Feasibility Rationale Description (FRD) Template

Total Page:16

File Type:pdf, Size:1020Kb

Feasibility Rationale Description (FRD) Template

Supporting Information Document (SID)

LEMA Pilot School Integrated Scheduling System

Team No. 12

Name Primary Role Secondary Role Neelima Agarwal Life Cycle Planner Project Leader Aakash Shah Prototyper Feasibility Analyst Madhulika Mazumdar Operation Concept Engineer Project Leader Harsimran Singh Benipal Requirements Engineer Life Cycle Planner Eunyoung Hwang Software Architect Requirements Engineer Louis Demaria IIV&V Developer

11/21/2011

Supporting Information Document (SID) Template Version 2.1

Version History Date Author Versi Changes made Rationale on 14/10/2011 AS,HSB 1.0 All sections are complete Initial draft for use with Core FC Package 10/18/11 NA 2.0 Updated traceability matrix, status Draft FC package and references 10/24/11 A.S. 2.1 Updated Traceability Matrix and Changes for the FC added Document Tailoring Package with all feedback incorporated 11/21/11 HSB 3.0 Updated Document Tailoring Changes for the Draft DC package

SID_DCP_F11_T12_V3.0 iii Version Date: 10/24/11 Supporting Information Document (SID) Template Version 2.1

Table of Contents

SUPPORTING INFORMATION DOCUMENT (SID)...... I

VERSION HISTORY...... III

TABLE OF CONTENTS...... IV

TABLE OF TABLES...... V

TABLE OF FIGURES...... VI

1. Introduction...... 1

1.1 Purpose of the SID Document...... 1

1.2 Status of the package...... 1

1.3 References...... 1

2. Traceability Matrix...... 3

3. Glossary...... 4

4. Document Tailoring...... 5

SID_DCP_F11_T12_V3.0 iv Version Date: 10/24/11 Supporting Information Document (SID) Template Version 2.1

Table of Tables

TABLE 1: TRACEABILITY MATRIX FOR ARCHITECTED AGILE TEAM...... 3

TABLE 2: DOCUMENT TAILORING...... 5

SID_DCP_F11_T12_V3.0 v Version Date: 10/24/11 Supporting Information Document (SID) Template Version 2.1

Table of Figures

SID_DCP_F11_T12_V3.0 vi Version Date: 10/24/11 Supporting Information Document (SID) Version 2.1

Introduction

.A Purpose of the SID Document

The Purpose of SID is to make a connection between all the documentation that we are making as a part of 577 A and B for LEMA Pilot School Integrated Scheduling System. It is very useful as it helps us to tack and coordinate the changes made in the various documents. The traceability matrix depicts the status of OCD, SSRD, SSAD and the Win-Win Conditions. Also, Document Tailoring section keeps a track of changes made till now.

.B Status of the package

This is the Development Commitment package. The exit criteria for all documents for draft FC package have been met.

OCD: All sections have been completed. LCP: All sections have been completed. SSRD: All sections have been completed. SSAD: Section 1 and 2 are complete. Prototype: All sections are complete and the base prototypes are ready. FED: All sections are complete. SID: All sections are complete. QMP: All sections are complete. .C References

Project Templates: http://greenbay.usc.edu/IICMSw/index.htm#publish.icm.base- usc/customcategories/icm_welcome_page_D99DA7B2.html

Team 12 Project Website: http://greenbay.usc.edu/csci577/fall2011/projects/team12/index.html

Win-Win Ranking spreadsheet: https://docs.google.com/a/usc.edu/spreadsheet/ccc? key=0AhkSL9uW143SdF93ZWtzdWhDcnpveTNyYXpWSUlnV2c&hl=en_US#gid=11

SID_DCP_F11_T12_V3.0 1 Version Date: 11/21/11 Supporting Information Document (SID) Version 2.1

Progress Report and Project Plan: http://greenbay.usc.edu/csci577/fall2011/projects/team12/PR/index.html

Client Interaction Report: http://greenbay.usc.edu/csci577/fall2011/projects/team12/EP/CIR_VCP_F11a_T12_V1. 0.pdf

Life Cycle Plan: http://greenbay.usc.edu/csci577/fall2011/projects/team12/VP/LCP_DCP_F11a_T12_V3. 0.pdf

