Greene County Lewis A. Jackson Regional Airport

Total Page:16

File Type:pdf, Size:1020Kb

Greene County Lewis A. Jackson Regional Airport 1 2 3 4 5 6 7 GREENE COUNTY LEWIS A. JACKSON REGIONAL AIRPORT ARCHITECTURE ENGINEERING GEOSPATIAL 4454 Idea Center Blvd Dayton, OH 45430 -1500 937.461.5660 TERMINAL EXTERIOR RENOVATION E Fax: 937.461.0743 PROJECT TEAM PROJECT IMAGE Sheet Number Sheet Name G-001 COVER G-003 STRUCTURAL GENERAL NOTES AD001 DEMOLITION GENERAL NOTES AD101 OVERALL FIRST FLOOR DEMOLITION PLAN 4454 IDEAS CENTER BLVD A-001 SYMBOLS AND ABBREVIATIONS DAYTON, OH 45430 A-101 OVERALL FLOOR PLAN A-201 BUILDING ELEVATIONS A-311 WALL SECTIONS A-601 DOOR SCHEDULE,TYPES & DETAILS D CODE INFORMATION CODE USED: 2017 OHIO BUILDING CODE EXISTING CONSTRUCTION TYPE: IIB EXISTING OCCUPANCY: MIXED USED, A -3 (TERMINAL B (TENANT SPACE0 AND S -1 (HANGAR) A-3: 2,425/9500 = 0.255 B: 2,400/23,000 = 0.104 S-1: 10,720/17,500 = 0.613 Total: 0.972 < 1.00 LOCATION MAP STAGING AREA MAP EXISTING FIRE PROTECTION: NONE EXISTING HEIGHT, 1 STORY, APPROX 30' -0" EXISTING AREA: A -3 (APPROX 2,425 SF), B (APPROX 2,400 SF), S -1 (APPROX 10,720) C PROJECT SITE t SEALS v r . 0 2 R _ h ARCHITECTURAL c r A THIS WORK WAS PREPARED BY B AIRPORT REGIONAL JACKSON A. LEWIS COUNTY GREENE RENOVATION EXTERIOR TERMINAL Road N Valley 140 45385 OH Xenia, _ l ME OR UNDER MY SUPERVISION a n i m Revisions: r VICINITY MAP e No: Description: Date: T t r o p r i A y t n u o C n e e r Project No: 081488 G JILL M. ELDER 1917677 / l a Date: 01/15/21 n STRUCTURAL i m r THIS WORK WAS PREPARED BY e Designed by: JME T ME OR UNDER MY SUPERVISION 9 Drawn by: TTT 1 I t Checked by: MJL r o p r i A PROJECT A Sheet Name: y t SITE n COVER u o C n e e r G / / : 0 Mark Mainridge E -76040 6 Sheet No: 3 M I 1/15/2021 1:29:23 PM 1:29:23 1/15/2021 B G-001 i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dea Center Blvd THE CONTRACTING OFFICER OR OWNER'S REPRESENTATIVE, THE CONTRACTOR SHALL ASSUME APPROPRIATE JURISDICTION. PROVIDE FASTENERS OF TYPE 304 STAINLESS STEEL. PROVIDE FASTENERS WITH ORGANIC- 2. FOR CLARITY, THE QUANTITY OF BRANCH CIRCUIT CONDUCTORS ARE NOT SHOWN. CONTRACTOR SHALL BE Dayton, OH 45430 -1500 RESPONSIBILITY FOR SUCH PERFORMANCE AND SHALL BEAR AN APPROPRIATE AMOUNT OF THE ATTRIBUTABLE POLYMER OR OTHER CORROSION-PROTECTIVE COATING HAVING A SALT-SPRAY RESISTANCE OF MORE THAN 800 3. CONTRACTOR IS REQUIRED TO HAVE AT LEAST ONE OF THE FOUR DOORS LABELED ON THE EXHIBIT AS DOOR RESPONSIBLE FOR PROVIDING ALL BRANCH CIRCUITRY. RECORD AS-BUILT CIRCUIT PATHS AND PRESENT 937.461.5660 COSTS FOR CORRECTION. THE CONTRACTOR SHALL TAKE FIELD MEASUREMENTS AND VERIFY FIELD CONDITIONS HOURS ACCORDING TO ASTM B117. DO NOT USE MATERIALS WITH DEFECTS THAT IMPAIR QUALITY OF SHEATHING 1, 2, 3 AND 4 SAFELY ACCESSIBLE TO THE TERMINAL THROUGH THE CONSTRUCTION SITE AT ALL TIMES, DRAWINGS FOR ENGINEER VERIFICATION WHEN REQUESTED BY ENGINEER. AND SHALL CAREFULLY COMPARE SUCH FIELD MEASUREMENTS AND CONDITIONS AND OTHER INFORMATION OR PIECES THAT ARE TOO SMALL TO