NRC Budgeted Costs (FY 2005)
Part 171 Annual Fees'
Operating Power Reactor Fees Spent Fuel Storage/Reactor Decommissioning Fees Nonpower Reactor Fees Fuel Facilities Fees Uranium Recovery Fees Rare Earth Facility Fees Transportation Fees Materials Annual Fees
Part 170 Fees
Licensing Fees Export and Import Fees Reciprocity Fees--Agreement State Licensees General License Registration Fees
Determination of Hourly Rate
Estimated Collections
Regulatory Flexibility Analysis
Small Entity Compliance Guide
Budget Authority (FY 2005)
OBRA-90, as amended
Court Decision 1993 2/11/05
Part 171 Annual Fees FY 2005 ($ in Millions) (All dollar amounts are rounded)
Includes an across the board rescission of 0.80 percent
$669.3 NRC Budget Authority
-68.5 Appropriated from Nuclear Waste Fund
$600.8 Balance
X.90 Fee Recovery Rate for FY 2005
$540.7 Total Amount to be Recovered For FY 2005
-2.2 Carryover from FY 2004
$538.5 Amount to be Recovered Through Fees and Other Receipts
-166.8 Estimated amount to be recovered through Part 170 fees and other receipts
$371.7 Estimated amount to be recovered through Part 171 annual fees
-0.5 Part 171 billing adjustments
$371.2 Adjusted Part 171 annual fee collections required 2/4/05
Part 171 Annual Fees FY 2005 ($ in Millions) (All dollar amounts are rounded)
Includes an across the board rescission of 0.80 percent
$669.3 NRC Budget Authority
-68.5 Appropriated from Nuclear Waste Fund
$600.8 Balance
X.90 Fee Recovery Rate for FY 2005
$540.7 Total Amount to be Recovered For FY 2005
-2.2 Carryover from FY 2004
$538.5 Amount to be Recovered Through Fees and Other Receipts
-163.1 Estimated amount to be recovered through Part 170 fees and other receipts
$375.4 Estimated amount to be recovered through Part 171 annual fees
-0.5 Part 171 billing adjustments
$374.9 Adjusted Part 171 annual fee collections required COMPARISON OF ANNUAL FEES (PER UCENSE)
FY 2005 DIRECT RESOURCES Sheet A-SwUMuY
SPENT FUEL STORAGE/ NON-POWER RARE EARTH INCLUDED IN I TOTAL POWER REACTORS REACTOR DECOMM. REACTORS FUEL FACILITY MATERIALS TRANSPORTATION FACILITIES URANiUM RECOVERY OTHER APPLICANTS SURCHARGE I
_ _ - I
S.K FTE SK FTE SX FTE SX FTE SK FTE XK FTE SX FTE S.K FTE SX FTE SK FTE SJK FTE I
_ . __ I
-
NUCLEAR REACTOR SAFETY 99.730 1.700 83.827 1.160 3 0 97 1 0 0 0 0 3 0 0 0 0 0 0 0 1.126 33 1
NUCLEAR MATERIALS SAFETY 28.788 602 Z.996 11 5.291 69 0 0 3,98 120 2.746 87 574 17 288 3 294 7 0 6 8.665 110 I NUCLEAR WASTE SAFETY 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01
INTERNAT1. NUCLEAR SAFETY & SUPPORT 0 0 0 0 0 0 . 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01 MANAGEMENT AND SUPPORT 103.894 595 360 21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 5 1
INSPECTOR GENERAL 1,3ZS 47 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
SUBTOTAL - FEE BASE RESOURCE 233.735 2944.0 87,183 1191.1 5293 69.5 97 1.4 3,968 120.1 2746 88.7 576 16.9 288 32 294 6.6 0 5. 9.891 147.8 1
------G-L== .- G=- -StSt ……------5 - ---- . _ se.s-- G--==s- = =s-sin mai=5...ss ssss----Wss=s=ss = ==== sin = -=l = ----- ' =G======---=G= = ==- -==-==
FY 2005 FEE AMOUNTS 440.8 25.2 0.5 38.3 27.5 5.4 12 2174 1.66184 58.5 % of 1 70 fees to total fet amount 31.7% 20.1% 57.8% . * 38.1% 6.8% 20.9% 93.7% 68.5% 100.0% 58.5 LESS PART 170 FEES 139.6 5.1 0.3 14.6 1.9 1.1 1.1 1.490 1.66184 0.0
PART 171 ANNUAL FEES 301.2 20.1 0.2 23.7 25.7 4.3 0.1 0.684 0.000 58.5
% OF BUDGET (EXCL SURCHARGE, OTHER APPL & SMALL ENTITY) 8Z36% 4.70% 0.097013% 7.16% 4.04% 1.01% 0.22% 0.41% N/A
Surcharge (including small entity) 3.3 0.070022 0.00144495 0.3 * 0.6 0.0 0.0 ' 0.0061 NIA 0.03174 0.000575
Part 171 billing adjustments (2.2) (0.1) (0.0) (0.2) (0.1) (0.0) (0.0) (0.01) WNA Adjustment for FY 2005 Rescission (0.3962) 10.0226) (00o0s) (0.0344) (0.0194) (0 0049) (0.0011) (0.0020) TOTAL FY 2005 ANNUAL FEE 301.911326 20.022433 0.217589 23.833961 26.088218 4.252167 0.071046 0.677611 0.0 Fee Per License (No. of Uicenses) 2.902994 :104) 0.164347 (121.83) 0.054397 (4) 0.071046 (1) FTE RATES REACTOR PROGRAM = 296,898 MATERIALS PROGRAM = 285,944 SURCHARGE= 328,608
$,M SMALL ENTITY SUBSIDY = 5.91 Total Surcharge (Reflects 10% off the fee base) 4.3
TOTAL PART 171 BILLING ADJUSTMENTS $,K Est. Unpaid FY 2005 Part 171 Bills 2.70 Est. Payments From Prior Year Part 171 Bills (3.20) Adjustment for addt'I FY 2004 collections (2.20)
Total (2.70)
Adjustment for FY 2005 Rescission ($0.480996) OPERATING POWER REACTOR ANNUAL FEE - FY 2005 PROPOSED RULE
NUMBER OF POWER REACTORS LICENSED TO OPERATE
Westinghouse 48
General Electric 35
Combustion Engineering 14
Babcock & Wilcox 7
TOTAL REACTORS 104
DETERMINATION OF ANNUAL FEE:
TOTAL BUDGETED COSTS $301,911,326 FOR OPERATING POWER REACTORS (INCLUDES SURCHARGE)
ANNUAL FEE PER REACTOR (rounded) $2,903,000 (BUDGETED COSTS DIVIDED BY 104 OPERATING POWER REACTORS)
PLUS SPENT FUEL STORAGE/ $164,000 REACTOR DECOMMISSIONING ANNUAL FEE
TOTAL ANNUAL FEE $3,067,000 PER LICENSE SEE BUDGET AUTHORITY TAB
FOR ALLOCATION OF BUDGET TO
EACH LICENSEE CLASS Sheet I-Surcharge-Rebaseline ,URCHARGE - FY 2005
SURCHARGE RATE: S328.608
DIRECT RESOURCES FEE AMOUNT SK FTE (SM) ITOTALRNRC-' FEDERAL AGENCY EXEMPTION 56 4 1A NONPROFIT EDUCATIONAL EXEMPTION I1,362 23 8.8 INTERNATIONAL ACTIVITIES 852 28 10.0 SMALL ENTITY SUBSIDY 5.91 AGREEMENT STATE OVERSIGHT 497 23 8.1 REGULATORY SUPPORT TO AGREEMENT STATES 3.784 31 13.9 SDMP 585 9 3.5 DECOMMISSIONINGIRECLAMATION GENERIC 2.109 24 10.0 LLW GENERIC 647 7 2.8
TOTAL 9.891 147.8 64.4
To meet the 90% fee recovery requirement for FY 2005, the Surcharge Is reduced by 10% of NRCs FY 2005 budget authonty, minus the NWF and the General Fund, as shown beow:
(SM) Total Surcharge amount less generic LLW (see note) 61.6 Budget Auttionty minus NWF & Gen Fund 600.8 Percent reduction in fee recovery amount for FY 2005 10.0% Reduction in annual fee recovery amount for FY 2005 60.1 Surcharge, excluding LLW. less reduction in annual fee recovery amount 1A89 Generic LLW amount 2.8 Total surcharge to be assessed 4.3
NOTE: Generic LLW activities are not considered a fairness and equity issue because licensees will benefit from these activities
ION OF SURCHARGE COSTS LLW SURCHARGE NON-LLW SURCHARGE 'OTALSURCHARGE
'PERCENT SM -PERCENT "'. s'M - SM'
POWER REACTORS 74% 2.1 82.4% 1.2 3.3 SPENT FUEL STORAGE/REACTOR DECOMMISSIONING - - 4.7% 0.1 0.1 NON-POWER REACTORS - - 0.1% 0.0 0.0 FUEL FACILITIES 8% 0.2 7.2% 0.1 0.3 MATERIALS 18% 0.5 4.0% 0.060175 0.6 TRANSPORTATION - - 1.0% 0.0 0.0 RARE EARTH FACILITIES - - 0.2% 0.0 0.0 URANIUM RECOVERY - - 0.4% 0.0 0.0
TOTAL 100 2.8 100.0% 1.5 4.3 SEE BUDGET AUTHORITY TAB
FOR BUDGETED SURCHARGE COSTS COMPARISON OF ANNUAL FEES (PER UCENSE)
FY 2005 DIRECT RESOURCES Sheet ASummamy SPENT FUEL STORAGEt NON-POWER RARE EARTH INCiUDED IN I
TOTAL POWER REACTORS REACTOR DECOUM. REACTORS FUEL FACIWLY MATERIALS TRANSPORTATION FACIUTIES URANIUM RECOVERY OTHER APPUCANTS SURCHARGE I
_ _ _ _ -- I S.K FTE S, FTE S.K FTE SK FTE S.K FTE S.K FTE SCK FTE SK FTE S. FTiE SK FTE SK FTE I
______- - I
NUCLEAR REACTOR SAFETY 99,730 1.700 83827 1,160 3 0 97 I 0 0 0 0 3 0 0 0 a 0 0 0 1.126 33 1
NUCLEAR MATERIALS SAFETY 28.786 602 Z996 It 5,291 69 0 0 3.968 120 Z746 87 574 17 286 3 294 7 0 6 8.665 ttO I NUCLEAR WASTE SAFElY 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01
INTERNAT. NUCLEAR SAFETY & SUPPORT o o o o 0 0 o o 0 0 0 0 0 0 0 0 0 0 0 0 0 01 MANAGEMENT AND SUPPORT 103.894 595 360 21t 0 0 o 0 0 0 0 0 0 a 0 a 0 0 0 0 100 5 I
INSPECTOR GENERAL 1.325 47 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01
_ --- I
SUBTOTAL- FEE BASERESOURCE 233.735 2944.0 87,183 1191.1 5.293 69.5 97 1.4 3.988 120.1 Z746 88.7 576 16.9 286 3.2 294 6.6 0 5.8 9.891 147.8 1
===C=====8=_====5"5- ____ :. .... ===..8 . ... …* == 5--'5---- 5 3 55 =5 _-__-_--_ _- -=--=5- - 5 5_ ======-== == a.bSS*S .. sI - *t= =_= = 5 in
FY 2005 FEE AMOUNTS 440.8 25.2 0.5 38.3 27.5 5.4 1.2 2.174 1.66184 58.5 % of 170 feestototal fee amount . 31.7% 20.1% 57.8% 38.1% 6.8% 20.9% 93.7% . 68.5% 100.0% 58.5 LESS PART 170 FEES 139.6 5.1 0.3 14.6 1.9 1.1 1.1 1.490 1.66184 0.0
PART 171 ANNUAL FEES 301.2 20.1 0.2 23.7 25.7 4.3 '0.1 0.000 58.5
% OF BUDGET (EXCL SURCHARGE, OTHER APPL & SMALL ENTITY) 8Z36% 4.70% 0.097013% 7.16% 4.04% 1.01% 0.22% 0A1% N/A
Surcharge (including small entity) 3.3 0.070022 0.00144495 0.3 0.6 0.0 0.0 0.0061 iWA 0.03174 0.000575
Part 171 billing adjustments (2.2) (0.1) (0.0) (0.2) (0.1) (0.0) (0.0) (0.01) WNA Adjustment for FY 2005 Rescission (0.3962) (0.0226) (0 0005) (0.0344) (0.0194) (0.0049) (0.0011) (0.0020) TOTAL FY 2005 ANNUAL FEE 301.911326 20.022433 * 0.217589 23.833961 26.088218 4.252167 0.071046 0.677611 0.0 Fee Per LUcense (No. of Ucenses) 2.902994 :104) 0.164347 (121.83) 0.054397 (4) 0.071046 (1) FTE RATES REACTOR PROGRAM = 296,898 MATERIALS PROGRAM = 285,944 SURCHARGE= 328,608
$,M SMALL ENTITY SUBSIDY = 5.91 Total Surcharge (Reflects 10% off the fee base) 4.3
TOTAL PART 171 BILLING ADJUSTMENTS $,K Est. Unpaid FY 2005 Part 171 Bills 2.70 Est. Payments From Prior Year Part 171 Bills (3.20) Adjustment for addt'l FY 2004 collections (2.20)
Total (2.70)
Adjustment for FY 2005 Rescission ($0.480996) SPENT FUEL STORAGE/REACTOR DECOMMISSIONING ANNUAL FEE FY 2005
LICENSES SUBJECT TO THE ANNUAL FEE:
Operating Power Reactor Licensees
104
Power Reactors in Decommissioninq or Possession Only Status with Fuel Onsite
Reactor Docket No.
Big Rock Point 50-155 Indian Point, Unit 1 50-003 Dresden, Unit 1 50-010 Haddam Neck 50-213 Humboldt 50-133 La Crosse 50-409 Maine Yankee 50-309 Millstone 1 50-245 Rancho Seco 50-312 San Onofre, Unit 1 50-206 Trojan 50-344 Yankee Rowe 50-029 Zion 1 50-295 Zion 2 50-304
Total No. of Reactors in decommissioning or possession only status with fuel onsite: 14
Part 72 Licensees without a Part 50 License
Ft. St. Vrain 72-009 GE Morris 72-001 Department of Energy, Idaho Ops. Office 72-020 Foster Wheeler Environmental Corp. 72-025'
Total Part 72 licenses: 3.83'
'Part 72 license issued to Foster Wheeler on November 30, 2004. FY 2005 annual fee will be prorated based on 305 days in FY 2005 that the license is in effect. The prorated annual fee is 83 percent of the total annual fee.
DETERMINATION OF THE FY 2005 ANNUAL FEE:
The FY 2005 annual fee is determined by dividing the total budgeted costs of $20,022,433 (including the surcharge) by the total number of licensees (121.83). This results in an annual fee (rounded) of $164,000 per license. SEE BUDGET AUTHORITY TAB
FOR BUDGETED SURCHARGE COSTS Sheet I- Surcharge-Rebaseline 3URCHARGE - FY 2005
SURCHARGE RATE: S328.608
DIRECT RESOURCES FEE AMOUNT S.K FTE (S M) 'TOTALNRC . i FEDERAL AGENCY EXEMPTION 56 4 1.4 NONPROFIT EDUCATIONAL EXEMPTION 1.362 23 8.8 INTERNATIONAL ACTIVITIES 852 28 10.0 SMALL ENTITY SUBSIDY 5.91 AGREEMENT STATE OVERSIGHT 497 23 8.1 REGULATORY SUPPORT TO AGREEMENT STATES 3,784 31 13.9 SDMP 585 9 3.5 DECOMMISSIONINGIRECLAMATION GENERIC 2.109 24 10.0 LLW GENERIC 647 7 2.8
TOTAL 9.891 147.8 64.4
To meet the 90% fee recovery requirement for FY 2005. the Surcharge is reduced by 10% of NRCs FY 2005 budget authority. minus the NWF and the General Fund, as shown below
($.M) Total Surcharge amount less generic LLW (see note) 61.6 Budget Authority minus NWF &Gen Fund 600.8 Percent reduction in fee recovery amount for FY 2005 10.0% Reduction in annual fee recovery amount for FY 2005 60.1 Surcharge. excluding LLW. less reduction in annual fee recovery amount 1.489 Generic LLW amount 2.8 Total surcharge to be assessed 4.3
NOTE: Generic LLW activities are not considlered a fairness and equity issue because licensees will benefit from these activities
ION OF SURCHARGE COSTS
LLW SURCHARGE NON-LLW SURCHARGE fOTAL SURCHARGE
PERCENT - ^ S.M PERCENT' . SM 7.. S Mi
POWER REACTORS 74% 2.1 82.4% 1.2 3.3 SPENT FUEL STORAGEIREACTOR DECOMMISSIONING - - 4.7% 0.1 0.1 NON-POWER REACTORS - - 0.1% 0.0 0.0 FUEL FACILITIES 8% 0.2 7.2% 0.1 0.3 MATERIALS 18% 0.5 4.0% 0.060175 0.6 TRANSPORTATION - - 1.0% 0.0 0.0 RARE EARTH FACILITIES - - 0.2% 0.0 0.0 URANIUM RECOVERY - - 0.4% 0.0 0.0
TOTAL 100 2.8 100.0% 1.5 4.3 SEE BUDGET AUTHORITY TAB
FOR BUDGETED SURCHARGE COSTS COMPARISON OF ANNUAL FEES (PER UCENSE)
FY 2005 DIRECT RESOURCES I ShtAwnsy SPENT FUEL STORAGE/ NON-POWER RFAREEARTH INCLUDED IN I
TOTAL POWER REACTORS REACTOR DECOMM. REACTORS FUEL FACJLITY MATERIALS TRANSPORTATION FACIUITES URANIUM RECOVERY OTHER APUCANTS SURCHARGE I
S.K FTE SK FTE S.K FTE SK FFTE FiT SJ FiT s. FiT 6K FiT 3J FT S.K$K FITE SK FTE I
- - -_ I
NUCLEAR REACTOR SAFETY 99.730 1.700 83,827 1,160 3 0 97 I 0 0 0 0 3 0 0 0 0 0 0 0 1,126 33 1
NUCLEAR MATERIALS SAFETY 28,786 602 2,996 is 5291 69 0 0 3.988 120 2746 87 574 17 286 3 294 7 0 6 8,665 110 1
NUCLEAR WASTE SAFETY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 INTERNATL NUCLEAR SAFETY & SUPPORT 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01
MANAGEMENT AND SUPPORT 103,894 595 360 21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 5 I
INSPECTOR GENERAL 1.325 47 0 0 0 0 0 o o 0 0 0 0 0 0 0 0 0 0 0 0 01
9 - - I SUBTOTAL - FEEBASE RESOURCE 233.735 2944.0 87.183 11.1 5,293 69.5 97 1.4 3.988 120.1 2.746 88.7 578 18.9 286 3.2 294 6.8 0 .8 9.891 147.8 I
====...=.a.==...... u.. .. a.. g.=cw Cang., _ -- =__ -=- = .. _ _ = === =C--_= _I ____ C=_ =.= t.. ... ,g__., at== - - ---= . ag.=t. =s====
FY 2005 FEE AMOUNTS 440.8 25.2 0.5 38.3 27.5 5.4 1.2 2.174 1.66184 58.5 % of 170 fees to total fee amoutrl 31.7% 20.1% 57.8% 38.1% 6.8% 20.9% 93.7% 68.5% 100.0% 58.5 LESS PART 170 FEES 139.6 I 5.1 0.3 14.6 1.9 1.1 1.1 1.490 1.661B4 0.0 2 PART 171 ANNUAL FEES 301.2 20.1 0.2 23.7 25.7 4.3 0.1 0.684 0.000 58.5
% OF BUDGET (EXCL SURCHARGE, OTHER APPL & SMALL ENTI"Y) 82.36% 4.70% 0.097013% 7.16% 4.04% 1.01% 0.22% 0.41% N/A
Surcharge (Including small entity) 3.3 0.070022 0.00144495 0.3 0.6 0.0 0.0 0.0061 N/A 0.03174: 0.000575
Part 171 billing adjustments (2.2) (0.1) (0.0) (0.2) (0.1) (0.0) (0.0) (0.01) N/A Adjustment for FY 2005 Rescission (0.3962) (0.0226) (0.0005) (0.0344) (0.0194) (0.0049) (o.9611) (0.0020) TOTAL FY 2005 ANNUAL FEE 301.911326 20.022433 0.217589 23.833961 26.088218 4.252167 0.071046 0.677611 0.0 Fee Per Ucense (No. of Licenses) 2.902994 :104) 0.164347 (121.83) 0.094397 (4) 0.071046 (1) FTE RATES REACTOR PROGRAM = 296,898 MATERIALS PROGRAM = 285,944 SURCHARGE= 328,608
$,M SMALL ENTITY SUBSIDY = 5.91 Total Surcharge (Reflects 10% off the fee base) 4.3
TOTAL PART 171 BILLING ADJUSTMENTS $,K Est. Unpaid FY 2005 Part 171 Bills 2.70 Est. Payments From Prior Year Part 171 Bills (3.20) Adjustment for addt'l FY 2004 collections (2.20)
Total (2.70)
Adjustment for FY 2005 Rescission ($0.480996) NONPOWER REACTOR ANNUAL FEE
FY 2005 FEE RULE
DETERMINATION OF THE FY 2005 ANNUAL FEE:
NONPOWER REACTORS SUBJECT TO ANNUAL FEES'
1. Dow Chemical - TRIGA MARK I R-108 50-264
2. AEROTEST R-98 50-228
3. GE, NTR R-33 50-73
4. NIST TR-5 50-184
DETERMINATION OF ANNUAL FEE
BUDGETED COSTS $217,589
ANNUAL FEE PER LICENSE $54,400 (Budgeted costs divided by number of nonpower reactor licensees subject to annual fee)
'Does not include License R-38 (TRIGA MARK I), Docket No. 50-89, issued to General Atomics. License R-38 was amended in 1997 to authorize possession only. SEE BUDGET AUTHORITY TAB
FOR BUDGETED SURCHARGE COSTS Sheet I- Surcharge-Rebaseline iURCHARGE FY 2005
SURCHARGE RATE: $328.608
DIRECT RESOURCES FEE AMOUNT S,K FTE (SM) JOTAL NRC- 7,, FEDERAL AGENCY EXEMPTION 56 4 1.4 NONPROFIT EDUCATIONAL EXEMPTION 1.362 23 8.8 INTERNATIONAL ACTIVITIES 852 28 10.0 SMALL ENTITY SUBSIDY 5.91 AGREEMENT STATE OVERSIGHT 497 23 8.1 REGULATORY SUPPORT TO AGREEMENT STATES 3,784 31 13.9 SOMP 585 9 3.5 DECOMMISSIONINGIRECLAMATION GENERIC 2,109 24 10.0 LLW GENERIC 647 7 2.8
TOTAL 9.891 147.8 64.4
To meet the 90% fee recovery requirement for FY 2005, the Surcharge is reduced by 10% of NRC's FY 2005 budget authority, minus the NWF and the General Fund, as shown below.
($SM) Total Surcharge amount less generic LLW (see note) 61.6 Budget Authority minus NWF & Gen Fund 600.8 Percent reduction i fee recovery arnount for FY 2005 10.0% Reduction hi annual fee recovery amount for FY 2005 60.1 Surcharge, excluding LLW. less reduction In annual fee recovery arrount 1.A89 Generic LLW amount 2.8 Total surcharge to be assessed 4.3
NOTE: Generic LLW activities are not considered a faimess and equity issue because licensees will benefit from these activities
ION OF SURCHARGE COSTS
LLW SURCHARGE NON-LLW SURCHARGE OTAL SURCHARGE I PERCENT 6 ;' S,M.. PERCENT - '$5,M
POWER REACTORS 74% 2.1 82A% 1.2 3.3 SPENT FUEL STORAGE/REACTOR DECOMMISSIONING - - 4.7% 0.1 0.1 NON-POWER REACTORS - - 0.1% 0.0 0.0 FUEL FACILITIES 8% 02 7.2% 0.1 0.3 MATERIALS 18% 0.5 4.0% 0.060175 0.6 TRANSPORTATION - - 1.0% 0.0 0.0 RARE EARTH FACILITIES - 0.2% 0.0 0.0 URANIUM RECOVERY - - 0.4% 0.0 0.0
TOTAL 100 2.8 100.0% 15 4.3 SEE BUDGET AUTHORITY TAB
FOR BUDGETED SURCHARGE COSTS COMPARISON OF ANNUAL FEES (PER UCENSE)
FY 2005 DIRECT RESOURCES
SheetAtSummay
SPENT FUEL STORAGE/ NON-POWER RARE EARTH tNCLUDEDIN I TOTAL POWER REACTORS REACTOR DECOMM. REACTORS FUEL FACILtTY MATERIALS TRANSPORTATION FACItunES URANIUM RECOVERY OTHER APPUCANTS SURCHARGE I
__ . _ __ I
S.K FTE SK FTE SK FTE SY, FTE FTE FTE SN PIE sN FTE FIE SKsx PTE SNS.K PTE1 IX
- - -- I
NUCLEAR REACTOR SAFETY 99.730 1,700 83.827 1.160 3 0 97 I 0 0 0 0 3 0 0 0 0 0 0 0 1,126 33 1
NUCLEAR MATERIALS SAFETY 28,786 602 299S I S,291 69 0 0 3.988 120 27406 87 574 17 286 3 294 7 0 6 8.665 110 1 NUCLEAR WASTE SAFETY 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o INTERNATL NUCLEAR SAFETY & SUPPORT 0 0 0 a 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 ' 0 0o
MANAGEMENT AND SUPPORT 103.894 595 380 21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 5 I INSPECTOR GENERAL 1=325 47 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 OI 233,73S_____294t.0_ 2,7t t67S7*692t -t __ -,293 -9.S -7 -- 1
SUBTOTAL - FEE BASERESOURCE 233.735 2944.0 87.183 1191.1 5.29 69.5 97 1.4 3.988 120.1 2.746 86.7 578 18.9 288 3.2 294 6.8 0 5.81 9.8191 147.8 1
=== == _= _= _= == : === =Z-- XS ======-======t r …= t = - --- * .. .= =. = ==- - = .. S ini =. zas_ 1s.s.... = *- _
FY 2005 FEE AMOUNTS 440.8 25.2 0.5 38.3 27.5 5.4 1.2 2.174 1.66184 58.5 % of 170 fees to total fee amouni 31.7% 20.1% 57.8% 38.1% 6.8% 20.9% 93.7% 68.5% 100.0% 58.5 LESS PART 170 FEES '139.6 5.1 0.3 14.6 1.9 1.1 1.1 1.490 1.66184 * 0.0
PART 171 ANNUAL FEES 301.2 20.1 0.2 23.7 25.7 4.3 ' 0.1 0.684 0.000 58.5
% OF BUDGET (EXCL SURCHARGE, OTHER APPL & SMALL ENTITY) 82.36% 4.70% 0.097013% 7.16% 4.04% 1.01% 0.22% 0.41% NWA
Surcharge (including small entity) ' 3.3- 0.070022 0.00144495 0.3 0.6 0.0 0.0 0.0061 . NA 0.03174 0.000575
Part 171 billing adjustments (Z2) (0.1) (0.0) (0.2) (0.1) (0.0) (0.0) (0.01) NWA Adjustment for FY 2005 Rescission (0.3962) (00238) (0.0005) 10.0344) (0.0194) (0.0049) (0.0011) (0.0020) TOTAL FY 2005 ANNUAL FEE 301.911326 20.022433 0.217589 23.833961 26.088218 4.252167 0.071046 0.677611 0.0 Fee Per Ucense (No. of Ucenses) 2.902994 :104) 0.164347 (121.83) 0.054397 (4) 0.071046 (1) FTE RATES REACTOR PROGRAM = 296,898 MATERIALS PROGRAM = 285,944 SURCHARGE= 328,608
$,M SMALL ENTITY SUBSIDY = 5.91 Total Surcharge (Reflects 10% off the fee base) 4.3
TOTAL PART 171 BILLING ADJUSTMENTS $,K Est. Unpaid FY 2005 Part 171 Bills 2.70 Est. Payments From Prior Year Part 171 Bills (3.20) Adjustment for addt'l FY 2004 collections (2.20)
Total (2.70)
Adjustment for FY 2005 Rescission ($0.480996) COMPARISON OF ANNUAL FEES (PER LICENSE)
USING 2/04 MATRIX
Sheet H FV.E L FACILITY ANUAL FEES FY 2005
Part 171 Amount $23,730,870 Less Billog Adjustment (193,317) Less Recission Adjustmern (34439 TOTAL $23,503,114 -TOTALANNUAL SAFETY SAFEGUARDS TOTAL SURCHARGE FEE
Allocation of Part 171 Amount to Safety/Safeguards $15,101,035 $8,402,079 $23,503,114 $330,847 $23,833,961
* EFFORT FACTORS
NUMBER OF Safety Safeguards Total LICENSES FEE CATEGORY 1A(1)(a) SSNM (HEU) 2 101 38.0% 86 58.1% 187 45.2% 1A(1)(b) SNM (LEU) 3 66 24.8% 18 12.2% 84 20.3% 1A(2)(a) LIMITED OPS (Framatorm 1 8 3.0% 3 2.0% 11 2.7% 1A(2)(b) OTHERS 2 9 3.4% 7 4.7% 16 3.9% 1E ENRICHMENT 2 70 26.3% 34 23.0% 104 25.1% 2A(1) UF6 (Honeywell) 1 12 4.5% 0 0.0% 12 2.9% ==01======4 TOTAL 11 266 100.0% 148 100% 414 100% % of total 64.3% 35.7%
(5) ALLOCATION to CATEGORY OTAL ANNUAL FY 2005 (1) (2) (3) (4) FEE PER Annual Fee Fee Category LICENSE Rounded 1A(1)(a) SSNM (HEU) 2 $5,733,851 $4,882,289 $10,616,141 $149,441 $5,382,791 $5,383,000 1A(1)(b) SNM (LEU) 3 3,746,873 1,021,875 4,768,748 $67,128 $1,611,959 $1,612,000 1A(2)(a) LIMITED OPS (Framatomi 1 454,166 170,312 624,479 $8,791 $633,269 $633,000 1A(2)(b) OTHER 2 510,937 397,396 908,333 $12,786 $460,560 $461,000 1E ENRICHMENT 2 3,973,956 1,930,207 5,904,164 $83,111 $2,993,638 $2,994,000 2A(1) UF6 (Honeywell) 1 681,250 0 681,250 $9,590 $690,839 $691,000
11 $15,101,035 $8,402,079 $23,503,114 $330,847
Cols 1 and 2=budgeted amounts x percent of total effort factor Col 3 = Col 1 + Col 2 Cot 4 = Total surcharge x percent of total effort factor Col 5 = Col 3 + Col 4/ number of licensees NRC Fuel Cycle Regulatory Program Effort/Fee Determinatlon CATEGORY UCENSEE FEE PROCESS CATEGORY Solid Enrchmnt Uquid HEU Dwn Convrsn/ Pellet Rod/ Scra Hot Cell Effort Factor UF@Metal _ UF6 Blend Powder Bundle Waste S SG S SG S SG S SG S SG S SG S SG SSG S |SG S SG I Total SSNM (HEU) 8WX Tech (SNM-42) 1A(1)(a) 10 10 0 0 0 0 10 10 5 5 10 5 5 5 10 5 1 1 51 41 92 NFS(SNM.124) 1A(t)(a) 10 10 0 0 0 0 10 0 10 10 5 0 0 10 10 0 0 50 45 95
SNM(LEU) Global Nuclear (SNM-1097J 1A(1)(b) 5 1 0 0 1 1 0 0 5 1 5 1 1 1 5 1 0 0 22 6 28 F.a1atomeANPRichland (SNM-1227J 1A(1)(b) 5 1 0 0 1 1 0 0 5 1 5 1 1 1 5 1 0 0 22 6 28 Weslinghouse (SNM-1107) IA(1)(b) 5 1 0 0 1 1 0 0 5 1 5 1 1 1 5 1 0 0 22 6 28
Other (a) Foa r natoriachld (SNM.127e 1 5 1*; 80 r 1 :. 1 0 ;00 5 1 0 .1 22V6.2*3 Hoeywell (SUB~526) Tia lk'%14, ______0 !0 ~ 1 V.0 W0 ~*a~'4-10 -, Ivc 0'~0~2~0 i~1 Other (b) GE Vallocitos (SNM-960) 1A(2)(b) 0 0 0 0 00 0 0 0 0 0 00 0 5 1 1 1 6 2 8 ___. USEC Lead Cascade (SNM-7003) 1A(2)(b) 1 0 1 5 0 0 0 0 0 0 01 0 0 0 3- 8 lotal 266 148 414
S = Safety Annual Ucenseo Fee = (A/B)x(ExF) + (C/D)x(ExG) SG = Safeguards where A = Average Safety Effort Factor for Category whi Regulatorv Effort Scale. B = Summed Safety Effort Factors for All Ucensees C = Average (do not Include licensee In average if SG = 0) Safeguards Effort High = 10 Factor for Category which Ucensee Is In - If SG = 0, then G = 0 Moderate = 5 D = Summed Safeguards Effort Factors for All Ucensees Low a 1 E = Fiscal Year Programmatic Budgel None = 0 F = Percent of Fiscal Year Budgot Related to Safety Programs G * Percent of Fiscal Year Budget Related to Safeguards Programs
1 1-Feb-05 SEE BUDGET AUTHORITY TAB
FOR BUDGETED SURCHARGE COSTS Sheet I- Surcharge-Rebaseline IURCHARGE - FY 2005
SURCHARGE RATE: S328.608
DIRECT RESOURCES FEE AMOUNT SK FTE (S.M) ITOTALNNRCC _ FEDERAL AGENCY EXEMPTION 56 4 1A NONPROFIT EDUCATIONAL EXEMPTION 1.362 23 8.8 INTERNATIONAL ACTIVITIES 852 28 10.0 SMALL ENTITY SUBSIDY 5.91 AGREEMENT STATE OVERSIGHT 497 23 8.1 REGULATORY SUPPORT TO AGREEMENT STATES 3.784 31 13.9 SDMP 585 9 3.5 DECOMMISSIONINGIRECLAMATION GENERIC 2.109 24 10.0 LLW GENERIC 647 7 2.8
TOTAL 9.891 147.8 64.4
To meet the 90% fee recovery requirerent for FY 2005. the Surcharge is reduced by 10% of NRC's FY 2005 budget authority, rinus the NWF and the General Fund, as shown below.
($,M) Total Surcharge arnount les generic LLW (see note) 61.6 Budget Authority rninus NWF 6 Gen Fund 600.8 Percent reduction in fee recovery amount for FY 2005 10.0% Reduction in annual fee recovery amount for FY 2005 60.1 Surcharge, excluding LLW. less reduction In annual fee recovery armount 1.489 Generic LLW amount 2.8 Total surcharge to be assessed 4.3
NOTE: Generic LLW activities are not considered a fairness and equity Issue because licensees wit benefit fron these activities
ION OF SURCHARGE COSTS LLW SURCHARGE NON-LLWSURCHARGE 'OTALSURCHARGE
jPERCENTT - S- M : .- PERCENT ------M S ,M
POWER REACTORS 74% 2.1 82.4% 1.2 3.3 SPENT FUEL STORAGE/REACTOR DECOMMISSIONING - - 4.7% 0.1 0.1 NON-POWER REACTORS - - 0.1% 0.0 0.0 FUEL FACILITIES 8% 0.2 7.2% 0.1 0.3 MATERLALS 18% 0.5 4.0% 0.060175 0.6 TRANSPORTATION - - 1.0% 0.0 0.0 RARE EARTH FACILITIES - - 0.2% 0.0 0.0 URANIUM RECOVERY - - 0.4% 0.0 0.0
TOTAt 100 2.8 100.0% 1.5 4.3 SEE BUDGET AUTHORITY TAB
FOR BUDGETED SURCHARGE COSTS
I COMPARISON OF ANNUAL FEES (PER UCENSE)
FY 2005 DIRECT RESOURCES Sheet A-Summay
SPENT FUEL STORAGE/ NON-POWER RAREEARTH INCLUDED IN I
TOTAL POWER REACTORS REACTOR DECOMM. REACTORS FUEL FACILITY MATERIALS TRANSPORTATION FACILITIES URANIUMRECOVERY OTHERAPPLICANTS SURCHARGE I
S.K FTE S.K FTE S.K FTE SK FTE SK FTE .K FTE S FE FTE SFTE SK FE SFTE TE S.K FTE I
______- I
I
NUCLEAR REACTOR SAFETY 99.730 1.700 83.827 1.160 . 3 0 97 t 0 0 0 0 3 0 0 0 0 0 0 0 1.126 33 1
NUCLEAR MATERIALS SAFETY 25.786 602 2,996 It 5,291 69 0 0 3.9SS 120 2,746 87 574 17 286 3 294 7 0 6 8.665 110 I NUCLEAR WASTE SAFETY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01
INTERNATI. NUCLEAR SAFETY &SUPPORT 0 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O I MANAGEMENTAND SUPPORT 103,894 595 360 21. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 5 I
INSPECTOR GENERAL 1.325 47 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01
233,735 -9. - - -I 1 SUBTOTAL - FEE BASE RESOURCE 233.735 2944.0 87.183 1191.1 5.29 69.5 97 IA 3.988 120.1 2.748 88. 578 18.L9 286 3.2 294 6.6 0 5.8 9.891 147.8I
------_ _= _ = . = =s=, . = = .=-.- * ======. = == =--. =
FY 2005 FEE AMOUNTS 440.8 25.2 0.5 38.3 27.5 5.4 1.2 2.174 1.66184 58.5
%of170feeslototalfeeamount 31.7% 20.1% 57.8% . 38.1% . 6.8% 20.9% . 93.7% 68.5% 100.0% 58.5 LESS PART 170 FEES 139.6 5.1 0.3 14.6 1.9 1.1 1.1 1.490 1.66184 0.0
PART 171 ANNUAL FEES 301.2 20.1 0.2 23.7 25.7 4.3 0.1 0.684 0.000 58.5
% OF BUDGET (EXCL SURCHARGE, OTHER APPL & SMALL ENTIY) 82.36% 4.70% 0.097013% 7.16% 4.04% 1.01% 0.22% - 0.41% N1A
Surcharge (including small entity) 3.3 0.070022 0.00144495 0.3 0.6 0.0 0.0 0.0061 NIA 0.03174 0.000575
Part 171 bIlIlIng adjustments (2.2) (0.1) (0.0) (0.2) (0.1) (0.0) (0.0) (0.01) NIA Adjustment for FY 2005 Rescission (0.3962) (0.022) (0.0005) (0.0344) (0.0194) (0.0049) (0.0011) (0.0020) TOTAL FY 2005 ANNUAL FEE 301.911326 20.022433 0.217589 23.833961 26.088218 4.252167 0.071046 0.677611 0.0 Fee Per License (No. of Licmnses) 2.902994 :104) 0.164347 (121.83) 0.054397 (4) 0.071046 (1) FTE RATES REACTOR PROGRAM = 296,898 MATERIALS PROGRAM = 285,944 SURCHARGE= 328,608
$,M SMALL ENTITY SUBSIDY = 5.91 Total Surcharge (Reflects 10% off the fee base) 4.3
TOTAL PART 171 BILLING ADJUSTMENTS $,K Est. Unpaid FY 2005 Part 171 Bills 2.70 Est. Payments From Prior Year Part 171 Bills (3.20) Adjustment for addt' FY 2004 collections (2.20)
Total (2.70)
Adjustment for FY 2005 Rescission ($0.480996) OUANIr r, AECOVERY ANNUAL FEES FY 2005
TOTAL TOTAL ANNUAL FEE AMOUNT (exci. surcharge): $671,559 TOTAL SURCHARGE: DM01 TOTAL: $677,611
GROUP Calculation of DOE Annual Fee
Fee Total Category FTE FTE Rate Fee 18.B. DOE UMTRCA Budgeted Costs: 1.4 $285,944 $400,322 50% x (Total Annual Fee Amount (excl. surcharge) less UMTRCA) $135,619 50% of Surcharge $3,026
Total: $538,966 DOE's Annual IFee Rounded: $539,000
GROUP o Calculation of Annual Fee Amnount for Remaining UR Licensees
Total Fee Remaining Annual Fee Amount (excl. surcharge): $135,619 Remaining Surcharge Amount (50%): $3,026
Total: $138,644
CALCULATION OF ANNUAL FEE AMOUNTS BY CATEGORY:
(1) (2) (3) (4) (5) (6) (7) (8)
FY 2005 Number of Category Total Weight Total base Annual Fee Per License Annual Fee Licenses Weight Value Percent annual fee Base Surcharge Total Fee Rounded Category Conventional Mill 2.A.(2)(a) Operational/Standby 800 800 20% $27,124 $27,124 $605 $27,729 $27,700
2.A.(2)(b) Operational/Standby 3 800 2400 60% $81,371 $27,124 $605 $27,729 $27,700 1 e.2 Waste Disposal 2A.(3) Disposal Facilities 0 0 0 0% $0 NA NA NA NA 2.A.(4) Disposal at POL Sites 800 800 20% $27,124 $27,124 $605 $27,729 $27,700 2400=====__ TOTAL 5 2400 4000 100% $135,619 MATRIX OF REGULATORY EFFORT BY CATEGORY OF LICENSEE (excluding possession only licensees)
Date of Last Update: 10/27/04
OPERATIONS (25) | CLOSURE (75) Groundwater Type of Site Category Mill Operations Waste Operations Groundwater Control Decommissioning Reclamation Restoration TOTAL 10 5 10 5 30 40 100 Effort Score Effort Score Effort Score Effort Score Effort Score Effort Score Conventional Mill (Ops or Standby) 2(A)2 Class I None 0 Some 25 Some 50 Some 25 Significant 300 Significant 400 800
Waste Disposal Incident to Operations 2(A)4 None 0 Some 25 Some 50 Some 25 Significant 300 Significant 400 800
Solution Mining 2(A)2 Class II Significant 100 Some 25 Significant 100 Some 25 Some 150 Significant 400 800
Waste Disposal 2(A)3 None 0 None 0 None 0 None 0 None 0 None 0 0
Grand Total 2400
Level of Regulatorv Effort None 0 Minor 2 Some 5 Significant 10
G:\DFM\LFT\Fee Policy\2005 proposed fee rule et al.\2005URfeesmatrix.wb3 CALCULATION OF ANNUAL FEES FOR URANIUM RECOVERY LICENSEES (excluding possession only licensees)
(A) (B) (C) (D) (E)
No. of Category Total Percentage Annual Fee Type of Site Category Sites Weight Category of Annual Fee Per From Matrix Weight Total By Category Licensee Licensee (A) X (B) (C)/5795
Conventional Mill 2(A)2 Class I 1 800 800 20.0% (D) x total 171 fees (E)/ (A) Kennecott-Sweetwater & White Mesa (Ops or Standby)
Waste Disposal 2(A)4 1 800 800 20.0% (D) x total 171 fees (E)/ (A) Pathfinder-SB Incident to Operations
Solution Mining 2(A)2 Class II 3 800 2400 60.0% (D)x total 171 fees (E)I (A) Crow Butte, Power Resurces, HRI
Waste Disposal 2(A)3 0 0 0 0.0% (D) x total 171 fees (E)/(A) Envirocare
Total 4000 _ SEE BUDGET AUTHORITY TAB
FOR BUDGETED SURCHARGE COSTS Sheet I-Surcharge-Rebaseline 3URCHARGE . FY 2005
SURCHARGE RATE: $328.608
DIRECT RESOURCES FEE AMOUNT $ K FTE MS.M) iTOTALN NRCR . FEDERAL AGENCY EXEMPTION - 56 4 1.4 NONPROFIT EDUCATIONAL EXEMPTION 1.362 23 8.8 INTERNATIONAL ACTIVITIES 852 28 10.0 SMALL ENTIY SUBSIDY 5.91 AGREEMENT STATE OVERSIGHT 497 23 8.1 REGULATORY SUPPORT TO AGREEMENT STATES 3,784 31 13.9 SDMP 585 9 3.5 DECOMMISSIONING/RECLAMATION GENERIC 2.109 24 10.0 LLW GENERIC 647 7 2.8
TOTAL 9.891 147.8 64.4
To meet the 90% fee recovery requirement for FY 2005. the Surcharge is reduced by 10% of NRC s FY 2005 budget authority, minus the NWF and the General Fund, as shown below.
(SMM) Total Surcharge amount less generic LLW (see note) 61.6 BudgetAuthority irinus NWF&Gen Fund 600.8 Percent reduction i fee recovery amount for FY 2005 10.0% Reduction inannual fee recovery amount for FY 2005 60.1 Surcharge, excluding LLW. less reduction hi annual fee recovery amount 1.489 Generic LLW amount 2.8 Total surcharge to be assessed 4.3
NOTE: Generic LLW activities are not considered a faimess and equity Issue because licensees will benefit from these acivities
ION OF SURCHARGE COSTS
LLW SURCHARGE NON-LLW SURCHARGE OTALSURCHARGE
I-PERCENT- . SMl- - -PERCENT ^ - 5,M S M' -i
POWER REACTORS 74% 2.1 82.4% 1.2 3.3 SPENT FUEL STORAGE/REACTOR DECOMMISSIONING - - 4.7% 0.1 0.1 NON-POWER REACTORS - - 0.1% 0.0 0.0 FUEL FACILITIES 8% 0.2 7.2% 0.1 0.3 MATERIALS 18% 0.5 4.0% 0.060175 0.6 TRANSPORTATION - - 1.0% 0.0 0.0 RARE EARTH FACILITIES - - 0.2% 0.0 0.0 URANIUM RECOVERY - - 04% 0.0 0.0
TOTAL 100 2.8 100.0% 1.5 4.3 SEE BUDGET AUTHORITY TAB
FOR BUDGETED SURCHARGE COSTS COMPARISON OF ANNUAL FEES (PER UCENSE)
FY 2005 DIRECT RESOURCES
Sh*stA SPENT FUEL STORAGEJ NON-POWER RARE EARTH INCLUDED IN I
TOTAL POWER REACTORS REACTOR DECOMN. REACTORS FUEL FACIaLTY MATERIALS TRANSPORTATION FACILITIES URANIUM RECOVERY OTHER APPLICANTS SURCHARGE I
- -.-.
S.K FTE SK FTE SK FTE ,.K FTE S.K FTE S.K FTE S.K FTE $S FTE S,K FTE SK FTE SK FTE I
____ _ - - I
I
NUCLEAR REACTOR SAFETY 99.730 1.700 83,B27 1.160 3 0 97 I 0 0 0 0 3 0 0 0 0 0 0 0 1.126 33 1
NUCLEAR MATERIALS SAFETY 28,786 602 2996 11 5291 89 0 0 3.988 120 2.745 87 574 17 286 3 294 7 0 6 8.665 1101 NUCLEAR WASTE SAFETY 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I INTERNATL NUCLEAR SAFETY & SUPPORT 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I MANAGEMENTANDSUPPORT 103.894 595 360 21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 5 I
INSPECTOR GENERAL 1.325 47 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I
SUBTOTAL . FEE BASERESOURCE 233.735 2944.0 87.183 1191.1 5,293 695 97 t.4 3.98 120.1 2746 B&? 576 18.9 288 3.2 294 6.6 0 5.8 9.891 147.8 1
==__===.=...... **_ -- _ - ==== ------= - = ----- i - - - - -== = - === = ---. .=-
FY 2005 FEE AMOUNTS 440.8 25.2 0.5 38.3 27.5 5.4 1.2 2.174 1.66184 58.5 % of 170 fees to total fee amount 31.7% . 20.1% 57.8% . 38.1% 6.8% 20.9% 93.7% 68.5% 100.0% 58.5 LESS PART 170 FEES 139.6 5.1 0.3 14.6 1.9 1.1 1.1 1.490 1.66184 0.0 5 PART 171 ANNUAL FEES 301.2 20.1 0.2 23.7 25.7 4.3 0.1 0.684 0.000 58.5
% OF BUDGET (EXCL SURCHARGE, OTHER APPL & SMALL ENTITY) 82.36% 4.70% 0.097013% 7.16% 4.04% 1.01% 0.22% 0.41% N/A
Surcharge (Including small entity) 3.3 0.070022 0.00144495 0.3 0.6 0.0 0.0 0.0061 N/A 0.03174 0.000575
Part 171 billing adjustments (2.2) (0.1) (0.0) (0.2) (0.1) (0.0) (0.0) (0.01) N/A Adjustment for FY 2005 Rescission (0.3962) (0.0226) 0.00005) (0.0344) (0.0194) (0.0049) (0.0011) (0.0020) TOTAL FY 2005 ANNUAL FEE 301.911326 20.022433 0.217589 23.833961 26.088218 4.252167 0.071046 0.677611 0.0 Fee Per Ucense (No. of LUcenses) 2.902994 :104) 0.164347 (121.83) 0054397 (4) 0.071046 (1) FTE RATES REACTOR PROGRAM = 296,898 MATERIALS PROGRAM = 285,944 SURCHARGE= 328,608
$,M SMALL ENTITY SUBSIDY = 5.91 Total Surcharge (Reflects 10% off the fee base) 4.3
TOTAL PART 171 BILLING ADJUSTMENTS $,K Est. Unpaid FY 2005 Part 171 Bills 2.70 Est. Payments From Prior Year Part 171 Bills (3.20) Adjustment for addt'I FY 2004 collections (2.20)
Total (2.70)
Adjustment for FY 2005 Rescission ($0.480996) Rare Earth Licenses FY 2005 Fee Rule
Fee Category
§171.16(d), Category 2.A. (2), Other Facilities
Name Docket Number License Number
1. Cabot 40-6940 SMB-920
DETERMINATION OF THE FY 2005 ANNUAL FEE:
TOTAL BUDGETED COSTS $71,046
ANNUAL FEE PER LICENSE $71,000 (Total budgeted costs divided by the number of licensees subject to the annual fee) SEE BUDGET AUTHORITY TAB
FOR BUDGETED SURCHARGE COSTS Sheet I- Surcharge-Rebaseline iURCHARGE - FY 2005
SURCHARGE RATE: $328,608
DIRECT RESOURCES FEE AMOUNT SK FTE 45.M)
'TOTAL NRC>-. 7.-7A''' ' ' FEDERAL AGENCY EXEMPTION 56 4 1.4 NONPROFIT EDUCATIONAL EXEMPTION 1,362 23 8.8 INTERNATIONAL ACTIVITIES 852 28 10.0 SMALL ENTFTY SUBSIDY 5.91 AGREEMENT STATE OVERSIGHT 497 23 8.1 REGULATORY SUPPORT TO AGREEMENT STATES 3.784 31 13.9 SDMP 585 9 3.5 DECOMMISSIONING/RECLAMATION GENERIC 2,109 24 10.0 LLW GENERIC 647 7 2.8
TOTAL 9,891 147.8 64.4
To meet the 90% fee recovery requirenent for FY 2005, the Surcharge is reduced by 10% of NREs FY 2005 budget authority. minus the NWF and the General Fund, as shown below:
($.M) Total Surcharge amount less generic LLW (see note) 61.6 Budget Authority minus NWF & Gen Fund 600.8 Percent reduction in fee recovery amount for FY 2005 10.0% Reduction bi annual fee recovery amount for FY 2005 60.1 Surcharge. excluding LLW. less reduction in annual fee recovery amount 1.489 Generic LLW amount 2.8 Total surcharge to be assessed 4.3
NOTE: Generic LLW acbivilies are not considered a fairness and equity Issue because licensees will benefit from these activities
ION OF SURCHARGE COSTS LLW SURCHARGE NON-LLW SURCHARGE OTALSURCHARGE
r PERCENT= -' - t^ PERCENT'$.M Sl - SM 7
POWER REACTORS 74% 2.1 82A% 1.2 3.3 SPENT FUEL STORAGE/REACTOR DECOMMISSIONING - - 4.7% 0.1 0.1 NON-POWER REACTORS - - 0.1% 0.0 0.0 FUEL FACILITIES 8% 0.2 7.2% 0.1 0.3 MATERIALS 18% 0.5 4.0% 0.060175 0.6 TRANSPORTATION - - 1.0% 0.0 0.0 RARE EARTH FACILITIES _ _ 0.2% 0.0 0.0 URANIUM RECOVERY - - 0.4% 0.0 0.0
TOTAL 100 2.8 100.0% 1.5 4.3 SEE BUDGET AUTHORITY TAB
FOR BUDGETED SURCHARGE COSTS COMPARISON OF ANNUAL FEES (PER LICENSE)
FY 2005 DIRECT RESOURCES
Shot A-Surnmary SPENT FUEL STORAGEt NON-POWER RARE EARTH INCLUDED IN I
TOTAL POWER REACTORS REACTOR DECOM4M. REACTORS FUEL FACILITY MATERIALS TRANSPORTATION FACILTIES URANIUM RECOVERY OTHER APPLICANTS SURCHARGE I
SK FTE S.K FTE SK FTE SK FTE SK FTE SK FTE SK FTE 5K FTE SK FRE SK FTE $X FTE I
_ ___ -- I
I
NUCLEAR REACTOR SAFETY 99,730 1,700 83.27 1.160 3 0 SI 1 0 0 0 0 3 0 0 0 0 0 0 0 1.126 33 1 NUCLEAR MATERIALS SAFETY 28.786 602 2.996 II 5.291 69 0 0 3,988 120 2746 87 574 17 286 3 294 7 0 6 8.665 110 1
NUCLEAR WASTE SAFETY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 INTERNAT'L NUCLEAR SAFETY & SUPPORT 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01 MANAGEMENT AND SUPPORT 103,894 595 360 21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 5 1
INSPECTOR GENERAL 1.325 47 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01
- - - - _ -- I
SUBTOTAL.- FEE BASERESOURCE 233,735 2944.0 87.183 1191.1 5.293 69.5 97 1.4 3,988 120.1 2.746 86.7 576 169 286 32 294 6.6 0 5.8 9.891 147.8 1
=s==__======--- =_=:==8z ==E-SS USSaPa=SSS - - - . = _==in===-U St US* US --- sh w ==-ts a n-*Sm fl= =s======n = ----- S = ==S3 BSSSS
FY 2005 FEE AMOUNTS 440.8 25.2 0.5 38.3 27.5 5.4 1.2 2.174 1.66184 58.5 %of 170feestototalfee amount 31.7% . 20.1% 57.8% 38.1% 6.8% 20.9% 93.7% 68.5% . 100.0% S8.5 LESS PART 170 FEES 139.6 5.1 0.3 14.6 1.9 1.1 1.1 1A90 1.66184 0.0 . . . = . . . . . -
PART 171 ANNUAL FEES 301.2 20.1 0.2 23.7 25.7 4.3 0.1 0.684 0.000 58.5
%OFBUDGET(EXCLSURCHARGE.OTHERAPPL &SMALLENTITY) 8Z36% 4.70% 0.097013% 7.16% 4.04% 1.01% 0.22% 0.41% N/A
Surcharge (including small entity) 3.3 0.070022 0.00144495 0.3 0.6 0.0 0.0 0.0061 NA 0.03174 0.000575
Part 171 billing adjustments (2.2) (0.1) (0.0) (0.2) (0.1) (0.0) (0.0) (0.01) NIA Adjustment for FY 2005 Rescission (0.3962) (0.0226) (0.0005) (0.0344) (0.0194) (0.0049) (0.0011) (0.0020) TOTAL FY 2005 ANNUAL FEE 301.911326 20.022433 0.217589 23.833961 26.088218 4.252167 0.071046 0.677611 0.0 Fee Per License (No. of Licenses) Z902994 :104) 0.164347 (121.83) 0.054397 (4) 0.071046 (1) FTE RATES REACTOR PROGRAM = 296,898 MATERIALS PROGRAM = 285,944 SURCHARGE= 328,608
$,M SMALL ENTITY SUBSIDY = 5.91 Total Surcharge (Reflects 10% off the fee base) 4.3
TOTAL PART 171 BILLING ADJUSTMENTS $,K Est. Unpaid FY 2005 Part 171 Bills 2.70 Est. Payments From Prior Year Part 171 Bills (3.20) Adjustment for addt'l FY 2004 collections (2.20)
Total (2.70)
Adjustment for FY 2005 Rescission ($0.480996) VV-4 WSb9TATION ANNUAL FEES
FY 2005
The total transportation budgeted costs of $4,252,167 to be recovered from annual fees is to be obtained from two sources: Materials Rate: $285,944 1. Department of Energy (DOE) 2. Other Part 71 licensees Fee Category 18.A. The costs are allocated to the two groups in proportion to the number of Certificates of Compliance they hold. DOE holds 34 of the 133 Certficates of Compliance (25.6%). Therefore,
Total Amount $4,252,167 FY2005 Annual x percentage 25.56% Fee Rounded Total DOE annual Fee = $1,087,020 $1,087,000
Total annual fee for other Part 71 licensees= $4,252,167 Less DOE 1.087.000 $3,165,167
The annual fee for other Part 71 licensees is assessed to package users, designers and fabricators who hold approved quality assurance plans. QA Plan annual fees are based on whether the plan is for design, fabrication and use (user and fabricator), or for use only, and the proportion is the same as the staff resources for QA activities.
From FY 2005 Budget: FTE Total % of total Quality Assurance Reviews 0.4 0.00 $114,378 16.00% 0.00 QA Inspections 2.1 $600.483 84 00% Total 2.5 0.0 $714,861 100.00%
No. of QA plans for use 84 No. of QA plans for design, fabrication, and use Total 119
Fee Categ Fee for QA's for use only: 10.B.2 Fee = Total amount $3,165,167 FY 2005 FY 2005 x percentage Annual Fee Annual Fee $506,427 divided by no. Perlicense Rounded of licensees: 119 $4,256 $4,300
Fee for QA's for design, fabrication and use: 10.B.1 Fee = Total amount $3,165,167 FY 2005 FY 2005 x percentage 0.84 Annual Fee Annual Fee $2,658,740 divided by no. Per licen Rounded of licensees: 35 $75,964 +Use only fee 425 $80,220 $80,200 . - I I - 1-1 ...... -Alvin. 11-I .-- -1 11- -.1-1--il I Tam my-,C-r66te--bne m6r'e-cfian-g-e to' Surcha,,-rge c-a-t-e-g-o-r-y-p--a, `C'kig-e, PagePi - 1 I Tammy Croote - One more change to Surcharge category package
From: Elise Heumann To: Tammy Croote Date: 9/9/04 7:06AM Subject: One more change to Surcharge category package Tammy- One more change to the backup for the surcharge category package. When we chatted yesterday, I mentioned that I was meeting with Michelle DeBose later in the morning to discuss the number of registered Certificate of Compliance (CoC) users, that Michelle had previously provided to Shirley Crutchfield. Newly counted numbers are: Total registered users is 460 Educational institutions are 21 Federal agencies are 18 This makes the percent of educational institutions 4.6% and the percent of federal agencies 3.9%, by my calculations. See you on Monday the 13th. Elise Heumann, x8506 VALUE SOURCE BUD
JDGET INPUTS~ C-
(11) No. of NRC Small Materials Licenses (Inc. exempts) 2004 - 2005 Edition Info. Digest (U.S. Materials by State) (10) No. of Agreement State Materials Licenses 2004 - 2005 Edition Info. Digest (U.S. Materials by State) Percent of Agreement State Matis Licenses to total Matis Licenses (8) No. of NRC Materials Users/SSD Part 171 Billable Fee Cats. (Incs. Feds) MATANN LTS & SSDS Reports of Frozen Data (Chris) (2) No. of Federal Agency Materials Users Licenses LTS Rpt Gyu.countfed total fee cats. (Ros) Percent of Federal Materials Licenses to total Materials Users Licenses (6) No. of Educational Fee Ex. Materials Licenses (LTS) LTS Rpt Gyu.countedu total fee cats. (Ros) (5) No. of Materials Licenses LFARB Data (automatically populated) Percent of Educational Materials licenses to total NRC materials licenses
a; . ! i '' l (7) No. of Agreement State Op & Standby Uranium Recovery Licenses State Programs Staff (Dennis Sollenberger) (9) No. of NRC Billable Uranium Recovery Licenses LFARB Data ( Ellen Poteat) Percent of Agreement State Uranium Rec. Licenses to total Uranium Rec. Licenses I] I , l.-:-':- - I No. of Route approvals E-mail from NSIR (Gloria BenningtonlPhil Brochman) No. of Route Approvals for Educational Institutions E-mail from NSIR (Gloria BenningtonlPhil Brochman) Percent of Education Route Approvals to Total No. of Registered Users* E-mall from SFPO (Michelle DeBose AND Elise Heumann No. of Federal Agency Registered Users E-mall from SFPO (Michelle DeBose AND Elise Heumann Percent of Federal Agency Registered Users No. of Educational Institution Registered Users E-mall from SFPO (Michelle DeBose AND Elise Heumann Percent of Educational Registered Users
(12) No. of Billable Power Reactors LFARB Staff w/Input from NRR (Ellen) (13) No. of billable Nonpower Reactors LFARB Staff winput from NRR (Ellen) (3) No. of Educational Nonpower Reactors- LFARB Staff wnput from NRR (Ellen) Percent of Educational Nonpower Reactors to total Nonpower Reactors No. of ImportlExport licenses Issued DIP data from Steve Dembeck and Carlotta Coates No. of Import/Export licenses Issued to Federal agencies DIP data from Steve Dembeck and Carlotta Coates
Percent of Fed agency Importlexport licenses to total Importlexport licens A registered user Is [1] any NRC licensee who has notified NRC of Its Intent, and uses one or more NRC-approved transportation packages to transport, or deliver to a carrier for transport, licensed material under the general license provisions of 10 CFR Part 71.12; or [2] any Agreement State licensee who has notified NRC of Its Intent, and uses one or more NRC-approved transportation packages to transport, or deliver to a carrier for transport, licensed material under compatible State regulations
** Includes 5 federally-owned or state-owned research reactors used primarily for educational training and academic research purposes where the design of the reactor satisfies certain technical specifications. These exemptions were provided In the Energy Policy Act of 1992, and Implemented In the FY93 final fee rule.
G:ILFBI2005BUDGETALLOCATION.PRELIMINARYFEES.123 2-1- !-- I Tammy ... . . _,,,, . L I,_ . _ = = . , Croote - FY 2005 Fee Ca cu lation , ..... for Proposed Annual Fee .. Pwaqe .. .. A. ^ . A..=,.,
From: Shirley Crutchfield To: Tammy Croote Date: 10/28/04 7:23AM Subject: FY 2005 Fee Calculation for Proposed Annual Fee
Tammy-
The numbers for the QA's and Certificate of Compliance are as follows:-
Number of QA plans for use (1OB.2) - 84 No. of QA plans design, fabrication, use (10.B.1) - 35 Totall No. of Certificates of Compliance - 133 No. of DOE Certificates of Compliance - 34 .
