CURRICULUM VITAE’

Name : ELMER B. BURBOS

Nationality : Filipino

Academic qualification : Civil Engineer License no : 0084827

Position : Planner / Quantity Surveyor / Cost Engineer

Total no. of yrs. experience : 14 years Address : Sinilian Third Camiling, Tarlac Birthday : April 11, 1975 Nationality : Filipino Email Address : [email protected] Mobile no. : 0563604806 / 09082876724 Saudi Aramco ID : 8087650 Saudi Council Engineer # : 207296

Educational Background : Auto Cad College (Short Courses) Delamar Institute of Technology Tarlac City (1998-1999) - Graduated

: Bachelor of Science in Civil Engineering College Tarlac State University Tarlac City (1992-1998) – Graduated

: Camiling School for Home Industries High School Camiling, Tarlac (1988-1992) - Graduated

Sinilian Second Elementary School Elementary Camiling, Tarlac (1982-1988) - Graduated Work Experiences :

June 2, 2012 – Up to Present : Rajeh H. Al Marri & Sons Co. PO Box 76934, Al Khobar 31952 K.S.A.

Position : Planner / Cost Engineer – Project Control Department Oil & Gas Company (Saudi Aramco Contractor)

Aug 2002 –July 2011 : Al-Derbas Roads and Maintenance Co. Ltd. P.O.Box 1419, Al-Khobar 31952, Saudi Arabia

Position : Quantity Surveyor / Site Engineer

Projects Undertaken:

- Main & Secondary Roads in Eastern Province (Ministry of Transport) 1. Security Building Interchange 2. Abu Baker Interchange (U-Turns) 3. Omar Bin Khatab Interchange (Underpass) 4. Prince Naif Interchange (Overpass) 5. Othman Bin Affan (Overpass) Project Cost: 192,693,523.00 Saudi Riyals

- 17.50 Km Construction of Riyadh Dammam Highway with Interchanges (including 5 bridges) (Ministry of Transport) Project Cost: 172,644,500.00 Saudi Riyals

- 96.5 Km. Rafiah-Sedawi Road (Ministry of Transport) Project Cost: 32,000,000.00 Saudi Riyals.

- 24 Km Al Noqiar – Al Noqiarah Project (Ministry of Transport) Project Cost: 3,000,000.00 Saudi Riyals

- Sect. 4 – 80 Km. Nairiyah-Sedawi Road (Ministry of Transport) Project Cost: 32,000,000.00 Saudi Riyals.

2000-2002 : E.M. Aragon Enterprises/AMO-JPM J.V. SBMA, Olongapo City, Philippines

Position : Site Engineer / Quantity Surveyor Projects Undertaken: - Construction of North Luzon Expressway (4 Main bridges, Bailey Bridge and 3 Utility bridges ) Project Cost: 8,000,000.00 pesos

1999 – 2000 : J.T.O. Construction SBMA, Olongapo City, Philippines

Position : Site Engineer / Quantity Surveyor

Projects Undertaken: - Construction of Appari (Electronics) Building Project Cost: 4,000,000.00 pesos

Detailed Job Description - RHM Company:

- Preparing Project Progress Measurement, S-Curve, Cash-flow of the project. - Site progress tracking for Weekly Progress Reports to be presented in ARAMCO meeting. - Taking actual reports from different discipline (Civil, Communication, Mechanical and E & I) - Verifying Budgeted Amount / Budgeted Quantity of all materials, manpower and equipment. - Prepare Cost Comparison Estimate for existing Projects based on Schedule C / CRPO price and Subcontract price. - Review Monthly Timesheet Total Man-hours of each project for the Monthly Earn Value Analysis. - Approval of all Advac Request (Manpower, Equipment, Material & Subcontract). And support Procurement Department for any cost.

- Al Derbas Company:

- Perform cost estimation for the project bill of quantity and monthly invoice. - Designing plan and profiles (Horizontal alignment and Vertical curve data’s), for road construction projects in various land development projects that includes preparation for all survey data's. Preparation of survey sheet levels from embankment, subgrade, base course, bituminous base course and bituminous wearing course. - Quantity computations of earthworks cut & fill using special programs EW (Earthworks) and EW XP (latest program for Earthworks). Designing codes, templates, side slopes, super elevations, vertical curves and up to 10 variables needed for cross sections. - Estimates and prepare bar bending schedules for the structural projects. Prepare designed elevations from foundations to deck slabs of bridges and for details @ abutments and piers - Site preparation and checking proper construction works. As per plan and specification required for specified projects. - Prepare and design of electrical pipe crossings, drawpits, cable turning drawpits, high mast foundations, pipe culverts, collecting tanks. - Design of highway road signage such as single pipe post, double and triple IPE post foundations and IPE size as per M.O.T. standards. - Taking actual finished grade elevation of asphalt (Bit. Wearing Course) using a special machine (I.R.I.) - Downloading and uploading data's from survey instrument (sokia) to computer. With special microsoft excel programs, derived formulas. - Prepare data's for drainage such as cross section of manholes, catch basin, reinforced concrete pipes.

Computer Skills : - Primavera P6 v 8.3 - Advac System - EW XP and EW (Earthworks) - Auto Cad 2007 (Special LISP program for Designing Roads) - Microsoft Excel (special program for Horizontal & Vertical Curve Datas) - Microsoft Word - International Roughness Index (I.R.I.) - Sokia & Leica (surveying instrument)