World Bank Document
Total Page:16
File Type:pdf, Size:1020Kb
PROCUREMENT India : Andhra Pradesh Disaster Recovery Project PLAN General Information Country: India Banks Approval Date of the Original Procurement Plan: 2016-10-06 Revised Plan Date(s): (comma delineated, leave blank if none) 2016-10-06 Project ID: P154847 GPN Date: Project Name: Andhra Pradesh Disaster Recovery Project Loan / Credit No: IDA / 56940 Executing Agency(ies): Project Implementation Unit , GVMC, Eastern Power Distribution Company of A.P.Limited, Panchayati Raj Department, Roads & Building Department, Revenue (DM) Department, Visakhapatnam Urban Development Authority WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-APEPDCL-212-CW-RFB / UG Single Stage - Two Pending cable network in VSP city IDA / 56940 Resilient electrical network Prior Request for Bids Open - National 19,000,000.00 0.00 2016-11-07 2016-11-12 2016-12-24 2017-03-08 2017-04-12 2018-10-09 Envelope Implementation Package-4 Public Disclosure Authorized IN-PRD-443-CW-RFB / Road from Perantalapalem to Restoration of connectivity and Single Stage - Two Pending IDA / 56940 Post Request for Bids Open - National 488,462.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-07-29 Jogaraopeta and Road from NH shelter infrastructure Envelope Implementation 16 to Jampapalem via Y Tuni IN-PRD-459-CW-RFB / AKP SBM road to Koppaka via Bhatlapudi, Kondupalem Road Restoration of connectivity and Single Stage - Two Pending at 1.8 Km to makavaram via IDA / 56940 Post Request for Bids Open - National 938,462.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2019-01-25 shelter infrastructure Envelope Implementation Chinnamakavaram and AKP CDM road to AKP SBM road via Mamidipalem and Kondupalem IN-PRD-470-CW-RFB / Gottipalli to Cheemalamettapalem, BN Road to Dibbadipalem, Boni Water Works Road to Gottipalli Kallalu, VZM Sontyam Road to Restoration of connectivity and Single Stage - Two Pending IDA / 56940 Post Request for Bids Open - National 750,769.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-08-03 Kothavalasa Via Gidijala, shelter infrastructure Envelope Implementation Vemagottipalem, VZM-STM Road to Kusuluwada via Mukundapuram, Ramunenipeta and NH5 to Yethapeta IN-PRD-473-CW-RFB / T.Nagarapalem BT Road to Gollalapalem via SC Colony, Mulakuddu BT Road to Srinagar Restoration of connectivity and Single Stage - Two Pending IDA / 56940 Post Request for Bids Open - National 412,308.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-08-03 Colony upto PMGSY Road, shelter infrastructure Envelope Implementation NH43 to Ramunaidupeta and Nerellavalasa colony to vambay colony via polytechnic college IN-PRD-476-CW-RFB / Potnuru to Kumaram via Gullamajjivarikallalu, Pandrangi Restoration of connectivity and Single Stage - Two Pending alamanda R&B road to IDA / 56940 Post Request for Bids Open - National 470,769.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-07-29 shelter infrastructure Envelope Implementation Tunipolem and Pandrangi to sangivalasa via Samayyavalasa and munivanipalem Public Disclosure Authorized IN-PRD-478-CW-RFB / B.N.Road to Kithampeta, Approach Road to Pedapachila, R.Kothuru to Restoration of connectivity and Single Stage - Two Pending Dibbalapalem, Kothakota IDA / 56940 Post Request for Bids Open - National 484,615.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-07-29 shelter infrastructure Envelope Implementation Makavarapalem road to Kannampeta and Thotakurapalem to Pothuluru IN-PRD-480-CW-RFB / K.P.Agraharam to Pedamadeena P.R. Road Via Kondapalem, Restoration of connectivity and Single Stage - Two Pending IDA / 56940 Post Request for Bids Open - National 443,077.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-07-29 R.T.Road to Karaka and shelter infrastructure Envelope Implementation Pedamadeena P.R. Road to Chinamadeena IN-PRD-481-CW-RFB / Damunapalli to Mycherlapalem, G.jagannadhapuram to Restoration of connectivity and Single Stage - Two Pending P.Kolliveedhi, B.N.Road to IDA / 56940 Post Request for Bids Open - National 347,692.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-02-03 shelter infrastructure Envelope Implementation Balusupalem and J.Naidupalem- Kasireddipalem road to Gurralapalem IN-PRD-483-CW-RFB / Road from Satyavaram to Vommali Restoration of connectivity and Single Stage - Two Pending IDA / 56940 Post Request for Bids Open - National 230,769.