USE WITH MINIMUM NUMBER OF JOINTS OR OPTIMUM JOINT ARRANGEMENT. PROVIDING A SAFE PEDESTRIAN WALK PATH TO TERMINAL ACCESS DOOR AT CLEARLY MARKED WITH SIGNAGE E Fax: 937.461.0743 KNOWN TO THE CONTRACTOR WITH THE CONTRACT DOCUMENTS BEFORE COMMENCING ACTIVITIES. ERRORS... ARRANGE JOINTS SO THAT PIECES DO NOT SPAN BETWEEN FEWER THAN THREE SUPPORT MEMBERS. CUT PANELS AND CAUTION TAPE. 3. CONTRACTORS SHALL VISIT PROJECT SITE PRIOR TO BIDDING TO ASCERTAIN AND BECOME FAMILIAR WITH AT PENETRATIONS, EDGES, AND OTHER OBSTRUCTIONS OF WORK; FIT TIGHTLY AGAINST ABUTTING CONSTRUCTION EXISTING CONDITIONS AS THEY PERTAIN TO THE SCOPE OF WORK. CONTRACTOR SHALL VERIFY EXACT LOCATION 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CUTTING, GRINDING, SANDING, FILLING, FITTING OR PATCHING UNLESS OTHERWISE INDICATED. SECURELY ATTACH TO SUBSTRATE BY FASTENING AS INDICATED, COMPLYING 4. CONTRACT TO PROTECT ALL SITE LANDSCAPING DURING CONSTRUCTION. IF LANDSCAPING IS DAMAGED, AND SIZES OF ELECTRICAL EQUIPMENT AND ALL OTHER APPURTENANCES ASSOCIATED WITH THE WORK. REQUIRED TO COMPLETE THE WORK OR TO MAKE ITS PARTS FIT TOGETHER PROPERLY. WITH TABLE 2304.9.1, "FASTENING SCHEDULE," IN THE ICC'S INTERNATIONAL BUILDING CODE. COORDINATE CONTRACTOR WILL BE RESPONSIBLE TO REPLACE WITH LIKE PLANTS. IF RESEEDING OF GRASS AREAS IS SHEATHING INSTALLATION WITH FLASHING AND JOINT-SEALANT INSTALLATION SO THESE MATERIALS ARE REQUIRED, CONTRACTOR MUST USE APPROVED SEED MIXTURE FOR USE AT AIRPORTS. 4. CONTRACTOR SHALL PERFORM ALL CUTTING AND PATCHING AS REQUIRED FOR HIS WORK. OPENINGS IN WALLS, 3. THE CONTRACTOR SHALL NOT DAMAGE OR ENDANGER A PORTION OF THE WORK OR FULLY OR PARTIALLY INSTALLED IN SEQUENCE AND MANNER THAT PREVENT EXTERIOR MOISTURE FROM PASSING THROUGH COMPLETED FLOORS AND CEILINGS SHALL BE FILLED IN, PATCHED, PAINTED AND FINISHED IN A MANNER TO MATCH THE QUALITY COMPLETED CONSTRUCTION BY CUTTING, PATCHING, EXCAVATING OR OTHERWISE ALTERING SUCH ASSEMBLY. DO NOT BRIDGE BUILDING EXPANSION JOINTS; CUT AND SPACE EDGES OF PANELS TO MATCH SPACING 5. CONTRACTOR TO TEMPORARILY REMOVE ONE SECTION OF FENCING AT THE NE CORNER OF THE TERMINAL OF THE DISTURBED AREA. CONSTRUCTION. THE CONTRACTOR SHALL NOT CUT OR OTHERWISE ALTER SUCH CONSTRUCTION BY OTHER OF STRUCTURAL SUPPORT ELEMENTS. PROVIDE MATERIAL CERTIFICATE. BUILDING TO PERMIT WORK ON FACILITY. CONTRACTOR TO ERECT A TEMPORARY MEASURE AT THIS LOCATION CONTRACTORS OR BY THE CONTRACTING OFFICER OR OWNER'S REPRESENTATIVE OWN FORCES EXCEPT WITH TO SECURE AIRFIELD ACCESS WHEN CONTRACTOR IS NOT ON SITE. 5. VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO DRILLING. WRITTEN CONSENT OF THE CONTRACTING OFFICER OR OWNER'S REPRESENTATIVE AND SUCH OTHER 2. ALL WOOD BLOCKING TO COMPLY WITH DOC PS 20 AND WITH GRADING RULES OF LUMBER GRADING AGENCIES CONTRACTORS; SUCH CONSENT SHALL NOT BE UNREASONABLY WITHHELD. THE CONTRACTOR SHALL NOT CERTIFIED BY ALSC'S BOARD OF REVIEW AS APPLICABLE. IF NO GRADING AGENCY IS INDICATED, COMPLY WITH THE 6. PARKING OR LAYDOWN OF MATERIALS IS NOT PERMITTED IN ANY GRASS AREA. 6. OPENINGS IN WALLS AND FLOORS SHALL BE PLANNED AND COORDINATED WITH GENERAL CONTRACTOR FOR THE UNREASONABLY WITHHOLD FROM THE OTHER CONTRACTORS OR THE CONTRACTING OFFICER OR OWNER'S... APPLICABLE RULES OF ANY RULES-WRITING AGENCY CERTIFIED BY ALSC'S BOARD OF REVIEW. FACTORY MARK INSTALLATION OF APPROPRIATE SLEEVES. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CORE-DRILLS EACH ITEM WITH GRADE STAMP OF GRADING AGENCY. MAXIMUM MOISTURE CONTENT: AT 19 PERCENT. FASTENERS 7. CONTRACTORS ARE NOT TO ACCESS THE APRON OR AIRFIELD AT ANY TIME. REQUIRED FOR INSTALLATION OF ELECTRICAL WORK. AND ACCESSORIES TO BE STAINLESS STEEL SHEET: ASTM A240/A240M OR ASTM A666, TYPE 304. INSTALLATION: SET 4. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGE THAT OCCURS TO EXISTING MATERIALS, FINISHES, WORK TO REQUIRED LEVELS AND LINES, WITH MEMBERS PLUMB, TRUE TO LINE, CUT, AND FITTED. FIT WORK TO 8. CONTRACTOR WILL NOT BE PERMITTED TO BLOCK ACCESS TO THE ATTACHED HANGAR OR PARKING AREA AT 7. ALL ROOF PENETRATIONS OR PATCHES (IF APPLICABLE) SHALL BE MADE PER ROOFING MANUFACTURER WARRANTY EQUIPMENT, ETC. TO REMAIN AS A RESULT OF THE CONTRACTOR'S WORK. IF DAMAGE TO EXISTING MATERIALS, OTHER CONSTRUCTION; SCRIBE AND COPE AS NEEDED FOR ACCURATE FIT. FRAMING STANDARD: COMPLY WITH THE NE OF THE BUILDING WITHOUT PRIOR COORDINATION WITH AIRPORT MANAGEMENT. ACCESS TO THE REQUIREMENTS. FINISHES, EQUIPMENT, ETC. TO REMAIN DOES OCCUR AS A RESULT OF THE CONTRACTOR'S WORK, THE AF&PA WCD1 UNLESS OTHERWISE INDICATED. INSTALL METAL FRAMING ANCHORS TO COMPLY WITH HANGAR AND INTERIOR SPACE SHALL BE LIMITED TO THOSE WORKERS NEEDING ACCESS FOR THE DEFINED CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND REPAIRING AS REQUIRED OR COMPLETE REPLACEMENT MANUFACTURER'S WRITTEN INSTRUCTIONS. DO NOT SPLICE STRUCTURAL MEMBERS BETWEEN SUPPORTS UNLESS WORK. 8. COORDINATION AND SCHEDULING SHALL BE RESPONSIBILITY OF THE INVOLVED CONTRACTORS. AS PER THE DIRECTION OF THE CONTRACTING OFFICER OR OWNER'S REPRESENTATIVE. OTHERWISE INDICATED. SECURELY ATTACH EXTERIOR ROUGH CARPENTRY WORK TO SUBSTRATE BY ANCHORING 5. CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORING AND BRACING AS REQUIRED FOR ALL DEMOLITION AND AND FASTENING AS INDICATED, COMPLYING WITH THE FOLLOWING: "FASTENING SCHEDULE" IN ICC'S 9. CONTRACTOR MUST PROVIDE THEIR OWN RESTROOM FACILITIES. ACCESS TO TERMINAL FACILITY RESTROOM 9. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL REQUIRED JUNCTION BOXES, ACCESS NEW WORK AS REQUIRED.
Recommended publications
  • Walls and Foundations of Historic Buildings
