

http://www.general.ca/

Scroll Saw

Lockview High School Construction Technology 21

Lockview High School Contec 10 Name______

Assignment ‘Safety With Portable Power Tools’ PART ONE

This assignment will consist of 12 slides in Power Point. You will create a storyboard and then include this in your multimedia presentation.

Slide 1 Title Slide ‘Safety With Portable Power Tools’

Slide 2 Table Of Contents

Slides 3-11 Diagrams / Explanations showing Brand name power tools and accessories. Graphics-showing History / Safety related to power tools. Sound and animation may be used. Example: cartooning, drawing in Paint or other programs may be used. Flash etc.

Slide 12 Reference Slide: Hyper links need to be shown and labelled by company name. Remember to cite for copyright.

**Please Use: Correct grammar, Spelling, and mechanics of writing while citing your sources of information. Obtain written permission where necessary.

Save your work “ OFTEN” in your Contec 10 Folder that you have created on your ‘H’Drive

Please Include: Jig Saw, Dremel Tool, Orbital Sander, Belt Sander, Router, Skill Saw, Drills, Die Grinder, Angle Grinder, and many more. The following URL’s may be of some help: www.blackanddecker.com www.dewalt.com www.stanleyworks.com www.makita.com www.porter-cable.com www.boschtools.com www.ryobitools.com www.mil-electric-tool.com www.jepsonpowertools.com www.dremel.com

Lockview High School Construction Technology 22 Name______

Lockview High School Contec 10

Assignment ‘Safety With Woodworking Machines’ PART TWO

This assignment will consist of 12 slides in Power Point. You will create a storyboard and then include this in your multimedia presentation.

Slide 1 Title Slide ‘Safety With Woodworking Machines’

Slide 2 Table Of Contents

Slides 3-11 Diagrams / Explanations showing Brand name Machines and accessories used in the Production Lab. Graphics-showing History / Safety related to these machines. Sound, transitions, and animation may be used on some slides. Mpeg’s of machines at work. Examples: cartooning, drawing in Paint or other programs may be used. Flash etc. Please do comparative “Canadian Prices” for our machines and display this on your slides.

Slide 12 Reference Slide: Hyper links need to be shown and labelled by Company name. Remember to cite for copyright.

**Please Use: Correct grammar, Spelling, and mechanics of writing while citing your sources of information. Obtain written permission where necessary.

Save your work “ OFTEN” in your Contec 10 Folder that you have created on your ‘H’Drive Include these machines: Table Saw, Jointer Planer, Thickness Planer, Drill Press, Band Saw, Wood lathe, Mitre Saw, Belt and Disk Sander, Scroll Saw.

www.general.ca

www.delta-tools.net

http://www.sawstop.co m/video.htm

Lockview High School Construction Technology 23 Lockview High School Contec 10 House Plans Name______

General Information for each student:

This project involves the creation of a set of working drawings for a domestic dwelling. The house you draw is to be a mirror reverse image of the supplied drawings. The house is to be placed on a block of land (supplied). Contours have been supplied to allow benching and site works to be completed if possible. Any by-products from creating the building will be viewed as bonus marks.

*Use 3D Home 4 *You will need to Supply Drawings on 11 x 17 paper:

1.Dimensioned floor plan

2.Footing plan

3.Side elevations. Right and Left

4.Front and Rear elevations

5.Typical section view of the house.

6.Your Print of plan of allotment for placing the house.

Task 1 – Working Drawings

The first part of the project consists of creating a full set of working drawings for the house.

Task 2 – Placing

The second part of the project involves placing the house on the allotment or print. This lends itself to doing rough site works, as contours have been supplied. All parts of the house are to be a clear 6m or local building code, from the sides and back boundaries of the block. Expected Output:

Lockview High School Construction Technology 24 A Full set of working plans for the supplied house. Including floor plan, elevations, foundation plan and sectional view, along with the house placed on the plot plan or building lot.

Method:

Check the web page for: Contec 10 House Plans

1.Choose a set of House Plans. http://www.coolhouseplans.com/ http://www.bhg.com/bhg/homeplans/ http://www.dreamhomesource.com/Search.asp

2.Work on each of the tasks. 3.Do neat work on your drawings and remember that this is a Contec 10 Project. 4. Local HRM and Provincial codes and bylaws apply. 5. Check and research the Building Code. 6. Programs like 3D Home Architect may be used, but the final work must be prepared on 11 x 17 paper (supplied).

Evaluation:

Check the Rubric for this project. Due Date:______

FLOOR PLAN (SAMPLE)

Lockview High School Construction Technology 25

Recommended publications