Progress Towards Data Synchronisation
Total Page:16
File Type:pdf, Size:1020Kb
FONT IPBPM shift plan for early first week February 2016 Neven Blaskovic & Talitha Bromwich
Baseline noise floor Jitter run with 70dB attenuation 5 m
Symmetric mode study
Access to replace hybrids with power splitters on IPA, IPB and IPC (ZX10R-14-S+ DC to 10,000 MHz). 15 minutes Centre beam as best as possible in all three BPMs. 5 minutes 1 h Take simultaneous waveforms on all BPMs at different charges. 0.05 to 0.7 x 1010 in steps of 0.05 at 0dB. Jitter runs of 100 triggers. 15 minutes Jitter run with 70dB attenuation at a charge of ~ 0.4 x 1010. 5 minutes
Single port study (2 ports on separate electronics) – IPA Access to send 2 ports of IPAY through IPA and IPB electronics. 15 minutes Beam waist on IPA (144A at QD0FF). Roughly centre the beam in IPA. Charge ~ 0.4 x 1010. Operate at 30dB attenuation. 5 minutes Jitter run. 5 minutes Wide-range (±4V) calibration scan (11 mover steps, 25 triggers per step) x 4. 16 minutes 2 h Access to switch electronics. 10 minutes Calibrate x 4. 16 minutes Access to switch electronics. 10 minutes Calibrate x 4. 16 minutes Access to switch electronics1. 10 minutes Calibrate1 x 4. 16 minutes
Single port study (2 ports on separate electronics) – IPB Repeat for 2 ports of IPBY through IPA and IPB electronics. 2 h Beam waist on IPB (137A at QD0FF).
Single port study (2 ports on separate electronics) – IPC Repeat for 2 ports of IPCY through IPA and IPB electronics. 2 h Beam waist on IPC (123A at QD0FF). Roughly centre the beam in IPC.
Access for hardware changes and set-up for next shift Access to return to normal IP BPM set-up. Swap FONT5 to FONT5A board (instrumenting P2, P3 & MFB1FF). 1 h Remove ZPULs. Remove 6dB attenuation from MFB1FF. 1 Optional FONT upstream feedback shift plan for late first week February 2016 Glenn Christian, Neven Blaskovic & Talitha Bromwich
1 bunch mode Set trim DACs Set scan delays Set bunch strobes Set LO phase shifter Centre BPMs 2 h Check scan delays Check bunch strobes ±10° phase scan BPM mover scan Jitter run – resolution?
2 bunch mode Jitter run – bunch-to-bunch correlation? 1 h If poor, consider extraction kicker timing scan and/or bunch separation scan Check kicker timing K1 kicker scan K2 kicker scan2 2 h K1-P2 latency scan (constant DAC mode) – K1 bunch strobe select off? K1 & K2 coupled loop latency scan (constant DAC mode)1 K1-P2 single-loop feedback run using nominal gain (including long run) K1-P2 single-loop feedback run scans: o Incoming beam orbit scan (‘T-shirt plot’) 3 h o BPM mover scan o Feedback gain scan
2 Optional as it involves coupled-loop feedback Other items
Progress towards data synchronisation
Add upstream FONT5 board and SIS digitiser EPICS timestamps to data file
SIS digitiser sample jumps
Monitor SIS digitiser sample jumps
Discuss issues with ATF staff
IP BPM mover system
Address issues with LAL and ATF colleagues:
o Discontinuities in I and Q signals during mover scans that make it difficult to calibrate at low attenuations
o Variable numbers of triggers per mover step in the AB mover
o Noise on the C mover voltage read backs