    District of Columbia Historic Preservation Guidelines WALLS AND FOUNDATIONS OF HISTORIC BUILDINGS Government of the District of Columbia Office of Planning Historic Preservation Office 1100 4th Street, SW Suite 650 Washington, DC 20024 202-442-8800 Designs of Walls and Foundations Walls and above ground foundations are among the most important character-defining elements of historic buildings. The design of walls and foundations is influenced by the types of materials used, the location, proportions and scale of openings for doors and windows, massing and rhythm of features such as bays and porches, and details and ornamentation. The exterior walls of most free-standing buildings are also structural, that is they carry the weight of the floors and roof to the foundation. Conversely, the front and rear walls of rowhouses and other party-wall buildings are usually not load bearing; rather the side walls carry the weight of floors and roofs to foundations. Altering, repairing or replacing primary character-defining walls and foundations -those facing major public streets or sidewalks- must be carefully considered so as not to detract from a building's character. Changes to secondary non-character-defining walls and foundations (typically on the sides and rear of buildings) should also be carefully considered. Greater flexibility in selecting methods of construction and materials is possible for changes to non-character-defining than for character-defining walls and foundations. Above ground foundation walls are often visually distinguished from the main wall by a change of plane. For example, brick and stone foundation walls are often visually separated from the wall above by a belt course of molded brick or shaped stone.
    [Show full text]
  • 614.252.0955 Or 800.845.7644 Visit Our Website at Oberfields.Com PAVER S • R E TAINING WALLS • PATIO STONES • ACCESSORIES
    614.252.0955 or 800.845.7644 Visit our website at oberfields.com PAVER S • R E TAINING WALLS • PATIO STONES • ACCESSORIES CORPORATE OFFICE Oberfield’s is Ohio’s premier manufacturer and marketer SALES 528 London Road P.O. Box 362 of high-quality concrete masonry, landscape, sitescape and Delaware, OH 43015 614.252.0955 740.369.7644 building material products. We invite you to visit one of our 800.845.7644 Fax 740.363.7644 five showrooms or many distributors throughout the region. SALES & MANUFACTURING 1165 Alum Creek Drive Columbus, OH 43209 614.252.0955 Simply call us for a convenient location near you. Fax 614.252.5858 SALES 450 W. Fair Avenue Lancaster, OH 43130 740.653.3074 Fax 740.653.7285 SALES 1190 S. Prospect Street Marion, OH 43302 740.382.8888 Fax 740.382.3110 SALES & MANUFACTURING 980 Shawnee Road Lima, OH 45805 419.225.6761 Fax 419.225.6121 O©2009 bOberfield’s,er Inc. field’s RESIDENTIAL Walkways/Patios................................................ 2 Driveways ........................................................ 3 Steps & Stairways ............................................ 4 Fire Pits & Grills .............................................. 5 Water Features ................................................. 6 Columns & Borders ......................................... 7 Monroe Pavers ................................................. 8-9 Washington Pavers ........................................... 10-11 Washington Circle Pavers ................................. 12-13 Lincoln Pavers .................................................
