Qualification Structure for SQA Level 2 NVQ Diploma in Formwork (Construction) - Formwork

Total Page:16

File Type:pdf, Size:1020Kb

Qualification Structure for SQA Level 2 NVQ Diploma in Formwork (Construction) - Formwork

Qualification structure for SQA Level 2 NVQ Diploma in Formwork (Construction) - Formwork Erector and Striker

SQA Qualification Code: GN45 68 Ofqual’s Qualification Code: 603/2508/2

Total Qualification Time: 420 hours Minimum Guided Learning Hours: 249 Credit value: 42

To gain the qualification, learners must achieve a minimum total of 42 credits (420 TQT)

This comprises:  42 credits from the Mandatory Core Units

Please note: It is important that the SQA Unit codes are used in all your recording documentation and when your results are communicated to SQA.

Mandatory Core Units: Learners must achieve all 42 credits

SQA Unit Regulator’s Credit Unit Title Level GLH TQT Code Unit code value FX74 81 Conforming to General D/616/6569 2 2 17 20 Health, Safety and Welfare in the Workplace FX6X 68 Conforming to Productive R/616/6570 2 3 20 30 Working Practices in the Workplace FX73 68 Moving, Handling and Y/616/6571 2 5 27 50 Storing Resources in the Workplace HW4N 68 Erecting and Striking Timber H/616/5701 2 20 110 200 Proprietary Formwork in the

Formwork (Construction) - Formwork Erector and Striker V1 14/11/2017 SQA Unit Regulator’s Credit Unit Title Level GLH TQT Code Unit code value Workplace

HW4P 68 Maintaining timber and F/616/5706 2 12 75 120 proprietary formwork systems in the workplace

Additional Units (not compulsory)

SQA Unit Regulator’s Credit Unit Title Level GLH TQT Code Unit code value Preparing and Operating T/508/1131 2 12 40 Scissor-Type Mobile HA70 79 Elevating Work Platforms (MEWP) in the Workplace Preparing and Operating 2 14 40 HA71 79 Boom-Type Mobile D/508/1107 Elevating Work Platforms (MEWP) in the Workplace Preparing and Operating M/508/1130 2 12 40 Mast Climber-Type Mobile HA72 79 Elevating Work Platforms (MEWP) in the Workplace Slinging and Hand M/616/7340 2 10 43 Signalling the Movement of HE58 68 Suspended Loads in the Workplace

Formwork (Construction) - Formwork Erector and Striker V1 14/11/2017

Recommended publications