General Inspection Checklist

Total Page:16

File Type:pdf, Size:1020Kb

General Inspection Checklist

General Inspection Checklist

FOR

 Preliminary Inspection  Grading Inspection  R/W & Engineering Inspection  Final Plan Inspection

Filled out ( * items ) prior to the field inspection and cross off items not applicable.

Date & Time of Inspection: ______

Location of Inspection: ______

Project Number:

______

Inspection Personnel: ______

______

______

______

______

______

______

______

______

______

______

1 Issued Apr_ 2008 General Inspection Checklist

PROPOSED CONSTRUCTION

*A. This project is scheduled for the in ______(Month, Year)

*B. This project is due in the Check Squad ______(Month, Day, Year)

C. Are there special conditions affecting working time of scheduling.

D. Estimated Construction Cost $______

E. Are City and/or County agreements needed?  Yes

 No

F. Work to be done by City and/or County forces prior to, or during construction.

G. Maintenance responsibilities upon completion of project (City, County, or WYDOT)

EARTHWORK

*A. Soils Profile received:

 Yes

 No

*B. Clearing and Grubbing:

1.  ACRE  LS (Explanation required)

2. Clearing trees

(a.) Diameter

*C. Removal of Structures and Obstructions:

*1. Removal of ______

(a.) Method of Payment (List Quantity)

 EA  FT  SY  CY

2 Issued Apr_ 2008 General Inspection Checklist

 TON  LS  Subsidiary  Salvage Value (Approval

required)

(b.) Disposition

Excavation & Embankment:

*1. Borrow

Special

Excavation

 CY

TON 

None

*(a.) Location

*(b.) Ownership

*(c.) Agreement

*(d.) Samples submitted

 Yes

 No

(e.) Stripping overburden (May be used in fill where large quantity)

(f.) Haul roads

(g.) Haul type

3 Issued Apr_ 2008 General Inspection Checklist

CYMI  TMI

(h.) Dead haul

*2. Muck Excavation

(a.) Limits

(b.) Quantity

(c.) Waste area(s)

(d.) Haul distance

3. Rock Excavation

(a.) Blasting required

 Yes

 No

(b.) Special precautions

 Yes

 No

(c.) Use to

constru

ct

emban

kment

 Yes

4 Issued Apr_ 2008 General Inspection Checklist

 No

(d.) Suitable for riprap

 Yes

 No

(e.) Waste area(s)

(f.) Dead haul

(g.) Seismic velocities

(h.) Special techniques  Pre-splitting

 Cushion blasting

4. Unclassified Excavation:

(a.) Excavation below grade

(b.) Limits & location

(c.) Type backfill required

(d.) Quantity (CY)

5. Unclassified Excavation (Excess)

(a.) Quantity (CY)

(b.) Waste area(s)

(c.) Dead haul

6. Embankment Construction

(a.) Shrink factor Limits

(b.) Swell factor Limits

5 Issued Apr_ 2008 General Inspection Checklist

(c.) Additional embankments

 Approaches  Ditch berms  Dikes  Over-exc. backfill

7. Water (MG)

*(a.) Prewetting

 Yes

 No

*(b.) Estimated Quantity/CY ______Gal.

*(c.) Water source(s) ______

(d.) Dust control

 Yes

 No

Gal.______

8. Grade Line

(a.) Vertical control changes (List locations and reasons)

(1.)

(2.)

(3.)

(b.) Excavation below grade

(1.) Location

(2.) Reason

(3.) Type of material

6 Issued Apr_ 2008 General Inspection Checklist

(4.) Depth

(5.) Waste area(s)

(6.) Source of backfill

Old Road Obliteration:

. Location

. Method of measurement  CY

F. Turnouts:

. Mailboxes  Single

Double

Multiple

Cluster

Location(s)

. Scenic

. Schoolbus

G. Guardrail:

 Box

beam

 W-

beam

7 Issued Apr_ 2008 General Inspection Checklist

Cor-Tan

H. Topsoil and Seeding:

*1. Topsoil storing  CY

______

*2. Topsoil placing  CY

______

. Limits  Slope stake - slope stake

 R/W - R/W

. Depth

3. Topsoil borrow  CY ______

4. Seeding a. Limits b. Seeding recommendations from Environmental Services Prior to the Grading Inspection, a form ARequest for Seeding Recommendations@ should be obtained from the WYDOT agronomist. This form is to be filled out with the required information and returned to the agronomist for his/hers use in recommending seeding and erosion protection items for the project. This information should be conveyed to the Resident Engineer.