    [Show full text]
  • A2 – Dressed Quarry Stone Wall
    Building techniques : A2 – Dressed Quarry Stone Wall Coutry: Lebanon PRÉSENTATION Geographical Influence Definition Dressed quarry stone wall - traditional masonry tools: chisel, picks and hammers. - 4, 5, 6 faces-sometimes 2 faces - naturally squared. - stone laying with or without wedging. - stones are laid straight, same size or not. - mortar laying Environment In the MEDA area, we find dressed quarry stone in all environments: urban, rural, in mountain, plain and sea side. Its presence is generally common. In Lebanon, dressed quarry stone (Moqassab) is often used everywhere: rural environment, urban, plain, mountain and sea side. Illustrations General view: Details close-up: This project is financed by the MEDA programme of the European Union. The opinions expressed in the present document do not necessarily reflect the position of the European Union or of its member States. 1/8 A2 Lebanon – Dressed quarry stone wall CONSTRUCTION PRINCIPLE Foundations Illustrations Finding a "firm base" or “good ground” is a preliminary for the builder. If rock shows on the surface, the wall is built directly above. If not, all countries dig a small trench (~ 50 cm deep), practically never deeper than 1m. the width can be equal to the thickness of the wall above-ground, but it can also be up to twice this thickness. Combination of 2 factors : width of the trench and type of filling materials: adjustments and adaptation to each spot and ground. The materials are always stony: the trench is filled with stones, generally linked with mortar. If the module is small, the trench is broader. Several countries reported construction over ruins used as foundation.
    [Show full text]
  • The Art of Stone Masonry in the Rockbridge County Area (1700 to Present)
    The Art of Stone Masonry In the Rockbridge County Area (1700 to present) Steven Connett Archaeology 377 5/25/83 Dr. McDaniel The art of stone masonry in the Shenandoah valley seems to be somewhat of a mystery prior to the nineteenth century. However, as some of us have learned from the anthropology 101 course: The absence of artifacts (documents in this case) is just as important as the presence of artifacts. In order to make sure that the lack of information was not due to my possible incompetence in research, I spoke with a current day stone masoner named Alvis Reynolds. Mr. Reynolds relayed t o me that when he was trying to learn the skills of stone masonry he, too, had great difficulty in obtaining information and thus decided to teach himself this art through the process of trial and error. Although this information did not directly aid me in my research, Mr. Reynolds did provide me with a bit of information that allowed me to derive a hypothesis on why there is this unusual lack of information in this line of study. I will state my hypothesis in this paper, however, I will not be able to prove it or disprove it due to the deficiency in available information. Mr. Reynolds explained to me that in the eighteenth century there were nomadic stone masoners. These nomadic workers went from valley to valley in search of people who needed help with building their houses. Since these people did not know how to cut stone themselves (after all, stone cutting is not the type of thing that is innate to most people) they had no choice but to p~y these men for their services or go unsheltered.