Shirley
.- SEE BUDGET AUTHORITY TAB
FOR BUDGETED SURCHARGE COSTS Sheet I- Surcharge-Rebaseline ;URCHARGE - FY 2005
SURCHARGE RATE: S328.608
DIRECT RESOURCES FEE AMOUNT S K FTE (S.M) jTOTAL NRC7 FEDERAL AGENCY EXEMPTION 56 4 1A NONPROFIT EDUCATIONAL EXEMPTION 1,362 23 8.8 INTERNATIONAL ACTIVITIES 852 28 10.0 SMALL ENTITY SUBSIDY 5.91 AGREEMENT STATE OVERSIGHT 497 23 8.1 REGULATORY SUPPORT TO AGREEMENT STATES 3.784 31 13.9 SDMP 585 9 3.5 DECOMMISSIONING/RECLAMATION GENERIC 2,109 24 10.0 LLW GENERIC 647 7 2.8
TOTAL 9.891 147.8 64.4
To meet the 90% fee recovery requirement for FY 2005. the Surcharge is reduced by 10% of NRC's FY 2005 budget authority, minus the NWF and the General Fund. as shown below,
($,M) Total Surcharge amount ess generic LLW (see note) 61.6 Budget Authority minus NWF & Gen Fund 600.8 Percent reduction n fee recovery amount for FY 2005 10.0% Reduction hiarnnual fee recovery amount for FY 2005 60.1 Surcharge. excluding LLW, less reduction in annual fee recovery amount 1.489 Generic LLW amount 2.8 Total surcharge to be assessed 4.3
NOTE: Generic LLW activities are not considered a fairness and equity issue because licensees will benefit from these activities
ION OF SURCHARGE COSTS LLW SURCHARGE NON-LLWSURCHARGE 'OTAL SURCHARGE
T PERCENT 7 ;S-M .-. - n PERCENT' - S. -
POWER REACTORS 74% 2.1 82A% 1.2 3.3 SPENT FUEL STORAGE/REACTOR DECOMMISSIONING - - 4.7% 0.1 0.1 NON-POWER REACTORS - - 0.1% 0.0 0.0 FUEL FACILITIES 8% 0.2 7.2% 0.1 0.3 MATERIALS 18% 0.5 4.0% 0.060175 0.6 TRANSPORTATION - - 1.0% 0.0 0.0 RARE EARTH FACILITIES - - 0.2% 0.0 0.0 URANIUM RECOVERY - - 0.4% 0.0 0.0
TOTAL 100 2.8 100.0% 1.5 4.3 SEE BUDGET AUTHORITY TAB
FOR BUDGETED SURCHARGE COSTS COMPARISON OF ANNUAL FEES (PER LCENSE)
FY 2005 DIRECT RESOURCES
Shoot A-Summary SPENT FUEL STORAGE/ NON-POWER RARE EARTH INCLUDED IN I
TOTAL POWER REACTORS REACTOR DECOMM. REACTORS FUEL FACILITY MATERIALS TRANSPORTATION FACIUTIES URANIUM RECOVERY OTHER APPUCANTS SURCHARGE I
_ . - I
SK FTE SK FTE S.K FTE SK FTE SK FTE SK FTE SK FT! $K FTE SK FTE S.K FTE S.K FTE I
_ - - _- I
I
NUCLEAR REACTOR SAFETY 99.730 1,700 83,827 1.160 3 0 97 1 0 0 0 0 3 0 0 0 0 0 0 0 1,126 33 1 NUCLEAR MATERIALS SAFETY 28.786 602 2,996 11 5.291 69 0 0 3.988 120 2746 87 574 17 286 3 294 7 0 6 8.665 110 I
NUCLEAR WASTE SAFETY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01 WNTERNATLNUCLEAR SAFETY & SUPPORT 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01 MANAGEMENT AND SUPPORT 103.894 595 360 21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 5 I
INSPECTOR GENERAL 1;125 47 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01
- -_- I
SUBTOTAL . FEE BASERESOURCE 233.735 2944.0 E7.183 1191t.1 5,293 69.5 97 1A 3.983 120.1 2.746 887 576 16.9 286 3.2 294 6.6 0 S. 9.891 147.8 1
C=SIS t , tS t==gstZ= s= -. = S = - -_ -_ - - .= … . ==='t = ==-…5= -s--= '= - *: _ a s F - - =- = -sss = ass. r = =-=s= ===
FY 2005 FEE AMOUNTS 440.8 25.2 0.5 38.3 27.5 5.4 1.2 2.174 1.66184 58.5 % of 170 fees to total fee amouzt 31.7% 20.1% 57.8% 38.1% 6.8% 20.9% 93.7% 68.5% 100.0% 58.5 LESS PART 170 FEES 139.6 5.1 0.3 14.6 1.9 1 .1 1.1 1.490 1.66184 0.0
PART 171 ANNUAL FEES 301.2 20.1 0.2 23.7 25.7 4.3 0.1 0.684 0.0D0 58.5
% OF BUDGET (EXCL SURCHARGE, OTHER APPL & SMALL ENTITY) 82.36% 4.70% 0.097013% 7.16% 4.04% 1.01% 0.22% 0.41%6 NZA
Surcharge (Including small entity) 3.3 0.070022 0.00144495 0.3 0.6 0.0 0.0 0.0061 NIA 0.03174 0.000575
Part 171 billing adjustments (2.2) (0.1) (0.0) (0.2) (0.1) (0.0) (0.0) (0.01) NIA Adjustment for FY 2005 Rescission (0.3982) (0.0226) (000os) (0.0344) (0.014) (0.0049) (0.0011) (0.0020) TOTAL FY 2005 ANNUAL FEE 301.911326 20.022433 0.217589 23.833961 26.088218 4.252167 0.071046 0.677611 0.0 Fee Per Ucense (No. of Licenses) 2.902994 :104) 0.164347 (121.83) 0 054397 (4) 0.071046 (1) FTE RATES REACTOR PROGRAM = 296,898 MATERIALS PROGRAM = 285,944 SURCHARGE= 328,608
$,M SMALL ENTITY SUBSIDY = 5.91 Total Surcharge (Reflects 10% off the fee base) 4.3
TOTAL PART 171 BILLING ADJUSTMENTS $.K Est. Unpaid FY 2005 Part 171 Bills 2.70 Est. Payments From Prior Year Part 171 Bills (3.20) Adjustment for addt'I FY 2004 collections (2.20)
Total (2.70)
Adjustment for FY 2005 Rescission ($0.480996) COMPARISON OFANNUAL FEES(PER UCENSE)
St"l ILF.. 0607o4g.y FY 2005 REIASE - E NUMBER OF LICENSEl. 606 0006 FY 200S (1) (2) (3) (4) (5) (6) () (6) (5) (50) (55) (52) (13) (14) (55) FY 2005 Amn.aI F" Slkd ei*d o11570F.) C.l.. Clol. Phq III a.- -e r. 764.5TtiOL E-d T6.I C.lo 6 d b 6 (Round.d} IFY 200 . FY 3004 T1F.- 646W b6 600 46b4 To6I A,.o..I __ _f En , _ 00.-4 00046in0 P- Lk. F. C.400y F. F.. FY2004 AppL bp. Flo. 1AM" 104. 0.n..G Gad UPqu4 h . U p 0... Ba FLO TOTAL 0. EMY 6.. Efty Sb JS,K) (S.K) 500 SPECIALNUCLEAR MATERIAL2
910 2.060 s 13220 4120 1663 56034 444 4.437 2.127 5 2.132 21 21 0 0 a I 2.100 50. MOOW G8384 0 5 15.0 A00W 5.700 5 179340 69540 3144 228374 1228 74.S63 4.971 am 1 I .70 303 353 7 0 245000 5,000
SOURCEMATERILJU
11 3 14.0 220 U400 I sao 2000 S35 740 215 3.015 750 2 752 II I1 1 0 01 750 20. 00, So U_ 41, Is maO 7.oo 5.800 5 G0320 77720 1145) 76034 1249 6602 I5S2 806 33 13.400 04 904 4 1 57800 1 13,500
0 BYPRODUCTMATERIAL: 0
3A. UA ". Ed... a 2 8.0 .30 50.300 2 115600 41200 10401 147206 S54W 44.304 23.947 *06 S 24.805 192 156 3 0 67500 I 24.,00 30. M..otAA1. .r- 'I 12 GU0 3aso0 3.700 2 20020 77700 6027 379731 130 3.670 7.35 606 17 0.57 463 0Is 12 20 224900 1 6,200 01 52 03. 30 44,0 4,700 4,300 3 23056 63067 7010 343655 1543 6,0913 A354 60 22 10,152 412 441 9 0 71100 1 10,200 30. Rd.O.6d.W M.UjP-s. 30. f . . U-0664 7 0 7.0 3aoo 2,200 3 203 5133 0263 35544 t70 hS Cm2 I5 6.06 42 42 2 1 13200 6,100 100 Is 116,0 2.00 3 33640 69600 3603 420375 a4" 74.041 4.339 1 1 4.50 502 105 2 1 7600 1 4,300 3E. bdimm 6 55f,0000 4 0 4.0 4.000 Zo0 3 21133 3332 6019 27675 607 .509 7.16 20 7,30 31 35 a 0 0 1 7I00m 3Ch. _-dO*O oh0bo=a 0 2 0 11.000 S0400 t 131200 43200 20084 167072 5615 46.55 20.600 60 26.705 254 214 0 0 0 20,i00 30 7 31.0 I3,00 2,400 s 517260 1n770 170I 517 16.125 15,.19 51 16.370 676 600 4 11 293500 1 1400 3K E-.W4 0.806lt NoOk. R. 6SS 31. E0 .. t . D. R. 50 67.0 0.m 1A0 5 500120 24120 1O04 753263 306 25973 15032 35 11.064 739 741 to a 151600 1 11,100 3W..GLk.- D4.06 R-4 6 5 19.0 1Soo 2.230 5 35074 0414 2351 44OU 440 9.125 2.U1 7 2.3 54 54 2 7 17500 1 2.400 3K GM Ll~ .1FfD.A R" 4 I 4.0 950 1,400 5 5450 1400 1390 6040 302 1.506 5.690 4 15,04 a 0 O I 1200 1 1,700 3L R D 40.4E 52 13 65.0 7,000 5.000 3 615333 100333 1205) 703572 7 5,65 3.50 006 3 54,690 000 655 02 24000 1 14.700 3R R&D * 0B- 152 35 507.0 3.500 2.900 5 600160 100640 4604 $7631 625 1156794 hI3 606 13 6.h30 903 1146 30 16 203600 1 6.100 30, 5.*A Lk- 04 n20 3ao00 2.200 4 291600 2000 1157 371327 102 42.643 5750 606 IS 6.570 414 473 I5 17 1620 1 6.600 30 Rtvqp, 62 57 1090 5.200 5.700 I 75*100 403300 8707 957732 3904 434,209 12.77 25 12.70 1392 1395 48 14 676200 1 12.00 3P.AO066 0o.&.fd MMa.. 1403 263 1664,0 f.loo 2,400 s 2632240 ?n0 2012 3351675 517 6105127 2.129 6 2.525 4213 4223 311 560 394200 1 2.500 0
WASTE D03AL A0N0PROCESSING: 0 I 0
4A W Ooai _ 1 0 0 0 0 G06 0 806 0 0 0 0 0 1 0 0 6 4.. ow Rp6!P54.VV 14 2 120 2,400 2.900 1 62400 330o0 6622 3015 3.12 0.637 M06 19 10,40 16 15 I 0 6200 1 10.500 4C. W.4 R- Pp~ka*gdl. f 2 0 2.0 3.600 2.00 2 "000 2600 6240 12479 1400 200 7?640 am Is 613 i5 1 7 I I 142001 6,500 0
WELL LOCOIC:
21 6 35.0 .300 3.00 3 01667 35676 2207 1099 1113 3 4.064 6 4,003 143 143 9 5 3400 1 4,100 50. Fl4ld F 1n SwIs' 0 6 3 0 0 o a 0 0 w0 0 0 0 0 0 0 1 00 0 0 I NUCLEARLAUNDRY. 0 A N.J.. La"y 2 X 3.0 55.600 3.600 2 u2000 s5 22412 67236 1953 h .615 24.150 6am 4 25,221 73 70 I 0 22000 25,200
0t HUMANUSE OF BYPRODUCT.SOURCE. OR SN6M 0 7A.T _W..W 12 1t0 0.600 3.500 3 15m00 21000 12431 223880 20 356 1256 22.614 53753 35 13.749 247 241 1 0 15400 I 13,700 70 M.40i.SE.0 33 6 39,0 6.200 7.900 I s4sxo 306100 17052 700249 20 772 0507 331.774 26.112 m6 52 27,239 1023 5066 I 0 25000 27,300 ?C. 4.4.OR0 1312 290 1602.0 2100 3.500 3 5019600 1655400 300 6392014 20 31700 1113 I.719509 5.5231 1 5.34 0206 225 340 70 1310600 1 5,100 COMPARISON Of ANNUAL FEES (PER UCENSE)
RE0ASSELINE NUMBSEROF ICENSE$ a06 0o6 FY2005 FY 2005 (1) (2) (3) (4) (5) (6) (7) (a) (9) (10) (I1) (12) (13) (14) (10) Anmual F.. ONad BMW P1. 176FPS. C.k. o C64. Totl Ed T£0a1.IC Co. _ d_____ S-i (Round*,) I Cim 0EPENSE. 0 0 0 I &6 CM D.. 0.0 4S0 2.200 5 5340 2640 1133 474 2.o43 1.607 3 1.6t0 10 10 0 0 0 1 1.600 0 1 a DEVICE.PRODUCT. Oft SEALEDSOURCE WAFETYEVALUATIOII 0 0 0., DO.AP00 Sey E.* . S'ad 76 0 t4. 10.300 7 1621200 a 24577 20.4424 0 0 24.577 71 24,647 2004 2070 IS 24 912900 1 24.,00 6. Ok.A4d Stj Eklbn Of- 12 2 14.0 190300 7 270200 0 24377 346076 0 0 24,577 71 24.647 344 345 0 0 0 1 24.600 9C £1d 5.4 SW" Eddn BWd 20 4 24.0 2.200 0S2100 0 2802 672M 0 0 2802 a 2.110 67 67 1I 2300 I 2800 90 S... So5 aly E4.M. Olt- 20 1 210 750 7 15750 0 9SS 20056 0 0 053 3 W5A 20 20 0 0 0 1 960
TRAHSPORTATION: a 0 I IoA(1) C.V . Cocn.P WA NWA IVA 0 0 I 10.0.41)App-f (UW* Wo Fan0kiM) 29 9 36,0 0 a I 101.4(2)Aff.4. (43.. ) 77 7 64.0 a 0 I 11 OTHERUCEI4SES: I 0 0 0 I a II. S l.&-d 504 Fda F.'a- WA WA 0.0 I 0 12. SpF Pd.T WA WA 0.0 0 0 I a 13A Spt F.0 00- C-M_ .o CopW" WA WA 0.0 o 0 I a 13jap.4 Fad C.l6 1 WA WA 0.0 0 0 I a 16. WA WA 0.0 0 0 I 0 I EWMM1W WA WA 0.0 0 o I 0 ILR.4.0* WA WA 0.0 0 0 I a I". AM.051." o 3 0 a.0 64 60554 1 435679 181675 104032 55470. 00i0 0 65212 195,635 250144 606 531 251411 750 754 1 251.000 d v.Id f_ F. VA-. 10A DOE T,.pwtmAmA. 0 I 1.0 0 - 6 _ 6 b..ad 0 11 0 O ELTRCAA06Ad I a 1.0
TOTAL 340.0 776.0 44614 15451006 4215122 20.94004 4.539A.06 075464 25521 2004 U3 370 4.712000 MA nO_.k-cay 0 I 12.00.0 210.1156 T0.dflNd 6 7 I M 71. $ .4 40.4447 30 370 w6000
MATERIJLSRATE: 0285.44
C64-i.l-l UNIQUE(W.. .. e. d Wt fal S T1.4 k.ovd t-a (FY2004 utA PPa. 35 k.5Wa .a) 0.6 p SO.00 I:OCTcTsI ToW'. (FTE*f1E _ a 0 w.4d rn.u) Powt of4NRC *_ _6.tb. WA a.dft ka. A..4t aud w NRC _ - (0blJ54 cad) 033,670 NA d Wadd NRCS.. (If FY2003. CtL 7.70 .7C0,S t4.d.AC a aM Mosw 1000 hUIrIqk par 40....: UAA 1.051 a ll l(..c0rn Ils~aIeaaa...0.09.Ooae..: es s FTE FTE 004 PSS 1644 12.7 a 0205.044 a Maayaa * 0.53.203 * 04,030,064
TW pU W b- 0. b-a _ U.69
A- I*2be ft.-d Om n4daOk_ 0504.462 No d *ltlld _S 626 CLW5Mw. PKoIV-: UN
T64d46 -WW1b6 -. 6.,b 0439,429I P-t.ge b6b0 .- _ d h - -W lk. Aim1 A-" Mbt. o.. *0 WcNa4.OA $60.175 Sheet I- Surcharge-Rebaseline ;URCHARGE * FY 2005
SURCHARGE RATE: $328,608
DIRECT RESOURCES FEE AMOUNT SK FTE (SUM) ITOTAL NRC .- . FEDERAL AGENCY EXEMPTION 56 4 1.4 NONPROFIT EDUCATIONAL EXEMPTION 1.362 23 8.8 INTERNATIONAL ACTIVITIES 852 28 10.0 SMALL ENTITY SUBSIDY 5.91 AGREEMENT STATE OVERSIGHT 497 23 8.1 REGULATORY SUPPORT TO AGREEMENT STATES 3,784 31 13.9 SDMP 585 9 3.5 DECOMMISSIONINGIRECLAMATION GENERIC 2109 24 10.0 LLW GENERIC 647 7 2.8
TOTAL 9.891 147.8 64.4
To meet the 90% fee recovery requirement for FY 2005. the Surcharge is reduced by 10% of NRCs FY 2005 budgetauthority. mrinus the NWF and the General Fund, as shown below:
(S.f,,A) Total Surcharge amount less generic LW (see note) 61.13 Budget Authority minus NWF & Gen Fund *600.8 Percent reduction hi fee recovery amount for FY 2005 10.0' Reduction in annual fee recovery amount for FY 2005 60.1 Surcharge. excuding ULW. less reduction in annual fee recovery amount 1.48'9 Generic LLW amount 2.8 Total surcharge to be assessed 4.3 N NOTE: Generic LLW activities are not considered a fairness and equity Issue because licensees will benefit from these activities
ION OF SURCHARGE COSTS LLW SURCHARGE NON-LLW SURCHARGE 'OTALSURCHARGE
FPERCENT7* . S.M " PERCENT $S,M- S.M
POWER REACTORS 74% 2.1 82.4% 1.2 3.3 SPENT FUEL STORAGE/REACTOR DECOMMISSIONING - - 4.7% 0.1 0.1 NON-POWER REACTORS - - * 0.1% 0.0 0.0 FUEL FACILITIES 8% 0.2 7.2% 0.1 0.3 MATERIALS 18% 0.5 4.0% 0.060175 0.6 TRANSPORTATION - - 1.0% 0.0 0.0 RARE EARTH FACILITIES - - 0.2% 0.0 0.0 URANIUM RECOVERY - - 0.4% 0.0 0.0
TOTAL 100 2.8 100.0% 1.5 4.3 SEE BUDGET AUTHORITY TAB
FOR BUDGETED SURCHARGE COSTS COMPARISON OF ANNUAL FEES (PER LICENSE)
Sheet L
Oe-rE an l MrN 4F MATERIALS PART 170 FEES and Average Inspection Costs FY 2005 FY2005 Materials Hourly Rate: $198 FY 2005 Professional FY 2005 Fee/Cost Materials Part 170 Fee Process Time (Professional Time FY 2005 Fee/Cost Category (Hours) x FY 2005 Hourly Rate) (Rounded)
1. Special Nuclear Material IC. Industrial Gauges Inspection Costs 10.4 $2,057 $2,060 New License 4.6 $910 $910
ID. All Other SNM Material Inspection Costs 28.6 $5,656 $5,700 New License 9.3 $1,839 $1,800
2. Source Material 2B. Shielding Inspection Costs 7 $1,384 $1,400 New License 1.1 $218 $220
2C. All Other Source Material Inspection Costs 29.1 $5,754 $5,800 New License 39.3 $7,772 $7,800
3. Byproduct Material 3A. Mfg-Broad Scope Inspection Costs 52.3 $10,342 $10,300 New License 46.8 $9,255 $9,300
3B. Mfg-Other Inspection Costs 18.6 $3,678 $3,700 New License 17.7 $3,500 $3,500
3C. Mfg/Distributlon Radiopharmaceuticals Inspection Costs 21.8 $4,311 $4,300 New License 24 $4,746 $4,700
3D. Distribution Radiopharmaceuticals/No Process Inspection Costs 11 $2,175 $2,200 New License 17 $3,362 $3,400
3E. Irradiators/Self-Shielded Inspection Costs 9 $1,780 $1,800 New License 11.5 $2,274 $2,300 COMPARISON OF ANNUAL FEES (PER LICENSE)
Sheet L
PEit~-E - N ATiR OF MATERIALS PART 170 FEES and Average Inspection Costs FY 2005 FY2005 Materials Hourly Rate:
3F. Irradiators < 10,000 Cl Inspection Costs 12.7 $2,511 $2,500 New License 23.4 $4,627 $4,600
3G. Irradiators => 10,000 Ci Inspection Costs 27.4 $5,418 $5,400 New License 55.8 $11,034 $11,000
3H. Exempt DistributionlDevice Review Inspection Costs 12.1 $2,393 S2,400 New License 68.2 $13,486 S13,500
31. Exempt Distributlon/No Device Review Inspection Costs 9 $1,780 $1,800 New License 40.5 $8,009 $8,000
3J. General License Distribution/Device Review Inspection Costs 11.3 $2,235 $2,230 New License 7.2 S1,424 $1,400
3K. General License Distribution/No Device Review Inspection Costs 6.9 $1,364 $1,400 New License 4.1 $811 S810
3L. R&D-Broad Inspection Costs 25.5 $5,043 $5,000 New License 39.3 S7,772 $7,800
3M. R&D-Other Inspection Costs 14.6 $2,887 S2,900 New License 15.9 $3,144 $3,100
3N. Service License Inspection Costs 11.3 $2,235 $2,200 New License 17.6 $3,480 S3,500
30. Radiography Inspection Costs 18.8 $3,718 $3,700 New License 16.4 $3,243 $3,200
3P. All Other Byproduct Material COMPARISON OF ANNUAL FEES (PER LICENSE)
Sheet L
PET-Ear 1N AT-O°N OF MATERIALS PART 170 FEES and Average Inspection Costs FY 2005 FY2005 Materials Hourly Rate: Inspection Costs 12.2 $2,413 S2,400 New License 5.4 $1,068 $1,100
4. Waste DisposallProcessing 4B. Waste Packaging Inspection Costs 14.4 $2,848 $2,800 New License 12 $2,373 $2,400
4C. Waste-Prepackaged Inspection Costs 13.2 $2,610 $2,600 New License 18 $3,559 $3,600
5. Well Logging 5A. Well Logging Inspection Costs 15.5 S3,065 $3,100 New License 6.6 S1,305 $1,300
6. Nuclear Laundries 6A. Nuclear Laundry Inspection Costs 18.4 $3,639 $3,600 New License 79.7 $15,761 $15,800 COMPARISON OF ANNUAL FEES (PER LICENSE)
Sheet L
PEG tN- OF MATERIALS PART 170 FEES D Nnd Average Inspection Costs FY 2005 FY2005 Materials Hourly Rate:
7. Human Use 7A. Teletherapy Inspection Costs 17.5 $3,461 $3,500 New License 43.7 $8,642 $8,600
7B. Medical-Broad Inspection Costs 39.8 $7,870 $7,900 New License 31.2 $6,170 $6,200
7C. Medical-Other Inspection Costs 15.8 $3,124 $3,100 New License 10.8 $2,136 $2,100
8. Civil Defense 8A. Civil Defense Inspection Costs 11.2 $2,215 $2,200 New License 2.3 $455 $450
9. Device, product or sealed source evaluation 9A. Device evaluation-commercial distribution Application - each device 97.8 $19,340 $19,300
96. Device evaluation - custom Application - each device 97.8 S19,340 $19,300
'C. Sealed source evaluation - commercial distribution Application - each source 11.3 $2,235 $2,200
9D. Sealed source evaluation - custom Application - each source 3.8 $751 $750
10. Transportation 10B. Evaluation - Part 71 QA program Application - approval 26.3 $5,201 $5,200 DETERMINATION OF GENERAL LICENSE REGISTRATION FEE
FY 2005
NOTE: FTE and Contract Costs are based on FY 2005 budgeted costs FY 2005 FTE Rate: $285,944
FTE: 5.2 Contract Costs: $389,000 Total Costs (FTE * FTE Rate + Contract Costs) $1,875,910 Number Registrants Subject to Fee 3000 Fee $625 Registration Fee rounded $630 COMPARISON OF ANNUAL FEES (PER LICENSE)
DETERMINATION OF EXPORT AND IMPORT PART 170 FEES* FY 2005
FY2005 Materials Hourly Rate: $198
FY 2005 FY 2005 Fee Export and Import Part 170 Fees Professional Professional Process FY 2005 Fee Category Process Time Time x FY 2005 Hourly Rate (Rounded)** (Hours) 10 CFR 170.21, Category K Subcategory 1 65 12,854 12,900 2 38 7,514 7,500 3 12 2,373 2,400 4 8 1,582 1,600 5 1.5 297 300
10 CFR 170.31, Category 15 Subcategory A 65 12,854 12,900 B 38 7,514 7,500 C 12 2,373 2,400 D 8 1,582 1,600 E 1.5 297 300
NOTES: * The application fees and amendment fees are the same for each subcategory because, per discussion with IP representatives, the processing time is the same for a new license or an amendment to the license. ** Rounding: <$1000 rounded to nearest $10, =or>$1000 and <$100,000 rounded to nearest $100, =or>$100,000 rounded to nearest $1,000 COMPARISON OF ANNUAL FEES (PER LICENSE)
DETERMINATION OF RECIPROCITY PART 170 FEES* FY 2005
NOTES: The reciprocity application and revision fees are determined using FY 1995 data*, and the FY 2005 hourly rate. The reciprocity application fee includes average costs for inspections, average costs for processing initial filings of NRC Form 241, and etfrkL costs for processing revisions to the initial filings of NRC Form 241. FY 2005 Hourly Rate: $198
Avg Inspection Average Inspection costs: Costs (Avg. no. Reciprocity Part 170 Fee of hours for Total Amount Category Insp. x hourly rate
Gauge Users (3P) $2,400 Number of FY 1993 Inspections Conducted 10 Number of FY 1994 Inspections Conducted 19 Total 29 $69,600 Radiography (30) 53,700 Number of FY 1993 Inspections Conducted 7 Number of FY 1994 Inspections Conducted 13 Total 20 S74,000 Well Logging (5A) $3,100 Number of FY 1993 Inspections Conducted 2 Number of FY 1994 Inspections Conducted 4 Total 6 $18,600 Other Services (3N) S2,200 Number of FY 1993 Inspections Conducted 3 Number of FY 1994 Inspections Conducted 6 Total 9 $19,800 GRAND TOTAL 64 $182,000
Initial Applications (Form 241) Processed by All Regions FY 1993 176 FY 1994 189 Total 365
Total Inspection Amount divided by Total Initial Application: $500
Average costs for processing Initial filings of NRC Form 241: Average hours* 5.6 Hourly rate $198 $1,107
Average cost for revisions to Initial filings of NRC Form 241: Average staff hours for revisions (no change per NMSS*): 1.3 Current FY Hourly Rate $198 Average cost per revision $260 No of revisions filed in FY 2000 i Total Revision Costs for FY 2003 $29,900 No. of initial NRC Forms 241 filed in FY 2000 174 Average revision cost per initial NRC Form 241 $170
APPLICATION FEE: Amount for inspections $500 Amount for initial filing of NRC Form 241 $1,107 Amount for revisions to initial filing of NRC Form 241 Total Application Fee $1,777 Application Fee Rounded $1,800
*see 10/12/2004 memorandum, Jack Strosnider to Jesse Funches HOURLY RATE-FY 2005
CALCULATION OF STRATEGY RATES: FY2004 STRATEGY: Total Total Strategy Total % change for Total % change for Strategy No. of FTE: S&B(S,K):. . . Rate ...($) No. of FTE: FY 2004 S&B(S,K): FY 2005 Rate (S)
NUCLEAR REACTOR SAFETY 1700 214.845 126,379 1663 2.2% 201,526 6.2% 118,063 6.6% NUCLEAR MATERIAL SAFETY (Excd. NWF & General Fund) 602 76.047 126,324 406 32.6% 48,530 36.2% 115,581 8.5% NWF & General Fund 134 19,623 0 0 0.0% 0 0.0% 0 0.0% NUCLEAR WASTE SAFETY (Excd. NWF & General Fund) 0 0 0 194 0.0% 23,782 0.0% 119,078 0.0% NWF & General Fund 0.0 0 0 78.0 0.0% 8,757 0.0% 116,623 0.0% INTL NUCLEAR SAFETY & SUPPORT (excl. General Fund) 0 0 0 43 0.0% 5,159 0.0% 119,632 0.0% General Fund 0 0 0 0 0.0% 0 0.0% 0 0.0% MANAGEMENT AND SUPPORT 595 $70,425 118,361 611 -2.7% $68,809 2.3% 107.608 9.1% General Fund 30 $3,517 0 0 0.0% SO 0.0% 0 0.0% INSPECTOR GENERAL 47 131,766 AZ 0.0% I597 3.5% 125.000 5.1% TOTAL 3.108 390.650 3.042 2.1% 362.538 7.2%
CALCULATION OF OVERHEAt:
Grand Total Surcharge Total Overhead allocated to surcharge Remaining Overhead STRATEGY: Total Strategy NWF/ Less Overhead (Surcharge Percent (Overhead less allocation to surcharge) S,K FTE Rate Grand Total Overhead General Fund - NWF/Gen fund FTE x Rate+S) Surcharge PGMIAS FTE Total PGM S FTE Total NUCLEAR REACTOR SAFETY 99,730 1700 126,379 314.575.000 78,621,982 235,953,018 5,250,052 2.23% 326,5( 03 11.26 .....- 14.347,497 494.74 76.872,611 NUCLEAR MATERIAL SAFETY (Excd. NWF & General Fund) 28,786 602 126,324 104,832,989 25,801.038 79,031,951 22,582,131 28.57% 1,127,7593 49.43 ...... 2,819,207 123.57 18,428,799 NWF & General Fund 40,592 134 0 40,592,000 40,592,000 0 0 0.00% 0 0.00 0 0 0.00 0 NUCLEAR WASTE SAFETY (Excd. NWF & General Fund) 0 0 0 0 0 0 0 0.00% 0 0.00 0 0 0.00 0 NWF & General Fund 0 0 0 0 0 0 0.00% 0 0.00 0 0 0.00 0 INTL NUCLEAR SAFETY & SUPPORT (Excd. General fund) 0 0 0 0 0 0 0 0.00% 0 0.00 0 0 0.00 0 General Fund 0 0.00 0 0 0 0 0.00% 0 0 0.00 0 MANAGEMENTAND SUPPORT 103,894 595 118,361 174,319,000 0 174,319,000 691,807 0.40% 0 0.00 0 103,434,000 569.00 170,781,605 General Fund 5.319 30 0 5,319,000 0 5,319,000 0 0 0.00% 0 0 0.00 0 INSPECTOR GENERAL 1,325 47 131,766 7,518,000 0 7,518.000 0 0.00% 0 0.00 0 1,325,000 47.00 7,518,000 4.9.0======: TOTAL 279,646 3108 647,155,989 104,423.021 45,911 ,000 496,821,968 28,523,989 1,4542,2595 61 *------121.925,705 1234.31 273,601,015 NWF&Gen Fund 45,911,000 -M&S/IG 95,301,410 ALLOCATION OF Non-DIRECT MANAGEMENT & SUPPORT (M&SI AND INSPECTOR GENERAL (IG):
Grand Total $ MANAGEMENT AND SUPPORT 174,319,000 INSPECTOR GENERAL 7,518,000
Total 181,837,000 Less Reactor Direct M&S 2,485,588 Less Materials Direct M&S 0 Less M&S Direct PS S 360,000 Less Surcharge Direct M&S 691,807 Total to Alocate: 178,299,605 ALLOCATION: Direct (%) M&SIIG Allocation Reactors 227,999,083 70.70% 126,060.368 Materials 56,836,897 17.62% 31,425,039 Surcharge 372645 599 11.67% 20814A198 Total 322,481 ,579 100.00% 178,299,605 0 VI a -Z rficluded In Hourly Rate (TOTAL (B)is allocated to the Reactors and Materials Programs overhead (O/H) based on the percentage of their Total Direct (A) -1 w, C(V Jed In Surcharge to the REACTOR AND MATERIALS TOTAL DIRECT (C) (B) REACTOR Direct STRATEGY (A) AND MATERIALS Allocated REACTORS PGM $,K FTE RATE TOTAL PGM $ FTE TOTAL TOTAL DIRECT Surcharge Overhead Ti Dtal - Excl. from Hr. Rate)
NUCLEAR REACTOR SAFETY $152,023,381 $14,347,497 494.74 $76,872,611 DIRECT $83,924 1161.00 126.379 146,726,028 96.52% $146,773,330 O/Ht 76,847,836 SURCHARGE $5,250,052 $1,749.371 $6,999,423 NUCLEAR MATERIAL SAFETY $62,857,782 $2,819,207 123.57 $18,428,799 DIRECT $2,996 10.53 126,324 1,330,732 2.12% $40,275,652 O/H 608,899 SURCHARGE $22,582.131 $7,372,239 $29,954,369 NUCLEAR WASTE SAFETY $0 $0 0.00 $0 DIRECT $0 0.00 0 0 ERR $0 O/H 0 SURCHARGE $0 SO $0 INTERNATIONAL NUCLEAR SAFETY & SUPPORT $0 $0 0.00 $0 DIRECT $0 0.00 0 0 ERR O/H 0 SURCHARGE S b o a S 3 , Subtotal $86,920 1171.53 225,513,495 $17,166,705 618.31 $95,301,410 Subtotal $27.832.182 $9.121,610 $36,953,792
==ss__
MANAGEMENT AND SUPPORT DIRECT $360 21.00 118,361 2,485,588 O/H 0 SURCHARGE $691,807 $0 $691,807 INSPECTOR GENERAL DIRECT $0 0.00 131,766 0 O/H 0 SURCHARGE $0 $0 $0
Total Direct M&S and IG Subtotal $360 21.00 2,485,588 Total $28,523,989 $9,121,610 $37,645,599
Total Reactor Direct & overhead $87,280 1192.53 227,999,083 Total Allocated M&S/IG 126-060-368 M&S allocated to surcharge $20,814,198 TOTAL $87,280 1192.53 100.00% 354,059,451 Less offsetting receipts $0 Less Offsetting Receipts 0 GRAND TOTAL SURCHAf $58.459,797 REACTORS GRAND TOTAL 354,059,451 282,968,782 20.08% Total Surcharge Less PS$ $48,568,613 REACTOR FTE RATE: $296,898 (Reactors Grand Total/Reactor total FTE) Surcharge FTE 147.8 REACTOR HOURLY RATE: $205 (Reactor FTE rate/1446 hours) SURCHARGE RATE: $328,608 MATERIALS PGM $,K FTE CC rate TOTAL
NUCLEAR REACTOR SAFETY DIRECT $5 0.37 $126,379 $47,302 O/H $24,774 SURCHARGE NUCLEAR MATERIAL SAFETY DIRECT $13,178 308.29 $126,324 $38,944,919 O/H $17,819,901 SURCHARGE NUCLEAR WASTE SAFETY DIRECT $0 0.00 $0 $0 O/H $0 SURCHARGE INTERNATIONAL NUCLEAR SAFETY & SUPPORT DIRECT $0 0.00 $0 $0 O/H $0 .SURCHARGE Subtotal $13,183 308.67 $56,836,897
MANAGEMENT AND SUPPORT DIRECT $0 0.00 $118,361 $0 O/H $0 SURCHARGE INSPECTOR GENERAL DIRECT $0 0.00 $131,766 $0 O/H $0 SURCHARGE Total Direct M&S Subtotal $0 0 $0
Total Materials Direct & overhead $13,183 308.67 $56,836,897 Total Allocated M&S $31.425.039 Totall $13,183 308.67 $88,261,935 Less Offsetting Receipts la MATERIALS GRAND TOTAL $88,261,935 MATERIALS FTE RATE: $285,944 (Materials Grand Total/Materials total FTE) MATERIALS HOURLY RATE: $198 (Materials FTE Rate/1446 hours) Summary:
Reactors Materials Surcharge Direct PS $ Off Fee Base TOTAL Direct Program Salary and Benefits $150,542,348 $38,992,221 $28,523,989 218,058,559 Overhead $77,456,735 $17,844,675 $9,121,610 104,423,021 Allocated M&S/IG $126.060.368 $31.425.039 $20.814.198 178.299.605 TOTAL $354,059,451 $88,261,935 $58,459,797 100,463,805 45,911,000 647.155.989 Less offsetting receipts $0 $0 so GRAND TOTAL $354,059,451 $88,261,935 $58,459,797 r FY 2005 ESTIMATED COLLECTIONS $ in Millions (All dollar amounts are rounded-all figures may not add due to rounding) Includes an across the board rescission of 0.80 percent
Part 171 Annual Fees
Operating Power Reactors $301.9 Spent Fuel Storage/Reactor Decommissioning 20.0 Nonpower Reactors 0.2 Fuel Facilities 23.8 Uranium Recovery (billed amt. less subsidy for small entity) 0.7 Rare Earth Facilities 0.1 Transportation (billed amt. less subsidy for small entity) 3.1 Materials Users (billed amt. less subsidy for small entity) 21.3 Subtotal Part 171 $371.2 Part 170 License and Inspection Fees 166.8 Subtotal Parts 171 and 170 Fees $538.0 Carryover from Previous FY 2.2 Net Adjustment (Part 171 Billing Adjustments) 0.5 TOTAL ESTIMATED COLLECTIONS $540.7 NWF Appropriation 68.5 10 percent of budget (reduction in fee recovery amount 60.1 For FY 2005) Total Budget Authority $669.3 2/11/2005
To: File
From: Tammy Croote f
Subject: Estimated FY 2005 Part 170 Collections for the Proposed Fee Rule
Licensing ($, M) Inspection ($, M) Total (S. M) Facilities Program Power Reactors Part 55 Operator Exams 3.72 0.00 3.72 OLs Under Review 0.06 0.00 0.06 Standard Plants 9.14 0.00 9.14 Topical Reports 2.21 0.00 2.21 Part 50 Amendments 44.67 0.00 44.67 Part 50 Inspections 0.00 79.79 79.79 Decommissioning 0.00 0.00 0.00 Total Power Reactors 59.79 79.79 139.59 Research Reactors 0.20 0.11 0.30 Facilities Total 59.99 79.90 139.89 Materials Program Fuel Facilities 11.03 3.56 14.59 Spent Fuel Storage 4.54 0.52 5.06 Transportation 1.08 0.05 1.13 Uranium Recovery 1.38 0.12 1.49 Rare Earth Facilities 1.02 0.10 1.12 Materials Program 1.69 0.20 1.88 Subtotal 20.74 4.54 25.27 Other. Export/import 1.66 1.66 Materials Total 22.40 4.54 26.94
Grand Total 82.39 84.44 166.83 2/4/2005
To: File
From: Tammy Croote
Subject: Estimated FY 2005 Part 170 Collections for the Proposed Fee Rule
Licensing ($, M) Inspection ($, M) Total ($, M) Facilities Program Power Reactors Part 55 Operator Exams 3.72 0.00 3.72 OLs Under Review 0.06 0.00 0.06 Standard Plants 9.14 0.00 9.14 Topical Reports 2.21 0.00 2.21 Part 50 Amendments 44.67 0.00 44.67 Part 50 Inspections 0.00 79.79 79.79 Decommissioning 0.00 0.00 0.00 Total Power Reactors 59.79 79.79 139.59 Research Reactors 0.20 0.11 0.30 Facilities Total 59.99 79.90 139.89 Materials Program Fuel Facilities 7.26 3.56 10.82 Spent Fuel Storage 4.54 0.52 5.06 Transportation 1.08 0.05 1.13 Uranium Recovery 1.38 0.12 1.49 Rare Earth Facilities 1.02 0.10 1.12 Materials Program 1.69 0.20 1.88 Subtotal 16.97 4.54 21.51 Other Export/lmport 1.66 1.66 Materials Total 18.63 4.54 23.17
Grand Total 78.62 84.44 163.06 COMPARISON OF ANNUAL FEES (PER UICENSE)
FY 2005 DIRECT RESOURCES ShwtASurnmary
SPENT FUEL STORAGE/ NON-POWER RAREEARTH INCLUDED IN I TOTAL POWER REACTORS REACTOR DECOMM. REACTORS FUEL FACI~LTY MATERIALS TRANSPORTATION FACAMIES URANIUM RECOVERY OTRERAPPUICANTS SURCHARGE I
- - - I
5.K PIE Lx FTE S.K PIE LXK PIE SJ( PIE S.K PIE SK FTE $x PIE $X PIE $.K FTE SK PIE I
______- I
I
NUCLEAR REACTOR SAFETY 99.730 1,700 83,8127 1.160 3 0 97 I 0 0 0 0 3 0 0 0 0 0 0 0 1,126 33 1 NUCLEAR MATERIALS SAFETY 28.786 602 2.996 II 529i 69 0 0 3.968 120 2.746 87 574 17 266 3 294 7 0 6 8.665 110 I
NUCLEAR WASTE SAFETY 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 INTERNATIL NUCLEAR SAFETY & SUPPORT a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 0 0 0 1 MANAGEMENT AND SUPPORT 103.894 59 360 21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 SI
INSPECTOR GENERAL 1.325 47 0 0 0 a 0 0 .0 0 0 0 0 0 0 0 0 0 0 0 0 1
______- I SUBTOTAL. -PEE BASERESOURCE 233.735 2944.0 67.183 1191.1 5.293 695 97 1.4 3.986 120.1 2,746 887 576 18.9 288 3.2 294 6.6 0 5.6 9,891 .147.6 I
.-...... ------…- - -n. --- s-- == ==- n.- ns. fl ...... sz .====-=aifh.hs
PY 2005 FEE AMOUNTS 440.8 25.2 0.5 38.3 27.5 5.4 1.2 2.174 1.66184 58.5
% of170 feesto total feeamoufl 31.7% 20.1% .57.8% . 38.1% 6.8% . 20.9% 93.7% 68.5% 100.0% 58.5 LESS PART 170 FEES 139.6 5.1 0.3 14.6 1.9 1.1 1.1 1.490 1.66184 0.0
PART 171 ANNUAL FEES 301.2 20.1 . 0.2 23.7 25.7 4.3 0.1 0.684 0.000 58.5
% OF BUDGET (EXCL SURCHARGE, OTHER APPL &SMALL ENTITY) 82.36% 4.70% 0.097013% 7.16% 4.04% 1.01% 0.22% 0.41% WIA
Surcharge (Including small entity) 3.3 0.070022 0.00144495 0.3 0.6 0.0 . 0.0 0.0061 N/A 0.03174 0.000D575
Part 171 billing adjustments (2.2) (0.1-) (0.0) (0.2) (0.1) (0.0) (0.0) (0.01) N/A Adjustment for Pr 2005 Rescission (0.3962) (0.0226) (0-0005) (0.0344) (0.0194) (0.0049) (0.0011) (0.0020) TOTAL Pr 2005 ANNUAL FEE 301.911326 20.022433 0.217589 23.833961 26.088218 4.252167 0.0710,46 0.677611 0.0 Fee Per Uicense (No. of Licenses) 2.902994 :104) 0.164347 (121.83) 0.094397 (4) 0.0710-46 (1) NOTE: THIS APPENDIX WILL NOT APPEAR IN THE CODE OF FEDERAL REGULATIONS.
APPENDIX A TO THIS PROPOSED RULE --
DRAFT REGULATORY FLEXIBILITY ANALYSIS FOR THE
AMENDMENTS TO 10 CFR PART 170 (LICENSE FEES) AND
10 CFR PART 171 (ANNUAL FEES)
I. Background.
The Regulatory Flexibility Act (RFA), as amended (5 U.S.C. 601 et seq.), requires that agencies consider the impact of their rulemakings on small entities and, consistent with applicable statutes, consider alternatives to minimize these impacts on the businesses, organizations, and government jurisdictions to which they apply.
The NRC has established standards for determining which NRC licensees qualify as small entities (10 CFR 2.810). These size standards were established based on the Small
Business Administration's most common receipts-based size standards and include a size standard for business concerns that are manufacturing entities. The NRC uses the size standards to reduce the impact of annual fees on small entities by establishing a licensee's eligibility to qualify for a maximum small entity fee. The small entity fee categories in §171 .16(c) of this proposed rule are based on the NRC's size standards.
From FY 1991 through FY 2000, the Omnibus Budget Reconciliation Act (OBRA-90), as amended, required that the NRC recover approximately 100 percent of its budget authority, less
100 appropriations from the Nuclear Waste Fund, by assessing license and annual fees. The FY
2001 Energy and Water Development Appropriations Act amended OBRA-90 to decrease the
NRC's fee recovery amount by 2 percent per year beginning in FY 2001, until the fee recovery amount is 90 percent in FY 2005. The amount to be recovered for FY 2005 is approximately
$540.7 million.
OBRA-90 requires that the schedule of charges established by rulemaking should fairly and equitably allocate the total amount to be recovered from the NRC's licensees and be assessed under the principle that licensees who require the greatest expenditure of agency resources pay the greatest annual charges. Since FY 1991, the NRC has complied with OBRA-
90 by issuing a final rule that amends its fee regulations. These final rules have established the methodology used by NRC in identifying and determining the fees to be assessed and collected in any given fiscal year.
In FY 1995, the NRC announced that, to stabilize fees, annual fees would be adjusted only by the percentage change (plus or minus) in NRC's total budget authority, adjusted for changes in estimated collections for 10 CFR Part 170 fees, the number of licensees paying annual fees, and as otherwise needed to assure the billed amounts resulted in the required collections. The NRC indicated that if there were a substantial change in the total NRC budget authority or the magnitude of the budget allocated to a specific class of licenses, the annual fee base would be recalculated.
In FY 1999, the NRC concluded that there had been significant changes in the allocation of agency resources among the various classes of licenses and established rebaselined annual fees for FY 1999. The NRC stated in the final FY 1999 rule that to stabilize fees it would continue to adjust the annual fees by the percent change method established in FY 1995, unless
101 there is a substantial change in the total NRC budget or the magnitude of the budget allocated to a specific class of licenses, in which case the annual fee base would be reestablished.
Based on the change in the magnitude of the budget to be recovered through fees, the
Commission has determined that it is appropriate to rebaseline its part 171 annual fees again in
FY 2005. Rebaselining fees will result in decreased annual fees for the majority of the fee classes of licensees. However, annual fees would increase for other classes including most materials licensees in the materials users class.
The Small Business Regulatory Enforcement Fairness Act of 1996 (SBREFA) is intended to reduce regulatory burdens imposed by Federal agencies on small businesses, nonprofit organizations, and governmental jurisdictions. SBREFA also provides Congress with the opportunity to review agency rules before they go into effect. Under this legislation, the NRC annual fee rule is considered a "major" rule and must be reviewed by Congress and the
Comptroller General before the rule becomes effective. SBREFA also requires that an agency prepare a guide to assist small entities in complying with each rule for which a final regulatory flexibility analysis is prepared. This Regulatory Flexibility Analysis (RFA) and the small entity compliance guide (Attachment 1) have been prepared for the FY 2005 fee rule as required by law.
II. Impact on small entities.
The fee rule results in substantial fees being charged to those individuals, organizations, and companies that are licensed by the NRC, including those licensed under the NRC materials program. The comments received on previous proposed fee rules and the small entity certifications received in response to previous final fee rules indicate that NRC licensees
102 qualifying as small entities under the NRC's size standards are primarily materials licensees.
Therefore, this analysis will focus on the economic impact of the annual fees on materials licensees. About 26 percent of these licensees (approximately 1,200 licensees for FY 2004) have requested small entity certification in the past. A 1993 NRC survey of its materials licensees indicated that about 25 percent of these licensees could qualify as small entities under the NRC's size standards.
The commenters on previous fee rulemakings consistently indicated that the following results would occur if the proposed annual fees were not modified:
1. Large firms would gain an unfair competitive advantage over small entities.
Commenters noted that small and very small companies ("Mom and Pop" operations) would find it more difficult to absorb the annual fee than a large corporation or a high-volume type of operation. In competitive markets, such as soil testing, annual fees would put small licensees at an extreme competitive disadvantage with their much larger competitors because the proposed fees would be the same for a two-person licensee as for a large firm with thousands of employees.
2. Some firms would be forced to cancel their licenses. A licensee with receipts of less than $500,000 per year stated that the proposed rule would, in effect, force it to relinquish its soil density gauge and license, thereby reducing its ability to do its work effectively. Other licensees, especially well-loggers, noted that the increased fees would force small businesses to get rid of the materials license altogether. Commenters stated that the proposed rule would result in about 10 percent of the well-logging licensees terminating their licenses immediately and approximately 25 percent terminating their licenses before the next annual assessment.
103 3. Some companies would go out of business.
4. Some companies would have budget problems. Many medical licensees noted that, along with reduced reimbursements, the proposed increase of the existing fees and the introduction of additional fees would significantly affect their budgets. Others noted that, in view of the cuts by Medicare and other third party carriers, the fees would produce a hardship and some facilities would experience a great deal of difficulty in meeting this additional burden.
Approximately 3,000 license, approval, and registration terminations have been requested since the NRC first established annual fees for materials licenses. Although some of these terminations were requested because the license was no longer needed or licenses or registrations could be combined, indications are that other termination requests were due to the economic impact of the fees.
To alleviate the significant impact of the annual fees on a substantial number of small entities, the NRC considered the following alternatives in accordance with the RFA in developing each of its fee rules since FY 1991.
1. Base fees on some measure of the amount of radioactivity possessed by the licensee
(e.g., number of sources).
2. Base fees on the frequency of use of the licensed radioactive material (e.g., volume of patients).
3. Base fees on the NRC size standards for small entities.
104 The NRC has reexamined its previous evaluations of these alternatives and continues to believe that establishment of a maximum fee for small entities is the most appropriate and effective option for reducing the impact of its fees on small entities.
Ill. Maximum Fee.
The RFA and its implementing guidance do not provide specific guidelines on what constitutes a significant economic impact on a small entity; therefore, the NRC has no benchmark to assist it in determining the amount or the percent of gross receipts that should be charged to a small entity. In developing the maximum small entity annual fee in FY 1991, the
NRC examined its 10 CFR Part 170 licensing and inspection fees and Agreement State fees for those fee categories which were expected to have a substantial number of small entities. Six
Agreement States (Washington, Texas, Illinois, Nebraska, New York, and Utah), were used as benchmarks in the establishment of the maximum small entity annual fee in FY 1991. Because small entities in those Agreement States were paying the fees, the NRC concluded that these fees did not have a significant impact on a substantial number of small entities. Therefore, those fees were considered a useful benchmark in establishing the NRC maximum small entity annual fee.
The NRC maximum small entity fee was established as an annual fee only. In addition to the annual fee, NRC small entity licensees were required to pay amendment, renewal and inspection fees. In setting the small entity annual fee, NRC ensured that the total amount small entities paid annually would not exceed the maximum paid in the six benchmark Agreement
States.
105 Of the six benchmark states, the maximum Agreement State fee of $3,800 in
Washington was used as the ceiling for the total fees. Thus the NRC's small entity fee was developed to ensure that the total fees paid by NRC small entities would not exceed $3,800.
Given the NRC's FY 1991 fee structure for inspections, amendments, and renewals, a small entity annual fee established at $1,800 allowed the total fee (small entity annual fee plus yearly average for inspections, amendments and renewal fees) for all categories to fall under the
$3,800 ceiling.
In FY 1992, the NRC introduced a second, lower tier to the small entity fee in response to concerns that the $1,800 fee, when added to the license and inspection fees, still imposed a significant impact on small entities with relatively low gross annual receipts. For purposes of the annual fee, each small entity size standard was divided into an upper and lower tier. Small entity licensees in the upper tier continued to pay an annual fee of $1,800 while those in the lower tier paid an annual fee of $400.
Based on the changes that had occurred since FY 1991, the NRC re-analyzed its maximum small entity annual fees in FY 2000, and determined that the small entity fees should be increased by 25 percent to reflect the increase in the average fees paid by other materials licensees since FY 1991, as well as changes in the fee structure for materials licensees. The structure of the fees that NRC charged to its materials licensees changed during the period between 1991 and 1999. Costs for materials license inspections, renewals, and amendments, which were previously recovered through part 170 fees for services, are now included in the part
171 annual fees assessed to materials licensees. As a result, the maximum small entity annual fee increased from $1,800 to $2,300 in FY 2000. By increasing the maximum annual fee for small entities from $1,800 to $2,300, the annual fee for many small entities was reduced while at the same time materials licensees, including small entities, would pay for most of the costs
106 attributable to them. The costs not recovered from small entities are allocated to other materials licensees and to power reactors.
While reducing the impact on many small entities, the NRC determined that the maximum annual fee of $2,300 for small entities may continue to have a significant impact on materials licensees with annual gross receipts in the thousands of dollars range. Therefore, the
NRC continued to provide a lower-tier small entity annual fee for small entities with relatively low gross annual receipts, and for manufacturing concerns and educational institutions not State or publicly supported, with less than 35 employees. The NRC also increased the lower tier small entity fee by the same percentage increase to the maximum small entity annual fee. This 25 percent increase resulted in the lower tier small entity fee increasing from $400 to $500 in FY
2000.
The NRC examined the small entity fees again in FY 2003 (68 FR 36717; June 18,
2003), and determined that a change was not warranted to the small entity fees established in
FY 2003. The NRC stated in the Regulatory Flexibility Analysis for the FY 2001 final fee rule that it would re-examine the small entity fees every two years, in the same years in which it conducts the biennial review of fees as required by the CFO Act.
Accordingly, the NRC re-examined the small entity fees for FY 2005, and did not believe that a change to the small entity fees was warranted. Unlike the annual fees assessed to other licensees, the small entity fees are not designed to recover the agency costs associated with particular licensees. Instead, the reduced fees for small entities are designed to provide some fee relief for qualifying small entity licensees while at the same time recovering from them some of the agency's costs for activities that benefit them. The costs not recovered from small entities for activities that benefit them must be recovered from other licensees. Given the reduction in
107 annual fees from FY 2000 to FY 2005, on average, for those categories of materials licensees that contain a number of small entities, the NRC has determined that the current small entity fees of $500 and $2,300 continue to meet the objective of providing relief to many small entities while recovering from them some of the costs that benefit them.
Therefore, the NRC proposed to retain the $2,300 small entity annual fee and the $500 lower tier small entity annual fee for FY 2005. The NRC plans to re-examine the small entity fees again in FY 2007.
IV. Summary.
The NRC has determined that the 10 CFR Part 171 annual fees significantly impact a substantial number of small entities. A maximum fee for small entities strikes a balance between the requirement to recover 90 percent of the NRC budget and the requirement to consider means of reducing the impact of the fee on small entities. Based on its regulatory flexibility analysis, the NRC concludes that a maximum annual fee of $2,300 for small entities and a lower-tier small entity annual fee of $500 for small businesses and not-for-profit organizations with gross annual receipts of less than $350,000, small governmental jurisdictions with a population of less than 20,000, small manufacturing entities that have less than 35 employees, and educational institutions that are not State or publicly supported and have less than 35 employees reduces the impact on small entities. At the same time, these reduced annual fees are consistent with the objectives of OBRA-90. Thus, the fees for small entities maintain a balance between the objectives of OBRA-90 and the RFA. Therefore, the analysis and conclusions previously established remain valid for FY 2005.
108 ATTACHMENT 1 TO APPENDIX A
U. S. Nuclear Regulatory Commission
Small Entity Compliance Guide
Fiscal Year 2005
109 Contents
Introduction
NRC Definition of Small Entity
NRC Small Entity Fees
Instructions for Completing NRC Form 526
110 Introduction
The Small Business Regulatory Enforcement Fairness Act of 1996 (SBREFA) requires all
Federal agencies to prepare a written guide for each "major" final rule, as defined by the Act.
The NRC's fee rule, published annually to comply with the Omnibus Budget Reconciliation Act of
1990 (OBRA-90), as amended, is considered a "major" rule under SBREFA. Therefore, in compliance with the law, this guide has been prepared to assist NRC materials licensees in complying with the FY 2005 fee rule.
Licensees may use this guide to determine whether they qualify as a small entity under
NRC regulations and are eligible to pay reduced FY 2005 annual fees assessed under 10 CFR
Part 171. The NRC has established two tiers of annual fees for those materials licensees who qualify as small entities under the NRC's size standards.
Licensees who meet the NRC's size standards for a small entity must submit a completed NRC Form 526 'Certification of Small Entity Status for the Purposes of Annual Fees
Imposed Under 10 CFR Part 171" to qualify for the reduced annual fee. This form can be accessed on the NRC's website at httD://www.nrc.gov. The form can then be accessed by selecting "License Fees" and under "Forms" selecting NRC Form 526. For licensees who cannot access the NRC's website, NRC Form 526 may be obtained through the local point of contact listed in the NRC's 'Materials Annual Fee Billing Handbook," NUREG/BR-0238, which is enclosed with each annual fee billing. Alternatively, the form may be obtained by calling the fee staff at 301-415-7554, or by e-mailing the fee staff at feesX nrc.aov. The completed form, the appropriate small entity fee, and the payment copy of the invoice should be mailed to the U.S.
Nuclear Regulatory Commission, License Fee Team, at the address indicated on the invoice.
111 Failure to file the NRC small entity certification Form 526 in a timely manner may result in the denial of any refund that might otherwise be due.
NRC Definition of Small Entity
For purposes of compliance with its regulations (10 CFR 2.810), the NRC has defined a small entity as follows:
(1) Small business--a for-profit concern that provides a service, or a concern that is not engaged in manufacturing, with average gross receipts of $5 million or less over its last 3 completed fiscal years;
(2) Manufacturing industry-a manufacturing concern with an average of 500 or fewer employees based on employment during each pay period for the preceding 12 calendar months;
(3) Small organizations--a not-for-profit organization that is independently owned and operated and has annual gross receipts of $5 million or less;
(4) Small governmental jurisdiction--a government of a city, county, town, township, village, school district or special district, with a population of less than 50,000;
(5) Small educational institution--an educational institution supported by a qualifying small governmental jurisdiction, or one that is not State or publicly supported and has 500 or fewer employees.'
' An educational institution referred to in the size standards is an entity whose primary function is education, whose programs are accredited by a nationally recognized accrediting agency or association, who is legally authorized to provide a program of organized instruction or study, who provides an educational program for which it awards academic degrees, and whose educational programs are available to the public.
112 To further assist licensees in determining if they qualify as a small entity, the following guidelines are provided, which are based on the Small Business Administration's regulations (13
CFR Part 121).
(1) A small business concern is an independently owned and operated entity which is not considered dominant in its field of operations.
(2) The number of employees means the total number of employees in the parent company, any subsidiaries and/or affiliates, including both foreign and domestic locations (i.e., not solely the number of employees working for the licensee or conducting NRC licensed activities for the company).
(3) Gross annual receipts includes all revenue received or accrued from any source, including receipts of the parent company, any subsidiaries and/or affiliates, and account for both foreign and domestic locations. Receipts include all revenues from sales of products and services, interest, rent, fees, and commissions, from whatever sources derived (i.e., not solely receipts from NRC licensed activities).
(4) A licensee who is a subsidiary of a large entity does not qualify as a small entity.
NRC Small Entity Fees
In 10 CFR 171.16 (c), the NRC has established two tiers of fees for licensees that qualify as a small entity under the NRC's size standards. The fees are as follows:
Maximum annual fee
per licensed
categorV
Small business not engaged
113 in manufacturing and small not-for-Profit organizations
(Gross Annual Receipts)
$350,000 to $5 million ...... $2,300.
Less than $350,000 ...... $500.
Manufacturing entities that have an average of 500 emplovees or less
35 to 500 employees ...... $2,300.
Less than 35 employees ...... $500.
Small Governmental Jurisdictions
(Including publicly supported educational institutions)
(population)
20,000 to 50,000 ...... $2,300.
Less than 20,000 ...... $500.
Educational institutions that are not State or publicly supported, and have 500 Emplovees or less
114 35 to 500 employees ...... $2,300.
Less than 35 employees ...... $500.
To pay a reduced annual fee, a licensee must use NRC Form 526. Licensees can access this form on the NRC's website at http://www.nrc.gov. The form can then be accessed by selecting "License Fees" and under "Forms" selecting NRC Form 526. Those licensees that qualify as a "small entity" under the NRC size standards at 10 CFR Part 2.810 can complete the form in accordance with the instructions provided, and submit the completed form and the appropriate payment to the address provided on the invoice. For licensees who cannot access the NRC's website, NRC Form 526 may be obtained through the local point of contact listed in the NRC's "Materials Annual Fee Billing Handbook," NUREG/BR-0238, which is enclosed with each annual fee invoice. Alternatively, licensees may obtain the form by calling the fee staff at
301-415-7554, or by e-mailing us at fees~nrc.aov.
Instructions for Completing NRC Small Entity Form 526
(1) File a separate NRC Form 526 for each annual fee invoice received.
(2) Complete all items on NRC Form 526, as follows:
a. Enter the license number and invoice number exactly as they appear on the
annual fee invoice.
b. Enter the Standard Industrial Classification (SIC) or North American Industry
Classification System (NAICS) if known.
c. Enter the licensee's name and address as they appear on the invoice. Name
and/or address changes for billing purposes must be annotated on the invoice.
Correcting the name and/or address on NRC Form 526, or on the invoice does
115 not constitute a request to amend the license. Any request to amend a license
must be submitted to the respective licensing staff in the NRC's regional or
headquarters offices.
d. Check the appropriate size standard for which the licensee qualifies as a small
entity. Check only one box. Note the following:
(i) A licensee who is a subsidiary of a large entity does not qualify as a small
entity.
(ii) The size standards apply to the licensee, including all parent companies
and affiliates--not the individual authorized users listed in the license or the
particular segment of the organization that uses licensed material.
(iii) Gross annual receipts means all revenue in whatever form received or
accrued from whatever sources--not solely receipts from licensed
activities. There are limited exceptions as set forth at 13 CFR 121.104.
These are: the term receipts excludes net capital gains or losses; taxes
collected for and remitted to a taxing authority (if included in gross or total
income), proceeds from the transactions between a concern and its
domestic or foreign affiliates (if also excluded from gross or total income
on a consolidated return filed with the IRS); and amounts collected for
another entity by a travel agent, real estate agent, advertising agent, or
conference management service provider.
(iv) The owner of the entity, or an official empowered to act on behalf of the
entity, must sign and date the small entity certification.
The NRC sends invoices to its licensees for the full annual fee, even though some licensees qualify for reduced fees as small entities. Licensees who qualify as small entities and file NRC Form 526, which certifies eligibility for small entity fees, may pay the reduced fee, which
116 is either $2,300 or $500 for a full year, depending on the size of the entity, for each fee category shown on the invoice. Licensees granted a license during the first 6 months of the fiscal year, and licensees who file for termination or for a "possession only' license and permanently cease licensed activities during the first 6 months of the fiscal year, pay only 50 percent of the annual fee for that year. Such invoices state that the amount billed represents 50% proration." This means that the amount due from a small entity is not the prorated amount shown on the invoice, but rather one-half of the maximum annual fee shown on NRC Form 526 for the size standard under which the licensee qualifies, resulting in a fee of either $1,150 or $250 for each fee category billed (instead of the full small entity annual fee of $2,300 or $500).
Licensees must file a new small entity form (NRC Form 526) with the NRC each fiscal year to qualify for reduced fees in that year. Because a licensee's "size," or the size standards, may change from year to year, the invoice reflects the full fee and licensees must complete and return form 526 for the fee to be reduced to the small entity fee amount. LICENSEES WILL
NOT RECEIVE A NEW INVOICE FOR THE REDUCED AMOUNT. The completed NRC Form
526, the payment of the appropriate small entity fee, and the "Payment Copy" of the invoice should be mailed to the U. S. Nuclear Regulatory Commission, License Fee Team at the address indicated on the invoice.
If you have questions regarding the NRC's annual fees, please contact the license fee staff at 301-415-7554, e-mail the fee staff at fees~nrc.pov, or write to the U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001, Attention: Office of the Chief Financial
Officer.
117 False certification of small entity status could result in civil sanctions being imposed by the NRC under the Program Fraud Civil Remedies Act, 31 U.S.C. 3801 et. seM. NRC's implementing regulations are found at 10 CFR Part 13.
118 FY2005 BUDGETDETAIL INCLUDEDIN INCLUOEDIN 02/0412005 FY2005 POWER SPENTFUEL STORAGE/ NON-POWER FUEL TRANS. RAREEARTH URANIUM REVIWS FOR HOURLY RATE BUDGET REACTOR REACTORDECOUW. REACTOR FACLITY MATERIALS PORTAT3IN FACLTIES RECOVERY OTHERAPPLICANTS SURCHARCE
Sheet D: Nuci lRteato Safety nIE S.K nE SK nE SK nE SK nTE SLK nTE SK FTE S.K nE S9K FTE S.K nTE S.K nE S.K FTE SK
PROGRAMfNUCLEAR REACTOR SAFETY
iSUI},ROGRAI ' REACTORUCENSI , - I iIIUF3PROCGAU REACTORLKN5N3 CICE PLAlNEDACTMTIES o.00 0.00 Prqod Maragament &Lton" Anlntvft 0.00 3120 0.00 3120 0.00 e.00 Lianan Ac00m 300.00 61.10 300.00 61.70 0.00 Ouw L 9 Teask 200.00 17.30 200.00 17.30 SOe 0.00 korpved Standad ToM Spec 0.00 6.00 0.00 6.00 0.00 0.00 Regulatory LkanWi M- "nU 614.00 38.20 614.00 38.20 0.60 0.00 Rulmalwl 125.00 17.40 125.00 17.40 0.00 0.00 Eents EvlwuaA Ad GanenCwnumo.abon 6000 21.00 60r00 21.00 7.00 AcW*te 3m000 7.90 60.57 0.90 Reseach an TestReactor LkarmS eD. 0.00 0.00 VOndm)Owwsr vupWACTecfuas Rnluhon 1060.00 29.50 1060.o0 29.50 am 0.00 LagalAdirm andRepraklabon 57.00 11.0 57,00 11.00 0.00 A4md4aolwyRem" 45.00oo oo 45.0 5.00 0.00 0.00 a m. Taiorii ad E nmpoyaDeawltpmect 0.00 26.00 0.o0 20.o0 4.90 Enal TratrAg 43300 000 432,00 0.00 0.02 0.00 Gnmil Tcnlgy 3028.00 4.80 3028.00 4.00 kintereyof ReackmSystem ad Compone" 12825.0 17.30 1282S. 17.30 Agrg RebW Effactson Systanand Component. 2100.00 2.00 2100ro0 2.00 0.00 SafetyAaessmon ofODigb Tedosoogmm 2010.00 4.00 2010.o0 4.00 LU RegatM kiraguck, wndhpocetw" Irkiloata. 32065.0 25.00 3265.00 25.00 0.00 Assesunaenof Oprabo 3407.00 4.90 3407.00 4.90 Probebw Rie Anaiysa ad Apoabons 10697.00 320 10697.0 32sO
AuiO and aareftRadw an SystemCod" 5733.00 13.50 5733.00 13.50 0.00 0.00 AwsanreOof Heto Ellects 715.00 3.20 775.00 320 0.00 k.ied Ore Fuel 700.00 0.50 700.00 0.50 0.18 0.00 Emargnrcy Prapardn. L/aang 0.00 14.00 0.o0 13.80 0.00 0.02 4691.61 7.17 TOWlDe0e Rasowwe 47964.00 415.00 47433.s0 406.90 o.0o o00 60.9 0.3 0.00 0.00 O.o 0.00 0.00 0.00 0c. 0.0 0.00 0.00 0.00 0.00 0.00 0.00
0.0 0.00 0.00 4,00 ITOwhead 0o. 4.Do 0.00 0.00 0.00 16400 S Owwd~w- ~ m~ 0.00 164.o0 3133.00 0.00 3130A 000 .0o0 LU
G:.FBaOOSaUDGETALLOCATION.PRELIMiNARYFEESJat.-wekpps.123 2-1 FY 2C05 BUDGET DAIL
02304005 FFY2405 POWER SPENTFUEL STORAGEJ iON-POWER FUEL TRANS- RAREEARTH URANIUM REVIEWSFOR INCLUDEDN INCWDED N BUDGET REACTOR REACTORDECOtM. REACTOR FACULTY MATERIALS PORTATION FACLITES RECOVERY OTHERAPPLtCANT5 SURCHARGE HOURLYRATE Sheet D: NHosa Racw safety SC IFTE SIC FTE S.K PTE S K FTE $I FTE SIK FTE SIK FIE SK FTE S.C FTC SRK FTE SIK FTE SIK FTE
ODO 0.00 465s.1 7.17 0.00 0.00 Total ODetRestms 47964.00 415.00 47433.80 405690 0.00 0.00 60.59 0.93 o0 0.00 0.00 0.0o 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0Go0 o.w0 1U6.00 Total Overhsad 0.00 16800 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00o.0 0.00 0.00 0.00 0.00 3133.00 oo. Travel 3133.00 0.00 0.00 0.00 o0o 00 0.00 0.00 0.00 000 0.00 0.00 0.00 0.0o 0.00 000 0.00 0.00 ec Rea-~ck LicarVo pieiceTtl:7500.0ZT8.0 4 43 0 080 30.00 00 0:~7: 60 ~0.03 .ZT770.00D73~,.0.00 1'00? 00 .01~00 N00 ~ 0 ¶00 ~~~ *.. .00~~ '1880
ESU9-PROGRAAREACTOR IXENS84O ~tBj 'SU.SUBPROGRNAhTEATIONAL ACTMTvES~-
PLNEO AC IM7A. blteeorra Nidear SateqtyeSaeua 344.00 16.00 344.00 16.00
.0oo 1.0o knamelao" ernmTreeing and Ce4lopnard 5.00 1.00 10.00 0.00 tntenabtionalEtatml Tmev 10.00 0.00 0.00 4.0 htembnl AD S.tor 0.o0 4.00 khtnbmoal Genal IromatbonTecKolgy 12.00 0.O0 12.0 0.e0 0.00 OD 0.0 0.00 371.00 21.00 0.00 0.00 Total Diret Rasoures 371.o0 21.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 .00 0.00 0.00 ITOvehebea 0.00 0.00 0.00 omoo 0.00 10.00 0.00 10.00 0.00 0.80 380.00 0.00 Trawel 380.00 0.00
0.00 0.00 0.00 371.00 21.00 0.00 0.00 TotaloDect Reoume 371.00 21DO 0.00 0.00 0.DO 0.00 0.00 0. 0.00 0.00 0.00 0.o 000 0.00 0.00 0.00 0.00 0. 0.m 0.00 10.00 TotalOverhead 0.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0. 0 0.00 0.00 0.00 0.00 0.00 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0Da0 3880 0.00 k ved 38.00 0.00 0.0 0.00 0.0 0.00 o.oo O. 0.00 0.00 0.00 0.00 0.DO 0.00 000
Ad. e TTonf770~T0 --30001I_R210 _ _ ~ 00
SUU.PROGRAk4REACTORAtCENSING r ; =SUB-SUBPROGRAM:REACTOR LICENSE RENEWAL. -:S' PlANNED ACCOMPJIMNT& 0.00 0.00 Renewa Appcalo RetvIws 6920.00 69.70 8920.00 69.70 0.00 0.00 Lkcmn"Rlnewal Regulatory Framework 650.00 0.10 650.0 8.10 0.00 0.00 Gonral hIformationTechnology 0.00 020 0.00 0.20 0.00 0.00 Leo9 Advice e Ropenotat ODO SO.05.00 0.00 5.00 0.00 0.00 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ToWtOwed Reoo.Md's 7570.00 6.00 7570.00 83.00 OD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 2Z.00 S--uY Ovemed 0.00 22.00 0.00 0.0 19500 0.00 Travel 195.DO 0.00
G:UJB2005BUDGETALLOCATION.PREUMINARYFEESjprintWkpps.123 2-2 FY2005 BUDGET DETAL 0210412005 FY200 POWER SPENTFUELSTORAGEI NOhNPOWER FUEL TRAJ4S- RAREEARTH URANIJM REVEWSFOR ICLUDED 4N INCLUDEDIN BUDGET REACTOR REACTORDECOMM. REACTOR FACEITY MATERIALS PORTATIN FACLITES RECOVERY OTHERAPPLIANTS SURCHARGE HOURLY RATE
EShetD: Nucjar RactorESfety-
I.K FTE $.K TE OK IFTE S.K FTE SK FIE SK PE S.K IFTE S.K PIE S.K PE O.K PIE S.K PIE O.K PIE
TotalDred Resources 7570.00 83.00 757000 53.00 000 0.00 0 00 0 00 0 00 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TotalOnrhoad 0.00 22.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 G. 0.00 22.00 Traml 195.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 195.00 0.00 RatrLcneRnwlRoucTO."7700- E00, 3- 0.000 .0 '0 00 0 0000 000.00 T~ .0 0 000 22.00.
G:\LFBQ2005BUDGETALLOCATION.PREUMiNARYFEESprht_ wkpps.123 243 FY 2005 BUDGETDETAIL
02104W2005 FY2005 POWER SPENT FUEL STORAGD NON-POWER FUEL TRAJS- RARE EARTH URANIUM REVIEWS FOR NCLUDEO IN NCLUDED IN
BUDGET REACTOR REACTOR DECOMa REACTOR FACITY MATERIALS PORTATION FACL7IES RECOVERY OTHER APPLICANTS SURCHARGE HOURLY RATE
Sheste:NuclwrRectorSfety S.K FTE $.K FlE SIK FTE SK FlE ,K FTE 7K FTE $,K flE SI FTE SK FlE SK flE $SK FTE SK FTE
SuBFPROGRA&tREACTORINSPECT-OfiN,-- TR. uSUB-WS PROGRAMHLSNSPEC710N t PLANNEDACTMIWS
HLS FPce-on-ForceProgram 2900.00 15.70 2900.00 15.70 0.00 0.00
HLSSSafeguards uupiona 0.00 1900 0.00 19.00 0.00 0.00
HLSSafegurds kuspectonProgram Dev dopVand Manlan 100.00 6.30 100.00 630 0.00 0.00
HLS Exkurrl Tr&A ODg O. 00 00 0.00 0.00 0.00
ToW Dd Recs 300000 41.00 3000.00 41.00 0.00 0.00 O0.0 0.00 0.D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 .OD0 0.00 O00 0.00 0.00 0.00 0.00 0.00
IT Oserhead 0.00 0.00 0D0 000
Supenisory,9ofreupwvury Ovrhead 0.00 5.00 0D0 5.00
Trasel 0.00 0.00 000 0.00
Toil OwedResouces 3000.00 41.00 300000 410 0.00 0.00 0.00 0.00 0.00 0.00 0.00 00 OO0 0.00 0.00 ODO m0 0.00 0.00 0.00 0.00 000 0.00 0.00
Total Oweread amO 0.0 000 .O00 0.00 0.00 0.00 0.00 0.00 0.00 .0 00 00 0.00 00 0.00 0.00 0.00 0.00 ODm 0.00 0.00 0.00 5.00 Tsel 0.00 0.00 0.00 O0 0.00 0.00 0.00 O0 0.00 0.00 00 0.00 0.00 0.00 00 0.00 OD0 0.00 0.00 0.00 00 00 0.00 0.00
R-esoame Td r3000 .00 y.¶.fln §.,, > w t. ... .O D n 0 0 r rO 0 0 tt0i7-.s .s 77jr0 . 0- ~ ~ .~ ~ Sj~j..j..~.$~ >4 * ~. ~.iA~~i:! s~t~'Si~....J z ..
S .0 DGRAI.,REACTOR HSECC 4,+.,." '
PLANNEDACTIVI1ES L-cene Renewell hrepectsn 0.00 6.00 Om0 6Dm 0.00 0c00 EmergcyfPwredn kspeh 550.00 400 550o00 4.00 cD0 0.00 see h 4specass 0.00 272.00 a0m 272.00 0.00 0.00 SuplemenlaliReacba hl ctofs 700.00 2830 700.00 28.30 0.00 em GOsnic Safety kIse knDpeclasn am 33.0 Oom 380 0.00 eoo
RFclur hIspecion .AAoegn Follw-up 2.00 28.00 1.94 27.97 D02 0O1 0a00 0.0 0.02 0.01 0.02 0.01
DE gercyPrograms am m0 0.97 01 00D 0.01 00 0.01
ReactorPerformance Asessment 505.00 23.00 595.00 2320 0.00 0c0
Reaclor hspechn andAssessment Program DelOs er Oad 442D0 22.90 442D0 22.90 0.00 0.00
Lkcns and Ernmkadon ofPoser Reacor Operuors am 2420 ODO 24.20 0.00 0.00
Opstor Licensing Program nd Tran g O gnit 280a00 10iSO 280D0 10iom O0 0.00
Researched Tes Reactor kuspcbn 320.00 3.50 36.57 0.40 203A3 L10
TTCTraswrg endDevedoper 1335.00 18.00 0.m SAO 1335.00 18.00
G:AU'BU2005BUDGETALLOCATION.PREUMINARYFEESprint_wps.123 2-4 FY2005 BUDGET CETAIL
021042005 FY2005 POWER SPENTFUEL STORAGEt WON-POWER FUEL TRANS- RAREEARTH URANIUM REVIEWSFOR IHCWDEDtN INCLUDEDIN BUDGET REACTOR REACTORDECOMM. REACTOR FAC8.JTY MATERIALS PORTATION FACtLTIES RECOVERY OTHERAPPLECANTS SURCHARGE HOURLYRATE Shoet 0: Nucler Reactor Satety SIK FTE SK FlE SR Fif SIC flE SIC flE SI,K FTE S,K flE SCK FTC SI FTE SIC FE SK FTE SIK FTE
TTC '-hormatenTectrlogy 497.00 3.00 0X CM0 497.00 3.00 TCRnbt odSpac 728.00 0.00 CM a0 72.00 0.00 TTC-Olhr AdmewtrahnSarmes 310.00 0.00 amON 310.00 0.00 Genel hoomnton Tctmology 170.00 000 167193 0.00 0.8 OOS 0.58 0.01 GM
Reacr hepacton . Sla. Fedeal, d Triba Lon Actmtes 0.00 4.00 3.00 0.11 Legl Adise endRaenentaon 0.00 2.00 0.00 2.00 0.00 08 Rect E ndomeltAcloun 188.00 11.0O 182.36 10.67 In 0.11 0.21 0.01 1.6 0.11 1.87 0.10 Reactor ineatgab 10.00 24.00 10J0 24.00 0.00 0.00 kewn Trnmg endDwlopnnet 0MDO 10.00 0.00 10.00 0.00 am E~rnal Tramw 487.00 1.00 466J8 1.00 0.04 0.00 0.00 0.04 Rea EventReepoa 33.00 10.0 33.00 10.80 0.04 ON0 React Ewnt Rf d 2973.00 13.10 2973M00 13.10
Reator heeu R Coofdnaon 0.00 3.10 3.10 Rfle kwcoxartkrrtmesbon 0.00 0.00 Totl Dct Reone 9620.00 528.00 6422.11 502.11 2.63 024 3687 0.41 0.00 0.00 0.0 00 Z63 0.13 0.00 GAG 0.00 0.00 0.00 0.00 243S76 4.1tl 2S70.00 21.0)
iT OC-wed OCO 23C03 am CN 0.00 23.00
S -o 0.00 210.00 G.80 0.00 0.00 210.00 Tral 7537.00 0.00 am 0.00 7537.0 0.00
TotwlDirect Resorces 202D0 828.00 5422.11 502.11 2.3 0.24 36.87 0.41 0.00 0.00 00 0.00 263 0.13 OD00 0C00 0M 0.00 0.00 am 285.76 4.10 287030 21N Towl Onetued 0.00 23300 0.00 0.00 OmCO 0Jo 0.00 am 0om0 0M 0aM am 0.00 0a0 0.00 0M0 ,OOD OM 0C00 am00 Om GAO amD0 233.00
Tral 7537.00 0M 0.00 00OD 0.00 0.00 amD amo amo o.oo amo Gao 0.00 0M0 mO mO O CO 0.00 0.00 am cm 0.00 753700 0aM 2rR a t o k t ac o f l n c 7 !r5 =0 30J ~ u ~ ' ' 5 2 1 ' 3 " t 0 4 7 3 . 7 % $ , 4 ~ C O O y mYj r 0 7 . 3 7 5 . 3- 1 0 r-mY r . .8 1 7 7 o r ~ r o. 0 m o 0 ~ 7 § 8 7 ' . 0 0 . 0 M.0z t t UE~ ?r.c ;..~t~~~Pk.t~ .>s;tA$prt~Q:~'t' a--.-...,.-,.. ~ o;
G:\LFU0OOSBUDGETALEOCATION.PREUMINARYFEESsprint_wkpps.123 245 FY 2005 BUDGET DETAL
02tO412005 FY2005 POWER SPENTFUELSTORAGE/ NON-POWER FUEL TRANS- RARE EARTH URANIUM REVEWS FOR INCLUrED4N #NCLUOEDIN
BUDGET REACTOR REACTOR DECOMM. REACTOR FACLITY MA7ERIALS PORTATION FACLITES RECOVERY OTHER APPLICANTS SURCHARGE HOURLY RATE
Shoot 0: Nuclear Roacw Safety SK PIE S.K PE SK PIE S.K PTE S.K FTnE S. PE $.K PIE SK PIE SK FOE S.K PIE S.K PIE S.K PIE
'SUB-PROGRAM, REACTORUES4 0-SUUB-PROGRAIEkNEWREACT0R LICENSO G0, 1 PLANNJEDACTIVTES
Early SE. Perw~s 1808.00 14.50 1808.00 14.6 0.80 0A
Design Codification 4137.00 33.50 4137.00 38.50 0.80 0.
Pro-Appicaton Reviews 80.00 4.50 50.00 4.50 0.00 0.G0
Regulatory hrftsructure 7250.00 22.50 7250.00 22.50 0.00 0.00
New Reader LiceknsinghepandeatAd&C 0.00 0.00 0.60 0.0
Legal Advice and Representaton 0.00 S.00 0.00 .500 0A. O8
Cwstructon ispecbon 0.00 0.00 0AO 0.00
Combhed LkcIUs 000 0.00 OA. 0.00
Adjudicatory Reviews 0.00 0.00 0.6 0am
Total DOct Reowrces, 13245.00 85.00 13245.00 8S.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 0.00 00 0.00 0.00 0.00
0.00 19.00 0m0 0a00 0.00 19.00
Travel 145.00 0.00 0.60 0.00 145.00 0.00
TOWelDiectResouces 13245.00 85.O0 13245.00 85.00 0.00 0.00 0A. 0.00 0.00 0.00 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0.0 0.00 0.00
TO Ovtdl 0A 18.00 0. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 08 cm 0.00 19.00 Trael 145AO 0.00 0.00 0.00 0.00 0.00 000 000 0.00 000 000 000 0.00 000 0.00 000 0.00 0.00 000 0 OA 145.00 0.00 M 0 0.00 I40.00-5.0` ,14`00_ 1o.0o'
W1PROGRAKI RECT01I UCENSING t' J .SUBSUB-PROGRAI& ESA.HLSACTMTES - PLANNEDAC7VITfES ESAHLS Velnerably Assesnents 0.00 000 00 0.80 Total Diet Resorces 0.00 .00 0.00 0.00 0.00 0.00 O.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.80 0.80 0.00 0.00
FTOverhead 0.00 0.00 0.0 0.0 0 00 0.00
TSYrl Ovrod 0.00 0.00 0.O00 0.0 0.00 0.00
Trawl 0.00 0.00 0GM 0.0 0.00 0.00
Total Diect Resources 0.00 000 0.00 0.00 OA0 0.00 0.00 0.00 0.00 0 00 0.00 0.00 0.00 000 0.00 000 0.00 0.00 0.00 0.00 0.0 0.00 0.00 0.00 Total Orred 0.00 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.00 0.00 000 0.00 00 0.00 0.00 0.00 0.00 0.00 0AO 0.0 0.00 0.00 Trawl 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0M 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0OA 0AO 0.00 0.00
G:%LF0\22005BUOGETALLOCATION.PREUMINARYFEES..pr~intykpps.123 246- 02/04/2005 fY2OOS POWER SPENT FUEL STORAGE) NON-POWER FUEL TRANS- RARE EARTH URANIUM REVIEWSFOR NCLUOED N INC UDED N
BUDGET REACTOR REACTOR DECOMM. REACTOR FACLITY MATERIALS PORTATION FACtUTtES RECOVERY OTHER APPUJCANTS SURCHARGE HOURLY RATE ShntONucbaarReactorSafety
S,K PTE 7,K fTE SK flE S.K flE 5K FTE S.K FFTEFIE 5* flE SIC flE S,K 7K FlE S.K IE SK fTE
,0UB.PROGRAACREACTOR (XENS'JO + .'a i~,!; 5
PSUASUBPROGRAMHISUCEN ENGSUPPOPTf lRs. 'f " >T& - F1.ANED ACCOMPISYENT[&
HL S Threat Asssnient tiamO 9.10 60.00 m.10 000 000
HUS Regulatory trovementf 3oom 1mim0 300.00 10.50 0.00 000
HU Mitigating Strategy 3775.00 13.10 3115.00 13.10 0.00 0.00
HLS Safeguards LUcensng 25OOm gm 250.00 4.t0 0.05 0.00 0.35
HIS Security ifrastroctra kprovemnats 1491.00 200 1401.00 2.00 0.00 0.0
HS Legal AdvIce and Rpresentation am00 im 0a00 1s0m 0.00 0.00
HLS Genera) Irfcrmutaon Technology tOO.mO 0a00 l0t.OO 000 0oo 0.e0
HIS Intern Training and Development cO00 1.00 c.Oo 1.00 0.00 0.0
HLS External Training 15(tOO 0.00 100.00 000 0.00 0.e0
TotalDirect tasource 61.00 42.00 6156.00 41,00 amiO 0.0a 0.00 Om 0am coOD 0.00 0 aMO cmC0 am 0.00 0.00 m000 O.O 0.00 0.3 0.00 am0
IT O ehea cm00 cm00 0.0 GMo am00 0a0
hrw - 7 ntp~tmr6varlrad am00 2 m.00 am cme 000 2a00 Trawl 40fm.00 0a00 O.0 am 405.00 0m00
To" De Remo StSltO 42-i tit5O0 416 a 0.00 c0.00 am am am am am am am am oooao ao am am cDO 0000 amoo Total Ove 000 2ftO a0 a0 0m00 am 0.00 0 a00 0.00 O mD 0m00 0a00 0.00 a0 0a00 0a0 am am 0m00am oLeo amo 28.00
Tral 401m00 amo amo ooo DAm amo a 0.00 am ooo Om am o.00 0a00 aO 0a00 0a00 a0 000 000 0.00 0.00 405.00 0.00 t 1 ReeourcTotae1- -05 4.aQ ' r .r~l~c ' 85358oo, r- 41.80ry . o o -5m 0'a 0 ;¶r% oa o ...... ro m~ ,r7 0o m'a~TZri r a m w0-V-- ,o m0yi0, z.; ~ 4 i~ - 4c 2,~. ~~~ ~ ~ ~ ~c ,~:rT~iu'.~a0Z!..0T~va.... a m- r7 Ocm 7 7'-"~ i~j c wri-,~ o o4000 7 -uw7-2802A3
--LI.. -s b o . K' r - . . . , ..
G:\LFB\2005BUDGETALLOCATION.PREUMINARYFEES_prihLwkpps.123 2-7 FY2005 BUDGETDETAIL 387.66 FY2005 POWER SPENTFUEL STORAGE/ NOPN.OWER FUEL TRANS- RAREEARTH URANOIUM REVIEWSFOR NCLUDEDIN INCLUDEDIN
BUDGET REACTOR REACTORDECOMIM REACTOR FACILUTY MATERIALS PORTATION FACLITES RECOVERY OTHERAPPLICANTS SURCHARGE HOURLYRATE Slhot E: Nucear Merls Safety
SK FTE SX FTE ScK FTE SK FTE SK FTE SJ< FTE Si FIE SJC FTE Sc FTE SIC FTE SK FTE SJC FTE
PROGRAM:MATERIALS AND WASTE F5US ROGRAM:FUE ACLTES LICENS a6 KSWT "I SUBSUB FpPROGRAMFUEL FACITIES LICENSNG& tNSP
PLANNEDACTMTE&E
Fuel Fecilitis Licensing 85530 17.10 855.00 16.50 0.60 0.00o OO
AflegationaiEnforcem en 030 0.00 ooo o0.0
Muterials Enforcement Actions 2.00 0.00 2.00 0.00 co 0.00 HLSThreatAsseesments 0.00 0.40 0.00 0.40 0.00 0.0o hU1.5MItigating Sratagles 0.00 1.00 0.00 1.00 0A0 0.00 HL5Regulatory improvementa, 100.00 5.40 0.00 0.60 o0o. 0.30 ooo 003 100.00 2.50 0.74 0.60 1.23 HLSSafeguards inspection 0.00 7.30 050 .80 ODO 0.00
HUSSafeguards Licensing 1800.00 6.00 1260.00 0.50 180.00 5.30 360.00 0.20
Fuel Facilitieshapectlon 0.00 15.70 0.00 15.70 0.00 030
1H1.5External TrainIng 50.00 0.00 80.00 000 0.00 0.00
HLtSS uart inspection ProgDev and Mainten 0.00 2.00 c oo 2.00 G.AO 0o0
MU Force on Forc Program 10.00 1.60 10.00 1.B0 0.00 0a0
Sed-Ox de4s Fuel Fatrtatlon Licensing 300.00 7.70 300z0 7.70 0. 0.00
Fuel Facilities Environmental Re"Iews 154(O0 4*DO 126.00 400 111.70 0.00
ad.xOade FuleFatblcation Facity Liensing ODm 2.00 o.oo 230 0.00 0.00 UraniumRecOvery Licensing 135.00 6.70 3500 0.35 oomoo 5.03 30. 1.32 UronkumRecovery inspecton 0.00 1.50 omo 1.50 0.0 0.00 Enclatiment Licensing and Certiftcation a1sm0 15.30 315.oo 15.30 0.00 0.0 Enrlc4mient h spections 0.00 6.10 ooo 6.10 0.00 0.00 Mixed Odds Fuel Faction Facitity Inspectlion 0.00 4.50 omoo 4.0 0.00 0a0 Legal Advic end Representation 0D00 4.00 0.00 430 e.o amo Fuel Faciltes Adjudication 35.00 3.00 3500 3300 0.00 0.60 Geosral Information Technology 50.00 ox 5030 0.00 O0m intern Training and Deelopment O.DO 4.00 m00 400 0300 03 External Training 174.00 OmO 0.66 1560.5 omo 1.32 13.50 1.57 amoo TotalDeect Resourcre 5374.00 115.70 1285.68 1.95 0OD0 0.30 ooo 0.03 332285 102.80 0.00 0.74 amO o.oo 1.32 0.60 278.80 6.83 00 030D 47527 2.75 0D0 030
T Overhead 030 0.00 0.e0 0.00 om amD
SapctesoraSapemewyOtwed 0.00 43.30 am amoo OD 43.30 T7rael 87530 030 030 00D 875.00 00D
TotalDrocI Resources 5374DO 118.70 1285.60 165 030 0.30 ODO 0.3 3322.5 102.80 0DO 0.74 03 0.00 1.32 0.60 278.80 6.53 0D0 0.00 473.7 2.75 ODO 0.00
G:tFB6UOO58UDGETALLOCATION.PREUMINARYFEES_prjnLwkpps.t123 2-1 38387.66 FY2005 POWER SPENTFUEL STORAGE) NON-POWER FUEL TRANS- RAREEARTH URAN8IJ REVEWSFOR INCLUDEDIN FNCLUDEDIN BUDGET REACTOR REACTORDECOAJ1 REACTOR FACEITY MATERIALS PORTATION FACLITES RECOVERY OTHERAPPLCANTS SURCHARGE HOURLYRATE
Sheete Nuclear Metars" Safety
$x FTE ti FTE S.K FTE tK F7E tIC FTE $A FTE SK FTE SK FPE SJC FIE SIC FTE icK FTE SJK PIE
Total Overhead 0.00 43.30 020 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 O0 0.00 000 0.00 0.00 0.00 0.00Om 0.00 0.0 0.00 0.00 4330 Travy 815.00 0.00 0.00 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0.0 020 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 875.00 0.00
HIGHLEVELWASTEREFOS11 40592.00 134.00 SUt-PROGRAM HIGFtLEVELVASTE$E~PSITOf-Y
=rRapo
OGA:DECOMOAISSICI4INGANDOL
PLANNEDACTVITES Low-lvel Waste Regulation endOversight 1000 4.20 10.00 420 Reactor Decan Rukemaking andRegulatoy Guidance 00 000 020 0.00 0.00 0.00 Power Reactor Decent Project ngt endLcensing 80020 950 0200 0290 800D0 8.60 0.00 0.00 Powe Reactor Decommilsionlng Inopecion 020 5.10 0.00 0.10 5.00 9.00 0.00
Material. and Fuel F YaciltyDecontisseoning Licening 107520 2120 9D00 2.30 14145 1A.9 91.10 1,40 7T245 16.71 Materials andFuel Faclilty Decommlslookn kIapecilen 020 220 0.0 0.83 0.40 0.00 0.07 Formerly Licensed Suee 020 000 0a 0.00 Deconslsaning ndLLW Enkwnetat Revies 72420 3.10 5020 0.50 20.78 0Y3 17500 0.50 471lZ8 1.75 hIto Tach . Sppor of Scintifc CodeAcivIties 020 0.00 0.00 0.00 General kWoTech 12000 020 60.00 80.00 0.00 Legal Adic endRepreentation 020 320 9040 2.90 EsbmaaTraWnng 97200 020 28.70 68.30 9.00 Assessment o Deesefor Envirnnuntal Centantinente 285520 9.00 142800 4.50 1427.00 4.50 TTC-Taining endDevelopnent 6920 0.00 0.00 0.00 6920 0.00 kItemarrmining Develo nt 0.00 220 0.00 2.00 Tavel 0.00 0200 9.00 000 hUSDecomnntssining and LLW Ackvities 0.00 0200 0.00 0.00 Tota Dletd Resoces 5750.00 60.00 142820 5.50 8to.70 14.60 020 020 139.00 3.70 163.23 2.67 0.00 020 266.10 2.30 0.00 0.00 0.00 020 2793S.7 31.23 692C0 020
IT Overhead 0200 0.00 0.00 0.00 0.00 020 Suynmnory/N n-SupernoryOverhead 020 31.00 0.00 0.00 020 31.00
Travel 564.00 0.00 0.00 0.00 564200 020
TotalDect Resources 5750.00 60.00 142820 520 88.70 14.60 0.00 0.00 13900 3.70 16323 2.7 0.00 0.00 266.10 2.30 0.00 0.00 0.00 O02 2795.17 31.23 69.00 0.00
G.\LFB\200SBUDGETALLOCATION.PREUMINARYFEESpsinLtwkpps.1i23 2-2 FY205SWUOGET OETAL 38387.68 FY2005 POWER SPENTFUEL STORAGE/ NON-POWER FUEL TRANS- RAREEARTH URANIUMI REVIEWSFOR INCWDED IN INCLUOEDIN
BUDGET REACTOR REACTORCECOUM. REACTOR FACLITY MATERIALS PORTATION FACILITIES RECOVERY OTHERAPPLIANTS SURCHARGE HOURLYRATE
Sher E Nuc LealrnetsSafety
SK FTE SF PTE Sx FTB SJK FTE St FTE Sx FTE SK FTE Sx FTE SK FTE SK FIE S,K FTE SR FTE
TOAIOverhead 0.00 31.00 O0 0.00 0.00 0,00 000 000 0.00 0.00 0.00 0.00 0.00 0.00 0,00 000 0.00 0.00 0.00 0.00 0.00 0.00 000 31.00 Trawl 564.00 0.00 OC00 0.00 0.00 0 00 0D00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0000 000 00 0.00 0.C0 0.00 e0.00 O. 564.00 0.00 ~ ~tL~,.~<~$50.. 9.0~K.~42.0.~.88.0~ 18X~'00 >.0004 l3m.$3 $13.3~;..6:~ 0P. ~ .0 K 0. 0 ~>000;.;0000_9.9 1.106300 1.0
SPENTFUEL STORAGEOAND TRANSPORTATION LICENSING AND INSPECTION SUBESUB-PROGRAhtSPENT FUEL STORAGE AND TRANSPORTATION LICENSNG AND INSPECTION R.ANNED ACTIVTIES Licensng and CCertihg rfon 2470.00 35.J0 2z0 0.00 2145.60 24.40 30.D0 16.19 151.10 728 2.00 2.80 119.71 3.52
hIpection, OA Reviews. Evsnt Respena. 50.00 11.40 S0.00 9.65 I.7 0.00 0.00
Spent Fue En.1ronmental Rmiaws 38.00 0.00 38.00 0.00 0.00 GA Adjudlcatory RevWs 42.00 1.00 42.00 1.00 0.0 0C0 Legal AdvIceand RepresentatUon 0.00 2.0 2.00 0m 0.00
General hfoTech 125.00 0.00 75.00 45.76 4.24 0.00 Inbam Training and De"lopment 0.00 1.00 050 0.50 0.00 0.00 Etenal Training 90.00 0.00 "o10 22.79 4.11 0.00
SpentF-el torageSystems Safety Aaasment 1650.00 4.CO I&b0C0 4.00 0.00 0.00
HILSThreat Asaaomnla OCm 0.70 0.10 0.7 C0.0 0.3
HL5 Regaleotry hypeoV*Menb 100.00 2.00 020 95.43 1.72 4.57 0.05 HLIS.bdblhg Srteglae 200C0o 0.J0 100.00 020 95.43 0.10 4.57 0G00
HLS ecurity inspectionand O Ight OMC m90 1.0 029 .0 0.01 HL SafSguard.Licenaing OmC 5.10 0.00 4.46 0a00 0.J4 HIS Sowity infraaruclume inwpvem Om Om 0.00 .00
HLSMAesa Dispersal from Spent Fuel 0.00 0.00 0.00 0.00 HLSExternal TrainIng OmO OmO 0.00 0.00
Total Dned Rasources 4771m00 65C0m 2D0 O0m 4169.70 48.11 0.00 0C0 30.60 0.00 16.19 000 410.52 1220 2.00 0Om 2.0 0.00 0.00 0.00 137.19 4J9 0.00 0.00
ITODamead Om0 0CO0 0.00 0.00 0.00 0.00
Tpror ur ny d 0.00 20.00 0.0 0.00 0.00 26.00 Trawld 3S4D0 0aC 0.00 0.0 394C00 0.00
TotalDiretRResowes 47710 65m00 2.00 0.00 4169.70 4.11 Om0 000 30.60 0.00 16.19 0.00 410.52 12.20 2.00 O0 2.80 0.00 0 000 137.19 4.69 00 000 TOA Oveme0d am0 2S0m 0.00 am0 000 am0 0C0 00m 000 O0 0.00 0.00 OmO 0o0 0.00 0a0 0.00 0.00 0a0 0Cm0 0em Om Oam 26.00 Trwl 39400 0m 0m OD0 0a00 000 O0 000 0.00 0.00 0.00 O0 0.00 00 0.00 0.00 om om am 0o 0.D 000 39400 000
__eueSi d=tr001 ka e a afdfl p _gad -s e m g 9 m, 'E , .. 0 .4 6 7 ½ . pa 1 ,.0 0-~' 00 0 ;.om. ,3 0 ~J0 .0 5 t " 1 6 * ik.., 2 2 om5 . :2 m 13 . 9 a[4.69i .;, 04m226.
G:.LFB%2005BUDGETALOCATION.PREUMINARYFEESjpirt wkpps.123 2-3 FY 2005BUDGET DETAI
383837f6 FY2005 POWER SPENTFUEL STORAGE NON-POWER FUEL TRANS- RAREEARTH URANIUM REVEWSFOR INCLUDEDIN SICUDED IN BUDGET REACTOR REACtOR DECOL REACTOR FACLITY MATERIALS PORTATION FACILITES RECOVERY OTHERAffLCtANTS SURCHARGE HOURLYRATE
Shaot&NclwoMtaerlSalely------
S.K FTE SK FTE SJt FTE StK FTE SJ( FTE SK FTE SK FTE SK FTE SK FTE SK FTE S.K FTC SJK FTE
SSUi-ROGRAN GENERALFUND HLW ',U, ,; , Y, " I WIIUWSBPORkGEN -ERAL FUUjO LW^; t~ ,_ 1 PLANNEDACTMVTES Gonmr Fund4fT-DMS 0.00 0.0 0.00 0.00 GCneal Fund-IT-LSN 0.00 O0 0.00 0.00 General Fund-HLWDocmnt Procslng 0.00 0.00 0.00 0.00
Toal Deed Resour 0.00 OC0 0.00 0.00 0.00 0.00 000O 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.00 0.00 00 0.00
0.00 10Oanei d 0.00 0.00 0.00 0.A0 0.00
0.00 0.00 0.00 0.00 0.00 0.00
TraWe 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 Toal Ded Rour 00 0.00 O.O 00 0.00 0.00 0.00 0.00 0D0 0.00 0.00 0.0 0.00 000 0.0 0.00 000 0.00 0. 0.00 0.00 0.00 0.00 TOWa&nftrhsad 0.00 000 0.00 0100 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000O 0.00 000 0100 0.00 0.00 0.00 0.00 0.00 0.0 Tralm 0.00 0.0 000 000 000 000 0.00 0.00 000 0.00 0.00 00 0.00 0.00 000 00 0.00 0.00 0.0 0.00 0.00 0.00 0.00 0.00 00 00 OOO0 000. OD 000lS 000OOOO 000 DOOO OO .O OOOOO DO OO' e D D 00i ' 4 O0 . T. . . .. m.-...?
AESS O& E EEURITY ; - -
PLANNEDACTWTfES ESAVubuiatlyAseaemenU 000 000 0.00 0.00 ESAThreat Asesoments 000 O0 0.00 0.0 Tota Deed RasorrAs OO D00O 000 000 0.00 0.00 O0O 0.00 00O O00 000 000 000O 0.00 0.00 000 0.00 000 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0. 0.00 0.00 IT Owttad 000 0.00 000 000 0.00 0.00 00 0.00 0.00 .O0 0.00 7ravl 000 0.00 0.00
0.00 000 0.00 Total Deed RAseeu 0.00 0.00 0000.00 000 000OO.00 0.00 0000 000 0 0DO 000 000 0.00 000 000 00 000 000 00 0.00 000 0.00 TotlWOweiamd 000 000 000 000 000 000 000 000 00 00 00 0.00 0.00 0.00 0 ODO000 000 000 0.00 0 0. 000 0.0 000G 0.00 0.00 Trave 000 0.00 0l00ODO 000ODOO .OO O0 000 000 000 000 000 000 000 0.00 O.O 000 O.O 0.00
tS4 L FOFIORLRUCNSED51ERLYLICENSED SITE - , ,. ;,. ,; __ .
