CORRIGENDUM FOR TENDER NO : EOT/COMM/12-13/030 dtd: 23.11.2012 FOR : SUPPLY, INSTALLATION AND COMMISSIONING OF SERVERS, L3 MANAGED SWITCH, ON-LINE UPS, LTO TAPE DRIVE, LTO CARTRIDGE & IMPLEMENTATION OF LAN AT FIVE MUNICIPALITIES FOR KUSP.

Sl. As in Tender Document To be read as No. A. TENDER SUBMISSION DUE DATE: TENDER SUBMISSION DUE DATE: 10/12/2012 (15.00 Hrs.) 12/12/2012 (15.00 Hrs.)

B. TENDER OPENING DUE DATE: TENDER OPENING DUE DATE: 10/12/2012 (16.00 Hrs.) 12/12/2012 (16.00 Hrs.)

C. Page No.: 20; SERVICE LEVEL (APPLICABLE FOR ALL SUPPLIES)

(to be READ as follows)

 SERVICE LEVEL (APPLICABLE FOR ALL SUPPLIES)

The average uptime averaged over each quarter should be as follows: -

Resolution Up time (**) Machine location Time Penalty requirement Requirement Kolkata Urban Services for the Poor, Change Proportional extension of warranty Management Unit, beyond the scheduled 60 months Govt. of West Bengal, (including battery of UPS) for the ILGUS Bhavan, As specified 99.0% entire system calculated on the HC-Block, Sector-3, above warranty support short coming of Bidhannagar, the worst support figure of any Kolkata- 700 106. individual item *

** Service up time calculation shall exclude any down time due to mutually agreed planned maintenance or any force majeure condition D. Page No.: 20; POINT NO. 14, SECURITY DEPOSIT

(to be READ as follows)

14. Security Deposit

Security of 10 (Ten) % of the total order value to be submitted in the form of Bank Guarantee within 14 days of LOI. Penalty of 0.5% of the System cost beyond the maximum permitted down time will be deducted from this SD. This SD will only be released after the completion of warranty period, if the vendor/ contractor submits the satisfactory after sale service certificate from the end customer. If the bidder fails to meet the delivery schedule, WBEIDC reserves the right to forfeit its PBG deposited as security deposit. Overall LD + penalty will not exceed 10% of the contract value i.e. 10% security deposit.

E. Page No.: 27; SECTION - F, BILL OF QUANTITY

(to be READ as follows)

BILL OF QUANTITY:

Sl No. Item Model no. Tentative Quantity 1 Server - 02 Nos. 2 24 Port L3 Managed Switch - 01 No. 3 10 KVA On Line UPS in dual redundant - 1 Set mode (1+1) 4 LTO-5 Tape Drive along with basic - 01 No. Backup software with capability to take backup of open files 5 LTO -5 Cartridge - 03 Nos. 6 LAN items for 5 Municipalities a) Supply of UTP cables - 250 Mtrs. b) Laying of UTP cables to connect - 250 Mtrs switch of the ULB with switch of the respective WBSWAN node. c) Termination of cable: - 5 Locations Terminating the cable at one end, existing core switch of the respective ULBs and the other end, the INVC router, both through patch panel. d) Supply and installation of 2 mtrs patch - 22 Nos. cord (12 Nos. to be delivered in ILGUS Bhavan & 10 Nos. in 5 Locations) e) Supply and installation of 3 mtrs patch - 10 nos cord at ILGUS Bhavan. 7 Server virtualization software (optional) - 1 no

Note: Server virtualization software to be quoted as a separate optional item with price. However the same will not be considered for price evaluation. F. Page No.: 27; SECTION - F, ITEM – 1, TECHNICAL SPECIFICATIONS FOR SERVER

(to be READ as follows)

TECHNICAL SPECIFICATIONS:

1. SERVER: QNTY. – 02 Nos. No. 1 Total no. of Servers 2 nos. 2 Processor type 64 bit multi core x86 CPU Intel Xeon E5-2640, 2.4 GHz or exact functional equivalent or higher 3 No. of cores 8 cores per processor

4 Cache per processor 20 MB/per processor

5 No of processor / server 2 Processors

6 RAM DDR III – 256 GB per server

7 HDD 6 x 300 GB HDD or higher with SAS interface with RAID 1,5 configuration 8 Networking 4 no 10/100/1000 Base TX Ethernet Interface

9 Optical Drive DVD R/W Drive

10 O/S support Certified with RHEL Server OS

11 O/S preloaded Preloaded 64-bit RHEL Latest Version with OEM support, updates, patches, upgrades for the entire contract/project period 12 Form factor * Rack mounted

13 USB port Minimum 3 nos with USB 2.0 or higher

14 Display/KB/Mouse 2 no each 17” LCD monitor/ 104 key keyboard/Optical Scroll mouse 15 KVM Switch 1 no KVM switch (4 ports) with cables 16 19” Server Rack 1 no. (to house 2 servers + switch) 19” Server Rack 36 U or higher fitted with Dual P.S. Rail and fan modules. Rack to be fitted with castors and mounting arrangements for server switch etc. The rack depth should be sufficient to allow server to operate with all door closed. One sliding tray for KBD and 2 fixed 19” trays should be provided for keeping monitor and LTO tape drive.