    [Show full text]
  • BUIL])ING STON.E O·F WASHINGTON
    BUIL])ING STON.E o·f WASHINGTON By WAYNE S. MOEN Washington Department of Conservation Division of Mines and Geology Bulletin No. 55 1967 State of Washington DANIEL J. EV ANS, Governor Department of Conservation H. MAURICE AHLQUIST, Director DIVISION OF MINES AND GEOLOGY MARSHALL T. HUNTTING, Supervisor Bulletin No. 55 BUILDING STONE OF WASHINGTON By WAYNE S. MOEN STATE PRINTING PLANT. OLYMPI A , WASHINGTON 1967 For sale by Department Pof? ceConsl]SliARYervation, Olympia, Washington. PACIFIC NORTHWEST FOREST AND RANGE EXPERIMENT STATION etnDTLAND. OR£00N CONTENTS Poge Introduction 7 General history .. ...... ...........................•............ 8 Production and vo lue . 10 Forms of building stone . 12 Field stone . 12 Rough building stone . 13 Rubble . • . 14 Flogging (flagstone) . 14 Ashlar . .. ......... ........ , ................. , . , . 15 Crushed stone . 16 Terrozzo . 17 Roofing granules.............. .... ..... ......... 18 Exposed aggregate . 18 Reconstituted stone . • . 19 Landscape rock . 20 Area coverage of bui Iding stone . 21 Acquisition of bui )ding stone . 22 Examination of stone deposits . 23 General quarrying methods . 24 Physical properties of building stone . 26 Strength . 26 Hardness and workabi Iity . • . 27 Color . 28 Alteration ....•...................... , ........... , . 29 Porosity and absorption ...........•. : . 31 Testing of building stone... .. .................... ................ 33 Common building stones of Washington . 34 Granite . 35 Geology and distribution . 35 Physical properties . 38 Varieties
    [Show full text]
  • How to Build a Dry Stone Wall an Instructional Guide for Beginners
    Do- It-Yourself: How to Build a Dry Stone Wall An instructional guide for beginners © Copyright Stephen Burton and licensed for reuse under this Creative Commons License. By: Stephen T. Kane Table of Contents: INTRODUCTION………………………………………………….3 TOOLS, EQUIPMENT, AND SUPPLIES………………………4 GROUNDWORK…………….…………………………………….7 FOUNDATION…………………………………………………….8 COURSING.…………………………………………………………9 COPING.……………………………………………………………10 GLOSSARY………………………………………………………..11 Introduction: Whether for pure aesthetics or practical functionality, dry stone walls employ the craft of carefully stacking and interlocking stones without the use of mortar to form earthen boundaries, residential foundations, agricultural terraces, and rudimentary fences. If properly constructed, these creations will stand unabated for countless years, requiring only minimal maintenance and repairs. The ability to harness the land and shape it in a way that meets one’s needs through stone walling allows endless possibility and enjoyment after fundamental steps and basic techniques are learned. How to Build a Dry Stone Wall provides a comprehensive reference for beginners looking to start and finish a wall project the correct way. A list of essential resources and tools, a step-by-step guide, and illustrations depicting proper construction will allow readers to approach projects with a confidence and a precision that facilitates the creation of beautiful stonework. If any terminology poses an issue, simply reference the glossary provided in the back of the booklet. NOTE: Depending on property laws and building codes, many areas do not permit stone walls. Check with respective sources to determine if all residential rules and regulations will abide stonework. Also, before building anything on a property line, always consult your neighbor(s) and get their written consent.
