Enter Organization Name

Enter Project Name Iterative Rollout Plan Approval Signatures

Name: Name: Title: Title:

Name: Name: Title: Title:

Name: Name: Title: Title:

Name: Name: Title: Title:

Name: Name: Title: Title:

Prepared by: Version: Date:

Project Board: Sponsor: Customer Representative: Technical Representative: Enter Project Name Iterative Rollout Plan Enter Organization Name Document History

Reviewed By Organization Person

Copied To Organization Person

Revision Record Number Date and Sections Notes

0a3ef863f0116b0f985acda3bda22876.doc iii 1/9/18 Acronyms

Acronym Description

0a3ef863f0116b0f985acda3bda22876.doc iv 1/9/18 References

Document Title File Name

0a3ef863f0116b0f985acda3bda22876.doc v 1/9/18 Table of Contents

1. INTRODUCTION 1

1.1 Document Purpose 1 1.2 Document Organization 1 1.3 Project Deliverable Roles 1 1.4 Related Documents 1

2. ITERATION SCOPE AND OBJECTIVES 2

3. ITERATION ACTIVITY PLAN 2

4. ROLLOUT WORK BREAKDOWN STRUCTURE (DETAILED) 4

5. APPENDICES 5

5.1 Related Work Papers 5 5.2 REVISION HISTORY 5

6. GLOSSARY 5

0a3ef863f0116b0f985acda3bda22876.doc vi 1/9/18 1. INTRODUCTION

1.1 Document Purpose The purpose of this document is to provide a clear definition of the work to be carried out in each rollout iteration of the current increment of the Enter Project Name project.

1.2 Document Organization The document contains an initial section listing the main characteristics of all the planned rollout iterations for the current increment.

1.3 Project Deliverable Roles The people listed below will receive a copy of the Iterative Rollout Plan deliverable. See the Project Work Plan for a description of the roles of the Creator, Reviewers, and Acceptor/Approvers.

This list is current as of January 9, 2018.

Creator Organization Name

Reviewers Organization Name

Acceptor/Approvers Organization Name

1.4 Related Documents

2. ITERATION SCOPE AND OBJECTIVES

The following table contains the plan for the number of iterations for the rollout of the new technology: the scope of each iteration (functions, entities, etc.) covered, the objectives of each iteration (first pass, final pass, etc.), and the estimated duration. Iteration Scope Iteration Objectives Duration Number

3. ITERATION ACTIVITY PLAN The following table contains the plan for the activities and individuals involved in each activity required to execute each iteration.

Iteration Activities Persons Responsible Duration

0a3ef863f0116b0f985acda3bda22876.doc 1 1/9/18 Number

0a3ef863f0116b0f985acda3bda22876.doc 2 1/9/18 Activity Selection and Planning Table Iteration #1 Iteration #2 Iteration #3 Iteration #4

4. ROLLOUT WORK BREAKDOWN STRUCTURE (DETAILED) ID Task Duration Start Finish Resources

5. APPENDICES

5.1 Related Work Papers These work papers were used as inputs to this deliverable:

Work Paper/Products Location

5.2 REVISION HISTORY The following table shows the history of revisions that have been made to this document.

Date Description Person Responsible

6. GLOSSARY A standard glossary of terms, including the names of all Best Practices Process Library methodologies and stages, is included in the standard Glossary. This section defines additional terms, including those specific to this business or project. Term Definition

0a3ef863f0116b0f985acda3bda22876.doc 3 1/9/18