G \LFB\2005BUDGETALLOCATION.PREUMINARYFEESjpintwkpps.123 2-4 fY 2005 BUDGETDETAIL 35387.88 FY2005 POWER SPENTFUEL STORAGE/ NON-POWER FUEL TRANS. RAREEARTH URANIUM REVIEWSFOR INCLUDEDIN INCLUDEDIN BUDGET REACTOR REACTORDECO&OJ. REACTOR FACUITY MATERIALS PORTATION FACILITIES RECOVERY OTHERAPPL CANTS SURCHARGE HOURLYRATE
ShootE: Nude Materials Safety
SRt FIE SiK FIE $X FTE S.K FIE SK FIE SK FIE SK FIE SJx FIE SI FIE S, FIE SK FIE S.t FIE
PtANNfEDACTMTIES
Formerly Licensed Sites 0.00 0.00 0.00 0.00
Total Dir Resoumes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.00 0.00 0.00 0.00 0.00 040 0.00 0.00
IT Orertsd 0.00 0.00 0.00 0.80 0.00 0.00 Super-wyftton-SupermeoryOw-Mead 0.00 0.00 0.00 0.00 0.00 0.00
Tranw 0.00 0.00 0.00 0.00 0.00 0.00
Total DOasiR&I0U~ss 0.00 0.00 0.00 0.80 08 0 0.00 0.00 O0.0000.00 0.00 0.00 0.00 0.00 0.00 0.00 OD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ToWlOnwasd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.00 0.00 TrawOl 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0.00 000 0.00 0.00 0.00 0.00 000 0.00 0.00 000 0.00 Tnn: y~icesed~as~soteiloto/ ~,.. .t ...... ,' tSUBPF1OGRA NUCLEARMATERIALS USERS LICEN & NSP j!,UB-POGRAI:NUCLEMJ MATERIALSUSERS LICEN 11,146P., WLANNEACTMIE& hInernaonal brporVgepot LkUenshg Reviews 0.00 3.00 0.00 2.88 0.00 0.2 nternationa HL5 Lkending Support 000 IZOO 0.00 1.79 040 .21 HL5 Internaltonal SadegowudOrsight 0.00 0.40 03 0.00 0.4 HLSSeturity inspection 705.00 12.10 53Z,13 9.18 172.87 .24 MaterwlaEent Response 0.00 0.00 0.00 0.00
Meteidal hlcident Response Coordho tion 0.00 0.40 020 0.03 0.00 0?17 aterilw Eent Readiness 0.00 A100 0G0 0.10 0.00 0.70 HLS Mitigating Stgetegis 0.00 0.50 0.0O 0.00 0.44 HLURegulatory knprbements 400.00 2.40 51.1 023 knterethonal Legal Advice nd Representation 0.00 1.00 Ri.k4nornmed Regulatory Frwoslt 200.00 1.00 100.00 0.50 12.90 0.06 70.00 0.20 13.55 0.04 |1145 0.26 Radiation Expoesre AsseesmentMedrods 35000 1.00 175.00 050 0.00 1040 3.40 25.00 085 25.00 0G5 3.23 0.11 2386 0.81 22.02 0.78 HU.Regulatory krtproremenla 100.00 0741.1 09 0.44 HU SafeguardeInspection endOersight 0.00 0.00 OO0.00 0.00Om4 HILSControl of Source and Registry 000 0.00 0.00 0.00 H.S hIto Tochrolo0y-Control ot Sources 1630.00 3.50 210 31 0.45 1413.09 3.05 UatedeteUcesnskg 50.00 31.70 0.70 0.02 9.30 0.23 1430 0.31 1.92 23.49 2.90 009 0.80 0.02 1.10 0.03 1 8.98 7.81 HLS Safeguards Lcknsing 0.00 0.00 0.00 0.00 ULSLegal Advke ndRepresenatlon 0.00 2.00 0.50 0.50 0.13 0.00 0.87
G:\LFB2005BUOGETALLOCATION.PREUMINARYFEES.print-wkpps.123 245 FY2005 BUDGETDETAL
35387.66 FY2005 POWER SPENTFUEL STORAGE! NON-POWER FUEL TRANS- RAREEARTH URANiUM REVIEWS FOR ICLODED IN INCLUDEDIN BUDGET REACTOR REACTORDECO&UM. REACTOR FACILrrY MATERIALS PORTATION FACLITVES RECOVERY OTHERAPPLICANTS SURCHARGE HOURLYRATE
Shlet E: Nuclaar Malanla Sfety
S.K FTE S.K FTE S3K FIE SK FTE SK FTE S.K FIE SK3X FTE SX3K PIE SlK FTE FIE FTETSX FTE
HLSCoordinaion wiN Slatbs 50.00 1t00 6.45 0.13 43.55 0.7 Malarial. Usars Envionm.na Raviwas 0.0 1.00 0.75 0.10 0.05 0.09 0.00 0.01 HS International Safeguards ngibrab Om 1.40 0.80 0.00 0.60 HILSInteralional ThreatAsses nl 0.00 0.10 000 0.10 Materialak s rpton$ 731.00 2220 3.00 0.06 3.00 0.06 3.00 0.06 450.85 18.34 2.86 0.06 21829 3A2 HIS hIearntional Ragulalory knproemnent 0.00 2.40 0.00 240 Material. R.Iemsaking 570.00 16.00 Si.00 1.72 90.30 324 105.00 1.95 219 0.71 44.30 2.51 6.0 0.26 2.80 0.02 215.71 5.5S Maltrials EenOEvahation 625W0 6.70 25.00 69.00 1.10 6129 0.66 56.00 0.50 413.71 4.44 Matlrialb hidnt R..pona. 120.D0 7.00 0.25 4.61 2.74 115.29 4.01 AllegationsEnfornent 2.00 14.80 0.10 100 0.40 4.50 1.36 .09 0.02 0.52 0.12 0.69 Matarial. Agrernent Slates 190.00 2620 5.16 1.55 184.4 24.65 larb State. FedorK and Trilal tLoian s0cm 2.00 0.20 9.21 1.68 0.79 0.14 Malerials Entrcemn l AciOna 2.00 500 0.10 0.25 0.40 1.00 1.3. 3.41 0.02 0.05 0.12 0.29 Mat4rIal. kwestigaion& 0o00 a0 000 1.10 6.36 000 0.54 Legal drloa andRepresentavln 0o0 3m0 039 00m 2.61 Malarials Adnicatcan 20m 2.00 1&42 SM4 1.58 0.16
hIloatrUon T 7dawlogy. Malerials 2434m0 050 97i.31 0.46 1454.69 0.04 Gen"re br0. Tecwmoag 630.00 Om i.10 70.50 "l3.10 2.59 25.37 6.00 am50 37.4 0.00
ITC.Tralmkd and Dewoproenl 59600 2.00 0.00 0.00 59600 200 barn Traknh9n*d Developnmnt am00 3 m00 I 00 m am0 External Training 19400 0.00 4.60 tO0m 14.80 12640 6a0 0.40 0.40 28.40 CM Torl Dret Raesouces 9e0oom0 190.30 270.40 305 232.30 623 0.0 0.00 49500 13257 2568.67 8328 163.33 4.54 16.10 0.28 12.0 0.05 00 5.81 92. 71.50 59600 200
0ODO 5D0 AO .o0 0.00 sm00 ITOve ,rea 7rr ed1 a a0 65.70 0.80 o m0 c m0 65.70 1449D0 amO a m0 om0 144 am0 am0
Tocl [ied Resources 9609.00 190.30 270.40 305 232.30 623 000 0.00 4950 13.57 2566.87 8328 163.33 454 16.10 028 02.10 0.05 cm 5.81 8256.9 71.50 590 2.00 Toal Oslcead 0.00 70.70 0a00 0am0 Wm 0.00 0.00 0a0 0am 0.00 0.00 0.00 0am0 0.00 a0m 0.00 0M0 a0 0.00 0o0 0o.0 Om 0.00 70.70 Trail 1449.00 .o 0c00 0.00 O.0 000 m00 am0 0a0 0.00 0.00 0.00 0.00 000 0 0.00 0c0 0a0 c0o a O 0.00 1449.00 0a0 2 7 U c2. n e c a,c 'o1 i10 .000 8 .0 .58 .. 3 5 . 8 2 . 1 3 3 4 5 . . . A . 1 .~.2. a. S.6.1m f. . . 1 $ ' 2 5 . 9 . 7U0 0 S , ~
G.\LFBE20055UDGETAOCATION.PREUMINAORYFEESEYF._wkpps.123 246 FY2005 BUDGET DETAIL 3&3U7M6 FY2005 POWER SPENTFUEL STORAGE/ NON-POWER FUEL TRANS- RAREEARTH URANIUM REVIEWSFOR INCLUDEDN ICLUDED IN BUDGET REACTOR REACTORDECOM. REACTOR FACLITY MATERIALS PORTATION FACLITES RECOVERY OTHERAPPLICANTS SURCHARGE HOURLY RATE ShmetEI Nudle MatwalsSalety
SK FTE S.K FTE sK FTE SIC FTE sx PTE 1K FTE SX FTE SK FPE SJ FTE SK FTE S,K FIE SIK FTE
G;\LFB200SBUDGETALLOCATION.PREUMINARYFEES_pMIwkps.123 2-7 FY 2005 BUDGETDETASL
3638768 FY2005 POWER SPENTFUEL STORAGE/ NON-POWER FUEL TRANS' RAREEARTH URANKJM REVIEWSFOR INCLUDEDN4 INCLUDEOIN BUDGET REACTOR REACTORDECOOMK REACTOR FACILITY MATERIALS PORTATION FACLITES RECOVERY OTHERAPPLICANTS SURCHARGE HOURLYRATE Sheet E8Ndcw MatanalsSafety
S.K FTE S.K FTE sx FTE SK FFTE FKFTE SK FTE .K FTE S.K FTE S.K FTE SK FTE S.K FTE S.K FTE
MFATERIALS SAPF tTPTYTS
GRANOTOTALWTHHIGIS-LEVELWASTEANDGENERAL 6937800 736.00 299606 10.00 5290.70 6924 0.00 0.03 398755 120.07 2746.09 866.68 573.85 16.74 2655.2 3.18 294.40 658 0.00 5.01 8084.02 118.17 3947.00 173.00 GRANDTOTAL HIGH- LEVEL WASTE 40592.00 134.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 00 0.00 0.00 0.00 GRANDTOTAL GENERAL FUND 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 00 0.0 0.00 0.00 0.00 E A E02M . 7
G:JB\2005BUDGETALLOCATION.PREUMINARYFEES.priwkpps.123 2-8 FY2005 BUDGETDETAL
021042005 FY2005 POWER SPENTFUEL STORAGE/ NON-POWER FUEL TRANS. RAREEARTH URANIUM REVIEWSFOR IhCLUOEDN INCLUDEDIN BUDGET REACTOR REACTORDECOE4M REACTOR FACIUTY MATERIALS PORTATIDN FACLITES RECOVERY OTHER APPLICANTS SURCHARGE HOURLY RATE SheelH. Management andSupport SIK FTE SK FTE S.K FTE SIK FTE SI FFTE SJK FTE SK FTE S K FnE SK FTE SiK FTE S.I FTE SiK FTE
STRATEGY:MAGEMENT &SUPPORT
'I~SUBiPROGH4Ak PLANNING.GEUDENTA !-;R PLANRGAC . YSIS PLAI4EDACTMTJE& 118 40 0 118 4 50 5.0 0 50 5
Fogl Adnpt a 10D. 0 0 10 FUIdsCaWto 4 60 0 4 6 WIomlan Ttchlnoogy. BudgetSysltms 295 1.0 295 1 Geneal lomrrnl Tecnology 21 0.0 21 0
S&B AdpustnMwd 0 0.0 0 0 Toal DirectR sources 488 26 0 0 0 0 0 0 0 0 0 0 0 0 488 26
0 11 0 11 Tand 12 0 12 0
TottiDed Ruocas 488 26 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 488 26 TOWOwdmad 0 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a a 0 11 Trae 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 0 SW0i0indislb 37 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 So0 37
PLANNEDACTMTIES. Geneal Awcouf" andFNMacXiW Reilg 919 70 0 gig 7 Iwmatn Tehnlogy . FederalFiancial Sysltarr SW9 0D 0 690 0 hkonnaon Technology. Cod Alna 406 10 0 406 1 CoslAnaly.. 0 3 0 0 3 Amus RaCSNRbG 9 4 0 9 4 LEan.. F.. 91 10 0 91 10 Ir1orma11n Technology. ULansaFe.. 1439 2 0 1439 2 Gar." hInormtion Technology 20 0 0 20 0 Financal Syslais 0 5 0 0 5 Tolal Dged Resurca 3474 32 0 0 0 0 0 0 0 0 0 0 0 0 a 0 3474 32
G:-LFB\2oS5uDGETALLOCATION.PRELIMINARYEESjx twkpps.123 2-1 FY2005 BUDGET DETAZL 02dO42005 FY2005 POWER SPENTFUEL STORAGE1 NON-POWER FUEL TRANS. RAREEARTH URANiUl REVIEWSFOR INCLUOEDN INCLUDEDN BUDGET REACTOR REACTORDECO416. REACTOR FACiLITY MATERIALS PORTAT10N FACLTIES RECOVERY OTHERAPPLKCANTS SURCHARGE HOURLYRATE
Sheet H. Manageent Vnd Support Sx FTE Sx FTE $.K FIE sx FTE sx FTE s. FTE SR PIE $.K FIE S)x FIE S, FTE SJR Fm SK FTE
Supwvuor4 scpw yw OMs4ed 0 5 a 0 0 5
Trawl 10 0 0 0 10 0
Total ODn dResouces 3474 32 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3474 32
Total Overhead 0 5 0 0 0 0 0 0 0 0 0 0 0 0 . 0 0 0 0 0 0 00 5
Tmawl 10 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 10 0
3484 37 0 0 0 0 0 0 0 0 0 0 0 a 0 0 0 0 0 0 O 0 34J4 37
'USU-P14OGRAkl FINANCIAL MIGE6EINT i^-i
PU5USP,ROGRAMKf=64A Vs PLANNEDACIVIMTES
hWmanbOnTetotogy. Payol SYVtm 1685 1 0 0 1685 1
Payment Senncs 680 a 0 0 680 a
Payment P ad Oblvabo 17 S 0 0 17 6
Tens. Labor end Paynoti 0 6 0 0 0 S
Car Alowmoo 0 S 0 a 0 5 General Informabor Technokw 150 0 0 0 150 0 TOWaDwed Resources 2532 26 0 0 0 0 0 a 0 2532 28
In Overead 0 0 0 0 0 5
Trawl 20 20 0
Total Deed Resources 2532 26 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2532 26 Total Owrlead 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Trawl 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 0 0 0 a 20 0 Ltz FhSance RResorFn ceS-T 2552 31 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 a 0 2552 31
M', rogrem*- _: = n _0 0• k ¢ _;
FSUNTAI ANDFACLITES IANAGE&ENT. tl
PtANNEO ACTMVTE&
Rentalof Space 234S5 0 0 23486 0
Supewfli-Supe Mty 0 0 a 0 0
G:\rLFB\205BUDGETALLOCATION.PRELMINARYFEES-prkNwYpps.123 2-2 FY 2005 BUDGET DETAL
02)0442005 FY2005 POWER SPENTFUEL STORAGE/ NON-POWER FUEL TRANS- RARE EARTH URANIUM REVEWS FOR INCLUDED h NCLUDED IN
BUDGET REACTOR REACTORDECOKU REACTOR FACLITY MATERIALS PORTATION FACILITES RECOVERY OTHER APPCANTS SURCHARGE HOURLY RATE
Soel H: ManagHaert eud St
SA FTE SJ FlE SK FTE SIC FTE SIK FTE SiC FTE SIC FTE Sx FlE Si FTE SxC FlE SK FTE SI FTE
TotIDoeRe a 25488 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 23486 0
F O, 2346 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 B 2348 0 rU- FRDGi l1 SENTND FACLITIES MAAGEENT SUS3 PUS3-FROGRASFACRETN S NAGEUEHT PLANNEDACTI7VTIES Fade14 Management 5376 860 0 B 8376 a TOW DirectRFoas 5378 a 0 0 0 0 0 0 0 0 0 0 5376 a
IT Oerhead o 0 o a 0 Suprww-%upwnaoy Ovefhad 0 3 o a
o 0 a '* 0
Total DOedRasouc 5376 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5376 5 Tow Ovehn 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 Trawl o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Fa FM- RW 5376 tl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5376 11
O. "r *- t r t - r 'cI r r ~ - 7 * . , .c - E-I
rt-ON ~SUB-SUBPROGRA MSECUR rrY 1wDL;?'.-A P1,AINED ACTIVITIES 4351 110 o @ 43'S1 1
TOW DCied R s 4351 11 a 0 0 0 0 O o 4351 11
IT Overhad o a
Supcrvumy/,w-SupawvY Ovrad B 3 0 a 0 o
Travl B 0 a B o o
Total DwedtRasourca 4351 11 o 0 0 0 B 0 0 0 0 0 B 0 0 0 0 B 0 0 0 0 4351 11
Total Owehead 0 3 o 0 0 0 0 0 0 0 0 0 B 0 0 0 0 B 0 0 0 0 0 3
Travel 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 0
j t'tt;-,-, Sem-ty R . Sub-TobLS 4351 14 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4351 14
G08LFB\200SBUDGETALLOCATION.PRELIMINARYFEES_primtnlpps.123 243 FY 2005BUDGET DETAIL
021to2005 FY200s POWER SPENTFUEL STORAGE1 NON-POWER FUEL TRANS- RAREEARTH URANIUM REVEWSFOR NCLUDEDIN NCLUOEDIN BUDGET REACTOR REACTORDECtOL REACTOR FACIUTY MATERIALS PORTATON FACLTIES RECOVERY OTHERAPPLCANTS SURCHARGE HOURLYRATE
Shet H: Manaemented Svpo Sic FTE Sic FTE SiC FTE Si FTE SiK VIE Si FTE Sc IFTE S FTE Sic IFTE sic FIE s$c FTE Si FVE
T r&UBPROGRA.ADINS RATIONI -,;., tS4.S9fROROMAGENCY SUPPORTSERVICES
PLANNEDACTITIES:
Admorskal" -, Sae 6493 25 0 6493 25
General khotmalion Temroogy 1208 0 1208 0 a Total Diec Re 7701 25 0 0 0 0 7701 25
IT Ovehad o 2 o 2
SuperoONmsyOmtwad 0 9 0 9
Travel 35 0 35 0
Total DMd Rsoures 7701 25 o 0 o 0 0 0 0 0 a 0 o o o a o 0 0 0 o 0 7701 25
Total Overhead 0 O 1 0 0 o o 0 0 0 0 0 0 o a o a o 0 0 0 o 0 0 11
Trawl 35 0 o 0 o 0 0 0 0 0 0 0 0 0 o o o 0 0 0 o 0 35 0
- A r 7738 38 o 0 o 0 0 0 0 0 0 0 o o o o o o 0 0 o 0 7738 38
9-SUft-PROOGRA ISTCONOF GOODS MID S.RVICES
PLANNED ACTIrWTE AcqOufl GoodseWd Sereca Go 27 0 0 60 27 Total Daed Reses 60 27 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 60 27
IT Overhad
Suro Od 0 a 0 6 o 0 Travel 0 0 0 0
Total Died Resources Go 27 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60 27
Total Overead 0 a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a Trawel 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d Goods and se i R. & 1 SO 35 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60 35
i : e -4t.t-Gn 121
PRGF: HUMANRESOURC.S:7; ,58U-RAORTRAINIG ANCDEVELOPMENT
GlFBW20058UDGETALLOCATION.PREUMINARYFEESpriwkpps.123 24 FY2005 BUDGETDETAL REVEWS FOR INCLUDEDIN N4CLUDEDIN 02/4)205 FY2M5 POWER SPENTFUEL STORAGE/ NON-POWER FUEL TRANS- RAREEARTH URANIUM SURCHARGE HOURLYRATE BUDGET REACTOR REACTORDECOLW REACTOR FACIUTY MATERIALS PORTATION FACLTIES RECOVERY OTHERAPPLICANTS
Sheet Managemnrt VW t Svpport FERE SI FTE SK FIE SK FFTE 5% FTE SK RE $J( FTE SK SIC RE 5%K FERE SIK FATE SiKK
PLANNED ACTM7JES a 0 2573 5 hWnW Trainkn and Daweopmrnt 2573 5 o 0 57? 0 Ex" Tradikr an Denelopntrd 57 0 0 a 0 0 * 0 3150 5 Total DrectRea s 3150 5 0 0 0 0 0 0 0 0
0 0O 2 0 2 0 o 0 o o
0 0 0 0 0 0 0 0 a 0 3150 5 Total DirectRsources 3150 5 o o 0 0 0 0 0 0 0 0 0 0 0 o 0 0 2 Total OCerhwa 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 Trml 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 3150 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I TY ______3150 7
iSUB-PROGRAM HUMAN RESOURCES -SUSPROGtAIeR9UCYAN OPERATIKNS FLANNEDACTMTES: 1298 5 1298 5 858 20 Recrubrim" VW SWtaf 5u5 20 105 4 SlltragqcWondrke PanIng 105 4 483 5 Pedonnanc Mawnag"n 453 5 53 2 Affom~a Act~ii a3 2 126 2 CM RQMI 126 2 275 0 Halonally BlackCollagen 275 0 50 0 Hispani SerVwigNawiun 50 0 65 1 65 1 5 1 5 I 0 0 0 3045 40 TotlaDieed Resoarcers 304S 40 0 0 0 0 0 0
0 0 14 Svpwmwplswy~nemtad 0 14 0 140 0 140 0
0 0 0 a 0 0 0 0 0 0 0 3045 40 Total Deed Rsotce" 3045 40 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a 0 14 TOal Oveftlad 0 14 0 0 0 0 0 0 0 0 0 140 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * 0 Trl 140 0 0 0 0 0 0 0 a 3185 53 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o V77 I` - - - 3185 53 0 0
G:ELFSE2005UDGETALOCTION-PR EUMINARYFESEr-ps_.123 2-5 FY 2005 BUDGETDETAIL
021W2005 FY2005 POWER SPENTFUEL STORAGEt NON-POWER FUEL TRANS. RAREEARTH URANIUM REVEWSFOR INCLWOEDli BNCLUDEDIN BUDGET REACTOR REACTORDECOMLL REACTOR FACILZTY IMATERIALS PORTATION FACLTIES RECOVERY OTHERAPPLCANTS SURCHARGE HOURLYRATE SheetH: Managmnd andSupport
SIK FTE SK FTE S.K FlE 5%K FTE SK FTE SK FTE flE sx fTETI SiK FTE SIK FTE SIK FTE SIC FTE
SUB-PROGRAM. HUMAN RESOURCES 3B-SUB PR!GRA1tLRKLFE SVICES z,,, PLANNEDACTTMITES
World. Servces 1NS 3.0 a o 1aw0 3 Totl Ded Res 1.08 3 0 0 0 0 0 O o 1808 3
IT Ova&ead o a 0 0 2 o 0 2 Trawl o a 0
TotalDear Resources 1808 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1008 3 TotalOverhead 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 Trawl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 B a 0 0
aW..- ',, S 1808 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1808 5
tA RESOURCEMANAGEW.NT PLANNIG PLANNEDACVMTIES
RnW- 235 4 o o 235 4 Adrioratw andResource Managemert 25 0 o o 25 0 TotalDwed Rasourres 260 4 0 0 0 0 0 0 0 0 260 4
0 18 18
Travel 75 0 75
TotalDed Resucas 260 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 260 4
Tolt Overhad 0 18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 18 Travel 75 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 75 0 - H! t ~=olr a v n r T rs * g s u ce u -T l 335 22 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 335 22 pSUB&PRDGRAI±IANhNHAND RESOURCEMAAGENENT
G:ALFB6205aUDGETALLOCATION.PRELIMINARYFEESJXfit-wkpps.123 Z46 FY 2005BUDGET DETAL 02041005 FY2005 POWER SPENTFUEL STORAGE) NON-POWER FUEL TRANS- RAREEARTH URANIUM REVIEWSFOR NCWDED IN NCLUDEDIN BUDGET REACTOR REACTORDECOAM REACTOR FACUTY MATERLALS PORTATION FACLITIES RECOVERY OTHERAPPLICANTS SURCHARGE HOURLYRATE SheetIt Managemmeted SVpor
SK FTE SK FTE SK FTE S, FTE S,K FTE 3, FTE S.K FTE S FTE SK FTE S,K FRE SK FTE SK FRE
,SUB-SUB-PROGRA.INFORMATION AND COliFUvER SECURITY
PLANNEDAC7MTES
HLSWormablo Seciy 1U0 10 1t20 10
Compute Saady 1700 3 1700 3
TotalDied Resources 3520 13 0 0 0 0 3520 13
ITOvedrad
- U-w h 0
Travel 0 0
Total Dkec Reso,"cs 3520 13 0 a 0 0 3520 13
TotalOwthed 0 0 0 0 0
TrylS 0 0 0 0 0 0 0 0 0 .0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 !LdOTIECP w 3520 14 O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 3520 14
'SU6PROORAIIPORJMTI TECHNOLOGYNFRASTRUCTURE _ ,ANERAC ,U SAT MAE T SERVICES M,.ANEDA.CTP/ITJE&
Seat lqlgm Swwas 8665 7.0 0 s665 7 krrautrclue Devlopre a htagrabon 3711 9.0 0 3711 9 Toal Diee Reo 12376 16 0 0 0 O0 0 0 0 12378 16
Supere"I#owrSuprwry Ovemead 0
TotalDed R orce 12376 18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12376 16
TotalOeread 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 4 Tavel 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o 0 0
¼' ' ..EeSMarragemer4RewsceSuty-ToSJ 12376 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 12376 20
R TECHNOLOGYINRASTRUCTURE (51J8418PRDG=RAMTELECO0t.NICATCNS SERVICESSUPPORT OANNEDACTIMAtST
G:LFB\U00BSUDGETALLOCATION.PREUMINARYFEES_prinLwkpps.123 2-7 FY2005 BUDGETDETAIL
0012005 FY2005 POWER SPENTFUEL STORAGEI NON-POWER FUEL TRANS- RAREEARTH URANOUM REVIEWSFOR INCLUDED8N INCLUDEDIN BUDGET REACTOR REACTORDECOEI. REACTOR FACILrY MATERIALS PORTATION FACLITES RECOVERY OThERAPPLICANTS SURCHARGE HOURLYRATE Shat H.'Magameol odSpport
SiK FIE SK FTE Sx FTlE Si FE Si FFB Si FTE Sx FTE S3K FTE Sic FTE Sic FTE &A FTE Sic FTE
TJlcommuwboat Sa .sodSpport 6247 50 0 0 6247 5 TotalDmed Re s 6247 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6247 5
SupffmorA4kx f Ovead 0 a
Total Drad Resourras 6247 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6247 5 TolialOwned 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Teasel 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 =oommwcabrmerSanSp B Ress STaj 6247 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6247 6
INFORMA N TEC GYINFRASTRUCTURE ',SUB-SUO-PRORAP ITNFRASTRUCTURE ANDFRODUCTION OPERATIONS PLANNEDACtICTES
ProFuconOpratono 3614 3.0 O 0 3614 3 DesktopOpern 58 0.0 0 0 558 0 Tolil DOedReauas. 4t72 3 0 0 0 0 0 0 0 0 4172 3
O wtlww d 0 2 a 0
TotalDrsd RaSorcu 4172 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 4172 3 TotalOwbhead 0 2 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o 0 2 Teasl 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a 0 0 igi ::in P- a S--i 4112 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o 4172 5 pwhn-c-ooogkt uinesue.&dT ,S228 t .- ~~ ~,~'--~ ~ s.. . ~- - ' - * ; ~ .''
[U&ROGRAM: APFLCATiK)NDEVELOF'UEN 0 0 TotalDed Resources 5388 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5388 30 TotalOvehad 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a G: UFSU005BUDGETALLOCATION.PREUMINARYFEESprhtwkpps.123 248 FY2005 BUDGET DETAL 021W2005 FY2005 POWER SPENTFUEL STORAGEINON-POWER FUEL TRANS- RAREEARTH URANIUM REVEWSFOR INCWUDEDN INCLUDEDIN BUDGET REACTOR REACTORDECOLM. REACTOR FACILTY MATERIALS PORTATION FACILITES RECOVERY OTHERAPPLIANTS SURCHARGE HOURLYRATE ShetIH: Managomint andSupport SK FTE SK FTE $A PTE 5FK FTE O.K PTE OK OK FTE FTEPIE SK PTE $XSC FTE SO.K FTE S.K FTE Trawl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 5' Appikca tin M a ou a n -Ta . 3 ~ O 0 ~L~pm 0 iS3a,' !SUB-PROGRAM; 5NFORMATIONWMAAGETmEhlT. PLARNEDACTMTVES WormmaumoSerwees 727 16.0 727 16 -S S erwan 3710 22.0 3710 22 Racord&Manmagemort 2657 21 2657 21 Total DOrd Rsutces 7094 50 0 0 0 0 a 0 7094 so 0 11 0 11 TotalDoed Resoucs 7094 59 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7094 53 TotalOmnwesd 0 t 1 0 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 Tnsl 0 0 0 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 rCa ':,q tormo^ MgrolReanler - oblai 7094 70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7094 70 SU6@RO GR A J;N ORTION MANC -NT PLANIIEDACTIVITES WomfabomSwrim 2750 La 0 0 2750 B Total Di Rect 2750 a 0 0 0 a 0 0 0 0 0 0 2750 S 0 0 TowlDMod Rejotacns 2750 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2750 S TotalOwhead 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Trawl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2750 9 0 jZ: ' ,, eDMS = 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ' 0 0 0 0 2750 9 4 7. - .SU 6-F RoGRM OLE SU PPORT r.;S PLAMNEDACTMITE.S Commsman 1025 22 0 0 1025 22 ToW DWedRaaoucu 1025 22 0 0 0 0 0 0 0 a 0 0 0 0 0 1025 22 G:U.FB\2005BUDGETALLOCATION.PREUMiNARYFEESjpriNlwkpps.123 2-9 FY 2005 BUDGET DETAL 02t042005 FY2005 POWER SPENT FUEL STORAGEt NON-POWER FUEL TRANS. RARE EARTH URANtUt REVEWS FOR INCLUDEDIN INCUDED IN BUDGET REACTOR REACTOR DECOt0 REACTOR FACLITY MATERIALS PORTATtON FACItTES RECOVERY OTHER APPLKCANTS SURCHARGE HOURLYRATE Sheet H.: ta tm~nlMd Support SKK FTE PTE 5K PIE sx FIE Si PIE SFT S.KsS FTETEEIE S.KO.K PIE SiK PIE S,K FTE SK FTE 0 23 O 0 0 23 Trawl 365 0 0 0 355 0 Tow Dwl Ramwxce 1025 22 o0 0 0 0 0 0 0 0 0 0 0 0 0 1025 22 o o 0 0 TotalrDrhtd 0 23 o0 0 0 0 0 0 0 0 0 0 0 o o 0 0 O a 0 23 Travel 355 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 O 0 355 0 = ~ L R5 1380 45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o e 1380 45 SUB-PlR0GRAM ~ ~ii ^wy iSJBSU0eROGRA" COIA , AtPELATE ADJUDJCATION PLA1NNEDACTM/TES. CmomAppella Adi 5 o o 5 4 Gene" korm Tectho 4 o a 4 0 Total Dect R.owca 9 4 a 0 0 0 0 0 0 0 a a 0 0 o a 9 4 0 * 0 0 1 Tfawl S o a 5 0 Total DirO Fa&os 9 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o 9 4 ToWl Owbtad 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o 0 1 Tnel 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o 5 0 P1Swpta18te 14 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * 0 14 5 C YGRAIISUPPORT r ZUB4UB.PROGRAk CONGRESSPONLAFFAItRS PLANNEDACTMrTES Congressial Affars 21 0 0 21 6 Ganeraltwmation Tecnlogy I 0 0 1 0 TotalDred Re cs 22 6 0 0 0 0 0 0 0 0 0 0 22 6 0 0 0 0 3 Tnal 7 0 0 7 0 Totl DOeedResurme 22 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 22 0 Toal Oetde 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 Tralwl 7 0 0 0 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 7 0 G:V F\2005BUDGETALLOCATION.PREUMINARYFEESprint_vwpps.123 2-10 FY2005 BUDGETOETAIL 0204n2005 FY2005 POWER SPENTFUEL STORAGE/ NON-POWER FUEL TRANS. RAREEARTH URANIUM REVIEWS FOR INCLUDED IN INCLUDED IN BUDGET REACTOR REACTOROECOMM. REACTOR FACIU.TY MATERIALS PORTATION FACULITIES RECOVERY OTHER APPLICANTS SURCHARGE HOURLY RATE SheeltK MaNement an Support SK FTE ,K FTE Sx FTE OsK FTE SX FTE S.K FTE S.K FTE sx FTE .K FTE S. FTE $.K FTE SK FTE p Aflairs -PlcySoPp tRceSob-Trslz 29 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 29 9 .;StJ.PROGRALFOLSySUT7T ;; 1SUB-SUEBPROGGMGENERAL COUNSEL ,,j z'j PLANNEDACTMIVTE& Pohcy and Di0ecm Legal Advice 310 7 0 310 7 Manageent Sppot Sec Lgal Advce a 1a 0 0 10 Gen" bdwramn Tenlg 30 1 0 30 1 Total Dret Re 340 Is 0 0 0 0 0 0 0 0 a a 0 340 1S SuppenororS C ay d 0 10 a 0 10 36 0 0 38 0 Total Dead Reurces 340 18 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 340 18 TotalOverh~ead 0 10 o a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O0 10 Tranel 38 0 o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 36 0 f CovtPt37S 28 o a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 376 28 (ES.PROORAM POLCYSLRPORTg.' noJ'4$- j R8S8POGRM~ I t.CFVA0 7' PLANNEDACTMITE& PoWic Alan 145 tt 145 it General hIrormahon Technolmg 18 0 0 18 0 Total Died Re 163 11 a 0 0 0 0 0 0 0 0 a 0 0 0 163 11 0 3 0 0 3 Tranel 16 0 0 16 0 Total DrecltReources 1t3 tt 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 a 8 1631 t1 Total Overtead 0 3 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 a 0 0 0 6 0 3 Travel 18 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 a 16: 0 =r P Ae -P icy Support Reource t 179 14 a 0 0 0 0 0 0 a 0 0 o 0 o 0 O 0 0 0 a a 179 14 tL AGRTMT;FOLICYSUPRT j ySUB-SUB.PROGRAM.SECRETMRW .. S! f OE9 Ptl4NEOACTIWfS. G:\LFB\2005BUDGETALLOCAT ION.PRELIMINARYFEES_prfrinwkpps.123 2-11 FY2005 BUDGET DETAL 02104i2005 FY2005 POWER SPENTFUEL STORAGEI NON-POWER FUEL TRANS. RARE EARTH URANIUU REVIEWSFOR INCLUDED IN NLCWDED IN BUDGET REACTOR REACTORDECOMM. REACTOR FACtLITY MATERIALS PORTATOtN FACILITES RECOVERY OTHER APPLCANTS SURCHARGE HOURLY RATE Shnt H. Managemrg. S. 410ort SK FIE S.K FTE S.K FIE S.K FTE SK FIE BK FIE BK FTE S.K FIE SK FIE SK FIE SK FIE SOK FIE SecretamuI 0 12 0 0 0 12 Gwnal hwormatianTednology 189 a e o IS 0 Tota Died ResorFtes in9 12 0 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 B C in 12 Surprwl Suwsorymt 0 3 a 0 3 Travel 5 0 5 0 TotalDied Resources 189 12 o o 0 0 0 0 0 0 0 0 0 0 0 0 0 B a 0 a a 189 12 TotalOvedwW 0 3 O o 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 0 B 0 3 Trawl 5 0 O O 0 0 0 0 0 0 0 0 0 0 0 0 0 B 0 B 0 0 5 0 a 0 194 15 3-S.,- t.PhyYSo1ratFc SElb1Tol 194 15 o 0 0 0 0 a 0 0 0 0 0 a 0 0o o 0o SUS.PROGF;AMh.POLtCYUFFSt,'P . sf .SUB-UPROGROAM EDO PANNEDACrMUlE& EDOan Op talW StaB 30 12 a a 30 12 General hriomation Technology 179 0 0 0 179 0 Total DirectResaoces 209 12 0 0 0 0 0 0 0 0 a 0 0 0 0 0 0 0 a 0 0 0 209 12 IT O.enso o o a 10 o 18 Trawl es 0 es 0 Total Dead Resoes 209 12 0 a 0 0 0 0 0 0 0 0o 0 0 0 0 0 0o a a 209 12 Tolal overft 0 16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 0 16 Trawl 95 0 O O 0 O C O 0 0 0 C 0 0 a 0 C C O 0 O 0 95 0 i 9- otq Eoppoo:Fcyurtce uti.Tott:l 304 28 o 0 0 C C o C 0 C 0 0 0 C 0 0 o o 0 a e 304 28 :sus.PROORAm: POULCYSO.FPORT4~ iSUBSyta RALAt;OY COtTEEFOtREACTOt SAFEGUAFROSNUCLEARWASTE PLANNED ACTMTIE& Reacto 1Saety k4*pntml A&" 280 21 2S0 21 0 C Matlenes. Safety. LLUWS Dornrm 100 S Ganeral kionatmon Technlogy S0 0 80 2 0 a Total Dead Resraes 460 2S 360 21 0 B a a 0 0 0 B 0 100 5 0 G:LFV82OO5BUDGETALLOCATION.PRfUMINARYFEES-pritLwkpps.123 2-12 FY2005 BUDGET DETAL 0ZISW005 FY2005 POWER SPENTFUEL STORAGE/ NON-POWER FUEL TRANS- RAREEARTH URANLUM REVIEWSFOR INCLUDEDOi INCLUDEDIN BUDGET REACTOR REACTORDECOMIM. REACTOR FACILITY MATERIALS PORTATIDN FACISTES RECOVERY OTHERAPPUICANTS SURCHARGE HOURLYRATE SheetH: Menageentt ard Suppot Sc FTE SK FTEB sa FTE Sac FTE SK FFTE SSc FiB 8K fTE SK fTE Sa FTE sa fiB sa FTE SK FTE Sqppor,-SupeetyO-tfe&d 0 5 0 6 0 5 Trlved 318 0 0 0 318 0 TotalDdct Reaowces 460 26 360 21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 5 0 0 Totl Oh*te 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 5 Tranl 318 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 318 0 0 0 0 0 0 0 100 5 318 5 E 77U 31 360 21 0 0 0 0 0 0 0 0 0 0 iEPROGRAM: FERMANENTHIANGEOF STATION UB-SUB- FRO1: ENEN. CT=AGE OPSTATION PANNED ACTh'ITE: G2M0 0 EmployeeChange 00 Stabon Btta4s 6288 0 0 0 EmployeeRelocaton Sette 2100 0 0 6 2100 0 TotalDiot Resores 8388 0 0 0 8388 0 PCS-PCSRusoucSub.Tokal: 838 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8m 0 SFogemPnigFbaneottceOeax.id. 88 0 j ~~;:A~od'e...... Ast.;~ot,.ilX0 3{L:R - ...... " 0...... 'ta | .AJ PABSU6BUP1ROGRAEM t%!eC 6., 0 PhlyocalSecry 0 0 0 0 Total Otect Resources 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 JSUB-PROGRAM:HOMELAND SECURITY(MANAOGEMENT AND SUPPORT) P R Ls REV O ~NRCNFRA5TRUCTURE ANDNCIDENT RESPONSE PROGRAM PLANNEDACTIWrES HLS.Relow of ktrastucus and oted Respone Pro 0 0 0 0 0 0 Total Dfed Re 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 0 0 0 0 0 TMAo 0 0 0 0 00 0 0 000 0 0 0 0 0 0 0 0 0 0 G:\LFB\2005BUDGETALLOCATION.PREUMINARYFEES_pjnL~wkpps.123 2 13 FY2005 BUDGET DETAIL 02D4r2005 FY2005 POWER SPENTFUEL STORAFEt NON-POWER FUEL TRANS- RAREEARTH URANIUM REVEWSFOR INCLUDEDIN NUCLUDEON BUDGET REACTOR REACTORDECOIU. REACTOR FACLITY MATERIALS PORTATION FACtLITES RECOVERY OTHERAPPLICANTS SURCHARGE HOURLYFATE ShIWtH.: M1 gementan Suppot S.K FTE Sx FTE SX FIE SK FTE SK FIE SIC FTE SK FTE SK FTE .IK FIE SJK FIE SK FTE SK FTE UMJAPFUFWT Akn e IPPtORT STRATEGY TOTALS, GRANDTOTALWITHHbGH-LEVELWASTEAMDGENM109213 625 360 21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 a 108753 599 GRANDTOTALHIGH-LEVEL WASTE 5S19 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5;319 30 GRANDTOTALOGENERALFUNO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 t O 0 0 T:~HOtT.HIGHLEVEL0WASTE0AN _ 2I1 _ _ 0e G:\LFBX2005BUDGETALLOCATION.PREUMINARYFEESRYFlwkpps.123 2-14 FY 2005 BUDGET DETAIL 0242005 FY2005 POWER SPENTFUELSTORAGE/NON-POWER FUEL TRANS- RAREEARTH URANIUM REVIEWSFOR INCLUDEDIN BUDGET REACTOR REACTORDECOUL. REACTOR FACILITY MATERIALS PORTATION FACLITIES RECOVERY OTHERAPPLIANTS SURCHARGE Shestt hnpedor General Sic FTE SK FTE SIK FTE S FTE 5$ FRE SK FTE SJ FRE SK FTE S.K FTE SK FTE S,K FTE V-,-STRATEGY. ISSPECTOR GENERLER~~ PROGRAMtIWSPECTOR GENERAL PLANNED ACCOMPLJSHA"EMRS. Mveetiagtons 45 16 0 Aud" 790 19 C ExternalTranng 10S 0 C Generalhtormnatlon Technology 125 1 C Operational Support 30 3 0 54B Adjustnent 0 0 TotalOWDeed Rsecs 1095 39 a 0 0 0 0 0 0 8 Trawl 230 0 0 TotalDOed Resources 1095 39 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TotalO ehead 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Travel 230 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0. 0 0 0 0 0 InspectorGnrmal ProgrnaResuce Total: = _ e - ' - I ..... I -ASEG- I.AL51 IN: E-- GA?40MTOTA1 -ru ______M___ .P -L G:\LFB\2005BUDGETALLOCATION.PRELIMINARYFEESSi1tLwkpps.123 2-1 020,412005INCLUOED IN FEDERAL NONPROFITED. INTERNATL AGREEMENTSTATE AGREEMENTSTATE COMPLEX GENERIC GENERIC BUDGET SURCHARGE EXEMPTION EXEMPTION CTTSOVERSIGHT REGULATORYSUPT DECOMMISS0IONGO DECOMMOJRECLAIU. LLW sum SIC FIX SIC FTE SCK FTE S.I FTE $.K IFTE SIC FTE SKC FTE SIC ITE S.IC FlE SIC FTE PROGRJJ4NUCLEAR REACTOR SAFETY WBU-IVROGRAWLREACTORLICENSING=t-'~ ~ 'SUB-SUBPROGRPMREACTOR LIENS4 PL.ANN~EDACWTITES: ProjectManagemari & iken"~ ASSOW~f 0.0 0.00 0.00 31.30 LicwunLAdaonx 0.0 0.0 300.00 81.70 Cow~Lr.nsmg TaME 0.0 0.00 200.0 17.30 k-Wro~,dSWlandd TwdA Spec. 0.00 0.0 0.00 8GM RegM~W"Lcanu-g InprowmtsnW 0.00 0.00 014.0 31.20 RulemauVg 0.0 0.00 125.00 17.40 E~mfsE-aluabow and Goe=an Commun"cans 0.00 0.0 oo.oo 21.00 Rossoli VWdTesd Reactor LlcanwQ Acma0s 400.43 7.00 4604. 7.0 530.0 7.50 VsndorXOwwsrwa&.pAcEWT4T hNaksusRas~uw 0.00 0.00 1000.00 20.50 Legal1A0dwA and RP'tsantation 0.0 0.00 57.0 11.0 A4.d-kwyR.~t 0.00 0.0 4S.0 .0 Inter Trarvig "n Employe.Dealopmens 0.00 0.0 0.0 I0.0 Exteral Traaang 0.1s 0.00 0.18 432.00 a.m GenwWak"atunTactwiclogy 0.0 0.0 302.00 4.00 kg"y0of Ft Sy"- &WamComnpor-ftW 0.0 0.0 1282.0 11.30 AgNg R.atald Effectsan S ysem. an Comparunfa 0.0 .OO20M 20 SWatyAsavamanamof Ocial Technolog1as 0.00 a.0 I010.0 4.0 PA."rew kftsaruchs Vndknpvmmvam a Ndfahwa 0.00 0.00 3265.00 25.0 AssesumnevfOperabons 0.00 Om0 3407.00 4.00 PRo"eAbOcReak Anayses an Appcbona 0.00 0.00 10691.00 33.00 A658sui andU~anIM*Q Reador "n SyalemCodes 0.0 0.00 5733.00 15.5 Assesamerf4of11H50 E/acta 0.0 0GAO 775.00 3.20 MiendCOd.i Fail 0.00 0.00 700.00 0.50 EnsfwwasYPIewedsku Lcanawng 0.00 0.18 0.18 0.0 14.00 TotalDeadcRawsoscaa 465.01 7.17 0.00 0.00 400.01 7.17 0.00 0.0 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.0 0.00 47964.0 415.0 IT Oertww~ 0.00 0.00 0.00 4.00 EupesaaociNor.uprwr Oewlead 0.00 0.00 am0 040 Travel 0.0 0.00 3132.00 0.00 G:UJWB20O583UDGETALLOCATION.PREUMINARYFEES~privdwkpps.123 2-1- 02154j005 3NCLUDEDIh FEDERAL NONPROFITED. INlERNATiL AGREEMENTSTATE AGREEMENTSTATE COMPLEX GENERIC GENERIC BUDGET SURCHARGE EXEMPTION EXEMPTION ACTMTIES OVERSIGHT REGULATORYSUPT DECOMMISSIONHlG DECOMruRECLAAL LLW SUm Shnt D: Nuclar Ractr Seldy $. PIE SK nIE SK FTE SK PIE OLK FTE $.K FIE S.K FTE tK FTE L.K FTE $5K FIE TotWlDwddRsumas 46.11 7.17 0.00 000 469.1 7.17 0.00 o00 000 000 0o00 0.00 0.00 0.00 0.00 0.00 000 000 4764.00 415.00 ToWlOvnrhdOo 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.00 00 0.00 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 00 1GLOO Tral 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 O0O. O.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 313300 000 -, - --:R 77Fead Lkenang 1l.ac oal. ,00 0 T00 0 ~ 0 0.700 ~ ~ ¶00 3;:.7 :.0 PU.ANNEOAcTNTIS ktdnaln Nodr Safetyand Safa1ada 344.00 10 344.00 16.00 34400 10.00 krwrmeoi tolemTranwg an Daveoponmr s.00 1.00 5.00 1.00 5.00 1.00 kwratbonal EsAmelTramw 10.00 0.00 10.00 0.00 10.00 0.00 htmaLon AX)Stppor 0.00 4.00 0oo0 4.00 0.00 4.00 ht rnatlon Gwneal hioWn Tedology 1200 0.00 1200 0.00 12.00 0.00 TotalD"d Rmwos 371.00 21.00 0.00 0.00 0.00 0.00 371.00 21.00 0.00 0.00 0.00 000 0 0.00 0.00 0.00 0.00 0.00 371.0 2100 IT Overtled 0.00 0.00 0GM 0.0 S- ow oeo 0o0 0.00 10.O Tnral 0o. 0.00 2u08 0.00 TO rDclRasoucae 371.00 2100 000 000 0.00 0.00 371.00 2100 0.00 0.00 0.00 00 0.00 0.00 0.00 000 0.00 0.00 371.00 21.00 TOWOvehed 0.00 000 0.00 0.00 000 000 000 0.00 0.00 000 00 000 0.00 000 000 0.00 000 0.00 0.00 10.00 Tral 0.00 GAG 000 000 000oO 0.00 0 00 000 000 0.00 000 0.00 0.00 000 000 0.00 000 3100 0o. Y- 0.00TA lbWI .* 000I0 00-00QFZ5 0'000 7. FZU8-PROGAk ,REACTOR1lCENS G ,SUB-SUBPROGRAkt REACTORLICENSE RENEWAV. OUIIWEDACCOFLSHE.NTS. Renewal Appiruoion Rsnlws 0.00 0.00 0920W0 *9.70 LUanscRenewal Raulaltory Fa ork 0.00 00 05000 10 Generalhfaal n Tacnology 000 000 000 0.20 Lep$ AdlM ndMRprsenlatbn 0.00 000 omo 5o. ToWlDGrid Rasourte 0C0 0.00 000 0.00 0.00 0.00 0.00 000 000 0.00 0.00 0 00 000 0 00 000 000 0.00 0 00 757000e 2.00 SuPer m S4to -onmowyOvatuad 0.00 0.00 000 22.00 Trave m0 0o00 105.0 0oo G:\LFB\20058UDGETALLOCATION.PRELIMINARYFEES_prinwkpps.123 2-2 0210412005 INCLUDED IN FEDERAL NONPROFIt ED. INTERNATL AGREEMENT STATE AGREEMENT STATE COMPLEX GENERIC GENERIC BUDGET SURCHARGE EXEMPTION EXEMPTION ACTIVITIES OVERSIGHT REGULATORYSUPT DECOMWOISSIONDIG DECOMMJRECLAI. LLW SUM Sh..t D: huclr R.tr Safety SM FTE SIK FTE SK FTE SK FT9E $.K FTE SIC FIE SK FTE SK FTE St FTE SIK FTE Totl Drel Rmso~ms 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 i750.00 U.00 Tol OotwW 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.00 Trawl 0.00 0.00 0.00 0..000 0000 0 00.00 0.00 OO000.00 0.00 0.00 0.00 0..OD0 0.00 195.00 000 Ftscf Lce ewWReok"0.0--0.0 0.00 -: .0.007''7?8S017&.00W'710S-Y p00'T'000r-- w.0 G:\LF8\2005BUDGETALLOCATION.PREUMINARYFEES_pInnwkpps.123 243 014213005 INCLUDEDIN FEDERAL NONPROFIT ED. NTERNAT7L AGREEMENTSTATE AGREEMENT STATE COMPLEX GENERIC GENERIC BUDGET SURChARGE EXEMPTION EXEMPTOON ACTMTES OVERSIGHT REGULATORY SUPT DECOMMISSIONING DECOMUJRECL4AL LLW sum Stre D: Nubsr Reactor Safety SLK FTPE SISK FTE SI E SI FE SI,K FTE S.K FIE SIK FTE SK FTE SIK FTE S,K FTE SUW-RG REACTORNSPECTION . SUO4UB-PROGRAMtHLS NSCECT10NOisi-. b 4P~f-; Ndc-. r . s* g PLANNE.DACTMTAES HLS Fwceo-Foce Progrem 0.00 0.00 2900.00 170 HLS Saredaknspelon 0.00 0.00 0.00 19.00 HLS Sffeguarwshspecbon Prognun Developmentand Mbrn 0.00 0.00 100.00 5.30 HLS EaemaITro" 0.00 0.00 0. 0 0.00 Toal Diret Raowcn 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.00 3000.00 4t.00 IT oselead 0.00 0.00 000 S.00 0.00 0.00 Tolel Drd Reurces 0.00 0.00 0.0O 0.00 0.00 0.00 0.O 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 41.00 Total Owhead 0.00 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.O Travel 0.00 0 . 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hi S kuLpecoconRosemace Tow 1 .0.GO 0 00 1 0.oop 00.00 ?.00 W, T.00-U 'p.0000 0300.00 RRE TOAEAPOTR Lican Renevadmsacon 0.00 0.00 0.00 0.00 EmergencyPreper.rodes isco 0.00 0.00 SSO 4.00 Baselinekuiapctana 0.00 0.00 0.00 272.00 SeppleanrVieacbr Inspecons 0.0 0.0 700.00 2.30 GrW~eSafety bea. hopeCbon 0.00 0.00 0. 00 3. 00 Reactor -Allgsto kesopcton Follow-up 0.02 0.01 0.02 0.01 2.00 2-0 OE AGencyProgr-m 0.00 0.1 0.01 0.00 1.00 RatOr Podforance Aoeurmeni 0.0 00O0 595.00 2U0 Reactor hIspecton ndAsesment Proram Dsvoprn ent 0.00 0.00 44200 22.90 Licesng and Emnnon of Powr Reactor Opwa 0.00 0.00 0.00 24.20 Operato Lcenun Prorm en Tneweg Overstl 0.00 0.00 260.00 10.50 Reeatrh wAdTesl Reacbr hspechn 283.3 3.10 283.43 3.10 320.00 3.0 T7C-Tratoo and Dowiopmnt 0.00 0.00 133t 0 10.00 G:%LFB\2005BUDGETALLOCATION.PRELIMINARYFEESjpinLwkpps.123 2-4- D2/0412005INCLUDED IN FEDERAL NONPROFITED. INTERNAT'L AGREEMENTSTATE AGREEMENTSTATE COMPLEX GENERIC GENERIC 8UDGET SURCHARGE EXEMPTION EXEMPTION ACTMTES OVERSIGHT REGULATORYSUPT DECOMMISSIONINO DECOMMJRECLAJiL LLW Sum Shent D: Ncmar Reaclof Safely S,K FTE SIK FTE SIK FTE SK FTE S.K PIE SK FTE PIE SK FTE SIK FIE SK F7E TC-mWiormarionTecthnology 0.00 0.00 407.00 3.00 TIC-Reta of Specs 0.00 0.00 724.00 0.00 TTC-Otw Admirioka0%Services 0.00 0.00 510.00 0.00 General lormaon Technology 0.61 0.00 0.61 170.0 0.00 Reactor hIepection- State. Federal. end Trbal Liaeon Acvites 000 0.00 0.09 0.00 4.00 Leal Ad.e endRepresentalon 0.00 0,00 0.00 2.00 ReactorEnarcenrel Acrbo 1.0T 0.10 1.67 0.10 111.00 1100 Reactor herhgahono 0.00 0.00 10.00 24.00 MnIm 1 * aedDIeCopmDI 0.0 0.00 0.00 10.00 Eelrn Treg 0.04 0.00 0.04 407.00 1.00 ReackorEvenl Respore 0.00 0.00 5.00 10.J0 ReacrEEenl Readewa 0.00 0.00 211100 13.10 Reactor coen RP ne Coordinamon 0.00 0.00 0.00 3.10 Reactorhocdenl hvwotgabon 000 0.00 0.00 0.00 TotalDrved Resoroms, 295.71 4.10 0.00 0.00 215.76 4.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0620.00 S2.00 IT Ov~hwad 0.00 0.00 0.00 2.00 0.0 0.0 .00 210.00 Trawl 0.0 0.0 7557.00 0.00 TotalDOive Resocee 215.71 4.10 0.00 0.00 285.76 4.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 000 0.00 8620.00 52.00 Total ontwmea 0.00 0.00 0.00 0.00 0.00 0.00 00 000m0 0 00 0.00 0.00 00000 0.00 0.00 .00 0.00 0.00 0.00 233.00 Tral 0.00 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.0 O0 000 0.0 O.0 0.00 000 0.00 757.00 000 7ReactrchlwecflnRumm~8.6 j.0 ~ ~ .0~~00 T1 0'~ 0.0M0 ~ 0.'~.o7~.0~0~00 G:ULBU2OOSBUDGETALLOCATION.PREUMINARYFEESjpxi~wkpps.1232. 2-5 02142005 INCLUDEDIN FEDERAL NONPROFITED. INTERHAT'L AGREEMENTSTATE AGREEMENTSTATE COMPLEX GENERIC GENERIC BUDGET SURCHARGE EXEMPTIOh EXEMPTION ACTIMITES OVERSIGHT REGULATORYSUPT DECOMMISSJONING DECOMMJRECLARL ULW sum Sheet 0: Nachar Reactor Safely SK FIE S VFTE Sl FTE SRK nIE SR nIE K "aE S.K FIE SIK PIE $.K nIE $.K FTE ,SUBPROGRAM:'REACTOR LKCENSNG ; 8UB SUE-PROGRAJNEWREACTORLICENSNG t * >', .I PLANNEDACTMrlES Eary Sit. Perm. 0.00 0.0 1uo0o0 14.50 DesignCertification 0O0 0.o 4137.00 3450 PreApp~lcatian Ravlaws 0.00 e.00 5.00 4.50 Regulatory hrastructure 0.00 0.0 725000 22.50 NeawReactot LkcnsagInodependent Advkn 0.00 0.00 000 0.00 Legal Advke nd Repreeenlallan 0.o 0.00 0.00 50o Cotructioni npoculn 0.00 0.00 o0 0.00 Combined Lkcens" 0.00 e. Adjdlicatory Rviews 0.00 0.00 0.00 0o. Totvl Dyed RFeources 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1324500 ise0 SupeonSrnSupe Overhead 0.0 e.0 0.O 19.0° Travl 0.00 0.00 14.00 0.00 Total 0ect lasoumoF .0 0.00 0.00 0.0 0.00 0.0 0.00 0.00 0.00 O0 0.00 000 0.00 0.00 000 0.00 0.00 000 1324.0 So.0 Total Ofrhesd 0.00 00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o0.0 O. 0.00 0.00 0.O0 0. 0.00 0.00 19.0 Trawl 000 0.00 0.00 0.00 0.00 0.00 0.00 OD0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14s50 0.00 Now 33 -00'7.0r 0W:"7.00 fusi -. f.,fAgTopItCENS4G-7i, !SUB SUB-T'FROGR.4Jk ESA-HLSACTri . .E M. PLANNEDACTiTES ESAHLS Vlnerably Asaeanta 00o e.0 0.00 0.00 TOl Died Reeolau 0.00 0o 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.00 IT Ovened 0.00 0. o.o4 G. S.o& 0SuPw Ov-d 0.00 0.0 0.0 0.0 Travl 00 0.00 00 0400 TotalDlled Resource 0.00 0.00 0.00 0.00 0.00 0.00 0.o0 o0o 0.00 0o00 0.0 oo0 0.0 0.00 o00 o0o. o0o 0.00 0.o0 0.o TotalOvIerhead 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.0o 0.o0 0.00 0o. 0.00 0.00 0.00 0.00 o0 0.00 Trawl 0.00 0.00 o0 0.00 0.00 0.oo 0.00 0.00 o.oo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 00 0.0e 0oo G.\LFBUOOSBUDGETALLOCATION.PRELIMINARYFEES_pdnt_wikpps.123 246 2 ov2005 1NCLUOEDIN FEDERAL NONPROFIT ED. INTERNATE AGREEMENT STATE AGREEMENT STATE COMPLEX GENERIC GENERIC BUDGET SURCHARGE EXEMPTION EXEMPTION ACTMTES OVERSIGHT REGULATORY SUPT DECOMMISSIONIhG DECOMMJRECLA&I. LLW SUm Shost 0: Nuclear Reactor Saflty SK FTE SIK FTE S.K FTE S,K FTE 5.K fE SIK FTE SK FTE SK FTE SK FTE SK FTE Z!t~1~ ReactorH~orneland SupplowomntOalY R"so rcO - tw. S.- 0 £ c 0 0 t ?0 S 4 t 0 W0. 0 -SU8PROGRAM:REACTORLCENIGGrt-? r¶ PLAIVEDA.4CCGPS s. hLS Threat Assessmat 0.00 0.00 60.00 9.10 hLs Regulatory kpmroment 0.00 0.00 300.00 1050 hLS MItigating Strategy 0.00 0.00 3775.00 13.10 hUL Safeguards Licansig 0.00 0.35 035 250.00 5S00 hLS SeCully Intrastructure beprovmeets 0.00 0am 1401.00 2.00 hLS Legal Advc end Represenlatlan 0.00 0.00 0.00 1000 hLS General knfor-Na Technology 0.00 0.00 100.00 0.00 *1LStotem Trainhg and Devlabpmnen 0.00 0.00 0.0 1.00 hL5 Eternal TraInIng 0.00 0am 1Iso0 0.00 Toa Ded Resowcee 0.00 0.35 0.00 0.00 0.00 035 0.00 0.00 0.00 0.00 aOD O. 0.00 0IM 0.00 0.00 0.00 0DO 61564eo 42.00 a Overhead G.D 0.00 0.01) 0.00 emo eeo - o- 0.00 O0 0AO 0o20 Trel 0.0 0.0 4eaeo Gox TotalDeed Resoces 0.00 0.35 0a00 ao 000 0.35 0.00 O 0.00 00 Om aOO ODO ODa amO O.OO ODm amOO am1 61154.0 42.00 TotalOwedlead e mG 0 .0 0 @30 a m0 a m0 a m0 coo0 a m am o m0 a m0 a m0 a m0 a m0 o m0 o m0 a m0 a m0 e m0 a1.6o Travel Gm OOm aO am ODD a. Dm 0.00 amO OODamO amO D OJO Oam amO c 0.00 0.00 401m GOD ItPAR O1ACTfR&A6FFTY TRATrGyTOTAL IGRAA,14DL ,>3 .>. .t l t , r T 2 W T s 10; 1 Dt.. r ri 7 mal rc~ 7 or 0 ... m 000 jfl?3050T7017i0 G:ALFB2005OUDGETALLOCATION.PREUMINARYFEES-print-wkpps.123 2-7 330e7.8 INCLUDEDN FEDERAL NONPROFITED. 4ITER74ATl. AGREEMENTSTATE AGREE.MENTSTATE COt.PLEX GENERIC GENERIC BUDGET SURCHARGE EXEMPTION EXEMPTION ACTIVTE OVERSIGHT REGULATORYSUPT DECOIAMISSIONING DECOMRECLAAL LLW SUm Shlt E Nuclear mtals Satfty S,K FTE SK FTE SIK FTE SK FTE SIK FTE SK FTE S.K FTE SIK FTE SK FIE SIK FTE PROGRAF MATERIALSAND WASTE tSJPROGRAM:FUELIFACUtES LCENt4SING&NSip. .4'. t I-, ~SUBSUSF'FOGR FULFACLITtES LICENSNG & NSP PLANNEDACTAIM FuelFacilliles Lcensing 0.00 0.00 035.00 17.10 AlIbgaonstEnorce mant 0.00 0.00 0.00 0.00 MaterIals EnforcementActions 00 0.00 2.0 0.00 IlLS Threat Aesente 0.00 0.00 0.00 e0A hULSMitigating Strategies 0.00 0.00 0.00 1.00 hLS Regultory knprv.-nr.nt 0.00 1.23 033 0.90 e100.00 SA hUS Safeguards Inspction 0.00 0.00 0.0 7.30 hLS Safeguards Ucensing 360.00 20 360.00 020 1000.00 $0.0 F"asFacilties hkapctin 0.0 0.00 0.00 15.70 hLS External Training o. 0.00 hLS Safeguards inspection Prog Devand Maintenance 0.00 0. 0.00 2.0 hLS Foreo on Force Program 110.00 1.00 Ulxed-OAlde Fuel Fabrication Licekxing 0.00 0.0 300.00 7.70 Fwl Facilities nvosmnmental Revews 113.70 0.0 113.70 1545.00 4M0 &xedO.OideFa FabrIcation Faciiy LicensIng 0.00 2.00 Unan Reorfy Licensing 0.00 0.2 0.50 135.00 0.70 Urenluni Reco"vry inepechon 0.00 0.00 31.0 15.30 Enricilnent Licensing endCodification Enrichment inspections 0.0 0.00 0.00 0.10 Mixed Oxide Fuel FabrIcatIon Facilfy Inspection 0.0 4.90 Legal AdvIce and Representation 0.00 0.00 0.00 4.00 Fuel Fec9ies Adjudication 0.00 0.00 35.00 2.00 General nflomoiaonTechnology 0.00 0.00 00.00 0.00 inten Training and Deipne 0.00 0.00 0.00 4.00 External Training 1.57 0.00 1.57 174.00 0.0 TotalDc d Rexsouces 475.27 2.7e 0.00 0.00 0.00 .3 360.00 020 1.57 0.2 0.00 0.o0 0.00 0.00 113.70 0.50 0.00 0.00 5374.0 115.70 IT Overhsad 0.0 0.00 0.00 0.0 0.00 0.00 0.00 4e3.3 Tmrsl 0.00 0.00 075.0 0.00 TotalDeed Rerou 47527 2.75 0.00 0.00 0.00 0.33 360.00 020 1.57 0.U2 0.00 0.90 0.00 0.00 113.70 0.50 000 0.00 5374.00 113.70 G:ILF6BUDGETDGETALOCATION-PRELIMINARYEEES~printwkpps.123 2-t- 13087.55 INCLUDEDIN FEDERAL NONPROFITED. '4TERNAT1. AGREEMENTSTATE AGREEMENTSTATE COMPLEX GENERIC GENERIC BUDGET SURCHIARGE EXETIP7ON EXEMP'TkIO ACTIVTIES OVERSCHST REGULATORYSUPT C)ECOMMISSIONINIt DECCM*.IJRECLAJMI. LLW Uum ShoteIE NuceammateaI1l5 Safety OK FTE SA PIE S.K FTC SRK FIE SR FTE SJ( FIE S.R P7E SR PIE SR FTE SA FIE Tota Ov.4ilad 0.00 0.50 0Om 0.50 0.50 0.50 0.50 0.50 0.5 0.00 0.50 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.50 43.30 Trendl 0.00 0.00 0.50 0.50 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 875.00 0.0 -IF- -L:300 -~-~2L. IS 08 6249.0 150.00 SU-UOPORA HIGH-LEVELWASTE REPOSITORY fSUB.PRDOGRAMDECOMfMISSIONING ANDLLW, -~, ISUS.SUS-PROGRA& DECOMISWS iNIIOANDLLW.$ I~ PLANNIEDACTWIES Low.4a.*I Want. etsfalion and 0,ersight 10.00 4.20 0.50 10.00 3.70 10.00 4.20 Reac~torOscom R.k~making and Regulatory Gulcdanc 0.00 0.00 0.00 6.00 Powsr RescoreDecem proejct dngifand Licensing 0.00 0.00 800.00 8.50 Power ReactorDecommisslorting Inspecllon 0.00 0.00 0.00 8.10 Malerlals and Fuel Facilty Decenagtnisoning Licensing 752.45 116.711 gm8 0.17 28.57 DAY 0.50 0.87 203.00 4.30 430.80 10.30 1075.0 21.00 Materials and Fuel Fecillty Docnorruenjaiong inupection 0.00 0.07 0.m 2.20 Fonosriy Licensed Sias 0.0 0.00 0.00 0.00 Oeconialsimsoing andLLW EnvIronemena Reviews 4781.22 1.75 1.32 0.02 11.10 0.03 475.00 1.70 724.00 3.110 ill Itech . SuppoutlofScientifi CodeActivities 0.00 0.00 am0 Om0 Gerwrelno Techr 60.00 0.00 20.00 40.00 120.00 0.m Legal Advlc and Representation 0.m 2.00 2.00 0.00 3.00 Extemasl TralIning 6".3 0.00 2.30 9.10 47.00 0.90 67.00 0.00 Asseassmentof Deesesfoe ErvreovnmsntalContaminants 1427.00 4.50 857.00 2.70 570.00 1.80 28155.0 9000 TIC-Training andDevelopment 0.A0 0.00 65.00 8.00 IrflarnalTraining Developrrent 0.00 2.00 2.00 8.00 2.00 Travel 6.00 0.0 8.00 0.00 HlLSDocomminsinnng and LLWActivities 0am 0.00 0.00 0.00 TotalOteec Resources 2795.87 31.2 11.30 0.10 30.47 0.5 2.30 1.10 0.00 0.00 0.00 0.87 292.10 4.30 1870.90 20.40 579590 3.80 8750.00 60.00 IT Overhead 0.00 0.00 0.00 0.00 8.00 0.0 0.00 31.0 0.00 0.00 564.00 0.00 Teisi Dired Resourcan 2785.07 31.2 11.30 0.19 30.47 0Om 2.30 1.10 0.00 0.00 0.00 0.87 252.10 4.30 1870.90 20.40 579.80 3.80 5750.0 00.00 G:%LB%205BUDGETALLOCATION.PR~EU~L1NARYFEESjprinLwkpps.1232- 2-2 383t7t INCLUDEDIN FEDERAL NONPROFIT ED. 4TERNAT'L AGREEMENTSTATE AGREEIMENTSTATE COMPLEX GENERIC GENERIC BUDGET SURCHARGE EXEMPTION EXEkePTtON ACTTIES OVERSIGHT REGULATORYSUFTDECOtU A58110NNG OECOIaUJRECLASJ. LLW SUm Sheet E. NwleA Materials Safety SA nTE SL FTE SK FTE SI FTE SK FTE SK FTE $A FTE $.K FTE SK FTE SA nTE TOWaCOarhea 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0100 0.00 0.00 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 31.00 Trand , 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0°00 544.00 0.° 1, -- -- LC.!,~ i~, 2T2.9 ;.?I -,- 31MT _,,X*, E -?A.2Z"'i?31400 S~ 911.0 NUELSTORAGEAND TRANSPORTATION LICENSNG AND INSPECT11tON ~SU64UB.PRoGRAhi SPENTFUELSTORAGE AND TRANSPORTATION LtCENSPNG AND NSPI ECTION PLANNEDACTIVITES Licensing and Certilicauion 110.1 3.S2 103 2.85 1.4r 0.08 106.70 100 1.70 2.40 3.10 2.60 2470.00 1.m0 Ispection, OAReviews, Event Response 0.0 0.00 50.00 11.40 Spent Fuel Environmental Reviews 0.00 0.00 34.00 0.00 Adjudldty Reviews 0.00 0.00 42.00 1.00 Legal Advice endRepre nntelion 0.00 0.00 0.00 2.00 General InfoTech 424 0.00 1.96 228 125.00 0.00 Ilern TraInIng en Dolopment 0.0 0.00 0.00 1.,00 Extenal TraInIng 4.11 0.00 0.S7 1.14 2.00 96.00 8.00 Spent FuelStorage Systems SaehtyAbessment 000 0.00 1850.00 4.00 HLS Tnsel A e 0.00 0.03 003 0.00 0.70 HLS ReguWey Irnpreovmente 4.57 0.am 4.57 008 100.00 2.00 HUL Mitigaing Stategles 4.57 0ao 4.57 0.00 20000 0.30 1LSSeettY hIepeollen and Oversight eo0 0.0 0.01 0.00 1.00 HL'. Sadguune Licensng 0.00 004 0.64 0.00 510 HLS Scrft hrstnrcture irnproveawnl 0.00 000 0.00 0.00 HLSAnens Diperal m Spent FPel 0.00 0.00 0M00 0.00 HLtS Eternal Training 00 000 0.00 0.00 Tol Deed Resunrce 137.19 4.s 308 2.85 14.03 0.85 108.70 11.00 0.00 0.00 1.70 0.00 2.40 0.00 3.80 0.00 2.80 0.00 4711.00 .0 ITOerhead 0.00 0.00 .00 0.00 S p r Overtad 0.00 0.00 0.00 28.00 0G0 0.00 39400 000 Toal DredResourcen 137.119 4.81 30 2.85 14.03 0.5 108.70 1.00 0.00 0.00 1.70 0.00 2.40 0.00 3.80 0.00 2.80 0.00 4771.00 05.00 TOal Overhead 0.00 00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.00 Trend 0.00 0.00 000 0.00 0.00 0.00 000 000 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 0.00 354.00 0.00 -.-- -05 -D _- = O 'i, 6 l5.00 S 1.00 G.FB\2005BUDGETALLOCATION.PREUMINARYFEES_prit_wkpps.123 243 183&7.6 INCLUDEDP4 FEDERAL NONPROFITED. 'ITER*JAT1L AGREEMENTSTATE AGREEMENTSTATE COMPtLEX GENERIC GENERIC BUDGET SURCHARGE EXEUPTION EXEWPTION ACTIVITES OVERSIGHT REGULATORYSPT DECOt1MSSIONING DECO4MARECLAt LLW sUm SK n7E S.K FnE SK FTE SI FTE S.K FTE SK FTE SIK FTE SxK PE SK FTE SIK FTE PRGA. .EEAPUNO-HLW iti ..' s ,-.- L .; PLANNEDAC7ITIES G.rat F. -i4T-DOMSf 0.0 0.00 0.00 0.00 G*.aI Fud-IT-LN 0.00 000 0.00 0.00 Gan&rJ FunHLW Docent Procussing 0.00 0.00 0.00 0.00 TlowDsct Rexkcas 000 0.00 000 0.o0 0.00 0.00 o.00 o.0 o0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.0 nTOverhead 0.00 0.00 0.00 0.00 S,,; ~yowm 0.00 0.00 0.00 0.00 Travel 0.00 0.00 0o00 0.00 Tot01Disc Resoumes 0.00 0.00 0.00 0.00 o0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 000 TOWOvertie 0.00 000 0.00 0.00 0.00 0.00 0.00 o0o. OD0 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.00 0.00 Trawel 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TnS ono oo ooo ooo oott o~oo o~o ooo on o~o~t ott ono oo oooo oooo oooo T06 -'0 000 , 0.00... O.G 0 0 . 7 i0' 0 0.00 ISUFRO(RAE OMELANOSECURITY ~SUB4LOBPROGRAht HqEA4! !Y FtANNEDACTMTIES EsA6Vultraltym..ssmreits 000 000 0.00 000 ESA-ThbOtArsea*mns 000 000 0.00 0.00 TO1.Orwed ROwm o 0.00 000 0.00 000 0.00 0.00 0o00 0.00 0.00 0.00 0.00 0.00 0.00 000 0o00 0o00 0o00 0.00 0oo IT Ovierda 0.00 0.00 000 000 S oN ctKrWty 0.00 0.00 0.00 0.0 Trawl 0o. 0.00 0G0 0.0 Tot1l DwedResource 0.00 0.00 o0 0o00 0o00 o0 0.00 0.00 0.00 0.00 o0 0.00 0.00 0.00 0.00 0.00 0D0 0.00 0.00 0.00 TOW.Owmed 0.00 0. 00 0.00 000 000 0.00 0o00 0.00 0.00 0.00 0.00 0.00 0o00 0o00 0.00 0o00 0o00 0.00 0.00 Travel 0.00 0. 000 000 000 0.00 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0o00 0.00 0o00 0O 0.00 R000. 0 00 .00 0 - , 0 TX,,, .0 o0 0.00 0.00 SUBPR__ ERLYWNSED SIIES i' ; if -I§s''-.Al',. ' :l aCZSDSTS:-F G:\LFB\2005BUDGETALLOCATION.PREUMINARYFEESiprit_wkpps.123 2-4 311387.6 ICLUDED IN FEDERAL NONPROFIT ED. NTERNATI. AGREEMENTSTATE AGREEMENTSTATE COMPLEX GENERIC GENERIC BUDGET SURCHARGE EXE£PTION EXEMPTtON ACTMTES OVERSIGHT REGULATORYSUPT DECOMMISSIONING DECOMMJRECIAML 1LW sum 0,K FIE 5( FTE SK FTE SK FTE SK PIE S.K FIE SJK FIE SJC FTE $C FTE S.K FIE PLANED ACTMT7ES Formrly Lkc d Sies 0.00 0.00 0.00 o0 Total Diect Resources 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.DO 0.00 0.00 0.00 0.00 0.0 0.00 IT Overhead 0.00 0.00 0.00 0.0 Sup-ve-pWoSup Overhead 0.00 0. 0.00 0.00 Trawl 0.00 0.A 0.00 0o0 TotalDied Resources 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0DO 0.00 00 0.00 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 Tota Otrhed 0. 0.00 0.00 0.00 0DO 0.00 0.00 0.00 0.00 0.00 0. 0.00 0.00 0.00 0. 0.00 0.00 0.00 o00 0.00 Trawl o.oo 0.00 0.00 0o 0.00 0.00 0.00 0O00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 00 0.00 0.0 0.00 .. Z0 .. 0. C s 0 0.00 0.00 O.PROGRAKNUCLEAR MATERIALS USERS LICEN & #NSP N- L N & NMATERIAISUSERSISP PELA(NACTVTSE& hvitmalsnall knport/Esport Licenskn Reviews 0.00 0.2 0.32 0.00 2.00 Itrn n NLSLicensIng Suppt 0.00 0.21 0.21 0.00 2.00 hUL tratlonas Setguarde vrsIghl 0.0 014 0.04 0.00 0.40 HU5 S-ay inspectione 172.7 2J4 0554 0.96 11722 1.88 705.0 12.10 Materials Event Repons 0.00 0.00 0.00 0.00 Matertale cdent Respons Coordiralon 0o0 0.17 0.02 0.10 0.00 0A0 Mateias Evnt Resdlne" 0DA 0.70 0.06 0.3 0.00 1.8 HILSltIang Strategies 0ae0 0.44 0.04 0.40 0.00 0.50 "LS Regutw kvpro ments 348.32 0.02 31.57 0.19 0.20 318.82 1.38 400D. 2.40 InteratIoa Legal Adik and FsprsW*** l*n 0.00 1.00 0.00 too Rlsk44n ormed Regulatoy Fraeork $7.10 0,44 7.89 0.04 7920 0.40 200.00 1.00 Redbatlon Exposure Assessment Methods S14A 0.20 829 0.02 03.16 024 350.00 1.00 NHL5Regulatory Irnproveiments 22.72 0.70 3.11 0.11 19.80 0.67 100.00 3.40 HUS Safeguards h specton and Oversligt 0.00 0.00 0.00 0.00 HLS Control of Sources and Registry 0.00 0.00 0.00 HLS kItoTecbnology-Control of Souacea 1410AO 3.5 128.65 0.28 1291.04 2.77 1630.00 3.50 Materials Uicenaing 1" 7.51 0.01 1.18 2.23 0.60 0.2 1.60 002 1t.88 3.16 1.30 2.00 1.50 0.04 0.90 0.03 50.00 31.70 HLE Safeguards Licnsing 000 o0X 0.00 0.00 HU5 Legal Adc nd Representation 0.00 0.07 0.08 0.79 000 2.00 G:\LFBQ2OO5BUDGETALLOCATION.PREUMINARYFEESpriI_wkpps.123 2S5 38387.861INCLUDED I FEDERAL NONPROFtTED. 'ETERNATL AGREEMENTSTATE AGREEMENTSTATE COMPLEX GENERIC GENERIC BUDGET SURCKARGE EXEMPTION EXEL0'T0ON ACTIVIIES OVERSIGHT REGULATORYSUPTDECOMMISSIONING DECOMMJRECLAIM. LLW sum Sheet E NuldearMatenels Selfty SJ FTE SC FTE SRK FTE St FIE St FTE SK FTE SK FTE SK FTE Sx FTE SRK FTE HLSCoordinatin wilth States 43.5 0.J7 3.35 0.08 39060 0.79 50.00 1.00 Materials Users Environmental Rsviews 0.00 0.01 0.01 0.01 0.00 1.00 HLShItsmational SadosgardsLlcnseig.Maleriale 0.00 0.00 0.10 0.50 0.00 1.40 HLS khtsmatbonalThreat Assessment 0.00 0.10 0.10 0.00 0.10 Materials Inspectione 266.29 3.A2 39.43 029 56.38 1.74 171.07 1.5 731.00 22.20 HLS lrsmsntenal Rsglatory Miprovementa 0.00 2.40 2.40 0.00 240 Materials RulemnaLing Z15.71 5.50 13.45 0.43 3.50 0.27 3.40 0.02 137.76 438 4680 0.02 47.60 0.44 520 0.03 570.00 11.00 Materials Event Evah&tbn 413.71 444 3743 0.40 37622 4.04 625.00 ts7 Matia hbulrsdetResponse 115L3S 4.1 0o39 023 13.0 3.0 100.00 0.80 12000 .00 Allegutlons&sfercerrent 012 0.61 0.12 0.69 2. 