5. Landscaping SUB-BASE DESIGN

A. Overburden (all pits):

. Removal ______CY

. Placing ______CY

8 Issued Apr_ 2008 General Inspection Checklist

A. Sub-base:

*1. Pit name and/or location

*2. Agreement

*3. Samples submitted:

 Yes  No

4. Special provisions

5. Air quality permit required  Yes  No

6. Crusher Run  Yes  No Crushed  Yes  No Pit Run  Yes

 No

7. Haul  Yes

 No

 CYMI  TMI

BASE COURSE DESIGN

 Crushed  Cement Treated

 Emulsion

Stabilized 

Plant Mix Bit

*A. Pit name and/or location:

*B. Agreement:

9 Issued Apr_ 2008 General Inspection Checklist

*C. Samples submitted:

 Yes

 No

*D. Mineral filler location if required:

A. Lime:

A. Winter protection:

 Yes

 No

A. Special provisions:

A. Air quality permit

required:  Yes

 No

A. Haul:

 Yes

 No

 CYMI  TMI

SURFACING

 Plant Mix  Concrete  Wearing Couse

 Commercial Mix

*A. Pit name and/or location

*B. Agreement

10 Issued Apr_ 2008 General Inspection Checklist

*C. Samples submitted:

 Yes

 No

D. Lime

E. Concrete

1. Source

2. Fly Ash required  Yes  No

3. Placing of concrete and reinforcing

4. Finishing and finishing equipment

5. Joints and placement

E. Mineral filler location if required

F. Seal coat  Yes  No

1. Type  Fog 

Chip  Chip (Overshoot)

2. Shoulder widths  < 4 feet  > 4 feet

E. Blotter  Yes  No

Source:

 Ton  CY

F. Haul  Yes  No

 CYMI  TMI

G. Rumble strips required  Yes

11 Issued Apr_ 2008 General Inspection Checklist

 No

H. Special provisions

I. Air quality permit required  Yes

 No

APPROACHES AND CATTLEGUARDS

*A. Approaches

. Show locations on plans and list in summary form on R/W & Utility Plans

. Included approaches requested by entities B BLM, USFS, etc. ?

*B. Cattleguards

Station on plans Width

Cattleguard &

Type Description

1.

2.

3.

FENCING

. Types Station to Station

______

12 Issued Apr_ 2008 General Inspection Checklist

______

______

______

. Replace in kind

. Type

. Location: Station______to Station______

. Reset existing fence

*B. Special gates (> 16 feet wide B two gates will be required unless recommended

otherwise)

. Location

Type

Width

a.

b.

2. Replace in kind

Location

Type

13 Issued Apr_ 2008 General Inspection Checklist

Width

a.

b.

3. Remove and reset gates

Location

Type

Width

a.

b.

4. Remove existing gates

Location

Type

Width

a.

b.

C. Snow fence

 Reset Snow Fence  Snow Fence Repair  Snow

Fence (Wood)

14 Issued Apr_ 2008 General Inspection Checklist

(Panel lengths and height required for quantity computation) Pay unit = EA

DRAINAGE

A Minor drainage

1. Drainage surveys completed?

 Yes

 No

2. Alkali samples submitted?

 Yes

 No

3. Culvert Design System (CDS) runs complete  Yes  No

4. Erosion Control

Type:

Source:

B. Major Drainage

1. Drainage surveys competed?

 Yes

 No

2. Alkali samples submitted?

 Yes

15 Issued Apr_ 2008 General Inspection Checklist

 No

3. Structure selection complete?

 Yes

 No

4. Applications for required water quality certificates and permits submitted by Environmental Services  Yes  No

5. Erosion control

Type:

Source:

C. Storm Sewer

*1. Manholes

*2. Drop Inlets

D. Detention Ponds

E. Irrigation structures

1. Landowner contacted?

 Yes

 No

2. Private irrigation easement required?  Yes

 No

3. Separate contract with irrigation district to adjust ditches?

16 Issued Apr_ 2008 General Inspection Checklist

 Yes  No

4 Structure a. Location b. Type (concrete, wood, other) c. Drawing number (WYDOT)

5. Contract items (list)

 Force account  Lump sum

Subsidiary

F. Channel Changes

14248. Do proposed channel changes conflict with recent changes, additions or corrections to the plans?  Yes  No

If yes, explain:______

2. Is material usable for balancing?  Yes  No

3. Waste area. if required

4. Irrigation structures affected by channel changes?  Yes

 No

5. Should Ch.Ch. be fenced inside right-of-way?  Yes

 No

G. Subsurface pipe (Underdrain)

17 Issued Apr_ 2008 General Inspection Checklist

*1.  Recommended  Not

recommended

*a. Location

*b.

