Submit Button for Eplan Users Only

Total Page:16

File Type:pdf, Size:1020Kb

Submit Button for Eplan Users Only

Submit button for ePlan Users Only SHUTTER / WINDOW / DOOR/ PERMIT APPLICATION

Residential Commercial Property Owner: Permit #: Strap#: Lot: Block: Unit: Job Address: Subdivision: Directions:

Contractor Business Name / Applicant Name: License #:

Phone #: Email: Construction Value: $ Electric Required: No Yes, a separate electric sub-permit will be required. Description of work: Are you using Private Provider services for Plan Review? No Yes Inspections? No Yes

If construction value exceeds $2500 a building permit addendum and notice of commencement will be required. A condo association letter must be submitted if the windows / shutters are being installed on a condo. APPLICATIONS FOR SHUTTERS must include a completed shutter worksheet for the type of covering that will be used. You may obtain a copy of the shutter worksheet online at: h t tp : // l e e go v . c o m/ d c d / Bl dP er m itSer v / A pp s P r o c d / sh u t w i n d req APPLICATIONS FOR WINDOWS / DOORS Note: If the window / door replacement is not size for size please use the Residential permit application.

Note: SHGC value must be less than or equal to 0.25. *U-Factor and Orientation (N, S, E or W) required on Commercial Buildings 4 stories or greater and will require Plan Review. Select one of the following: (compliance with table R402.1.2 of the 6th Edition (2017) Florida Building Code) Complying with Complying with Lee County’s Master Calculations, WINDMSTR01 (can only be used for window replacements less than or equal to 60ft high.) Providing Individual Calculations Providing Individual Engineering

FLOOR PLANS: All applications must include three (3) copies of the floor plan indicating all openings which will be affected by shutter/ window installation and the expected means of escape (egress). The affected openings must be numbered in accordance with this application and/or the shutter worksheet. If electric shutters are installed a separate electric sub-permit will be required. ENGINEERING If the product does not have an active FL# or NOA# it must be submitted with three copies of engineered details showing compliance with the 6th Edition (2017) Florida Building Code. THIS PERMIT IS VOID IF THE FIRST INSPECTION IS NOT MADE WITHIN SIX (6) MONTHS FROM THE DATE ISSUED OR IF NO INSPECTION HAS BEEN MADE FOR A PERIOD OF SIX (6) MONTHS FROM THE MOST RECENTLY PASSED INSPECTION. THE PERMIT IS VOID IF THE ZONING CLASSIFICATION IS VIOLATED. APPLICANT AGREES TO COMPLY WITH THE SANITARY REGULATIONS AND UNDERSTANDS THAT THE PROPOSED STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL AN APPROVED CERTIFICATE OF OCCUPANCY IS ISSUED. APPLICANT FURTHER UNDERSTANDS THAT FAILURE TO OBTAIN PERMIT OR MISREPRESENTATION OF THE IMPROVEMENTS IS A MISDEMEANOR AND UPON CONVICTION, APPLICANT CAN BE PUNISHED AS PROVIDED BY THE LAW. FAILURE TO COMPLY WITH THE MECHANICS LIEN LAW CAN RESULT IN THE PROPERTY OWNER PAYING TWICE FOR IMPROVEMENTS. I HEREBY CERTIFY THAT TO THE BEST OF MY KNOWLEDGE, THE INFORMATION SUBMITTED FOR THIS PERMIT IS TRUE & CORRECT, & COMPLIES WITH DEED OF RESTRICTIONS.

Signature Authorization: Date: Print Name (Required for hand signatures only): ______Web/ShutterApp (3/2018) BUILDING PERMIT APPLICATION ADDENDUM THIS ADDENDUM MUST BE COMPLETED IF CONSTRUCTION VALUE IS $2500.00 OR MORE

Fee Simple Titleholder’s Name (if other than owner):

Fee Simple Titleholder’s Address:

Bonding Company:

Bonding Company Address:

Architect/Engineer’s Name:

Architect/Engineer’s Address:

Mortgage Lender’s Name:

Mortgage Lender’s Address:

1This application is for a permit to do the work and installation indicated. No work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for (ELECTRICAL WORK, PLUMBING, SIGNS, WELLS, POOLS, FURNACES, BOILERS, HEATERS, TANKS AND AIR CONDITIONERS, ETC.)The foregoing information is accurate, the county has been advised of all easements on the property and all work will be done in compliance with all applicable laws regulating construction and zoning.

Under penalties of perjury, I declare that I have read the foregoing Building Permit Application Addendum and that the facts stated in it are true. Name: Date:

Web/BuildingPermitApplicationAddendum (5/2017)

Recommended publications