    [Show full text]
  • Improving the Seismic Performance of Stone Masonry Buildings
    A TUTORIAL: Improving the Seismic Performance of Stone Masonry Buildings Jitendra Bothara • Svetlana Brzev First Edition, July 2011 A TUTORIAL: Improving the Seismic Performance of Stone Masonry Buildings Jitendra Bothara Svetlana Brzev First Edition, July 2011 Publication Number WHE-2011-01 © 2011 Earthquake Engineering Research Institute, Oakland, California 94612-1934. All rights reserved. No part of this book may be reproduced in any form or by any means without the prior written permission of the publisher, Earthquake Engineering Research Institute, 499 14th St., Suite 320, Oakland, CA 94612-1934. This tutorial is published by the Earthquake Engineering Research Institute, a nonprofit corporation. The objective of the Earthquake Engineering Research Institute is to reduce earthquake risk by advancing the science and practice of earthquake engineering by improving understanding of the impact of earthquakes on the physical, social, economic, political, and cultural environment, and by advocating comprehensive and realistic measures for reducing the harmful effects of earthquakes. Production of this tutorial has been supported in part by generous contributions from the New Zealand Society for Earthquake Engineering and the Earthquake Engineering Center of the University of Engineering and Technology, Peshawar, Pakistan. This tutorial was written and reviewed by volunteers, all of whom participate in EERI and IAEE’s World Housing Encyclopedia project. Any opinions, findings, conclusions, or recommendations expressed herein are the authors’
    [Show full text]
  • DRY STONE WALLS Fig
    INFORM DRY STONE WALLS Fig. 1: Two regional variations showing how local geology influences walling style. Composition of dry stone walls DRY STONE WALLS Dry stone construction is an ancient This INFORM guide aims to broaden building technique, where the walls are the awareness of the importance constructed from carefully positioned and complexity of dry stone walling interlocking stones placed on top of in Scotland, and it outlines common each other without the use of mortar. causes of deterioration and the Pressure from the stones at the top maintenance required to prolong the and the way the stones are interlocked life of such walls. ensures the self-supporting stability of the wall. However, there is more to the Dry stone walls, or drystane dykes as construction of a dry-stone wall than known in Scotland, are an integral part randomly setting stone upon stone; of the built heritage and landscape the skill required to properly construct of Scotland. They perform several a wall without mortar that will last for functions, such as to delineate several hundred years is considerable. boundaries, to corral livestock and to provide shelter for wildlife. Despite The construction of the wall depends the many thousands of miles of dry on the quantity and types of stone stone walling which can be seen available. Although today it is possible forming field boundaries and related to source quarried stone, walls would structures, it is a much neglected have originally been constructed with and misunderstood part of the built stones found on local ground. There heritage. Both their construction are regional variations in the type of and repair are complex tasks that stone used for dry stone walls, as the should not be undertaken lightly; It local geology varies from one place is recommended that any large-scale to another, dictating the shape and repair is performed by a competent or size of available stone, as well as the accredited dyker.
    [Show full text]
  • Seismic Performance of Rock Block Structures with Observations from the October 2006 Hawaii Earthquake
    4th International Conference on Earthquake Geotechnical Engineering June 25-28, 2007 SEISMIC PERFORMANCE OF ROCK BLOCK STRUCTURES WITH OBSERVATIONS FROM THE OCTOBER 2006 HAWAII EARTHQUAKE Edmund MEDLEY 1, Dimitrios ZEKKOS 2 ABSTRACT Unreinforced masonry construction using blocks of rock is one of the oldest forms of building, in which blocks are stacked, sometimes being mortared with various cements. Ancient civilizations used locally available rocks and cements to construct rock block columns, walls and edifices for residences, temples, fortifications and infrastructure. Monuments still exist as testaments to the high quality construction by historic cultures, despite the seismic and other potentially damaging geomechanical disturbances that threaten them. Conceptual failure modes under seismic conditions of rock block structures, observed in the field or the laboratory, are presented. A brief review is presented of the damage suffered by the culturally vital Hawaiian Pu’ukoholā and Mailekini Heiaus, rock block temples damaged by the Mw 6.7 and 6.0 earthquakes that shook the island of Hawaii on October 15, 2006. Keywords: rock block structures, Hawaii earthquakes, earthquake observations, geomechanical failures INTRODUCTION Construction of unreinforced masonry is common in various earthquake-prone regions, particularly in developing countries, and rural areas of developed countries. This vulnerable type of construction is susceptible to often devastating damage, as evident from the effects of the 2001 Bhuj, India earthquake (Murty et al. 2002), where 1,200,000 masonry buildings built primarily based on local traditional construction practices, either collapsed or were severely damaged. Buildings constructed with adobe and unreinforced masonry suffered devastating damage in the Bam, Iran 2003 earthquake (Nadim et al.