Operation Concept Description: http://greenbay.usc.edu/csci577/fall2011/projects/team12/VP/OCD_DCP_F11a_T12_V3 .0.pdf

System and Software Requirements Description: http://greenbay.usc.edu/csci577/fall2011/projects/team12/VP/SSRD_DCP_F11a_T12_V 3.0.xlsx

System and Software Architecture Description: http://greenbay.usc.edu/csci577/fall2011/projects/team12/VP/SSAD_DCP_F11a_T12_V 3.1.pdf

Feasibility Evidence Description: http://greenbay.usc.edu/csci577/fall2011/projects/team12/VP/FED_DCP_F11a_T12_V3 .0.pdf

Prototype Report: http://greenbay.usc.edu/csci577/fall2011/projects/team12/VP/PRO/PRO_DCP_F11a_T 12_V3.0.pdf

SID_DCP_F11_T12_V3.0 2 Version Date: 11/21/11 Supporting Information Document (SID) Version 2.1

Traceability Matrix

Table 1: Traceability Matrix for Architected Agile Team

OCD Win Agreement SSRD SSAD Test Case OC – 1 WC_729, WC_925, WC_880, CR -6 UC – 19, 20, 21, 23 WC_875 OC – 2 WC_940, WC_932 CR – 10 UC – 19, 20, 21, 23 OC – 3 WC_927, WC_891, WC_888, CR-2, CR-14 UC – 7 WC_931,WC_951,WC_9 32,WC-925,WC_812 OC – 4 WC_851, WC_847, WC_841, CR-7, CR-8, CR-11, UC – 20 WC_910,WC_858,WC_8 CR-12, CR – 13 46 OC – 5 WC_812, WC_1012, CR – 15, CR-16 UC – 3,4,5,6,7, 8, 9 WC_940, WC_947,WC_873,WC_8 20 OC – 6 WC_1011, WC_947, CR – 1, CR-3, CR-4, UC – 1, 2, 8,9, 13, 14 WC_828, WC_952, CR-9, CR-11 WC_917

SID_DCP_F11_T12_V3.0 3 Version Date: 11/21/11 Supporting Information Document (SID) Version 2.1

Glossary

1. SIS : Student Information System - Student Data Repository system in use by LEMA

2. COLUMBIA : Scheduling system in use by LEMA

3. FED : Feasibility Evidence Description

4. LCP : Life Cycle Plan

5. SSRD : System and Software Requirement Description

6. SSAD : System and Software Architecture Description

7. LAUSD : Los Angeles Unified School District

8. OCD : Operational Concept Description

9. APSCS : Assistant Principal, Secondary Counseling Services

10. Counselor: Is assigned to each student (usually 1 for the LEMA School) and oversees the course selection by each student and guides the students on their 5 week progress reports as well.

SID_DCP_F11_T12_V3.0 4 Version Date: 11/21/11 Supporting Information Document (SID) Version 2.1

SID_DCP_F11_T12_V3.0 5 Version Date: 11/21/11 Supporting Information Document (SID) Version 2.1

Document Tailoring

Table 2: Document Tailoring

Feasibility Evidence Description

 Business Case has been updated  Risk management has been updated

Rationale: All sections completed as per requirements of the Draft DC Package

Operations Concept Description

 Updated Work-flows, Benefits Chain Diagram, Elements Diagram Relationship Rationale: All sections completed as per requirements of the Draft DC Package

Life Cycle Plan

 All sections have been completed

Rationale: All sections completed as per requirements of the Draft DC Package

Prototype Report

 Additional prototypes have been added  All sections have been completed

Rationale: All sections completed as per requirements of the Draft DC Package

Supporting Information Document

 Updated document tailoring  All sections have been completed

Rationale: All sections completed as per requirements of the Draft DC Package

SID_DCP_F11_T12_V3.0 6 Version Date: 11/21/11 Supporting Information Document (SID) Version 2.1

System and Software Architecture Description

 Add Technology-specific system design and Architectural styles, patterns and frame- works

Rationale: All sections completed as per requirements of the Draft DC Package

Quality Management Plan

All sections have been completed

Rationale: All sections completed as per requirements of the Draft DC Package

SID_DCP_F11_T12_V3.0 7 Version Date: 11/21/11

Recommended publications