1480 MaterIals Agr*ement Stat s 104.04 24.65 3.10 027 150.00 22.40 31.AS 1.8 0.10 0.10 020 1000 26.20 Materials Stale, Federal end Tribal Ia-ison 0.79 0.14 0.79 0.14 10.00 2.00 Materials Enforement Actans .12 0.29 0.12 029 2.00 5.00 Materl InvesltigatlOns 0.00 0.54 0.54 0.00 e00 Legal Advnicand Representation 0.00 2.11 0.24 2.38 0.00 2.0 Materials Adjdicatin 1.56 0.16 1.58 0.16 20.00 2.00 lnformatin Technobogy . Materials 1454.59 0.04 192.11 0.04 1262.5 243400 0.50 General nto Tecnobgy 37.04 0.00 1.03 4.51 5.30 33020 0.00 7.0 11.60 7.80 Wo00 0.0 TTC-Trsining and Derelepent 0.00 0.00 S0"0 2.0 hIternuTinng nd Devlopment 0.00 0.o 0.00 3.00 E.ertd Trannb 2L40 am00 11.00 0.50 10.30 5.30 0.0 0.40 14.00 0.00 TotalDeed Reeoms 5S24 71.50 40.466 100 561.0 929 9.00 4.49 405.00 22.44 3751.8 28.93 290.87 4.51 61.0 058 14.40 0.26 00L99 1900. FTOverhead 0.00 0.00 0a00 5.00 &qWporVprdon-rVy Ove'lead 0.00 0.00 0.00 570 Travel 0.00 0.00 1440.00 0.00 T7alDeResources 5256S 7150 40.46 1.00 561.08 929 9.90 4.49 495.00 22.44 3781.08 28.93 2900.7 451 61.60 Om 14.40 0.26 0608S. 19030 TotalOveread .00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0o 70.70 Trael 0.00 .00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1449000 00 N M4s s9Ma L 5__ 1 I - . , 40.g11057.0S 261.00 G:ILFB%20058UDGEALOCATION.PREUMINARYFEES..prin~wkpps.12320 246 38387.66 INCLUDED IN FEDERAL NONPROFIT ED. 'ATERNATiL AGREEMENT STATE AGREEMENT STATE COMPLEX GENERtC GENERIC BUDGET SURCHARGE EXEMPTION EXEMPTtON ACTIVMES OVERSIGHT REGULATORYSUPT OECOMMISSIONING DECONMtJRECLAM LLW sUm Shle., Nudw MeatwosSafety S.K FTE S.K FTE SJC FYE SK FTE S.K FTE SJ( FTE Ox FTE S.K FTE $.K FTE SK FTE NUCLAFR MATFRIAJ S SAFFTY qTRATYFY TOTAL R. GRAND TOTALWITHHIGH-LEVELWASTEANDGENERAL 8664J2 110.17 55.73 403 605.37 11.04 4t0.30 6.79 497.07 2326 3763.68 30.70 655.17 8.a1 2059.00 21AB 596.90 4.06 69377.9 736.00 GRAND TOTAL HIGH- LEVEL WASTE 0.00 0.00 0.00 O0 O.M 0.90 OM.0 0.00 0.00 0.00 0.00 0.00 0.0 000 0.00 0.00 0.00 0.00 4059200 14.00 GRAND TOTAL GENERAL FUND 0.00 m0 0.00 0.00 0.00 00 0 0.0000000 0.00 0.00 O0. 0000 0.00000 0.00 0.00 0.00 0.00Om G 605ANO 11 6 1 7j3 -j 6.i79 ; 91 - J~ 2326 37; I 26 G:bLFB=2OO5BUDGETALLOCATION.PREUMINARYFEESprntwkpps.123 248 02M4r2O INCLUDEDIN FEDERAL NONPROFITED. NTERhATI, AGREEENT STATE AGREEMENTSTATE COtU'LEX GENERIC GENERIC BUDGET SURCtARGE EXEMPTION EXEMPTION ACThTtES OVERSIGHT REGULATORYSUPTDECOMMISSIONtIG DECOMMWIRECL.AJ. LLW SUm ShdetH: Llanagenient nd SuPpot SK FTE S FFIB SR FTE SK FTE $SK FTE S FFIT SK FE Sx FIE $.K FTE SK FnE STRATEGY:MANAGEM4ENT & SUPPORT ,UB-FRGRU FtNANCWALtiAEtN jSUB-SUBWGRNAL4Nht4G, BUDGEt ANDAN LYSIS PLANNEDACTNMTES& o a 11 4 BudgetOpemt o e 50 5 ProgramAnWM o o 0 10 Furds ConWo o 0 Wormation Technoogy. BudgetSyisems o a 295 1 Gonenl trrmtlon Tcdholgy o o 2t 0 St Adjomnaent o o 0 0 TOtalDvect Ro o o g o 0 0 0 0 0 0 0 0 0 45* 28 S-Pl Suaorwy Osead a 0 1t 0 12 0 TotalDOect oo a o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4*t 21 TOWlOigtO d e B 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 Travel 0 a 0 0 0 0 0 0 0 0 0 0 a 0 0 0 0 0 12 0 ,a. Eo tAn .Flt mtF e FR- Sh- Toit 0 O O O O O O O O O O 0 0 0 0 0 0 0 500 37 lSUBRPGRARFNcU mte'; i3 vSUB-SUB-PROGRAUlFIIAIILI.WNA&NT FtANNEDACTMITIES: Genal Acwnig endFeCWl RepoIng o 0 919 7 kiforman Technology - Fedenl Frarcil Systems o o 590 0 kbion Technlogy . CostAnalyze o o 406 1 CodlANWy o 0 O 3 AccountsRecenaee o 0 9 4 Ltwnae Fe" S 0 91 1t krwnan Technlogy. tlo Fees o o 1439 2 Geeal Inrnalon Tecnoogy o o 20 0 Finacial Srsleam o o O S TotalDeed R oores o o0 0 0 0 0 0 0 0 3474 32 G:U.FBt2005BUDGETALLOCATION.PREUMINARYFEESjpthtwkpps.123 2-1 0242O05 INCLUDEDIN FEDERAL NONPROFITED. 4TERNAT1 AGREEMENTSTATE AGREEMENTSTATE COMPLEX GENERIC GENERIC BUDGET SURCHARGE EXEAPTION EXENIPTION ACTMTES OVERSIGHT REGULATORYSWPT DECODIMISSIDNING DECOtAMJRECLAU U.W SUm StmetIt Managementan Support SK FTE SK FTE SK VE SJ FTE SK FIE sI FTE SK FTE SK FTE $1K FIE SK FTE SuvSery O ad 0 0 5 Trael 0 10 0 ToWlDact ResouAs 0 00 0 0 O O O 0 0 0 0 0 0 0 0 0 3474 32 ToWlOvmad 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 Trawl 0 O 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 10 0 SF Mnamed;Fin ^Mg'RasorcaSu~oTntj 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 244 37 S$iiijB-PfGALF MICAJNAGEI~N~~ WP4UB-PRfOGRAPAC4LSERCES ' PLANWEDACTPMES kinonmamoTedlogy . Payol Sydem 0 0 16U5 1 PaymnentSrmCas a 0 "a a PaMnet Potty ed ObEgah 0 0 17 6 Tune.Labor andPaypoll 0 0 0 6 CentralAlloace 0 e 0 S Ganaralinformawn Tacoogy 0 0 150 0 Total Dir eP*eouxca 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2533 26 IT Overhod e0 Ovehea 0 5 Travel 20 0 ToW lDeadRasomAs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2532 26 TOWDOvrhead 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 Trawl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20 0 Sub-TOW. 5;0rn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2Ss2 31 I ".., 04.i-f, :""O" - , "-I 7j, i 1 mm- - ;:., - , 460 T , F -:I: WI, , - Ai I B2RENTAt AND FA lS MANAGEMENT,S , jSUB-WSu-PRPOGR:MIFENE. iT.Y.",Y,,m,5.r PLANNEDACIMTTE& Rentald Spca 0 0 23416 0 0 G:ULFB2DSOBUDGETALLOCATION.PREUMINARYFEESUprintwkpps.123 2-2 02/02005 NCLUDEDIN FEDERAL NONPROFITED. TERNATh AGREEMENTSTATE AGREEMENTSTATE COMPLEX GENERIC GENERIC BUDGET SURCHARGE EXEMPTION EXEMPTION ACTMTIES OVERSIGHT REGULATORYSUPTDECO4MISSIONING DECOGIJRECLAIM LLW SUm Sr"t Hanqamw and qSrPd SK FRE SJC FRE SI FTE sx FTE SK FTE IC FRE Sx FTE SI FRE SCK FIE SK FRE TOWladflecRasourma 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21446 0 I - )R t1 corcc1'-L 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2346 0 FUB- PROGRAMRENT MO FACLITIES AGEM14T SU0-SuJS- PROGRAMFACIJIES MANAGEMENT41Fl FLAhEDACTWTiES FPacd MAnaeAt 0 0 SITS S Toal DindlRs s a 0 0 0 0 0 0 0 0 0 5376 8 IT onad o o 6 owh o 0 TaWl TokiDowadRaa s 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O 5376 8 TOWOvedleW a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O 0 3 Tral,, 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o 0 0 F,~j. ~-ah ou0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 6376 11 d Fod= t PA-- rr L7'r ~ •2hxT:3TrmT O i ,2jMi SB-PROGRA&EADMN0TRATION ,-,. LANNEDACT&ITES o a 4351 11 ToWalDOecIRaou o a 0 0 0 0 0 0 0 4351 11 IT Ovnead * 0 0 SweSuparviaory Owhead o a 3 0 Trawl o o Todl Mad Reso~s 0 0 o o 0 0 0 0 0 0 0 0 0 0 0 0 0 O 4351 11 TOWaOverhead 0 a o o 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 3 Tral 0 0 o o 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 TnF O O o o 0 0 0 0 0 0 0 0 0 0 0 0 o o 4351 14 G:ALFB\2005BUOGETALLOCATION.PRELIMINARYFEESjpit_wkpps.123 243 02.42005 SICLUDEDIN FEDEaAL NONPROFITED. ITERNATL AGREEMENTSTATE AGREEMENTSTATE COtaPLEX GENERIC GENERIC BUDGET SURCHARGE EXEMPTION EXEMPTION ACTMTIES OVERSIGHT REGULATORYSUPT DECO4MIKSSONING DECOMAtAtECLAM 1W SUM Sheet tt Managementan Support SK FTE St FTE SIC FTE Sc FTE SJ< FTE SK FTE StK FTE Sic FTE SiK FTE SiK FTE vSU8-PROGtRAMAOttt GTRATCNo ; 7>'ti - I isua r1, ,. ;-x~t'..F kr,1-- L~.g* I8 MAGENCYrPPORT SERVICES FLANNED ACMVTES& Admanlrakas Supod Sa5te o o 6493 25 Gnnet tntortion Tadinogy o o 1204 0 Totai Datd Resources o 0 0 0 0 a 0 0 7701 25 ITOvedwad o o Trnvet 35 0 TotalDead Reourea o a o o 0 0 0 0 0 0 0 0 0 0 0 0 O O 7701 25 Towl Overhead o a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O a a lt Travl 0 0 o a a a 0 0 0 0 0 0 0 0 0 0 0 0 35 a Re'ourcSt.,-TotaL 0 0 o a 0 0 0 0 0 0 0 0 0 0 0 0 o a T734 34 TSWPOGMJGMotTRAT I tttN' ^ U GOD ERVICES PLANNEDAC7lWTaS A dqutoofGood"a Sentas 0 O 27 TotalDd Resourcae 0 0 0 0 0 0 0 0 0 27 i5 Overhead supwwmwyflmQponwyovwer O o a Travwl o o ToWtDvead Resource o a o o o a a a a a a a o 0 No 27 o o o a TotalOvetre o a O a 0 0 0 0 0 0 0 0 0 0 0 0 0 8 Trw 0 0 o a o a o a a a a a a a a o o a o o jAL.of od n Serca~rsReoreSr-oe o a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 so 35 2 AdnrtaoResoucon"tl• 'o'Y7~c- o-' ' n4:j 0 '-.A$7J\t7oLto&>4J Ž114AY.0O 6UB-PROGRA.t HUMORRESOURCS:, SUSi-SKPROGRAI1TRAININGAND DEVELOPMENT G \LF82005BUDGETALLOCATION.PREUMINARYFEES_pritywkpps.123 2-4 0242005 ICLUDED IN FEDERAL NONPROFIT ED. 'ITERNATL AGREEMENT STATE AGREEMENT STATE COMPLEX GENERIC GENERIC BUDGET SURCHARGE EXEMPTION EXEJ.TION ACTMTIES OVERSIGHT REGULATORY SUPT DECOMMISSIONING DECOEMJIECLAM LLW SUm SheetH Mnagementa and Support SK FTE Si FTE SJ FFTE SR FTE SJC FTE SK FFTE FTETK S&K FTE SK FTE SK FSTE PLANNED ACT7Vrr9ES hemal Trainm and Developrd 2573 5 Ewel Tnwiw va Deveopmnent o 0 Si? 0 o o Toeal DOed Res 0 0 0 0 0 0 a 0 0 0 3150 5 0 2 Trand 0 0 Totl Dwec Resources 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 3150 5 Total O.ehWd 0 0 O 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 2 Travel 0 a o o 0 0 0 0 o 0 O 0 0 0 0 0 0 0 0 0 EL71-;-isln~ad --- ocSboJ 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3150 7 rSUBPRORSH - RESOURCES. a SUB-SUB-PROGRAMH POUCiFYAOPERATIONS FLANNEDACIamWE 1218 5 lalu4mrd ad EfS SuS 20 SB4agcoWonr. PliSo 105 4 403 5 APremaWeAcbm U3 2 Ciii RPA" 120 2 Halorially laE Cltegas 275 0 50O 0 M-g Dive 65 1 Sen E a 1 ToeWDred Resources 0 0 0 0 0 0 3045 40 0 14 0 Travel 140 0 Total Dmcd Reasourcs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3045 40 TOal Overhead 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14 Travel 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 140 0 I ______0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 0 3155 S3 G:JLF82O058UDGETALLOCAT1ON.PRELIMINARYFEES_prinLwkpps,123 245 02,V412C05 INCLUDED N FEDERAL NONPROFIT ED. 'TERNATL AGREEfENT STATE AGREEMENT STATE COLEX GENERIC CENERIC BUDGET SURCHARGE ExEMPTION EXE1PTION ACTMTES OVERSIGHT REGULATORY SUPT DECOMMISStONNG DECO&MJRECLADL LLW Sutm Sheet tt Manageent endSuppoti SK FTE SC fTE S,K FTE SX FTE SC IFTE SCK FTE SxC FTE S.C IFTE SK FTE SKC IFTE SSPeROORAM. HUMAN RESOURCES +>- , jiSUU. POGRt S,:WR( EI " iRW PLANNEDAC TlWTES Worwie S ecAn o o 1808 3 TotalDeet Renres o 0 0 0 0 0 1888 3 IT Ovdid o o 0 rr5enms O o 0 2 Trawl O 0 0 Totl Dead Resoaca 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O o 18 8 3 Total Owmread 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 2 Traw 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - Reu e Su T 0 o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1008 5 OF ,l ~ ~ e n a o c s ae1c 5 e d o tt7h i f A . 4 t'. . 0 3 A . 0 171 1'', 0 '~1;~~ l WPLANNIN AND RESOURCES MANAGEENT zB.JBA kTm AND RES0URC E MATNRfGEONMAENT PLANNING PLANNEDACT7NES 235 4 Mmxeeive andResource Manwagenat o 0 25 0 TotalDOed Resource 0 0 0 0 0 0 0 0 0 0 2t0 4 0 0 18 Trawel 0 75 Total DOwedReenm 0 0 0 0 0 0 0 0 0 0 0 0 0 G 0 0 260 4 Total Oerthed 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18 Trawl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 75 0 !1 d betf! c Me e e n nt r k m Re o r e u - o0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 335 22 LEH PLANNBGMDE RESOURCEMAGEMENT G:\LFBI2005BUDGETALLOCATION.PREUMINARYFEESJiltrWkpps.123 Z46 02DW2005INCLUDED N FEDERAL NONPROFITED. WTERNATL AGREEMENTSTATE AGREEMENTSTATE COMPLEX GENERIC GENERIC BUDGET SURCHARGE EXE14PTION EXEUPTION ACTIMITES OVERSIGHT REGULATORYSUPT ECO&MMISSIONNG DECOIMURECLAIM. LLW SUm Steet H: Managomen endSupport S FTE Slt FTE SCK FTE S, FTE SA RE SI FTE S.C PIE SAC RE SC FTE SA FTE SUBUB-PROGRAM INFORMATIONAND COMPUTER SECURITY PLANNEDACTMTE& HLS tromilsn Securty o a 1820 10 Compuer Serdy o a 1700 3 Total Dired Reources o a 0 0 0 0 0 0 3520 13 IT Onrl ad SuperworONWonupaoryOustread a Traw 0 Total DroolResoces a 0 0 0 0 0 0 0 3520 13 Total O0Wma 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Trawl 0 0 o a a a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RP3.t t ma o. nr-?wE.,_., -- rdw Coatr S t x y R ac r a 7 f ~t I a o a a 0 o 0 0 0 0 0 0 0 0 0 0 0 3520 14 "0 Rnoums-Rem~r ~$ -. ~r0 ½t X r' I 3 5 SU ROGRANIFORMATION TECHNOLOGjNFRA£STRUCTURE ~SU-EUS-PROGRA SEATMANAGEMET ERyCES FLANNEDACTIMTfE& Set MannSe c a a 8665 7 ktrsmakuctxDevelopiwMe and Ieg hn 0 0 3711 9 Total Died Rora 0 0 0 0 0 0 0 12370 16 Supmr--W--Sppflr" Ovtlead 4 Total Diect Resources 00 0 0 0 0 0 0 0 0 0 0 0 0 0 12376 16 Total Omehed 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 E ' C m '- e etS b T t a0 0 0 0 0 0 0 0 0 0 0 0 0 12376 20 'SUE-PROGRAMONFORMATIONTECHNOLOGY INFRATRUCTURE M -. P;RO'G-R*.--TELE(MMU'i l uB` SUPPORT PLANNEDACTMTES G:;LFBU2OOSBUDGETALLOCATION.PRELIMINARYFEESrtiLwtpps.123 2-7 02d02005 INCLUDEDHN FEDERAL NONPROFITED. 4TERNAT1. AGREEMENT STATE AGREEMENT STATE COMLEX GENERIC GENERFC BUDGET SURCHARGE EXEUPTON EXEMPTION ACTtvtTtES OVERSIGHT REGULATORY SUF7 DECOMMSS3iONNG DECOGtJRECLAt LiW sUm Sheet H: Management and S.pod S,K flE S.K FTE FKE SKK FlE SxSi FTE S.K FTE SJC FTE SR FlE tiK F7E SK F7E Tecom mwationuSe ad Support o a 6247 5 Total DeedtRasoms o ao 0 0 0 0 0 0 0 6241 5 TowlDee cRaomea 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6247 S Totl Owhead 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Trawl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ecommungcabooSem E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6241 S GNFORMATION TEC5NOLOGY NFRASTRUCTURE jsuSUBPRGR FNFRASTRUCTURE5 AND PRODUCTION OPERATIONS PLANNED ACTMTES Produolin Op araona 0 0 314 3 Deskbp Opetn- 0 0 5S4 0 Total Dret Rasuo a ° 0 0 0 0 0 0 0 0 0 4172 3 SWWor-Spv-O-& a a 2 ToO DkecOwdou s 0 0 o a 0 0 0 a 0 0 0 0 0 0 0 0 0 0 4172 3 Toal Owroed 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a Trawl 0 0 o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Ved FPodtn Opea1a Ret 5 a1 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4172 S piahi~eiwolowtuaarw~.0 ~~ asa~Gard~o~A. ~ cfo~ kw-~ &l.L0A~~.'0,A \{)0'U2 3VOtC --tP?~4~;or. 0 B -SURORO. PAMATPPLIOTNONDEVELOPMEq PLANNEDAC[M TES Apponl Supt endtgraton 0 0 2862 12 8reas A Appa Enterc Act o o 1214 10 TotalDeed Rsores o 0 0 0 0 0 0 0 0 0 5309 10 Su ySurNol-Supry Ovewd Total Deed Reasos 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 520 1 30 Total Overad 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a G.LFO\2O5GUOGETALLOCATION.PRELIMlNARYFEESjuinwkpp.123 248 02C2005 INCLUDEDN FEDERAL NONPROFIT ED. TERNATIL AGREEMENT STATE AGREEMENT STATE COMPLEX GENERIC GENERIC BUDGET SURCHARGE EXEMPTKlN EXEWPTtDN ACTrTtES OVERSIGHT REGULATORYSUPT DECOMMISSIONING DECO&IWJRECLAM LLW SUm Sh t1ft 0 a.mra SVWS tppul St FTE S.K FTE S.K FTE S.K FTE SJ( FTE S$ FTE SJ FTE S.K IFTE SJK FTE SK FTE Trm . 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 F ' me I ~ e o - o~wo e : ~ ' j ~ -ao < ~: - r o . . 0 4 T h ~ 0 ~ ' 0 ' ; . . o : g : ;' 0 . - ' \ , 0 :L- hL , ~' ' ' : 5 . ~ . 3 .E-PROGRiAt: INFORMATK2N MNEMENT .: jSUD-SUB PIOGRA~knqFONATINNAGEtEN PLANNED ACrIVITES woqmabon Sam. 727 is Fu~atur Sws 3710 22 Romds Managemed 2657 21 ToWt Doed R Fwest o 0 0 0 0 0 0 a 0 0 704 59 a 0 11 Total Died Rels 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 70S4 5s TOW Ooulud 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 Traoel 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 E Ro we. SbT 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 70U 70 ISUBPROGRAU. NFOMTIONI tANTG N' PLANNED AC7TIVES Idonm 0 a 2750 I ToWtDmd FRsoues 0 a 0 0 0 0 a 0 0 0 2750 a 0 Totl Od Resour.ce 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2750 a TOWEOwvesd 0 0 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 1 TraM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TnF °u-ow 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2750 9 "-I---,-- -- T 7_: -1= - -11 = -,, " T 1 , !" 7 21L $SUB.0ROGA FO tLEY SUPPOR ,,~ ,T _,, U i .SUE-US~ROGRAM COU4hSION \9A PLANNEDACTNMITI C T4 0 0 1025 22 ToWliretF souces 0 0 0 0 0 0 0 0 0 0 1025 22 G:\LFB2005BUDGETALLOCATION.PREUMINARYFEESprit_wlkpps.123 2-9 021W20D5 ICLUDED IN FEDERAL NONPROFIT ED. SITERNATL AGREEMENTSTATE AGREEMENT STATE COMPLEX GENERIC GENERIC BUDGET SURCHARGE EXEMPTION EXEPTION ACTIVITES OVERSIGHT REGULATORYSUPT DECOMMSSIONING DECOGMMRECLAM LLW SUm SheetH mamagend SWpport SK FTE SK FTE SiK FTE SiC FTE Sic FTE S, FTE SK FTE SK FTE SA FTE S.K FTE 0 0 23 Trawl a 3S0 a Total Dwed Redouces o a 0 0 0 0 o 0 o 0 0 0 0 0 0 0 0 0 1025 22 Total ODwrhod o a o 0 0 a o 0 0 a 0 0 0 0 0 0 a 0 a 23 Travel Suppor Ruourca o a o 0 0 0 o a o a 0 0 0 0 0 0 0 0 35M 0 ,;C ir~yty - o @ 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 1360 45 SUB-PROFGRAPOLIX SUPPGR, LUB-SUB-PROGRA COAISSION =PkLLATE DDCATION PLANNEDACTMES' Conm AppeDltaA4 0 5 4 Gemertkrlomaon Tcai,0og 0 4 0 Total Dead RFeo;as 0 a 0 0 0 0 0 0 0 0 0 9 4 Supervisorp?4orrSupermory Orhead 0 0 1 Trawl 0 5 0 Total Diect ResouwA a o 0 0 a 0 0 0 0 0 O O 0 0 o o 0 0 9 4 Total Orhead a O a o 0 0 o o 0 0 O D D D o 0 a 0 a 1 Trawl 0 o 0 0 0 0 0 0 0 0 o o 0 0 o o a 0 I 0 niMAe,A T a0 a 0 0 0 0 0 0 0 0 o o 0 0 o o 0 0 14 S S~4UCONGRESS, NAA, C olf"Q Ahan o o 21 a Gene rormaton Te0logy o 0 I a Tobl Died Reiowcma * 0 0 0 0 0 0 0 0 22 6 S NoSper-ory ovead o a 3 Trawl o a a To7alDied t Reacurr 00 0 0 0 o 0 0 0 oa 0 0 0 0 0 0 22 6 ToWlOverIaad o 0 0 0 o o 0 0 0 0 0 0 0 0 0 0 0 3 Trawl o a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 0 G\LFB\2005BUDGETALLOCATION.PRELIMINARYFEESjpintWkpps.123 2-10 02,42005 INCLUDEDIN FEDERAL NONPROFITED. NTERNAT1 AGREEkIENTSTATE AGREEMENTSTATE COMPLEX GENERIC GENERIC BUDGET SURC"ARGE EXESJPION EXElPTION AC7M7£ES OVERSKiHT REGULATORYSUPT DECOMIASSION1NG DECOUMJLRECLAA. LLW sUm SheetH: lanagerlai armdSupp1or 5K FTE SK FTP S/t FIE SX F7E S$ FTE SJ( FTE SK FTE SJ IE JK FTE SK FTE 0 0 a JSUD-PROGRA:POLICYSUPPORT;17~s-;+ " ':SUB.SU0.f'ROGRAM: GENERALCGUNSE.x ^ e PLANEDACrTMTAE 310 7 Pglcyed DOomLegl Ad0s 0 10 Managenra S 1ppo4Selkas Legal AdwA o 0 30 1 Gwnedahtormataln Techwgy a a 0 0 0 340 Is TOalDrred FResoes 0 0 0 a 0 10 34 0 Travl a Tolal D~ed Rebowcaa 0 a 0 a 0 0 0 0 0 0 0 0 0 0 o a O 0 340 18 a 10 ToW Owrtte" 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 O O 0 0 36 0 Trawl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 _ . P t P0 0 0 0 0 0 0 0 0 0 0 0 a 0 o 0 O O 376 21 PLANNEDACTMTE&' 145 11 P~bttCAffmi 1i 0 Gerwal hdwmaln Te7mCogy 0 a 0 0 113 11 Toal OwedResouces 0 0 0 0 0 0 0 0 0 Isa 3a Travl 0 0 O a 113 11 Tol Dted Rmumes 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 TOWOveread 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 16 0 Travl 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 179 14 rI_ a 0 0 0 0 0 0 0 0 0 0 0 iSU POL0ZYSUPPYPlOGRMf F7 ? ;" 1$U_-SUBF.kOGRAt SECRETARIAT-- ? PLANNEDACrMTIES G:fB\205BUDGETALLOCATION.PREUMINARYFEES_pnnLtwkpps.123 2-11 0205 INCWLDEDtN FEDERAL NONPROFITED. ViTERNAT AGREEMENTSTATE AGREEMENTSTATE COEX GENERIC GENERIC BUDGET SURCHARGE EXEMPTION EXEMPTION ACTNITES OVERSIGHT REGULATORYSUPT DECOMMISSiONBIG DECOIIJJRECLAIIL aW sum SheetK magamerL NWdsuppot Sx FTE $SJ FTE SK FTE SA SJ PTE $KSIE PIE sx FIE SK FIE SK FTE 1,K FIE o o 0 12 Gerral Idormabon 7edmiogy o 0 109 a ToWlDcdR Fsawcs 0 0 0 0 0 0 0 0 0 0 0 a 0 0 0 185 12 o o a 3 Trand e o 5 a TotalD-ed Resoure e o 0 O O O 0 0 0 0 0 0 0 0 0 0 0 19 12 ToW Overfead 0 o o 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 Travel 0 o o 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 f Std.I aSelodat-PdqppIte o o 0 O O 0 0 0 0 0 0 0 0 0 0 0 0 194 15 ,SUBPROGRAM !R'-OISUPPORT SUS4UO-fROGRAM EDO'2 PLFNNEDACTMTES: EDOnd OpyaLn Sl&A 30 12 Gene tonnaw Tecltnoy 179 a TotalDuct Rosomwe o 0 0 a 0 0 0 0 0 0 0 ZOO 12 ITOvertflo a 0 B 0 0 o B B 1a Travel O e S5 e TotalDecd RFosaa O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ZO 12 TotalOvetwd O O 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 Is O0 0 0 0 0 0 0 0 0 0 0 5 0 . . F Rf< .aD- O 0 0 0 0 0 000 0 0 0 0 0 0 0 0 0 304 26 =PP : ,SUBPROGRAM POLICYSUPOIT .; ' _UBUPOGRAk ADVISORYCC*4TTEE FORREACTOR SAFEGUARDS/NUCLEAR WASTE PLANNEDACTMITES ReactorSafely kidepwnet Advice a 0 200 21 50.0 3 50.0 3 100 5 U4tar-d, Safety. LLW 5 D meci 100 5 GwneralkoVomn Tecnolgy 0 0 SO 0 Total DMcRestoos 100 5 0 0 a 0 50 3 50 3 440 20 G:\LFBW2005BUDGETALLOCATION.PREUMINARYFEESprint_wkpps.123 2-12 0244005 INCWDED IN FEDERAL NONPROFn ED. 'ITERNATL AGREEMENTSTATE AGREEMENTSTATE COMPLEX GENERIC GENERIC BUDGET SURCHARGE EXEMPTION EXEwPTION ACTMTIES OVERSIGHT REGULATORYSUPTDECOMMISSONfNG DECOMMJRECLAM LLW sUm Shat II: Mauagrwt endSupport SIK FTE SK - FTE SK FTE SIC FIE SI FTEh I FTE SIC FTE SAC FTE SIK FIE SIK IFTE o 0 0 5 Travel o 0 318 0 TotalDead Resowcas 100 5 o 0 o o O 0 0 0 0 0 0 O0 3 50 3 460 26 TotalOrt4o o 0 o 0 o o O a 0 0 0 0 0 0 0 0 0 0 0 5 Travel o a o o o o O a a a 0 0 0 0 0 0 0 0 318 0 778 31 Si'i ' _¾?!CSPMR P ySuprtR uraSu 2Toa4 1000 5 o o o o O 0 0 0 0 0 0 0 50 3 50 3 r~~~~~~STE AU-RG TD ~TION PROGRAGlPRMPSUB NENTC N O SAGETION PLANNEDAC7MVIES& EmtnloyeeCherse d StacSbonSafis 0 0 528 o EmlployebRaloabonSearwas 0 0 2100 0 Tobl Dere Rasorces 0 0 1 0 PCS - PCSReouxc Sub-otal: 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 585 0 'f ! OI i olame aa u ca G d o al t .7*s . o, . o 37,11 T~ Y A V l - r ~ A -0f: 's 4 '/ As r4 .A g - Q. %'., A A] Sadlegua-rdean Sacorly kimplamarrlabo a Physaal Sao-sf 0 0 TOd;Dirg Resourea S 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 E a z 7 •Y'9-'- OcttZuO vi j 0' SUB-,PROGRAHOMLAND SECURITY(MANAGEMENT AND SUPPORT) ,;Z,'X-S " ;, vt ,1 , R IIEVIW Of NRC If`RASTRUCTUREAND NCIDENTRESPONSE PROGRAM PLANNSEDACI1TTES 0 HLS-Rai~w of kitrasovcturaand bnodantRaspou Pro 0 0 TotalDriectResorce 0 0 0 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 s RevaofRevieLS kfnjturaRaxca Sub-Total' 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 G:\LFBUOOSBUDGETALLOCATION.PREUMINARYFEESxAEwkpps.123 2-13 02M200S INCLUDEDIN FEDERAL NONPROFrTED. NTERNAT1L AGREEMENTSTATE AGREEMENTSTATE COMPLEX GENERIC GENERIC BUDGET SURCHARGE EXEUPTION EXEMPTION ACTIMTIES OVERSIGHT REGULATORYSUPTDECOU ISSIONING DECOMMtJRECLM. LLW SUM Sheet H Managementen Suppot * LK FTE S fEFTE FTE SJ FTE SJCLX TE $X FTE S RFTE SLK,E FTE SL FTE GRANDTOTALWITHHIGH-LEVELWASTEANOGENM 100 5 0 0 0 0 0 0 0 0 0 0 0 0 50 3 50 3 109213 625 GRANO TOTALHt LEVELWASTE 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0o 536 30 GRANO TOTALGENERAL FUND 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CRNTTALW1THOUTHIGWLEMELWASTE AROI. i0?,.O-.O~ 0 ~~'~~: ~ 77 0 ! -- I G:\LFB\2005BUDGETALLOCATION.PREUMINARYFEESjxtNtwkpps.123 2-14 ci-iC~~- ~ ~ c k e eK, )~ -,4a3Q 12c~ '1~ (r : -ji--) v)*-\LMc p 4-. 0Ox rL rN'I A-, / / Vf% I'-~ U..d nioccA4 0C (PIpItW ISIJ4) FY 20 BUDGDFTILIO~~ I I II II "'3A004" FTIM PO, . uwpuPUR MNWTmD LA IWu OMIERU WTI.DMN AGREM STATE INU NIKrT PA :T REACTOR COUM. I FAk UATI1U" 4 "TM I PACI EE RJEI IWaoRT M1) A= IE U S MP D___ __A_ - - SK FME ix FIX sic FTIE LK Ft LK FMt Fu LK FMi Lx FMt IE "It LK FME LK PM LK FrI Ux FTI LK FMt LKC FT IhATIrTs NUCLEAREACTOR SAMffT OpOAIUcs~ngn rogsku .kaOrh V Zoe, 17. _ Rvemfliry "?c~gkw~~s __ - '2- L'*i _ ANS7.1 , .4 I - - asnes -pR&Nm ft- …- - Lpknm tRw.&"impecims NP - -- - i~Us Ronswi RegubbsyrFr -rtm.E *- TM". - - - LowuA~omaECO T*Opnmouimg - 'row- - _Iad _ _Ikj F NAZi2 0.4SA C#=OMWkd WQ FY204BUDG'DETAI I -" -3mn gs - S-MFtrnsum mtAI m. LAu OMER KMAn _ 0 m O&M f -wawow_ u _1 _ .- -- - -; .< ~ ~D= .< nt ShW Qpdaw ftctrm - 1 - 1 = ------I sjc FMiII ox n I. I S 1r M 1X t ax I. FI Fri FiI I t. I Im PIF S. I S. "IN . ox IFM PLAECD_ICO11UPM / - --- | - 11 1 - - I - -F - = = ojr-nA .. Ie- - - - - ~Morfa~ Ro.wrOpwatSa A D-cE,,mksobIk. bS, __ WUSFaWi NuW Tr" A cdU I G4.M.1y~e M~ed~l - I - -1 11 -1 1' - - 1 - - 1 | - 1 -1 ! -S| E 1 ! l iW,§?tC"dw %wAPsdonT"gIU .U8~~~aUI4~~l - _ -in" - -i3l3/2 2 1 1 - -. -1 1 - -1 - I - - - l - - - - -1 - AD orgodmu.FI4 MIT-W…………OWP- -- -- law Dedi R..axuss 7t --- - i I; 25jQ SAW&~CCnOI am to US" e a IFY '20d0BUDO DETAI I~ I ILA R atJT T t' npc Pp l cN4ctT i N NOtFUEL _0 'M nm bUt E . oTtat N A M TA T . . - C - a hctNlbRt=dT_ wbtC uMDtlWMA-M __ - M _ I __l ltrVcTw _ORUC~= _ rArOTVSPtC 4tTtWt|t _ I POR-TA R WI . - .i FM LK IME LK FM LK I'l I. -_ I. nt LK IICFM Fr LK FTI 1------I- LK I . = I I' IK I FM _I -- - F. EX IFM 1E F 1 -.- - -_I - - - I -| ______:I_:__I_:Ii__i_ I =_ - i - - I - - - - - I - PMAVVEDAC~CUMMAMMG5NS ______an:-U - -1 -0 zz_ - LX 1 ii- -- t"As snawd of MlWTecbnlog;s _ _ Rcgm . . ret ucture ow npn bwwls tlegwsl l . |- t l l ll l l *AIshgy*.bvunad l yhW mtntd Codt z~ __ - - .bbJ etA.k.Iy. - - - -…… Appc ------. - I - | - - - | 1------ Asa"s..WnI1flpr@W 0.1 WIIPgad 11 I1 _ - - - -1 - -- - l ll -l - l - - PLAndWMA. F&PDOM 3D"NqdCorahftabo Li ------ TotalSOkd fl anawans ll lll ____ A.rAsvs-ua VI .__ fifC~mkdLcan g ipwm dtf Vuhanytsa |. _- Toel Direct ftsomac - stew mtrsimeur -ww "."' t4% ------1 - -1 111- - IT- -1 ------1 1- PLAM=IEACCOMPLWWNUAM ------_AGA~AI~IUd -1- - IEUTt… 1- 11 1- -t~ro A w ;suar b 'sn Call i IU$._ %Ms%tc O _W " - I I _ I.I I I I I IFY 2001 BUDG 5DETAIL II . I I_ _ ---- __L _ _ _ _ _ n ___ 11 _ _. G4Ilz~a4l pizg -'Fn I I If_ _ _Il t RS- I I It . I -4.-4I I I_ W P-_ - - ¶ I4 .I:I S241j - I - = I - _=[-- * VrrII R V IO._ U 26~ .. III MATEUALS PWOtNkT Pb2 II Mc4nny ,M~WF wAulS owu6aw I I I DECOI4 MM dw .a U t P.t- a * 1 .1--_ ..------~tb _ - - - 11 - 1 - -I - II - | -wl - -~t - -T -x s E -~t - .11 I. I I _I I ._ ._ R.wAts Inpmow~nfu t) ,- - - 3Lt - - - - 1- : - a I I - - - - : Y d - H H - _ Y | _. mL, J__ =V_ _ 1 ...i P _ .. _ 1;,; :R-- .=or 4 I I I~ $gwf U o ab_ I I W-tl91 _Sei I- - rX,~I-,- IgWMOs I..w md -W.Wm _ I I I I -1 ------X T - 1 - li - 1- Guu Wwml TeehI.I g I IL I -= - 11 tbs Tbth9 ad De. * -I--.-. : - - - - - Itmi*n -III I - - 11 1- _ - - -1 - EWVDmo.-*.-WWSert Ruo.",A I I I1 F.G v / ,:zg5 6 zyo A12 UsedMil3W CCDS Om UuWW~an trs5) 11FY 200 BUD T DEAL -II- FY Pi &R- ISPEN'T FE IL TM NO4 WIR P1II. RAN! RARE 114 A U OTHERAIPUCANTI; 1g4EAT1ONL AGREEUNT STATE4!I 11uT REUTOR REACTOF OECO& AS FACUTY MAT t1ALS A~iU FOTTO IEVR(EPR wOAT) ___A_ ____E a lT I_ St~eeP~t~efl5W ti~htIV - Ax FT! !K FT! Sx FM! sx IT rm x "I JefPf Lx PTs sx nTa 1 FM! LK PT! I PT X FM! LK PT! ix "a EK PTM !TRMEY: . UCLEARWAS'TE SAFETY mgtt-Lns WaestRep.Aeoo iaeeountas Iniltj_ PLANNEDA VOPLHENTI* Zn*cnmen" Rr~svf Low4.aesl WasteRteguatodwonm&OvrsMb ELegal Tuc wWtnplnag ExternailrwetnlgadDvlp PouWfReacto DeOMA11881onk*9-tpealon Matadal &Real FParltY DemmaakNUamingbv Matwleais&ueIadmty DecnwuwiSI"llghapseif - _I _-- - - - .. L .------Uanagwmiteg~owprmedUcsnueel~lsu jefeTecfdemutezedRiskAansemneL &DataAnaystLab iewseI Total obvtResoume LktewTaningand Oeveuopnmn Lxegtal Ta iningRprsaa~ -, C -r, v/r/ -- o'ret Usd-W rd JSDtaU14 FY 20O~BUD zTDETA L I I I II I I I VII OR OTEI I F O_040200s a SPENT Fl EL NON OWEI. FL I T7 US P EARTH UPAPPLWIdS EITITIONL STATT. RI GE0 ERIC l1.ODET REYUCRS REACTOI DECOM REA rORS . AC . MATE ALS PORI ,TION PA UTIES RM EN Ezo Papw ACTTIES OV SIGHT I.P WE 0= GENIUCLLW hA61ZhnIdlt aiSmtlw 4 I _ety- - - - - _ - - .K FEP|I K Fm LK_ |T! FL TEmTI LK LK rPTM LK P FTE FT E F LK ! S X P! LK FTC T LK_K P * | FTEP! LK | m| STRATEGY: INTERNATIONAL.NUCLEA R AFEIT SUPP NAT InlmeloAlNCeabltye Seeud - l ___- - -I - _- - -1 -… I -- - -- = _I I linpaportEpt Licensing Review, IntsmalonaI Legal Advices a Reprasanien -o . - - EuflemaTraininganOwdp et SuppedIoMOto AI - - . _ General Information Technology TotaIl WaldRaeources___- - - -0__ STRATEGY: ICNIJUAND SECURITY……- - - ………- PLNNDACCOAWILUSHMENTM. TIwasAssessmants Vunably Assm -I -- - - - F I - - 11 1 - - -- - Safeguetds Inspectio Kn eight .I_1I !aeigueldt Ucemain SecurtyWdrastrucurahcuper'emnts ------Intanrallo SeaiIM Gan nfrclwmut Technology- Extesai Traw"ng------t !j TotlDe Re=sc~|ource l l = lHll |iec _S < l .9 0 6 Office of Nuclear Security and Incident Response N'SI&K Homeland Security and Management Support FY 2005 Resource Allocation A B IC DIE F IG JTII~ K F iF WWxWW TT FW W J z AA AB _ _ _ _ _ ~Spent Fuel _ _ 2 HOMELAND FY 2005 Power Storage/Reactorj Non-Power Fuel Materials Transportation Rare Uranium Exports/ International Agreement St SDMP Generic G3eneric 3 *-SECURITY, ICurrent Est Reactor Decomm IReactor IFacilities Facilities Earth Facs Recoem orts Activities Ove I Decom LLW TPlanned Activitles FTE K -- T r- -FT-EI I- L f-Ri1W1 -FTET --- [1 Z-F~fi7Z$- FT__- F-FVpE$k 77TM 6 TIER 1: REACTOR PROGRAM ______7 HLS Direct Resources 74.0 6176 73.6 6176 0.0 0 0.4 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0 0 0 8 Headquarters 56.0 6176 ______ 9 Regions 18.0 0 __ ___ 10 Region 1 4.5 0 11 Region II 4.5 0 ___ 12 Region III 4.5 0 ______ 13 Region IV 4.5 0 ______ 14 Overhead (HO) 13.0 0 ___ 15 Travel (HQ) 0.0 345 ______ 16 Training (HO) ______137 17 TOTAL 87.0- 6658 __ 19 TIER 2: REACTOR LICENSING___ 20 Tier 3: 131 Homeland Security Uicensing______ 22 Overhead 8.0 0a ______ 23 Travel 0.0 150______ 24 Training 0.0 25 ______I__ 25 Total 41.0 3351 _____ 27 131180 General IT 0.0 100 0.01 10 _oo___ __ 30 131393 Safeguards Uicensing 5.0 250 4.6 250 0.4A 0 _____ 32 Power Reactor Reviews 3.4 250 3.4 250- _ _ 33 Seourity Plans 2.0 250 ______.1 34 AAJFFD 0.4 0 I 35 2.206 Petitions 3/yr. 0.3 0I 36 - Plan Changes 0.7 0 ______I_ _ _ DNS FY06 C-3 Ver 11 .xdsFees1Juy2,04 1 July 22, 2004 Office of Nuclear Security and Incident Response Homeland Security and Management Support FY 2005 Resource Allocation A B I C I D I E F IG h | K N O P | TI U T X IWY Z M AB -: - . - ...... I Spent Fuel _ _ _ _ _ 2 - HOMELAND | FY 2005 Power Storage/Reactor Non-Power Fuel Materials Transportation Rare Uranium Exports/ International Agreement St SDMP Generi Generic 3 . -: -:SECURITY -. . | Current Est Reactor Decomm Reactor Facilities Facilities Earth Facs Recoveryv Imports Activities Oversight Decom LLW - Planned Activities FTE SK K TFIFTEgTY SK FTEI SK FSTET-R T TE S TEV sR TS SK 3J I RTR Reviews 0.4 0 0.41 0 39 Security Plans 0.2 0 40 AAIFFD 0.1 0 I I 1 1 -I 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 41 Regulatory Reviews 0.1 0 42 _ _ I 43 Early Site Permit Reviews 0.5 0 . 0.5- A.. . 71 1 1 1 1 -I I I I I I I I I I I I I 44 _ _ I 1 1 1 1 1 1 I 1 1 1 I 1 I I 1 1 1 1 I 1 1 I 45 j AP100O Review (design certification) 0.3 0 0.31 .--II I I I I I I I I I I I I I 1 1 ' 1 1 1 1 1 1 47 Catawba MOX Review 0.2 0 0.21 I 48 49 Catawba MOX Hearing 0.2 C 0.21 50 ' 51 131395ThreatAssessment 9.1 60 9.1 60 52 53 131395A Intergovernmental CoordlCo, 60 54 CIA Counterterrorism Board 1.CI 0 _i 55 Other Agency Coordination 0.5 56 FBI-Joint Terrorism Taskforce 0.1, c00a_ = =__ - __ I I I I I I I I I I I 1-I 1 I 57 Crypto Maintenance 0.1 58 EPD Threat Activities 1.7 59 0 _ _ 0-c______-_ ! !_ _i i !_i- 60 131395C DBT 0.0 61 Rulemaking (delete for 06) 0.0I c 62 Regulatory Guidance 0.0I o II_ I _II 63 0 64 131395D Threat Assessment 0 _ 65 External Interface 0.4 65 IAT 2.0I 67 Incident Resp./Exercise Planning 0.4 ___iI 0 _ I 0 _< _X I I I - - I _ I _I _ I 1 I 68 Demographic Data 0.1 69 Protected Web/Event Data (lormerly 0.1 0 I It I~ 70 . Licensee Intelligence Communicatio: 0.3I l _ 71 i Threat Assessment of Intelligence 2.0I 0 _~~~~~ I I DNS FY06 0-3 Ver 11.xisFees 2 July 22, 2004 Office of Nuclear Security and Incident Response Homeland Security and Management Support FY 2005 Resource Allocation A B I C D E F G H J K X Y Z AA AB -. --:. . .Spent _ Fuel _ _ _I 2 HOMELAND - . FY 2005 Power StoragelReactor Non-Power Fuel Materials Transportaton Rare Uranium Exportsl International Agreement St SDMP Generic Generic 3 - - SECURITY . . Current Est Reactor Decomm Reactor Facilities Facilities Earth Facs Recovery Imports Activities OveIsght Decom ELW _ Planned Activities -. z FtE SK ZT _T FI SK I FTE TSK rTR FTE SK _1 F1T RSKR E- F TEKR PT _ 73 131396 Regulatory Improvements & 10.2 300 1021 300 74 75 76 131396A Intergovernmental CoordlCor 1.4 77 t Congressiona/legislative activities 0.5 78 I Integrated Response Planning 0.0 79 Working Group Interface (TSWG) 0.3 0 80 EPD ActivitIes 0.6 82 131396D Access Authorization 2.4 100__ 83 Demographic Data Prog Managemrt 0.9 50 84 Demographic Reg Actions 1.0 50 _ 85 Order Response Reviews (delete for i 0.0 0 86 Risk Ranking on non-Reactors ( ) 0.0 87 Insider Threat Risk Ranking () 0.0 0 _ 88 External Communications () 0.0 0 89 Insider Mitigation Program 0.5 0 ______90 91 131396E Fitness for Duty 0.5 92 FFD Program Management 0.5 93 Order Reviews (delete for 06) 0.0 94 External Communications (delete for 0.0 95 96 131396F Rulemaking 5.4 200 ___ 97 Pt 73. Appendix B Training, Revisior 0.0 98 Pt 73.21 (SGs Info) revision 1.0 99 Pt. 73.55 revision (ind. App 8) 1.9 100 Fitness for Duty rulemaking 1.5 200 ______ 101 Pt 73.56. 73.57 (Access Authorizatio 0.5 0 ______102 DBT Rulemaking (73.1) 0.5 103 Adv Rx Security Requirements 0.0 _ 0 - .1. DNS FY06 C-3 Ver 11.xisFees 3 July 22, 2004 Office of Nuclear Security and Incident Response Homeland Security and Management Support FY 2005 Resource Allocation A B I C D I E F I G H I J K L M N |U VZ AB ___ :I ______Spent Fuel _ I1ILLI IILIZI _ 2 . HOMELAND- FY 2005 Power Storage/Reactor Non-Power Fuel Materials Transportation Rare Uranium ExporW International Agreement St SDMP Generic Generic 3 : ,:SECURITY-: ^^ : Current Est Reactor Decomm Reactor Facilities Facilities Earth Facs Recovery Imports Activities Oversight Decomr LLW 7 T- P~i-n-ned Activitles* FTUE 5KR 1-FiTEf1R -FTUF1RJI T-FIPTTEF ___ 1-F-T-ETI1K FT9T--& FTV $K FTE{RFTk~~T _____ 105 131396G Safeguards Policy 0.5 0 _____T _ 106 Policy Issue Development 0.5 0 = = =___| 107 108 131397 Mitigating Strategies 5.7 975 5.7 975 ______| 109 _ _ _ I.111 110 131397A Intergovemmental Coord/Cor 2.5 0 1 _____ Ill ______.______l l ll 12 131397B Mitigating Strategies .1.5 75 l 13 ______14 EPD Mitigating Strategies 1.7 900 = 15 ______ 16 131398SecurityInfrastructure 2.0 1491 2.0 1491 _____ 1 II 17 ______= _ _ 18 Intem Training & Development 1.0 0 1.0 0 19 __ . _._ I ____ 20 TOTAL RX UC HLS DIRECT 33.0 3176 32.6 3176 OA 0 _ 21 _ | 22 Travel 0.0 150 _ _ _ 23 Training 0.0 25… ------24 Supervisory Overhead 5.0 0o 25 Non-Supervisory Overhead 3.0 0 _ _ = 26 TOTAL RX Ucensing HLS Resources 34.0 860 _ _ | _ _ _ _ 28 . ______= _ _ 5'7c-a I ra , O (Jr " (O i. ..oD DNS FY06 C-3 Ver 11.xdsFees 4 July 22, 2004 Office of Nuclear Security and Incident Response Homeland Security and Management Support FY 2005 Resource Allocation A B IC DIE F IG H I J I KI M FL AA AB 2~ . HOMELAND'~ FY 2005 Power Storage/Reactor Non-Power Fuel MtrasTasotto Rare Uranium Exports] Internationat Agreement St SDMP Generic Generic 3 SECURITY: I Current Est Reactor Decomm Reactor Facilities Facilities Earth Facs . overy~~ mports Activities Ovrs ght Decom LLW * -*Pl-anned Activitie FTE .. ,.t. . .,.JT ______eco F K~ FF F 129 TIER 2: REACTOR INSPECTION __ 130 Tier 3: Homeland Security Inspection ___ __ -- =- ___. -- --- 132 Headquarters 23.0 3000 _ _ 133 Regions 18.0 0 134 Region I 4.5 0 ______ 135 Region ii 4.5 0 ______136 Region III 4.5 0a__ 137 Region IV 4.5 0 _ _ 138 Overhead (HO) 5.0 0 __ 139 Travel (HQ) 0.0 195 140 Training (HQ) 0.0 112 __ ___ 141 Total Rx HLS Inspection 46.0 3307 _ _ 142 ______ 143 131391A Safeguards Inspectiaon Prl 6.3 100 6.31 100 ______ 144 Development &Maintenance 0.0 0 -- - - _- - - _ ------ 145 Entorcement. & Allegations 11.11 0 ______ 146 -_ __ 147 Progam Development 2.1 100~ _ _ _ _ 148 ______ 149 IP 711130 Revisioni/Maintenan 0.8 0 ------_ _ 15 0 ______ 151 Significance Determination Pro 0.8 100 _ _ 152 ______ 153 Qualification Program ReViewfl 0.3 0 __ __------__ 154 ______ 155 Temporary instruction Dev 0.2 0 ------ 156 Access Authorization 0.0 0 _ ____ 157 Train~ng 0.0 ___0___I1 t------158 Fatigue 0.0 0 ____ 1 . . . _ 159~ MCtiAtiglowgeMCAoerReactors - -__ i . _ __- _ DNS FY06 C-3 Ver I11.xlsFees5Juy2,04 5 July 22, 2004 Office of Nuclear Security and Incident Response Homeland Security and Management Support IFY 20051Resource Allocation A B i C D I F IG JEEEI KLM N II I1 Q 1III :r] AAyABi~_ 2HOMELAND. FY 2005 Power Storage/Reactor Non-Power Fuel Materials Transportation Rare Uranium Exports/ International Agreement St SDMP Generic Generic 3 *: ~ UlY~Current Est Reactor Decornm Reactor Facilities Facilities Earth Facs Reca~ imports Activities Oversight D~ecomn LL.W 162 Safeguards Inspection Prog22E!sl 1.1 0 ------__-- - 163 PilAssessment 0.5 0- - - _- -…_ - - __ - - - - 164 Inspection Prog Assessment 0.1 0- - -…- - - - _ - - - _ _ 165 SDP Assessment 0.5 0 - - - _ _ -… _ 16 6 ______ 167 Reactor Oversight Process for Phy I 2.0 0 -…------ 168 ROP Development & Implementi 1.0 0 ______ 169 ROP Program Managemen 1.0 0 -…- - _ - -- __ 171 Tech Support to LAT/Event Followup 0.0 0 ___ 172 ______ 173 131391B Safeguards Inspections 19.0 0 19.01 0…_ ____ ------ 174 Headquarters 3.0 0 ___ 175 Regions 16.0 0 ______ 177 RTR Inspections: RTR>2MWt 0.0 0__…_ ------_ ------ 179 13139lBA Baseline Security Inspect 17.0 0 ____- - - - 180 Headquarters 2.0 0 ___ __ 181 Regions 15.0 0 ______ 182 Region 1 3.8 0……- -- - _____ 183 Region 1l 3.7 0 - - - _ _- -- - - _ 184 Region III 3.8 0 ______ 185 RegionI 3.7 0…__ - - _ 87 131391 BB Baseline MC&A Inspecti( 2.0 0…___ - - - ___ - - ___- - ___ - - __ 88 Headquarters 1.0 0------ 89 Regions 1.0 0 ___ 90 Regioni1 0.2 0___ I___ 91 Regionli1 0.3 0 -. _ _ _ ._ 92 Region III 0.2 0 - - - - ______93 Region I 0.3 0~ ..- DNS FY06 C-3 Ver I 1.xlsFees6Juy2,04 6 July 22, 2004 Office of Nuclear Security and Incident Response Homeland Security and Management Support FY 2005 Resource Allocation A B I C |D E |F G | H | I | | MO P |T U|W X | Y Z I A AB ...... Spent.. Fuel .. ... _ =- . I 2 x HOMELAND: - FY2005 Power StoragetReactor Non-Power Fuel Materials Transportaton Rare Uranium Exports/ International Agreement St SDMP Generic Generi -SECURITlY: -- -.: Current Est Reactor Decomm Reactor Facilities Facilities _ Earth Facs Recove Im orts Activities Oversight Decom LLW PlannedActivitles FT S T K FTE K FT S E !K FTE 195i131391C Force-on-Force Program 15.71 2900 15.7 2900 -IIII I I I I I . . I I IIIIIIIIIIII Headquarters 13.71 2900 19b7 Regions 2.0 0 _ _ ,, . _ 199 Program Support 1.7r 2400 __ 200 Miles 0.2 2400 ____ 201 Barrier Book 0.0 0 202 JCATS 0.0 0 _ _ _ 1 1 1 1 1 1 1 1 1 1 203 Significance Determination Pr 0.5 204 Program Maintenance 0.0 0 205 Prog Development 0.5 *0 206 0.5 * 0 207 Force-on-Force Inspections 14.0 208 Headquarters 12.0 209 Regions 2.0 00 210 Region 1 0.5 211 Region II 0.5 212 Region ill 0.5s_0__ 213 Region IV 0.5 * 0 _ _ _ _ _ II II 214 215 TOTAL RX INSP HLS DIRECT 41.0 3000 41.0 3000 216 217 218 Travel 0.0 195 ! ______I___ 219 Training (05 & beyond 575K Qual) 0.0 220 Supervisory Overhead 3.0 11 ___ =__=___ [__ i-1fj 221 Non-Supervisory Overhead 2.0p 0 222 TOTAL RX Inspection HLS Resources 46.0P 3307 223 224 225 ~ ji IS11I ~lE 226 227 228 , , ...... , . , .. .7.. . ,. ,I _r,%$r\,& kq-' "\ i 5 1 ] I 5 'J DNS FY06 C-3 Ver 11.xisFees 7 July 22, 2004 Office of Nuclear Security and Incident Response Homeland Security and Management Support FY 2005 Resource Allocation A B I C D F IGJIK L M N P Q R S AA B m' 777777__7 Spent Fuel ~_ 2 -- HOMELAND:: - FY 2005 Power Storage/Reactor Non-Power Fuel Materials Transportation Rare Uranium Exports/ 4InternatIonal Agreement St SDMP Generic Generid 3 i SECURITY- Current Est I Reactor Decomm IReactor Facilities Facilities Earth Facs Reovr omrts Activities Oversi htgm _ Decorn LLW 7- Planned Activities. FTE $K5 -TT-w-FTE7-W-Ffr- ___5K___ TISK F TTI-E___ I - F-TtTE -;COEI htK___ 22 9 ______---- 230TIERI: MANAGEMENT&SUPPORTPROGRAM ____- 23 TE 2: PLANNING & RESOURCE MANAGEMENT__ 232 TIER 3:Information &Computer -ecurityii - - 233 HLS Information Security______ 2~34 Direct Resources (HQ) 100 1820 )5.3 14881 0.4 0f 0.2 01 2.9 2471 11.2 85 ______ 23 Overhead (H O)______ 236 Travel______?37 Training ______!38 Total HLS Into Security______ !40 131385 Information Security 10.0 1820 5.3 1488 0.41 0 0.2 0 2.9 247 1.2 85 ___ !41 Ciassification Management 1.8 50 0.5 1.3 50 !M2 Intelligence Program 1.8 3 0.4 3 0.4 0 0.2 0 0.4 0 0.4 0 _____ !43 Part 95 Implementation 0.8 200 0.2 200 0.6 0 _____ !44 Secure Communications 2.1 1347 1.8 1200 10.31 147 ______ .45 Safeguards Information Program 1. 0 10 25 __ 020.6 25 __ !46 Security Education 0.5 170 0.2 60 ___ __ 0.1 50 0.2 60 ___ __ 47Class ified Scanning 0.0 0 ______ A 8 Administration for E-mail 0.3 0 0.3 _____ :49 C:OMSEC Audits 0.2 0 0.2 _____ '50 Policy and Procedures 0.2 __ 0 0.2 __ 51 Special Access Prog. Development 0.2 ____0 0.21______ 52 Special Access Prog. lmplernentat'n 0.3 0 0.3 ____ -- __ - - - __ ------__ __ - - 53 Backlog 0.0 ____0 __1 55 TOTAL M&S DIRECT 10.0 1820 _ __ j 56 Overhead - supervisory, 1.0 0 - . -r 1 58BT -ravel1- 0.0 43j______59 Training (05 & beyond S5K Qual) 0.0 13 44 60 Total: M&S Homeland Security 11.0 1876 DNS FY06 C-3 Ver 1I.xs Fees8Juy2,04 8 July 22, 2004 Office of Nuclear Security and Incident Response Homeland Security and Management Support FY 2005 Resource Allocation A B | C Dl |E | F | G H I I |J K L | N I O P R S I T Y |Z A I AB _ Spent Fuel _ L I L 4 I 2 HOMELAND FY 2005 Power Storage/Reactor Non-Power Fuel Materials Transportation Rare Uranium Exports/ International Agreement St SDMP Generic Generic 3SECURITY Current Is IcommA Reactor -s--Recovery--Facilities Facilities Earthr*--F.Earth Facs Recoverv Imports Activities Oversight __Imp____ Decom LLW y I 1111110 MGCUVIUeS rIC a, r t tl or, 1 = 7tI rI~tr 4M. rIEEI 4% ItI a% 11b1 5K IitI 5K I-IFI 5 F-TII SK I-FEI SK FITEI SK _ . -_ _. _ . .- . - ._ . ; ._. . ._... I .I. . ._ ... . - I ,Z631's-I 264 TIER 1: MATERIALS & WASTE PROGRAM (Exc-ludes High Level Waste) 265 HLS Direct Resources 52.0I 3315 1.61 1260 7.5 100 0.3 0 18.6 290 5.8 548 2.8 200 0.0 0 0.0 0 1.5 0 3A. 360 10.5 557 0 0 0 266 Headquarters 36.0I 3315 ______267 Regions 16.0 t I0 268 Region 1 6.0 0_ _ 269 Region Ui 3A 0 270 Region III 4.2 0 271 Region IV 2.4 0 _ 272 Overhead (HO) 7.0 273 Travel: Domestic (HO) 0.0 274 Travel: International (HQ) 0.0 I 125 275 Training (HO only) 0.0 I 50 _ _ 276 TOTAL 59.01 3690 _ _ _ 277 '78 ,79 '80 Tier 2. Fuel Facs. Licensing & Inspection !81 HLS Direct Resources 22.7I_ 19110 1.6 1260 I 0.3 I___ 0 0.31 0 18.61 290 0.8 0 =I1 0.0 0 0.0 0 0.0 0 0.0 0 0.2 36011 0.9 1 011 1 !82 Headquarters 18.7 191020 05| _ _… | | | | l ______l _ !83 Regions 4.0 '84 Region 0.6 0 _ _ !85 Region II 2.1 286 Region III 0.6 0 :87 Region IV 0.7 *0 88 Overhead (HO) 3.0 :89 Travel (HO) 0.0 9 0 ______90 Training (HO) 0.0 91 TOTAL 25.7 2035 _ _ _ _1 92 . I DNS FY06 C-3 Ver 11.xAsFees 9 July 22, 2004 Office of Nuclear Security and Incident Response Homeland Security and Management Support FY 2005 Resource Allocation A B IC DIE F IG 1iIZI K rn N 0 P QZ hI TT h w Ixv Z AA AB 2 HOMELANDj FY 2005 Power Storage/Reactoi Non-Power Fuel Materials Transportation Rare Uranium Exports/ international Agreement St SDMP Generic Generic 3SECURITY I Current Est Reactor Decomm Reactor Facilities Facilities Earth Facs Recy~import$ Activities Ove I ht Decomn LLW Planned Activities- FT K IF9---z-ffgzz- :--zF zz wFzze WEZ!K 1-T-ET-W FI-- FT __ 293 Fuel Facilities Licensing______294 ~K~•g~~~is o ~~~~$0~.*280 &Nb ~0O~~O~b 4fo. 4.0 0W o,- =146:.O to 295 -Headquarters 10.9 1900 296 Regions 0.9 0 _ _ ___ 297 Region I 0.2 0…… 298 Region ii 0.3 0 ………………- - 299 Region III 0.2 0 - - -__…_ 300 Region IV 0.2 0 __ 301 302 215393 Safegiuards Ucensing 5.0 1800 0.5 1250 - - -4.3 180 - ___0.2 360- 303 CAT I DBT Plan Reviews 0.2 0 0.2 _ __ 304 FCF Physical Protection 1.2 0 1.2 1 305 FCF MC&A 1.1 0 -1.1…- __ 306 LES Appi Review -MC&AJPP 0.6 0 - - - -0.5…6 __ 307 USEC Appi Review-MC&A(P 0.3 0 0.3 - -… 308 MOX FFF (DCS) MC&AIPP 0.6 0 -- 0.6…-- - - - 309 MOX FFF CONST. HEARING SUPP. 0.2 0 -- -0.2------ 110 NMMSS Operations 0.8 1800 0.51 1260 0.1 180 __ 0.2 3601___ __ 112 215395 Threat Assessment OA 0 OA 0 __ 113 ______11 4 215395C DBT 0.1 0 115 ______ 116 215395D Threat Assessment 0.3 0 __ 117 vaT 0.1 0…-a_ - - - - _ _ 118 Incident Response 0.1 0 … . 119 Threat Assessment 0.1 0 -.-- _ _ ;211 2153/6 Reg Improvement &Prog. M64 5.4 100 0.6 0 0.310 0.3 0 2.51 100 0.8' 0 ______. ;-22 Headquarters 4.5 '100 ___..~- .23 Regions 0.9 0 ___ .24 Region I 0.2 0 __ .25 Rgo i0.3 0 ___ 26 Region III 0.2 0 _ _ ___ 27 Region IV 0.2 0 _____ 28 -- 29 215396A Intergovernmental/Comm 0.0 0 ______ DNS FY06 C-3 Ver 11.xlsFees 101 Julyuy2.20 22, 2004 Office of Nuclear Security and Incident Response Homeland Security and Management Support FY 2005 Resource Allocation A B I C D |E F G H I I K N P a AA AB Y C t Et R r Spent Fuel F I E F o I I c 2 . HOMEtAND FY 2005 Power StoragelReactor Non-Power Fuel Materials Transportation Rare Uranium Exports/ International Agreement St SDMP Generic Generic 3 :. SECURITY. Current Est Ratr Decomm Reactor Facilities Facilities Earth Facs Recovery _Imports Activities Ovarsgh Decomn LLW *4 - Planned AciUvities FTE SK FTEISK FTiE $K -FTEI -KFT S FTEI SK FtTE I SK FTEt SK FTET SK FT SK F 1i FT_ 331 215396B Emerging Security Req. 1.2 100 = = 1.2 100 = = 332 MC&A Program Review 0.0 0 _ _ _LI I 333 _ 334 215396D Access Authorization 0.0 0 ___ == 335 Orders/lCMstGuidance 0.0 0 _|ii 336 _ 1 . l 337 215396E Fitness for Duty 0.2 0 0.2 0 _ 7 1 II 338 Fatigue OrderrJICMstGuid Devel1 0.0 0 ______|_| 339 _ _ _ _ _ 340 215396F Rulemaking 0.9 0 0.3 0 0.6 0 ______341 Pt73&74(PhyProt&MC&A) 0.5 0 0.5 0 = | T 342 Access Authorization 0.0 0 ____ _ . _ 343 Fatigue 0.0 0 ______ 344 NMMSS Rulemaking OA 0 0.3 0 0.1 0 ___ _ 345. 346 215396G Safeguards Policy Issue Dev 0.2 0 0.2 0 347 NRC/DOE Comparability Study 0.0 0 ____ 348 2 . 0 0 0 0 0 0 _ 0.9 349 215396H NMMSS 2.9 0 1_0.31 I 0.31 0.31 I 0.31_ 0.E1 I os0.9 I I I 350 351 NMMSS Upgrade 0.0 0 352 353 NMMSS Corrective Actions 2.9 = _ = _ =I = I I I_ -I I I I 1 1 354 HQ Corrective & Rebaselining 2.0 355 Regions 0.0 ______-__ 1l1 356 0.2 Region I !___ 0 = ______, __ __l 157 Region II 0.3 358 Region III 0.2 14 jL ___ 1 j j- - - _____, 59 _ Region iV 0.2 0 I .. 160 I 161 215397 Mitigating Strategies 1.0 162 0.0 0- - 1.01° 0 _____4S !- I-ll 163 215397A Intergovemmental/Comm 0.0 0.0 165 215397B Mitigating Strategies 1.0 0-______arlll-ll 166 VA & Tech Support (FC) 0.2 167 VA Mitigating Strategies 0.8 ;68 DNS FY06 C-3 Ver 11 .xsFees 1 1 July 22, 2004 Office of Nuclear Security and Incident Response Homeland Security and Management Support FY 2005 Resource Allocation A B I C | D I E F I G HJ | KAA L M N O AB 1- - " ,-- Spent FuelI IIIii 2 HOMELAND FY2005 Power Storage/Reactor Non-Power Fuel Materials Transportation Rare Uranium Exports/ International Agreement St SDMP Generic Generic 3 SECURITY - Current Est Reactor Decomm Reactor _ Facilities Facilities Earth Facs Recovery Imprts Activities Oversight Decom LLW 4 PlannedActvities $FTEK I FTE SK - FTE S FE - - SK - - ! T_- - - T 1 TFT S T 369 Fuel Facilities Inspection 0.0 0o I _ 1 i I 370f,* SJO 9 1( , -- -* ______(- ~- ~ 37 Headouarters 7.8 10 1372 Regions 3.1 -I0 I______--1.11 373 Region I 0.4 111 0ol ______374 Region 11 1.8 0 I_ 375 Region liI 0.4 0 376 Region IV 0.5 377 378 215391A Safeguards Inspection Prol 2.0 0 __ 2.0 0 379 Development & Maintenance 0.0 380 Enforcement and Allegations 0.5 381 Baseline Inspection Development 0.5 0 ______382 Adjustment to match CRDS 0.0 _ ____Siii 383 Tech Support for lAT/Event Followu 0.0 0l ._ I___= I I I I 384 MC&A Policy Development 1.0 385 - °I0- l- -=_ _ I I I I I I 386 215391B Safeguards inspections 7.3 0 0.5 0 6.8 0 _l _ __ . I I I I 387 I I I 388 NMMSS TI Imp (FCSSPS) 0.6 0 0.5 0 0.1 0 389 390 215391BA Baseline MC&A InspectU 4.8 391 Headquarters (SOS/FCSSPO) 3.0 0-- ______- _ 392 Regions 1.8 1 393 Region I 0.4 I _ ol______l l l I 394 .1 Region 0.5 395 Region II 0.4 0L L ______1 396 Region IV 0.5 0 ___ __ o | l __ __ l ______'1 l l 397 l l _ l l 398 215391BB Baseline FC Security Insi 1.9 0F I F I ! I I I M - I ] I - 399 Headquarters 0.9 100 Regions 1.0 101 Region I 0.0 0f I g 1 . 0 _ _i I_1- I - 1 i 102 Region II 1.0 103 Region iII 0.0 .04 Region IV 0.0 .05 - I . I I I .I I I. I .- I. I . I I I DNS FY06 C-3 Ver 11.xlsFees 12 July 22, 2004 Office of Nuclear Security and Incident Response Homeland Security and Management Support FY 2005 Resource Allocation _A | B I C |D I E |F I G |J I |K L |M |Q|N|OP |R |SAA T|UV|WX|YZAB A B-IC ~ i Spent Fuel F i 2 HOMELAND FY 2005 Power Storage/Reactor Non-Power Fuel Materials Transportation Rare Uranium Exports/ International Agreement St SDMP Generic Generc 3 SECURtTY Current Est Reactor Decomm Reactor Facilitles Facilities Earth Facs Recovery -ports Activities Oversi ht Decom LLW 4- Plannecldtivities -7 -FE K -F-TETSK -FT-ET-SK FTEP SK Ft SKW FTET --- FTT SK$E K FE K FTE! KT E FE SK 215391C Force-on-Force Program (C 1.6 10 1.61 10 407 11 t fI-I-I I I I l l I -I-I 408 Program Development 0.3 a I-I I _ 4091 I______.3I I I I 4101 Program Support 0.0 0 411 412 Force-on-Force Inspections (C 1.3 10-______I- I 413 Headquarters 1.0 10 ____- 414 Regions 0.3 .415 Region I 0.0 o0 ___ _l __ I . l 416 Region II 0.3 00o___ =______==__ _ __I_____ I I = I I I I Ill I I 417 Region iII 0.0. 418 Region IV 0.0 419 420 Fuel Facilities Ucensing & Inspection 3° 0 ______=______l l 421 Travel 0.0 90 422 Training (05 & beyond S25K Qual) 0.0 35 423 Supervisory Overhead 2.0 0 424 Non-Supervisory Overhead 1.0 425 0 ______426 Subtotal-FFL&I Travel. Training, OK 3.0 1251 427 TOTAL-FFL&I Total 25.7 2035 428 I I I I I I I 1I i I I I I I I I I I I I 1429 I I I I I I I I I I I I I I I I I Q y55 DNS FYO6 C-3 Ver 11.xdsFees 13 July 22, 2004 Office of Nuclear Security and Incident Response Homeland Security and Management Support FY 2005 Resource Allocation 810 * * ~Spent Fuel _ _ 2 HOMELAND FY 2005 Power Storage/Reactor~ Non-Power Fuel Materials Transportation Rare Uranium Exports/ International Agreement St SDMP Generic Generic 3 - .SECURITY . . Current Est Reactor Decomm Reactor Facilities Facilities Earth Facs Recover Imports Activities 9yght DcomnLL Planned Activities -F-T-E 5K FT-FT -FT-EI 5 11W RJ TE$ St-F-TE-F1R -- ~f--KFTEFI $ TF E SKj 143-0 Tier 2: Nuclear Materials Users Ulc & lnsp______ 431 HLS Direct Resources 19.3 1105 __ __ 5.0 548 1.5 0 3.2 0 9.6 557 432 Headquarters 9.3 1105 _____ 433 Regions 10.0 0 __ ___ 434 Region 1 5.2 0 _____ 435 Region ii 0.0 0 1 1 436 Region Ill 3.4 0 _____ 437 Region IV IA- 0 ______ 438 Overhead (HO) 2.0 0 ___ 439 Travel DomestIc (HO) 0.0 70 ______ 440 Travel International (HQ) 0.0 125 ___ __ 441 Training (HO) 0.0 10 442 TOTAL 21.3 1310 __ 44 3 ______444 Materials Users Licensing 446 _____ 447 215393 Safeguards Uicenslng 0.0 0a______448 irradiator Order Review 0.0 0 449 Material Control Rspns 0.0 0 __ ___ 450 ______L_ _ _ _ 451 215396 Regulatory Improvements & 2.4 400 ___ __ 2.0 40__ 0.2 0.2 452 Program Management. I___ 453 215396A IntergovemnmentaV/Comm 0.0 0 _____ 454______ 455 215396B Emerging Security Req. 1.0 0 ____1.0 ___ 458 2153961' Rulemaking 1.4 400 - -- r. t- 459 Enhanced Materials Sec& Tier 2Lk 1.0 400 ______1.01 400 ___ 460 _Portable Gauges ______0.0 0 ______ 461 Import/Export 0.2 0 __ __ 0.2 162 Protocol Rulemaking 0.2 0 ______0.2 $63 _ _LA__ _ _ _ 164 215397 Mitigating Strategies 0.5 0 ___ 0.5 165 Byproduct Material Tech Support 0.5 0 ______ $661 ______ DNS FY06 0.3 Ver 11.xlsFees 141 Julyuy2,20 22, 2004 Office of Nuclear Security and Incident Response Homeland Security and Management Support FY? 2005 Resource Allocation A B I F IG TT J K LZ T T T1 T]x~ AA AB 2 -HOMELAND FY 2005 Power StoragetReacto Non-Power Fuel Materials Transportaion Rare Uranium Exports/ International Agreement St SDMP Generic Generic -SECURITY Current Est Reactor Decomm Reactor Facilities Facilities Earth Facs Recov Imports Activities Ovrih ___Decom LLW ____- _Planned _Activities______T9T W FTE __ _Z__rZI FT I $K~______, 467 materials Users Inspection _ ~~_ ~ ~ ______~_ _ _ _ _ i _ _ _ _ 469 Headquarters 2.11 705 ______- __ 470 Regtons 10.0 0 __ 471 Regioni1 5.2- 0 _____ 472 Region Ii 0.0 0 _____ 473 Region III 3.4 0…… 474 Region IV 1.4- 0 ______ ______475 _ _ _ 476 Security inspections -materials 12.1- 705 2.5 148 ____9.6 557 :.C4,0 $77_____------_ $78 215391A Enforcernenv/Allegations 1.0 0 …-l /O 47 9 ______ $80 21539IBC Baseiine Materials Inspectic 11.1 705 - $81 HO Includes 2741 1.1 705…------ 182 Regions (Inc. 2 FTE ea yr for enf 10.0 0 __ 183 Region 1(53%) 5.2 0 ___ 184 Region II (0%) 0.0 0 __ $85 Region III (34%) 3.4 0a__ __ 186 Region IV (i3%) 1A 0 __ 188 International Homeland Security 0.0 0 ______ 190 Overhead (HQonly) 0.0 0__ - _ 191 Travel (HQ only) 0.0 125 ______ 194739 Safeguards Lcensing 1A 40 ------0.9 00. 