State of New Hampshire s2

Total Page:16

File Type:pdf, Size:1020Kb

State of New Hampshire s2

STATE OF NEW HAMPSHIRE DEPARTMENT OF ADMINISTRATIVE SERVICES BIDS WERE OPENED ON THE 16TH DAY OF MARCH, 2006 FOR HAMPTON BEACH SEA WALL & RAIL REPAIR, ROUTE 1-A, HAMPTON, NH PROJECT NO. 80236R COMPLETION DATE: MAY 25, 2007 A. B. C.

ITEM NO. ITEM QUANTITIES UNIT TOTAL UNIT TOTAL UNIT TOTAL

1 SECTION 1: SEA WALL 500 FEET $382.00 $191,000.00 $818.74 $409,370.00 $800.00 $400,000.00 PILASTER & COPING, ALUMINUM RAIL REPLACEMENT 2 SECTION 2: THERMOPLASTIC 5200 FEET $116.00 $603,200.00 $167.90 $873,080.00 $140.00 $728,000.00 RAIL REPLACEMENT & CONCRETE REPAIRS 3 CLASS I CONCRETE SEA WALL 500 SQ. $195.00 $97,500.00 $329.58 $164,790.00 $400.00 $200,000.00 REPAIRS FEET 4 CLASS II CONCRETE SEA WALL 1600 SQ. $260.00 $416,000.00 $190.99 $305,584.00 $500.00 $800,000.00 REPAIRS FEET 5 SECTION 3: RESET STAIRWELL 3 UNITS $24,000.00 $72,000.00 $27,495.31 $82,485.93 $10,000.00 $30,000.00 FOUNDATION 6 REPOSITION GRANITE SHORE 200 UNITS $260.00 $52,000.00 $285.63 $57,126.00 $200.00 $40,000.00 BLOCKS RANGING BETWEEN 1 & 5 TONS EACH 7 SECTION 3: ADA RAMP RAIL 1 UNIT $12,500.00 $12,500.00 $19,020.00 $19,020.00 $15,000.00 $15,000.00 REPLACEMENT 8 ALLOWANCE FOR SHORELINE 1 ALLOW- $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 CLEANUP ANCE 9 ALLOWANCE FOR UNFORSEEN 1 ALLOW- $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 CONDITIONS ANCE BASE BID LUMP SUM FOR ITEMS 1 $1,594,200.00 $2,061,455.93 $2,363,000.00 THROUGH 9

A. R.S. Audley, Inc., 609 Rte. 3A, Bow, NH 03304 B. Turnstone Corporation, 51 Franklin Street, Milford, NH 03055-3705 C. E.D. Swett, Inc., 8 Industrial Park Drive, Concord, NH 03301

Recommended publications