    [Show full text]
  • Technological Features in Greek Fortifications in Sicily
    ________CIPA 2005 XX International Symposium, 26 September – 01 October, 2005, Torino, Italy________ TECHNOLOGICAL FEATURES IN GREEK FORTIFICATIONS IN SICILY F. Scalisi DPCE, University of Palermo,Viale delle Scienze, 90128 Palermo, Italy – [email protected] KEY WORDS: Archaeology, Fortifications, Masonry, Typology, Preservation ABSTRACT In a historical framework archaeological structures surely occupy a position of some prominence; apart from their enormous importance from a historical and artistic point of view, they possess structural elements made from materials that are worth studying, analysing and restoring. This paper has been prompted by research that is still being carried out, and whose aim is the examination of the wall-structures of fortifications to be found in the archaeological sites of Greek Sicily. For this purpose, great importance was given to survey of the parameters of the wall that distinguish such structures, for a better understanding of the construction and technological process of the past. 1. INTRODUCTION is for this reason that sculptural and pictorial representations have often portrayed the fortifications as a symbol of the cities. It is known that the defensive works of some Sicilian cities in These monuments represent very complex architectonic beings, Magna Grecia, such as Naxos, Lentini, Megara Iblea, Selinunte, more so, as a result of their remarkable extent and resultant date back to the Archaic Era. Most of them date back to the end difficulty in having a more unified and total vision of the of the sixth century B.C. and are closely connected to the tyrants monuments. Unlike single monuments, that are clearly located age. Nevertheless, some of the towns, such as Camarina and in a circumscribed area, the fortifications are often positioned Selinunte, present fortifications that date slightly earlier, in the outside the circuit of the archaeological site; here lies the middle of the sixth century B.C.
    [Show full text]
  • Windsor Castle Site Visit Workbook
    Windsor Castle School ……………………………………………………. Answer Booklet In the Footsteps of Medieval Kings Site Visit Workbook You will need: • Weather appropriate clothing • Sensible shoes • Site visit workbook • Pen and pencil • Packed lunch • Water Security at Windsor Castle Windsor Castle is a working royal palace • On arrival, you and your belongings will be subject to airport-style security checks. Please try to bring as little as possible with you as it will help you to get through security screening more quickly. • Eating and drinking are not permitted in the State Apartments or St George’s Chapel. You will be asked to place drinks and food in closed bags before being admitted to the Castle. • Photography and filming are not permitted inside the State Apartments, the Semi-State Rooms or St George's Chapel. • Large backpacks are not permitted in the State Apartments and must be checked in. What do you know about Windsor Castle and its use today? Windsor Castle is: • oldest and largest inhabited castle in the world. • one of the Queen’s Official Residences, which include Buckingham Palace, in London and The Palace of Holyroodhouse, in Edinburgh. • home to over 40 British Kings and Queens in its 900 year history • never been allowed to fall into disrepair or become a ruin. Windsor Castle was built in about 1080, for William the Conqueror. Why did William build castles to live in? William was a French Nobleman, Duke of Normandy, promised the crown of England by the King at the time Edward I, but when the King died he named his successor as Harold.
    [Show full text]
  • Historic Stone Highway Culverts in New Hampshire Asset Management Manual
    Historic Stone Highway Culverts in New Hampshire Asset Management Manual Prepared for: New Hampshire Department of Transportation, Bureau of Environment, Concord. Prepared by: Historic Documentation Company, Inc., Portsmouth, RI September 2009 TABLE OF CONTENTS 1.0 INTRODUCTION .........................................................................................................1 1.1 Purpose......................................................................................................................1 1.2 Why Preserve Historic Stone Culverts .....................................................................2 2.0 IDENTIFYING HISTORIC STONE CULVERTS.......................................................4 2.1 General Information .................................................................................................4 2.2 New Hampshire Stone Culverts................................................................................7 2.3 Stone Box Culverts ...................................................................................................8 2.4 Stone Arch Culverts................................................................................................14 3.0 MAINTAINING HISTORIC STONE CULVERTS ..................................................16 3.1 General Maintenance Discussion ...........................................................................16 3.2 Inspection & Maintenance Program ......................................................................17 3.3 Clear Waterway .....................................................................................................18
    [Show full text]