Lake Ray Hubbard

Total Page:16

File Type:pdf, Size:1020Kb

Lake Ray Hubbard

MARINA INSPECTION LAKE RAY HUBBARD 2008

Inspector(s): Date:

Marina: Marina Owner:

Marina Manager: Asst. Manager:

Office Phone #: 24 HR Emergency #:

Marina Lease Administrator:

Lease Agreement Expiration Date:

# of Employees:

# of Boat Slips (Wet / Dry):

Boat Slip Occupancy Percentage (Wet / Dry):

Room for Expansion:

Pending Expansion Plans:

Marina Size – Shore Area – Acres:

Marina Size – Water Surface – Acres:

Gas pump on site?

Size of Storage Tank: Above or Below Ground:

Are spill containment materials on site? DWU-FRM-011-RESWS Approved by: Rene Caraveo Effective date: 10/5/2010 Desc. of Change: Initial Release Rev. 1 Inspection of Gas Pump Area:

Maintenance Facility on Site:

Maintenance Facility Waste Oil Disposal:

Maintenance Facility Runoff into Lake:

Boat / Dry Storage Inspection:

Boat / Dry Storage Area Runoff into Lake:

Sewage Pump-Out Facility:

Method of Sewage Disposal:

Method of Trash Disposal:

Break Water Material:

Rebar on Break Water:

Break Water Inspection:

Concessions:

Who owns concessions?

Boat ramp on site?

City of Dallas issued signs posted?

Are any buoys needed?

Crime Problems?

Were there any boating accidents is last year?

DWU-FRM-011-RESWS Approved by: Rene Caraveo Effective date: 10/5/2010 Desc. of Change: Initial Release Rev. 1 Any other problems?

NOTES

DWU-FRM-011-RESWS Approved by: Rene Caraveo Effective date: 10/5/2010 Desc. of Change: Initial Release Rev. 1

DWU-FRM-011-RESWS Approved by: Rene Caraveo Effective date: 10/5/2010 Desc. of Change: Initial Release Rev. 1