APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATI ON FOR MINING OF MINERALS UNDER CATEGORY ‘B2’ FOR LESS THAN AND EQUAL TO FIVE HECTARE.

1. Basic Information

Name of the I Mining Lease “Granite Building Stone Quarry of Mr.Abdulla T T” Site Survey No: - 172 Village: Kodiyatho or Taluk: - District: - Kozhikode State: - Boundary Latitude Longitude Pillar BP 1 N 11 0 17’0.08” E 76 0 2’25.24” BP 2 N 11 0 17’0.17” E 76 0 2’26.06” Location/Site BP 3 N 11 0 16’58.67” E 76 0 2’26.42” II (GPS Co - BP 4 N 11 0 16’57.76” E 76 0 2’26.64” Ordinate) BP 5 N 11 0 16’55.74” E 76 0 2’24.59” BP 6 N 11 0 16’56.41” E 76 0 2’21.04” BP 7 N 11 0 16’57.35” E 76 0 2’20.83” BP8 N 11 0 16’57.42” E 76 0 2’20.58” BP9 N 11 0 16’58.25” E 76 0 2’20.99” BP10 N 11 0 17’0.09” E 76 0 2’21.59” BP11 N 11 0 17’1.06” E 76 0 2’21.67” BP12 N 11 0 17’0.49” E 76 0 2’23.70” BP13 N 11 0 17’0.08” E 76 0 2’24.59”

Size of the III 2.0437Ha Mining Lease

1

Capacity of IV 781024MT Mining Lease Period of V 10 Years Mining Lease Expected Cost VI 85 Lakh of Project Name Mr.Abdulla T T Address S/O Alikutty Thenginthottatil Contact VII Kalanthode Information NIT Campus P.O Kozhikode,Kerala - 673601 Mob 9388338600

2. Environment Sensitivity

Sl.No. Areas Distance (KM) Distance of project site from Rail, Road Puthiyanidam culvert - 500m SE 1 Bridge over the concerned River, Rivulet, Bridge - 5.5km NW Nallah etc. Distance from infrastructural facilities Railway Line Road - 23.28KM - SE NH 766(Kozhikode - ) - 17.4KM National Highway NW State Highway SH 34( - ) - 3.48KM - W Major District Road - Parathode - 1.66KM - E 2 Thotttumukkam - Valillapuzha Road Other Road 0.32KM - S Electrical Transmission Line or Pole Pallithaze - 500M Canal/Check Dam/Reservoirs/Lake/Pond Kakkayam DAM - 31.7KM In - take for drinking water/pump house Mukkam - 6KM - N In - take for Irrigation canal pumps Vellanoor Irrigation Project - 12KM - NW

2

Areas protected under international conventions, national or local legislation for 3 None within 1KM from project site their ecological, landscape, cultural or others related value. Iruva zhinji River - 6.25KM Janaki Forest - 47.3km - NW Thusharagiri Waterfalls - 21km - NE Areas which are important or sensitive for Vanaparvam Biodiversity Parks - 24.76km ecological reasons – Wetlands, watercourses 4 NW or ot her water bodies, coastal zone, Forest - 17.86km NE biospheres,mountains, Nadugani Reserve Forest - 40.01km NE New Amarambalam Wildlife Sanctuary - 40.88 NE Areas used by protected , important or sensitive 5 species of flora or fauna for breeding, nesting, None within 1KM from project site foraging, resting, over Wintering, migration 6 Inland, coastal, marine or underground Waters None within 1KM from project site 7 State, National boundaries None within 1KM from project site Routes or facilities used by the public for NH 766(Kozhikode - Karnataka) - 17.4KM 8 access to recreation or other tourist, pilgrim NW areas SH 34(Koyilandy - Edavanna) - 3.48KM - W 9 Defense installations None within 1KM from project site Densely populated or built - up area, distance 10 Mukkam - 7.53Km NW from nearest human habitation Hospital: - Government Primary Health Centre, – 1.65 km SE Airport: - Calicut Airport - 18.5KM SW Areas occupied by sensitive man - made land School: - MKHMMO VHSS,Mukkam – 11 uses (Hospitals, schools, places of worship, 6.25 km NW community facilities) Church: - St.Thomas Forane Church, Pallithazhe, 1.61 km SE Mosque: - Jumua masjid,Gothampu Road, 2.95 km W

3

Temple: - Orugip para Sree Shastha Bhagavathi Temple, 3.19 km N Janaki Forest - 47.3km - NW Thusharagiri Waterfal ls - 21km - NE Areas containing important, high quality or Vanaparvam Biodiversity Parks - 24.76km scarce resources (ground water resources, NW 12 surface resources, forestry, agriculture, Vellarimala Forest - 17.86km NE fisheries, tourism, minerals) Nadugani Reserve Forest - 40.01km NE New Amarambalam Wildlife Sanctuary - 40.88 NE Areas already subjected to pollution or 13 environmental damage, (those where existing No legal environmental standards are exceeded) Areas susceptible to natural hazard which Could cause the project to present environmental problems (earthquake, 14 subsidence, landslides, erosion, flooding, or No extreme or adverse climate conditions) is proposed m ining site located over or near fissure/fracture for ground water recharge Whether the proposed involves approval or clearance under the following Regulations or Acts namely: - (i) The Forest (Conservation) Act, No 1980; 15 (ii) The wildlife (Protection) Act, No 1972; (iii) The Coastal Regulation Zone No Notification, 2011 If yes, details of the same and their status To

4