RFB 2018-003, 2018-004 & 2018-005 Transfer Lift Station Project: Packages 1, 2 & 3 Addendum 6 Purchasing Services Post Office Box 2570 Waco, 76702-2570 Phone: 254-750-8062 Fax: 254-750-8063 [email protected] CITY OF WACO www.waco-texas.com

Date: 02/23/2018 RFB No: 2018-003, 2018-004 & 2018-005 Commodity: Waco Metropolitan Area Regional Sewerage System (WMARSS) – Transfer Lift Station Project: Packages 1, 2 & 3 Purchasing Agent: Mr. Jody Copp

Closing Time: Thursday, March 29, 2018 Opening Time: Thursday, March 29, 2018

RFB Opening Location: Operations Center, Purchasing Services Office, 1415 N. 4th St., Waco, TX 76707 ______

Addendum No: 6

The above-mentioned RFB invitation has been changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time and date with your RFB response. Returning this page signed by your authorized agent will serve to acknowledge this change. All other requirements of the invitation remain unchanged. If you have any questions, please call or stop by the Purchasing Office at the above address.

1. See Attachment 1. Please note that TIMES do not change, only the DATES!

Firm:______

Address______

Signature of Person Authorized to Sign Bid:______

Signor's Name and Title (print or type):______

E-mail Address:______

Date:______Telephone:______Fax:______

Page 1 of 18 RFB 2018-003, 2018-004 & 2018-005 Transfer Lift Station Project: Packages 1, 2 & 3 Addendum 6

Waco Metropolitan Area Regional Sewerage System Transfer Lift Station and Force Main Project Packages 1-3 ATTACHMENT 1 SECTION 00906 ADDENDUM NO. 6 LOCKWOOD, ANDREWS & NEWNAM, INC. 8911 N. Capital of Texas Highway, Building 2, Suite 2300 Austin, Texas 78759 Phone: (512 ) 338-4212 Fax: (512) 338-4942 TO: Prospective Bidders This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification.

MISCELLANEOUS 1. Bid schedule revised as detailed below. Events and dates not listed below are unchanged. a. Contractors notified of Prequalification Status (Pass/Fail) by: 3/2/18 b. Review of Prequalification Status Determination: 3/5/18 – 3/9/18 c. Deadline for bid questions: 3/22/18 d. Bids due: 3/29/18 e. Bids opened: 3/29/18 f. Evaluation of bids: 3/30/18 – 4/4/18 2. As-built information has been made available for reference by download on the City of Waco Current Advertised Bid Opportunities website (http://www.waco-texas.com/bids.asp): a. As-built Transfer Lift Station (existing) plans b. As-built LaSalle Lift Station plans

PLANS 3. Revise plan sets as follows: a. Package 1: i. Replace sheet C109 with revised C109 provided in Attachment 2. ii. Replace sheet C116 with revised C116 provided in Attachment 2. iii. Replace sheet C202 with revised C202 provided in Attachment 2. iv. Add sheet C206 provided in Attachment 2. v. Replace sheet C512 with revised C512 provided in Attachment 2. b. Package 2: i. Add to General Notes on E-104: “7. REFER TO C206 IN PACKAGE 1 PLANS FOR DETAIL OF ELECTRICAL SERVICE ALIGNMENT.” ii. Add to General Notes on E-602: “5. REFER TO C206 IN PACKAGE 1 PLANS FOR DETAIL OF ELECTRICAL SERVICE ALIGNMENT.” c. Package 3: N/A

160-10710-005 00906-1 Addendum No. 6

Page 2 of 18 RFB 2018-003, 2018-004 & 2018-005 Transfer Lift Station Project: Packages 1, 2 & 3 Addendum 6

