Me-437 Pipeline Engineering
Total Page:16
File Type:pdf, Size:1020Kb
ME-437 PIPELINE ENGINEERING Fall 2011
NAME OF THE PROJECT (UTILIZED SYSTEM) (PROGRAMMING LANGUAGE)
Supervised by: Dr. Ekin BİNGÖL
Assistant Alp Emre Öngüt
Prepared by (Name of the participant)
METU DATE ANKARA, TURKEY ME-437 PIPELINE ENGINEERING PROJECT FORMAT
-Title Page (see exemplary title page) -Introduction -Problem Definition o Map o Physical Properties of Fluid o Flowrate Distribution along Pipe -Design Methodology o Definition of Optimization Problem o Definition of Pipeline Design o Definition of Pump Selection o Definition of Objective Function -Design Iteration using Design Capacity as Main Flow Rate (Show all calculations) o Selection of Pipe Diameter and Thickness o Calculation of Friction Factor o HGL and MAOP for each iteration o Cost Calculations and Table Showing Cost Optimization -Pump Selection -Map of Final Design (Topography, HGL, places and specifications of pump stations) -Manipulation of Pumps for Operating Conditions (i.e. due to flow rate distribution) -Map of Off-Design Operating Condition (Topography, HGL, places and specifications of pump stations) -Conclusion and Recommendations for Future Work -References -Appendices o Supply all information you have utilized during design in forms of figures and tables o Cost Tables and Functions o Pump Specifications (Showing operating points for each pumps) o API table used in the necessary range o ……. Electricity Cost : 0.07 $/kW-h Total Life : 25 years Interest Rate : 0.1 Electricity Demand Charge : 5 $/kW-month
Pipeline Construction Costs ($)
Factor for Wrap Type of Diameter Basic Const. Cost Basic Wrap Cost Diameter Cost Condition (inch) ($/m) ($/m) ($/m) 12 40.80 0.50 12.00
24 81.60 1.00 24.00
Unmade 24.00 30 102.00 1.25 30.00
36 122.40 1.50 36.00
12 48.00 0.50 12.00
24 96.00 1.00 24.00
Agricultural 24.00 30 120.00 1.25 30.00
36 144.00 1.50 36.00
12 60.00 0.50 18.00
24 120.00 1.00 36.00
Rock 36.00 30 150.00 1.25 45.00
36 180.00 1.50 54.00
12 108.00 0.50 24.00
24 216.00 1.00 48.00
Swamp 48.00 30 270.00 1.25 60.00
36 324.00 1.50 72.00
12 216.00 0.50 24.00
24 432.00 1.00 48.00
Sea 48.00 30 540.00 1.25 60.00
36 648.00 1.50 72.00
Pipeline Material Costs ($) Pipe Wall Pipe Line Bend Location Diameter Pipe Cost Grade Thickness Weight Cost Class (mm) (mm) (Kg/m) ($/m) ($/m) 300 X42 6.40 49.68 34.77 1.74
400 X52 6.40 62.58 43.81 2.19
450 X46 7.90 87.71 61.40 3.07 Class 1 500 X52 7.90 97.63 68.34 3.42
600 X52 9.50 140.81 98.57 4.93
900 X56 12.7 282.12 197.48 9.87
300 X46 6.40 49.68 34.77 1.74
400 X60 6.40 62.58 43.81 2.19
450 X52 7.90 87.71 61.40 3.07 Class 2 500 X60 7.90 97.63 68.34 3.42
600 X60 9.50 141.26 98.88 4.94
900 X65 12.7 282.12 197.48 9.87
300 X42 9.50 73.76 51.63 2.58
400 X46 9.50 93.13 65.19 3.26
450 X52 9.50 105.05 73.54 3.68 Class 3 500 X60 9.50 116.97 81.88 4.09
600 X52 12.70 186.75 130.73 6.54
900 X65 15.90 351.41 245.99 12.30
300 X42 12.70 97.36 68.15 3.41
400 X46 12.70 123.18 86.22 4.31
450 X52 12.70 139.07 97.35 4.67 Class 4 500 X56 12.70 154.97 108.48 5.42
600 X65 12.70 186.75 130.73 6.54
900 X65 19.10 420.19 294.14 14.71 A PRACTICAL WAY OF CALCULATING THE WEIGHT OF LINE PIPES
W= (OD-WT) x WT x 0.02466 OD : mm WT : mm W : kg/m
COST OF LINE PIPE
MATERIAL SPECIFICATION CBP (USD/ kg) X42 0.56 X46 0.58 X52 0.60 X56 0.62 X60 0.64 X65 0.66
COST OF PE COATING
CPE=12 USD/m2
COST CALCULATION OF LINE PIPE
CO= (W x CBP) + [(OD/318) x CPE]
EXAMPLE Calculate the cost of 1 meter, X52 grade, line pipe with an outer diameter of 24 inches and a wall thickness of 11.1 millimeters using practical weight calculation formula. SOLUTION OD = 610 mm WT = 11.1 mm CBP=0.60 USD/kg CPE=12USD/kg W = (610-11.1) x 11.1 x 0.02466=163.93 kg/m CO = (163.93 x 0.60) + [(610/318) x 12] CO ≈ 121.4 USD