Size

*c.

Type

2. Waste area (Location)

3. Backfill material (Location)

H. Edge drain

*1.  Recommended  Not

recommended

2. Location

ENVIRONMENTAL CONSIDERATIONS

A. Wetlands

25256. Wetland encroachments

25257. Mitigation measures required

25258. Have wetland permit applications been made and approved by the Corps of Engineers?  Yes  No ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd

18 Issued Apr_ 2008 General Inspection Checklist

Any stipulations or changes required? eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee eeeeeeeeeeeeeeeeeeeeeeeeeeeeee. Have agreements been obtained from the landowner?

A. Additional Corp of Engineer Permits required

25936.  Rivers  Streams

 Drainages

A. Additional permit requirements

26280. DEQ - Air quality permits

26281. DEQ - NPDES permit nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn

19 Issued Apr_ 2008 General Inspection Checklist

Has plan been completed for:

 Roadway  Pit and plan sites ooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo ooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo ooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo ooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo ooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo ooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo ooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo ooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo ooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo ooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo ooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo ooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo ooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo ooooooooooooooooooooooooo. Responsibility

 Contractor  WYDOT

A. Archeological

clearances obtained

 Yes

 No

20 Issued Apr_ 2008 General Inspection Checklist

TRAFFIC

A. Detours

*1. Typical section

*2. Design speed

26282. Type of surfacing

26283. Special structures

26284. Method of payment

26285. Detour obliteration:

 Yes

 No nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn

21 Issued Apr_ 2008 General Inspection Checklist

Waste location

26286. Pipe Salvage llllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll llllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll llllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll llllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll llllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll llllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll llllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll lllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll. Location mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm

22 Issued Apr_ 2008 General Inspection Checklist

Disposition nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn. Estima ted quantity

B. Traffic will be carried through construction

28032. Temporary guardrail required  Yes

 No

2.

C. Temporary connections

*1. Was survey made?

23 Issued Apr_ 2008 General Inspection Checklist

 Yes  No

*2. Typical section

*3. Design speed

4. Type of surfacing

5. Method of payment

B. Traffic control:  Yes  No

40. Quantities obtained from Traffic design and field engineer

D. Temporary median cross-overs

*1. Location

*2. Drainage culvert size

E. Intersections or interchanges

*1. Location

*2. Special design

required?

 Yes

 No

3. Special recommendation by field

B. Traffic signals required?  Yes  No

C. Lighting

D. Service roads

*1. Locations (show on plans)

2. Inside of outside right-of-way

24 Issued Apr_ 2008 General Inspection Checklist

*3. Fence location

*4. Design a. Typical section

b. Sub-base:  Yes  No

Depth______

c. Base:  Yes

 No

Depth______

d. Plant mix  Yes  No

Depth______e. To be set up by Materials and Project Development

5. Method of payment

Excavation (include with balance?)  Yes

 No

Equipment hours

 Bulldozer  Motor Grader  Roller Type ______ Scraper  Truck 

Loader

Compaction

25 Issued Apr_ 2008 General Inspection Checklist

RIGHT-OF-WAY

A. Section ties complete  Yes

 No

A. LUCO and LUFJ complete

 Yes

 No

A. Recommended changes since previous inspection (show on plans)

A. Additional topography (show on plans)

A. Recent ownership changes that would affect design (show on plans)

A. Construction permits

UTILITIES

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXX. Recent utility changes (show on plans)

*B. Private utilities to be set up in contract

2432. Location

a.

b.

2433. Contract item

 FA  LS

 Unit

26 Issued Apr_ 2008 General Inspection Checklist

SPECIAL PROVISIONS

Sequence of work, etc

MISCELLANEOUS ITEMS

*A. Historical signs, markers & monuments

3112. Location

3113. Disposition

*B. Turnouts and rest areas -- show on plans and explain

Median cross-overs -- show location on plans and explain

Special design items

*1. Retaining walls

*2. Wells

*3. Sewage systems

*4. Crops involved  Yes

 No

Special precautions  Yes  No

*6. Picnic Facilities

*7. Curb & Gutter

Type  A  B

 C

*8 Double gutter

*9 Sidewalks

27 Issued Apr_ 2008 General Inspection Checklist

*10 Median paving

11. Climbing lanes

28 Issued Apr_ 2008

Recommended publications