Waco Metropolitan Area Regional Sewerage System Transfer Lift Station and Force Main Project Packages 1-3 SPECIFICATIONS 4. Revise specifications as follows (revisions in bold) a. All packages: i. Appendix A.2.A.2.c: : Information submitted with prequalification packages associated with this requirement will be evaluated based on the revised criteria detailed below: “List two (2) dewatering projects for the Project Manager, Project Superintendent and Project Engineer which included continuous dewatering to a depth greater than 20 feet below groundwater surface elevations for a construction area of at least 1 acre. Specifically provide the following information: • Name of project and location • Name, contact, address, telephone number, and email of the owner • Name of construction manager • Project cost and description demonstrating similar size to this project.” b. Package 1: i. Amend Project Manual with U.S. Army Corps of Engineers letter of authorization for Nationwide Permit 12 regarding proposed Brazos River crossing (Attachment 3). ii. Supplementary Conditions: 1. SC 4.02.A: a. Amend with the following text: “Brierley Associates Corporation Geotechnical Baseline Report WMARSS Transfer Lift Station and Force Main Project – Phase 1 Waco, TX dated December 2016” 2. Amend with SC 13.07.A: a. “If within two years one year after the date of Substantial Completion…” (refer to Article 13.07.A of the General Conditions for continuation) iii. IV – Requested services; A.1: “The City of Waco has issued this solicitation … and preparatory work for tie-in to existing 54-inch sewer including bypass pumping using a combination of open cut and tunneling methods.” iv. Disregard duplicate Section 02260 (IFB Project Manual p.368-372). v. Section 02400.4.01.A Payment for launching and receiving shafts will be made at the unit price bid per unit measurements specified in bid form. each, complete in place and including specified equipment and maintenance services, as one of the following bid items: B Pay Item No. 02400-LS: Launching Shaft, complete in place Per Each. Pay Item No. 02400-RS: Receiving Shaft, complete in place Per Each. c. Package 2: i. Supplementary Conditions: 1. SC 4.02.A: a. Amend with the following text: “Forrest and Cotton, Inc. & W.F. Soules and Associates, Inc. La Salle Street Lift Station Construction Plans Sheets 13-26 of 37 dated October 1969”

160-10710-005 00906-2 Addendum No. 6

Page 3 of 18 RFB 2018-003, 2018-004 & 2018-005 Transfer Lift Station Project: Packages 1, 2 & 3 Addendum 6

Waco Metropolitan Area Regional Sewerage System Transfer Lift Station and Force Main Project Packages 1-3 b. Amend with the following text: “Shimek, Jacobs & Finklea Construction Plans for Transfer Lift Station dated December 1981” ii. Appendix A.1.B.2.q: Information submitted with prequalification packages associated with this requirement will be evaluated based on the revised criteria detailed below: “…submersible pumps equal to or greater than 200 300 horsepower (HP)…” iii. Section 11395.2.01.B: Manufacturer: One of the following, modified as necessary to meet the Specification requirements: 1. Daniel Mechanical. 2. Bioair. 3. ECS Environmental Solutions. 3 4. Or equal. iv. Disregard duplicate Section 15139 presented on IFB Project Manual p.752-758. Refer to p.745-1075 for relevant content. d. Package 3: i. Supplementary Conditions: 1. Amend with SC 13.07.A: a. “A. If within two years one year after the date of Substantial Completion…” (refer to Article 13.07.A of the General Conditions for continuation)

ATTACHMENTS 1. Responses to bid-related questions received since Bid Advertisement. 2. Revised/amended Package 1 plan set sheets 3. U.S. Army Corps of Engineer letter of authorization (Package 1)

END OF SECTION

OF T TE EX 2/23/2018 A A T S S

DANIEL E. DOW

P R 119652 R O L E D F I C E E E E N S N S I S N G I O N A L E

Lockwood, Andrews & Newnam, Inc. Texas Registered Engineering Firm F-2614

160-10710-005 00906-3 Addendum No. 6

Page 4 of 18 RFB 2018-003, 2018-004 & 2018-005 Transfer Lift Station Project: Packages 1, 2 & 3 Addendum 6

Attachment 1: Responses to bid-related questions received since Bid Advertisement.