94 Import/Export Uicenslng (delete Of 0.0 0 ______ 95 Exrort Lic-ansing Reviews 0.9 0 ___ 1 : 1 ___ .96 Obligatiion Tracking and Reportng 0.3 0 ______0.31 0 97 Cooperation Agreement Comnplianct 0.2 0 __0.2 0 -98 99407395 Asessment Threat 0.11 0 ------0.1 - 01 407395A Intergovernmental 0.1 0 ____ 1 ______II I__I 02 Bilateral Physical Protection 0.0 0 ______ 03 International Threat Support 0.1 0 ______IPPAS Mission 04 0.0 0E - . . - . . - . . - DNS FY06 C-3 Ver 11.xsFees 151 Julyuy2,20 22, 2004 Office of Nuclear Security and Incident Response Homeland Security and Management Support FY 2005 Resource Allocation AB I C D I E F I G HJ K LN R S T U X Y Z AA AB A . Spent Fuel ; | I X A Ai 2 HOMELAND FY 2005 Power Storage/Reactor Non-Power Fuel Materials Transportation Rare Uranium Exportsl International Agreement St SDMP Generic Generic 3 SECURITY Current Est Reactor Decomm Reactor Facilities Facilities Earth Facs Recovery Im orts Activitles Oversight Decom LLW Planned Activitles FTE SK FKTE _FTE___FTE T TSFTR FTSFT$S T S F SKSK 505 - -- 506 407396 Regulatory Improvement & 2.4 0 … - - - - - 2.4 0- 507 Program Management 0.0 0 = =____ 508 407396A Intergovernmental 0.0 0 ------I - 509 Protocols and Convention Supp 0.0 0 ------510 LAEASafeguards Implementation 0.0 0o 511_=_ 512 407396D Access Authorization 0.0 0 - -_ _ _ _ | 513 _ _ 514 407396EFitness forDuty 0.0 0 _ ------1 1 515.__ = _ - 516 407396F Safeguards Policy 2.4 0 - - - | I I I 517 Strengthen International Safeguar 0.6 0 518 Safeguards Implementation 0.7 0 _ 519 CPPNM (Convention) 02 0 - - - 520 Additional Protocol 0.7 0 ______521 IPPAS Mission 0.1 0 I 1 1 522 LAEA Transport Security 0.1 0 - 523_.__ 524 407391 Safeguards Oversight OA 0 _ _ - _ - - - 0.4 0o- 525 407391A Bilateral Physical Protection OA 0 526____ - 527 Materials Users Licensing & Inspection =_= 528 Travel. Domestic 0.0 70 _ _ _ _ _ 529 Travel- Intematinal 0.0 125 - - i 530 Training 0.0 10 _ _ _- - _ - 531 Supervisory Overhead 1.0 0 _ _.___ 532 Non-Supervisory Overhead 1.0 0 - _-1| , 533 ..-...... - 1 I _____ [___._.___-__j_-- 1--_____ - I 534 Subtotal-MUL&I Travel, Training. OH 2.0 2051 1 1 _ 1 535 TOTAL-MUL&8 Direct& Overhead 21.3 13101 _ _4 I "Vr@nz-Q Gc) 5- 1L -e-CA DNS FY06 C-3 Ver 11.xlsFees 16 July 22, 2004 Office of Nuclear Security and Incident Response Homeland Security and Management Support FY 2005 Resource Allocation A B I C I iEEIE F IG HELI J I UKI Y Z I AA _A 2 HOMELAND FY2005 I Power Storage/Reactor{ Non-Power Fuel Materials Tasotto Rare uranium Exports/ International Agreement St SOMP Generic Generici 3SECURITY'- Current Est Reactor Decomm Reactor Facilities Facilities Earth Facs R oImorts Activities Ovright ___Decom LLW ______tv__es ___7__TE______TT_ F -TfF-9 -TE-FF -- W-FT-E-f slFTEFSI ( -ff - FTE vrK FTE1 $ *_'Tff R_ FTEr $ 536 ______537 Tier 2: Spent Fuel Storage & Transportation___ 538 Ucensing & inspection______ 539 HLS Direct Resources 10.0 300 __ 7.2 100 ____ 2.8 200 540 Headquarters 8.0 300 __ 541 Regions 2.0 0 __ 542 - Region I 0.2 0 _____ 543 Region 1i 1.3 0 ______ 544 Regioni fii 0.2 0 ______545 Region IV 0.3 0 546 Overhead (HQl) 2.0 0 _____ 547 Travel (HQ) 0.0 40 548 Training (HQ) 0.0 5 549 Total - SFSTL&I 12.0 345- 551 Spent Fuel Storage & Transip. Licensing___ 553 Headquarters 7.1 300 _____ 554 Regions 1.0 0 ___ __ 555 RegIon I 0.0 0 556 Region If 1.0 0 ______557 Region Ill 0.0 0 558 Region IV 0.0 0 559 ______ 560 318393 Security U.censing 5.I 0 5.1 0 ____ 0.0 Ii 561 Headquarters 4.1 0 _____ 562 Regions 1.0 0 5643 15 E , ern 1ies 0.5 0! ____ _ 0r1- - t - - - - -. - -- - - 566 318393B ISFS~s 0.7 0 0___7 ___ 557 Power Reactor ISFSls 0.2 0 ______ 568 Other ISFS~s o.s 0 _____ 569 _ _ _ i70 Other Spent Fuel 0.7. 0 - -. 7 - 1 I_ ~71 DNS FY06 C-3 Ver 11 .xdsFees 117 Julyuy2,20 22, 2004 Office of Nuclear Security and Incident Response Homeland Security and Management Support FY 2005 Resource Allocation A B I C .D F IG HJ IJ K V W Z AA AB 2 OEADFY20 oe Soae atoSNnPwrpul Mtrilenntrtto aeUrnu xots nentunl AreenltSM enrcGnr __ HOELNDF_205Poe Spent FuRelco NnPwr Fe aeil Transportatio RareI UraniumZ jxorsKjeraioaAgeeen StS Gnrc _eei 3 SECURITY Current Est Reactor Decomm Reactor Facilities Facilities Earth Facs Recovery Imports Activities Oversight ___ ecom LLW -.Planned Activities FTE SK ___K -E - - Z1ZT fE .$KF1 - - 1- -- TFT -- I $KF~R_ 2 57 lTransportation Lcensing 3.2 0 ___.'2 -0.0------ 573 Headquarters 2.2 0 _ . 574 Regions 1.0 0 ______ 575 Region I 0.0 0__ _ _ .------ 576 Region II 1.0 0 ______ 577 Region IIt 0.0 0 -L I - ---- 578 Region IV 0.0 0 _ ____ 579 ______- _ 580 318395 Threat Assessment 0.7 0 0.1 - - - - -0.6 - - _ - - - -__ - - -- 582 318395A Intergovernmental Coord/Cor. 0.0 0 583------_ ------_- - - - 584 318395B 1CMs 0.5 0__------ 5B5 Decom ISFS - Order Response 0.0 0------_ -- - 586 ReviseAAProgrm 0.0 0------ 587 Transportation 10 RAM 0.0 0 __ __ 588 Transportation CAT eIiad1SNM 0.5 0-- - 0.5 ------ i90 318395C DBT 0.0 0a__ __ 591 Transportation Cat I SNM 0.0 0 ______ i93 3183950 Threat Assessment 0.2 0 0.1 I 0.1 ___ i95 318396 Regulatory Improvement & 2.0 100 ____ 0.2 0 1. 100 ______ 196 ProgramManagement- 0.0 0-- _ __ - __ -- - W9 3l81396AlIntergovernmental 0.0 0 ------I t-__ -00 31B395SBLO RAM Ck~s 0.0 0 - __ __ 04 318396E Fitness for Duty 0.1 0 0.1 -__ DNS FY06 C-3 Ver 11 .xdsFees 118 Julyuy2,20 22, 2004 Office of Nuclear Security and Incident Response Homeland Security and Management Support FY 2005 Resource Allocation A |_B I C |_D I E_| F I G J K |L R S T |U Z AA AB A B I Spent Fuel 2 HOMELAND FY 2005 Power Storage/Reactor Non-Power Fuel Materials Transportation Rare Uranium Exports/ International Agreement St SDMP Generic Generic 3 P"n'SECURITY eCurrent Est Reactor Decomm Reactor Faci s Facilies Earth Facs Recovery Imports K Actvltes Oversight Decom __W __2 5 Planned ?Eiivitles 7 TE SK FE lT! K T! S 7E SKTT__FTEfT!_ SK E! K TET SK FTEI K FE K T T! S 606 318396F Rulemaking 1.3 100 1.31 100 0 607 Transportation of Spent Fuel 0.0 608 Transport Cat I and II SNM 0.8 609 Transportation Action Plan 0.0 610 Transportation LO RAM 0.5 0 _ _ 611 612 318396G Safeguards Policy 0.5 0 0.5 0 - I I I I I I I I I 613 Transporttion Cat I and 11SNM 0.5 0 I I- .1 I I III 614 II I II. 4 1-1 -I 1--t-4-4- -4 U'A 1-4-4-4 4 615 318397 Mitigating Strategies 0.3 200 0.2 100 0.1 100 616 I I I - - 1 - 1 - AA I I A .A I I . i 617 318397B Mitigating Strategies 0.3 200 0.2 100 0.1 100 618 4 1--I.-4-----4 t14 t4t-1tt-i---4--4 4 1-4-4-4 4-1-4 ______519 318398 Security Infrastructure 0.0 0 520 D21 522 Sp -tansS*et to s & 323 kfflagi*o 324 Headquarters 0.9 325 Regions 1.0 326 Region I 02 327 Region 11 0.3 01_6__ _ 1 ______328 Region III 0.2 329 Region IV 0.3 330 318391 Securily Inspection & Oversi 1.9 0 1.8 0 __ - - - -- . __0 _ _ i32 - Headquarters 0.9 0 3331 Regions 1.0 I _ _ I! -I- ! I!- 3341 I _- _ _i_ _ i ___ - * '*~------^ ~------r---r 335 318391A Inspection Program Dev & I 0.7 0 iA 0.4 0 ! 0.3 0 II_ - - 336 Enforcement 0.2 0 _ _0.2 0- - - _ - - - - ______I _ _ I _ _ _ I _ _ _ I * I 337 Enforcement Policy 0.0 0 ______ ;38 Allegations 0.0 0 ______ 339 Baseline Inspection Program Dev 0.0 0 ______ 34 Decomm 0.0 0 ______ 34 Wet ISFSI 0.0 0 ______ 142 Dry ISFSI 0.0 0 ______343 Tech Support for lAT/EventFollowup 0.2 0 0.2 0 _ *__ * I I I I I I I I I I II I i.l., ;. 3;5 DNF03r\1J DNS FY06 C-3 Ver 11 vFees 19 Le July 22, 2004 Office of Nuclear Security and Incident Response Homeland Security and Management Support FY 2005 Resource Allocation I A B I C D I E F FuI | J K I Z AA AS T I " " ' Spent Fuel j I Z I Z1______1 2 .. HOMELANJD I FY 2005 Power Storage/Reactor Non-Power Fuel Materials Transportation Rare Uranium Exports/ International Agreement St SOMP Generic Generic 3 SECURITY. - .. Current Est Reactor Decomm Reactor Facilities Facilities Earth Facs Recovery Imports Activities Oversight Decom LLW 4 _Planned Activities FTE SK fT E|I- T- SK- FTESK| FTE [ SKi FTEFI SR TEIKI FTEJ S F R __ TEI5K FTEJ SK 344 *._ .- 3461 Temporary Instructions Developmen 0.3 0 _ _ _0.3 0 _ __ _ _ Ct0______-0.3____ 347 Dry ISFSI 0.0 ___ 348 Decom & Wet ISFSI 0.0 349 Trans-SNF secuity 0.0 350 Trans LQ RAM 0.3 351 0 ;52 Ti inspection 0.0 0 ______;53 Decom. Wet & Dry ISFSls 0.0 354 HQ 0.0 0 o___0 _ =- =I _ I I I ;55 Regions 0.0 T_ 356 Region I 0.0 357 Region li 0.0 ;55 Region IlI 0.0 ,0 ______=__ _ _--II_ 0o .______i59 Region IV 0.0 e0 = ______i60 ______l l 4 i61 SNF Transport 0.0 i62 HQ 0.0 0 ______l l__ i63 Regions 0.0 0 _ .64 Region I 0.0 2 0 1.2__ 0 _ _ 65 Region II 0.0 _.0_i____| 1 | T 1- - __ 0 __ _.. _ 66 Region IlIl 0.0 0I I __ 67 Region IV 0-o__--. __._._l! - -- L1! 1 0.0 _ _0 _ 68 0______69 318391B Baseline Inspections 1.2 1 _I_ 70 SNF Transport 0.7 71 HQ 0.1 72 Regon__s 0.6 73 Region I 0.1 74 Region II 0.2 2 0 _l 0 . 1 _ 1 1 _ 1* _ _ _ r - 75 Region iII 0.1 * I I 76 Region IV 0.2 77 DNS FY06 C-3 Ver 11.xisFees 20 July 22, 2004 Office of Nuclear Security and Incident Response Homeland Security and Management Support FY 2005 9 Fee Class Resource Allocation A B C D I E F I G H J P Q | R T | U Z AA AB 1 Spent Fuel _ _ _TI 2 HOMELAND - FY 2005 Power Storage/Reactor Non-Power Fuel Materials Transportation Rare Uranium Exports/ International Agreement St SDMP Generic Generic SECURITY Current Est Reactor Decomm Reactor Facilities Facilities Earth Facs Recove Im orts Activities Oversi ht Decorr LLW PlannecActivles FTE SK 4 FT-E s K FTEI S I -FT|FiSKFTE SK_S SKK .FE _F_ SK =___E_ 678 Decom. Wet & Dry ISFSis 0.5 0 0.5 0 679 HO 0.1 0 __ __ 680 Regions OA 0 681 Region I 0.1 0 _ _ 682 Region II 0.1 0 683 Region ill 0.1 0 684 Region IV 0.1 0 6 8 5 ______ 686 Spent Fuel Storage & Transportatlor 0.0 0 _ _ _ 687 Travel 0.0 40 688 Training 0.0 5 _ _ __|| 689 Supervisory Overhead 1.0 0 690 Non-Supervisory Overhead 1.0 0 691 TOTAL SFS&TL&8 Direct & Overhead 11.0 345 | 593... 594 TOTAL DIRECT RESOURCES 136.0 11311 80.5 8924 7.9 100 0.9 0 21.5 537 7.0 633 2.8 200 0.0 0 0.0 0 1.5 0 3A 360 10.5 557 595 FEECLASSTOTALCHECK 136.0 11311_ _ 596 (EXCLUDES HLW) D97 398 HIGH LEVEL WASTE 1.0 15i 399 Safeguards Ucensing 1.0 15| 700 Support NMSS on security Iss 1.0 0° 701 Utigation Support for security 0.0 0 ______ 702 . Travel 0.0b.. 15 ______1 704 . DNS FY06 C-3 Ver 11.xlsFees 21 July 22, 2004 DIVISION OF PREPAREDNESS AND RESPONSE INCIDENT RESPONSE DIRECTORATE FY 2005 Fee Allocation AB IC ID E J H I J IK L M TP0Z AA ~ A NCDNENE ERTS FY 2005 Power Storage/Rea Non-Power Fuel Materials Transportation Rare Earth Uranium Export/ International Agreement St SDMP Generic Generic PANDATiTE : Current Est Reactors Decomm Reactor Facilities Facilities I- Facs Recovery Imports Activities Oversight ______Decomm LLW 'A~FE KFEFTETEI K FTEj SK FTEI 5K FTEI_ $K FTE SK FTEj 5K -- FT-EI K ETE K $KFTEI 5K _FTEJ {K SFTEJS$_~ _K 6 ITER 2:Reactor Inspection- - - - -……………………- - - 7 Direct Resources J27.0 3,035 27.0 3035 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 8 Headquarters 118.0 3,035 ------ 9 Regions J9.0 0~ … 10 Overhead (HO) 17.0 0 ------…- - II Travei (HQ) J0.0 85 ------12 ,Training (HO) 10.0,201 - … 13 TOTAL 34.01 3,140 15 103180 Incident Investigation 10.0 - __ … 16 Incident Investigation (moved to 103182) ------… 18 1 03237 RX Event Response 10.8 33 10.8 33 - - -… 191 Headquarters 8.5. 33 - - -… 20 Regions 2.31 0 - - - - -… 22 HooslHeros (HO) 6.0 33- - - - 24 Regions Event Response (113 from 1031 2.3 0 _ ------…- - - 26 I/ 0.0 ______ 27- II/ 0.5 ------… 30 Event Respnse (HO) 2.5 - - - - -_ … 31 Manualupdle (to103182) ------… 3 TrainingRspne (to 103182) _ …33 - . .-- -1.1 - --- DIVISION OF PREPAREDNESS AND RESPONSE INCIDENT RESPONSE DIRECTORATE FY 2005 Fee Allocation ABIC ID E FIGIH IJ IK T U V DA J Spent Fuel f i ,]CDN~EOSOEAOS.F20 oe trgle o-oe ul Mtras Transportation Rare Earth Uranium Export/ International Agreement St SDMP Generic Geri 3 -. LNNDATIIIS Current Est Reactors Decomm Reactor Facilities Facilities Facs Recovery Imports A&tivlties Oversight ______Decomm LLW ___ _T____K__ FTE_____TE______-s 5KT TEI 5K TEIK FTE1 $K t FTTE 5K_ FTET _$ FT___E -T-T 4 *.TE' FT 5KK $Kz.w I TITE FE K E 5 TE ' KFK' 34 1103182 RX Event Readiness 13.11 2,973 13.11 29731__ 35 Headquarters 8.51 2,973------_____ 36 RegIons 4.31 0__------_- - - - 38 Event Rep. Read(EventRead) 5.620 ------_ 39 Hoos/Heros (HQ) ------_ 40 Response Training (From 103237) _ 41 ______ 42 Regional Event Readiness (113 from 2.31 0 __ 43 I 0.6 _ _ _ _ _ 44 I/ 0.6 _ _ _ _ _ 45 I/I 0.5- - - - -…- -… 46, IV 0.6------…- -… 48 Plans &Procedures(from 103237 M 0.3 20………_ 49 COG (crosses prgmsl/aFY05) 1.0 ------… … 50 COOP,, Region (crosses pgms in FY 2.0- - - - -…- - 52 Incident Investigation 0.1______- - - -…- 54 Pro5.4 Re0ines_(eent-eadiess) 5A…- 55 Exercises; Radiological; HQ 2.11______ 56 Exercises; Radiological; 1/2 FTE per Region_____ - - - - -……- -57 Lessons Learned0.j . I 58. Inter-agency Excercises 2.8 _ _ 60Facility Readiness (event readiness) 2.0 2,953 -- - - _- -- -…___ - - - - - 61 1 Circadian Lighting System 7 __ … l 62 OCIMS 1.5 8141 ------_ -_ 63 OCIMS Telecommunications PBX - I__ - - - - _ … 64 EROS 0.51 1,5501 - 65 DAIS - 2001 1 - DIVISION OF PREPAREDNESS AND RESPONSE INCIDENT RESPONSE DIRECTORATE FY 2005 Fee Allocation A B IC D E FIILIG H I JI K r F ~1 1 T T W T h~ Spent Fuel_____ im i t zzu INIET OPERATOhiS'~ FY 2005 Power Storage/Rea Non-.Power Fuel Materials Transportation Rare Earth Uranium xot International Agreement St SDMP Gerc Gnri LAEACTIS CretEtRats Deom Reactor Faiiis Facilities Facs Recovery Imports Activities Oversight ______Decomm LLW 'TE. :K-vT-EF $r--T'EFIE TK FTEITET$ -- T K---E-$ ______FTE 5KTEE 5KFTEK5K 1FTEE5 FKFTE 651 Satellite Phones j50 671 National Wamning System 3 68 Redirect Service 4 69 RASCAL 210 70 RDD 15 71 GIS 100 72 Protected WEB Server (PM0A funds) _ - 73 SVTS (Moved to INFOSEC;,FY06 maintenance) 75 103185 Coordination 3.1 0 3.1 0 __ 76 Headquarters 0.7 0 _____ 77 Regions 2.4 0 7 8 ______ 79, HQ Coordination 0.7 __- - - -…- - - 81 Regions (broken out to 103237;,182;15 2.4 0 __ 82 Region I.0.6 ------… 83 Region!! 0.6. 84 Region fit 0.6 85 RegionlIV 0.6 ------__…… 86______ 87 103160 General IT 0.0 29 0.0 29 __ 88 ______89 Subtotal-HQ Direct Resources '18.01 3,035 -90 Subtotal-Regional Director Resourcej 9.0 0 ------__ … 92 Travel .5 93 :Training . 201 94 Supervisory Overhead 4.0 95 Non-Supervisory Overhead 3.0, ------… 97 ISubtotal-RX Overhead 7.0 0 99 JTOTAL-RX Resources 34.0 3,140,------DIVISION OF PREPAREDNESS AND RESPONSE INCIDENT RESPONSE DIRECTORATE FY 2005 Fee Allocation A B. IJ SpnFue _ K ~ A B C E ~ H JSKentI~uel 2 INCIDENT RESORSE OPER FY 2005 Power Storage/Rea Non-Power Fuel Materials Transportation Rare Earth Uranium Export/ International Agreement Stj SDMP Generic Generic 3 ~"'P4L"A'N-NE'D AC-T'vi~ Current Est Reactors Decomm Reactor Facilities Facilities Facs Recovery Imot Aivte Oergh ______DcmLW 4 TE S T -IskFTEI sK FTEI sK FTEJ $KI FTEI $K 5TK FTE $K FTEI $KI iFTET$ _FTEI _K FTEIT TI KFE 5 TI 102 TIR2NulaMaelsR2 :UsrUc eIrnspspt!~~IlIIt r aer& FIf I i 103 Direct Resources . 2.0 0 0.0 0 0.0 0 0.0 0 1.0 0 1.0 0 0.0 0 0. . . 0 0.'1 ol 0. 0 0.0 0 0.0 0 0.0 0 104 Headquarters* 0.0 0 - -………… _ -_ 105 -RegIons ,2.0 0 .... _ __- 106, Overhead 107 Travel. 0.0 20 ------. ----- _ 108 Training___ 109.. TOTAL* 12.0 20 _ 110 Ill 206237 Materials Event Response 0.0 0 1121 Headquarters 0.0 0 113. Regions.. 0.0 0------………- 114 115 Emergency Response(frm RX Event RsnsiO3237)__ 116 117 208182 Eventileadiness 1.6 0 ~ ~~ 0.8 0 0. r.. _ _ __ _ - -…… 118 . Headquarters 0.0 0 ~ ~ ~ ~ _ - -- -- _ 1191 RegIons .. 1.6 0 _ ____ 1201 121 Emergenc Excercises 122 *Response Training 123 124 Regions (event readiness) -1.6 125 Region I 0.4 126. Region lI 0.4 ------__…- 1271 Region Ill 0 1281 Region IV 0.4 11 ………… 1291 1301208185 Coordination 0.4 0 - -0.2 0 0.2 0 __ 1311 Headquarters 0.0 0_ 1321 RegIons .0.4 0- -……- …- 133 ______134 HO Coordination 135 136 Regional Coordination 0A4 137 RegionlI 0.1 ------ 138 Region Ii 0.1- - __ 11391 Region Ill 0.1 ------…… … 11401 Region IV 0.1~ I I - I I I ………… I ---- ……-I Ir3f% r!Wn& 11 n C__ Al- A I.- 'In "InnA DIVISION OF PREPAREDNESS AND RESPONSE INCIDENT RESPONSE DIRECTORATE FY 2005 Fee Allocation A B I C I D E F G H |I J I K V I W X Y |Z A 4, '. .',T.V. --.- ) l'< ' ., _l Spent Fuel L O P s l INCIDENT RESONSE OPERATO FY 2005 Power StoragelRea Non.Power Fuel Materials Transportation Rare Earth Uranium Export/ International Agreement St SDMP Generic Generic PLANNEDACTIITIES ;< Current Est Reactors Decomm Reactor Facilities Facillties _ Facs Recovery Imports Activities Oversight Decomm LLW 4- FTE 5K !; FTEIEFTEI . K-SK FTE 5K FTEI 5K FTE 5K FTEI 5K FTEI S K FT $ FTEI SK FTE| S K FTE STK FTE SEK FTE| FTK 141_ 142 Subtotal-Materials Direct 2.0 0 ------ 144 Travel (HQ only) 20 - - - - - 146 Supervisory Overhead 147 Non-Supervisory Overhead . - - - - - … … … … … … … … … - 148 149 Subtotal- Materials Overhead 0.0 0 - - - - … … … … … … I … … … … … … … … … … … … … -I- 150 TOTAL -Materials 2.0 20 - - -_ - - 15 1 0 1 0 _ _o o _ o o _ _o _o _° _o o _ oo _ 152 TOTAL -DIRO RESOURCES BY FE 29.01 30351 27.01 3035 0.0 0 0.0 01 1.0 0 t 0 0.01 0, 0.01 0 0.0I 0 000 0 0.0LU 0.0 (- 0 0.0 0 tA '. n 'nfAA Division of Preparedness and Response Emergency Preparedness Directorate FY 2005 Resource Allocation A i C D I E F I G J I K |V W |X Y | A AB . _ .= _ __ SpentFuel _ _ -'EMERGENCY PREPAREDNESS' FY 2005 Power StoragelReactor Non-Power Fuel Materials Transportation Rare Uranium Exportsl Intemational Agreement St SDMP Generic Generic _,e .- t PLANNED ACTIVITIES:;-' '! Current Est Reactor Decomm Reactor Facilites Facilities Earth Facs Recovery Imports Activities Oversight Decom LLW _-' -. ; i !-.K FTE -''FTE 5K FTE SiK FTE| SK FTE SKF FTE| SK FTE S5K FTE| SK TEI SK FiE SFTEI SKF E| SK TIER 1: REACTOR PROGRAM/Nuclear Reactor Safety __I [ T l I I I I I I I IT T T _T I l l TIER 2: Reactor Licensing______I ______Direct Resources 14.0 0 13.8 0 0.2 0 = _ T1 1 ______1 Overhead 5.0 0 = = = Travel 0.0 80 _ _1__ _11__ __ Training TOTAL 19.00.0 9111 __ _ _1 = _ _ _1_ =_ __ = = = - | | ______ PA: Emergency Preparedness Licensing 14.0 0 13.8 0 0.2 0 Sub-PA: Licensing Actions 2.0 2 ______1 Sub-PA: Future Licensing 2.0 1 2 r _ _ _ _ 1 1 I Sub-PA: Reg & Technical Issue Developmen 8.5 8.4 0.1°.1 _ | Standards Commitees & Federal Interfaces 2.0 2 ______| _ Reg Policy & Federal Interfaces 2.! 2.5 .4- - t--I-4--t---4-+-i t-t t-fr-+-*-4-I-+-I-+-+- - -I----4-4-4 4 + Process Improvement Development 1.1 0.9 0.1 _ Vendor/Own Gp Act & Tech Issue Resolution 3.0 3 _ Sub-PA: Reg & Technical Issue Implementa 1.5 1.4 | _ | 0.1| _ Rulemaking 1.o 0.9 | 0.1-|__ Generic Comm & Event Evaluation 0.5 0.5 _ ____- I PA: Overhead 5.0 01 I____ I Supervisory 3.0 ______TII Non-supervisory 2.0 ______ IPA: Travel 80 ______P-A---ii- _---- . z.- I I I It -I I I ' z EPD FY06 C-3.xisFees 1 July 12, 2004 Division of Preparedness and Response Emergency Preparedness Directorate FY 2005 Resource Allocation A D I E F I G H J K L |M IN | _I P Q R T U V W X Y Z | ISI AB ______z T.*, .. .,z • ...... ;' -. < , - D Spent Fuel 2 /'r t.EMERGENCY PREPAREDNESS.. .FY 2005 Power Storage/Reactor Non-Power Fuel Materials Transportation Rare Uranium Exports/ InternatIonal Agreement St SDMP Generic Generic 3 '. ,: ,-rPLANNED ACTIVITIES -'Z' Current Est Reactor Decomm Reactor Facilities Facilties Earth Facs Recovery Imports Activities Oversight Decom LLW T i FTEI $K FTE| SK FTE| SK FTE|SK FTE $KFTE| SK F El SK FTES K FTE| $K ____ $K FTE| SK FTEI SK 37 38 TIER 2: Reactor Licensing - . / _ i i i 39 HOMELAND SECURITY SUPPORT I II__ ILL// I- A IJ I_77 40 Direct Resources 41. 9001__ 4 - ______41 I 42 PA: HLS Threat Assessment 1.7 0 44 PA: HLS Regulatory Improvements 0.6 0 ______ 46 PA: HLS Mitigating Strategies 1.7 900go 47. 50 TIER 2: Reactor Inspection I T 51 Direct Resources I4.014550 _IIII I I I I 1 52 53 PA Emergency Preparedness inspection 4.0 550 4 I I__ I__ I______56 Reactor Oversight Proces Management 4.0 550 _ 1 - - - _ I 57 58 TOTAL EPD RESOURCES 27.0 1541 - 59 Direct 22.0 14501 60 Overhead - 5.0 0 61 Travel 0.0 80 62 Training 0.0 11 EPD FY06 C-3.xlsFees 2 July 12, 2004 t - , - . . - ______- I I I I I Aornt St IUnlic ComOlex Power Rx ISpt Fuex dec INon PrRx IFuel Fac I materials Transp Rare Earth Uran RecI Im~p/Exp IInternatni IOversi ht Sites' Nnr e e eei L oa oa AD TOTAL 5K FTE $K FTE SK FTE 5K PIE SK PTE 5K FTE 5K FTE 5K PIE 5K FTE $K PTE 5K PI E 5K PI E I K PIE 5K PIE 5K PIE 5K - TE FY 2005 C-3s (HO &RGN)- -- _ ------ Reactor__j__ __ _ Reactor Licensing _ tjI……- … - - - .__ _ _ Planned Accomplishments: ------_ Pre-Application Reviews 01 1.01 0 0.0 0 0.0 __ 01 0.0 0 0.0 __ 01 0.01 01 0.0± =0 0.01 01 0.01 0 0.0 _ 0 _0.0 _ 0 0.0 0 0.0 0 0.0 0 1.0 0 1.0 Intl Nuclear Stty &Safeguards 01 .1 0 OjO0 0.0 __ 01 0.01 0 0.01 01 0.01 01 0.01 .. 01 0.01 .... 01 0.01 .... 0 1.01 0 0.0 Ol.... 0.01 O 0.0 - - - ____ 1.0 0 1.0 Total Direct 0 1.01 0 0 _____ 0.0 __ 0 0.0 0 0.0 __01 0.01 01 0.0 01 0.0 __01 0.0 01 1.0 _ 01_ 0.0 __ 0 0.01 0 0.0 _ 01 0.0 __ 2.0 0 2.0 Materials _q II Fuel ------_ Facil Lic &Ins .4.. I_ _4 PlannedAccomplishmwnts: Fusl Facilities Licensing . _0.0 -.. 0 0.0 .0O-! 0 0.0 855 16.5 0 0 0.01 0 0.6 a~ 0.0, 0 0.0 0, 0.0 0 0.01 0 0.0 0 0.0 ______0 .55 17.1 83551 17.1 t-Lual r~acities Inspection_ 0 0.0, 0~ 0.0' 0 0.0 0~ 15.7: 0' 0.0: ' o!o 000 0.00 000! 0 0.0 0.00 __ 0.0 01 0.0 0.0 0! 0 _ 15.70 1? Fuel Facs Envir Reviews 0. 00 0 0.0 1269 4.0 0 0.0 0 0.0 0~ 0.01 279 0.01 0 0.0 01 0.0 __0 0.0 01 0.0 0 0.0 01 0.0 1548 4.0 1548 4.0 Uranium Recovery Uc 35 0. 0 0.0 0 0.0 0 0. 0 9L0 0.0 _ 0 0.0 100 4.7 0 0.0 0 0.0 _ 0 0.7 01 0.0 _ 0 0.0 0 .0 135 5.7 135 5.7 Uranium Recovery Inspec0. 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 _ 0 0.0 0 1.5 0 0.0 0 0.0 _ 0 0.0 01 0.0 _ 0 0.0 0 0 1.5 __ 0 1.5 Enrichment Lic &Cert g0 IIZZ 0 0.0 0 0.0 315 15.3 0 Jjjj0 0.0__ 0 0.0 0 0.0 0 0.0 0 0.0 _ 0 0.0 01 0.0 0 0.0 0 315 15.3 315 15.3 Enrichment Inspection _____ 0 0 0.0 0 0.0 0 6.1 0 0.0 _ 0 0.0 _ 0 0.0 0 0.0 0 0.01 0 0.0 _ 0 0.0 0 0.0 _ 0 0.0 01 0.0 0 6.1 ___0 6.1 MOX Fuel Fab Lc 0 0.0 0 0.0 01 0.0 300, 8.7, 0 0.0 0 0.0 _ 0 0.0 0 0.0 0 0.0 0 0.0 __0 0.0 0 0.0 __0 0.0 0 0.01 300 8.7 300 8.7 MOX Fuel Fab Insp 0 0.0 0 0.0 0 .0 0 2.9 0 0.0 0 0.0 _ 0 0.0 0 0.0 0 0.0 0 0.0 __ 0 0.0 0 0.0 _ 01 0.0 0 0.0 0 2.9 O__ 2.9 HLS Safeguards Lcensing __ 0 0.0 0 0.0 0 . .0 0 0.0 __ . _ 0.0 01 0.0 0 0.00 0.0 0 0.0 0 0.0 0 0.0 0 00 0 1.0 ___0 1.0 General lT 0 0.0 0 0.0 0 0.0 50 0 0.0j 0 0.0 _ 0 0.0 0 .0 0 0 .0 0 00 0 0.0 0 0.0 0 0.0 0 0. 0 0.0 50 0.0 Intern 0 0....9...... 0 0.0 00. 0j9 0 00. 0 0 0.0 0 0.0 0 0. 0 0.0 0 00 0 0.0 0 0.0 _0 0.0 0 00 0 1.0 __0 1.0 External Training 1 0.0 0 0.0 0 . 8 .0 l 0 0.0 0 0.0 2 0.0 16 0. 0.0 0 00 2 0.0 0 0.0 0 0.0 __0 00 29 0.0 130 0.0 Total Direct 36 _01 0 0 _ 0 029771 711 0 _0 __0 _0 _21 1 3951_ 61_ 0 __01_ 0 _01 21_ 1 _0 _0 0 0 _0 __ 034121 79.0 33331 79.0 M~aterials UsersL!c&AInso -I . … Planned Accomplishments.:- HLS Regulatory Improvements 0 _ 0 25 1 0 __0 25 1 25 _ 1 25 1 0 0 0 __ 0 _ 0 _ 0 0 __0 0 _ 0 __0 __0 0 0 __0 _ 0 100 3.4 100 3.4 Materials Licensing 1 0.0 ___9 0.2 ___0 0.0 15 0.3 15 28.9 _ 3 0.1 I_ 0.0 1I_ 0.0 __0 __0.0 I_ 0.0 2 __0.0 1 2.0 _ 1 0.0 __1 0.0 so 31.7 50 31.7 H-LSInto Tech-Control Source ___0 0.0 01 0.0 __01 0.0 _ 01 0.0 1630 3.51__ 0 0.0f 0 0.01 0 __0.0 __0 _ 0.0 __0 0.0 0 _0.0 ___ 0.0 __0 0.0 __0 0.0 1630 3.5 1630 3.5 Materials Users Envir Reviews 0 0.8 0 0.1 ___0 0.0 _ 0 0.1 0 0.1 0 0.0 0 0.0 0 __0.0 __0 0.01 0 0.0 0 _ 0.0 __0 0.0 0 0.0 a_ 0.01 0 1.01 0 1.0 Materials Inspection 3 0.1 3 0.1 0 0.0 3 0.1 719 22.0 3 0.1 0 0.0 0 0.0 0 0.01 0 0.0 0 0.0 0 0.0 0 0.0 0 0.01 731 22.21 731 22.2 Materials Rulernaking 81 1.7 90 3.2 0 0.0 105 1.9 170 5.5 44 2.5 9 0.3 6 0.0 __0 -0.0 3 0.3 3 -0.0 __5 0.01 48 0.4 __5 0.01 570 16.0 570 16.0 Event Evaluation 0 0.0 25 0.0 __ 0 0.0 69 1.1 475 5.1 56 0.5 0 0.0 0 __0.0 __0 __0.0 0 0.0 0 __0.0 __0 0.0 0 0.0 __0 0.0 625 6.7 625 6.7 Incident Response 0 0.0 __0 0.0 0 0.0 __0 0.3 5 2.9 _ 0 0.0 __0 0.0 0 _0.0 __0 __0.0 0 0.0 15 _3.1 100 0.8 __0 0.0 __0 0.0 120 7.0 120 -7.0 Allegations 0 0.01 0 0.9 __ 0 0.0 _ 0 4.1 0 7.3 _01 0.5 01 0.0 0 _0.0 __0 _0.0 __0 0.0 0 _0.0 __0 0.0 __0 0.0 __0 0.0 0 12.8 __0 12.8 Agreement States 0 0.0 ___0 0.0 0 0.0 __ 0 0.0 0 1.4 _ 0 0.0 0 0.0 01_ 0.2 _ 0 __0.0 _ 0 0.0 0 __5.2 _ 0 0.1 _ 0 0.1 0 0.2 0 7.2 ___0 7.2 IT-Materials 0 0.0 0 0.0 __ 0 0.0 _ 0 0.0 23 0.5 _ 0 0.0 0 0.00_ 1 . __0_ .0 0.0 0 _ 0.0 _ 0 0.0 0 0.0 _ 0 0.0 2434 0.5 2434 0.5 General IT 6 0.0 71 0.0 0 0.0 93 0.0 57 00 0.02 6 0.0 9 _ 0.0 __0 _ 0.01__ 5 0.05_ . _ 7 0.0 121 0.0 _ 8 0.0 305 0.0 305 0.0 Itmrann& vlp0 0.0 0 0.0 0 0.0 0 0.0 0 1.0 0 0.0 00. 0 _.0 _ 0.00_ 0 0.0 0 _ 0.0 _ 0 0.0 01 0.0 __0 0.0 0 . __0 . External Training 5 0.0 9 0.0 0 0.0 15 0.0 144 0. 0.0 0 0.0 0 0.0 0 0.01 0 0.0 15 0.0 __5 0.0 11 0.0 __0 0.01 2041 0.01 101 0.0 7 Total Direct 951 2.6 231 54 . 325187 56J5 79.04 5 161 0.31 165 03 0.0- 0.31 411 8.3 119 2.9 62 06 14 0.3166 113.01 66661 113.0 G:UPMDA\PAT1FY 20068Budget\FYOS 9-Class\NMSS 9-cass HQRegion\NMSS-xls 07/16/2004 3 Agrmt St Unlic Complex Power Rx Spt Fuel/Rx dec Non Pwr Rx Fuel Fac Materials Transp Rare Earth Uran Rec Ip/Exp Internatni Oversight Sites Non rx gen dec Generic LLW ITotal Total ICARDS TOTAL $K FTE 5K FTE 5K FTE 5K FTE 5K FTE 5K FTE 5K IFTE 5K IFTE 5K FTE 5K FTE 5K FTE $K FTE 5K FiT SK FTE 5K FTE 5K FTE W aste ______ Planned Accomnplishments:------…- -- _ _ ___ LLW rag &oversight __ o T.0 0 ~0 __ 0 0.0__ 0 0.0 0 0.0 _ 0 0.0 _ 0 0.0 _ 0 0.0 0 0.0 0 0.5 _ 0 0.0 0 0.0 0 0.0 10 3.7 101 4.2 10 4.2 Rx decornPM &Lic __0 0.0 B00 8.6 ___0 0.0 _ 0 0.0 0 0.0 _ 0 0.0 _ 0 0.0 _ 0 0.0 0 __0.0 0 0.0 _ 0 0.0 _ 01 0.0 _ 01 0.0 01 0.0 800 8.61 8001 8.6 Rx decom insp __0 0.0 0 5.0 _ 00.0 _ 00.0 0 0.0 __0 0.0 _01 0.0 _01 0.0 0 _0.0 0 0.0 _ 0 0.0 _01 0.0 _01 0.0 0 0.0 0 5.0 _ 0 5.0 Mzis &Fuel decom lic 0 0.0 0 0.0 ___0 0.0 89 2.3 362 6.01__ 01 0.0 101 2.1 _ 0 0.0 0 0.0 0 0.6 0 0.0 2631 4.3 2601 6.6 0 0.0 1075 21.9 1075 21.9 MtIs &Fuel decorninsp I_ 0 0.01 0 0.0 __ 0 0.01_ 0 0.91 0 0.91__ 0 0.0 __0 0.4 _ 0 0.0 0 __0.0 0 0.01_ 0 0.0 __0 0.0 __0 0.ol 0 0.0 0 2.2 _ 0 2.21 Decomm &LLW Envir Revs I_ 0 0.01 0. 0.0 __ 0. 0.01 50 0.5 24 0.4 _ 0 0.0 250 1.0 _ 0 0.0. 0 __0.0 0. 0.01 O_ 0.0 _ 0 0.0 400 1.22 0 0.0 724 31 74 3.1 ITSto1inii~ds __0 00 0 00__ . _0 _ 00__0 00__00 00_0.0 0 0.0O_ 0 0.01 0 0.0 __ 0.01_ 0 0.0 _0 0 0.000 0 0.0 0 0.0 _ General Into. Tech I 0! 0.01 601 0.01 01 0.01 20. 0.0, 20 0.0 0 0.0 0. 0.0. 0 0.01 0 __0.0 01 0.01 0, 0.0 20 0.0 _ 0 0.0' 0 0.0 120 00 10 0.0 Interns _raining ______oi o.oi O__ O. O 01 0 0.0I ot 0.o o1 0.0 0 0.0' o0 0.0 _ 0 o.ot 0 0V.o1 00 O, 0.01 0 0.0 __ 0 1.0 0 1.01 ___0 1.0 External Training - 1 0.1 2 -. 0 O -. 0 - 0.01 O.O]1 _ 7 0.0 0 _ __ 0 0.1 21ON0 0 10.0 91 0.01 1 6 0.01 10 0.0 97__0 7 __0 Total Direct ___0 0.01 889 13.6 __ 0 0.0 1671 3.7 4211 7.3 ___0 0.0 358 3.5 ___0 0.0 ___0 __0.0 2 1.1 _ 0 0.0 292 4.3 676 7.8 201 4.7 28261 46.0 2805 46.0 Svent Fuel Stor &Transo------_ __ Planned Accomplishments: _____ Licensing &Cert ___2 0.0 2146 24.4 __ 0 0.0 31 0.0 19 0.0 151 10.2 2 0.0 _ 3 0.0 _ 0 0.0 107 1.0 _ 2 0.0 _ 2 0.0 _ 4 0.0 3 0.0 2470 35.6 2470 35.6 Inspect, OA Revs, Event Resp ___0 0.0 50l 9.7 ___ 0 0.0 __ 0. 0.01 0 0.0 ___0 1.8- 0 0.0 __01 0.0 __ 01 0.0 01 0.0 __ 01 0.0 __ 0 0.0 _ 01 0.0 _ 0 0.0 50 11.4 50 11.4 Spnt Fuel Envir Reviews ___0 0.0 38 0.01 0O__ 0.0 ____ 0 0.0 0- 0.0 ___0 0.0 0.0__ 0 0.0 ___0 0.0 0 0.0 _ 0 0.0 _ 0 0.0 0 0.0 _ 0 0.0 38 0.0 38 0.0 General 0I0.0 75 0.01 __ 00.0_ 01 0.0 01 0.01 50 0.0 0 . _0 0.0 __0 0.0 01 0.0 _0 0.0 _0 0.0 _0 0.0 0 0.0 125 -0.0 125 0.,0 lntem Training &Devlop O__0 . 0.5 __ 0 0.0 __ 01 0.0 01 0.0 __ 0 0.5 fi90__0 0.0 __ 0 0.0 0 0.0 _ 0 0.0 __ 0 0.0 _ 0 0.0 _ 0 0.0 0 1.0 __0i 1.0 External Training 0 .0 73 0.01 0 0.01 01 0.0 01 0.01 26100 0.00 0 0.01 0 0.0 21 0.0 0 0. 0 0. 0.01 0 0.0 101 00 9 . Total Direct 21 0.01 2381 34.61 01 0.01 311 0.01 19 0.01 2271 12.51 21 0.01 31 0.01 01 0.01 1091 1.01 21 0.01 21 0.0 41 0.01 31 0.0 27841 48.01 27741 48.0 IGRAND TOTAL 1331 3.9130 53.51 01 0.01 34991 83.61 6115 86.31 3931 17.01 3781 4.41 4141 6.51 01 0.01 1211 3.41 441 9.01 4131 7.21 7421 8.41 371 5.01 157911 288.01 15578f =288.0. GA\PMDA\PAT\FY 2006 BudgeI\FY05 9-Class\NMSS 9-cLass HQ._Reglon\NMSS-xls 07/16/20044 4 DIVISION OF FUEL CYCLE SAFETY AND SAFEGUARDS- I I SURCIIA ______I_ _-. - - I _ _ Non-Reactor Spent Fuel Other Unlicensed Genetic Storagaf Non-Power Materials Transports. Rre. EarthI Uranlurm tmpor_/tn*_t&I JAgm8et~a Complex DecommAssion- Generic r~vnC CQ~ b-., 0-... -.- I 8ACliVITY OR SUB-AC TIViTY iTESC. 5K FTE SK FTE SK FTE SK FIE 5K FTE SIK FTE SK FTE 5K FTE SK _FTE SK TEl~ SK FTCEJ SK Fr_ SKI FTE SK FTE $K FTE 9 FUEL FACILITIESULCENSING 8u5 17.1 0 0.0 0 0.0 0 01 85 16.5 0 0I 0 01 0 0.61 0 a 0 0 0 01 G 0 01 a 01 0 0 10 Headquarter Subtotal 855 16.5 0 0.0 0 0.0 0 0.0 855 15.9 0 0.0 0 0.0 0 0.6 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 1 1 Regions Sublotal 01 0.61 0 0.0 0 0.0 0 0.0 0 06 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 *UECCECNNGAEOK855 -161 -- 0,0-6.0.00--- -0 855 155 0-.O 07 7-07.0 70.0 7-- 0.0__ 0. 7 0 0. 0 0 15 Rgon .jgca 05.6 0.0 0.0 0.0 0.0 0.0 0.0 2. 1.4-0.06.0 0.0 0.0- 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9-. 0.0 0.0 0. 00 . 16_ _ _ _- - - . -.- - - - .. .Q -9 - - __. - . 18 Readuate ubol85.0 1.1 0. 00 0. 00 0.0 14.1 . G00-:0 0.0 0.0 0.0 0. 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 _0. 00 00 1.9 RegionsrtSubtotal 05.0 04.61 . 0.0 0.0 0.0 0.0 0.0 0.0 14.0.0.M.0 0.0 0.0 0.0 0.0 0 0.0.0 0.0 0.0 Go 0.0 00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 21 Amendments 17___25.0 205 17 __ 22 Reviews 1. -0.00 120______Renewals 1.61 200.00 I 1. ongoing Remedlatlon 20 ------I-- . Project Management 0.2 0.000.0.00 I 2-40 1 ------.-- 2.4 2-i Major Amendments I L...I __ 0.0 i2-1. ISA Reviews_____ 45 5.01 450.00 1 S. -l -- I-..I i - -- I -- ~28 0.6 0. 0.00 0.60 - Amendments- 34 * Renewals A __..Project Management-- ...... I11 .Jit....,l. knt,1.IU . lIl n . - --.- - -.. -- -.------L- 38 I Amendments 39 Reviews ______I__ I 0.11 III-Ii I- 41- Project Management - 0.41 .__ I- - I-- I-I- -- it- 42I -1- . - . - I -___ XA-v _l lp _ ot _e f _ u _ n t I s-n_ (_ D _ _ _ I-_ I n1rv --- , [-- I- [ ------1--- J-.--L ------J- -f ---. ] - L--- I--- I-- S& MCE7 CI 0.0 0.00 0.00 5~2BUSINESS PROCESS IMPROVEJAENTSIFTAM (NO) 0.00 54 TECHNICAL SUPPORT FOR LICENSING (HO) 58 .J 1 J A A L .-.--- 1 A A. .. A. G1.PM0DA\PAT'%FY2006 Budget\FYOSO9-Class\NMSS 9-class HCLRegion\NMSS-xis 07/16/2004 FC-SSFS.1Atcmn - I Attachment I ______------______I ______I SURCHARGE CATEGORIESI -- 1 ~ 1 T 7 r Non-Reactor Spent Fuel Other Unlicensed GenerIc Storage/ Non-Power Materials Transporta. Rare Earth Uranium ImpoWt mnerattoosiAgreement Steat Complex Decommission. Generic FY05 EST I Power Reactor Reactor Deconmm Reactor Fuel Facilities tine.. Ho.n Fe-llit.. A,-Ik.,f1.. I l.,.,.tnht Rit.. I.. I I U ------. . I I . . I --- I - - -- -... I ... , I -- .. ACTIVITY OR SUB-ACTIViTY DESC. SK FTE 1 I " FEI5KI FTEFEI1 5KI SKI If FTEjI I FTE]I FTEI SKK FTE] K IF5K 1 I 5K I FE I1 I FTEK IFEIS 0.0K 0.0T FUEL FACILITIES INSPECTION 0 15. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 Headquarler Subtotld 0 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.0 Regions Subtotal 0 13.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 _ 13.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.0 f EL -CYC LE I1NSP ECTI0 N PRO-GRA M- ' 1 0 1 _ 00_ 1 ___---1O0 - -.- l-Y-l -~ - 1 . -. 1 - .0 00- 00.00.0 _-- -_ -_.0 _ 00U__--__ 0 . .. -- 0 0 0 0 00 0.0 0.0 5010.-- - 0.0 -1 -_ -.------1 1 6E31 Hiadqusner Subtotal . --- k W.Z 0.0 ul.0 U~.L Jul0. q.( 0.00.01 .01P7.31A 0.01 P01.0 0.01 0.0 - - 0.0 .0.0 0.01 0.-901 0.0- .1 0..0 00 00 00 0. 0C 1;k21 0.0 0.0 0.X 0.OJ O.( 0.01 0.0 13.2 0.01 0.01 0.-01 06.0 '0.0~I 0.0kI 0.0 0.0.I 0.01 0.010 0.0100] - 0 0 0 o 1 .. 01.4 1 0.0J..o .oj 0.01 o.c 651 6i- Inspections ______I.. .. .I . 9 Headquarters I 0.1 . 1 ~ W Regions Subtotal - ____1 1 . 11 1 I __I_ -1I-1-I.....t--1 1 4 60 I . Flio nI _ . - - 0.0 ____- ~4I 701 ___RegionUII_ 9. -- l-1-0-01-1-1 I 1-1-1 I I 2--5-- -[-I -I- I I- L------a IRESIDENT INSPECTION PROGRAM 74 I REM~ON [it _q qM ------I -,- i i i i - - 1- 1 . i -- 0. 0.50 0 0 Rearo el1I - Regior Recion IV 3. -- r -. I.1 JILLWI L FUEL. FACILITIES ENVIRONMENTAL REVWS (DWM) 0 I. I I'm 4.6 C 0.0 a 0.A 01 0.0 1,269 4.0 a a 0.0 0 0.0~ 0.6 0. a 0.6 C 0.6 0 0. Headquarte~rSubtotal 1A48 4.C C 0 0.6 01 0.01 1,269 4.0 0 O0.0 0 0.01 0 0.000 0.01 0 0.01 0 0.( 0. a 0.6 C 0.0 A 0.6 0 0.6 Regions Subtotal C 0.6 C a 0.6 01 COo 0 0.0 a a 0.0 0 0.6 0 0.01 0. a C 0i1 0 G.6 -4-4-4-1-4-4- &- A - .1. - A - I - I ...... 1 I - I ...... L ...... J. A - A - .1...... L 91FE ACLTE ENVIRONMENTAL IUPACI I and EAs * H~s (DWM) __ 931-Headquarters -I.5Q 9-i Fuel Facility EIS 6 EM 1.269 4.0 -n FMI~ F A. n r ]2790. ~0.0 Wi Regionsl ______1 0 1 0 0 1I 98>:- Regron 1 ______L Il IoitzI=1 99 1k go I 0.X io . Reio I -1-1-1 1021 -I- 103 1 1 1 1 1 1 1 1 1 1 1 1 Gi\PMDA\PAT\FY 2006 Budgel\EYO5 9-CLass\NMSS 9-cass HO-Region\NMSS.xd3 07/16r2004 FCSSCS2AicetI -2 Attachment I NU(LIMA ALIAT~fIFAlI -AFFTV AunlQA;Fr5A~nc FY 05 9-Class Spread______LivosVIIO Or FUEL L. I..Lc. *ArrI V ANiU bAI~I.%sAI1Ub I . T Non-Reactor Spent Fuel Other Unlicensed Generic Storage/ Non-Power Materials Transportis. Rare Earth Uranium import) International Agreement State Complex Decommission- Generic ______FY05 EST Power Reactor Rleactor 'Decomm' Reactor Fuel FacIlities Users ____ion Facilities Recovey Export Activities Overslght Sites Ing LLW ACTIVITY OR SUB-ACTIVITY DEESC $K FTE, 5K FTE, .4K IFrE 5K FTE 5K FTE 5K FTE $K ITE 5K FTE SK p5., SK PTE 5K FTE $K FTE SK STE 5K FTE $K IFTE 105 URANIUM RECOVERY LICENSING 135 35.0 0.0 0.0 00 0.0 C 0.0 0.0 0.0 0.0 0.0 0.0 A 00 00 C IA100C . . . . . 16 Headquarter Subtotal 135 5.7 a5s 0 0 0 0 0 0 0 a 0 0 0 1,00 4.7 0 0 0 0 0 0.7 0 0 0 0 0 a 17 Regions Subtotal 0 0.0 0 0.0 0 0.00 0 0.0 0 0.0 0 0.0 0 0.01 0 0.0 0 0.0 0 0.0 0 0.01 0 0.0 0 0.0 0 0.0 0 0.0 10o9URANIUM RECOVERY UICENSING ___ 0 I______4__ 1.40 110 -NEW.VFACILITIES 0 0.0 .-.. 112 -REEW0S__4_ 114 RECLAM4ATION REVIEWS ___ 0___7 _ 100.0 0.70 ______115 -RECLAMATION PLANS ______116 -- CONSTRUCTION COMPLETIONS 02 118 GROUNDWATER REVIEWS (includes ACL&s ______ 120 PUBUIC PARTICIPATION ______121 -HEARINGS/2.206ALLEGATIONS 0__2__0____ 20_ 122 -WORKSHOPSIPUBUIC MEETINGS __0_2 __0____20 123 -AGREEMENT STATE SUPPORT - - - 7 - . -- -0.70 125 URANIUM RCVER GUD EDEVELOPMENT - 0 0.0 'B - ____ 127 DAM SAFETY PROGRAM ___ 129 U2TRCAUCENSING ATITLE 1.1140 E J I____ -LONG-TERM UICENSING I_ 0. Title I Sites (sunset In I 1. 137 138i URANIUM RECOVERY INSPECTION C 1.5 0.0 0.0 I 0.0 0.0 I 0.0 0.0 0.0 0 .A I OA0 0.0 I 0.0 0.0 0.0 0.0 0.0 0.0 000.0 I 0.00 0.0 0.0 13_9 Headquarter Subtotal G 0.4 0 0.01 0 0.01 C 0.0 01 0.01 01 0.01 0 0.0 0.01 C 01 0.41 C 0.0 a 0.0 C 0.0 CI 0.01 C 0.0 0~ 0.0 1405 RegIons Subtotal C 1.1 a 0.01 0 0.01 C 0.0 01 0.01 01 0.01 0 01.0 0,01 '1.11 0,0 0.0 a 0.0 C 0.0 CI 0.01 0 0.0 0I "00 141 1.10 0.00 I -- r.- 0.20 I1 0.00 -A- GIPMDAPATiF-Y 2006BOudgerFYOS 9-C~ss\NMSS 9-class HO-.Region\NMSSaxds 07/16/2004 FCSSFS -3Atcmn3 Attachment I NUCLEAR MATERIAL SAFETY AND SAFEGUARDS FY 05 9-Class Spread DIVISION OF FUEL CYCLE SAFETY AND SAFEGUARDS m______-___ _II___ | , - - - IIIIII__- - - T- ; - I | e . ;___,___e Ir i i I I I I.1 I - l --- - l ------l l --- - Non-Reactor Spent Fuel Other Unlicensed Generic Storage/ Non-Power Materials Transport. I Rare Earth I Uranium import/ International IAgreement State Complex Decommission- Generic ______FY0 EST IjPower Reactor IReactor Decomm Reactor IFuel Facilities Users I____ion Facilities Recovery I EX )oil Act OtiS I Oversight I _____In LLW_ ACTIVITY OR SUB3-ACTIVITY DESC. $K FTE SIK FTE $KSIEC FTE I S FTEKII SK FrEPIES 5EK F K FTE SIK FTE IFTSK FTE $K I FT E K TSK r 150 ENRICHMENT UCENSING AND CERTIFICATION 315 15.3 0 0.0 0 0.0 0 0.0 315.0 15.3 0 ...... 151 HeadquadrtrSublot~aI 315 15.31 0 01.01 0 0.01 0 0.01 315.01 15.31 0 0.01 0 0.01 0 0.30 0 0.0 0 0.0 0 0i.01 0 0.0 0 0.3 0 0.0 0 0.0 12 Ragbzns SubtoWa .0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.3 0 0.0 0) 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 153 _ _ _ _ 154 URANIUM ENRICHM~iENT UICENSING AND CERTIFICATION 315 15.3 ______15 edquartc~rSubtotal 315 15.3 -- - . .~.~ 155 :RjQicns SuI)total 0.0 157 ______158 GDP Certification (HO) 0 1.71.0___ 159 Advanced Enrichment Technology (HO0) 315 13.6 315 60______0___13___ 160 -USEC-Full Scale (American Centrifuge Fac.) 250 8.1 __ 161I USEC-Lead Casacade 0 0.8 16 .- LES-Gas CentrIfuge Uranium EnrIchment Fac. 65 -- 4.7 ______163 ______ 165 ENRICHMENT INSPECTION 0 6.1 0.0 0.00 0.0 0.00 0.0 0.00 0.0 6.10 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 16 Headquarter Subtotal 0 1.5 0 0.0 0 0.0 0 0.0 0 1.5 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0. 1T67 Reglons Subtotal 0 4.8 0 0.0 0 0.0 0 0.0 0 4.6 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 169 GDP INSPECTION PROGRAM______ 7 1 liaqatrSbtotal 0 0.01 ______1i72 lReglon II Subtotal 0 3. __ __50______3___ 173 1- ______IGD1 Pls ~ inHO) ~0 2.09______175 1 GDPResidentlInspcio REGIONI ______2_ ___0_ 176 1GDP InNt!2 REGION 11 0 1.5 178 GAS CENTRIFUGE INSPECTION PROGRAM 18 Haduala Subtotal ___0 _ _0_60 181 IRa Ions Subtotal ______182 ______183 I EI nsaHO) ___ __ 14 I LES Inspections (Region 11) 0. 1815 IUSEC Lead Cascase Inspectons (HO) _0_3 186 i USEC Lead Cascadelnspeclions (Region 11) 0 0.6______ 188 ___ 189 00 00 MGLUXED-OXIDEFUEL FABRICATION FAG UICENSING 300 'i 00d.0 0.0 0.00 0.0 0.00 300.0 8 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0. 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 191 Headquarter Subtotal 300 8.7 0 0.0 0 0.0 0 0.0 300 J)L7 0 0.01 01 0.0 0I 0.01 0 0.01 a 0.01 01 0.0 0 0.0 0 0.0 0 0.0 0 0.0 Ti_ Regions Subtotal 0 0.0 01 0.01 0 0.0 0 0. a . 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 01 0.0 01 0.0 0 0.0 0 0. -9 MOX Licensing (HO) 300 873-00.0 8.70 ___ 195 Regions (REGION II) 0 0.0 0.0 0.00 1F98MIXED-OXIDE FUEL FABRICATION FAG INSPECTION 0) 2.9 0.0 0.00 0. 0.00 0.0 0.00 0.0 2.90 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 *i9] Headquauter Subtotw 0 0. 00 0 0. 0 0. 0 0. 0 0 0. 0 0. 0.0 0 00 0 00 0 00 0 00 0 00 0 00 0 00 9o ~ln~boa 0 2.54 0.0 0 0.0 0 0.0 0 0.5 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 201: 1 2021 MOX Inspections __ _ 29 203 Headquarters 0 0.4 0.40fl 20~ Regions (REGION 11) 01 25 2 . 50 __ GPM4DA\PAliFt 2006 Budget\FY05 9-ClassNMSS 9-class HORegionV4MSS.xls 07/16/2004 FCSS -4 Attcmnt I ______~~~~~~~NUCLEARMATERIAL SAFETY AND SAFEGUARDS______FY 05 B-Class Spread flivlin~nrc nIt r~YE-1F:CAFPWVAnAcrtrIIA~nQ ______- _ _ _ _ - ______... ~ -SURCHARGE CATEGORIES __ __ _ Non-Reactor Spent Fuel Oter Unlicensed Generic Storage/ Non-Power Materials Trariaporta- Rare E&Mi Uranium lmportl International Agreement State Complex Decommission- Generic ______FY05 EST Power Reactor Reactor Decomm Reactor Fuel Facilities Users ___tion Facilities Recovry Export Activities Oversight Sites njLLW MI ACTIVITY ORSUUS-ACTIVITY DESC. $K IFTE SK FTE 5K FTE 5K RE SK RTE 5K RTE 5K RE 5K RE $K RFE 5K FTE 5K E SK RTE 5K FTE 5K E 5K RFE 205 20? FCSS INTERN PROGRAM 0 1.0 0.0 0.00 0CA 0.00 0.0 0.00 0.0 1.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 20AJ ftadquarflrSubltoal a 1.0 0 0.0 0 0.0 0 0.0 0 1.0 0 0.0 0 0.0 0 0.0 0 0.0 a 0.0 0 0.0 0 0.0 B 0.0 0 0.0 0 0.0 209 Regions Subtotal B 0.0 0 0.0 0 0.01 0 0.0 0 0.0 0 0.0 0 0.0 0 0.01 0 0.0 0 0.0 0 0.0 0 0.0 B 0.0 0 0.0 01 0.0 213 24HOMELAND SECURITY SAFEGUARDS LICENSING 0 1.0 0.0 0.00 0.0 0.00 0.0 0.00 0.0 1.00 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 215S Headquarter Subtotal I 1.0 0 0.0 0 0.0 0 0.0 0 1.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 (L0 0 0.0 218 RegionsaSubotaal 0 0.0 0 0.0 0 0.0, 0 0.0 0 0.0 0 0.0- 0 0.0 0 0.0 0 0.0 0 0.0 DI 0.0 0 0.01 0 0.01 0 0.0 0 0.0 218 IHLS HOMELAND SECURITY SAFEGUARDS LICENSING 0 1.0 _ ____ 219' HEADQUARTERS 1.00 _____ 221, Examine Vulnerabilities 813) 0. 222ij nterimnomensatory Measures Followup __ 23IREGIOS BUTOTAL ____ 2241 Re i n _ _ _0- ______225: j Region 1I _ __ _ 0______ 226' Regioni ______228 j Techinical Support to NSIR 1 230 23I GENERAL INFO TECH - PM A 50 0.0 0.0 0.00 0.0 0.00 0. am0 50.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.00 233! . lntrastructuralBankccard ______. 234 Monkc&Mc~end Soltware 40____ 237 EXTERNAL TRAINING -FUEL FACILLIC &INSP 209 - - - 0.0 W-40- - - -. - -0. -. - 0.0 0.0 0.0 Division of FCSs)2 ~___ 00__ . . __ DIRECT STAFF,*FUEL FACILITIES LIC & 23INSPECTION PROGRAM (Inc. Agency-Wlde External Tng.) 3,412 79 36 0 0 0 020 Z77 71 0 0 0 0 2 1 395 8 0 0 0 0 2 1 00 0 0 0 0 240 HleadquresrSubtotal 3.1 7 36 0 0 0 2,977 50 0a 00 0 0 2 1 39 5 00 2 1 0 00 2411 IRegions Subtotli DI 22 0 0 0 0 0 0 - 0 21 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 242 NUCLEAR REACTOR SAFETY PROGRAM 0 2 0.0 1.0 0.0 0.0 0.01 0.MO. 0.0 0.0 0.0 0.0 0.0 0. 00 . 0.0.0 .0M 0.0I 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 243-SN~etw 'ReacorLceintLkonusing -Pre-Appiicatlon Reviews: 2441 Advanced Reactor Designs (FCSS) 0 1.0 0.0 1.00 ! - International Nuclear Safety and 245 Saegads PMDA) 0 1.00 ------*--t-II I - 2471 I LILIIIIIIIIIIIILIII1IIiII.1LL....L11111 I Li L..i - G.'~PMAVPATIFY 2006 DBudgeIAPYOSO-Ctass4NMSS 9-class HO..RegionV4MSS~xls 07/16/204 FCSSPS - S5Atahtn Attachment I I I I I I I I I I I Spent Fuel Othe Unlicensed Non-Reactor C4 storege/ Non.Power Mated&[$t Transporla- Rare Earth Uranium iniporV Itnernetlonal Agreement State Complex Generic Genewic cvn- I -... .. - -.- -1-- 50 4 .== -! I I~.or,'on I 1 rrerove5y 4 crpon I ACIIVIIIC7IIS . I4C L5~'~ -¶ I - ACniVrrY OR SUB-ACT DESCRIPT1ON z 5K I IFIB I 5K I FIFE I K I FTE I FTE FTE I F I STE lie I VTE I lbKI VTF I Ra I FYE I tie I V~ro I te I ErrsI tic I E I ., 1T- SK EWIIkl1f SIC vrs SIC SIC .- I U.~U.~ .1I W O.0 U.WU (LB LI~ 1.0 U.I~I 1. 1.9 0.04 0.9 0.03 50.0 12.00 .. , I 0.0,2 ;-3I 023 0.0- 0.00 14.5 0.1 5. 11.21 2-91 0.09 0.6 0.02 1. 0.03 0.0 0.00 0.6: I 0.0U21 1161 10.021 1.-3 1.5 0.04 0.9 10.03 IHAOATRSUTOTA7L Hi 4-I "I 1G7ISUB -TO -TAL 0.0 19.70 .3 I I0.00I 17.70 I I-)iY3 i I I IEGIONSSUBtOTAL I iI- - 0.U REGIOBSSUBTOTAL I I REGIONI REGIONU REGIONIIB FlEGIONIV I IAMF)ENOETAPPVUCATIONS I __I __I 8.50 I "E.AOOUARTEILS REGIONSSUBTOTJ -REGION I REGIONe REGIONXB REGIONIV 4.,10 10. /' , -1 I 0.10 30. IVf* AlJ 4.30 REGIONI 30. REGIONN )O. REGIONlB_ I; 10. 0.1?o. I. -- 4-- 1.- -4-- &- I - &- L - .-. L...Z. J- - 40 0.0 3.1101I f .%I 41 I-I I I I -r-t-t- ~jREGION I 45 R4 -i REGION I 48 REGIONN 47 . REGIONIV 49 53 REGIONI 54 REGIONN REGIONII -owdo kg art-in" I - . . ---- - .. . . . - -- . I I C IADAPAT\FY 2008 Ouger\FYOS9-ClassV&IJUSS -classhQjlegiaVNMSS.xls 07/112004 LMNSl N -.1Altrer I ArAchrnord I NUCLEAR MATERIALS FY 05 B4 Division ol Industria I I --I I I I I I I I I I i I I I - I I§ Spent Fuel Otter Unlicensed Non-Reactor 0 Storagel Non-Power Materials Transports. FtierEarth Uranium imnrpl ntlernaitonal Agreement State Cornplex Generic Generic Cr.... . PV. tt 11-1tO 0 eom 1-h. ______r I FY05X X . I M.-do i Fue-Milt- Aevie ---- ACTIVITY OR SUB-ACT DESCRIPTION a SK I FTE I SK I FTEI K I FTE SK I FTE I SK FTE SK FTE I SK I FTE ISK SK FTE F7E SK; T FTESK FTE T S 4SKI TE SK FTE -1t 'TbE S PREarn POST LICENSING _____ 2.40 _ _ 9 I INEA OOU ARTERS I= 0.60 I REGIONS SUBTOTAL 1.s0I |REGIONI I- t I( WI1.. I CONSOItDATED uULTISITE UCENSES _- 190 i I. _ _ 0.20 1.70 REGIONI _R) I O ' _ _ _ f g 1 I-_0 I HEADOUARTERS 0.0 _I REGIONSSUBTOTAL REGIONI - _ I WI .- L 4 IL- -J I JCENSING GUIOANCE)PROGRAU GDEVELOPUENT 0.0 l l l 3 HEADQUARTERS ____I I 9 REGIONS SUBTOTAL _Oj I _ REGION I _ 0.0 l REGION _ 0.001 I ;MG IMPROVEMENTS REOG BY STRATEGIC PLAN EFFECTIVENESS O-.0 -5- I i .' HEADQUARTERS n k I Il- I I I I I I I I I I Il I I REGIONS SUBTOTAL REGION I 0.00 REGION N 0.00 REGION IN 0.00 L8t 0.00 _ REGION I 0.00 REGION B O.DO1 .~~~~~~~~ I . G.VPM0APATIFY 200 Bud9gelFYO5S-CRu MSS -ca HQRs0IVWMSSids 07112004N LUNS * 2 Avahrint I NII t.IA9 UAYrQIAI CAtEV A~rn CACtr.A~nf FY 05 9-Class Soread Medical Nuclear Safety - Spent Fuel Unlicensed Non-Reactor Staragel Non-Power Materials Transports. Rate Earth Ursnlum lrnpodl International Agreement State Comnplex Generic Gencric ------___-______.....fr-- - -I . u~i ~c.. e vr I lo r U.,O41 I ecovery I txpon I Activities I Oversgh I bitee 4I ~CMecms IS~~ni LLW ACTIVITY OIRSUB-ACT DESCRIPTION 2 5K mT sic I STE tie sic STE PTI;I SIC JITI Wi STE tmc FME Tie ECy tie rTgE I lie tie I crc I tic I PTW tv Z`rc ASURE ORGANIZATIONALEFFECTIVENESS 1.I I___L . 1 i 1 . . . 1 i .. I I i i i i tI _II I I I t I I _ 11 4 1. HEADQUARTERS ______0.01 .01 11 1JL 1 1 I I 1 - ziff II I 1 1- REGIONSSUB3TOTAL __ 0.00 I I I OUCTANPLFRC RES (SKUNKWVORKCS) I.. I I_ _II__II- HEACCUARTERS 0.0 0.cO REGIONSSUBTOTAL 0.00 REGIONI REGIONI A REGIONIll REGIONIV ROVEPT I 0.0 0.00 \ Lfl) -~-- ,I R-I-s- S PROCIES 0.00- 15.01I 0.00 I 2.9 1 0.00 I 0.8 I0.001 1.i 0.00 0.0 0.00 0.8 0.00 1.6 0.00 1.3 0.00 1.5 0.00 0.9 0.00 HEADOL 0.00 IMNS 0.00 PMDA 0.00 REGIONSSUBTOTAL 0.00 REGIONI I 0.00 REGIONII REGIONIII REGIONIV ATKOWfMPO VEMESNT 1.00 kILN 1.000 eASIOLUCENS"W-fPt 1.00 ~ !EALTMPHYSICS SUPI1 0.00 IOPLAN PROCESS MIS im0 F LIFE ADDS[SEJOPE 0.00 ANdE EFFECThIENES! 0cm tRETREAT- NO-PUOA 0.00 I I I I I I I , I I I I - I I I I . I I I I I I I I I I I I I .old PlannedAtIIvIlT. MATERIALSIJ4SPECTIONS. 3.0 -730 300 ,175-T, ~~7119.00 I NEA0OUARTERSSUBT0TAL k.-3.00 f:2L9 `,1 . -*6~: 0 "O.' - OO' ': 0 .0 o6 . -:. ~. 0 0 ',IL 0.0 - : Aoe' M. - ~-. 'it;. -. A i.Ž.-1Q0 .. 20A0 .Yit S k- I ... 1-r-1-t-1-t-l-1-l I t1111t-tt111 jROUTI, I AMiI IUbLWJIb itigien MW 8.60 1 / if k-r-A - I. (I I I ' I. I-, I) 0.00I -. I - 4-A I I _.;L-"II-tLICA.N ) - r I I I I o !,-4:; b 'it -, I . ml ,nal I I . INSPECTOR-LEADTRAININO ____I__I__I I I I- k-11.4 /7_0.20 -5-t I ' II REGIONS 0.00 REGIONIII 0.20 REGIONIV 0.20 G:WDAIPATMF2008 SwgeIffYO5 S-ClassM.SS S-classH0.JtegionNUSS" 07/16r.004 LIANSIN - 3 Anachmentlaiel I NUCLEAR MATERIAL SAFETY AND SAFEGUARDS FY 05 9-Class Spread -I SpentFueF Other Unlicensed Non-Reactor Storagel Non-Power matertals Tranaport&- Rare Earth Uranium Lmaport international Agreement State Couples Generic Generic ------klo na.- -, ryan a.,rena -rowor, aco., ,aeacaor u-coma. ereanor rue, racaaa,, u-er. ona. 4 r~c§aaae5 necuv,5a.rr 4f cr~.n | ciwaaa .verxaina 4 v ats Inur a. sonao,1.nan El'- t FTP - AtiVITV R SUE-ACT DESCRIFiON Z SIC FTE SKc FTEI lie I FT SiK I FTM SKf FTE SKc FTE I lS FTE SKC FTE SKC FTE SKc I FTP SKI FTP SeK I FTE SKc | FTP SK FTE SKC FTE n ~ .ov I I I I_ I t. I I A i 4EACOUARTERS -, I * t ,.e)wi StiBTOTAL I.-, \L I RECiON5 I--I- -r. . - REGIONI 'iL \ REGIONI REGIONl REGIONIV ICENSEEPROGRAr .'0 1 I, - _- T\ PAOCtiARTERS 715.0 I-715.0 1.20 1 I I I ( / I : i Ii I -i II I IONSSUBTOTUAL .n i i I 4. ii I 4.IU 1 / ILI a GENERA PECTIOWSAUPLING 7t5.0 50 0.I EGIONli 1.1 REGIONIV 0.194 I' . I ...... - -' ...... I I..I -, I . I .i-.; .,. I '. -i-'.. I .- 1 4'a a . . ENVIRONMENTAL _____ 1 1_____ 1 .. i2.4... 'I - I, - - -. _ HEADQUARTERS SU DOT REGIONSSUBTOTAL - ENVIFRONUENTALrIMPACTST. HEADOUARTERS 0.0 REGIONSSUTOTAL REGIONI REGION N _REGION 11 2REGION IV It - r 41 l05.I Z .4 .S0 ,:,0.00 ,j'3.5, -4..-- ,o,2? *;-0.02 |--.v00 ,'i47.8 AinT 570.0 ;~.iO.D 1G5 5.6 1-.'°3 It-.0. i1l,,,4; 1 .. 0.0 I 'n. -.I tJ 4.1 S'i 3 . 0.0 71'LO+2 j EAOTUAERSETOTAL..i; *.xi'Yi . 570.0 :^-; 1609.00 .. 27.0t. ^..O.W ct~ a°°~L i1',"50 la;, iii'47.5 PA .?'52 0.6 .0 I0.20 .r : , 1.,cLQ' .:,.A;e 0.0 5.0" .2 I, loo ; ",Irl 90.34. A. - -.Z-( 170.0 9.00 27.0 0.90 34.0 2.00 24.0 1.00 53.0 3.20 27.0 1.70 _ ± 3 PLAN I 170.0 REGIONS SUBTOTAL REGIONI REGION4 REGIONIN REGIONIV ZA RULEMAKING 0.0 20 DO0 30. IC. :10 IoI I0. ,IO1 0.110. _O I1 G:.WAIPAT.FY 2006 BudgertY05 9-ClaasSS -dasHRonNMSSR 07119/2004 IMlNS* 4 Alladhrent. I -4 I I I I Spent FuJe Unlicensed Non-Reactor StorageJ Non-Power sAttraeLu Transporta- Rare Earth Uranium Imporlt International Agreement Slate Complex Generic Generic FYtlfl uljnnt D^w^ R^rfn*acso Reactor Decomm -... .-I r- E I * *u, vunenx rower rsel "eacs jrm fl 1-9lj LLW ACTMVITYOR SUB-ACT DESCRIPTION E SK FTE SK FTE SK FTE SK FTE SSKFTEI Xj E$- JE KJK FTE SK FTE SK F' SK IFTE KINGGUIDANCE - HEADQUARTERS REGIONSSUBTOTAL REGION I REGION N 0.00 0.20 020 025 0.25 I (140 40.0 0.40 WINFRASTRUCTURESUPPORT FOR IT SERVICES _3 200.0 1.00 52 0.03 LMEETINGFACILITATION-PUDIAG 200.0 1.00 n il i _ =- _ _ 0.0 W 0.0 -Z A _ i ______ |Plunne~~v~lty1 ATERIALSEVENYWEVALUATION,: - t . 625.0 :L46.70 1.,~-0.0 ;r7 25.0 ~.;0.00 69.0 @....p.50 ;>'r0.0 ;.0.00 ',.0.0 ':0.00 02~.001>0.0 0.0 | ". 'HEA00UiRTIERSSUBTOTAL, . . -1 .- ' 25'.'0 0 5.90 , M~ 475.0 '-,0.0 00 --.oo It=. p.OO0.00 s 0 '.' O.0 ' ~ Ii -Ot,''-'" 0- iPfvo.d 1 f';, 0.Q |3 O.D . 5.0 Z!.0.0 1.0 1...4.5);:56.0 It' 0.4 ,';',O0.O ,,e~; ^r.'-'.; 0 ,., . .z'0,.0 I.0~ L: I ""O0.Q '.~,0.0 a-wi~ I ~.o~ - -'OO ~O.0 ~LQ0 I:.. wa0.6 +-5., O.D ' QQ : I .0.1 o~.g9.''oo'. 00 "c P.9jls~rtoo *~~~~~~~~ 45o0.oo>,>o rrY. ti_ 0. |~ EONS}|Q W8TIJLtL..~ -. £> J :. ; I.;'tooo |ENERACISSUES FOLLOWUPIREG COORO (HO) 0.70 GENERICCOMUUNIC INEWLTRS.ANFO NOTCES) (HO) 0.40 DATAANALYSISWUEO 625.0 4.30 HEADQUARTERS 3.50 69.0 0.57 475.0 2.69 56.0 0.024O REGIONS SUBTOTAL 0.40 REGIONI 0.40 ____REGION E 0.00 REGIONN 0.20 REGIONIV 0.20 EMERGENCYPLANNNG 1.00 0.20 0.70 1 0.10 HEADQUARTERS 1.00 |_|_REGIONS SUBTOTAL 0.0 0.00 | REGIONI 0.00 = 0.00 1 1 1 1 1 1 1 -- !- I I I 0.00 I I I I I I I I I X~-= b44 ;- 1 1 _ _ I 1IeW-dACUAII INCIOE*4T -'p.OO I;,oo. (.0.0;I 0.0 *>j..- i;: Q p.0t,0.-4.,3..- ! !_ Oo.a'':,;9-p0 UATERLS ir.,7-00 I1 . Oro:. '.>oo:;,po _0.0 0'.0.0 | . 0.0 | .2. 3|, \ t5.Q ,, q.(OD '':0.00 'L-0.00 |0.0 ..... i240.0 ,Q .|--0.0 |4 e*.0.00| | .0.000. | |0.0 $Qo||-5oe !I0.0 Zo.o t!-0.0 ;:1, I0I do i5.0 -ff 0.5.lo.0 A . 0090;"O0~,O.:000 .-"-oO 2'3O0- - 0.0 | ....tSI.!,'; O6 .-,;.-it20.D ,, 5I.20 |!.'0- .- j,:.001Iv 0.0 Ei .,a0.0' - ." | |UTTL WEAURTS i ' t A !~Lqqt~,40- J0.a~0 .. : ... .11t-0 0 2.b.O ° i 'i O 2.8 ;- ~-0.0 0.0I 5.90 I I I i i i 1 I = - i _ _ _ . _ 0.15 f 0.15 0.40 2.60 REGIONI REGIONII 0.1 REGION11 I.: 0.1 7=,oh-4 5.0 _.o 100.0 0.50 1IYI f tIMn aOR . . -.- . . O.w-.I GPU0AIPAT\FY 2006 S.aterFYOS 9-CIassNMSS SclassHORegionW.MSSis 07/16r20041 IMNS- S Atch~nent I NUC.LEAR iATERIAL bAMIE AND) bAFLUARDS I l I - I _ Spent Fuel Other Unkimed Non-Re"ctor Storege Non-Power Tranporta. iar. Earth Uranlun Impor" lnttisma AgreementState Complex Goneri Generic - - - -1...- .. _ F OiF tCro-. mtn ._ Powc lecor R00trv. Tv comm vRo ,!p5L r _ I run _ Fq... tb- I , 1,s;_7U __ 1 _._ Tn _r _vFanc;,Iths _r R ctr__! x rr1 1 _vO_Cc vitr __ _.Oversight _p_ Sil IsD commrsloulngj LLW - - ACT1vrrY OR SUB-ACT DESCRIPTION e7e vI_ Z SK FT ISK SK t;TE SK FTE SK FTE SK .1 lt FTE SK FTG K FTE SK FTE K ETE K tT-' -v rs r_ _ .. i Iii - __i- -- i - _ 1 - /,- 1 ,_ , - _,_ 1 ; 1 ~ ~ i -1 - -i 'j 1 " 1 , _1 _ 1 _ -"1 ,- 1 ,, I , 5, 1 FE 1 51, 1 FE 1 SS rFI I - E _no. I, , ,4 0 90 , ';: O.D /4.10 '.4a 0.0 ::0.OD .-,"0. ;40.00 -12 ' i00 -~ t2.22 st DO. V-..00 .:~ .oo 0.00 ' 0i.0' .'0.00 t...'0,0 .: .4, 0.0 0.0i 00 s;,'OD L'0.00 0.42 7{,,._0.7,4 -.. 0.0 {^-'!tO.66;'Z"0 0 _'.QO "'; 0oC :.4 0.0 ' .D0.10 _P.O ~.0.00 :- o.oe , Q,. . _.0 00 ,,-0°.0 ,'0.00 -; t o,o :QOO1 ' --.-.. -- Z. ;I" ... .,.tl$O. L?.i L1 zf , 1 . -;t . I "'o.o ,- 6o6 11b'Ii ,3zC i Li 00 Q"L ,,.g0. -o0.0 2S404~& Z'2q2 .. -... o ZiDj97A AZr.-O.'Z47 -t~ .t3. o 0.0 SUPT FORALLEGATIONS & INVESTIGAIONSPWV/PO _I _ HEADQUARTERS REGIONS SUBTOTAL 6.20 I REGION I 2.30 - i0so I 1.30 It *Fr--t---t-S^t~tt~i b~~ttN~lt~rtttt-t t -1 __ t.4 I | | | I- I-. . - - - . . HADOOUARTERS 0.10 0.01 0.03 0.06I I 0.00 - z II 7 Ii . 0.00 7''00 I. I 90I I. IO4 - ; . I0.0 0.0 5.4520 Ao (:O.10 $0. 102 [wZ-O. ; ~0.0 ,t4.~2 000 Ptnidr.4y MTRAL : ,.04 .0 00~ 00 24 2 00... _0.00 ,. fC~fi~b U.A .~.~,:~.:...42,....~ ~ .. *. ~00~.. , *2 .co 6. I D 4.is,mcia 2x.014,.- ao2. _i220.0 .Z,?06 0.054 . 00 422.a n I r'fl n -~nn I TStAtSit . . . - - _I _.. g.n.r - _. 120- A I 0.00 i REGION S REGION U -I - t1 2 0 _ _ I - - I - - - _ I REGIONI 0.00 I I 2.40 I 0.80 I 1.60 I REGION I REGIONI 0.40 I- REGION 11 0.40 0.40 i O.50 I I REGION I i REGIONE 0.00 REGION N 0.00 i ftvl~r. IV Annn I . A...... 7 7 i 1 1__I Spent Fuel o0l11r Unlicensad Non-Reactor Stoaes Non-Power lAterials Transpora Fare ESM Uranium Tr~pV InternaUonal Agreement Slate Complex Generic Generic -eer.,^ ------. arlt^ - 1-1-ll A.l~l AcLnVTTYOR SUE-ACT CIESCRIPTION 5 I K FE I FTFEI K T SK -j FTE SK "T F ESFTE TE4'j..MSI(K J FTE SIJ -4-. 4 1 ... TERE 5KT "FE4 SII FT6KIF IEE j SK IFTE 41 342 PERFO64AGREEMENT ! REGION N 0.00 I- REGION I1 0.10 REGION IV 0.10 50 PERFORAMREGIONAL UAPEP RE'VIEWS 2.00 L I 0o05 0.05 0.10 St NEADGUARTERS 100 00 0.10 00 0.05 0.10 52 REGIONSSUBTOTAL 1.00 0.70 0.10 0.05 005 0.10 S3 REGONII 040 TI 54 REGIONIV 020 55 _ REGION IIITOTAL _ 020 ______.58 __ REGIONIV _ __ 0.20 ___ 364PlngPclh0).' = 100.0 '4 3.40 P r25.0 0.851 25.0 0t 0.85-25.0250 0.85 .4Q =.. .O 36 HEAOOUARTERS 100.0 3.40 62 REGIONSSUBTOTAL 000 63 164 R.I~maklng Activltks 100.0 3.40 25.0 0,85 25.0 0.SS 25.0 0.85 25.0 0.85 .65 HEADQUARTERS.RvIsm~klActivIfite 100.0 3.00 .66 ___ REGIONSSUBTOTAL.- Ruhn..kq AdIlvflle ____ 0.00 ___ V6 REGIONI 0.00 368 REGIONa 0o00 169 REGION 11 0.00 370 REGION IV_ 0.00 71 _____ 0.40 372 Sp lhetonsNuIer.Aseele. = ______= 73 - HEADQUARTERS 0.0 0.00 74 REGIONSSUBTOTAL 0.00 375 REGION I 0.00 37a REGION U 0.00 177 REGION IN 1630.0 0.00 _ ___ 378 | REGION IUSTOTAL = 0.00 . !VZ -p 182 H4EADQUARTERS 1630.0 3.50 F3tRGIONSSUBTOTAL 0.00 385 SOURCETRACKING SYSTEM (HO)(PUOA/IUS)_ 1630.0 3.50 ____ as Sfewrum-1ee "(NSrSe e Trackig SyF0HQ-PDA 13860.0 2.00 _ ____(_ 87 sfelsource . HO .AINS 0.0 0.50 _ X/_ - .erIt. Databae HO* BINS 250.C 1.00 I - - - G1U0DA\PAlUY 2006 0udgelFY0S 9I-Cta\NMSS9-class HQlegion1NMSSi" 07/162004 LMNS - 7 AMr~et I t,1.1 and I I -- SURCHARGE CATEGORIES Spent Fuel O~ter Unlicensed Non-Reactor Storage/ Nonv-Power Materials Transportat- Riar Earth Uranium kiiporV International Agreement Slate Complex Generic Generic FY05 Current Power Reactor Reactor Decomm Reactor Fuel Facilities Users tion Facilhties Recover Exoorl Actlvitles Oversiaht Silas becommission.4nn ILW 0. - - . _ _ . - . ___ - - . - - - __ .