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-02-03 Kata and Jampena Sivalayam to shelter infrastructure Envelope Implementation Veeranarayanam IN-PRD-484-CW-RFB / Road from Taruva to M.Alamanda and Restoration of connectivity and Single Stage - Two Pending IDA / 56940 Post Request for Bids Open - National 404,615.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-07-29 Road from Tenugupudi to shelter infrastructure Envelope Implementation Marepalli IN-PRD-486-CW-RFB / Arjunagiri to Cheedipalli and Chodavaram Restoration of connectivity and Single Stage - Two Pending IDA / 56940 Post Request for Bids Open - National 553,846.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-08-03 Turuvolu R and B road to shelter infrastructure Envelope Implementation Pedagogada via Chettupalle IN-PRD-487-CW-RFB / Road Public Disclosure Authorized from Rongalinaidupalem to Restoration of connectivity and Single Stage - Two Pending IDA / 56940 Post Request for Bids Open - National 384,615.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-07-29 Medicherla and Road from shelter infrastructure Envelope Implementation Srungavaram to Pindrangi IN-RBD-492-CW-RFB / Permanent Restoration to Ragolu- Restoration of connectivity and Single Stage - Two Pending IDA / 56940 Post Request for Bids Open - National 1,666,666.00 0.00 2016-11-01 2016-11-06 2016-12-18 2017-03-02 2017-04-06 2018-01-24 Palakonda road from Km 10.00 shelter infrastructure Envelope Implementation to 20.00 in Srikakulam Dist Page 1 Public Disclosure Authorized IN-PRD-493-CW-RFB / Road from Kothakota Makavarapalem R B Road 0.0 to Jangallapalem Restoration of connectivity and Single Stage - Two Pending IDA / 56940 Post Request for Bids Open - National 558,462.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-07-29 9.0km and Joginadhuinipalem Jn shelter infrastructure Envelope Implementation to Vazragada via Tammayyapalem IN-PRD-495-CW-RFB / Tootipala to to Janakirampuram via Restoration of connectivity and Single Stage - Two Pending IDA / 56940 Post Request for Bids Open - National 1,200,000.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2019-02-03 Adigarlapalem, Pothalooru shelter infrastructure Envelope Implementation ,Tadapala , K,.Tadapala. IN-PRD-497-CW-RFB / Kothuru Junction to K.Ellavaram via Restoration of connectivity and Single Stage - Two Pending Kasimi and Providing BT road IDA / 56940 Post Request for Bids Open - National 538,462.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-08-03 shelter infrastructure Envelope Implementation from Karaka R&B road to Jillelupudi IN-RBD-496-CW-RFB / Permanent Restoration to Saluru- Restoration of connectivity and Single Stage - Two Pending Duggeru road (via) Makkuva from IDA / 56940 Post Request for Bids Open - National 2,916,666.00 0.00 2016-11-01 2016-11-06 2016-12-18 2017-03-02 2017-04-06 2018-07-24 shelter infrastructure Envelope Implementation Km 0.00 to 18.725 in Vizianagaram Dist. IN-PRD-499-CW-RFB / Formation of the road from Venkatapuram H.O Salikamallavaram to Kuruwda Road of Nathavaram Mandal, Restoration of connectivity and Single Stage - Two Pending IDA / 56940 Post Request for Bids Open - National 676,923.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-08-03 Providing BT road from Nrpm shelter infrastructure Envelope Implementation Devipatnam Road to Kumarapuram via Ch.Nagapuram and Narsipatnam Devipatnam R and B road to Nallanki IN-PRD-501-CW-RFB / Ramannapalem to Masampalli Restoration of connectivity and Single Stage - Two Pending IDA / 56940 Post Request for Bids Open - National 661,538.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-08-03 and Approach road to shelter infrastructure Envelope Implementation Chinagolugondapeta IN-RBD-503-CW-RFB / Permanent restoration from Km Restoration of connectivity and Single Stage - Two Pending IDA / 56940 Post Request for Bids Open - National 4,333,333.00 0.00 2016-11-01 2016-11-06 2016-12-18 2017-03-02 2017-04-06 2019-01-24 0.00 to 14.380 of Devada GPY shelter infrastructure Envelope Implementation road in Visakhapatnam Dist IN-RBD-505-CW-RFB / Permanent Restoration from Km Restoration of connectivity and Single Stage - Two Pending IDA / 56940 Post Request for Bids Open - National 2,000,000.00 0.00 2016-11-01 2016-11-06 2016-12-18 2017-03-02 2017-04-06 2018-07-24 0.00 to 6.00 of SKK road in shelter infrastructure Envelope Implementation Visakhpatnam Dist IN-PRD-506-CW-RFB / Nathavaram R B Road to Manyapurtla road via.