Natural Resource Project Inventory (NRPI) s11
Total Page:16
File Type:pdf, Size:1020Kb
Agreement No. 03-114-557-0 – Task 1.5
CONTRACT SUMMARY
Date filled out: June 30, 2004
A) Contract Information Please use complete phrases/sentences. Fields will expand as necessary as you type.
1. Contract Number: 03-114-557-0
2. Project Title: Cathedral City Cove Area Phase One (1) Septic System Elimination Project
3. Project Purpose – Problem: The use of septic tanks in a densely populated area of Cathedral City, known as the Cove area, is polluting the upper levels of the underground aquifer that supplies drinking water to the Coachella Valley. The severity of the area’s groundwater degradation resulted in the adoption of Assembly Bill 358 in October 2001. AB 358 changes State law to prohibit the discharge into the ground from continued use of septic tanks in the Cove area by January 1, 2012. In order to comply with AB 358, there is a need to construct municipal sewer facilities in the Cove for the collection, treatment and disposal of wastewater. Cathedral City has adopted a four-phased master plan for the design and construction of a sewer system in the Cove area. This Project will provide for the design and construction of Phase One of the Cove sewer collection system. Phase One will provide sewer pipeline, eliminating approximately 425 septic tanks.
4. Project Goals: a. Short-term Goals: Completion of Phase One of the Cove area sewer construction program will provide 1. Sewer pipeline to eliminate approximately 425 septic tanks in the Cove area of Cathedral City. 2. The first connection from the Cove to the City’s newest pumping station that was completed in 1999 with the intention of accommodating the entire sewer system planned for the Cove area. 3. Increased citizen participation in subsequent phases of sewer construction. 4. Cathedral City will attain progress in meeting standards set out in AB 358, which prohibits the use of septic tanks in the Cove as of January 1, 2012. b. Long-term Goals: 1. Eliminating septic tank usage in the Cove area will lead to the reduction of high concentrations of nitrates migrating into domestic groundwater resources from old and poorly maintained septic tanks. 2. Long-term protection of the area’s groundwater resources through the implementation of Best Management Practices (BMPs) in the Cove watershed region. 3. Increased community awareness of the affects of Septic Systems on ground water and watershed areas. 4. Compliance with SWRCB Management Measures 3.1A, 3.4A & B AND 3.6A. 5. Compliance with SWRCB Non-point Source Program Strategy and Implementation Plan, 1998-2013. 6. Compliance with RWCQB-7 WMI Strategic Planning Chapter. 7. Implements identified activities in the Targeted Non-point Source Implementation Project No.’s R7-3,4 & R7-15
Page 1 of 2 Agreement No. 03-114-557-0 – Task 1.5
5. Project Location: (lat/longs, watershed, etc.) Salton Sea, Region 7 a. Physical Size of Project: (miles, acres, sq. ft., etc.) b. Counties included in the project: One (1) square mile Riverside County
Legislative Districts: (Assembly and Senate) 80 & 37
6. Which SWRCB program is funding this contract? Please put an "X" by the one that applies. _X__ Prop 13 ___ EPA 319(h) ___ Other
B) Contract Contact: Refers to contract project director.
Name: William O. Bayne, P. E. Job Title: Interim City Engineer
Webpage Address: www.cathedralcity.gov Organization: City of Cathedral City
Address: 68-700 Avenida Lalo Guerrero, Cathedral City, CA 92234
Phone: 760-770-0360 Fax number: 760-202-1460
Email: [email protected]
C) Contract Time Frame: Refers to the implementation period of the contract.
From: January 15, 2004 To: March 31, 2006
D) Project Partner Information: Name all agencies/groups involved with project. 1. City of Cathedral City – Will design and construct sewer pipeline. 2. Desert Water Agency (DWA) – Constructed Pumping Station in Cathedral City in 1999 to serve future Cove area sewers. 3. Coachella Valley Water District – Will accept Cove area effluent for treatment in regional sewage treatment plant.
E) Nutrient and Sediment Load Reduction Projection (if applicable): N/A
PLEASE PROVIDE A HARD COPY AND AN ELECTRONIC COPY TO YOUR CONTRACT MANAGER AND YOUR PROGRAM ANALYST WITH YOUR QUARTERLY/MONTHLY REPORT. ALL APPLICABLE FIELDS ARE MANDATORY. IF FIELD IS NOT APPLICABLE, PLEASE PUT N/A IN BLOCK. INCOMPLETE FORMS WILL BE RETURNED.
Page 2 of 2