17 PC table 2 nos. PC tables

Servers should have the following mandatory features for better reliability, availability and performance. 1. Product quoted, including processor should be guaranteed for service availability from OEM for next 7 years and OEM support should be available during this period. 2. The quoted server should be equipped with processor of latest generation for the model. 3. RAM must have advanced memory error protection technology. 4. Redundant power supply and cooling fan for each rack mounted servers. 5. Each server should be capable of configured with high availability and have failover Server/partition through clustering solution. 6. Server management: Dedicated Baseboard Management Controller for system management functionality on every Server. 7. Server should be capable to communicate with existing CMU applications installed in the ULBs, running on RHEL AS4 update 4. 8. All servers should be capable of generating pre failure Alert relating to CPU, Memory, HDD, Power Supplies, etc The Pre-failure alert message should be used for preemptive replacement for alerted components to maintain the high uptime. 9. Servers should have international certification for EMI/EMC ( relevant FCC certification), safety certification (UL) etc

Servers should additionally have the following mandatory features for better reliability, availability and performance.

a) System should be capable of creating partitions with dedicated OS instance.

b) RAS features:  Processor: i. Multi-Core CPU ii. Alternate Processor Recovery iii. Support server virtualization

 Memory i. Address / control bus parity ii. Dynamic Memory Resiliency/ Guarding iii. ECC feature

G. Page No.: 32; SECTION - F, ITEM – 4, TECHNICAL SPECIFICATIONS FOR LTO-5 TAPE DRIVE

(to be READ as follows)

4. LTO-5 Tape Drive along with basic backup software with capability to take backup of open files:

H. Page No.: 32; SECTION - F, TECHNICAL COMPLIANCE (to be READ as follows)

TECHNICAL COMPLIANCE:

The bidder has to attach a technical compliance sheet in the following format:

Sl. Item Minimum Required Offered Complied/ No. Specification Specification downgraded/ upgraded 1 Server

2 24 Port L3 Managed Switch

3 10 KVA On Line UPS in dual redundant mode (1+1)

4 LTO-5 Tape Drive along with basic Backup software

5 LTO-5 Cartridge

6 LAN items for 5 Municipalities

I. Page No.: 33; SECTION - G, PRICE BID (to be READ as follows)

SECTION – G

PRICE BID

( Bidders have to submit the price bid strictly in this format , otherwise the bid will be rejected)

Ref . No. ( Mandatory) Date : ( Mandatory)

Tender for Supply, Installation of ------Tender No.------Dated------.

To, The G.M-Commercial, WBEIDC Ltd.

Dear Sir, In response to the above tender, we offer our price as below :-

Ser Ser Item Description vice Quantity vice ( with Make & Model No.) Unit Amou VAT VAT Tax Total Make & as per Tax Sl. No. as per technical Unit Price in nt Rate Amount Am Amount Model BOM Rat specification provided in Rs. (Rs.) (%) (Rs.) ount (Rs.) supplied e this bid (Rs. (%) ) 1 Server with 02 No. accessories 2 24 Port L3 Managed 01 No Switch 3 10 KVA On Line UPS in dual redundant 01 Set mode (1+1) 4 LTO -5 Tape Drive along with basic 01 No Backup software 5 LTO-5 Cartridge 03 No. 6 19” Server Rack 01 No. 7 PC Table 02 No. Total Rs. (A): 8. Implementation of LAN at 5 Municipalities (viz. PUJALI, BALLY, BHATPARA, UTTARPARA & DUMDUM)

a) Supply of UTP cables 250 Mtr b) Laying of UTP 250 Mtr cables to connect switch of the ULB with switch of the respective WBSWAN node.

Sl. No. Item Description Make & Quantity Unit Unit Amou VAT VAT Ser Ser Total ( with Make & Model No.) Model as per Price in nt Rate Amount vice vice Amount Tax Tax as per technical Am BOM Rat specification provided in Rs. (Rs.) (%) (Rs.) ount (Rs.) supplied e this bid (Rs. (%) ) c) Termination of cable: 5 loca Terminating the cable tion at one end, existing core switch of the respective ULBs and the other end, the INVC router, both through patch panel. d) Supply and 22 No. installation of 2 mtrs patch cord.

e) Supply and 10 No installation of 3 mtrs patch cord at ILGUS Bhavan. Total Rs. (B):

Grand Total (A+B) (Rs.) : In words:

9 Virtualization 01 No. Software (optional)

(Signature and Seal of authorized signatory. A copy of power of attorney is to be enclosed)