-- __- -. ____ ACTIVITY OR SUB-ACT DESCRIPTION FIFE I SK I IFTE SK I FrE I SK I IFTE I SK I FIE SK IFTE SK I FTE SK FIFE SK FtE SK FIFE SK I PITE SK PIE SK I PIE I SIC FTE SK PIE - t4 H11dc~y.NO~AINIINLG ~4(MACG :- *'~9 01I:.IQ0I 9U*.I!.. . .0~~0O;00 i. ' 0.0Ii;e.0w '00I0.O ,. :r ".o;400l~. I0 440 . 0 1 I n-8DURTRSBOALI I I.I iI*-I.. I - N0EWNI 150.0 0.00 - C-r-I V/ -- I ) ~.IS -, 1AOEMA 10.0 0.00 10.0 I - -1 11 T I.RTS (HO)1 180.0 0.00 180.0 0.00I -4--I- SAFESOURCE4PiHASEI( __1310.01 -0.00 %'-. I.O' - UICENSETRACKING SYS LTS)(HO)1 444.0 0.50 444.0 0.50 92.0 0.50 I - 300.0 0.00 30D.0 0.0 0.00 I n n n m - I . . _._ . _._ , I I I I . - . . - -1 . . I I I I I I I I : 1CONVERTTAPNU TO WES SYSTEM PineAcIGN5FORMATOiTEHONLNLO0Y b,~; '.57 iLo. :zbod 0:00 __ L2 '7',qLCq 0.00 I.-B -0.001 001...-I IL ml 422 424 [HAOATR ITTL0.0 1.00 __ ___ 425 __ REOIONSSUBTOTAL 0.0 0.00 431 EGIO .0 3.10 - 53 ~ ': "60 4 o3.., T " 433 REGONV0. 1.4 437 I EXTERNALRAINING-O U 48.000 ; ' :..,.-. j.7 439 _ ~ AATREGION.Iflsani30.70 -. ~.2 l. .1 ~. ~.0~9 R- 431 00 1..3.. RGION9 .N.N*$0 4.43 G~p.4UA~PAM'FY2008 Budg9oIFY05 9-C~ussMlWSS9-lasHOJ~gicnWMqSSjx 07/16,2004 LMNSNS6AldenI- 8 Attachment I NUCLEAR UATERIAL SAFETY ANI FY05 S-Class Spresc lastf Mg dE I I I I Spent Fuel OUte Non-Ieactor Storage/ Non-Power Materials Transporta. Rare Earth Uraniun lmnportU Inbernational Agnement State Unlicensed Generic GenericCon r FY05 Current Re-ctor Oecomm Reac-or Ful FactJItebs User- tbn V-iI1tk.. 0eo r- EVD.r Aetivitle. Co--k C.... .- -- r-.- - -- -.- ... ;-- I - I . ..I -_ SK FTEI SK FTE SK FTE SK I FTE SK FTE SK I FTE SK FTEI SK I FTEI SK I FTEI SK I FTE SK OGRAM: I _ E I I I I I I I I I I II >g- ti ti--- -;l^ ^4D -tvL. :lr>< a 1 r- J Evl-t42W1i 1 le- " -4V1,1W 117M= 1-Ai'-~i.7--1 1111-1~,,~.,-~.--- , .-- -.- I - . --.-.- . _V--4 L1 1--1 . -. 6#a.'-- .- .- .__vl _- -- -. -- , __- - B-.- -- . . P eAC PowerR eom Project 9'ga;ntA lic. . ~* 800 . 6 [ S * ' *i : '4^'-'4 Rlt''| |.i '-1';i , s , 4lY;.!>_,, | Zi,~i. .~ 'u..1.t; ~&~Id I Tech SuW t 25i0 0.41 - 6.0 5.0- _ _ -- .- ,-:: I - .:. Recion 11 O1 Recion ill .- f t 0.00 71 - Reaion IV 1 .7 __% i' ' 2t -IOw.t 4-O. ., 6 iw -t,I ~1'001,,OOi - 0.i 0.5 _____ I _____-_. -,263.0 015.0 101.0 t.8 3.61 260.0 64 60.0 _1 Fig0 3.0 0.4IPIb' 0.3 _ _-I&C S _-0: __ 601 0 4I. l E . I 1. 4 Comn PaDer(Btefinogs 0.0 0.1 Workshop 0.0 0 Interfaca w/Stalos 0.0 0.1 Intrlace w/RES nOn O I 1:.: r> iODr,:7W--g .> , . . t-~o. ! :;_ ' &>1! 17-, "' "-1 v 4IA! -- -M1 1.2.S.S1<>5Iwi.-_ 1 .. t|.BW.rz,I ,1,.;rK 112 Gurdae De RGi) Ot0 Ot1 _- 4 I I. I 4 _- .di 0.01 0.0 Region IV 0.0 0.0 0.0 MARLAP 0.0 0.0 G.APUDAPATIFY 2006 BudgeiFYOS 9-CtassMSS 9-classHO._RegionV4MSSjs 07116t2004t DWhtEP -1 Ardwrt I NUCLEAR iMA. 5AFEGUARDSS ______DivIson of Waste Ma onmentlt Protection I I I I I I Spent Fuel Ottier Non4Reactor Storagei Non-Power Matertaia Transporta. Rare Earth Uranium imporv International Agreement State Unlicensed Generic Generic Activities vsq Ivrlh-Com-bx Sdes n-eomsso LLW *ru j ___ rowat.urer __ r eacaW.. aro, r.cornrnmI eraclor rue, ra u . .. *e _ - nA rs rres J'! ...... 4 ACTIVITY OR SUB.ACT DESCRIPTION I SK IFI SK FTE SK FTE SK FIE SK IEF 1K I FTE SKI FTE SK IFTE SK FESK FE FTE 1K j__ i TE S | T SK IFTE 1127 = = = _ ;1- I I -I l =3__.L-_.a-- I iudizmA mL 1129 I Comoiw;iUateaalw SitSDIelonillingtt ':-_'_rd i _1_ IT=21is,i- EMT I _ ___ i ffl =s8s 1 ,) |tr B6,5 - II Pi O.X 19. 'Of I T Pe-Lcensina Consttation I Othn A r.Inti-.. 0.0 I 1140 1 __ .I :ense 1 Newly Identified Casework - HOC Region I 0.C A' Region IV 0.0 0.2 1155i 0Dcommissioninr .I--I-4 I-i- stw; 's-I g ^ . ^,c.,r;I 1~ 7ll;_.E i?,_7 I1_0~sL =.l I~llkk~ ~~w T,, tR ProgramU gem ni 00 0.1 _ Region °°l~ 0.3 °°l1 ._s 1KES -rrr, I S' I.~*r-t' I p.. jop ^- h *S1 rM ,int s:-ttEi 1.A i u:1 I I *.:1..;.. N -IE __ _I_ .I-. - I- I- I t'- ' 3 law vl liVli: I - taterialsFiciide O. tiort n.0. ,,qr i:l, _I I : I I -- i --- -i ______I_ - -. ~z -m l. ..- ', ~0= I._ -I t _ _ _ tII I 1E71 W _ -,;,;I I I7. I lv I- I _ _ . ; 'ISIb -. | II 'I -i- , *|9_' t|777''k ll 711-V<2lI ' -kI -I= 1t ..- " I -p _ _v- I i_ I 1Tj _ -- v.i.r I.-,. - I 1 : I I I-I-I -- I F-e'l -, 17NJ-6 M kL L ,,,2 , =o8=6vf1:1,2-s-.4 =2r U1o=tw~0:'u2-1 -117m .E! I_- I - _I-,- I, .I- s_,i_ I I_ I- II W-- 5~I~ -.I .I. -f11 175- I wwalts Z - I- --- _ ------I I- -_ -z: I _ _ I I - I-I -- on 181 E . zr . '-4"7%72'-1 4 7 EJL' C--I- I4 I ctliil L>_ - I ; v I - =i -G I= I I 1 1 f-f-t f-I.-f 1-1 - - __ 0.01 0.6 I I II _ . II I I I I I I I I I I _I _ _ GYIPDA\PATFY 200 BgetFYOS 9 ,-CUMSS9-dass HOFgnMSSs 07Ao004e DWUMEP-2 Attachmnt I Divisofi of Waste I I I I I I I I I I --- I- ARGE CATEG'ORIES Spent Fuel ocame Non-Reactor Stoeagal Non-Power Materials Transports. Rare Eart Uranium lImprt International Agreement State Unlicensed Generic Generic FY05 Cur-en rlort Activities OverIloht Compilex SitesIOecommlsalonrin 11W ACTIVITYOR SUB-ACT DESCFIPTION I-.-- I IFTE I SK I FTE SIC -9 7 jSK1 PYFES SeK' I~ .1S"K IE SK "0"FIE 1 SIC jilFTE1 K 15 -.4- Plan dfActivrlt Meteriles A Fuel Cycle Veconnitea onq ng.Z .~ -njraecio; IRojnjj I C.2- .,.I..-.2,. '2.-.- itt t - I I 4 ~ ~ ~ ':I' 187 -_ I ;; - I. - - I i I!ml1'050 *-. 0. -- ~ ~~; F .. :I IIN188 I Reclor ~ Recion Region III 0.c 0.6 RegioIVI 0.c 0.6 + 4-44--I - 4-4- - 4 4 -L - 1-I PlenedActlvi4'lto Tcnoloshy,- SupportTO for.; Scetfi , j; .:., ' 4t" 1 "-.' "'i I 11231 Cvde AclvhItIs n~eCrsdaIt PUDAA"''%- _";4-' ' . ' ' I 1 t ti t i i i P i i i- _f_'__ --- '; 77'_ --. _.. I! -, -...... Planned AdUtivts Decornnimalsonlng end Low-Level Waste ;, _!.,ir mi:.. -AlI~ ., I,4"4 - .1t'7 , A "":: . -Z 7.,., I.,- ' - . 'l .:. .., ~n~nteal Rfvle"JjaOqaq.,._____-, j '2409 1:6 46 1 - :,..'xDOOR -R-q -:,O .... _0- '-' . - _ I - Z0q.50 I ,-.qg -.. :L,9-0 . '.' A m - . 0.0 .--'Rtq .'W_.=_1.. ` * _ _.- ";' ". .- k A I 0 I I I " ___ -1 - -. Review Outter. EM~ 4WJ.i. 1.2 400.0 1.20 Prepare N4EPADocurnwrds (EIS & EA) Mails & Fuel OficonwmUceAlno EIS'A FAA Fit f t FIn !tfl rin - ,,i I -IN I __._ . _._ . __._ I - . ENV Ri~ernaking~and Gusdantce Developme 11 -4-4- - - I - t 14- - t1 -4--- 4-4 -4-- F- - I-- 1--- ..'L" -10.C 0.0 1-4 - 0.00 I -1:" 0.0 I " - 0.50 I "'-' 0.0 ..... 0.00 - 0- . LLWPo 0.X 10.0 LLW I I 0.5 I I I I - I 10 10 ______I___ (Tran0*lered InFY03 trom FCSS, tranisferred beck to FCSS in FY 04)1 0.0 I I I I I I I I I I I .1 .. ' , -rv L 1_7_ .'-_'J"; ::;-_-q l. .. I I .. 1!L". ' '., :4,x,I.!". , . !."P "' 5 I-" ?..+, I -- - -%Utilized ;; -r3y:f -- m ___ , I..nt I '. -;,, .::,; , I , I lInterns and Training Development - ", ' ~ -: r, %, , V I )-.4; 4 i- I i" i I'-2 ' i I'H.; t4": !'I ' I _; !! ... ..W :'7 11-r-t ". -1 !M 1 . 0, U a 14<- a - , e-_,, < I M.I , I I i i i i F-J_!-F . .- I .;_2 j I %-., I 1223 IPlannedActlvitv?- General lnfonation Technloav -. va.-'t .'X .0 7 ..- !';' .1z. v.i i:Battles, 1224 7 i 122 5 x e n . n n q n u o a P r aa e ) ~ L . i;., O (II I 1, m.a I -'2_1 1 .-.- ,m I-n n I, --- 10 If _`f-1-1 AI.',: i-- I_ . Q . . ____. . -I - I _ 1 . V:r. x* L W- _A'PI 4;i ;17 14 Ž 4n .4, 4 J S A. 4. [ j ~ l ~re 1 .- .. t v . -U '2 *.itjr I - . . ' . ±l T o t a D e c n..; ~ ~ ~ ~I .~ ! 0. ot ~~ 88 7I . - A ~ i 04 35 " . ~ . ' ~2~ ~ ; 1 1 v0s 2 . . 7 ... -2t .- s u b-. I .al. L 1 A. o - 4.s 1 .4'O C 5 i63 2 - 2 A ~~ 3, 3 & ~ . ~. , ~ 0~ ~ 2 ' C . 2 ' 4 3 ~. e L 6.8. i J HI i _ u t l i , . F F - i.,2 6~ . 0 ~ ~ .,' " Z ~' o 3 s . 4 . . a o rl ~ ~ btoti ~0067 0.0m:0 - .00 V5'b 0 ~ b o ~. ~ 0 ~ 0 ~.wO~ ~-It- C0 ~' . ~ ~o o ~ .~ ~ 0.o s0o ~ ~ . G.%PMDAIPAr'FY 2008BudgeflFYOS 9.ClassVNSS 9-classl1OReglon~NMSS.xls 07/161204 DWMD ME EP - 3 Adachrnentiai ei I - NUCLEAR MATE SAFEGt n SPENT ! 1I I1 I I I I - .. "11HG. AT.G.I.I.- Spent Fuel Other Unlicensed Non-Reactor 0 Y5Cret PwrPat- Storage/ Non-Power Materials Transports. FRareEarth Ursnlwn Importl International Agreement State Complez Generic Generic z 5Cren oe RatrReactor 0ecommu Reactor Fuel Facilities Users lion Facilities Recover Expr AcAtiv.ities Overej IgleeSiesomiDemIsion-Ina ACTIVITY OR SUB-ACT LW DESCRIPTION SK FTE SlK FE S IFTESK FTE SIK FTE FTESK PS 5KKCTE P 5KTE P TE SIK FTE SKC FTE SKC FTE SIC FTE SKC FTE SIC FTE 66RESOURCE ALLOCATION 670 N------0---- 69U 1-DUT T RU E S ,*.0 _-0- 4 Z 2 *~ . 0.'~ ` 00 0.00q --0. -. 00 .. 00 J~-ft 0.0 '" 7.30 .. 0.0 !.0.00 *0,0 ..0 .0 .O 00 000 -.. -0.0 -0.0 00 .- Y . 003'00400- j,'72. ,OGo 0.0O ,.0O 2 0.00 - 00 9.0O A 66o ~ oo 00 4 .SOO. 0 - ?.M 73 4 M' 0. - 4I0 4j. 00 w0. .48 oo ~oo ~. 0C~00 o~i~o .. . -- .oo o0 0 D.z..o0' .oo 0:"ot0 76 RHLWPORPLUTONIUMTAIRTRANSPORT [MI 0.00 80 (A,0 0.90i~._ Do'N62-6APPLICATION 81(Al EWAPUCTINSB( -0.0______84 ADAMENMENTS IAE 83 AD0.50.400 _0_0 AMENDMENTS 88 OMMRCIL SENTFUE 420 ___ TRNSORT702070.0 .2 890 __ AAtNWAPIATOS20 90 [A8tNEW APPLICATIONS- 0.60 __ SI [AEIAMENDMENTS 0.90 _ 92 IAD AMENDMENTS-IAEA9_ 0.60 _ ~__ - 93AGj RENEWALS -0.10 __ __ 96 DCOMERCNONSPENTFUEL TRANSPORT 70. 42 702_01.00 897 [AL NEW APPLICATIONS 2_.00 __ 98 AE AMENDMENTS _0.90__ 99G] RENEWALS 0.10 ___ 102 DOE NO"ENTP SPEN TRANSELTASPRT0.0 0.40 103 [BA NEW APPLICATIONS 0.00 104 ED AMENDMENTS 0.30 09 [BE RENEWALS 0.10 A 106 108 DOE c-NAVALRXNNSPENT FUEL TRANSPORT ____ 0.40 0.0A ___ 10 [BA) NEW APPLICATIONS _____ 0.00 ON A____ 1104 BCDAMENDMENTS ______0.10 ____ III IBF RENEWALS ____ 0.10 I If L 106______1037______ DOE-NAVAL RX SPENT FUEL TRANSPORT 0.30 0.30 1 (881 NEW APPLICATIONS 0.00 MMl*lFlnFT non FEFI RENEWALS 0.00 118 119 120 PACKAGE REF I1.60 1.60 .-l l l *- i -l - 'I' -41 ""-'----t I - t - I. - t- -t 121 1- 11 -t 1 k-I. 5-I- I. -i - I - -t - -t -'---'t- 11 125 I G:\PMDAUPAT\FY 2006BudgetFY0S9-ClasaVMSS 9-dHss _egion\NMSSxs 07-/104S SFPO -1 Attachment I FL-EJ = SPENT FUEL PROJECT OFFiCE I I I I I I I I I I I I I I I I .I Spent Fuel Other Unicensed Non-Reactor C0 Storage Non-Power Materials Transporta- Rare Earth Uranium Import/ Intemational AgreementState Complex Generic Generic FY05 Current Po-er Reactor Reactor Decomm Rertnoe Fuel Faelilltie User. lIon FacIlIties Recover- FEqt Activitles Oversiaht Sites Decommlislon-ino LLW _ .------.. . -a---- .4.... - ACTIViTY OR SUB-ACT DE SK FTE SK FTE K FTE S-- FTE SKi FT FTE SSK FTE |SK FTE | SK | FTE| SiK FTE | SK FTE SK FTE SK FT FTE SK I FTE L 3 S W='; ! Fi 4 1 i'-1 R I__ 1 1 126 ITg RAO E I ]ON SUF I_ I I _ _ _ _ *irP. Itt ,,# so 127 iDAL USER REGISTRATION 0.10 X I' PRE AND POST CERTIFICATION EFFORTS iDA? 1.00 -11 (4r TRANSPORT APPROVAL PKG1INFO SYSTEM ITAPISI [DA]I_ 0.1 - _I. I 0_0_ ____ Q0. 1358.0 7*11.7 . 0 C00 0.00 - - - C.C - 0.0 0._ ___. 0______0.0 I0.0 0.00 0.0 :Qo t o0 o r 0.00 - 0. ___.0 - 0.0 _.00 . o1a ,7'HEADQiUARTERS SUBT~>;--,--- -, -. I3"' AsPo.t -17.75 0.0 :,!- 68.0~t -,' 0 \ 0.00 Q000 .,.0.0 . 0.00 -.0.0i - ~ 0.25 0.0 r~10.00 6~~0.00 00oo ,4'.o. .-0.00 f;-'REGION SUETOTAL~T A; $.-1..;-`If '.:-,,,P,'-,,__[!M.;.7z . ; .0 ''OOd -0.00 -; , 0.0 , 0.00 |r-0.0 : -- 0.00 .- oQ '- -,0.0 I-.- 0.00 _'.)r °.° 0.0 :0.00 I0.00 ". 0.0 . 0.00 ,,0.01 0.001 2p0.0 , P 0.0 ~-t''.o. -'.000 1 e3 ni- * u -*' M__W_ ------l-t _I l I 171 172 ISFSI REVIEWS FC] 665.0 5.80 |.0 0.0 0.00 665.0 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0|0 0 00 0°0 0 00 173 174 NEW tREACTORS 465.0 3.00 465.0 3.00 175 176 DIABLO CANYON 00- 177 DIABLO CANYON-ASLB hearigs 178 _ _ _ _ 179 HUMBOLDTBAY app! 12-19.03 400.0 1.50 180 HUMBODLT BAY-ASLB hearms 0.0 0.00 ______- 181 _ _ _ _ 182 UNANNOUNCED 65.0 1.50 _ ------___-- - 183 _ _ 184 _ _ 185 AUENDUENTS 0.80 0.80 186 _ _ 187 _ _ _ _ 188 RENEWALS ______0.0 0.50 _ 050_ _ _ 189 GE Moris 0|0 00 | 050_ = 190 HBRobinsan 00. 040 _ _ 191 Su ______N/APoweo 00 0.00 _ t92 NAe__ °_ °° =_ 193 14HMAAFRMRACTORS 200.0 1.50 __ _ 200.0 1.50 195 PIGEON SPUR 0.00 tt -1 1204 OWL CREEK ENERGY PRO 1205 206 FOSTER WHEELER 05FS11 100.0 0.50 1I I1I I I _ 1207 FOSTER WHEELER PS 01 0.0 0.00 = I I I I-i---- FOSTER WHEELER -NO HEARINGS °° °°° _ I I I _-- I I I I I I I I I I II G:PM0AwPAT\FY 2006 6udgerNFY05 S-ClaU\NMSS 9-Wa HQ_egion\NMSSis 07/18/2004 SFPO - 2 Attachmntr 1 NUCLEAR MATERIAL SAFETY AND SAFEGUARDS FY= SPENT I l I IPN I SURCHARGE CATEGORIES Spent Fuel Other UnlIcensed Non-leactor Storages Rare Earth Imporl/ Generic Generic 0 Non-Power Materials Tranaporta- Uranium International Agreement State Complex eens r.,.^ - *.-_. n_.^s^. . . Be = e...... S A__ ...... _ BAA_____.__...... a Z | wluaGurrem ltPoverHeaclotlStnwet HeaclortRcOrnrn | FleeClor | FuelFCcilil*s | Wers | Uon | FIcl!lt"C | Hecove r | Export 8 Activities go oversiant | Sates 1°¢C°f rnlsslon nql LLW P_ tIhA VITY OR SUB-ACT DFSCRIPTION SK PM SK FTF A,,SKf - FTF SeK XFE SKe VTF: teK CTIP eSK VTr LTE SeK cTr I SeK BE tic SeK VTF tet BEt teK LTc - - 4-4 - FTE 21 RArG 5cvcrTElc rert 7nw n R1X 703.0 8.10 - Il -.. - 212 NEW APPUCATIONS 1.70 = = 21 ._ MAJOR AMENDMENTS I U l li 214 min AMENDMENTS 0.50 0.50 JPART 72 CoORULEM.AKINGS [GA] 0.20 05.0 2222 224 PRE& POST UCENSING (FE] _ 0.80 225 PRE-APPUCATION MEETINGS FFEI _ 020 226 GENERAL LICENSE PROJECT MGR _ 0.30 227 SITE-SPECIFIC UCENSE PROJECT MGMT 020 228 CoC PROJECT MANAGEMENT 020 229 TECHNICAL ISSUE RESOLUTION _ _ _ 1.001 _ 230 PERIODIC UCENSEE REPORTS 172.48, 72.70, 72.2481 _ 0.20 231 232 B Pl & PART R E V I E W za2.4MZaz EF zwi La -f '~ M .=R. LR*a --t Zg .s ME .m z zzZZ9 zz ,E !.!. --.:M ...... Z BPI - CORE BUSINESS PROCESS (UCENSING. INSPECTiON, 233 RULEMAKING) ______co BPI - BASIC BUSINESS FUNCTIONS (CONTRACTS, 234 WORKFLOW) ______0.00 235 AND GLTS _ 0.00 236 PART REVIEW of SPENT FUEL STORAGE & TRANSPORT _ 0.50 _ - 237 __._ ___ 238 7 e~ROGRA UItMeLEU-ENTATION & IREGULATORY ,4--7- es.-; ~- ." ~ .'- .- ~ ~ . w*ri-' -4 - -0 6 14000.- 000 40006 b.0 '000 Zet-2 -- "-A 00 - . - O 0 '. - ' . 0 " - "-0 0 241... TECH0ASSIS TO ONOOT REGS _0 _ r.2 ~ ....56 ._ ,..5 j1%,A0O~~ 00~ .0000- ~ 0EON ~ ~ L.O :2a .-0., - . .::000 0 Q . _2 :0_ 4a8 ~ .Q ;r2 t00 245243 iNTEPNATIONAL&T ECATESTORAGE REGIONSDOT COORDINATIONAlV1E~P1PONT DOT _= 10 0 0.201.eo~p _ _go _ _ _ _ _3j _jn _0. _ _ _0 0 . ' 150 _ _ _ _ . _ _ 'r _ __ 256 MOEMO EX RLAN =6 0.50 =0 244 - 247 INTERNATIONAL &OTCOORDINATION 105.0 1.00 -1050 1.00 248 249 _ 2 5 1 ______252 UPDATE TRANSPORT REGS (PART 71 ____ 0.50 05 ___ - 253 __ __ _ 254 UPDATE STORAGE REGS PART 72) 0.00 ___ 255 _ _ _ _ 256 MODERATOR EXCLUSION RULEMAKINGS o.so _____ 00 0.50 257 0: 258 DEVELOP & UPDATE REG GUIDES 0.0 0.00 259 260 PART 71 SPECIAL APPROVAL GUIDANCE 0.0 0.00 281 --. '~ 262 e ~ tO 4 rZ~t 5.0; 2j i7 2 7*--J~-- '7 0.45i -0 0 '00 "~30.5 -0 00 0 151.1 "- 45 -- . .0 W2S '. 0 ~ 0 ~ 00 17 '- 00 -i.7i 0 0 ly-2.4 - 0.00o -'~i z-;: 0~.00 4 - 2. 6 f _:6 G:\PMDA\PATFY 2006 BiageoFY05 9-CIiu&\NMSS 9-clm HRsgon\NMSSWs 0711&2004 I e 3 Anoaimnt SFPCI -t ... cu..C.Wmlm -t I Qu. n SpenI Fuel O~t., Unlicensed Non-Reaclo, SIoragel Maeiarls~ Transporta- 0 Non-Power Rare Eart Uranium Im-o Internatonal Agreement Slate Complex Genetic GenerIc "- P.-- -, 0-- ACTIVITY OR SUB-ACT DESCRIPTION SIC FTE SKC PTE S FTE SIK FTE SIC FTE SIC PTE SK FTE SIC FIB SIC FTE SICK FTE SK FIE SIC PI E SC PIE SISK FE SIC PIFE 264 ______265 PUBLIC OUTREACH on TRANSPORTATIONISTORAGE 180.0 1.70 __ _ 45.0 0.40 135.0 1.30 __ 266 ______267 PUBLIC OUTREACH TRAINING 15.0 0.30 __ _ 7.5 0.15 7.5 0.15 268 269 COMMUNICATIONSIDIVERSITY - SFPO 0.0 o.oo __ 270 _ _ _ _ 271 COMM4UNICA TIONS -DIVERSITY -BPI JL(DA I 100.0 0.00 2.0 0.00 23.1 0.00 0.0 0.00 30.5 0.00 1. 000 8.6 0.00 2.0 0.00 2.8 0.00 0.0 0.00 1.7 0.00 1.7 0.00 2.4 0.00 3.81 0.00 2.6 0.00 272 273 NXISS OFFICE TECHNIC~ALASSSTANT jiNMSS-001 .03 0 CO __ __ 274 _ _ _ _ 2775____ 278 RISIC-NFORM STANDARD REVIEW PLANS 0.00 _ ___ 279 _ _ _ _ _ 280 REEXAMINATION OF SPENT FUEL RISICESTIMATES 0.0 0600 __ 281 CONVERTTO SAPHIRE INUREG-66721______282 _ _ _ _ 283 IMPLEMENT RlRJP &PRA INSIGHTS 0.0 0.00 284 ______285 HNASSAFETY olSPENT FUEL STORAGE RECOMMENDS I_ 0.0 0.00 ______2886_ __ _ _ 287 HAS TRANSPORT OF RAD MATL. RECOMMENDS 0.0 0.00 __ 288 289 ER3 ,Aoll .';,"270.21'35.0 20 Q'70Q10.20 4;E200 -2.82.4 W O.DO~ do.0 29 Hf R"(31'fOATESIP C- - .0.Q.04. 244.40 0. (LO-..~I.00 0.0,..24 t ,,0Q.0.Q4087,.. .i. ~ P0 292~REICSSUTOTLA 10.0 i.000 2.0~.0 '2~2.1~o~q . 4.2 :~~o Q.0 ,.~.J0 /l.0 9Q 291 HEADOUARTEFISSFPMO ~~~. .~ ,. .90 2.Q ~.~~p~~ a ~..0QiS~t{000 ~ - ~ooo.0o ~9.jza:oo ~.00~ 0. 0o ~ L- ~ ~.. 0:00'0000'4. 07,- I-- t- I- - - -+ + + 4 & 4--I----Il. 4I- - & JJ It~ r=--j ------t=-t -r7t-- r =7 +. f! ! 1 !.= T4 =-!7 -- =~- r!- r. - a-r+ 4.: T= -r --. , 3 .1~ Planned Activity: INSPECTION, GA f.EVIEWS &'EVENT" 1.~W-1. - I .XWizk, " ~~Il,- -1 - --n -jv, 09, -. LA'.0.00~j -- , 175~-g,, 0.0 " -41'0Y .41-..~ ~g11.4 '4~ll A"'00 'N' , ACTIVITY TOTALfPR3, , , -5u1, 00:;. ,1-.0.00 -150.0 ,,.0.00 I t 0.00 , 0.00 ;I0.00- 1--- 0.0 i 0.0 0.0z~ I-, -.4. T0.00 0.0 -"00 .~0.0 4. 000 0 0 1.4- - 0. &.~0.44, lkI q 00 ,-,- ,Z 3 4~7,40 ~0.001800-5 r 1.11~ I"10 4'0.00 p0ko00 0-.0- 0.00 ,~,0.00 EGO SBTTA~E ;...S 10.00 .41.'.A 0.00 ---:4)'- I ~'-~~ I ,/ .'l t I'' '-00 -;4.00 i"0 0 ;i 4.00 10.00 .150.00 44.~' -.- 0.00 . -,0.00 - - ... z'~'---..-rr- - I-r'cr .. I, IAn . I I * ...... Lfl .. *S I~ I~M~n Is~ L~ ~,f HEADQUARTERS SUBTOTAL 50.0 8.30 1 0.0 I 0.0 50.0 I 5.1 0.0aI 0.0 o n 00o 00i 0 0.0 1.2 0.0 0.0 0.0 OO O000.0 0.0 0000 0 .0 0 .0 0.0 0.0 0.0 00 0.0 0.0 4.00 0.01 a-( 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 00 000.0 0.~0 0.0 00 0 0.0 010 0.0 0.0 3.90 0.1 11 11- -tt-tt-II-tI-tI-f-f-t-1-hI-Ii I- 1310 ITR 1.00 1.001 -- I- ISTORAGE VENDOR -FABRICATORS - 1314 I DESIGNER INSPECTIONS [PART 721 1.80 ~ - II I I _ I I I 1 1 1 1 I _ I - L L I _- I GA\FM0A\PAT\FY 2006 BIudget\FYOS 9-Clss\NMSS 9-ciass HQRegion\NMSSjxda 07/16/2004 SFPO,SP- - 4 At6utimentfainn I IUCLEAR MATERIAL SAFETY AND SAFEGUARDS FY 05 9-Class Spread SPENT FUEL PROJECT OFFICE I I I I I I I I I I I , T . ?I T I ITF bUMUIWAMU IA I M.Uhrc Spent Fuel OMar Unlicensed NonReactor Slorage/ Non-Power Materials Transporta- FRait Ert Uranium Impow International Agreement State Complex Generic Generic 0a -.O Curren I PwrRst Rese--- .. --- I .- .vr I .,.n.LunftrL-1~I~ cGo ru-, 1,Ie ver ...I'0I IUS nvn'¶rJ CE niI ANCUV~uef uversigh Stes MeeommIsioin-og LLW ACTIVITY OR SUB-ACTODESCRIPTION SKC FTE SK FTE SIC FTE SIC FTE SIC PTE SIC FTE SIC FTE SKC FTE SKC FTE SKC FTE SIC FTE SIC FTE SC IFTE SIC FTE SKC FTE 315 ______316 PR-E-OP INSPECTIONS. - RX ISFSIs [ART 721____ 3.40 317 HEADQUARTERS _ ___ 2.40 2.40 318 REGIONS 1.00 1.00 ___ 319 ___ 320 RECIONI1 0.30 _ _ 321 REGIONII 0.50I 322 REGION III 0.10 I___ 323 REGION IV00 _ _ 324 ______325 PRE-OP INSPECTIONS OF AFFRISFSIs [PART 721 0.70 326 327 HEADOUARTERS 0.40 0.40 __ 328 REGION IV 0.30 0.30 329 330 ROUTINE APR INSPECTIONS 2.90 2.92__90_ 331 __ 350. _ _ _ _ _{lAt} 332 HEADQUARTERS _ ___ 0.20 _ _ __ 0.20 333 REGION I [each Bottom]____ 0560 ___ 0.60 334 REGION II1___ 0.20 __ _ 0.20 35 REGION III (GE-Morris 060 0.60 33 EINIV M.1-2,Ft St Vrain, FFS. Foster Wheeler 1.30. 1.30 337 338 QUALITY ASSURANCE REVIEWS 0.40 0.20 0.20 __ 339 NEW APPLUCATIONS 340 AMENDMENTS 3.41 TERMINATIONS 342 RENEWALS 34 3.46 RESPONSE TO INCIDENTS & EVENTS 0.30 347 PREPARE BULLETINS & INFO NOTICES 0 io____ 348 ALLEGATION FOLLW-UP 0.60 ______ 349 ENHANCE LEARNING _ ___ 0.10 ______ PaedcvtSPnFEIEREOMNA . ,. .' ~ ~ . .,a. ~ ~. .~ . NEW 0 REACTORS HUMBOLDTBAY NEWAPPL.112-19-03] 0.00 UN ANNOUNCED 0.00 NEW AWAY FROM REACTOR OWL CREEK ENERGY PROJECT RENEWALS NS Robinson renewal 0.00 G-WIA0APATAFY 2006BtxgetFY05 9.Class SS 9-dau HQegioNMSSAxI 0711&62004 -.5 Aachmart I SFPO NUCLEAR MATERIAL rYAND SAFEGUARDS FY 05 I ...- .11. ______i iL. i . i. i i ~ Ji i i iSURCHARGE CATEGORIES i _ _SpcntFuet__ Other Unlicensed Non-Reactor o Stara*/ Non-Power tterbs Transport&- Rare Earth uranium tmport/ Internatonal AgrementSta| Complex Generic Ge nric 2 FY'yu_ Cnunt Power Reactor Reactor Decomm Reactor Fuel Facilities Users loan FacilItIes Recovery Exprt Actlvities OvcrsIght Sites Decommission-Inof LLW ACTIVITY ORSUB-ACTDESCRIPTION _ SI FTE SK FE SC FTE SI FTE SI FTE SK FTE SI FFEFTE SK SK FTE SK FTE SI FTE SK FTE $K FrE SK FTE SK| FTE 3 HEADU - U - | -0.00 ¶jN( | 1 - -- X | - W . w ; m W 2 . - . 1 37 REGIONSSUT6At; ~ Z2'' _ __0 . V*.04 ;'0, :s.~t &;"~~~~~~ 368 369 EMERGING TERRORIST SCENARIOS 0.0 0.00 370 371 PEER REVIEW OF VULNERASILITIESIMIT MEASURES 0.0 0.00 372 373 INTERACTION WITH FEDERAL, STATE AND LOCAL 0 0 000 3;74 AGENCIES ON THREATS = =_____| 375 ______PUBLIC OUTREACH to CONGRESS, INTERNATIONAL, 376 NATIONAL |_ 00 000 I____ STATE, LOCAL & NATIVE AMERICAN ORGANIZATIONS 377 & PUBLIC 378 I __ _ II 379 ICM DATABASE UPDATE 0.00 381 INTERNATIONAL HIGH BURNUP FUEL 0.00 382 SOURCE TERM CHARACTERIZATIONS _ _ 3834______304 ______REGULATORY IMPLEMENTATION OF REQUIREMENTS FOR SAFEGUARDS, ACCESS AUTHORIZATION, AND EMERGENCY 385 PLANNING 0.0 0.00 386 TRANSPORTATION 0.0 0.00- .- - -- - 387 STORAGE 0.0 0.00 7 = ------388 .'ll _ .. .5 r ... I2Z.~ I.. I . . . 389 1368a __l_ 390 GEEA NO O L CI!LR Ez,~ . .2!2. .tt; 5 _ __.-S ''vl >tS*,.S 391 'I 4P E4iWE-k I iq IYCSl/T_ II _/ _ I 395 0.50 __ 396 NUCLEAR SAFETY INTERN PROGRAM 1.00 0 50 St.' -ac`6 -'.5. 1398 Sf.f N & TORAC eGM N-tl-t 4> < $.i '4A- ~ l 1 A eS.0 .*-A p00t° s.0.tJO 0.0-eo 1399 DMSION OF SFPO TRAINING I_ 91.0 0.00 _ r _ 400 I I I FI _ -- .-.--.- 4-.--… - --- …...---.-+----- .-L-- -.-- - -- 1 ----.------U---.L ------I.Its.2784.0 V4&001 --2.0 1oOO------.0 .t2351 t----f 34.55 i.0 1o0.00° I u L0S5QmJonf.1'L71-OOL n i22.3-.2.5 ;.O-O OBA'OO O.Mi- h; -W-^O-324peO$t '-W CA #HFAI1OJARTERS. PAU 22.01 .00 I - 38.0 Ino I 252t1 409 - 410 411 412 413 - 414 REGION IV 1.70 tt715; van F. --- ~-O.i - .* r i-- tOTAL I~c~pou!~ ~ ~4LQ.- '~20[ 00:31. yllsfisont snnl..tnsl:b^:nnl I .\-ps o ut 1,o.. 722.3i2. J0o iI roj .,II , .' I I I o'C*3.8"' 0.0',O I~2. I 1I Sb~ -1 0. 0t274O.2.4.J~2i Mu-0 ;t~~~~~..<.,a ,,5~nl.o....J,+ 25fin3¢ *SrwQI$d.-, I2o.e, E;0. S tt O O ou i L___ q R oI 9 .z4uL;5LI!U. D a Am <0 0 2j on 0 at tloD.O O.Q I nn S. . n.n -+- o o ? ti w1 NOTES: 1. RESOURCES FOR COMMUNICATIONSIPROCESS IMPROVEMENT REVIEWS WILL BE ALLOCATED BASED ON HO FTE G.APMOAIPATIFY 2006 BudgcFY05 9-Class\NMSS 9-cla HQPagionMSSxbs 0711&62004 SFP`0- 6 AdnchwntI 0 U-d 0=4 CO= OM (WA " WM) = .FY 2 EiUDbGE, DE O I I I I= -:r -_ ~e ------. |_-,.-.-- - l- - - - |_ - - - Nuj RE"RF" R.AcRotA~Ocou^L | LA.-OR rAC LTI . rRTnONPA.au FAMsimE AM VERY .EXPORTI PORT) AC4n OVEn~ EC4 I S.'. =li . -I - 1- 1I IXI FY UOOI _I_ I .I 1 .M LKu FMz . LKu |r S | rTEr|nEE m nFM ,K |X F6ntr EX | nE . | reFM K | mr ,K |FTE . LK FM LK |Ln "a K m STUTR:HULA eREU~iACTORSAFTrY _ . _. _ _ __.. hEATO COe R P _ Sa.ATEIAL ; lIO _ .ER POT _EPR -… - P___ L-|-1- A'WW_------ RORIgudo RATR wcalugrdo - - l. .… | - RP,WwyU~n~..., IMUP-M'g s.- tnh l 9..ACa eL- ;dmnafPw RI OP-ers._- O.MfL..m.20 md..k. f NlM-md S"W.roTed Mg"c SWmUO.,.Ig. A0.moUe.wkPA q.. TinnIsIti _ Eorn S,.haw~ewd Gawic C ... ,.i, Ve ___R-o - -/ --- | -s-- - < -E - El< - -0 - -E _ Lgi A dvgid0ceRevim_ Rl~se.i. 1L LL 5ll l l l l w.~O.,W , Aoo-m.g./Tcm jbu ..&U bmm.,h*~ an !..i D v To. iov.,d um TW^knIROW1 L1 I / -11 - S - I S d …-mIi 1; r S- {i PR6GRAM.REACTOR LCNEEEA' PLANAIDEA CC4FUqJHAdENT& ku..,. R~wmsa .pnticn ULb- R nw.lftw.icto g y r .ki _.F_. SanndW,uk bceu T.,frnogy -T - I1 _ WWzd____ zCz1z - _ GDETLAIL _F_200_BU 04CwT! PT PO EX ISPENTPIESTORA . * R _ _ . RAMEARTH UR U OTHERA S _ INTt AREEM STATE NOW Oa REA REACTOR CL I MATRM P ORT PAMIES . rPORTI RT). eetwAf4t SW GETw). |ECOEA L W (EPRIMMA-T-QVRK U ao il -- ~ &blCh REde FTErM t rrs SKLFE F| LK | FT mT _ aX FM S FMn _r RE Z.K FI LK FT|E ||L nMn K LK PRO RAkE.hU.CTO ,-- LIS' -. PLAAWEVACCOAOLMNEMTM- - - - R P1.lklenCEfl -I _------_ - - ………………… _ _ _ 6 l l l1 - "lSUpn-PWMR..cWoPwloww,*n ftR"U As.-ue-.$up; ======_---nWr" R..Ctof b%.pand A enn-.. hp. Del. Wn OnNsigM __ ------…… Non-.Ww ftdenld.loOpuen L _IOn=weeonn =SP =11 1I St.%*.Pad.,.). ad TftS.UnionAt~f . Leg. A&,Ic. sd Rtp....ttdnn PIRmtc necmn Acow~o botul Tan*Ing end!onp~). CaOwlos adwnni T.ek*, ReetertC.,ddsdhw lpti on TT-Rsbdn enWdV.s*dopa.. TT4C-bdsneUoTenhdwWM Ran." of Bp~cTTC TIC-Othn Ad.Odniatlon S5..*es Generakdo"m"tlo Tndtwimg TowEIgdrsso-- = Hed . … if - -= ea CC3,l12U4=m am (skt - %s F20 BUDGE DETAI _|= 943W2M FY O' sRf ;PWT ru Tr!RLC _ PLA7l SRRE LWTUfthU OTHEIIAPT A" MV CtUWTCATZCc UCrR.KotbI E U.K P U. |_ U. Ff Ur- I TS .K RpmR U. F1 U. FC .K F1 U. IS UK iS .K F1 U. Ff UK BUI_-L=L M I MAItamci I= -A6o FA #11IVER (_tm A." vn6wmo.ml _ i! soe pca,*rRMft.CWC sfet -111… … … 1- … - I------I- - PAORA; Rl!ACTORLAItYrPe~H{IS --- Fniii Wonnvrcn ilitrsb a EMl PLANWEDACCOMP1JShMVJS …… ------ O.,.al kdo-..tion Ts8.hlogy------basoft d Alector Syila nd C _.WU...... A9g~. RItwd 8. . ytelCon8sa Coaponen. . w AsmO f D&GtaTKcrrnologia- AUssess of _dht ll B R v.a.. nla Txhde ve_*nl D _ PAOORAM:NEW PAACTFaAUCW nOB - -a 1*l llg EdmaFAWED ACOMULISMAl e r _ .Hy &M PaahsnuU DesignCarflfmaua ft,&*&oan Raolm Fel Oklna R_e|.cel mars rr| ftgolan. kalmuuclha N.. ft.CiWrUCtn5g hkdpaoaolAi Total DlelRa a .m ------Lhg.fdaClm Apat.Uomu - PLANNED ACCOMPUSMAENT~z Vulnwakmly Acaatsa~e.U "Eaaty-P'iEA~tOHOMELAND Wm#-u kaptonaaanl SUCUAI'T'-9t&8-<~S PLElll|ld AL .l 'low Dka8 Rasown. nSEDc RI T,O 10M,a 9u P I |, |~C . 3 H E I IM < T"r'e.;.r -- - -I .p~aFYnp:R ------a- - -- 2001 Budgel I- PUJ~d~DRcVIEPLWIORN1$ FedcuiMalEATi lia la3E OI(E SFed IA iU R- M PPICNrgOV 5gN Fed Fu~diUs hlwW~~nq Urtd..m Rmovy Llosah tkanJwmlR~eewfy b..p*cU- &Ih,.1. U..- A e"Ifoti F.. F~dMdl. A4"-i~mn a£mw.~ Tuwm'n TeedOred R.O. PLA MWE _ _AC 0- - - . ..-...... - aMe.t.s RuemakkV I M.Wtm. K..., I~lI~ MM.I.Wo k..kd ftepte. Afltg*thon Wee.t'.S*.d .~fa! LMAime NWd.p,.ti Mmed.LA eepende U.te.W. hoeldod&Weu~ae mweWa~Raueme~kng TTC.TTekdnend Devdep-.ed 1.d d.1 WI Y12001 Budgelu STATZG~s NUCLEAR kA~MALS SAFETY - . . . ~ - - * - - - * * * * * - - P.L.k.WorffwdR~gWAoq F-or Ac~on o M.Ihtsds Th.W Dkoa Re~te PRoGRAMA-MATzRIAU MmOMAN6£iiaihii-SUPLh.EMA PLAWJDACCOMMJSMMENTS mniwAsant TOWIOwed ftsft -- … "AwOAOwwf 5M."gft. msmwbtn NWdOw."gm Co." of Scum"s and thy kdt..i5. Twanjo".~yCent ofsowo. &-atwy k*nuuiciw, h.pu.na Wo d Rcpmnom on G.Wal WomSo"afnTedwn~gy &,mmTern j n;a,~id Do-oIp-.o4 E.WomaTMoInft Tota DI,.d Rosourcas*t____ Usd 11AMC~DSDs*tdndmf2) JFY200 BUDGkTOETAL -I -I1 1I1 FY:ZOS POWER ISPENT FELST OJOE r RLAREEATH du UR OThER PLCANTSINTWEA ONL. AGAEIUNT STAT - 0ERic _ 5UDjGET E4- IREACTOF DECO1M REA.R FA UTlY IIMAT FAORT fON FACI MES RE VER (EXPORTVPRT) ATMES 0VE NGT lowCO GEN LLW EShtMF:MdwWaaheSadey S.K PIE SLK PIE EK PTE LK PIE LK ME LXK PIE LK PIE LK PIE &K PFM SK PIFE K PIFE ELK PFM LK FIE &K PIE IE PIE STRATEGY: NUCLEAR WASTE SAFETY PROGAM.i4G41VI.A 'tREOU!w nON- Nig-Lvel Waste Regulation ResoujrcssTotal: PR'OdRAli.-ENVlbIROmENlTAL PROTECiON ANDi LLW iIANAII iz-~ P4ANNEDACCOMPIJSHUENTU EnwvtooamentalRavitwisI Low-Level Waste Reg.Aatlon & Oveslght Legal Advice* ed Repmasenation EoterneTfalntn kern TrfnngroaNW Developmehtt TosleDires Resourcs LegalsAdieedoomRepqResentallao Eowerloat TraDeconvalig n lmet MAwgmdVeDACOOmPty EHMENSR"Ism UGen"ln andt,"CefcAmlog Legal Advics and Peprasenteton-- Externa TralonIg IVCS O (R SPU F M NOW OE AEUL U THER EIAIN.AR SAT GERI BIUT EAM PAMFDCMqI. FArYFO ECEY WPMJ`ORD7 0 I EO CLA14 GENJIVLLW ShW.NuMdswW.RIM1 - ---- … Spant PingiStm96 Sylars SafetyAsasewt1 rn ------TrawDirect Resowoes ViPROGRM1& GENERAL C General Fund* InformationrTanchnotogy. DDUS HLWDocufmet Proc"uln GeneralFun~d . Ilronmation Technology *LSH Total DiretReeowiren … PLAAM.~ACCOUPLISHMEHTS: Total MdircRoaaowces PLAMIEDACCOMPLISHAUENTIL SFegrard UcwW Sitg hiTcWSwwuls Direcn NRChreatA~sssictr s rpoee Genera~lynArmsesinTecnolsg nfegurTrInspngtand s adeeOvmensgt Saf eguarstrLic t;ensin g vte GeneraTotalor1ist1aReTources &W1/3=| C D m - t . | FY200 BUD TDE L I I I I Vi!WS fiOR OThJ I tH04= 2005 PO!ER SPENT FEL STO NOW OWER . I. NS. M"EARTM u MUM APP N TIONAL. EREEM TSTA ERIC _BDET REACTORS REACT CECOM R ORS FA MAT TIO POR7 . UTI0OLMES RECOVERY (Expcl AC vmESE OVERSIhtT I P DECOMN |CLAJ a CLLWd IPTE LK FTE RE .,K |TE LK FTP SI FT2 SI PTE SK PTE SI FTE sI P|E &I FTE SIKC E SIK PT S| FE K F E |TE STRAIEt: WTERATIOAL NUCLEAR &AFETYSUPP DST PROhI PARTICPATb0IOt INTWEAXATKONAL -… - - - - PLAWNEDOACCOMPLtOTSH = kas~m.anaimHuclea Safety and "aeguads gmpolIEopod I cnslng Rylvaws IknwtonaI LegalAdvice a Repenseaton = .)1 Intern Tkinng Dev_=opment_W Extarnal Tral rdng ------… Support to AID Gwneralkf rtmaton Technolog Tot iec~t ~Rea.ms -……u- - - - - STRATEOTIHOMELAND SECURIlY d~flORA1L~T2IWTIO UCLEAR SASTE BUPI t't9_ . - - _ ------PLMNEVACOUAWS=AIENTS, Thnet Asseyimnents_ Reguistory k -rvfftl SatoguardsInspectWn and Overalght Sseqeuards Ucenelng Securtty Indreetucftuv improveme44ts hWortmationSecurity Et ____il -r4 = TolalDirect Reeurca"I i-_ _ i .. X~~ Umd IA=4 DcVAP**d n MwU FY 200 Budgc DetaillEIW R~ BtDGET RE ZR 0ECODECOM. RE FUELfLl MAT -RAS TNM RTATION FA tiLMS RE OEY (EXORI UMT) ATMES OV CSWSUP DECOM GENEC LLW SiK PTE SK PTE SIC FT! SK FTE LKc FM! SI FTE SIK FTE SIC FTE sic FM SJK PTE SIX FTE V.C FM! SX RfE RFM LKc FT STRATEGY.MANAGEMENT&SUPPORT 7 - ORM-AD VISORYCOMU WTE FDAREACTOR GUAER WAST PLANNED ACCOAMPLISHuENMS RAeclogSafety bidepuMont Advice Mater~asSalety. Lole4evu Waite & Dscamm Genwir nalrtomtionTadtnoto"… 'iv 'J '~ / TF C 5'4 l-' I'ti W l BUDG - -l | - 0 -2 A 4) 1Ni IFY2 I El Y - - - - - _ Y2 lu ohER -OAmFs. .ou lka MS. 1_t. PUARAI AWrEA.At UMOU TAr" - G C B A"081 .u______REACUlATCI rtI l VERY __ A VEJA.ToACT 1a DLICOU6LWCLxA| __Vl - - --i --| = swE1s.tcsgh.MR4.aoES~fI.Iy=_ - -= - o.K Ff1 x PM1 F 1 &K P1 . IS L. I Ix FM . 1 11 1i Lx IX Pi BX F PII .A F1 11 FM1 1X "I STRATZCYSMr-"I REACTORSAPUY PROOGAU1WA TO ILI ' C.…- -. - -… PLAAWDACCOUPVLSUN71JM PwoiluUw~g..M -a Uw.-Ing Asswuma Lkessing Aaj.., CowrUcuksJng Tiaks tp.O~d SaMud.Tech 3I.C. POM0TI1:d1 1 Lk.,wIeg AE.481niton of Pwr SUOp-a~u" E.Me Ee.WUUWand OerdacCeownwcrnhee v______1_:T_11_1_II_:I______:_L______-e.P. F aw Pro".er- UgrM and UcIftjA4I Ugai AdeIaled Rep..,Mtlllb ON.". kowe-T~mm hg [ l auT le Eep!~euikfl w .1 I i i 1 -1 i Ip I i i ie TOW1ODed ft.boreM PRGAeMCfOLJCD ENVdL~olAl'il-l'- PLAMAUEO liscMErlwL73 I POIMI Appklshen RA."dw Lk- mRw* RgLA.L does y Ft|. Ork fEa.ee TMek" G.eglAA,8C*h- -AkoG=ft_" le UROp..eMEW"c[I0T t~ d X|-4tlA1w " I T.W1Ckeef R.a*1cox u- %cC-S D p" s = _ _ =FY200! BUDG DETAI LAOL0LPf: PERNTuELAUTCRAU OTER LA ITRtIL A|REZ;IAN STATE MMR=C G CSO RtEACTORiF _ RU MATERIALS T Pr'I U OFTACLr RECVCRY A IIfRPOTUPORI1 OMISSCHT EwP D Ljw Fri aK_ RE C~I.gI 1=~t E.I.I1 LK aK FM |_ |I nFM Fu |m _K LX M SK -1 4 LX __ I- I__ ___ FI I-I I _1E 11 1F I_ I _IT L …………… rF K FF x | SEI | FMr K m - - FRORI RLCTOR ILECmlON ANQ PERORIMCE StrsSciNT-u PLAMNNEDACCULMAWNINTS R.CMPNM AI.ae~~ ==A IIi I - -1 - 11 1 1 71- Im I 11 - -… ll E~ai.. F.da.I. .atA~~t~ itT~I S 9 1 -R .. ------ ReMI ECsAaw~V T"Ul I~A -W L.iiva MacfIMbf - - l - - l l l l l - l - ………… 11- 1 - I I - I - I kA A&.Ik. aM 1SP1aW- 111II 11III ftswIMk~tsuaIR..aC*- - eAvTC-Mdemae id EpTTC d aegl. " 1 l_ O@TOthAd|rh.IaffeIM S&aMC ranaaa ktdo,.taIeT-volmO~q ______T _ _ _ _ - - - -I _ S ______oua I FY200.-BUDG DliTM L I_1 1 11 I_ . I II I_ III __W LK FYI &K FMI L FMN LK IFTS EX P LK DIFT LK DIN Lx FMN L FTZ ______LKP_ LK FM LK Fri &X FT& kpr"QCaw"O yW."sWhA Ra.-p- -- A9h.gD.Ia*. MMfctO Sylawal andCcmpa*.as Reg@4at@"Yhk*.ZVac.aaNWhap-,m-a" kmai~u Froabablda11is1 A-tVyas &WAp~pda.U~ A.-.s.g.and MakitalaIM Roadf WAdSyU14s Cad.. Whad 0aift Fad iumettakdng AndvaLap-rAf - Tam DIed Raawa~ Raftmda-- - - Dm uscoCic~a Tota DkIrectRjsf *ORXREACTOROE.NSCw-. pLAWdEDACCQOdftBaiVMDJL 3 ud WMW CCA OWtPM- U2W) = 200g====FY 8UDGI DETJ I I = 1 . 1 = = I I I I I I G44004 mVW nj I 1IH M s. W 11mvwo I s II m i 1 ,wILII uba1I TE 11 1. 1n 11@kXkI11111 ,I 11 G I BUOT ECTR RACTOR DCOWL REA.CTM FACAATILA DOR TIO e - FACLX PECOVIRY ILXPMORT PCR1) ACIniAMI r I- 1 1 CM ION? SLi ECU S LW 9" N-,dsw R.CkE saltyVunt~f">U__L -- 1-1 1-11 t- e | _L -- DEA _ 1 zL 1 - - l11_ LK Fri I.E Frm SI Lr P11 P5 Lx 9 Fri sx m LX FMi a~x FT "XIT LKE FM sjc Fri i. FM LK m S.X Fri S _,I …-t - _. --. W>~m. E. ton S l lll.. S.I.5uvd a..in WA Ai~u= LagTi a R pn.. niMD< o _ 1 G~neuI dafl Tuhnalnqyl r r | 1 1 1 L : I : I 1 1 1_ 1 kwaT 3M C ~lakw~g9- r T I I ITI r T I1M1 1 OddYF2005 O&rX,2 Budei Detail I I 1K IT 1Kv IT 1K 111 1K. , IS LX IT 5K IT I I II 1K III~ IE IT vw ITS '1K IT 1- I~TS( IE 'T 5K IT NTRIlEkhastk.A.Mg - .X IT I. IT ------I I I - - . - I . - I I I..I~sI~h- ~- .d~ - - - - - 9 ------ !m'khm.nZ&k.mt & _kmsa. __ 1 L..d4lj F,. L.rA AdA* VWRO~,s"WM I I I 1 I I I I I i ]1 - III - I i I I I 11 1 rW ______-. I II I I I l II l I I I H -II -U- I I - .-... I - - -U rwP.j.iA4do .UIT.. I-I-I I I I . I I~I I I I = -=-.. .Z..P~m I[I I-. - -L I-lI-11 =I 1 _- I _ -4 -- .. d. _ltt i i i . i ili il I- - - - . I - - ! 1 i - -1.' - 1 1' = : I.- 11 = I I 11 1 11 1 1 I I 11 I 1. 1 , , ,. _ - =- I - 11 1 I1 1- 1 I I - 1 - - I MsW"1I SvSMS..k.UmIf MOW"m kviam Ra-po.t 1a41 lI _ . I I 11 - -- - - 1-11- II 17 .1*Ih .DI-&,Di 1 '7 N - C II ,I2..i I- uswiw. sm. F.ImA " Tr" L.j p I . III 7I- I4 I I - ... __ .- -- .I, I I * - ft - aI.6 A1 I 7Io= =: I ; IT m~fqbt oM - - - - - I I - -. - -. - - -1. _I1 1 11 111 1 I 11-1 1 1 1 1 .... T~g~6lyUC . .. - .- - ... - GCmkeafllCollT.chnolo 0.a __-L - - . . i l .. ll . |._ - - - k"W.iW EI" IMAI .1I1 uawwus hclwnt Ihlloal e_ .f 1TC-Tfak¢m VWDo,-PMWCno aulge euLL REMWS OROTI rY PO IUUENTFU MM~e RARE > A IPU"b amE n_ATm ic,|rn A" t STATE | |ERC MI- O. WCW uitdleU;o Al MI REACTOR U=6. guDEOU I- REATFQSP ya-TU= Ffiiw-, f : / ERc y japoAmpoM . G A w~vit |5m o W~ -_ VK |FTE LK FMnl t nE | FT9LLK rri LK LK Ua nmLt LK | m t |n LE|K |rTE LK| FTE LK | T 1l LK TI LK |Fri 1LK nT | nRTwYodS-WET. l-||' =CD -4C. lR.Ip. IJ . | _ _|_ __ ITRATICY: MUCUAFIMATIFRALUSOMEY~ --- - - * - -- __- - - * - - - - LX . FY __ IW~ TrajkikV sd D~OP.W-d IT..tt.Ir- Oi..d ft..,. 11 I - - - - 1 - 1 - 1 - 1- - 11 1- RFsk4INod Reg,4AasFw k~,o~ 1-I FlackadmExpow A...... IA~e&4d Aleaa~u1J4Iis.Ia..c*Tw ok.0 Re"o c. PUAVMEOACCDUPUSM"LTS PFOCWA UATIM J~iLHOME2JJ4OSEcU1qTY!~ $ XfX1II1 1 11rX1 lb, . Mt PAIjuj, anoiwT0b.D.CO~S~ ------l l -! - - L -) -l - ! - !! - ) I…-!\E Il I Safpd. Mi obftl md CwugM - - - - awtim T0im_v-Cld *IS" l || |Hll l l t~oyk~w,"r"h ~p.Uwf~ d AgMdafl~dNdp..Iif - - - - - rr -l - -d I I I I -H - I- 11111 Oeh.1~i.d dft - I ------1 - - - 1 Mw=rankeanD~oM~..G~anu~.* ok~m rr - - - + ------T 111 mk.~o. umt Tow ______ 2 Utad t1134 CCADSOmn O.-Uad ad IMAM)l 1 F20055UDGETDET) L I f _II___ _ _ I ÷EL I_ - SUDGE RESTR ECTO DECO I O11RB LAIITATER S PoiTlO PA ESccI VERY (ELRORIIMPORT) ACT Gup DECOM IMLIA GENERICLLW ______LK FTE &K TFri SK FTE g.K PTE LK FriE S1.K PIE 1.K PFTE SK PT! FTE L.K FrI U.K PM SIK FTS EK Fri sK FrE LK PTE STRATEGY:NUCLEAR WASTE SAFE_ I PRORMt1044.YJ WST RGULATION:,'1 - H[gh4Lav&1WasteRAsoiaiina Raaorceas Total: I--- PLAMEo ACCOuPLISHAuEM3. FAvlronanentaRevlewa Low-Level WasteRegutalto AOvesalght LegalAdvice and Representatllm Ineen Training andDevelopntn _ …………… ------Total Direct Resources ~6PRORU4 RLG~iJATIOF4OFDECOUMISIOIN Rencter Decommissioning Ruleanking & Reg G~e PowerReactor keonlaolgPojectUgasi& Licensing PoersReactor DecomaaolagwnpectIon Materials A PuelFaiuyDcmalslnn Licsneln lialarilel A AWeFacility Oacoanmlsslorlfteeto mMarnageenof FornmwWlLicensed SR"a Isnues Ino TocltC~owtreirtzed Riek Assussmali L DataAnalysis Lab Generaltlonoatlo Technology LegalAdvice andRepmeentatlon ExteanalTrainig Aussessmentof Dose from Envlronnmitanl Coruanalnani ncTr.Takn~g adDevepment Total DGiet Resources PLAMIED ACCOMPLISHALIITS Ucensing endCertification lnspecloon,GA Reviews, Event Response jtidldictaory Reviews LagalAdvice endReraeniatO" Geneal wanlototon Tectnology - InternTrahinng andDevelopment EalrtemaTrainin I FY2005 IPOCIER SPEWT ELSTO NO-OE FtEL I hN- RARE URA U OH APLCANT. W~TM ATOtS AGREEUENTSTAT GONERIC ____GE IOM AACTOS ____TO______AMATERIALS FO ON FACJUIO" Re VE (EXRI IMPORT) ACTvtnEs OvEIRSIEOUGHT ,iENiPc L SIC FMI S.K FI LK FMI EX FTE IEX FYI SIC FY SI FIE SIC FYI FTI I FMI "I S.C Fmg LK FE &K FmE 5$ FM SpWnFuel BlgoagSystems Safety Asasssmen … - -… :L ~umProGRAusiRAFng.L Genwal F" - Wnormaton T.Ci&no0ngyLSN… __ TotIAIOI ctR.oums8__------ ~PRORAIiWA7EHOMaELANDSECUFMSUPPLUNA( - -- - PLANNEDACCOMP.MUSNENTM. ESA* Vuhwnabut~ AsazsmalAt PROffGRALI;WASTE HOM ELANSCUia;Y.isuppLUTA . Tow Dlked Adsbucux~ ___ ,LAJSED A CCOUPLISHUtNI ------Formarty f.na Shag…… ~R~aRWASTI1OEaANflSEWCUT.WASTE PLANNEflACCOUP-LISHWEMMS --- - TihraatAgs~samods Vidnailblty Assgunamni &4.gumidslnkpwhinan Ovorsigtd- - …-- sal.guardsmLkwslfS……- - Sucaatyb*&kumcbxa Impovom~ts ………-… InWOa.I1I4 S-1hY………---… "4RCl-t~umufs ~~kIIwVImt………-- -- Gmnwra~lItnUmaOaTch~naIogY -- TTC. TmrnatdlGd DanLopmag……--- WardnTrakn~ngAMdOsvelopmafI------W- IILW R.po.toryLicagnal Acd-IIe…- - -- Towal OIt f~whss - 2 O" nV 2'JFY200II…I=4FMD DUEOTDET L I I I I I I - -V 1- -+ O01 THFI C41300C04 F{05 PO WER SPEWt EL STRj TREANSLMATRILSRAR.JI H ~ Uplum APIw giL kGEEMEITSAEGE EI BUGT REACORS RIATOI DErom4 F, ORs FORArJLFAJLTTL FE dG …_____ ELALS ) ACT VITIE OV ShIGH M DECOM' E 0 1F sr" It Vkmnmatarl"Iaa"Siafty &onat… ……… ……… ……… …… -- 1 1- S.K PT! S.IC PT! LK PFT! Fri SK FT! SiC PT! LX FT! LK FTF I !Fr s.K PT! sI FT! &r FTE SIx Fri sIC Fri sIC F?! STRATEGY: INTERNATMOALNUCLEAR SAFETY SUPP OR? :,PROCRAU: PARICPAININ INTERNATIONACT S PLANNED ACCOLIPLISHNIIrN Intams Allo Nuclear Safetyari Safegujards limkoflExport Lkarwing Roviaws intarmatial lagal AdvkceandRepreeratinlgf trlarniTraInIng andDevalopma" Exlarnal Trainng Support to AID GenealJIlonrmalon Teefmnoogy Total Direol Reaeuscas STRATEGY:HOIAELANO SECURITY ra N-UcMEAR -WAS-TE- -SUPFOT' PLANNED ACCOWLPI.HULENTS: Treal Asessmwents VainwrebUIty Aasemel Regulatory knpnrvemornl Saleguarda Inspeaction WAOVeralGiM Sataguars Maimaning Security kdanmct=Wakoprovwamena Wnormelln Secuily, General Inloromelln TecrInOly 1 ___ I ITI&I UsdM34= Cat (w aS-v'a - FY 200~Budg, Detail - - - - - ShoaltxMaftgnsrs a&,t*W V4 FY SSP WER BENT FUE.STORAG ENON WR tIRAREEARTM us OilM APPI.LTS INTERt TIONAL.ARE STATI GENERUC SuDGEr RE CTOR ERACTOFDICOLIt R kCTOR FUELF ILTURALS TRANSPORTATION FACJTES RE OVR (EXPORT1 PR) ATV~ES OVE6i~GHT SOUP CICO aECI IGINEWC LW ______SC F 1 LK FTI S. FM1 SK FIE LK FTf SIC F f1 LK Fri LK F f1 LK FMI SK PTE SiK FTE &X F f5 LK FM1 L K F M1 SJ FM5 ORa. AD VISOR?COA WrTELEFOR REACTORUCUGN WS---- PLNNDACMPLIWSHMENTSJ Reaclo Safetybuiepeindeml Adivce ImatetimisSafety. Low-Ievel Waste & Decowm Geneal Infmation TechOlog TOW Due" Reosona - - - - o\9~ U_ C __Dt _R301I 1 1 FY2a0 BUD TD L 11 ~~~~~~~~~~~~~~I ZOOSw4 OENT SP Ft ELI&TOR CNON WERE TFU RAREEARTH URNU olAPPUmm rJIOR=IlwI I1111XXTE tWnX~1ONALl1| " EaSTATEGEC Bt WET IAt S REACTOF ECOM REAM S FAC IUTV EAT POIB fION FACIITIE M REOMP o I AC Wm 0 IE < EEl-O A GEuWEuc |W &tatIt 1I- 1_1 3l - -_- -- -. ___l S_ _ FTRE LK RFM FYS s. | FTE S-K FRE KC FrE SK FrE LK FTE LK |E .C RFTE LK IFTE LICK EM S RE E SI RE STRATEGY: WERNATONALNUCLEARSAFETY SUPI ART . PROhWIPATINRNPATON;Bau__l___l_=1 _ IJ11XI10I_1fX hllPLARNED mU~~eNudw ACCOMPUSLENSWAM ,SdIt and Segudeu V/ ____ == == ;= E7 E< e lmporlllxpovt Ucensing Revlews- kitenetonel Lag! Advice end FRepmwe~ntslo InhenTmInLv end Development |__._.L L/L - .SupporttaJU = Total fird Remuowe SMTRTGY: HoIIELAND tECUJRrrV___ PLANNED ACCOAUPLISMAENTM VuhnrebxlAensesmrifta J~~nh~ndog TO D- P AVO . l _ 1S 11 RegIietoay kwirevemqnla Safe9g"" uarshepCUomid Overeight SafeguaftdSUlceneng secmuft bnkucu"~IGW knprvemants bdaomutlon 8.cwlty Gar."l kdomsadon rechnology Extenal TraiN~n £7Ta0MaLRMTRAL&P1= -Y20*ug tl I1 ~RGMA TIC: ULSAt M4UATIILLS6,2Y 1 NT tm~ "aft.. Aesflap.nUstra PLAHNYEACCOMPW4T* U-StAsos.s..stS I - AVIk WdR.~Usoftk beermT..iWn VWdDewmp.,w TOW.Oked Fltaswurs, L~" PLtv-i C / ,Q. ; Q ) 4'- '7GbL -4 Q-::) FY200 BUOG DETAIL ~ ~ __ d______rnt" 1 I I - OTHERAP UCANT! OnF ATL OSMN TT 04r"20024 PT 200S FCItR SPENT FUL TO N MIWEnuPUlL RARE TRA I" vurDuE I REA~cOR REACTORI=....L OPFCLIY MORT MMO (WT PR) ArML CVA=l CU -7SAVLY11 IALLV Seet.. CAN,1w R4*Em, safety - LK mT PT! LK FM! &- PT! Sx PT LK FM! LK FT!LI T ax rT! LIK PTEa PT! LK P! LX PT! LK PT! LK STRATEGTSRUCUEAR REACTOR SAFMT _____ PROOIEAID.REACTMR UC!)45*G - PLANNEVACCalALWMWMd1E r COtha,Ulcm.kI T..ks ben- 111"V0 Ta.R SP.9. P9m 0.-*Nm-M - ftknuI"A Esmk~atlwof Pm. Ri Operators - oprntit Ucmmk.I Prig,,, A Trakdng 0-sighI E-t-E,- d - -ti- - - -~ft .q.Total ClRred Reamlre. PLAAWEDACCOMMSNUl"NAi Re-aml A"Uk.Ema R-Imse LMUe.R~emlmp.conS icarise.RsUeo RbW9itwy FraMewOrk Geoe-a k.Ianmlle Tdnhealel Saleeel ral~ngr Laog "WAi aNdReprm..nlel Toaw Disoa Reoaa-oo zzzrnI-iziziziiizzz z-z I wI4Cco w MLWd Wfl u w h IY 200 BUDGDETALI I- II - 0mm FTRIE PO,VAR SPENT?FUIL STCRAA FJEL ?R Ns. RARE TURO'hER AP TEJIAT1. AGAESMtN STATE I IICGNEI 3uETCR REA.-ctOa~wc" auhICTR PA LITT MATERIALS PC fTlON F AM MVlY I(WORT4 RI) ISA mVERGa soIMP DECCEUIIECLAILL Ldw I.E FMi LK FTE I.E FM &A PIE SX PTA AX AXEI. LK. Fr I.E PI :.E Fr LK PIE ax Fri sxE Frm LK Fri LX Fri *RORMARE&TRINSPECTIH AND0 PERORMANCI PLAAMDE ACCOAUPLMWEAI7S Binsefte k",acdline Espp~rneni~dRec~h.b~.pTEW1 GenericSafety W-Is..cpectlam Abeg.E~n aflem*p R..Cto Pe~lomewtcAssea.-M~ Asawaoktop en Ass..salrn PIG.C... and0,.rslft Noe.~P. R.mc OpmratlonA CIn.reiekghsp ____ Sltae,Pedenal en TUbelU.sheR Acfthles L.Sel Ad4.4asand Pa.epn.oIetia Rew.EnlcwcefmwA&Etena fieeCho Inesugations InmTernIchig eeAKmorypao. Cenho.Ng.. EmRiti Trestlng R&eCWoK.&Mt Responee Reesffl SFel Reednese ReethefCoaeRdenagm Reecsonlnkded hneegedee TTC.T-ehnlnen- ee4prr TTC4W."nlre*fheleimeog neo'" of ipec.TT 1rC-Otftn AdmWg.hnefelvServgee Mhl."u-sfl Feofwep Ce-rchadol tRTdnlg TendObn Rtaftenas 2 u.___Ulme_ _am. - FY20iBUDG DETAIL I I I I II II I I I Wi101 Pt t TCD __REVIEWStOR CCOt^EC ctn.1GET REACTOR R&A.TOR M tCR UIYM _FAC_ AAA PORTUM ~ IF_ STIE _ tel VERY tlXXiPORT) UPF ACtlaM | Ovuta SOU D MAMA UwetC.Nucw f..wteSalary ------~- .X1 FM LK ! 1ErA sic Fri LK FM SI P1 LA P1 1.1 FM LK 1 1i "a! P7 E FM CK FM 1 1. 71 X PT! PROGAM:RACCOR SUL rIMMSACH(1).,~ h±' sw WA o -i azmD _ _ - Agingl R.Wd i,1M:Ing 1232toG SWemCO d., I11 2>.zhI,. III mP.mb4ti11oM Ing 1 I111…I1 LUsdDW REACTOR0 PRiOG4vt;X _III111 ER5 T Dfy Iii! PLANNaAinCc. LASR.PMOI8 r~gCWI0dO4 __ '4Dfl 2L i…--1 l ll l ll l L l 1 I--Qfi IJ 71 - _ 1 IT 1 11 1 1 I -I T 1 -- Des .. ^ =wnd l l X I : | 1 l 1 1 l 4 1 1.a'R kbumdL k.-a r.m lloo 5 (f. M..1OdRsmwcgu PLANEDCCOLASWESCUMn PRGRM.b 3lyACTOm IM *r, pILANNlEDACCUPUSH&WME~ ?I.IA0.....w 3 Ua.d Irn04CC[S~ GM fETAad M =A Y G IOR REVIEWS 1. AREEYSAEO~ZI OI URSL OhRAPCNE WE -&RI - Glh FUEL 44. RARELARTH ~ - _____ -AT AG A- *1 "2m s PO iU soalaSTORA& -I -T-1 I "--j.- . -R - 04130d200- PORT) A OS OvEat SuMECOu tEPcLA. W WIDCET . R _ ACTOR|DEuM& I TOR FACJ.Y . A L I FORTiTION FACJTIES RECOvERY (EXPORT - - - r- 1 - - Sheet C. ._m I--1t- s-afety -4 - PE 11 K' LK I r 11 -x T LK FYI .K PTt LK & -T T S. Ii I K IKF III A FM &K "a TE ITE K 11 ' - w Eit.g~sm huIflSdw~ VWOvrstI0' IL CI p A G. - - e-sIc II-l I - - II I I . I I~I I- I -I |Smn^flcem lRhp,n l~ | |- - -. 4 I-,ML Ttaislng ToIMDkscIRt +Ti6 mvs oaSQC LiA~~ e - 1 It~AUGYNUCLL&UATZRYSS2005Y-Budge-- * * - fihM,0.. AMMW. 0WV AMEW fR OTHE PLFNEBACC.OMPLMSHUEM3 UU1,d0.)de P.Wfabd*uson hcM~yUCkfiwgQ-j… FPW F.~uzu k..pwLiol Um.kmwReso~my hLk-sckg L&,dcjwnl LUcemtkn& Cnalkmhon NMfi scdhi.I MI... C.W., bdoruoI TtcAclkgy - - -- ……… Ikiun Tw&.ng -d Do-opmnt M.Lwl&. kwp".. hadww.s vcummA R.p.e IhWtWA AW-IM"nn AIWU U9gi Aftic aNWASg~WtaionS h*.WUoa Thnn.IagyJAliwws &I.wdlsI r Ramnuadlmun UrMmoasEIng Aispo Ugarmis co.,*imIOn TTC-.Tndlnam ______ I H 200 Budge etaV STRATEGY:NUCLEARMATERlALS SAFTY- btusm Igaloig NW D.Mopa-n*I ExternalTrsg - - WU.k-Wf.-..d Rg.Ww~oy Fra&s.ok t0 .1 Radlhflon £.PO$..O £Zl"SM.Alf Me""~Od 35) I.± O 1. O-S-...... Af2- -O.------"afgatman "UftlaWs. IUa~arls ______T______lq : ~ 0 .- - - . - - ~ (I-. - -- PROGAM' Mx'Lsi;6MCLAND scunfry. SiwP6~ PUAYOVEDACCCUP1ZHULLERM nheal ASSOS.rmnz I ToW. Ok~tst PLAhME4DACCO"gJMPWHUMT U~wal ASS.Swwd V.kw.b&W Asee..4s..'28 cw*SM .t $-aes esMftgbzy sewjty k~as&.Cve bnp,..m LUg. Ad~k SM ftpw,..tat.- - - - … Cowrk.UMn Oh Ualed bg~m Tnk*,g SMwD-.Jop.Pwid L1~cf~..~l-- - 2 L~aon3oa CCADS owntoffrntd on1G&5,4) 1 11 11FY 2005 BUDG D L I I ILIj FT 00 PO ER. SPENTFiEL.STO NG41J FJlEt.TLS RAREEATH UR tUld OTHERA Pu AT. Rm TOL AR TT]GE.NERIC BUDGE REACTOR REACTOFDECOM ECTRIALl MA Eil! FORT1O FACI MIS REC VERY (IX-POR CWPR11 ACTVIT1S OVEASGHT OP 0! AN ECLAil C -qC LLW Wwat P. Ncea, WaseaSoarie- -- -.------F.TE LKI PTE LKc FTM LKE PTE SLK PTX LKC FT! IK PT! sit PT! K PTE SLK PIX LK PT LKC PT! SIC Fri LK PT! LKc PTE STRATEGY:NUCLAR WASTESAFETY *PRlOGRAUiBNIVUiWENTAL~.0iROECTIN AND LWAiMNAG IK~'- PLAWNEDACCOMPUSHAUENThz EnvitonnorI flalRviews Low-Leval NW.sReguititon A Ovesightsl Legal Advice andRepresematdon Ealarnal Tratnig i~zz IntemtTralntng en Davalopmani TOW ~tectflesourcat--…- - - - - Reactov OeoomnmlaasnlnhVRiewnatd & RagQDsidaa Power Reactor DscammlealonlngProject Ugint A Lice,1ns1Ing Power Reacto DecovaismlalionngInsaclo liatranlsl A FuelFacility OeoolaolgLcensing AtatersislA FuelPacwly Decommissioni~ng Inapection Info Tedls-C*onjtgunsd Risk AaaessewenA DataAnAtynts Lab General WarmnationTechniology Legal Advice andRapresentaflon Ausasamor at Dosesfroms Envirognum"a Ccnlaminants3q I `e .. TYC-Tralnng NWDevelopment 9CG ').I--ff - -L PLANNED ACC0UPLUShAIANS. Licansing andCertlltcato lnapectton. CA Reviews.Enan Respores Adjudcawoy Reviews Legal Advice endReprosonlaintat Gonaral Wnornatls Techsnotogy rwnTlitanid Devetopmnentd ExenlTrainn I .M - IFY2005 BUD DETADL LS . - A .__ Used UIN4 CCROS Ds -ud . .% 4 j SOW. S0WA T ; K E1 RARE 1 h I I i kT | amsPE I EONREI S S VR ° _AOEICT|D i |PORT i | Bqt REA P LACTOC DECOS -N7MATE OSF __ P! SC P! ______SCFY i 5KPSIC lPT SPT!A TES T . I AE EATH IA R I A A SP"mFulI Stmeg System SafetyAsessment II.C.5 0 - - _..l TOW Wed~ Floc. 6 f Ge." Fieid * WoGm°llanTechn.to" D==S | - HLW Docuametocase------…-- ns.eal d* kiratlon TeChnology. LS| l l |Gnralhjlwl~ ~ ~ ~ rta OTruct Resowoes lll l l PROGRAM.WASTE HOMELANd UUmT.CUP~iiUPLkE~J0T1eA;t Cter)I PLANJNEDACCOUPLISRUENfS - - - - ESA.Vulnorabl~ly Aaassmne - - - - -I… PROGRAU.WASTEHOWIWANEUEUrsuppa4ENTAl _|In) - PLANE IACCOMPUSMMLNME- 1 Total C4,e ResowoCs1 - - …………………- PROGRAM.OR MERLY LJ4EN SI FLANRiDlACCOIAPLISMIENTM Pemreity Lkcensd Sites ToWaDikect Reewcax 'ROG M WATEl O S! JR ST PLAANEDACCOMPISNMM------1 - - - Tlvea Aasseefeent - ………… 1 1 I I - -1 1 1 - 1 - - - - =------11 :- |Satg5dIt59abbpe~onctiOU Onntght NRCln~sswfucts lewpovsmts 1i 1 1 1 - - - 1 1 - -11 Oaeltorstlnscntogy - 1: 11 - ……… 11 I 1 |C .Trstno D|relopm r | |W WotrnTre~gandr msul ogcmeet TOta Otrnc Rasoucs- Usd-14CRS 011ICAI&4 JF 20 B D I I II EVIEWSIOA OT IEI 2mC PI VER SPENTF EL ETORj NOW OWEN 7RTUE EARTH UPkUU APPLI NS u m4nNLjGEM SA.IG IERIC B DOET R C9 REACT0ODECOMM RI TRS LAl M.ATERAS PCR TO FA S RE OVERY EprlACT VIIES I O N I SOUP DECOU LI GENEIC LLW 1T LK EZ L FM LKIEAK K FrFTEVi LK FlE LK FlE LK F LKEF're LK FlE L TE_ KI IFT LK FTE LK FT FMt STRATEGY:INTERNATIONAL NUCLEAR WAETYSUPPR -PROGRAM: PARtICIPATIO ININERATONL ES o~pri/ExanLcmnslng Revie"…- IntenT&'a n rm .&mpnr EternalTakgToa teReoa}- - -' Support to AID------…------ General kuforumatonTechnology- -- - STRAT!GY: HOMELAND SECURITY……… -- *NUCLEAR WASTIES 'P PLANNLEDACOOPIW HMIENTS2…… - - Vulnarsbil"y Aeeeeamumette- - - - RaguletocY btprvweente - - - Safeguatchlflspction and Qvervgh …… ……- - SaIeguards LicflskVq…………- - - -- Securitly lntrwtLnctitth effmtts -- …… WnormationSecurity4- -- GanrwalWomtlintlan Technology ------ ExbermalTrailnlng 1………-- - -- Total Direct Resources . Used1113V CCHM CamhWd0danIOh.V4) ,Dti _F20Bd _ _- - .- I - - -- I__ I R EWS:OR WH-I- SI dmef o gw WE PN U SOA OE I RAREART ULUU UTMMLA7I AMOIJAL JAGREEM STATEILJ StLOGET RE TOR RACTO DECOMMIN RE 01CR UEP UY MAYE AS TRMISP RTATnoN PACIlIES RE OERY (EXPOA1 PORT) ACT_VES I VI!I~ I DfOP DECO.LJRECLAM GERE;CLLW STRATEGY:MANAGEMENT & SUPPORT I *PRoGRJm.POLICY SUPPOTt::;- - ………………………------cRG.-AD VsoRr FMTTFORREACTOR UPOUA.DNU WASTA PLAJINE ACCOPUPLSIUENTS. Roactor Safety MadpencdeedAd'AtcS Usew~s Safety, Low4avel Waste & Oecomin General donrmatoo Techr-olog1 ______I _ _ - - _ I /415L,~ c-)p adCID s -= 4 -- - - - _ _ - T1 - FY2 IBUGE DETRVEWS ORi C." D - T _ RARE LATH _ R| _OTHER APMCATS _ A T AGREINbT STATE 0=00 FY2X P OI VER _ PEIIT FILn^c OW R _ FUEL ; BUdGET R ATOR REACTOR ECOW. | OR F TY UTRIALS PORT TIO _ F ES REVERY (EXPORTMPS_ S OVET - I _ MP LIR LP F M D71C4FECALSTNJGERRJL _ K PTa U.K T _ x LK | FTE LK FTESFTE K FTi K K F6 LK FM _ LK |I FM & |T m|Fr K | TE STRATEGY.NUCLEAR REACTOR EAFETY PROGRAMI REACTORLICENSM r.-i.F ;. __SJENM_ PLAON ACCOI__ Uco~." AMg...U&Ucniq .En CaLmLk.uka Ti.s. OLk.W A EaWaT Os9ZTlll<.of P. ft Op-u _Si_ l _ l . E~ _4M ,..I 4 L _D 45 _ *Vw-d SIh.S .M ET*o.hSP Pu .I.IPmw .. …___ - ! W L { 1- - ! I 1 iigY -[ - - -…- O..U 1 4Ifl~dfO Un.sA.l MZ E RnAw1WU SPIO p*SUwd hU 5a IDII PRwwOGRARACTO WIchr RENEWRaift _WE | _ _ AP AFN" ED1AF C C lA 9 A _ T.W RA4i.d . Su 1. _A " T I . ll . lt J7 loft GM'...InLk Reh - ROW..mtoT"ao-1 - I aR1lw d r X lly OE-a hhBU Tc - l _ u llll E.Wn,. TralnbLa I : I:g gu. Tro , \' - IIII LOIIg.IKWS 7 A|W 1 l _ l l ll _ T , oR D w UdV"…IFYA i w*) F2 BUDG IDETAJUL I II1 II I I I I I - - TRFd RARE LA TE !rIT KM SnTATE GINEI PY2EO5 PG Pt NON1 0WER FUEL u RU OR REACTORDCOLUL RA-OR PAtV MAT RAS PORT TIONMIE RICO VERY (EXPORT4 OT) ____ M OVEP15GhT SC ECOM ECAI.W LK FT[ LK PTE SK PT! LK FT! 5.K PT! LK FT! 8.K FM LK nit LK rt! LK T LK FIE LK PTE LK PT! LK PT! LK FTE PLAMNEDACCOMPLISHMUENTS.I P..do Pf.doW@RA*..~ R..cto b'p end A.....n. Pg. D.e.. d O-WgMt ______ No.4P.w R.@io OpIAtoni A O.toe-.W*Wfte M ___ SM. F~d.~.I aNWTd". ULan Acft~es *g.I Ade~ eNdRP-.p..t.Iia R~ee.-Wknsteiost~eS k~mm Tkmngn and Lnp6e D.n.Wp.ent E.Wen, Tme.ingt Ree.'w E"Mn Respw"~ peecW. beel ReedeW* TTO-&0..~M-f Tod-newoy MeI" Of Spe--ITC TTC-OV@A.'Ar*. Serds., TOWP-P I cl4 i-t-a -&~"- low)411 FY 2 BUOG DETM4jL - 07220 YP~R lEFj.ST FdN~~R FUEL W- RARE URIU A~CMS STEFXE NAnh AGREEMENTSTATE GENEERIC S GE I REACT1OR REACTORDECOLaM. REACTOR FA LIT MAT AU PORTpt FAiRCVERY AiN (EXU POFOARIIT --- O v"ERSIGT iSii* DE1 i- LK1 FTE FM L K FFME FTEIULKPM! LK P"a .K L.1 FTUFTEU UKLK IS OKL. FE L.K FrI L.K PTE LK F?! L.K Fr Z.K PT! FROORAMGREACTONR SAFEY RESLARCH(RS PLAAWLDACCOMPUJSMIfEJVSI Oea., InWomatlo., T*chnology W*" 91yoR..ctW Eyaia' ad C-np-Mnt Aging Rotatd EMf.ct Ont&Yffin. and CO-p&nant &eatyA..euMan of DIgit Tecletoogin, RAQgimtatymd.ee&aotana Adkp.on.. kdtt.tl6 'toneblltmW RlO A.alyne an pWlel Aeae..lng and Mon.Wa.Wg RP-t-ad Syat. Cod-I A ofnataHa.ltt Effects Wo~odOa.W. Foot bitT,.Wkn and Do.loPn.n4 Ltotn.t ToelnIg TalDwnd RAanae PROGRAM. NMWRECORS* 1wt Saf Pm-fta DOW"n Codwwuma pv*AppaIkedn R oad" ka Ra~do.ULk-.kV hkdopondOdAd,'.e Con.blnad Uoonae TOta Glad Rantea iROGRAMREACTOR HOMELAMID SECURITY .SUPfLEM LfSY PROGRA&- REACTORHOMEL.ANDSJIY ~ ------SEGT REACTOR REAC'TOR "ACCOIAC V AT M' POERRAnYTIT A VIPLHTDE CLW Sh.I C.mxcw R..tw -of.y- - SIK FTE LK "II IS.K FTIE LK FTU IK.TEL S_____ LK ____ I. ITI I.Ex FM I.E FM I.E P16 &K__ Fit sic L.E P7 sm. whap-QnN 0;h £nt.." Traw"n EiWCUOniC Who..ISc..tt R~q~k*~w TOW------ ______T I 200 ge W I I IER OM M4FT RAlLRE EARTH UNA 4U . APPUiCAkRs Dt0TSIA~ONL AGREEMETSTnAn._.tERI rr POI ER .SPEN FULL STORACGIE NONP;S~ MLJCat LA lf30CCRDS 0- _ R I . oC041| St |CTOR DECO-M, a TA TAnt| I FAm. - . . . . STRATEGYZ2dUCLEARMATERLALS SAFETY - . * * - 'PROGRAmD.FUEL FACWTES LJENS04 A .==P PAJ*M0 ACC*LJHENTS' Fu. FtWiW. Lk. _._ _ S..d O.W. FUMF.b.um u .- . _.miV= Ft.d FPtMwis kb.P.dh5 EWk..kM505...yWnmO &U..d-.idW FUW ULg* Ad.IrA .t" Rp~.0W 1OfUl F.W F-.tU..*Adjldktimf 35 LAU1 2 Ithnm T..Md_ ___D__--W.O _ 1=r 1.o.IDkeetRe tt. -35 PnoRAmtt NUCLEAR mATEMALS4ES MCE A PI | PLAOEAaD 4EOP?.MUN U"MU Uokw" Mudm.i"bRs....k~ M.WUOMAEt.UU Et.M.. 1 XW wUdia.MM Etas.- FLlo.LS UU.f-S . IAU Li 1i UMM AdWEM V .ee.., AdI. tkI htlat, d- oI-gy'ikfI . R.M Te_'|_ d|g= _eeleE~e. F|_ edte ll . 1 11I I_ I . I 11I . l l 11 . I ..- W.1EaM RS... l l t.WW.C.rti - II______- . 111 _- -t tt-1-tr-1-t-1--t-lt-1-*t-+-H--+-4-4--+- - 4 - 4 I I - 4 - 4 _iI - I I i 1 1 I l 1 .I I 1 M.a@,WSRukoakf _____ .. w.. -_ f .__ . . I .- f1 . I _- I .I l I l 1I 11 77.rann I ,I - I I . I I I . I Ud I1 CCRSDS l 2_* REDRE CdUn F _ AlMREC VE . k A 7 S. F T| E .SA El[ FTELK FM K r7E A |r m . FT nE mT _K mT &X|nE|K sic &K FMnE |. FtsnEa n sic nm LK |I ne K FTS| STRATEGY:NUCLEARMATERAL2 SAFETY - klln Tral-in9 D=nPo 'N = - I| _. Rl4.hfoened Rgelely Ft... RFdlwen Expenern """=mad= M==how_ TW P_--on .'. 23 2 2 2 PROG.RA. MATUUALS HOMELIAD SECAITY aE_:I PLANNEDACCOMPLISHMENTS Tot eSde Rou.en*n PROGRAM MATE:LALSHOMELAND SECI _ _Y PLAAWEDACCOMPLEHUENTS Tls-et Ase".ee..s Sys.-d h en-on O..__igs._ Con"e of 5Seo IndR.9".sT ktonetdeoeeog~ty.ee I se- Tf I 1 ItI I 1en1 ~e l dI Leg.l A&WOMeNd Repee.emtn C.o.dlretln wth~ Stane knoesetlonslo oselyl l ll ______kern Toetoe eNWDeneopoett ExenlTIedg eetOtotRse" .fIftEacE=II Fz PO%fER SPNT PU;LSTORA NION-P.OWER FLERF s ARE EATHR 4UN OTHERA CNS ITE, 11OM. AGREEMENTSTATE GE xRIC U E RETOR REACTOR RDORE P MATERIALS PORTLETION PACAT S RE OVERY (EXPORT UOT ATVMOVEVtK SOUP DECO ECL'EI. GEND .K Ff1 E.K PTE IL PIE LK PTE IA MTE LK na LK PUE IK PE LK PIE 1 L PU LK IPIE LK PUE LK PE LK PUE LK STRATEGY:NUCLEAR WASTE SAFETY P;W;Z . -- 9CULATt . 1440-Law.4 Waste Re~atime R..~~.TosL~ PROGRAM.ENVIROANENTAL PROTECTIO AMDLLW MA"GAEUE[ PLAAMEDA~COANUSHMMVT LoW-Ls.vI Waste Rfg.Asmfi & 0-dgJ. E*Ia'os T.161n hu.w" rk*.g "~ De"pom - PROGRAM.REGUl ATION OF DECOMMISSIOMNIN RAact. hai.10 P.ORlkule A Rg Gifts P.... Rootuw Dcoff.&.ftft~~s P"A.c *1gM A os~ Po..Rsco 0..mte.Intehpoctbo. Moa.6161 A PF61Fakly DL...dsohn cnain Musgsn.1 of F"...wt,LkU d U"e Wes." n*1 To&C..pA.. Ri" Ass-fewdt a O.1 An611 . Lab G.,.61 hsdo....dOmTeshnolgy Lega A"Wm so R"pMesntmio ASM&..M6 of - MM Cw.ngf TTC-T-V~nkg WnD.-"-pnd. To~ta0*1.0 R.aa..ts -PROGRAIL SPENTFUEL STOR-AGE A mRANS.UCENSPIC ANC MNP (oMSS - PLANNEDACCOMPUIAMENT$A Maeek...1gs CAIdtcad F"mftn i*dcW~~s42A IA AU. la Loo A- ______- - - 1 - ==-n D-%Ift- - - - i -ZW I F) 200 BUDG DETAL - - I I IOU00 POOfR SPENT PU L TORAE NON-POWER TRANS. FARE UTN IUR OTHERAPPLEAN WM- T)N AGROIU~' STATE G EU A~aRiAA40 FC n MATEOFu ORT kTKO FACEn REC RI" (EXPOR s-IMPT AM -M OWsr)f OMP 0CI~CAi L T IO. KF FTM K FM1 OLK FYI O.K Fri O.K FTE SOK FTE S.K PT!E IA9 PrN &X Pr I. Fri SIX PT! LK PE O.K C--WFGW kfl-O. ------ CGnMWF-,d LSc.IHy.U PROGRAM:WAMT HOMEUAN SECIJNTY.SUPPLEMENTALPR.-d O)-. P(AAUJEDACCOMLISHMDJS - -N_ - - - - ESA.- VkWoba~yA*.-ft *PROGRAUWWAST*OUELANO EECURTY.EUPPLIEMENTAL(W." PLANILEDACCOAUMSPIMMDJ ESA . V..M..bU"y A~.-"w0 low. ok.dt R...c PLANNEDACCOA&~IJSNMW5MT Fem..d Lk..-.d OM. T.%M Dkad R~ PRORAM WATEHOUELAIM ECU.BETY.WAm ,LAAJD0ACCOVLUMNUENMS. ThnMubhtA.... . M~ NMC Wr....0. ht MM O.3Ikilfo...O, T.ch~ow"g r -TC.TWIn. am D~awpm.M I bdM, Traknhg &WD~4or, HLW RtpoJyyUce-ing A-V-"s~ Teu~lOJ,.t R.c~o, BC 1w FM 3 ;ic I.LW PTE 4 uWd 3CdanW D d- | f I IFY2 BUDG DETO i| I II I L V" I- Ioe I REVTFELTOIrORk OTE I APPUA I WTERNTKO"A AGREEIMdSTATI'~~ 7PS 4 OU POIER SPENTPU SLTO IdON.TOW!R MP." "A1 TM URAtumJ _ LTR F AC ._ E1CR F* -- AZTS RrCO"DE__ MRILR|_| GNI LItW S _ET CRREAIT R TOR aC R AF OR V M I FT .K FE _ LaK rTE LK T! S._ PE LK PT! S||K Lx PT! S| FTT &K flu SaK F |E LK FT | K | T LK nT"F. | K mT LCK SMETRTGY 04TERNA1TON. #ACLWA SAFETYSUPPORT____ PGRMPARTKCWAT1OIM INTERJCATIOI4ALA~i PL4JUEDACCOUPUSNMAENT!' bftm.nalon.W N-1w iS.S-y aNdS.Sqard. knpo.rmpoa Lkanaln Pt.AI MU_.,.W L*g. Ad4c. .,.*.n.,=_-11 i,.mw TmWlnngand D.-.1OP..an GW- W..alkn.ujo Td-ln~gy STUnGTY: HOMELANDSECURITS 'PROGRAsa.IIERHdATIO~dAJ..IUCLEAR WAi! CUP .PLAM!OAACCOuPUSH"CNTS, TIVO A ..a... Ws V.,k-.bIW Asan..an t. G..e kWo o-n.Si T.Chno"le i b1..nM g I iI1 ! I H i I - I -l I III - 2 En_____n_l' -dl~s - - - I -l r lmflmlzl tz mflm~ in l ll irnlinlmlimt ll liJ Lv- 'LI - 0 _: 6 I/tV77'kI \ QZ-oa-1-E U.dUWO4CCRDSb1 Da1sW.dl. o _-2 FY 200 Budgi Detail ------_ =O OTHE_ Sh"I ManhgmurdSW4 pQ0 FYPY P WER SENTFUE STORAG NOWER I RARE USANIUI I AP WITEA IAGRIEUINTSTAI I B DGT ECTOR REACTOR DECOMU BRE I FUEL MAYERUIAL5 TRANSP RTATION FUTAES | RE VERY (PORPORT) ACT0 | OVE TP DECOU EC I GENEMC LLW SLK FTE SK PFTE S, PFTE SI FTE SLK FTE SK FTE SC FTE SI| FTE SK PFTE SI FTE LK FTE SK PFTE SK |FTE SK FTE SK FMI STRATEGYzMANAGELENT &SUPPORT efla ADMISORYCOUlTEEFOR REACTOR SF£GUARJ D0MUML. WAST1 PL4ANED AC OOmPSHUEmW 1 1_ BFactorSafetybusdepermlent I|II I Uts Safety, Lol Wuaston 1 - GCnra iomutlofl Technology - 'rawIDirectIR……ca…… I=- …|| t DMWfdctrV I FY 200 SBUD DETAL7 - - -A ______FY PER SPENTFtEL SOU N OWDIER E A ERH UAo OTEA PAT1 TE TONMTATG SuaT E" REACTOFDE ORB FA UTY UAT A P TO FAIMS RE(VY (XOIUPR) Sh" PtASlwWus&a atSj ______SIX FiT LK PT! LK FM! LK PT! LK FTE LK FM! FT! LK PM! LK PT! LK PTE LK FM! LK PT! __K __ LK FM LK FM! STRATEGY:NUCLEAR WASTE SAFETY -PRCRA.IGN4V!LWASTE RECIA1N $- Low-L.vol WastoReuarionk A Ovwtalgo Lega Mvlce ard Rgwapraentln SoaurnaTrainng totemTreirrinq andDe.aopnrent Tota DirectResources iiP fGA&.mREUiiONOF flECOMM O IN Reacto DaocoflnlamlwrlnRWlemak~" A RagGulaes Powa Reacto beoceolaiglonln Projec taruf A LUceneng Poger Reasoew otadlcn Ieeio Mat&Wls" A Fue FacI~i Daoonintselof kupaodm Uaug-d of Formerly Licanaad S Issbues ala TacbtCemmpAutarmdRis Assesmaoan & DataAnalyal Lab Geeralg WiowmMlonTeClmAOlg Legal MOMiCeru Rapeswltsdan Lutemel Taining AsaessmaboMof Dow~ ImonEenlrownffltl Contsmlmnso 1TC-Tralritrrand Doerpmeot Tota Direc Resources PLANNED ACCOPLISHREMM$ Ucorislo aNWCertltlotion kupectko CA Reviews.Evati Response AcgdcataqrRavle, LegalAdvice and Representation Geaeal InnadormatoTechology ktniemkreslgendWeCanoaes------ExtarntalTrainin OFFICE OF ADMINISTRATION UieCdm114 Om co = =kd = = = T FY200 BUD E DET L I I I I I I I"S I OR OTH|I =I = = = oIn 20f POI fER SPENT F STO . NC ON40WER FUEL 3 EUCR-ATOj DEC 0ERLW U11weOT REAqfoIs flEACTOf OECOmlmtTl FAIJM MATEIL f OR T7 FAC |IE |E' .PO AC VI||TIES . I OSIGHT I MOi DECOfM /RECW GEE } Steth-_.& _-;af-at-t-&-vod…- S…h - W- -- -1 - 11 - -I------1 1- tK FT1 LK FTE LK SE LK |tRE LX PRE .ILK |RE .I PT! LK PT SIC | mX "Ea Sm _ ! FM LK FMT Sx "Pa STRATEGY: INTERNATIONALNUCLEAR SAFETr SUPI _RT J - -li-…- - - -I - -eV- M------lntamettooalNuckwSeteyendletogmmrds 6… IMPortVEZpo UCamtnGReviews lntaltdonel LegalAvica end Repreenat_.ion In mTrain~iWh Dwislopm=_' External Tratnku Suwpot to AID OGWenalntdobation Tachno-o.. Total DkRt esure STRATEGY:HOMELAND SECUR.ITY PLANNEDACOMOPL.ISHAMDATS. Reagulatory~ciean vwlt b=0EI . l Safeguards Licenising I ._ : l Inlounmalon Secuity Ganarl worm m-aloTehnology- - External Trkaulg Total Direct Resources -6.. 7 o- i U -1-1 U.d W&W CCO W -. ___ I FY 200 BUDG DETAIL I jI I I - REVUMW~OR III SPENT RU STOW- W4I - ~ MS. RfTRlFACIR EATHO nmUl. I IRECURA VER ITORTJTHERICA _ Mr-dun £ INTEASPORTTM TLAORESCM&IGHTT AGREC^EMYWAOTlPmOTPD S np OLOUGdRICL I - In RE" |_ - - - M--- I- __ | - - - - S - - - M sLx Pi LK FMS LK MK FS.X PTMMi SI Fric ITSr. SK FTLA P E TE ~iL L K Fit LK PiE LK FTE LK T Si ri LK FI' SRATEGY:NUCLEAR REACTOR SA... | PIROGRA.:REACTORICSHSINC __ MAAJACCOWL.I Mw . l . l .H l _. l . Fm.idMan merd~t£ Lconsig Asuismani U.1.0.9g Actiln 0Gw ucan~lngT.ka* bOwk"d Sn.,d-f Tch ipao. f.m | .lwm.t LUneskg & Eaoninatlon of PamRx Op_.m__ OpmwsUchmsig Prov & Tndnlng 0v. . g. _ P.pdmmr Umnnsinginp-o.onni tvnia E.W.ustin andGn.4c Commmkunl~~n NcrP RanPioFigandww UIinig . Vandan1wn.. Aoiion/@chnlc & Is~as RakaoI~n Le.d titmi and R Lpm.nt.tion A4udindmtr Reviewsd tg~T,.* Lnlo. Oa.n.Iop . .n l k0.i Ttkiou*o TectiXpWg -i - iTctIldR.cm D - d ------= …- - - - M.A fotmeDn~oouShmmL I OGh:REACTR LiCsNSRSNICWALettp RaeWal8 Application R.'Mwsg U... R.al kipradlo Gon" Wmado..on Technolog EdotanlTmW"kt Leaw"l timcand ROas,'eswt~ion TOal ad Resowo.s I EadIA=4UActnos- | a" IUDGDETAI_I IFY I I YO . I I I I I I I I C___2w_ FY.______O__ r41ER PUo . RARE OTHER AREEAG. AT! OUNERIC GEJU.C i___oCA____l!A____lORA.- t>N~z clotllliV .EPORT MRC, 1- MATE- , |--rI|- l - |1 RECjVERY - =7 --_ i- i IIi- I E C u W C4AAaLEaRp loIN A PIR O U d ESS _ R*WPa19lyI1S ... A pclna.. R~acw Imapan £...l n P~g.O".,.an O'.w&Vt ___ uan.p.. ft..cwoOp-..dn a Oan_.9oAM~g k~p III Rta.P.d. ad_T_ LIaiso=Acdniia= _a_ LaA.andROlkwalatlw"vim WW n - -h .=_pIs=11Wba------Rt.scto EWoa~,d Atios bRamwrakst5gand %4le~ /a b, Io ZaM .amTaTrCa ng WE e =:=:::p m 0 T - ¢ =-- d- - =- l D- l - - -4 - - -= - - 1TC4,&~Obanlopa ad Tm*AwanmeI Tadmohg TTC-O. AiONW .Sad. ToaalDI,.dftasooms |/a .0 =_- - =...... = _ __ - - - - - U"d VUW CCRN DM (pd,"d - WW" FY200! SUOG DETAIL Rrilm on OUJOCAN FT 2)W P01 WER SPIM PU a. FU61. TFUM. URAWm OTH" APPLCAM AaREEM STATI GIONERIC BLICGrr RMTOR PAACTOR GENEM R mc ff MATEqL4,L$ PORT kM RMNERY (---T --Ti Shed C; A= M om -w sow DEMM lkclear Reader Wety - - 1-1------I- - - - -1 Lx rm Sx "I Ix M &K m tx FM Sx FU ax &x rm Sx m ax rm ax rm Six FM FM Sx FM LX Pmgwwog.. assaw Seely asso-mb I RAAWED ACCOAMISHAIMM I Gentle kdonsed- Ted-wim I I Int"M ol Roacior tyawns "A CWOWWWA Aging R.Wed Eflocts an Sym-m and Co.,pa-us way A.."-Wd of fttt.1 T.dewl-gles RgW.u.y kd..Uvctwo and kno .Onft hO&Was I Assesmant of OFO.U-s P.b*bU.W NO ArAty". and Appikail-s I I Assessing and Meilaining Rssd " Synom Codes q I A.sessmentatHuMlEffecls &Q.d0.1" FUM and Dow.Umm..t Enwnsl TaWno TOW Dift.1 Ftss "kiaa P&AMMEDACCOAMSMA901M, " a" Pennies Design ce'docea." pw4puce"n A-i- if ftvwm kdm.&U.:bm New R"cW UcwW" Indepand" Advim LsqWAdWmsrARspr**s.t*dm__ C.Uh..Bm hapeadan CoffdW.d Uveneas f TOW Dined A Su PLAPPMACCOUP1.1SHUMM W.-blUrfAssevowerss Sec.fty lk-VUCWM TOW Direct Rasorces P"WEVACCOAMISNALPiM -- T-TF iTht"Assos-US L I I- L - 11 1 3 umVo34 cambmwkmd n I FY 200! BUDG DETAIL~ auwEV Km=_R__1 REAR sbo_ g. FTOR FA . A PORt T1014 PO REs(XPOFJ 1)ORT) . . OVERUT __.w a WW. u | tx rm~ FM rT X rm | a &K F txl FMf FMt x "I |K FM -s n ax FM | m ax FM IX M1 SX FM~r _ _.gIMW VW - - - _- _W ------.I 9gardabsp md OwlZ0w ATl = ll = = = L.t,0 AdW.6UA" uing -u G-r k"O -A~g bA" Treirdnand wlpan l..p Ad,,u and'Rm aanCt L4.unrdn Comrd.W.an andSoeftly RPqkwrnmM ToaWCuinn Rlanrn | 4 -- LK_I Ts LK LK FT aX FT sl FT Si rr LX FMC X FM sx FTC LK FTC LK FT Ix m LK FTC sx FMC LK FT - SnRATEOT LAFM = =L- ==MAT=RULS _ - - - - -= -= - - - - ------= = = _ ! UdIFW F sM a nsing = - Fud Faci buiesdjdicn Ua.M.i-OnAd raininR ftwm usimdand bt."Ingn _&_==y - JCLEA& I I - - I - FvFckS_&iWftU*ft~lRAiC kM_==l_|I I -… … … … … … ------= -= ------FF,,lWAJEEDA41.AmVh------ - - - -T- - - - - G - - … - … … … … - … - … … … … … ------tFl~ntacfmtlinssap. iol - - … . -d - - - -p - f- -A- i -- - -- ------g - n------T --- MMW.i5AQhftda- Slafte L1I---..d--nWtio - - -X …-X - -- … MatemiusSams. Fitimkl U.0, ad Ct.UM Tibur/7oHJooCrt Uulmn A&W .d . -- - - MatedoaiEMnia*Mn~n Actios- - ~M~tmtathnsn~ati~se~- - - - .. o ~I a Legal ,cA ndkeWRft.F &L;nantl - --- -A- - - - ------WattmuTlahnT.clt gydhnuAtws ------ Ua~.t.ul RA-snklN TTC-Tmklnlngad Oaslagman __ __VO -r-l-tI0r /,07 Y2f (16(rjW_ 41O,4j eo = = ==- | = = = = ~~~FY200e Budge LOW]1_ 1 1| = l l ueaosw*sUv FI RATOR ,EG& FA LIT KAir .&~ ~ M-pm-orin 1 F Aal nLs ov %mk I~vR I UNe _EW X rTE LK | m LKt|rE lKx FMrn LK FMrT E SX TEsK FrTE "a 1 c | F - FTELKu |m FM LKa ^C sxu n u sx LK | FT | x r FM &MhTEQYt UCUARUATERMALSJETT V-- . - . - . . - . . -- R1.6k.lm~d ftsuktoVT F,.mdwk Aln.tdwu MflDWUd. MSWml.J PROGA-d MAKLL rniowIlunYm Qc_ R_| K1N[ .CWOW.N / 0 __._ | rxi e 1TA5 r r lr s W l PORMA^.lelPLAAUEEDACCWAPdmmWNS AUHUllb*Es t7.' hl h------…- - - ° - -' ------ * WDfOPA6 PLANAWDACCOPUPCEMr=TS ftaWeg=.wXInso Wd O wuigt V X B 1 C.iUv $-a"Sof wd RMgiWu I=tdF v - wo~.gm" Sm."afy l L-~ A~dvi AW R.ft.Mldon G..nm~ Wa.min TJstf doW Wanib .. d bamo ._lw* = D wg Ek I Tndah , 2 UsedM31ji CGP.SData, ~ onaMM204 I IiFY200 BUDaTDETAIL PY:!Cw P0 ER SPIENTRELOTR4 Nw,- - -M S -AEEAT UR UMU OTE A P IT TIONL A TGREGENEI UL GET REAS0RTOTB DECOU REACIORII MAT ALSOI P FAMI MES REC VERY (EXPOR OVl ITES OVEMGMTo DECO& DULENE ULLW ______PT SK F! SIC FM U mT SiK FM! S FTE FMCT SC FT! I PTM LK mT U MT SC PFT! LK MT FMPT 9 FM! STRATEGY:NUCLEARWASTE SAFETY d .. h / / ~D.. _ ______ff,",20 0 .~ _ _4' . _ _ 0 _ ------Nlgh.LamlWWst. R~gauladnRaaoanaasTaL 4 *0__ . . EnviromaentnalReveaws……------awJ-LevalWaste Rag~atslon A OversigN LegalAdvice and Ropmsonlation, ErtwaralTrawning Intsm Traning VWdDevelopment TotcalDkoel Resoigas, Rea~ctor caony1anlaaaangRulemoakng &Rag Guides PowerRae&te Doornmlaslonln ProJacUgra A Licensing PowerReader Decoomdfisimln; hmpedim MMAteIALS& Fuel Facility Oecornadzalri-AlnLUoanang Matlebil A FuelFacilley Vsoslalen apetoie Mawgnwgenaof ormwrty LicumesdSisa kaa. Irlo Tscb~Comp~dedd P~ek Assaarnwnl ADelta AnalysIs Lab GenerallnfoarntatinTocllnology LegalAdvios andRapasonlatlmo EztamoaTfaInkng Assessmnerdall Dosso kom EnvirranmanalContamkInats Total DirectResources PLV&Ma'jAGCOMPLSWjENT Llenoling andCartincatMo kispecowto,2A Reviews. Event Rasponase Ad4udcatory Rev.ews LegalAdvice andRaprasentalloo_ General WennalleaTocltnology lots, Training aVWDavelopotant ExternalTraining I aSoER SPENTFEL STOJ40NO I'RR UR GUM O phER liT!I ATIOMI AOEU4STAT-E FY GET RELO SO B MTRAS PRfi - OTHE A- I I SWGT= ECWDCMEqOS FCLT AEIAS 101k=REC VERY (EXPORIPRT) AT0 ffDECOM SOUP SRE DWENECLLW S.K PT SIlC FM SKI FTE SIC PTE SI FT! S.IK FT!E SK PT! SK Fri S5$ PT! SIC PT! LK FT! SI T! SIC PTE SKC PTra SC PT! SpWnFuel swoage Systems SWeir Assessmenr- - TOWaDirect Resources- - - GenerAlFund .lrtlemvattl TeChnology GOUS HLWGoWne ProcessfinS GarmeralFundt ktWormedlo"T--hatlogy LSNI Tofu Direct Resources PL&NNEDACCOUPLL90HUEPT' ESA.VutnersWqAyAsmlattet PLAJNEDAccOwMLJSHMWBATS SEm.Vulneabwlwt Aeueesantett 'TOta Miect Resources - -… PL ANNDAC WMLiSNUENIS: -ow~lUCWW Steal Total Direl esources PLNEDACCOPLZSHALENIS Theist Assessomets v lenttyAssessmants salfeguardsalepectIon fad Ovarstgt Saleguante 1.1saing Security hntrucufusteUnprovements Wiormalon Sn*t URCWmlruetucis ICmPwvisn GeneraWnormation Techtnoio kflern tralrung VWdDevelopmard KLWReposNory Ucanslg ActIvities F Toal Direc Resorce ~v4CROO~r~g~I - FY 2005Budgi Detail Qx F POWERn PENUE STORAGA NM AR ERT UPAMM T0 ERGICI. REGC6CTOR EATOR CECOA RE OTR FUELIMAT TRANSP AATO FA Lles RE VEY (EXPORI PORT) AVE IOIGH SOUP OECO&AMRE GENE VCLLW LXK FTC IK F11 S,K PTE IX S T!.I FTELK IPTrESIX FTELK FTEK C S.K FM SKC FTE IXPK FTE LX P11ELXKFFM FTE11FrS.K STRATE0y. MSAGMAEENT &SUPPORT …- oRG. ADwVSORYCOMTEEFOR REACTOR C.tUA fl WASTE PLANNED A=OOOMFLSHIIENTS ……… RacloSf~ty 4 Indspafld" AdIC T M..Uazrnalsety, Lcw~evoeIWSS~iDWLm4 Gv.Wak~5mtaIonTechoWgy……-rj TOWDota,d ftourcs… ...... …… AWCF=Q&(idIFY atI 4 20 BUD DE - - I I I - - - - III I IEVIEWS OTHF1 I - -I -- I 000 nj 2 00s. P4ER SPENT EL STW NONfd WER FIAU. TR S- EARTH U UUNTERNARTSTION,1L %GSEEMEIITETA I EGIC BOGT .TRS REATOf DECOUM RE ORS FACLT MAT RA POR"TkTION FA R4VERYOIIS ( -WInot ITE-C OVE SIH Dup DECOM ULA GENEWLLW SIK Fr! LKC FTE S.K Fr SIC FTE f.K FTE SLK FMX SIK FiT LK FMt SI Fit SK FrE SIC FiT SI FrE SIK Fr- LK FrE SKC Fm STRATEGY:nINTRNTIONAL NUCLEAR SAFErY SUPF NT -1PROGAM ARICPTNINNTERNATlOMi- -G PLARN EDACCOUPLISNUENTM2 Intarn.Uional Nuclear Safety and Safeguards lmnpoulExpoutiUcmnsing Reviews International LegalAdvice and Representation Intern Training andDevelopmentn Eltlanal Training Support to AM) Ganaral Infonnation Tsechology Total DiracI Resourcaa STRATEGY: HOMELANDSECURITY PLANNEDACCOUIPLISHMEMT& Threat Asseaumentl VvlnarabilityAaaaaaramran Safeguarda Insectimo andOversight Sal eguara Licensing Security Infrastructure ImnProvaemntns Wn~ormllouSam"il General Inforgailon Technolog External Training ToatalDirect RasounasI 1 FY2005 Fee Allocation Table for OE (Simplified{ - ,_~Ck, FY 2005 J Power I Spent Fuel Stor. Non-,ower d | Fuel Materials Transportatio Budget E - Reactor - ReactorDecomm. I, R!ctor / I Facility -I . iO.Ain - ' S. K FTE S. K FTE FTE S.K \L FTE_ -S.K Nuclear Reactor Safety FTE $. K S. K FTE .Tr Reactor Insp. and Performance Assessment - - - Reactor Enforcement Actions I/ 188 11 182.36 10.67 1.88 0.11 1.88 0.11 0 0 0 0 1.88 0.111 External Training . I.Jz 4 0 3.88 0 0.04 0 0.04 0 0 0 0 0 0.04 0 Allegations Follow-up 5. | 2 2 1.94 1.94 0.02 0.02 0.02 0.02 0 0 0 0 0.02 0.02 PROGRAMS'RIAtOA General Information Technology Cl1 69 1 UCEP4SMd .''- -. ~'__ 66.93 0.97 0.69 0.01 0.69 0.01 0 0 O 0 0.69 0.01 i i- 5 _.-_ r.UWkWg "acfo, .2 Nuclear Materials Safety W~ff UCOW" IE_ /"N- Fuel Facilities Licensing & Inspection , b.psrd £t.ndod t..h Zp.. Pg. . - -p- J- Fuel Facilities 6nforcement Actions/ Lkw.hg &E-*U.., of Pet FU Op~wm~ 2 0 0 0 0 0 0 0 2 0 0 0 0 0 ft.m" =-= External Training 1 0 0 0C 0a 0 1 0 0 0 0 0 Ezl,.a 1'dng * Aib-. -~ah Nuclear Materials Users Licen & Inspection ------C, -Materials Enforcement Actions , 2/ 5 0 0 0.1 NwR7T .ffNO URIIM w _i _ 0.25 0 0 0.4 j 1.48 3.7 0.02 0.05 Vs~da.OwtuAc* External Training / 0 g../T*dhdcW he... R...i~dco __ 0 0 0.05 0 0 0 0.2 0.74 0 0.01 0 Allegations Acitivities - Materials V , _ 2 1 0 0 0.1 0.05 0 0 0.4 0. 1.48 0.74 0.02 0.01 274l(rtc //;Att~~ =- _ _ _ _ Ucu Bindd 7h Spn; gm -p - _ = _ _ _ _. ,WII Trulft NaW Eh.sWDMMioP"W" - --- Nuclear Waste Safety 2..send h*.mdh s - _ High Level Waste RegulaUon EA.s TEkss G- ec -n TowaOhot P.,0O.N* __ High Level Waste Regulation Resources 4 1 0 1,gcldslcand~LthO _ _- 0 4 1 0 0 0 0 0 0 0 0 rnTM"i db Tai letPsac. _ _ _ r Tn~lg_ _ ft.tRu AplAMe ._ °V WitorlmotnnT.O.ntgy - - _ tj..A&,,uRu ccao ap.M M , ------FY200 BUDG DETAIO I_ I - I-… thi"WI I |FfW4U G DS l ISOI 1 nIgl|w1 1 1 1 1 1 11 1 1 *ut ETOR REACMORDECOM. REAOR PACU Y MATE RP0TkT , AE VERY (tPRT AORT SI D | R. 4 L _"a FI PxS FT ___ $| FM FTE " _ mFM E " A F xTEC 1F C FM LK F11 SC FMS FtAM4EDACCOMPLISHMEMTL hwln kpmctI.sm W wot. 6apW1 Saolelmlap kwpt.-alw Re..cw P.-b -. e Auapn-e*d R.Vw b-p ad Aambsa Pr.. D". Nd 0 _ _-19 . _ - - - - Nonn d t &9oPwg l .Op _ .D. . . .no . Sat.. Padea.4 med MMbaLIateo AWteUia R_ lhm _ _l _ …- _ 3 - - - - - _ - _ . - -] |* - rce RR - _ ------ inItm Trsiaev -Wao"" Drlale..Rv RS.wt C-wdlnAto S1dalnTfakln 11 I I~ -_ - - - I- - I I.~ 2. - - IL111111 1r0C4rdmalon Tadtig d',,,ol&26lTSmk7 1v8 w I D1 mo ll||w I I~F911111 >rTrC4OW Admksbdwbt~Lewelc H 1 1 ATowtonFDsnk eI. i I.o ~ . I _ I- -II _I 131CF W -. WWI 1 1e FY200BUDG oErAIL I I 11I 1 I- 1 11I iIf I 1 pap sd 44. RRE 14OnE mm I AGREEMENTSTATE cmNERIC FACT ECOM. _ F TY MAT PORT kTN F s LN VERY (fiOR MPORT) ___ M OVE.SIGHT .SCOUUM ECLAUL _ I I- I--- I I I on -- I& II I =1 Sha .-NCe R."IcafSafelyaW~ PLAMVEDACCOAPUMLENTP2 Owma Imarmatin Tacl aogy ktgroy QCRia r ndw Cad w=ta T = =.pa Algi. Ralatadgffect an Syateas and Coffqpa.nw Uf.!y As..ta of Digitl Tedchoagh= Rtgulauwy k*fsuactcwo andkhpmvwnian Indilmata Aasas.anad.O.. tlaof PmbaWIMala Atayat nd Applikdla= AatskgV and Mrant* 8.acW an Sp_ a._ Cod". Aaam~na-d ofH.dM EMaca lmtan0.18 Faa! ItknmT.ngr andDarCvip-n,'d 1.arac~dTrobnk'S NROGRAM;NEWRgACTOFR CN_ I T PLANED ACCOAMUSdMHTAIM O"I"~ Catrwfatbon flaw ReactorUcarainag Wasaadr Am", f Legal Ad.10 WWR"MsuanlUan……- -- C.ahk'd LUse TaW OdiccRecast. PRO0RAUREACTOR 4iO SURiTS SUP A PLAKWEDACCUPlSHJeDTS2 VulnarblIty Assesantar Soaemk'N.Saadt" ko- , Tat. Direc Ra saxt PLAAVED ACCOMPUSHMEriTI nw"a.t.a.Sdnst U.dind-cmD wv vwC mv') = _== FY 2W' BUIDG DETA I I I I I I C GQX2m FYP RERPOI WPENTFU STORAOE OOR _EL = E. RSRETHMA U A OThERA WNTS AGRESliNT STATE + iC G - ……… ',TM ACTO_ ……… CI PORT iO _ I- _ REA_ (EXPORT - N - -F0 ManCO -L 0 REC WRL FM E8K FTE sxc FM £ix T| FXsx I mTsF SIK !X I.E RTI m. sTI Esx FT! E- PxI LKX T I LK FM AX IF LKX IT R.9Wd."w bpm...Wd VUdW*MltY Ami$~mi Sa.f.usrds Umctnlbng~ w h Imiwfty b"O - WmUEO.m&-O iLIIg.S I£d E-Ie: mid ii p-lrni!daJ1f 1 G.nlI"offaIII TI mhIIogy 1.56. Tisinki mid D-.n4pImi I11I E.ti T t- Ei.mcVS C_ "ft_ m mid Esas Rquk.mmilie PLTN TElCCOIINUSUhENMATE USFT FwalFmc~ftv U.*Luesg Mlad Ou.d F.Wl Fabdc.n F-DUUYUcW".~ FuelFadlUO. k.paction lkanlw. R~c..'. Uuec.Mo £tlduhuwd UCcaulng& Cdelfialk.. EASl ichwd c.kwpftftn .ZO M"elOxk* FW3c.a Ouroml kdomuu o.dwdmo0c0 bo.m T.&"h~ bad O.~opwfent Toale Dfrbl R.w ;al -.-. n ~' U.M.2l.1loapctlo Mortaels&A-l."~u U.torkalsAumccWO Stales Meltdel bkwmc-go.mAce Leg. "dele andR."sentation MUitrllM. 04ud&.aoe, wcematiocTedraoigyd."Wlals Genera kulendcnTedwn-le I Materiel.Steli Reeadhne. MeeawleSeed Reupena. Uateriel Cowcnelwan Mutertetloclde Imestlodon MateW&l Rdftmktg ITMTC-minemdD..V p, H 2 BudgeY:etaLE I I I I I II I I I h'" Wra..g u"wlopaNiand- mIEco h~m mWDavmlopwa Toaaii0g PLANNED ACcUPLISH&ENTS 1T- A.O.S.-ft. TotlOWa RDa~ma P.RooGRAmASAS. IL4OS~NY 11v~at~aanc-rn- PLANIMACbfWIIySa.snwdEN -Wv -fS andftmatgM kdw.n.ait Todm.alag. CawStat9iSana -wwd somby~ w~nt LagalAftim ad R"".pMaada Caand~k.ataNit Staft. hc. aTcsicgand D .. wpn.t, £tan-a Traw"n ToWakDlti aa.o w-I]V)------SDM-0"d FY200 BUDG DETL - - I I - - I F POWER SPENTFLEL ST " WEN TR.UMS- RARE :ATN R a OTHERAU INTERAILTIONL Tt0.i bU~T RlEACTOR REACTOFDECO AS FA LIlY MAT I-lQ PR TION FAecES ASVERY (EXPOR7IPORT) I ~ . S OVERSIGHT DEUPGENEEL. 0 UC.LW LIK PTE S.K PT! SKI FTE &K FTE S.K PT! 1K FM! IK FtE S.K FTM SIC PTE K FM! SI FM! Si FM! TMi LK FMB SI FTM uTAumy: NUCLEAWASTE SAFETY Iflgh-Lavel WasteRegulat~o Resources Total: --P146diAMi' EN ONMENTALPGIECT)ON AND;LLWi MAXAG . ;" PLANNJEDAXCOMPIJSHMENT&, Envlronmontatl Review$ Low4LevelWaste Regulation & Oventgh LegalAdvic. and Representation Intem Trinin andDeveopmend. TotalDirc Resources Reacto DeoloneIilraalng Rae-a"n II beg Guides. Power 8eacto Decommlsslonfn Pr~ojecMigrt & iesn Power Reactor OemonrntasslontInapecio MoatelalsS, FWeFacility 1.on1slnlgLcensing Materials & Puel Faciitry DeC-ne-"SWotn IsPectio Managemeintof Formerly Licensd SiteslIssuns- - - -… Wo Tach.Coaffgptulzd Risk AssassmentA Data Analyrala Lab Generl ntlofrtatten Technolog Legal Advice endRepresentatmo External Trainin Assessmsenof Dosesloni Environmental Co~ntaminat TIC-Trainin andDevelp-met Tota Direct #Raswec& PLANNEDACCOMPIJSWUM.ETS Licensing and Certitoslnm Iropection. GA Reviews. EventResponse PAdudicatory Revies Legal Advice andRepresentation Generalinfoffnatlon Technolog knter Trainng andDevelopmentw--l- - - ExfteralTrinin Wled03014 CCROSD"~ owadn law)EC 1FY200 BDU AL EIW O MOOS0 P0 fER SPENTFtEL OTOAA NN OWE Nl Th1US- RARE URLW OTHERAPUIM DT TIONL AREINSTAT 0 RI GE 11 RATF EO C FA TY MAT FASORT kTIOi FACIIE RE 4EITY (EXPORITPRI) ATVTES 0 GiT --- Du DECO CLI GENERICL.1W &e~i4Judeg~aeE.J7y - O.K PIE OK PT! L.K FTE LK FIE O.K PIE OK FIE O.K PT73 OK PIE .K PIE LK PIE OK PIE OK PTM LK ME L.K PTE O.K FIE SpentFuel StarageSystems Saetey As.sessmeant Total Olred Resources iPORA;ENRl FUND .L~~JC GerwarlFund - rlOnnetU Technology.- OD" HI.WDocument ProcessingII General Fund .lInformsthn Ischrolotty. LSNII TOWaDjrsc* Resources YFROGRAALWiSTE HOMEbo saNiSIrITy ..suPft.EN0TAL.(~ PLAAKEDACCOJAPLJShWEMEV ESA.- VLinarbIatl Assessments PL&EACCOMPLIOMTM Total OllaRetAseourcess PLANNDDACCOMPUSAMEMfl, Formaly LUcmunsSiae TOWaOtract Resources NRCnerseb~tyuctxamroement dguwdsfbIonspeionTecholorsgy NRC.Inraltrntne sIpDevenopents iere Traonng ndDevetopmvent HLWRepository Licnsing Ac~ivtles TOWaDirect ResorcesslFAI I -I 1 ______]I JFY 20O BUDG..-DE..IL _ _ _- ______- ]EWS OTHE 041300004 m2005 PO0VE SPENT LI.ESTO NOW.POWER F .T.EARTH URUM APPU S9 INTERN,MIO1A R STAT GE IERC Ot DOET RA COR8 REACTOIDECOUM REFACOLITY MATERIL POR liON FA LTS aOVERY ACTV3TES VE SiONTf 4MP DSCOUN 0EN LLW Smut ft k~dormtawl er SalevSupprt- - SK IFTE IK PT!E IK FT! ILK PTE SIK ITE SI T! SIC PT! SIC PTE SC FT! SC FTE SICK PT! IC FT! S.K VT! sic VT! SCK PTE STRATEGY:INTERNATIONAL NUCLEAR SAFETYSUPP 3T PLAAWEDACCOMPLJSMAZENTS' International NcLeukSufety and Safeguards Imipofl/Exprancenesng Reviews Irdernetorial LegalAdvice end Repreentatio3n InlermTraining andDevsiopmeni ExterWeTraining Support to AlD General bilrmellon Technoiogy, TOta Direct Resources STRATEGY:HOMELAND SECURITY PoGrAM IEIAIY4.IL hWASTE SU OATL64i PLAMNNDACCO&IPLISHMEATM ThrueaAm~euaffmf Vulne'reilty Aeeeesawntsi Aegulatoo khwovwne.U … ------Welguarde hiepection andlOversight Saesguards 1.cerelng ------Security bimsnurcture bpvnn kWorrnetlon Security Geerwalkdornslon Technology Total likecd Rescurnee = I = = = Used1/I CDS = = = = =FY200 d DetaDl I= -A -T AT _____ TINLAGEMI EEI- y DOE WRO 'ENCT DUECSORA OR OE R If uppi X gManagem :I d GA REVIEWS- Shmel IOTWkHE DECO RECLAI4 GEN CLLW IRTATRN FAC TIES . RERUPORT1 VUATEY O ACTVTIES OVE6SIGHT DtuP B_ WET . RE_ REACTORDECO . RE ICTDR FUEL F TRANPI | K FTE | | | | FTE | LK FTE K FTE_ LK FM SK FM SK FTE SK FM _K _F _.K F_ LK FTE Sic FTE S!K FTE LK FTE I11 STRATEGY&MM4AEUDElT&SUPPORT I _I _ -.PROGRA-PO4cYv SUPPORT…………- OR5: AOvisoRrcoummIEEFotRoEAcroR unaa wsU~ommV_RwAsM PLANNED ACCO WPLJSHUENM_ RearClr Safety Independmnt Advice eeUntutasSafety. Low-level Waste & Decomm General lnfmation Tachndoogy _ -…l | Tolul-…-t I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Stalf Years In Full-Time Equila FY 2004 FY 2004 FY 2005 FY20 Enacted Current Pres. Budget Current $ FTE $ FTE S rTE \ I PROGRAM: NUCLEAR REACTOR SAFETY SUB-PROGRAM: REACTOR LICENSING SUB-SUB-PROGRAM: REACTOR LICENSING PLANNED ACTIVITIES: Project Management and Licensing Assistants NRR HO 0 29.0 0 29.0 38 26.2 0 31.2 Licensing Actions NRR HO 375 86.6 315 88.3 344 87.6 300 81.7 Other Licensing Tasks NRR HO 200 16.4 191 19.4 200 16.2 200 17.3 Improved Standard Tech Spec Program Development NRR HO 0 4.0 0 3.8 0 4.0 0 6.0 Regulatory Licensing Improvements NRR HO 444 34.8 507 35.6 934 39.9 614 38.2 0 eC Z a : AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years In Full-Time Equila FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE S FTE $ FrE Rulemaking NRR HO 150 18.3 353 18.0 125 19.1 125 17.4 Event Evaluation and Generic Communications NRR HO 60 16.2 41 16.2 60 17.5 60 19.0 REG 0 2.0 0 2.0 0 2.0 0 2.0 ' Subtotal: 60 18.2 41 18.2 60 19.5 60 21.0 Research and Test Reactor Licensing Activities NRR HO 230 6.4 120 6.4 530 7.9 530 7.9 Vendor-Owners Activitles/Technical Issues ResoluUon NRR HO 1,286 34.2 1,192 33.3 1,160 30.9 1,060 29.5 REG 0 0.1 0 0.0 0 6.9 0 0.0 Subtotal: 1,286 34.3 1,192 33.3 1,160 37.8 1,060 29.5 Legal Advice and Representation OGC HO 5 12.0 5 4.0 57 11.0 57 11.0 6~o ~ I.-- I . AGENCY i FY 2004 - 2009 i Report: CC-01 RESOURCE REPORT I (Dollars InThousands, Staff Years In Full-Time Equilai FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budoet Current $ FTE $ FTE $ FTE $ FTE Adjudicatory Reviews ASLBP HO 315 5.0 315 5.0 315 5.0 45 5.0 Intern TraIning and Employee Development NRR HO 500 25.0 0 25.0 400 28.0 0 20.0 REG 0 3.0 0 3.0 0 3.0 0 3.0 RES HO 0 3.0 0 3.0 0 3.0 0 3.0, REG I REG 0 0.0 0 0.0 0 0.0 0 0.0 REG II REG 0 0.0 0 0.0 0 0.0 0 0.0 REG IlIl REG 0 0.0 0 0.0 0 0.0 0 0.0 REG IV REG 0 0.0 0 0.0 0 0.0 0 0.0 Subtotal: 500 31.0 0 31.0 400 34.0 0 26.0 External Training NRR HO 285 0.0 285 0.0 300 0.0 289 0.0 ;lS1 q-N if-S-S..Z-L. i-M : AGENCY I FY2004-2009 Report: CC-01 RESOURCE REPORT I (Dollars InThousands, Staff Years InFull-Time Equlla% FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current i $ FrE $ FTE $ FTE $ FTE NRR REG 0 0.0 0 0.0 0 0.0 0 0.0 RES HO 125 0.0 125 0.0 125 0.0 125 0.0 NSIR HO 0 0.0 0 0.0 0 0.0 11 0.0 ASLBP HQ 8 0.0 8 0.0 8 0.0 8 0.0 I REG I REG 0 0.0 0 0.0 0 0.0 0 REG II REG 0 0.0 0 0.0 0 0.0 0 0.0 REG III REG 0 0.0 0 0.0 0 0.0 0 0.0 REG IV REG 0 0.0 0 0.0 0 0.0 0 0.0 Subtotal: 418 0.0 418 0.0 433 0.0 433 0.0 General Information Technology NRR HO 1,765 6.0 1,671 6.0 2,187 5.8 2,212 4.8 RES HO 689 0.0 689 0.0 610 0.0 816 0.0 0 -. -M A 11 - I I.I:i AGENCY I FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, S1aff Years inFull-Time EquIL FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FrE $ FTE $ FTE Subtotal: 2,454 6.0 2,360 6.0 2,797 5.8 3,028 4.8 Integrity of Reactor Systems ancdComponenets RES HQ 16,156 20.3 16,156 20.3 13,570 19.6 12,825 17.3 Aging Related Effects on Systenns and Components RES HO 1,455 3.3 1,455 3.3 1,450 3.0 2,100 2.8 Safety Assessment of Digital Teechnologles RES HO 2,334 4.8 2,334 4.8 2,760 3.9 2,010 4.0 Regulatory Infrastructure and Improvements Initiatives RES HO 1,928 21.3 1,928 21.3 2,715 23.0 3,265 25.0 Assessment of Operations RES HO 3,800 4.9 3.800 4.9 2,950 5.0 3,407 4.9 Probabilistic Risk Analyses and Applications RES HO 10.678 31.3 10,678 31.3 9,567 32.3 10,697 32.8 0 -. - 3 * I-0S I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years In Full-Time Equil, FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current S FTE $ FTE $ FTE $ FTE Assessing and Maintaining Reactor and System Codes RES HO 4,745 10.7 4,745 10.7 5,552 10.5 5,733 13.5 Assessment of Health Effects RES HO 931 2.9 931 2.9 675 2.2 775 3.2 Mixed Oxide Fuel RES HO 907 0.5 907 0.5 650 0.5 700 0.5 Emergency Preparedness Licensing NSIR HO 0 0.0 0 0.0 0 0.0 0 14.0 DIRECT RESOURCES ASLBP HO 323 5.0 323 5.0 323 5.0 53 5.0 NRR HO 5,295 276.9 4,675 281.0 6,278 283.1 5,390 273.0 NRR REG 0 5.1 0 5.0 0 11.9 0 5.0 Subtotal: 5,295 282.0 4,675 286.0 6,278 295.0 5,390 278.0 SZ - 0 * . -. : I AGENCY I FY 2004 - 2009 Report: CC-01 RESOURCE REPORT i (Dollars inThousands, Staff Years InFull-rime Equlla FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE NSIR HQ 0 0.0 0 0.0 0 0.0 11 14.0 OGC HO 5 12.0 5 4.0 57 11.0 57 11.0 REG I REG 0 0.0 0 0.0 0 0.0 0 0.0 REG II REG 0 0.0 0 0.0 0 0.0 0 0.0 REG III REG 0 0.0 0 0.0 0 0.0 0 0.0 REG IV REG 0 0.0 0 0.0 0 0.0 0 0.0 RES HO 43,748 103.0 43,748 103.0 40,624 103.0 42,453 107.0 DIRECTRESOUVRCES Subtotel: 49,371 402.0 48,751 398.0 47,282 414.0 47,964 415.0 ITSTAFF NRR HQ 0 2.0 0 2.0 0 2.0 0 2.0 RES HO 0 2.0 0 2.0 0 2.0 0 2.0 S -M-MS S i~ *, AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands. Staff Years In Fun-Time Equlla IFY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE ITSTAFFSubtotaIl: 4.0 0 4.0 0 4.0 0 4.0 SUPER/NON-SUPERVISORY STA ASLBP HO 0 3.0 0 3.0 0 3.0 0 2.0 NRR HO 0 95.0 0 95.0 0 93.0 0 91.0 NSIR HO 0 0.0 0 0.0 0 0.0 0 5.0 OGG HO 0 6.0 0 6.0 0 6.0 0 5.0 REG I REG 0 2.0 0 2.0 0 2.0 0 2.0 REG II REG 0 2.0 0 2.0 0 2.0 0 2.0 REG IV REG 0 3.0 0 3.0 0 3.0 0 3.0 RES HO 0 48.0 0 48.0 0 49.0 0 53.0 Rill REG 0 1.0 0 1.0 0 1.0 0 1.0 * -e* S - .; I I AGENCY i FY 2004 - 2009 Report: CC-0l RESOURCE REPORT (Dollars InThousands, Staff Years inFun-Time Equilav FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FrE $ FTE $ FTE - SUPtERWON-SUPMORY STA Subtota: 0 160.0 0 160.0 0 159.0 0 164.0 TRAVEL ASLBP HO 24 0.0 24 0.0 24 0.0 24 0.0 NRR HO 968 0.0 1.618 0.0 968 0.0 1.388 0.0 NSIR HO 0 0.0 0 0.0 0 0.0 80 0.0 OGC HO 41 0.0 41 0.0 59 0.0 59 0.0 REG I REG 118 0.0 115 0.0 136 0.0 136 0.0 REG II REG 123 0.0 115 0.0 126 0.0 126 0.0 - REG III REG 80 0.0 80 0.0 105 0.0 90 0.0 REG IV REG 90 0.0 90 0.0 90 0.0 90 0.0 RES HO 870 0.0 870 0.0 869 0.0 1.140 0.0 E SOL19;1 k-: - I; * I. *:' .to] AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Donars InThousands. Staff Years In Full-ime Equlla% FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current S FTE S FTE $ FrE $ FTE TRAVEL SubtobW: 2,314 0.0 2,953 0.0 2,377 0.0 3,133 0.0 6t I* * *:. AGENCY | FY 2004 - 2009 i Report: CC-01 RESOURCE REPORT i (Qollars InThousands, Staft Years In Full-Time Equitay FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE REACTOR LICENSING Program/Org. Resources Total ASLBP HO 347 8.0 347 8.0 347 8.0 77 7.0 S/B Costs 1,042 1,042 1,128 987 ASLBP Subtotal: 1,389 8.0 1,389 8.0 1,475 8.0 1,064 7.0 NRR HO 6,263 373.9 6,293 378.0 7,246 378.1 6,778 366.0 S/B Costs 47,193 47,710 48,587 47,033 NRR HO SB Subtotal: 53,456 373.9 54,003 378.0 55,833 378.1 53,811 366.0 NRR REG 0 5.1 0 5.0 0 11.9 0 5.0 S/B Costs 591 580 1,409 592 NRR REG SB Subtotal: 591 5.1 580 5.0 1,409 11.9 592 5.0 NRR Subtotal: 54,048 379.0 54,583 383.0 57,242 390.0 54,403 371.0 NSIR HO 0 0.0 0 0.0 0 0.0 91 19.0 S/B Costs 0 0 0 2,516 6 0 I-1= I *. .0-11i:. AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years In Full-Time Equllavi FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current S FTE S FTE $ FTE $ FTE NSIR Subtotal: 0 0.0 0 0.0 0 0.0 2,607 19.0 OGC HO 46 18.0 46 10.0 116 17.0 116 16.0 S/B Costs 2,270 1,261 2,173 2,045 OGC HO SB Subtotal: 2,316 18.0 1,307 10.0 2,289 17.0 2,161 16.0 OGC Subtotal: 2,316 18.0 1,307 10.0 2,289 17.0 2,161 16.0 REG I REG 118 2.0 115 2.0 136 2.0 136 2.0 S/B Costs 232 232 237 237 REG I Subtotal: 350 2.0 347 2.0 373 2.0 373 2.0 REG II REG 123 2.0 115 2.0 126 2.0 126 2.0 SIB Costs 232 232 237 237 REG II Subtotal: 355 2.0 347 2.0 363 2.0 363 2.0 REG IlIl REG 80 0.0. 80 0.0 105 0.0 90 0.0 S/B Costs 0 0 0 0 S a * - S to *: . AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands. Staff Years In Full-Time Equilav FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE S FTE $ FTE REG IlIl Subtotal: 80 0.0 80 0.0 105 0.0 90 0.0 REG IV REG S0 3.0 90 3.0 90 3.0 90 3.0 SIB Costs 348 348 355 355 REG IV Subtotal: 438 3.0 438 3.0 445 3.0 445 3.0 RES HO 44,618 153.0 44,618 153.0 41,493 154.0 43,593 162.0 SIB Costs 20,191 20,191 20,624 21,695 RES Subtotal: 64,809 153.0 64,809 153.0 62,117 154.0 65,288 162.0 RIII REG 0 1.0 0 1.0 0 1.0 0 1.0 SIB Costs 116 116 118 118 RIII Subtotal: RESOURCE TOTAL: 51,685 566.0 51,704 562.0 49,659 577.0 51,097 583.0 SIB TOTAL: 72,215 71,712 74,868 75,815 PROGRAWORG TOTAL: $123,900 566.0 $123,416 562.0 t124,527 577.0 $126,912 583.0 SM1t e RR 4M4*11 to =11 *: AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years In Full-Time Equilavi FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE S FTE $ FTE $ FTE PROGRAM: NUCLEAR RIEACTOR SAFETY SUB-PROGRAM: REACTOR UCENSING SUB-SUB-PROGRAM: INTERNATICINAL ACTIVITiES PLANNED ACTIVITIES: International Nuclear Safety and Safeguards - NRR HO 0 5.0 0 5.0 0 5.0 0 5.0 NMSS HQ 0 1.0 0 1.0 0 1.0 0 1.0 ADM HO 71 0.0 71 0.0 71 0.0 66 0.0 IP HQ 131 12.0 155 12.0 278 12.0 278 10.0 Subtotal: 202 18.0 226 18.0 349 18.0 344 16.0 International Intem TraIning and Development lP HO 4 1.0 4 1.0 5 1.0 5 1.0 International External Training IP HQ 6 0.0 6 0.0 10 0.0 10 0.0 o 0 Oi -etI -1 ;L[- S1 - a. *:-; A' = AGENCY i FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Slaff Years In Full-Time Equllavi FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE International AID Support NRR HO 0 2.0 0 2.0 0 2.0 0 2.0 ADM HO 0 0.0 0 0.0 0 0.0 0 0.0 'P HQ 0 2.0 0 2.0 0 2.0 0 2.0 Subtotal: 0 4.0 0 4.0 0 4.0 0 4.0 International General Information Technology 'P HO 12 0.0 12 0.0 12 0.0 12 0.0 DIRECT RESOURCES ADM HO 71 0.0 71 0.0 71 0.0 66 0.0 'P HO 153 15.0 177 15.0 305 15.0 305 13.0 NMSS HO 0 1.0 0 1.0 0 1.0 0 1.0 NRR HO 0 7.0 0 7.0 0 7.0 0 7.0 00-t - 6 - 'I I I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Stall Years In Full-Time Equllas FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE S FTE $ FTE $ FTE - OIRECTUIESOURCES Subtotl: 224 23.0 248 23.0 376 23.0 371 21.0 SUPERWYON-SUPERVISORY STA lP HO 0 8.0 0 8.0 0 8.0 0 10.0 NMSS HO 0 0.0 0 0.0 0 0.0 0 0.0 NRR HQ 0 0.0 0 0.0 0 0.0 0 0.0 SUPERONMSUPERVISORY SBASubtotl: 0 8.0 0 8.0 0 8.0 0 10.0 TRAVEL lP HQ 148 0.0 347 0.0 163 0.0 188 0.0 NMSS HO 0 0.0 0 0.0 0 0.0 0 0.0 NRR HQ 196 0.0 196 0.0 198 0.0 198 0.0 TRAVEL Subbotbl: 344 0.0 543 0.0 361 0.0 386 0.0 S |B iI. AGENCY FY 2004 - 2009 1 Report: CC-01 RESOURCE REPORT i (Dollars In Thousands, Staff Years In Full-Time Equiavi FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE INTERNATIONAL ACTIVITIES Prograrn/Org. Resources Total ADM HO 71 0.0 71 0.0 71 0.0 66 0.0 S/B Costs 0 0 0 0 ADM Subtotal: lP HO 301 23.0 524 23.0 468 23.0 493 23.0 SIB Costs 2,953 2,952 2,987 2,988 IP Subtotal: 3,254 23.0 3,476 23.0 3,455 23.0 3,481 23.0 NMSS HQ 0 1.0 0 1.0 0 1.0 0 1.0 S/B Costs 125 125 128 128 NMSS HO SB Subtotal: 125 1.0 125 1.0 128 1.0 128 1.0 NMSS Subtotal: 125 1.0 125 1.0 128 1.0 128 1.0 NRR HO 196 7.0 196 7.0 198 7.0 198 7.0 S/B Costs 884 883 900 900 6 * a - a' I AGENCY i FY 2004 - 2009 i Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years in Funl-Time Equilavi FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE NRR HO SB Subtotal: 1,080 7.0 1,079 7.0 1,098 7.0 1,098 7.0 NRR Subtotal: 1,080 7.0 1,079 7.0 1,098 7.0 1,098 7.0 RESOURCE TOTAL: 568 31.0 791 31.0 737 31.0 757 31.0 S/B TOTAL: 3,962 3,960 4,015 4,016 PROGRAM#VORG TOTAL: $4,530 31.0 $4,751 31.0 $4,752 31.0 $4,773 31.0 S -S - 0 . Li 1 &J.% I I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years in Full-Time Equlla% FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE PROGRAM: NUCLEAR REACTOR SAFETY SUB-PROGRAM: REACTOR LICENSING SUB-SUB-PROGRAM: HLS LICENSING SUPPORT PLANNED ACTIVITIES: HLS Threat Assessment NRR HO 0 0.0 0 0.0 0 0.0 0 0.0 NSIR HQ 385 6.4 385 6.4 60 8.9 60 9.1 REG 0 0.0 0 0.0 0 0.0 0 0.0 Subtotal: 385 6.4 385 6.4 60 8.9 60 9.1 HLS Regulatory Improvements NRR HO 0 0.0 0 0.0 0 0.0 0 0.6 NSIR HO 545 15.8 545 15.8 1,594 17.8 300 10.2 REG 0 0.0, 0 0.0 o o.o 0 0.0 Subtotal: 545 15.8 545 15.8 1,594 17.8 300 10.8 -s* - - S - *. : -... g AGENCY FY 2004 - 2009 Report: CC-O1 RESOURCE REPORT (Dollars In Thousands. Staff Years InFull-Time Equilav FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current S FTE $ FTE $ FTE $ NE HLS Mitigating Strategy NRR HO 300 6.0 1,389 6.0 0 5.0 0 1.4 RES HO 8,757 10.0 8,757 10.0 2,000 6.0 2,800 6.0 NSIR HO 123 3.1 123 3.1 50 4.0 975 5.7 REG 0 0.0 0 0.0 0 0.0 0 0.0 Subtotal: 9,180 19.1 10,269 19.1 2,050 15.0 3,775 13.1 HLS Safeguards Licensing NSIR HO 2,735 6.5 2,735 6.5 250 3.1 250 5.0 HLS Security Infrastructure Improvement NSIR HO 1,035 4.0 1,035 4.0 2.086 4.0 1,491 2.0 REG 0 2.0 0 2.0 0 2.0 0 0.0 Subtotal: 1,035 6.0 1,035 6.0 2,086 6.0 1,491 2.0 HLS Legal Advice and Representation OGC HO 0 1.0 0 1.0 0 1.0 0 1.0 0 - .0 0 - a AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years InFull-Time Equitav FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE S FTE HLS General Information Technology NSIR HO 140 0.2 140 0.2 35 0.2 100 0.0 HLS Intern Training and Development NSIR HO 0 0.0 0 0.0 0 1.0 0 1.0 HLS External Training NSIR HO 40 0.0 40 0.0 100 0.0 Q 8&) 0.0 DIRECT RESOURCES NRR HO 300 6.0 1.389 6.0 0 5.0 0 2.0 NSIR HO 5,003 36.0 5,003 36.0 4,175 39.0 3,356 33.0 NSIR REG 0 2.0 0 2.0 0 2.0 0 0.0 Subtotal: 5,003 38.0 5,003 38.0 4,175 41.0 3,356 33.0 OGC HO 0 1.0 0 1.0 0 1.0 0 1.0 0 - a a *I I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands. Staff Years In Full-Time Equil FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE RES HQO 8.757 10.0 8,757 10.0 2,000 6.0 2,800 6.0 DIRECTRESOURCES Subt*ti: 14 4,060 55.0 15,149 55.0 6,175 53.0 6,156 42.0 SUPER/NON-SUPERVISORY STA NSIR HQ 0 21.0 0 21.0 0 25.0 0 28.0 TRA VEL NRR HQ 0 0.0 0 0.0 0 0.0 0 0.0 NSIR HQ 528 0.0 528 0.0 378 0.0 X 0.0 TRAVEL Subota*: 528 0.0 528 0.0 378 0.0 408 0.0 0 *0 - - S - a. *:. AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands. Staff Years In Full-Time Equila FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FrE $ FrE HLS LICENSING SUPPORT PrografOrg.Resources Total NRR HO 300 6.0 1,389 6.0 0 5.0 0 2.0 S/B Costs 757 757 643 257 NRR HO SB Subtotal: 1,057 6.0 2,146 6.0 643 5.0 257 2.0 NRR Subtotal: 1,057 6.0 2,146 6.0 643 5.0 257 2.0 NSIR HO 5,531 57.0 5,531 57.0 4,553 64.0 3,764 61.0 SIB Costs 7,370 7,369 8,476 8,078 NSIR REG 0 2.0 0 2.0 0 2.0 0 0.0 SIB Costs 232 232 237 0 NSIR Subtotal: 13,132 59.0 13,132 59.0 13,266 66.0 11,842 61A OGC HO 0 1.0 0 1.0 0 1.0 0 1.0 SIB Costs 126 126 128 128 OGC HO SB Subtotal: 126 1.0 126 1.0 128 1.0 128 1.0 * . - .3 .- "* - -I.1 AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years In Full-Time Equ~a% FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current S FTE $ FTE $ FTE $ FTE OGC Subtotal: RES HO 8,757 10.0 8,757 10.0 2,000 6.0 2,800 6.0 S/B Costs 1,320 1,320 803 803 RES Subtotal: RESOURCE TOTAL: 14,588 76.0 15,677 76.0 6,553 78.0 6,564 70.0 S/ TOTAL: 9,805 9,804 10,287 9,266 A PROGRAWORG TOTAL: $24,393 76.0 $25,481 76.0 $16,840 78.0 $15,830 70.0 S *O S * a- I - - I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years In Full-Time Equlla' FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current S FTE $ FTE $ FTE $ FTE PROGRAM: NUCLEAR REACTOR SAFETY SUB-PROGRAM: REACTOR UCENSING SUB-SUB-PROGRAM: REACTOR LICENSE RENEWAL PLANNED ACTIVITIES: Renewal Application Reviews NRR HO 8,005 70.0 6,677 70.0 6,920 69.7 6,920 69.7 License Renewal Regulatory Framework NRR HO 750 8.8 808 7.8 750 9.1 650 8.1 General Information Technology NRR HO 60 0.2 0 0.2 60 0.2 0 0.2 Legal Advice and Representation OGC HO 0 3.0 0 2.0 0 4.0 0 5.0 DIRECT RESOURCES NRR HO 8,815 79.0 7,485 78.0 7,730 79.0 7,570 78.0 0 -* e0 - q-U U1 AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years InFull-Time Equllav FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget -Current $ FTE $ FrE $ FrE $ FrE OGC Ha 0 3.0 0 2.0 0 4.0 0 5.0 DtRECTRESOURCES Subtotal: 8,815 82.0 7,485 80.0 7,730 83.0 7,570 83.0 SUPER/NON-SUPERVISORY STA NRR HO 0 19.0 0 19.0 0 18.0 0 22.0 OGC HO 0 0.0 0 0.0 0 0.0 0 0.0 SUPEPMON-SUPERVMSORYSTA Subltata: 0 19.0 0 19.0 0 18.0 0 22.0 TRAVEL NRR HO 140 0.0 230 0.0 140 0.0 140 0.0 OGC HO 0 0.0 0 0.0 0 0.0 0 0.0 REG I REG 5 0.0 10 0.0 12 0.0 12 0.0 REG II REG 32 0.0 10 0.0 33 0.0 33 0.0 , , = , . . . . .: =: I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years InFull-Tlme Equila FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE REG IlIl REG 22 0.0 22 0.0 10 0.0 10 0.0 REG IV REG 0 0.0 0 0.0 0 0.0 0 0.0 TRAVEL Zubt*i: 199 0.0 272 0.0 195 0.0 195 0.0 6 - e 0 - I.*. * i AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands. Staff Years In Full-Time Equil; FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FrE $ FTE $ FTE REACTOR LICENSE RENEWAL Programn/Org. Resources Total NRR HO 8,955 98.0 7,715 97.0 7,870 97.0 7,710 100.0 S/B Costs 12,369 12,243 12,465 12,851 NRR HO SB Subtotal: 21,324 98.0 19,958 97.0 20,335 97.0 20,561 100.0 NRR Subtotal: 21,324 98.0 19,958 97.0 20,335 97.0 20,561 100.0 OGC HO 0 3.0 0 2.0 0 4.0 0 5.0 SIB Costs 378 252 511 639 OGC HO SB Subtotal: 378 3.0 252 2.0 511 4.0 639 5.0 OGC Subtotal: 378 3.0 252 2.0 511 4.0 639 5.0 REG I REG 5 0.0 10 0.0 12 0.0 12 0.0 SIB Costs 0 0 0 0 REG I Subtotal: REG II REG 32 0.0 10 0.0 33 0.0 33 0.0 ;i- .i . . I i3 . AGENCY I FY 2004 - 2009 1 Report: CC-01 RESOURCE REPORT I (Dollars In Thousands, Staff Years In Full-Time Equllaw FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FrE $ FTE SIB Costs 0 0 0 0 REG II Subtotal: REG III REG 22 0.0 22 0.0 10 0.0 10 0.0 S/B Costs 0 0 0 0 REG IlIl Subtotal: REG IV REG 0 0.0 0 0.0 0 0.0 0 0.0 SIB Costs 0 0 0 0 REG IV Subtotal: RESOURCE TOTAL. 9,014 101.0 7,757 99.0 7,925 101.0 7,765 105.0 SIB TOTAL: 12,748 12,495 12,976 13,490 PROGRAMORG TOTAL: $21,762 101.0 $20,252 99.0 $20,901 101.0 $21,255 105.0 0 - . . : I, *... AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years In Full-Time Equlla FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE S FTE $ FTE $ FTE PROGRAM: NUCLEAR REACTOR SAFETY SUB-PROGRAM: REACTOR UCENSING SUB-SUB-PROGRAM: NEW REACTOR LICENSING PLANNED ACTIVITIES: Early Site Permits NRR HO 2,539 18.7 2.560 18.2 1,893 12.6 1.808 13.0 REG 0 1.0 0 1.0 0 3.0 0 1.5 Subtotal: 2,539 19.7 2,560 19.2 1,893 15.6 1,808 14.5 Design Certification NRR HO 457 15.4 282 7.2 3.097 29.1 3,137 32.7 REG 0 0.4 0 0.4 0 0.2 0 0.2 RES HO 940 2.3 940 2.3 1.650 7.3 1,000 5.6 Subtotal: 1,397 18.1 1,222 9.9 4,747 36.6 4,137 38.5 Pre-Appiicatlon Review NAR HO 462 8.6 477 12.1 0 3.4 50 3.4 0 -11111-.1 - 0"-a AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT I (Dollars In Thousands, Staff Years In Full-Time Equilav FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE S FTE NRR REG 0 0.0 0 0.0 0 0.0 0 0.0 RES HO 406 5.0 406 5.0 150 0.6 0 0.1 1 NMSS HO 0 1.0 0 1.0 0 1.0 0 1.0 Subtotal: 868 14.6 883 18.1 150 5.0 50 4.5 Regulatory Infrastructure NRR HO 483 9.3 292 9.5 0 5.9 0 5.9 REG 0 2.6 0 2.6 0 2.8 0 2.3 RES HO 7.651 23.7 7.651 23.7 8,600 21.1 7,250 14.3 Subtotal: 8,134 35.6 7,943 35.8 8,600 29.8 7,250 22.5 New Reactor Licensing Independent Advice ACRS/ACNW HO 0 0.0 0 0.0 0 0.0 0 0.0 Legal Advice and RepresentatIon OGC HO 0 3.0 0 1.0 0 7.0 0 5.0 0i *ii -i i -i I. i :.i AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands. Staff Years InFull-Time Equtla' FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE Construction Inspection OGC HO 0 0.0 0 0.0 0 0.0 0 0.0 Combined Licenses NRR HO 0 0.0 0 0.0 0 0.0 0 0.0 REG 0 0.0 0 0.0 0 0.0 0 0.0 Subtotal: 0 0.0 0 0.0 0 0.0 0 0.0 Adjudicatory Reviews ASLBP HO 0 0.0 0 0.0 0 0.0 0 0.0 DIRECT RESOURCES ACRS/ACNW HO 0 0.0 0 0.0 0 0.0 0 0.0 ASLBP HQ 0 0.0 0 0.0 0 0.0 0 0.0 NMSS HO 0 1.0 0 1.0 0 1.0 0 1.0 NRR HQ 3.941 52.0 3.611 47.0 4,990 51.0 4.995 55.0 S * - - I I I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Full-Time Equila FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE NRR REG 0 4.0 0 4.0 0 6.0 0 4.0 Subtotal: 3,941 56.0 3,611 51.0 4,990 57.0 4,995 59.0 OGC HO 0 3.0 0 1.0 0 7.0 0 5.0 RES HO 8.997 31.0 8,997 31.0 10.400 29.0 8,250 20.0 DIRECT RESOURCES bto: 12,938 91.0 12,608 84.0 15,390 94.0 13,245 85.0 SUPER/NON-SUPERVISORY STA NRR HO 0 16.0 0 16.0 0 21.0 0 17.0 RES HO 0 2.0 0 2.0 0 2.0 0 2.0 SUPERN40-SUPERVISORY STA SubloMl: 0 18.0 0 18.0 0 23.0 0 19.0 TRAVEL ASLBP HQ 0 0.0 0 0.0 0 0.0 0 0.0 NRR HO 141 0.0 141 0.0 135 0.0 135 0.0 11111ee *S10 1 -. 0 9* , AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years In Full-Time Equilai FY 2004 FY 2004 FY 2005 FY 2005 * Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE OGC HO 0 0.0 0 0.0 0 0.0 0 0.0 REG IlIl REG 5 0.0 5 0.0 10 0.0 10 0.0 TRAVEL Sublobt: 146 0.0 146 0.0 145 0.0 145 0.0 0 .0 - 0 - S. AGENCY FY 2004 - 2009 Report: CC01 RESOURCE REPORT (Dollars InThousands. Staff Years InFull-TIme Equilam FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE S FTE $ FTE NEW REACTOR LICENSING Prograrn/Org.Resources Total ACRSIACNW HO 0 0.0 0 0.0 0 0.0 0 0.0 S/B Costs 0 0 0 0 ACRSIACNW Subtotal: ASLBP HO 0 0.0 0 0.0 0 0.0 0 0.0 SIB Costs 0 0 0 0 ASLBP Subtotal: 0 0.0 0 0.0 0 0.0 0 0.0 NMSS HO 0 1.0 0 1.0 0 1.0 0 1.0 SIB Costs 125 125 128 128 NMSS HO SB Subtotal: 125 1.0 125 1.0 128 1.0 128 1.0 NMSS Subtotal: NRR HO 4,082 68.0 3,752 63.0 5,125 72.0 5,130 72.0 S/B Costs 8,583 7,952 9,252 9,253 0 . 0*f - I . l0 : 1. i . . . .i AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands. Staff Years In Full-Time Equfla% FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE NRR HO SU Subtotal: 12,665 68.0 11,704 63.0 14,377 72.0 14,383 72.0 NRR REG 0 4.0 0 4.0 0 6.0 0 4.0 S/B Costs 464 463 710 474 NRR REG SB Subtotal: 464 4.0 463 4.0 710 6.0 474 4.0 NRR Subtotal: 13,129 72.0 12,167 67.0 15,087 78.0 14,857 76.0 OGC HO 0 3.0 0 1.0 0 7.0 0 5.0 S/B Costs 378 126 B95 639 OGC HO SB Subtotal: 378 3.0 126 1.0 895 7.0 639 5.0 OGC Subtotal: 378 3.0 126 1.0 895 7.0 639 5.0 REG III REG 5 0.0 5 0.0 10 0.0 10 0.0 S/B Costs 0 0 0 0 REG IIISubtotal: RES HO 8,997 33.0 8,997 33.0 10,400 31.0 8,250 22.0 SIB Costs 4,355 4,356 4,151 2,946 S . I - - 0 a.- 1* : e AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years In Full-Time Equila% FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE S FTE RES Subtotal: 13,352 33.0 13,353 33.0 14,551 31.0 11,196 22.0 RESOURCE TOTAL: 13,084 109.0 12,754 102.0 15,535 117.0 13,390 104.0 SIB TOTAL 13,905 13,022 15,136 13,440 '* PROGRAWORG TOTAL: $26,989 109.0 $25,776 102.0 $30,671 117.0 $26,830 104.0 -- -. * . M *.. AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years InFull-Time Equila' FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE PROGRAM: NUCLEAR REACTOR SAFETY SUB-PROGRAM: REACTOR UCENSING SUB-SUB-PROGRAM: ESA - HLS ACTIVITIES PLANNED ACTIVITIES: ESA HLS VulnerabilIty Assessn NRR HO 0 0.0 0 0.0 0 0.0 0 0.0 DIRECT RESOURCES NRR HO 0 0.0 0 0.0 0 0.0 0 0.0 - ' ' I I I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Full-Time Equlla FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE ESA - HLS ACTIVITIES ProgramlOrg.Resources Total NRR HO 0 0.0 0 0.0 0 0.0 0 0.0 SIB Costs 0 0 0 0 NRR HO SB Subtotal: 0 0.0 0 0.0 0 0.0 0 0.0 NRR Subtotal: RESOURCE TOTAL: 0 0.0 0 0.0 0 0.0 0 0.0 SIB TOTAL: 0 0 0 0 PROGRAMWORG TOTAL: $O 0.0 SO 0.0 50 0.0 $0 0.0 * * - 6- a. *: ... ' AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Full-Time Equlla% FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE PROGRAM: NUCLEAR REACTOR SAFETY SUB-PROGRAM: REACTOR LICENSING DIRECT RESOURCES ACRS/ACNW HO 0 0.0 0 0.0 0 0.0 0 0.0 ADM HO 71 0.0 71 0.0 71 0.0 66 0.0 ASLBP HO 323 5.0 323 5.0 323 5.0 53 5.0 'P HO 153 15.0 177 15.0 305 15.0 305 13.0 NMSS HO 0 2.0 0 2.0 0 2.0 0 2.0 Subtotal 0 2.0 0 2.0 0 2.0 0 2.0 NRR HO 18,351 420.9 17,160 419.0 18,998 425.1 17,955 415.0 NRR REG 0 9.1 0 9.0 0 17.9 0 9.0 6 S O- . . : * . . ._ _ AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Full-Tlme Equllav FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE Subtotal 18,351 430.0 17,160 428.0 18,998 443.0 17,955 424.0 NSIR HO 5,003 36.0 5,003 36.0 4,175 39.0 Q3,3 47.0 NSIR REG 0 2.0 0 2.0 0 2.0 0 0.0 OGC HO 5 19.0 5 8.0 57 23.0 57 22.0 Subtotal 5 19.0 5 8.0 57 23.0 57 22.0 REG I REG 0 0.0 0 0.0 0 0.0 0 0.0 REG II REG 0 0.0 0 0.0 0 0.0 0 0.0 REG III REG 0 0.0 0 0.0 0 0.0 0 0.0 REG IV REG 0 0.0 0 0.0 0 0.0 0 0.0 RES HO 61,502 144.0 61,502 144.0 53,024 138.0 53,503 133.0 0 *O - - - iiS.M I 11..a AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands. Staff Years In Full-Time Equila; FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE S FTE DIRECT RESOURCESSubtotal: 85,408 653.0 84,241 640.0 76,953 667.0 75,306 646.0 ITSTAFF NRR HO 0 2.0 0 2.0 0 2.0 o 2.0 Subtotal 0 2.0 0 2.0 0 2.0 0 2.0 RES HO 0 2.0 0 2.0 0 2.0 0 2.0 IT STAFF Subtotal: 0 4.0 0 4.0 0 4.0 0 4.0 SUPERRNON-SUPERVlSORY STA ASLBP HO 0 3.0 0 3.0 0 3.0 0 2.0 'P HO 0 8.0 0 8.0 0 8.0 0 10.0 NMSS HO 0 0.0 0 0.0 0 0.0 0 0.0 Subtotal 0 0.0 0 0.0 0 0.0 0 0.0 NRR * , .* i iS . , * AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands. Staff Years In Full-Time Equilavo FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE S FrE $ FTE - HO 0 130.0 0 130.0 0 132.0 0 130.0 Subtotal 0 130.0 0 130.0 0 132.0 0 130.0 NSIR HO 0 21.0 0 21.0 0 25.0 0 33.0 OGC HQ 0 6.0 0 6.0 0 6.0 0 5.0 Subtotal 0 6.0 0 6.0 0 6.0 0 5.0 REG I REG 0 2.0 0 2.0 0 2.0 0 2.0 REG II REG 0 2.0 0 2.0 0 2.0 0 2.0 REG IV REG 0 3.0 0 3.0 0 3.0 0 3.0 RES HQ 0 50.0 0 50.0 0 51.0 0 55.0 Rill REG 0 1.0 0 1.0 0 1.0 0 1.0 S *S * a * III I. . ' AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years in Full-Time Equilave FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current S FTE S FTE $ FTE $ FTE SUPEPA4ONSUPEWVSORY 8TA Subt~tal: 0 226.0 0 226.0 0 233.0 0 243.0 TRAVEL ASLBP HO 24 0.0 24 0.0 24 0.0 24 0.0 IP HO 148 0.0 347 0.0 163 0.0 188 0.0 NMSS HO 0 0.0 0 0.0 0 0.0 0 0.0 Subtotal 0 0.0 0 0.0 0 0.0 0 0.0 NRR HO 1,445 0.0 2,185 0.0 1,441 0.0 1,861 0.0 Subtotal 1,445 0.0 2,185 0.0 1,441 0.0 1,861 0.0 NSIR HQ 528 0.0 528 0.0 378 0.0 9 0.0 OGG HO 41 0.0 41 0.0 59 0.0 59 0.0 Subtotal 41 0.0 41 0.0 59 0.0 59 0.0 REG I S S. -S *:. - S * ... AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years In Full-Time Equilav, FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE REG 123 0.0 125 0.0 148 0.0 148 0.0 REG II REG 155 0.0 125 0.0 159 0.0 159 0.0 REG III REG 107 0.0 107 0.0 125 0.0 110 0.0 REG IV REG 90 0.0 90 0.0 90 0.0 90 0.0 RES HQ 870 0.0 870 0.0 869 0.0 1,140 0.0 TRAVEL Subtotal: 3,531 0.0 4,442 0.0 3,456 0.0 4,267 0.0 *S - 0 . 1 *.1.I ai. AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years in Full-Time Equilav FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FrE $ FTE $ FTE - $ FTE REACTOR LICENSING ProgramResources Total ACRSIACNW Ho 0 0.0 0 0.0 0 0.0 0 0.0 S/B Costs 0 0 0 0 ADM Ho 71 0.0 71 0.0 71 0.0 66 0.0 SIB Costs 0 0 0 0 ASLBP HO 347 8.0 347 8.0 347 8.0 77 7.0 SIB Costs 1,042 1,042 1,128 987 ASLBP Subtotal: 1,389 8.0 1,389 8.0 1,475 8.0 1,064 7.0 lP HO 301 23.0 524 23.0 468 23.0 493 23.0 SIB Costs Z953 2,952 2,987 2,988 - . I i* ' - 4 AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Stall Years In Full-Time Equllax FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ IFTE $ FTE $ FTE $ FTE IP Subtotal: 3,254 23.0 3,476 23.0 3,455 23.0 3,481 23.0 NMSS Ha 0 2.0 0 2.0 0 2.0 0 2.0 SIB Costs 251 250 256 256 NMSS HO SB Subtotal: 251 2.0 250 2.0 256 2.0 256 2.0 NMSS Subtotal: 251 2.0 250 2.0 256 2.0 256 2.0 NRR Ha 19,796 552.9 19,345 551.0 20,439 559.1 19,816 547.0 SIB Costs 69,787 69,545 71,847 70,294 NRR HO SB Subtotal: 89,583 552.9 88,890 551.0 92,286 559.1 90,110 547.0 NRR REG 0 9.1 0 9.0 0 17.9 0 9.0 SIB Costs 1,055 1,043 2,119 1,066 NRR REG SB Subtotal: 1,055 9.1 1,043 9.0 2,119 17.9 1,066 9.0 NRR Subtotal: 90,638 562.0 89,933 560.0 94,405 577.0 91,176 556.0 NSIR Ha 5,531 57.0 5,531 57.0 4,553 64.0 3,855 80.0 SIB Costs 7,370 7,369 8,476 10,594 a -s 0 - I. ' ' ., t AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands. Staff Years In Full-Time Equilavi FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE NSIR REG 0 2.0 0 2.0 0 2.0 0 0.0 SIB Costs 232 232 237 0 NSIR Subtotal: 13,132 59.0 13,132 59.0 13,266 66.0 14,449 80.0 OGC HO 46 25.0 46 14.0 116 29.0 116 27.0 S/B Costs 3,152 1,765 3,707 3,451 OGC HO SB Subtotal: 3,198 25.0 1,811 14.0 3,823 29.0 3,567 27.0 OGC Subtotal: 3,198 25.0 1,811 14.0 3,823 29.0 3,567 27.0 REG I REG 123 2.0 125 2.0 148 2.0 148 2.0 S/B Costs 232 232 237 237 REG I Subtotal: 355 2.0 357 2.0 385 2.0 385 2.0 REG II REG 155 2.0 125 2.0 159 2.0 159 2.0 S/B Costs 232 232 237 237 0 - V 4- 01 - to . .: *..I 4 I , "' " , , - - , - ''-, - -, I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Stalf Years In Full-Time Equilavet FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE REG II Subtotal: 387 2.0 357 2.0 396 2.0 396 2.0 REG III REG 107 0.0 107 0.0 125 0.0 110 0.0 SIB Costs 0 0 0 0 REG IlIlSubtotal: 107 0.0 107 0.0 125 0.0 110 0.0 REG IV REG 90 3.0 90 3.0 90 3.0 90 3.0 S/B Costs 348 348 355 355 REG IV Subtotal: 438 3.0 438 3.0 445 3.0 445 3.0 RES HO 62,372 196.0 62,372 196.0 53,893 191.0 54,643 190.0 SIB Costs 25,865 25,867 25,578 25,444 RES Subtotal: 88,237 196.0 88,239 196.0 79,471 191.0 80,087 190.0 Rill REG 0 1.0 0 1.0 0O 1.0 0 1.0 SIB Costs 116 116 118 118 6 I1*11-. do 0 *: l. .. I I I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT I (Dollars InThousands, Staff Years InFull-Time Equilaver FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE S FTE $ FTE RESOURCE TOTAL: 88,939 883.0 88,683 870.0 80,409 904.0 9 893.0 SAI TOTAL: 112,634 110,993 117,282 116,027 PROGRAM RESOURCE TOTAL 201,573 883.0 $199,676 870.0 $197,691 904.0 5195,600 893.0 5 091 10-e * S."]-% A* - AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT I (Dollars InThousands, Staff Years In Full-Time Equilaver FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE S FTE $ FTE $ FTE PROGRAM: NUCLEAR REACTOR SAFETY SUB-PROGRAM: REACTOR INSPECTION SUB-SUB-PROGRAM: HLS INSPECTION PLANNED ACTIVITIES: HLS Force-on-Force Program NSIR HO 1,813 9.6 1,813 9.6 3,075 6.5 2.900 13.7 REG 0 4.0 0 4.0 0 4.0 0 2.0 Subtotal: 1,813 13.6 1,813 13.6 3,075 10.5 2,900 15.7 HLS Safeguards Inspection NSIR HQ 0 5.8 0 5.8 0 5.8 0 3.0 REG 0 15.0 0 15.0 0 15.0 0 16.0 Subtotal: 0 20.8 0 20.8 0 20.8 0 19.0 HLS Safeguards Inspection Program Development and Maintenance NSIR HQ 250 6.6 250 6.6 100 4.7 100 6.3 - 42 - _ __l AGENCY FY 2004 -2009 Report: CC-01 RESOURCE REPORT I (Dollars InThousands, Staff Years In Full-TIme Equllave. FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ IFTE $ IFTE HLS External Training NSIR HO 10 0.0 10 0.0 0 0.0 0 0.0 DIRECT RESOURCES NSIR HQ 2.073 22.0 2,073 22.0 3,175 17.0 3.000 23.0 NSIR REG 0 19.0 0 19.0 0 19.0 0 18.0 I Subtotal: 2,073 41.0 2,073 41.0 3,175 36.0 3,000 41.0 CIRECTRESOUJRCES Subtotal: 2,073 41.0 2,073 41.0 3,175 36.0 3,000 41.0 SUPERINON-SUPERVISORY STj NSIR HQ 0 4.0 0 4.0 0 4.0 0 5.0 TRAVEL NRR j HQ 0 0.0 0 0.0 0 0.0 0 0.0 I NSIR HO 0 0.0 0 0.0 0 0.0 m 0P *S -W - 0 * I. I I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years InFull-Time Equllav FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FrE TRAYEL Subtotal: 0 0.0 0 0.0 0 0.0 0 0.0 I *S I * 3. ..- AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Full-TmI ie EqullavE FY 2004 FY 2004 FY 2005 FY 2 )05 Enacted Current Pres. Budget Cun nt $ FTE S FTE $ FrE $ F;E .4 HLS INSPECTION Program/Org.Resources Total NRR HO 0 0.0 0 0.0 0 0.0 0 0.0 S/B Costs 0 0 0 0 0 NRR HO SB Subtotal: 0 0.0 0 0.0 0 0.0 0 0.0 NRR Subtotal: NSIR HO 2,073 26.0 2,073 26.0 3,175 21.0 3,000 28.0 S/B Costs 3,362 3,361 2,781 3,707 NSIR REG 0 19.0 0 19.0 0 19.0 0 18.0 S/B Costs 2,203 2,203 2,250 2,131 NSIR Subtotal: 7,638 45.0 7,637 45.0 8,206 40.0 8,838 116.0 RESOURCE TOTAL- 2,073 45.0 2,073 45.0 3,175 40.0 3,000 16.0/ S/B TOTAL: 5,565 5,564 5,031 5,838 I PROGRAhVORG TOTAL: $7,638 45.0 $7,637 45.0 $8,206 40.0 $8,838 16.0 0 -. 0 - . *: AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years InFull-Time Equilav FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE PROGRAM: NUCLEAR REACTOR SAFETY SUB-PROGRAM: REACTOR INSPECTION SUB-SUB-PROGRAM: REACTOR INSPECTION PLANNED ACTIVITIES: License Renewal InspectIons NRR REG 0 4.0 0 4.0 0 6.0 0 6.0 Emergency Preparedness Inspection NSIR HO 0 3.0 0 3.0 0 0.0 550 4.0 Baseline Inspections NRR HO 0 1.0 o 0.7 0 0.0 0 0.0 REG 0 271.0 0 271.0 0 271.4 0 272.0 Subtotal: 0 272.0 0 271.7 0 271.4 0 272.0 SupplementatlReactive Inspections NRR H-Q 744 0.0 . 726 0.0 1,250 0.0 700 0.0 REG 0 26.8 0 26.8 0 28.3 0 28.3 !; , -. . ,- i'' t AGENCY I FY 2004 - 2009 Report: CC-01 RESOURCE REPORT i (Dollars InThousands, Staff Years InFull-Tilme Equllavel FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE Subtotal: 744 26.8 726 26.8 1,250 28.3 700 28.3 Generic Safety Issue Inspections NRR HO O 0.0 0 0.6 0 0.0 0 0.0 REG 0 3.8 0 3.8 0 3.8 0 3.8 Subtotal: 0 3.8 0 4.4 0 3.8 0 3.8 Reactor Inspection - Allegation Follow-up NRR HO 0 4.9 0 4.9 0 5.1 0 4.9 REG 0 22.1 0 22.1 0 22.1 0 22.1 OE HO 0 1.0 0 1.0 2 1.0 2 1.0 Subtotal: 0 28.0 0 28.0 2 28.2 2 28.0 OE Agency Programs OE HO 0 0.0 0 1.0 0 1.0 0 1.0 Reactor Performance Assessment NRR HO 378 8.4 346 7.7 395 8.8 595 9.0 __-i -I - S. M - - AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands. Staff Years InFull-Time Equllaver FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE S FTE NRR REG 0 14.8 0 14.9 0 14.8 0 14.8 Subtotal: 378 23.2 346 22.6 395 23.6 595 23.8 Reactor Inspection and Assessment Program Development and Oversight NRR HO 350 22.4 1,550 23.7 250 19.7 442 19.3 REG 0 5.5 0 5.5 0 4.6 0 3.6 Subtotal: 350 27.9 1,550 29.2 250 24.3 442 22.9 Licensing and Examination of Power Reactor Operators NRR HO 0 0.7 0 0.7 0 0.8 0 0.7 REG 0 23.0 0 23.0 0 23.5 0 23.5 Subtotal: 0 23.7 0 23.7 0 24.3 0 24.2 Operator Licensing Program & Training Oversight NRR HQ 330 4.6 330 4.6 330 5.0 280 3.6 REG 0 6.9 0 6.9 0 6.6 0 6.9 Subtotal: 330 11.5 330 11.5 330 11.6 280 10.5 - IF1S - -;: K :a AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years In Full-Time Equilavw FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE Research and Test Reactor Inspection NRR HO 80 3.1 61 3.1 320 3.5 320 3.5 TTC-TrainIng and Development HR HO 1,265 16.0 1,370 16.0 1,375 18.0 1,335 18.0 TTC-Informatlon Technology HR HO 464 3.0 464 3.0 466 3.0 497 3.0 TTC-Rental of Space HR HO 651 0.0 651 0.0 728 0.0 728 0.0 TTC-Other Administrative Services HR HO 0 0.0 0 0.0 310 0.0 310 0.0 General Information Technology NRR HO 0 0.0 0 0.0 0 0.0 0 0.0 NSIR HO 0 0.0 0 0.0 20 0.0 29 0.0 * -e - S - a. a... AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Full-Time Equilave: FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE OE HO 99 0.0 57 0.0 99 0.0 69 0.0 01 HO 69 0.0 69 0.0 72 0.0 72 0.0 Subtotal: 168 0.0 126 0.0 191 0.0 170 0.0 Reactor Inspection - State, Federal, and Tribal Liaison Activities STP HO 0 1.0 0 1.0 0 1.0 0 1.0 REG 0 3.0 0 3.0 0 3.0 0 3.0 Subtotal: 0 4.0 0 4.0 0 4.0 0 4.0 Legal Advise and RepresentatIon OGC HQ 0 2.0 0 1.0 0 2.0 0 2.0 Reactor Enforcement Actions OE HO 4 6.0 24 6.0 6 6.0 188 6.0 REG 0 6.0 0 5.0 0 5.0 0 5.0 Subtotal: 4 11.0 24 11.0 6 11.0 188 11.0 0 * -I-S 0 -- * I...... AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years In Full-Time Equilavet FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pros. Budget Current $ FTE $ FTE $ FTE S FTE Reactor Investigations 01 HO 10 24.0 10 24.0 10 24.0 10 24.0 Intern Training and Development REG I REG 0 2.0 0 2.0 0 4.0 0 3.0 REG II REG 0 0.0 0 0.0 0 2.0 0 1.0 REG IlIl REG 0 2.0 0 2.0 0 4.0 0 3.0 REG IV REG 0 2.0 0 2.0 0 4.0 0 3.0 Subtotal: 0 6.0 0 6.0 0 14.0 0 0.0 External Training NSIR HQ 10 0.0 10 0.0 20 0.0 0 0.0 STP HO 0 0.0 0 0.0 0 0.0 0 0.0 OE HO 4 0.0 4 0.0 4 0.0 1 0.0 01 4S 0.0 HQ 18 0.0 18 0.0 18 0.0 111IL0-0-hSe -1a. . l AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Full-Time Equilavent FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current i $ FTE $ FrE $ FTE $ FTE 5 REG I REG 85 0.0 85 0.0 90 0.0 .1tO2- 0.0 REG II REG 90 0.0 476 0.0 95 0.0 125 . 0.0 REG III REG 149 0.0 149 0.0 120 0.0 140 . 0.0 REG IV ! 1i-f -IC: REG 68 1.0 68 1.0 78 1.0 787 1.0 Subtotal: 424 1.0 810 1.0 425 1.0 487 t.0 Reactor Event Response NSIR HO 3 2.5 3 2.5 20 2.5 33 8.5 REG 0 0.0 0 0.0 0 0.0 0 2.3 Subtotal: 3 2.5 3 2.5 20 2.5 33 10.8 Reactor Event Readiness NSIR HQ 2,117 11.9 3,312 11.9 3,005 10.9 2,973 8.8 REG 0 0.0 0 0.0 0 0.0 0 4.3 Subtotal: 2,117 11.9 3,312 11.9 3,005 10.9 2,973 . 13.1 _ _:. AGENCY FY 2004 - 2009 i Report: CC-01 RESOURCE REPORT i (Dollars InThousands. Staff Years InFull-Time Equilave I FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE Reactor Incident Response Coordination NSIR HO 0 4.5 0 4.5 0 4.5 0 0.7 REG 0 7.0 0 7.0 0 7.0 0 2.4 Subtotal: 0 11.5 0 11.5 0 11.5 0 3.1 Reactor Incident Investigation NSIR HO o 0.1 0 0.1 0 0.1 0 0.0 REG 0 0.0 0 0.0 0 0.0 0 0.0 Subtotal: 0 0.1 0 0.1 0 0.1 0 0.0 DIRECT RESOURCES HR HO 2,380 19.0 2,485 19.0 2,879 21.0 2,870 21.0 NRR HO 1,882 45.1 3,013 46.0 2,545 42.9 2,337 41.0 NRR REG 0 377.9 0 378.0 0 381.1 0 381.0 Subtotal: 1,882 423.0 3,013 424.0 2,545 424.0 Z337 422.0 0o* ~I* ] * S * S. *Z. 1=F-M t AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years InFull-Time Equilai FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ IFTE $ FTE $ FTE $ FTE NSIR HO 2.130 22.0 3,325 * 22.0 3,065 18.0 3,605 22.0 NSIR REG 0 7.0 0 7.0 0 7.0 0 9.0 Subtotal: 2,130 29.0 3,325 29.0 3,065 25.0 3,605 31.0 OE HO 107 7.0 85 8.0 111 8.0 263 8.0 OE REG 0 5.0 0 5.0 0 5.0 0 5.0 i Subtotal: 107 12.0 85 13.0 t11 13.0 263 13.0 OGC HO 0 2.0 0 1.0 0 2.0 0 2.0 01 HO 97 24.0 97 24.0 100 24.0 100 24.0 REG I REG 85 2.0 85 2.0 90 4.0 102 3.0 REG II REG 90 0.0 476 0.0 95 2.0 125 1.0 REG IlIl If REG 149 2.0 149 2.0 120 4.0 140 3.0 S -* A q ;; . - , S ,.', j-4'11 * . AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years InFull-Time Equilav FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current S FTE $ FTE $ FTE $ FE . REG IV REG 68 3.0 68 3.0 78 5.0 78 4.0 STP HO 0 1.0 0 1.0 0 1.0 0 1.0 STP REG 0 3.0 o 3.0 0 3.0 0 3.0 Subtotal: 0 4.0 0 4.0 0 4.0 0 4.0 DIRECTRESOURCES Subotel: 6,988 520.0 9,783 521.0 9,083 528.0 9,620 528.0 IT STAFF NRR HO 0 1.0 0 1.0 0 1.0 0 1.0 NSIR HQ 0 0.0 0 0.0 0 0.0 0 0.0 OE HO 0 1.0 0 1.0 0 1.0 0 1.0 01 HO 0 1.0 0 1.0 0 1.0 0 1.0 REG I REG 0 4.0 0 4.0 0 4.0 0 4.0 * e 0 - a . : * ... AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years in Full-Time Equilavi FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE FTEI REG II REG 0 6.0 0 6.0 0 6.0 0 6.0 REG IIl REG 0 6.0 0 6.0 0 6.0 0 6.0 REG IV REG 0 4.0 0 4.0 0 4.0 0 4.0 IT STAFFSubtotal: 0 23.0 0 23.0 0 23.0 0 23.0 SUPERNON-SUPERVISORY STA HR HO 0 6.0 0 6.0 0 6.0 0 6.0 NRR HO 0 8.0 0 8.0 0 8.0 0 8.0 NSIR HO 0 10.0 0 10.0 0 7.0 0 7.0 OE HO 0 3.0 0 3.0 0 3.0 0 3.0 OGC HO 0 0.0 0 0.0 0 0.0 0 0.0 01 HO 0 6.0 0 5.0 0 4.0 0 4.0 6 6. I -eI ... . AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years In Full-Time Equllavei FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE REG I REG 0 49.0 0 49.0 0 48.0 0 48.0 REG II REG 0 45.0 0 45.0 0 45.0 0 45.0 REG III REG 0 49.0 0 52.0 0 50.0 0 50.0 REG IV REG 0 39.0 0 39.0 0 39.0 0 39.0 STP HO 0 0.0. 0 0.0 0 0.0 0 0.0 SUPRNONWSUPERVSORY STA Subtotal: 0 215.0 0 217.0 0 210.0 0 210.0 TRAVEL HR HO 110 0.0 110 0.0 110 0.0 110 0.0 NRR HO 289 0.0 149 0.0 309 0.0 309 0.0 NSIR HO 100 0.0 100 0.0 95 0.0 105 0.0 OE HO 39 0.0 54 0.0 39 0.0 39 0.0 S- .I S . * : AGENCY i FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years In Full-Time Equilave FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE OGC HO 0 0.0 0 0.0 0 0.0 0 0.0 01 HO 215 0.0 328 0.0 226 0.0 268 0.0 REG I REG 1,170 0.0 1,418 0.0 1,407 0.0 1,680 0.0 REG II REG 1.140 0.0 1,319 0.0 1,475 0.0 1,527 0.0 REG III REG 1,344 0.0 1,484 0.0 1,206 0.0 1.580 0.0 REG IV REG 1,354 0.0 1,579 0.0 1,638 0.0 1,919 0.0 TRAVEL Subtota: 5,761 0.0 6,541 0.0 6,505 0.0 7,537 0.0 S - *O * * ':.. AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years In Full-Time EqultavI FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ IFE $ FTE $ FrE REACTOR INSPECTION Program/Org.Resources Total HR HO 2,490 25.0 2,595 25.0 2,989 27.0 2,980 27.0 S/B Costs 2,796 2,797 3,082 3,082 HR Subtotal: 5,286 25.0 5,392 25.0 6,071 27.0 6,062 27.0 NRR HO 2,171 54.1 3,162 55.0 2,854 51.9 2,646 50.0 SiB Costs 6,828 6,941 6,670 6,427 NRR 10 SB Subtotal: 8,999 54.1 10,103 55.0 9,524 51.9 9,073 50.0 NRR REG 0 377.9 0 378.0 0 381.1 0 381.0 SIB Costs 43,817 43,829 45,115 45,103 d NRR REG SB Subtotal: 43,817 377.9 43,829 378.0 45,115 381.1 45,103 381.0 A NRR Subtotal: 52,816 432.0 53,932 433.0 54,639 433.0 54,176 431.0 ! NSIR HO 2,230 32.0 3,425 32.0 3,160 25.0 3,710 29.0 SIB Costs 4,137 4,138 3,310 3,841 esh_ *S S* . *:...... I AGENCY i FY 2004 - 2009 i Report: CC-01 RESOURCE REPORT I (Dollars In Thousands, Staff Years In Full-Time Equlawe FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FrE S FrE $ FrE NSIR REG 0 7.0 0 7.0 0 7.0 0 9.0 SIB Costs 812 812 829 1,065 NSIR Subtotal: 7,179 39.0 8,375 39.0 7,299 32.0 8,616 38.0 OE HO 146 11.0 139 12.0 150 12.0 302 12.0 S/B Costs 1,451 1,583 1,605 1,605 OE HO SB Subtotal: 1,597 11.0 1,722 12.0 1,755 12.0 1,907 12.0 OE REG 0 5.0 0 5.0 0 5.0 0 5.0 SIB Costs 580 580 592 592 OE REG SB Subtotal: 580 5.0 580 5.0 592 5.0 592 5.0 OE Subtotal: 2,177 16.0 2,302 17.0 2,347 17.0 2,499 17.0 OGC HO 0 2.0 0 1.0 0 2.0 0 2.0 SIB Costs 252 126 256 256 OGC HO SB Subtotal: 252 2.0 126 1.0 256 2.0 256 2.0 OGC Subtotal: 252 2.0 126 1.0 256 2.0 256 2.0 I ** 3 I - I. -V- . . ' - :, - , I i AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT i (Dollars InThousands, Stat Years In Full Time EquIave FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE 01 HO 312 31.0 425 30.0 326 29.0 368 29.0 S/B Costs 4,224 4,087 4,038 4,038 01 Subtotal: 4,536 31.0 4,512 30.0 4,364 29.0 4,406 29.0 REG I REG 1,255 55.0 1,503 55.0 1,497 56.0 1,782 55.0 SIB Costs 6,377 6,377 6,630 6,511 REG I Subtotal: 7,632 55.0 7,880 55.0 8,127 56.0 8,293 55.0 REG II REG 1,230 51.0 1,795 51.0 1,570 53.0 1,652 52.0 S/B Costs 5,913 5,914 6,274 6,155 REG II Subtotal: 7,143 51.0 7,709 51.0 7,844 53.0 7,807 52.0 REG III REG 1,493 57.0 1,633 60.0 1,326 60.0 1,720 59.0 SIB Costs 6,609 6,957 7,103 6,984 REG IIISubtotal: 8,102 57.0 8,590 60.0 8,429 60.0 8,704 59.0 * *- *0 _ S - _ AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT I (Dollars InThousands, Staff Years In Full-Time Equltave FY 2004 FY 2004 FY 2005 IFY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE I REG IV REG 1,422 46.0 1,647 46.0 1,716 48.0 1,997 47.0 S/B Costs 5,334 5,334 5,683 5,564 REG IV Subtotal: 6,756 46.0 6,981 46.0 7,399 48.0 7,561 47.0 STP HO 0 1.0 0 1.0 0 1.0 0 1.0 SIB Costs 114 114 115 115 STP REG 0 3.0 0 3.0 0 3.0 0 3.0 SIB Costs 348 348 355 355 STP Subtotal: 461 4.0 462 4.0 470 4.0 470 4.0 RESOURCE TOTAL: 12,749 758.0 16,324 761.0 15,588 761.0 17,157"/ 761.01/ SIB TOTAL: 89,592 89,937 91,657 91,693 I PROGRAM/ORG TOTALS S102,341 758.0 $106,261 761.0 ;107,245 761.0 $108,850 761.0 0 ~B- I - S. *:. AGENCY i FY2004-2009 | Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years InFull-Time Equllav, FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FrE $ FTE $ FTE PROGRAM: NUCLEAR REACTOR SAFETY SUB-PROGRAM: REACTOR INSPECTION DIRECT RESOURCES HR HQ 2,380 19.0 2,485 19.0 2,879 21.0 2,870 21.0 NRR HO 1,882 45.1 3,013 46.0 2,545 42.9 2,337 41.0 NRR REG 0 377.9 0 378.0 0 381.1 0 381.0 Subtotal 1,882 423.0 3,013 424.0 2,545 424.0 2,337 422.0 NSIR HO 4,203 44.0 5,398 44.0 6,240 35.0 6,605 45.0 NSIR REG 0 26.0 0 26.0 0 26.0 0 27.0 OE HO 107 7.0 85 8.0 111 8.0 263 8.0 OE REG 0 5.0 0 5.0 0~ 5.0 0 5.0 S - - -.S - a._ il AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Doflars inThousands, Staff Years In FuN-Time Equial FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE Subtotal 107 12.0 85 13.0 111 13.0 263 13.0 OGC Ha 0 2.0 0 1.0 0 2.0 0 2.0 Subtotal 0 2.0 0 1.0 0 2.0 0 2.0 01 HO 97 24.0 97 24.0 100 24.0 100 24.0 REG I REG 85 2.0 as 2.0 90 4.0 102 3.0 REG II REG 90 0.0 476 0.0 95 2.0 125 1.0 REG III REG 149 2.0 149 2.0 120 4.0 140 3.0 REG IV REG 68 3.0 68 3.0 78 5.0 78 4.0 STP HO 0 1.0 0 1.0 0 1.0 0 1.0 STP REG 0 3.0 0 3.0 0 3.0 0 3.0 Mq4H W N44 M*9 1LM= A f-1J*46* .. AGENCY FY 2004 - 2009 I Report: CC-01 RESOURCE REPORT I (Oollars InThousands, StaffYears In Full-Tme Equllav FY 2004 FY 2004 FY 2005 FY 2005 I Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE DIRECTRESOURCES Subtotal: 9,061 561.0 11,856 562.0 12,258 564.0 12,620 569.0 IT STAFF NRR HO 0 1.0 0 1.0 0 1.0 0 1.0 Subtotal 0 1.0 0 1.0 0 1.0 0 1.0 NSIR HO 0 0.0 0 0.0 0 0.0 0 0.0 OE HO 0 1.0 0 1.0 0 1.0 0 1.0 Subtotal 0 1.0 0 1.0 0 1.0 0 1.0 01 Ha 0 1.0 0 1.0 0 1.0 0 1.0 REG I REG 0 4.0 0 4.0 0 4.0 0 4.0 REG II REG 0 6.0 0 6.0 0 6.0 0 6.0 REG III REG 0 6.0 0 6.0 0 6.0 0 6.0 6 -_i I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Doflars InThousands, Staff Years In Fut-Time Equila FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE REG IV REG 0 4.0 0 4.0 0 4.0 0 4.0 IT STAFFSubtota: 0 23.0 0 23.0 0 23.0 0 23.0 SUPER/NON-SUPERVISORY STA HR Ho 0 6.0 0 6.0 0 6.0 0 6.0 NRR Ho 0 8.0 0 8.0 0 8.0 0 8.0 Subtotal 0 8.0 0 8.0 0 8.0 0 8.0 NSIR HO 0 14.0 0 14.0 0 11.0 0 12.0 OE HO 0 3.0 0 3.0 0 3.0 0 3.0 Subtotal 0 3.0 0 3.0 0 3.0 0 3.0 OGC HO 0 0.0 0 0.0 0 0.0 0 0.0 Subtotal 0 0.0 0 0.0 0 0.0 0 0.0 01 I- - __3 jI AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars in Thousands. Staff Years InFull-Time Equilave FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE HO 0 6.0 0 5.0 0 4.0 0 4.0 REG I REG 0 49.0 0 49.0 0 48.0 0 48.0 REG II REG 0 45.0 0 45.0 0 45.0 0 45.0 REG IlIl REG 0 49.0 0 52.0 0 50.0 0 50.0 REG IV REG 0 39.0 0 39.0 0 39.0 0 39.0 STP HO 0 0.0 0 0.0 0 0.0 0 0.0 SUPERlNON-8UPERVISORY STA Subtot: 0 219.0 0 221.0 0 214.0 0 215.0 TRAVEL HR HO 110 0.0 110 0.0 110 0.0 110 0.0 NRR HQ 289 0.0 149 0.0 309 0.0 309 0.0 W S!L . - S * S i I I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands. Staff Years In Full-Time Equilav FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE Subtotal 289 0.0 149 0.0 309 0.0 309 0.0 NSIR HO 100 0.0 100 0.0 95 0.0 105 0.0 OE HO 39 0.0 54 0.0 39 0.0 39 0.0 Subtotal 39 0.0 54 0.0 39 0.0 39 0.0 OGC HO 0 0.0 0 0.0 0 0.0 0 0.0 Subtotal 0 0.0 0 0.0 0 0.0 0 0.0 01 HO 215 0.0 328 0.0 226 0.0 268 0.0 REG I REG 1,170 0.0 1.418 0.0 1,407 0.0 1,680 0.0 REG II REG 1,140 0.0 1,319 0.0 1,475 0.0 1,527 0.0 REG IIl REG 1,344 0.0 1,484 0.0 1,206 0.0 1,580 0.0 REG IV .eem*. - - S* a' *: AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years InFull-Time Equllav FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE REG 1,354 0.0 1,579 0.0 1,638 0.0 1,919 0.0 TRAVEL SubtoW: 5,761 0.0 6,541 0.0 6,505 0.0 7,537 0.0 MI0 t *0 44 - I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years in Full-Time Equlla FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FrE $ FTE REACTOR INSPECTION Program Resources Total HR HO 2,490 25.0 2,595 25.0 2,989 27.0 2,980 27.0 SIB Costs 2,796 2,797 3,082 3,082 HR Subtotal: 5,286 25.0 5,392 25.0 6,071 27.0 6,062 27.0 NRR HO 2,171 54.1 3,162 55.0 2,854 51.9 2,646 50.0 SIB Costs 6,820 6,941 6,670 6,427 MIRRHO SB Subtotal: 8,999 54.1 10,103 55.0 9,524 51.9 9,073 50.0 NRR REG 0 377.9 0 378.0 0 381.1 0 381.0 SIB Costs 43,817 43,829 45,115 45,103 NRR REG SB Subtotal: 43,817 377.9 43,829 378.0 45,115 381.1 45,103 381.0 NRR Subtotal: 52,816 432.0 53,932 433.0 54,639 433.0 54,176 431.0 NSIR HO 4,303 58.0 5,498 58.0 6,335 46.0 6,710 57.0 SIB Costs 7,499 7,499 6,091 7,548 0 . - - I ~ ' : . I. .I. AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT I (Dollars InThousands, Staff Years InFull-Time Equlla FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE NSIR REG 0 26.0 0 26.0 0 26.0 0 27.0 S/B Costs 3,015 3,015 3,079 3,196 NSIR Subtotal: 14,817 84.0 16,012 84.0 15,505 72.0 17,454 84.0 OE HO 146 11.0 139 12.0 150 12.0 302 12.0 S/B Costs 1,451 1,583 1,605 1,605 OE HO SB Subtotal: 1,597 11.0 1,722 12.0 1,755 12.0 1,907 12.0 OE REG 0 5.0 0 5.0 0 5.0 0 5.0 S/B Costs 580 580 592 592 OE REG SB Subtotal: 580 5.0 580 5.0 592 5.0 592 5.0 OE Subtotal: 2,177 16.0 2,302 17.0 2,347 17.0 2,499 17.0 OGC HO 0 2.0 0 1.0 0 2.0 0 2.0 SIB Costs 252 126 256 256 OGC HO SB Subtotal: 252 2.0 126 1.0 256 2.0 256 2.0 0 I - A- V * MEisj;J~z .. , AGENCY i FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Full-Time Equlla FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE S FTE - OGC Subtotal: 252 2.0 126 1.0 256 2.0 256 2.0 01 HO 312 31.0 425 30.0 326 29.0 368 29.0 SIB Costs 4,224 4,087 4,038 4,038 01 Subtotal: 4,536 31.0 4,512 30.0 4,364 29.0 4,406 29.0 REG I REG 1,255 55.0 1,503 55.0 1,497 56.0 1,782 55.0 S/B Costs 6,377 6,377 6,630 6,511 REG I Subtotal: 7,632 65.0 7,880 55.0 8,127 56.0 8,293 55.0 REG II REG 1,230 51.0 1,795 51.0 1,570 53.0 1,652 52.0 S/B Costs 5,913 5,914 6,274 6,155 REG II Subtotal: 7,143 51.0 7,709 51.0 7,844 53.0 7,807 52.0 REG III REG 1,493 57.0 1,633 60.0 1,326 60.0 1,720 59.0 SIB Costs 6,609 6,957 7,103 6,984 S *S - 6 *., AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Full-Time Equilavc FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FrE $ FTE REG IlIl Subtotal: 8,102 57.0 8,590 60.0 8,429 60.0 8,704 59.0 REG IV REG 1,422 46.0 1,647 46.0 1,716 48.0 1,997 47.0 S/B Costs 5,334 5,334 5,683 5,564 REG IV Subtotal: 6,756 46.0 6,981 46.0 7,399 48.0 7,561 47.0 STP HO 0 1.0 0 1.0 0 1.0 0 1.0 SIB Costs 114 114 115 115, STP REG 0 3.0 0 3.0 0 3.0 0 - 3.0 SIB Costs 348 348 355 355 STP Subtotal: 461 4.0 462 4.0 470 4.0 470 4.0 RESOURCE TOTAL: 14,822 803.0 18,397 806.0 18,763 801.0 20,157 807.0 S)B TOTAL: 95,156 95,501 96,688 97,531 PROGRAM RESOURCE TOTAL tt 09,978 803.0 t113,898 806.0 01t5,451 801.0 117,688 807.0 IIIIII -ilo * S. El *rA 4.,.1--- I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years InFull-Time Equllai FY2004 FY2004 FY2005 FY2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE I .i PROGRAM: NUCLEAR REACTOR SAFETY DIRECT RESOURCES ACRS/ACNW HQ 0 0.0 0 0.0 0 0.0 0 0.0 ADM Ha 71 0.0 71 0.0 71 0.0 66 0.0 ASLBP HQ 323 5.0 323 5.0 323 5.0 53 5.0 HR HO 2,380 19.0 2,485 19.0 2.879 21.0 2,870 21.0 'P HQ 153 15.0 177 15.0 305 15.0 305 13.0 NMSS HQ 0 2.0 0 2.0 0 2.0 0 2.0 Subtotal 0 2.0 0 2.0 0 2.0 0 2.0 NRR HQ 20,233 466.0 20,173 465.0 21,543 468.0 20,292 456.0 NRR 0 S - S - -.- . AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Full-Time Equila FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FrE $ FTE REG 0 387.0 0 387.0 0 399.0 0 390.0 Subtotal 20,233 853.0 20,173 852.0 21,543 867.0 20,292 846.0 NSIR HO 9,206 80.0 10,401 80.0 10,415 74.0 9,972 92.0 NSIR REG 0 28.0 0 28.0 0 28.0 0 27.0 OE HO 107 7.0 85 8.0 111 8.0 263 8.0 OE REG 0 5.0 0 5.0 0 5.0 0 5.0 Subtotal 107 12.0 85 13.0 111 13.0 263 13.0 OGC HO 5 21.0 5 9.0 57 25.0 57 24.0 Subtotal 5 21.0 5 9.0 57 25.0 57 24.0 01 HO 97 24.0 97 24.0 100 24.0 100 24.0 REG I REG 85 2.0 85 2.0 90 4.0 102 3.0 REG II GH-LeS 0 WE.1 .:1 AGENCY i * FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands. Staff Years InFull-Time Equila' FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE REG 90 0.0 476 0.0 95 2.0 125 1.0 REG liI REG 149 2.0 149 2.0 120 4.0 140 3.0 REG IV REG 68 3.0 68 3.0 78 5.0 78 4.0 RES HO 61,502 144.0 61.502 144.0 53,024 138.0 53,503 133.0 STP HO 0 1.0 0 1.0 0 1.0 0 1.0 STP REG 0 3.0 0 3.0 0 3.0 0 3.0 DIRECTRESOURCES Subtotal: 94,469 1,214.0 96,097 1,202.0 89,211 1,231.0 87,926 1,215.0 ITSTAFF NRR HO 0 3.0 0 3.0 0 3.0 0 3.0 Subtotal 0 3.0 0 3.0 0 3.0 0 3.0 NSIR HO 0 0.0 0 0.0 0 0.0 0 0.0 . . .W- -- S - ., AG]ENCY I FY 20C4 - 2009 Report: CC-01 RESOUR(CE REPORT I (Dollars In Thousands, StaffYears InFull-Time Equila FY 2004 FY 2004 FY 2005 *FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE OE HO 0 1.0 0 1.0 0 1.0 0 1.0 Subtotal 0 1.0 0 1.0 0 1.0 0 1.0 01 HO 0 1.0 0 1.0 0 1.0 0 1.0 REG I REG 0 4.0 0 4.0 0 4.0 0 4.0 REG II REG 0 6.0 0 6.0 0 6.0 0 6.0 REG III REG 0 6.0 0 6.0 0 6.0 0 6.0 REG IV REG 0 4.0 0 4.0 0 4.0 0 4.0 RES HO 0 2.0 0 2.0 0 2.0 0 2.0 IT STAFF Subtoat: 0 27.0 0 27.0 0 27.0 0 27.0 - - * . M . ~ ~ . .- AGENCY i FY2004-2009 I Report: CC-01 RESOURCE REPORT I (Dollars In Thousands, Staff Years In Full-Time EquilavI FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FrE $ FrE $ FTE SUPER/NON-SUPERVISORY STA ASLBP HO 0 3.0 0 3.0 0 3.0 0 2.0 i HR HQ 0 6.0 0 6.0 0 6.0 0 6.0 'P HO 0 8.0 0 8.0 0 8.0 0 10.0 NMSS HO 0 0.0 0 0.0 0 0.0 0 0.0 Subtotal 0 0.0 0 0.0 0 0.0 0 0.0 NRR HO 0 138.0 0 138.0 0 140.0 0 138.0 Subtotal 0 138.0 0 138.0 0 140.0 0 138.0 NSIR HO 0 35.0 0 35.0 0 36.0 0 45.0 OE HO 0 3.0 0 3.0 0 3.0 0 3.0 Subtotal 0 3.0 0 3.0 0 3.0 0 3.0 6 * O- S. AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT I (Dollars InThousands, Staff Years InFull-Time Equftave FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE OGC HO 0 6.0 0 6.0 0 6.0 0 5.0 Subtotal 0 6.0 0 6.0 0 6.0 0 5.0 01 HO 0 6.0 0 5.0 0 4.0 0 4.0 REG I REG 0 51.0 0 51.0 0 50.0 0 50.0 REG II REG 0 47.0 0 47.0 0 47.0 0 47.0 REG III REG 0 49.0 0 52.0 0 50.0 0 50.0 REG IV REG 0 42.0 0 42.0 0 42.0 0 42.0 RES HO 0 50.0 0 50.0 0 51.0 0 55.0 RiII REG 0 1.0 0 1.0 0 1.0 0 1.0 STP 0 - *0 -- . S *.. AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years In Full-Time Equllav FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE - HO 0 0.0 0 0 .0 0 0.0 0 0.0 SUPEIRNOtNSUPERVISORYSTA Subioti: 0 445.0 0 447.0 0 447.0 0 458.0 TRAVEL ASLBP HO 24 0.0 24 0.0 24 0.0 24 0.0 HR HO 110 0.0 110 0.0 110 0.0 110 0.0 IP HO 148 0.0 347 0.0 163 0.0 188 0.0 NMSS HO 0 0.0 0 0.0 0 0.0 0 0.0 i Subtotal 0 0.0 0 0.0 0 0.0 0 0.0 NRR HO 1,734 0.0 2,334 0.0 1,750 0.0 2,170 0.0 Subtotal 1,734 0.0 2,334 0.0 1,750 0.0 2,170 0.0 NSIR HO 628 0.0 628 0.0 473 0.0 593 0.0 *CZ S AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT i (Dollars In Thousands, Staff Years in Full-Time Equilave FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE s . FTE $ FTE OE HO 39 0.0 54 0.0 39 0.0 39 0.0 Subtotal 39 0.0 54 0.0 39 0.0 39 0.0 OGC HQ 41 0.0 41 0.0 59 0.0 59 0.0 Subtotal 41 0.0 41 0.0 59 0.0 59 0.0 01 HQ 215 0.0 328 0.0 226 0.0 268 0.0 REG I REG 1,293 0.0 1,543 0.0 1.555 0.0 1.828 0.0 REG II REG 1,295 0.0 1,444 0.0 1,634 0.0 1,686 0.0 REG III REG 1,451 0.0 1,591 0.0 1,331 0.0 1,690 0.0 REG IV REG 1,444 0.0 1,669 0.0 1,728 0.0 2,009 0.0 RES HO 870 0.0 870 0.0 869 0.0 1,140 0.0 6 6 .6 - - * 7 -- - - -, - - " "'- AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands. Staff Years In Full-Time Equlla FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE S FTE $ FTE S FTE TRAVEL Subto~i: 9,292 0.0 10,983 0.0 9,961 0.0 11,804 0.0 0 *S* * a. I I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars inThousands. Staff Years In Full-Time Equflave FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE NUCLEAR REACTOR SAFETY Strategy Resources Total ACRS/ACNW HO 0 0.0 0 0.0 0 0.0 0 0.0 SIB Costs .0 0 0 0 ADM HO 71 0.0 71 0.0 71 0.0 66 0.0 S/B Costs 0 0 0 0 ASLBP HO 347 8.0 347 8.0 347 8.0 77 7.0 S/B Costs 1,042 1,042 1,128 987 ASLBP Subtotal: 1,389 8.0 1,389 8.0 1,475 8.0 1,064 7.0 HR HO 2,490 25.0 2,595 25.0 2,989 27.0 2,980 27.0 S/B Costs 2,796 2,797 3,082 3,082 HR Subtotal: 5,286 25.0 5,392 25.0 6,071 27.0 6,062 27.0 S*S - - S - AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years In Full-Time Equila FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FrE $ FTE $ FTE 'P HO 301 23.0 524 23.0 468 23.0 493 23.0; S/B Costs 2,953 2,952 2,987 2,988 IP Subtotal: 3,254 23.0 3,476 23.0 3,455 23.0 3,481 23.0 NMSS HO 0 2.0 0 2.0 0 2.0 0 2.0 StB Costs 251 250 256 256 NMSS HO SB Subtotal: 251 2.0 250 2.0 256 2.0 256 2.0 NMSS Subtotal: 251 2.0 250 2.0 256 2.0 256 2.0 NRR HO 21,967 607.0 22,507 606.0 23,293 611.0 22,462 597.0 SIB Costs 76,615 76,486 78,517 76,721 NRR HO SB Subtotal: 98,582 607.0 98,993 606.0 101,810 611.0 99,183 597.0 NRR REG 0 387.0 0 387.0 0 399.0 0 390.0 SIB Costs 44,872 44,872 47,234 46,169 NRR REG SB Subtotal: 44,872 387.0 44,872 387.0 47,234 399.0 46,169 390.0 NRR Subtotal: 143,454 994.0 143,865 993.0 149,044 1,010.0 145,352 987.0 NSIR HO 9,834 115.0 11,029 115.0 10,888 110.0 10,565 137.0 . M I AGENCY FY 2004 - 2009 ! Report: CC-01 RESOURCE REPORT j (Dollars InThousands. Staff Years In Full-Time Equilk FY 2004 TFY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FrE $ FTE S/B Costs 14,868 14,868 14,567 18,142 NSIR REG 0 28.0 0 28.0 0 28.0 0 27.0 S/B Costs 3,247 3,247 3,316 3,196 NSIR Subtotal: 27,949 143.0 29,144 143.0 28,771 138.0 31,903 164.0 OE HQ 146 11.0 139 12.0 150 12.0 302 12.0 S/B Costs 1,451 1,583 1,605 1,605 OE HO SB Subtotal: 1,597 11.0 1,722 12.0 1,755 12.0 1,907 12.0 OE REG 0 5.0 0 6.0 0 5.0 0 5.0: SIB Costs 580 580 592 592 OE REG SB Subtotal: 580 5.0 580 5.0 592 5.0 592 5.0 OE Subtotal: 2,177 16.0 2302 17.0 2,347 17.0 2,499 17.0 OGC HO 46 27.0 46 15.0 116 31.0 116 29.0 S/B Costs 3,405 1,891 3,963 3,707 OGC HO SB Subtotal: 3,451 27.0 1,937 15.0 4,079 31.0 3,823 29.0 OGC Subtotal: 3,451 27.0 1,937 15.0 4,079 31.0 3,823 29.0 _=1 a.*1 1_ . I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Doflars InThousands. Staff Years In Full-Time Equila; FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ IFTE S FTE $ FTE 01 Ho 312 31.0 425 30.0 326 29.0 368 29.0 SIB Costs 4,224 4,087 4,038 4,038 01 Subtotal: 4,536 31.0 4,512 30.0 4,364 29.0 4,406 29.0 REG I REG 1,378 57.0 1,628 57.0 1,645 58.0 1,930 57.0 SIB Costs 6,609 6,609 6,867 6,748 REG I Subtotal: 7,987 57.0 8,237 57.0 8,512 58.0 8,678 57.0 REG II REG 1,385 53.0 1,920 53.0 1,729 55.0 1,811 54.0 SIB Costs 6,145 6,146 6,511 6,392 REG II Subtotal: 7,530 53.0 8,066 53.0 8,240 55.0 8,203 54.0 REG IIl REG 1,600 57.0 1,740 60.0 1,451 60.0 1,830 59.0 SIB Costs 6,609 6,957 7,103 6,984 REG Ill Subtotal: 8,209 57.0 8,697 60.0 8,554 60.0 8,814 59.0 REG IV REG 1,512 49.0 1,737 49.0 1,806 51.0 2,087 50.0 S/B Costs 5,681 5,682 6,038 5,919 6 - I * S l =1 .:. . AGENCY i FY 2004 - 2009 Report: CC-01 RESOURCE REPORT I (Dollars InThousands, Staff Years In Full-Time Equilavc FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE REG IV Subtotal: 7,193 49.0 7,419 49.0 7,844 51.0 8,006 50.0 RES HO 62,372 196.0 62,372 196.0 53,893 191.0 54,643 190.0 - S/B Costs 25,865 25,867 25,678 25,444 RES Subtotal: 88,237 196.0 88,239 196.0 79,471 191.0 80,087 190.0 Rill REG 0 1.0 0 1.0 0 1.0 0 1.0 SIB Costs 116 116 118 118 STP HQ 0 1.0 0 1.0 0 1.0 0 1.0 SIB Costs 114 114 115 115 STP REG 0 3.0 0 3.0 0 3.0 0 3.0 SIB Costs 348 348 355 355 STIR Subtotal: 461 4.0 462 4.0 470 4.0 470 4.0 S - . - S - I' ~ l AGENCY 4 FY 2004 - 2009 1 Report: CC-01 RESOURCE REPORT i (Dollars InThousands, Staff Years In Full-Time Equllave FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE S$ FTE $ FTE 0 - RESOURCE TOTAL: 103,761 1,686.0 107,080 1,676.0 99,172 1,705.0 99,730 1,700.0 SIB TOTAL: 207,790 206,494 213,970 c-E3;I STRATEGY TOTAL: p311,551 1,686.0 1313,574 1,676.0 W313,142 1,705.0-t31,288 1,700.0 0 -. - I * I *..- AGENCY i FY 2004 - 2009 Report: CC-01 RESOURCE REPORT I (Dollars In Thousands, Staff Years In Full-Time Equilave FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FrE $ FTE $ FrE $ FrE 6l I , , - i AGENCY FY2004-2009 Report: CC-01 RESOURCE REPORT (DollarsInThousands,StaffYearsInFull-Time Eilave _tI Ime Equilave FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE PROGRAM: MATERIALS AND WASTE SUB-PROGRAM: FUEL FACILITIES LICENSING AND INSPECTION SUB-SUB-PROGRAM: FUEL FACILITIES UCENSING AND INSPECTION PLANNED ACTIVITIES: Fuel Facilities Licensing NMSS HO 648 13.8 648 13.8 520 18.4 855 16.5 REG o 0.2 0 0.2 0 0.4 0 0.6 Subtotal: 648 14.0 648 14.0 520 18.8 855 17.1 Allegations/Enforcement OE HO 0 0.0 0 0.0 0 0.0 0 0.0 Materials Enforcement Actions OE HO 0 0.0 0 0.0 2 0.0 2 0.0 HLS Threat Assessments NSIR HO 0 0.3 0 0.3 0 0.4 0 0.4 0 *:t__-. i0tw I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years in Full-Time Equllaven FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE HLS Mitigating Strategies NMSS HQ 120 0.0 120 0.0 235 0.0 0 0.0 REG 0 0.0 0 0.0 0 0.0 0 0.0 NSIR HO 0 2.8 0 2.8 0 2.8 0 1.0 REG 0 0.0 . 0 - 0.0 0 0.0 0 0.0 I Subtotal: 120 2.8 120 2.8 235 2.8 0 1.0 HLS Regulatory Improvements NSIR HO 340 5.4 340 5.4 0 4.7 100 4.5 REG 0 1.0 0 1.0 0 1.0 0 0.9 Subtotal: 340 6A 340 6.4 0 6.7 100 5.4 HILS Safeguards Inspection NMSS HO 0 0.0 0 0.0 0 0.0 0 0.0 NSIR HO 0 3.7 0 3.7 0 4.3 0 4.5 REG 0 1.0 0 1.0 0 1.0 0 2.8 0 . - 6 *- 9' . *Ig.I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars in Thousands, Staff Years In Full-Time Equilavet FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE S FTE Subtotal: 0 4.7 0 4.7 0 6.3 0 7.3 HLS Safeguards Licensing NMSS HO 0 0.0 0 0.0 0 1.0 0 1.0 REG 0 0.0 0 0.0 0 0.0 0 0.0 NSIR HO 1,890 3.0 1,890 3.0 1,600 3.1 1,800 5.0 Subtotal: 1,890 3.0 1,890 3.0 1,600 4.1 1,800 6.0 Fuel Facilities Inspection NMSS HO 0 2.6 0 2.6 0 3.4 0 2.5 REG 0 12.5 0 12.5 0 12.0 0 13.2 Subtotal: 0 15.1 0 15.1 0 15.4 0 15.7 HLS External Training NSIR HO 14 0.0 14 0.0 30 0.0 50 0.0 HLS Safeguards Insection Program Development and Maintenance NSIR HO 0 3.8 0 3.8 0 4.7 0 2.0 moe k'I ; 9. - io 614l *.tq _ - *... I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years in Full-Time Equilav FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE HLS Force-on-Force Program NSIR Ho 0 0.9 0 0.9 0 0.9 10 1.3 REG 0 0.1 0 0.1 0 0.1 0 0.3 Subtotal: 0 1.0 0 1.0 0 1.0 10 1.6 Mixed Oxide Fuel Fabrication Licensing NMSS HQ 285 11.5 285 11.5 400 11.0 '300 7.7_ Fuel Facilities Environmental Reviews NMSS HO 0 3.0 0 3.0 0 0.0 1,548 4.0 Mixed Oxide Fuel Fabrication Facility Ucoing RES HO 0 3.0 0 3.0 0 3.0 0 2.0 Uranium Recovery Licensing NMSS Ho 195 5.2 195 5.2 0 5.0 -135 6.7 Q. _, Uranium Recovery Inspection NMSS HO 0 0.4 0 0.4 0 0.4 0 0.4 S - e - - Si i. . . . - AGENCY FY 2004 -2009 i Report: CC-01 RESOURCE REPORT (Dollars In Thousands. Staff Years In Full-Time Equllaver FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current S FTE $ FTE $ FTE $ FTE NMSS REG 0 1.2 0 1.2 0 1.1 0 1.1 Subtotal: 0 1.6 0 1.6 0 1.5 0 1.5 Enrichment Licensing and Certification NRR HO 0 0.0 0 0.0 0 0.0 0 0.0 NMSS HO 0 12.2 o 12.2 125 8A 315 15.3 REG 0 0.0 0 0.0 0 0.0 0 0.0 Subtotal: 0 12.2 0 12.2 125 8.4 315 15.3 Enrichment Inspection NMSS HO 0 0.9 0 0.9 0 1.5 0 1.5 REG 0 3.9 0 3.9 0 3.9 0 4.6 Subtotal: 0 4.8 0 4.8 0 5.4 o 6.1 Mixed Oxide Fuel Fabrication Facility Inspection NMSS HO 0 0.4 0 0.4 .0 0.9 0 0.4 REG 0 3.2 0 3.2 0 4.6 0 2.5 0 *0 - 0 0' *;. .... S. AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Full-Time EquilaveI FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FNE $ FTE OGC HO 0 1.0 0 1.0 0 2.0 0 2.0 Subtotal: 0 4.6 0 4.6 0 7.5 0 4.9 Legal Advice and Representation OGC HO 0 5.0 0 1.0 0 4.0 0 4.0 Fuel Facilities Adjudication ASLBP HO 24 1.0 24 1.0 21 1.0 35 3.0 General Information Technology NMSS HO 81 0.0 81 0.0 182 0.0 50 0.0 Intem Training and Development NMSS HO 0 1.0 0 1.0 0 1.0 0 1.0 REG I REG 0 0.0 . 0 0.0 0 0.0 0 0.0 REG II REG 0 0.0 0 0.0 0 1.0 0 3.0 REG Ill REG 0 0.0 0 0.0 0 0.0 0 0.0 0 *0 - 0* I. .: .... B ------ AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT I (Dollars In Thousands, Staff Years InFull-Time Equllaven FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE REG IV REG 0 0.0 0 0.0 0 0.0 0 0.0 Subtotal: 0 1.0 0 1.0 0 2.0 0 4.0 External Training NMSS HO 97 . 0.0 97 0.0 107 0.0 130 0.0 OGC HO 0 0.0 0 0.0 0 0.0 0 0.0 ASLBP HO 0 0.0 0 0.0 0 0.0 0 0.0 OE HO 0 0.0 1 0.0 1 0.0 1 0.0 REG I REG 0 0.0 0 0.0 0 0.0 0 0.0 REG II REG 0 0.0 0 0.0 0 0.0 43 0.0 REG III REG 0 0.0 0 0.0 0 0.0 0 0.0 REG IV REG 0 0.0 0 0.0 0 0.0 0 0.0 Subtotal: 97 0.0 98 0.0 108 0.0 174 0.0 *e V- I ; S. V-*Z..... I. - - AGENCY FY2004-2009 Report: CC-01 RESOURCE REPORT I (Dollars InThousands, Staff Years In Full-Time Equilave FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE PROGRAM: MATERIALS AND WASTE SUB-PROGRAM: FUEL FACILITIES LICENSING AND INSPECTION DIRECT RESOURCES ASLBP HQ 24 1.0 24 1.0 21 1.0 35 3.0 NMSS HQ 1.426 51.0 1,426 51.0 1.569 51.0 3,333 57.0 NMSS REG 0 21.0 0 21.0 0 22.0 0 22.0 Subtotal 1,426 72.0 1,426 72.0 1,569 73.0 3,333 79.0 NRR HO 0 0.0 0 0.0 0 0.0 0 0.0 Subtotal 0 0.0 0 0.0 0 0.0 0 0.0 NSIR HO 2,244 19.9 2244 19.9 1,630 20.9 1,960 18.7 NSIR REG 0 2.1 0 2.1 0 2.1 0 4.0 OE S6 * el. f :-. . . AGENCY I FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands. Staff Years In Full-Time Equilavi FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE HO 0 0.0 1 0.0 3 0.0 3 0.0 Subtotal 0 0.0 1 0.0 3 0.0 3 0.0 OGC HO 0 6.0 0 2.0 0 6.0 0 6.0 Subtotal 0 6.0 0 2.0 0 6.0 0 6.0 REG I REG 0 0.0 0 0.0 0 0.0 0 0.0 REG II REG 0 0.0 0 0.0 0 1.0 43 3.0 REG III REG 0 0.0 0 0.0 0 0.0 0 0.0 REG IV REG 0 0.0 0 0.0 0 0.0 0 0.0 RES HO 0 3.0 0 3.0 0 3.0 0 2.0 DIRECTRESOURCES Subboe: 3,694 104.0 3,695 100.0 3,223 107.0. 5,374 v' 11S.7/ ITSTAFF V 0 - *]S -.* .. - 6 AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Fun-Time Equilav FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE NMSS HQ 0 0.0 0 0.0 0 0.0 0 0.0 Subtotal 0 0.0 0 0.0 0 0.0 0 0.0 REG I REG 0 0.0 0 0.0 0 0.0 0 0.0 REG II REG 0 0.0 0 0.0 0 0.0 0 0.0 REG IlIl REG 0 0.0 0 0.0 0 0.0 0 0.0 1 REG IV REG 0 0.0 0 0.0 0 0.0 0 0.0 IT STAFF Subtoteal 0 0.0 0 0.0 0 0.0 0 0.0 SUPERNON-SUPERVISORY STA NMSS HQ 0 26.0 0 26.0 0 21.0 0 23.0 Subtotal 0 26.0 0 26.0 0 21.0 0 23.0 NSIR HQ 0 3.0 0 3.0 0 3.0 0 3.3 0 i* -. 1IA:- I: 4- 6I W- I. F*:... [1 IM. AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Full-TIme Equilaver FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE OGC HO 0 4.0 0 4.0 0 4.0 0 4.0 Subtotal 0 4.0 0 4.0 0 4.0 0 4.0 REG I REG 0 0.0 0 0.0 0 0.0 0 0.0, REGQ REG 0 5.0 0 5.0 0 7.0 0 12.0 REG III REG 0 0.0 0 0.0 0 0.0 0 0.0 REG IV REG 0 1.0 0 1.0 0 1.0 0 0.0 RES HQ 0 1.0 0 1.0 0 1.0 SUPERtfN-SUPERYISORY STA Subotael: 0 40.0 0 40.0 0 37.0 0 /43.3 } TRAVEL ASLBP HO 9 0.0 9 0.0 9 0.0 9 0.0 6 -. '1 -[A 06110.01219S .: AGENCY i FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Full-Time Equilave FY 2004 IFY 2004 FY 2005 FFY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FrE NMSS HO 330 0.0 330 0.0 303 0.0 303 0.0 Subtotal 330 0.0 330 0.0 303 0.0 303 0.0 NSIR HO 130 0.0 130 0.0 200 0.0 200 0.0 OE HO o 0.0 4 0.0 6 0.0 6 0.0 Subtotal 0 0.0 4 0.0 6 0.0 6 0.0 OGC HO 18 0.0 18 7.0 23 0.0 23 0.0 Subtotal 18 0.0 18 7.0 23 0.0 23 0.0 REG I REG 0 0.0 5 0.0 0 0.0 0 0.0 REG II REG 193 0.0 320 0.0 448 0.0 325 0.0 REG Ill REG 2 0.0 2 0.0 0 0.0 0 0.0 REG IV REG 9 0.0 9 0.0 9 0.0 9 0.0 . -s - 0 - a..:. AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands. Staff Years InFull-Time Equflav. FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE RES HO 0 0.0 0 0.0 0 0.0 0 0.0 TRAVEL Subtotel: 691 0.0 827 7.0 998 0.0 875 0.0 0 0 - 0- 0.'Z ~1M ~ AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Statt Years In Full-Time Equllav FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current rres. Budget Current $ FTE $ FrE S FTE S FrE FUEL FACILITIES LICENSING AND INSPECTION Program Resources Total ASLBP HO 33 1.0 33 1.0 30 1.0 44 3.0 S/B Costs 130 130 141 423 ASLBP Subtotal: 163 1.0 163 1.0 171 1.0 467 3.0 NMSS HO 1,756 77.0 1,756 77.0 1,872 72.0 3,636 80.0 S/B Costs 9,653 9,652 9,204 10,226 NMSS HO SB Subtotal: 11,409 77.0 11,408 77.0 11,076 72.0 13,862 80.0 NMSS REG 0 21.0 0 21.0 0 22.0 0 22.0 S/B Costs 2,435 2,434 2,605 2,605 NMSS REG SB Subtotal: 2,435 21.0 2,434 21.0 2,605 22.0 2,605 22.0 NMSS Subtotal: 13,844 98.0 13,842 98.0 13,681 94.0 16,467 102.0 NRR HO 0 0.0 0 0.0 0 0.0 0 0.0 SIB Costs 0 0 0 0 I t;1A' -. i W*.~*1j1~= .: &l.4 I AGENCY I FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years InFull-Time Equilave FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE NRR HO SB Subtotal: 0 0.0 0 0.0 0 0.0 0 0.0 NSIR HO 2,374 22.9 2,374 22.9 1,830 23.9 2,160 22.0 SIB Costs 2,961 2,960 3,164 2,913 NSIR REG 0 2.1 0 2.1 0 2.1 0 4.0 SIB Costs 243 244 248 474 NSIR Subtotal: 5,578 25.0 5,578 25.0 5,242 26.0 5,547 26.0 OE HO 0 0.0 5 0.0 9 0.0 9 0.0 SIB Costs 0 0 0 0 OE HO SB Subtotal: 0 0.0 5 0.0 9 0.0 9 0.0 OE Subtotal: 0 0.0 5 0.0 9 0.0 9 0.0 OGC HO 18 10.0 18 13.0 23 10.0 23 10.0 S/B Costs 1,261 1,639 1,278 1,278 0-ek t. *0 % . - * 0 -1to]4 'ML1 1 AGENCY I FY 2004 - 2009 Report: CC-01 RESOURCE REPORT i (Dollars In Thousands, Staff Years In Full-Time Equilavei FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Buidget Current $ FrE- $ FTE S FrE $ FTE OGC HO SB Subtotal: 1,279 10.0 1,657 13.0 1,301 10.0 1,301 10.0 OGC Subtotal: 1,279 10.0 1,657 13.0 1,301 10.0 1,301 10.0 REG I REG 0 0.0 5 0.0 0 0.0 0 0.0 SIB Costs 0 0 0 0 REG I Subtotal: 0 0.0 5 0.0 0.0 0 0.0 REG II REG 193 5.0 320 5.0 448 8.0 368 15.0 SIB Costs 580 580 947 1,776 REG II Subtotal: 773 5.0 900 5.0 1,395 8.0 2,144 15.0 REG IlIl REG 2 0.0 2 0.0 0 0.0 0 0.0 SIB Costs 0 0 0 0 REG IlIl Subtotal: 2 0.0 2 0.0 0 0.0 0 0.0 REG IV REG 9 1.0 9 1.0 9 1.0 9 1.0 SIB Costs 116 116 118 118 0 - - IO a.-- - AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Full-Time Equilaver FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE REG IV Subtotal: 125 1.0 125 1.0 127 1.0 127 1.0 RES HO 0 4.0 0 4.0 0 4.0 0 2.0 S/B Costs 528 528 536 268 RES Subtotal: 528 4.0 528 4.0 536 4.0 268 2.0 RESOURCE TOTAL' 4,385 144.0 4,522 147.0 4,221 144.0 6,249 /159.0,/ S/M TOTAL: 17,907 18,283 18,241 20,081 PROGRAM RESOURCE TOTAL $22,292 144.0 $22,805 147.0 $22,462 144.0 $26,330 159.0 0 **L _ 0 - S. - AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT - (Dollars in Thousands, Staff Years InFullTirne Equlavi FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FME, PROGRAM: MATERIALS AND WASTE SUB-PROGRAM: NUCLEAR MATERIALS USERS UCENSING AND INSPECTION SUB-SUB-PROGRAM: NUCLEAR MATERIALS USERS UCENSING AND INSPECTION PLANNED ACTIVITIES: International ImportlExport Licensing Reviews IP HO 0 3.0 0 3.0 0 3.0 0 3.0 InternatIonal HLS LUcensing Support lP HQ 0 2.0 0 2.0 0 2.0 0 2.0 HLS International Safeguards Oversight NSIR HO .0 0.0 0 0.0 0 0.0 0 0.4 HLS Security Inspections NSIR HO 1,006 1.3 1,006 1.3 1,415 1.3 705 2.1 REG 0 5.9 0 5.9 0 9.9 0 10.0 Subtotal: 1,006 7.2 1,006 7.2 1,415 11.2 705 12.1 0 - - -3 - 3 AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars in Thousands, Staff Years InFull-Time Equilap. FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FrE $ FTE $ FTE $ FiTE Materials Event Response NSIR HO 0 0.0 0 0.0 0 0.0 0 0.0 REG 0 0.0 0 0.0 0 0.0 0 0.0 Subtotal: 0 0.0 0 0.0 0 0.0 0 0.0 Materials Incident Response Coordination NSIR HO 0 0.0 0 0.0 0 0.0 0 0.0 REG 0 0.4 0 0.4 0 2.0 0 0.4 Subtotal: 0 0.4 0 0.4 0- 2.0 0 0.4 Materials Event Readiness NSIR HO 0 0.0 0 0.0 0 0.0 0 0.0 REG 0 1.6 0 1.6 0 0.0 0 1.6 Subtotal: 0 1.6 0 1.6 0 0.0 0 1.6 HLS Mitigating Strategies NSIR HO 0 1.3 0 1.3 0 1.3 0 0.5 REG 0 0.0 0 0.0 0 0.0 0 0.0 E ,S 3 - I. I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years InFull-Time Equilan FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FrE $ FTE Subtotal: 0 1.3 0 1.3 0 1.3 0 0.5 HLS Regulatory Improvements NSIR HO 26 3.3 26 3.3 0 0.9 400 2.4 International Legal Advice and Representation OGC HO 0 1.0 0 1.0 0 1.0 1.0 Risk- Informed Regulatory Framework RES HO 500 2.0 500 2.0 500 2.0 200 1.0 Radiation Exposure Assessment Methods RES HO 250 1.0 262 1.0 250 1.0 350 1.0 HLS Regulatory Improvements NMSS HO 290 4.0 290 4.0 100 3.0 100 3.4 HLS Safeguards Inspection and Oversight NMSS HO 0 0.0 0 0.0 0 0.0 0 0.0 * .6 - . * 1.- AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Full-Time Equilave FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FrE $ FTE $ FTE HLS Control of Sources and Registy RES HO 400 0.0 400 0.0 400 0.0 0 0.0 NSIR HO 0 0.0 0 0.0 0 0.0 0 0.0 REG 0 0.0 0 0.0 0 0.0 0 0.0 Subtotal: 400 0.0 400 0.0 400 0.0 a 0.0 HLS Information Technology-Control of Sources NMSS HO 1.880 2.0 1,880 2.0 1,110 2.0 1,630 3.5 Materials Licensing NMSS HQ 50 13A 50 13.4 465 15.1 50 12.0 REG 0 20.9 0 20.9 0 20.5 0 19.7 Subtotal: 50 34.3 50 34.3 465 35.6 50 31.7 HLS Safeguards Licensing NSIR HO 0 1.2 0 1.2 0 2.0 0 0.0 . S 1-1 !1# ~ -41W~ ... S - - AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years In Full-Time Equilavr FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FITE $ FTE $ FIE $ FTE HLS Legal Advice and Representation OGC HO 0 2.0 0 1.0 0 2.0 0 2.0 1 HLS Coordination with States STP HO 0 0.0 50 1.0 50 1.0 50 1.0 REG 0 0.0 0 0.0 0 0.0 0 0.0 Subtotal: 0 0.0 50 1.0 50 1.0 50 1.0 Materials Users Environmental Reviews NMSS HO 0 1.0 0 1.0 - 0 0.0 0 1.0 HLS International Safeguards Licensing - Materials NSIR HO 0 1.0 0 1.0 0 1.0 0 1.4 HLS International Threat Assessment NSIR HO 0 0.8 0 0.8 0 0.8 0 0.1 Materials Inspections NMSS HQ 590 1.8 834 1.8 806 2.1 731 1.7 Wo4 l .. II- a-Ili1. =W~ I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years inFull-TIme Equile FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE NMSS REG 0 20.0 0 20.0 0 19.7 0 20.5 Subtotal: 590 21.8 834 21.8 806 21.8 731 22.2 HLS International Regulatory Improvements NSIR HO 0 3.2 0 3.2 0 2.8 0 2.4 Materials Rulemaking NMSS HO 1,685 21.8 1,785 21.8 1,270 21.8 570 14.9 REG 0 1.2 0 1.2 0 1.2 0 1.1 Subtotal: 1,685 23.0 1,785 23.0 1,270 23.0 570 16.0 Materials Event Evaluation NMSS HO 651 4.9 651 4.9 625 4.9 625 5.9 REG 0 0.8 0 0.8 0 0.8 0 0.8 Subtotal: 651 5.7 651 5.7 625 5.7 625 6.7 Materials Incident Response NMSS HO 170 1.8 170 1.8 245 1.8 120 1.8 0 *0A11to ;-L1 *fll * S. AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands. Staff Years In Full-Time EquilaN FY 2004 IFY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FrE $ FTE $ FTE NMSS REG 0 5.2 0 5.2 0 5.2 0 5.2 I Subtotal: 170 7.0 170 7.0 245 7.0 120 7.0 Allegations/Enforcement NMSS HO 0 1.3 0 1.3 0 1.3 0 1.3 REG 0 10.9 0 10.9 0 10.6 0 11.5 OE HO 0 2.0 0 2.0 2 2.0 Subtotal: 0 14.2 0 14.2 2 13.9 2 p1 l Materials Agreement States NMSS HQ 0 3.0 0 3.0 0 3.0 0 3.0 REG 0 3.0 - 0 3.0 0 3.0 0 4.2 STP HQ 209 14.0 185 13.0 220 14.0 190 14.0 REG 0 *5.0 0 5.0 0 5.0 0 5.0 Subtotal: 209 25.0 185 24.0 220 25.0 190 26.2 6 -. 6 - I1 :- AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Full-Time Equllavw FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE Materials Site, Federal, and Tribal Liaison STP HQ 10 1.0 0 1.0 10 1.0 10 1.0 REG 0 1.0 0 1.0 0 1.0 0 1.0 Subtotal: 10 2.0 0 2.0 10 2.0 10 2.0 Materials Enforcement Actions OE HQ 4 2.0 42 2.0 2 2.0 2 2.0 REG 0 4.0 0 3.0 0 3.0 0 3.0 Subtotal: 4 . 6.0 42 5.0 2 5.0 2 5.0 Materials Investigations 01 HQ 0 7.0 0 8.0 0 8.0 0 8.0 Legal Advice and Representation OGC HQ 0 4.0 0 3.0 0 3.0 0 3.0 Materials Adjudication ASLBP HQ 125 2.0 125 2.0 125 2.0 20 2.0 S - . - S - a : I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years In Full-Time Equilave FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE j Information Technology - Materials NMSS HO 780 1.0 780 1.0 1,757 1.0 2,434 0.5 General Information Technology NMSS HO 770 0.0 770 0.0 683 0.0 305 0.0 NSIR HO 4 0.0 4 0.0 0 0.0 0 0.0 STP HQ 286 0.0 230 0.0 325 0.0 325 0.0 j Subtotal: 1,060 0.0 1,004 0.0 1,008 0.0 630 0.0 TTC-Tralning and Development HR HO 702 2.0 702 2.0 745 2.0 596 2.0 Intern Training and Development NMSS HO 0 1.0 0 1.0 0 1.0 0 1.0* NSIR HO 0 0.0 0 0.0 0 0.0 0 0.0 REG I REG 0 0.0 0 0.0 0 1.0 0 (0 1. 10 0 . -' ii- 0 L. ;. I AGENCY I FY 2004 - 2009 Report: CC01 RESOURCE REPORT (Dollars In Thousands, Staff Years In Full-Time Equilav FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE REG II REG 0 2.0 0 2.0 0 2.0 0 0.0 REG III REG 0 1.0 0 0.0 0 1.0 0 0.0 REG IV REG 0 0.0 0 0.0 0 1.0 0 1.0 Subtotal: 0 4.0 0 3.0 0 6.0 0 3.0 External Training RES HO 3 0.0. 3 0.0 3 0.0 3 0.0 NMSS HO 101 0.0 101 0.0 101 0.0 101 0.0 NSIR HO 0 0.0 0 0.0 0 0.0 0 0.0 1 STP HO 2 0.0 7 0.0 15 0.0 15 0.0 ASLBP *HO 3 0.0 3 0.0 3 0.0 3 0.0 OE HO 2 0.0 2 0.0 1 0.0 1 0.0 REG I REG 32 0.0 32 0.0 32 0.0 21 0.0 6 0 * .11IA-fl-~~ ------I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT I (Dollars InThousands, Staff Years In Full-lime Equflav FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ IFTE $ FTE I FTE $ FTE REG II REG 18 0.0 26 0.0 23 0.0 0 0.0 REG IlIl REG 15 0.0 15 0.0 40 0.0 30 0.0 REG IV REG 15 0.0 15 0.0 20 0.0 20 0.0 Subtotal: 191 0.0 204 0.0 238 0.0 0 ) °0.0 0 -01- 0 i- f-W ii'S1-W1 l I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Full-Time Equllavc FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE PROGRAM: MATERIALS AND WASTE SUB-PROGRAM: NUCLEAR MATERIALS USERS LICENSING AND INSPECT7ON DIRECT RESOURCES ASLBP HO 128 2.0 128 2.0 128 2.0 23 2.0 HR HO 702 2.0 702 2.0 745 2.0 596 2.0 lP HO 0 5.0 0 5.0 0 5.0 0 5.0 NMSS HO 6,967 57.0 7,311 57.0 7,162 57.0 6.666 50.0 NMSS REG 0 62.0 0 62.0 0 61.0 0 63.0 Subtotal 6,967 119.0 7,311 119.0 7,162 118.0 6,666 113.0 NSIR HO 1,036 12.1 1,036 12.1 1.415 10.1 1.105 9.3 NSIR REG 0 7.9 0 7.9 0 11.9 0 12.0 W0 1it -. 5 1 ;S * 03. L6: .:. ,, L AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Full-Time Equllaw FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE S FTE $ FTE $ FTE i OE HO 6 4.0 44 4.0 5 4.0 5 4.0 OE REG 0 4.0 0 3.0 0 3.0 0 3.0 Subtotal 6 8.0 44 7.0 5 7.0 5 7.0 OGC I HO 0 7.0 0 5.0 0 6.0 0 6.0 Subtotal 0 7.0 0 5.0 0 6.0 0 6.0 I0 1 01 HO 0 7.0 0 8.0 0 8.0 0 8.0 REG I REG 32 0.0 32 0.0 32 1.0 21 1.0 REG II REG 18 2.0 26 2.0 23 2.0 0 0.0 REG III REG 15 1.0 15 0.0 40 1.0 30 0.0 REG IV I REG 15 0.0 15 0.0 20 1.0 20 1.0 *! -. i i -i . AGENCY I FY 2004 - 2009 Report: CC-01 RESOURCE REPORT i (Dollars InThousands, Staff Years In Full-Time Equilav FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE RES HO 1.153 3.0 1,165 3.0 1.153 3.0 553 2.0 STP HQ 507 15.0 472 15.0 620 16.0 590 16.0 STP REG 0 6.0 0 6.0 0 6.0 0 6.0 DIRECTFIESOURCES Subotatl: 10,579 197.0 10,946 194.0 11,343 200.0 9,609 /190.3 7/ ITSTAFF NMSS HQ 0 3.0 0 3.0 0 3.0 0 3.0 Subtotal 0 3.0 . 0 3.0 0 3.0 0 3.0 REG I REG 0 1.0 0 1.0 0 1.0 0 1.0 REG IV REG 0 1.0 0 1.0 0 1.0 0 1.0 STP HO 0 0.0 0 0.0 0 0.0 0 0.0 . -e - M... AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands. Staff Years In Fun-Time Equila FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE I IT STAFF Subtotl: o 5.0 0 5.0 0 5.0 0 v' 5.0 t, SUPER/NON-SUPERVISORY STA ASLBP Ho 0 2.0 o 2.0 0 2.0 o 1.0 NMSS HO 0 18.0 0 18.0 0 16.0 0 18.0 Subtotal 0 18.0 0 18.0 0 16.0 0 18.0 NSIR HO 0 2.0 0 2.0 0 2.0 0 1.7 OE HO 0 2.0 0 2.0 0 2.0 0 2.0 Subtotal 0 2.0 0 2.0 0 2.0 0 2.0 OGC HO 0 0.0 0 0.0 0 0.0 0 0.0 Subtotal 0 0.0 0 0.0 0 0.0 0 0.0 01 HO 0 3.0 0 3.0 0 3.0 0 3.0 REG I * -S ; *461 - ;Il A. rf:.L1 I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Full-Time EquilaveI FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FrE $ FrE $ FTE REG 0 16.0 0 16.0 0 15.0 0 15.0 REG II REG 0 5.0 0 5.0 0 5.0 0 0.0 REG III REG 0 11.0 0 9.0 0 11.0 0 9.0 REG IV REG o 10.0 0 10.0 0 10.0 0 10.0 RES HQ 0 1.0 o 1.0 0 1.0 0 1.0 STP HO 0 5.0 0 5.0 0 5.0 0 5.0 SUPESRO4-SUPERVISORY STA Subtotal: 0 75.0 0 73.0 0 72.0 0 / 65.7 TRAVEL ASLBP HO 15 0.0 15 0.0 15 0.0 15 0.0 HR HQ 0 0.0 0 0.0 0 0.0 0 0.0 wUfvR t I * 3. :. I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years In Full-Time Equilave FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE S FTE $ FTE $ FTE NMSS Ha 377 0.0 377 0.0 301 0.0 301 0.0 Subtotal 377 0.0 377 0.0 301 0.0 301 0.0 NSIR HO 321 0.0 321 0.0 125 0.0 125 0.0 OE Ha 14 0.0 18 0.0 8 0.0 8 0.0 Subtotal 14 0.0 18 0.0 8 0.0 8 0.0 OGC Ha 4 0.0 4 0.0 8 0.0 8 0.0 Subtotal 4 0.0 4 0.0 8 0.0 8 0.0 01 HO 76 0.0 76 0.0 80 0.0 80 0.0 REG I REG 300 0.0 345 0.0 300 0.0 300 0.0 REG II REG 132 0.0 5 0.0 144 0.0 15 0.0 REG IlIl 6 -. I*6 a.114 I I:. AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Full-Time Equilave: FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE REG 288 0.0 288 0.0 165 0.0 195 0.0 REG IV REG 306 0.0 441 0.0 306 0.0 306 0.0 RES HO 25 0.0 25 0.0 25 0.0 25 0.0 STP HO 66 0.0 101 0.0 71 0.0 71 0.0 TPAVEL. Subtotal: 1,924 0.0 2,016 0.0 1,548 0.0 5o/ 0.0 S -S . - 6 * . AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands. Staff Years In Full-Time Equlilave FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE NUCLEAR MATERIALS USERS LICENSING AND INSPECTION Program Resources Total ASLBP Ho 143 4.0 143 4.0 143 4.0 38 3.0 SIB Costs 521 520 564 423 ASLBP Subtotal: 664 4.0 663 4.0 707 4.0 461 3.0 HR Ho 702 2.0 702 2.0 745 2.0 596 2.0 SIB Costs 224 224 228 228 HR Subtotal: 926 2.0 926 2.0 973 2.0 824 2.0 'P HO 0 5.0 0 5.0 0 5.0 0 5.0 SIB Costs 642 642 650 650 NMSS HO 7,344 78.0 7,688 78.0 7,463 76.0 6,967 71.0 SfB Costs 9,778 9,778 9,713 9,075 6 - O 6 - I AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Full-Time Equllavent FY 2004 -FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE I NMSS HO SB Subtotal: 17,122 78.0 17,466 78.0 17,176 76.0 16,042 71.0 NMSS REG 0 62.0 0 62.0 0 61.0 0 63.0 SIB Costs 7,189 7,189 7,222 7,458 NMSS REG SB Subtotal: 7,189 62.0 7,189 62.0 7,222 61.0 7,458 63.0 NMSS Subtotal: 24,311 140.0 24,655 140.0 24,398 137.0 23,500 134.0 NSIR HO 1,357 14.1 1,357 14.1 1,540 12.1 1,230 11.0 SIB Costs 1,823 1,823 1,602 1,456 NSIR REG 0 7.9 0 7.9 0 11.9 0 12.0 SIB Costs 916 916 1,409 1,420 NSIR Subtotal: 4,096 22.0 4,096 22.0 4,551 24.0 4,106 23.0 OE HO 20 6.0 62 6.0 13 6.0 13 6.0 SIB Costs 791 792 801 801 OE HO SB Subtotal: 811 6.0 854 6.0 814 6.0 814 6.0 lll, L S l S - I : . Is- AGENCY FY 2004 - 2009 Report: CC-01 RESOURCE REPORT (Dollars In Thousands, Staff Years In Full-Time Equilave FY 2004 FY 2004 * FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE S FTE S FTE $ FTE OE REG 0 4.0 0 3.0 0 3.0 0 3.0 S/B Costs 464 348 355 355 OE REG SB Subtotal: 464 4.0 348 3.0 355 3.0 355 3.0 OE Subtotal: 1,275 10.0 1,202 9.0 1,169 9.0 1,169 9.0 OGC HO 4 7.0 4 5.0 8 6.0 8 6.0 S/B Costs 883 630 767 767 OGC HO SB Subtotal: 887 7.0 634 5.0 775 6.0 775 6.0 OGC Subtotal: 887 7.0 634 5.0 775 6.0 775 6.0 01 HO 76 10.0 76 11.0 80 11.0 80 11.0 SIB Costs 1,363 1,499 1,532 1,532 Ol Subtotal: 1,439 10.0 1,575 11.0 1,612 11.0 1,612 11.0 REG I REG 332 17.0 377 17.0 332 17.0 321 17.0 S/B Costs 1,971 1,971 2,012 2,012 S * - 0 * *. *; I AGENCY FY2004-2009 -Report: CC-01 RESOURCE REPORT (Dollars InThousands, Staff Years In Full-Time Equilavent FY 2004 FY 2004 FY 2005 FY 2005 Enacted Current Pres. Budget Current $ FTE $ FTE $ FTE $ FTE $ REG I Subtotal: 2,303 17.0 2,348 17.0 2,344 17.0 2,333 17.0 REG II REG 150 7.0 31 7.0 167 7.0 15 0.0 SIB Costs 812 812 829 0 REG II Subtotal: 962 7.0 843 7.0 996 7.0 15 0.0 REG III REG 303 12.0 303 9.0 205 12.0 225 9.0 SIB Costs 1,391 1,044 1,420 1,065 REG III Subtotal: 1,694 12.0 1,347 9.0 1,625 12.0 1,290 9.0 REG IV REG 321 11.0 456 11.0 326 12.0 326 12.0 S/B Costs 1,275 1,275 1,420 1,420 REG IV Subtotal: 1,596 11.0 1,731 11.0 1,746 12.0 1,746 12.0 RES HO 1,178 4.0 1,190 4.0 1,178 4.0 578 3.0 SIB Costs 528 528 536 402