Page 5 of 18 RFB 2018-003, 2018-004 & 2018-005 Transfer Lift Station Project: Packages 1, 2 & 3 Addendum 6 TRANSFER LIFT STATION AND FORCE MAIN PROJECT ADDENDUM 06 ATTACHMENT 1: RESPONSE TO PREQUALIFICATION-RELATED QUESTIONS

ID QUESTION PACKAGE RESPONSE On sheet E-102, are the 3 combination starters, the two for feed 9 the Odor Control and one for feeding the Crane, combination 2 Provide a combination switch starter as specified in 16410. starters or actually non fused disconnects. Contractor is responsible for disposal of all electrical/mechanical elements of existing LaSalle Lift Referencing sheet C-109, is the LaSalle LS electrical demo cost Station. Refer to C109 for extent of civil/structural 10 included in Package 2. If so, will the owner be taking possession 2 demolition and abandonment. Include all costs associated of the apparatus or will the EC be responsible for the removal with demolition and abandonment of LaSalle Lift Station in Package 2 - Bid Item #20.

In reference to the Bid sheets, is the total amount of bid 11 1,2,3 Yes. supposed to equal the sum of total materials and total L&E? Where does the city expect specifications for seismic and wind Sections 01612 and 01614 are relevant to Section 11395 in 12 design criteria (01612 and 01614) to be relevant to the scope of 1,2 Package 2 and are not relevant to Package 1. this project? Yes - all documents included in Project Manual comprise the 13 Are the GDR and GBR considered as Contract Documents? 1,2,3 Contract Documents. Can you clarify on how Package 1 specification 02400 states Bid item payment as stated in Bid Form supersedes 14 measurement and payment for tunnels shafts by EA, but pay 1 prescription thereof in technical specifications. Refer to items for tunnels shafts is LS? Addendum body for text revision. Can you get more detailed sections on the Existing WMARRS Lift As-builts of existing LaSalle Lift Station and Transfer Lift 15 2 Station? Station are made available for download. No. A minimum 84-inch diameter steel casing pipe will be Can Flowcrete be used for the 66” Tunnel instead of Casing required to facilitate placement of the 66-inch diameter 17 1 starting at Sta 69+38 ending 74+56? reinforced polymer mortar (FRPM) carrier pipe within TxDOT right-of-way for the tunnel crossing under Hwy 77. Are fiberglass tee base manholes allowed for the “composite No. Fiberglass tee base manholes are not allowed on 18 manholes” on package 2 – lift station? FRP tee base manholes 2 Package 2 – Lift Station. are allowed in the gravity siphon.

160-10710-005 PAGE 1 OF 3 2/23/2018 Page 6 of 18 RFB 2018-003, 2018-004 & 2018-005 Transfer Lift Station Project: Packages 1, 2 & 3 Addendum 6 TRANSFER LIFT STATION AND FORCE MAIN PROJECT ADDENDUM 06 ATTACHMENT 1: RESPONSE TO PREQUALIFICATION-RELATED QUESTIONS

ID QUESTION PACKAGE RESPONSE Sheet C.305 (package 2) and C.501 (package 1) have a detail for No change made to plans at this time. Reference to ASTM 19 Tee-Base Fiberglass Manholes that has a callout for “ASTM 2 D3262 is correct. Disregard reference to ASTM 03743 as 03743” that should read “ASTM D3262”, can this be corrected? shown. The surge pressure is listed as 150 psi. Is this an appropriate 20 3 Minimum design pressure for all force main piping is 150 psi. value for the anticipated surge pressure? We have noticed several instances on the package 3 force main No change made at this time. Base bid on design as 21 where air release valves are not at a high point in the pipeline. 3 proposed. Should the ARV’s be moved to ensure effectiveness? Please confirm if CPUSA will be including the two (2) alarm 26 2 Yes this is in CPUSA's scope. beacons in their scope. If not, a detail is preferred. Please confirm if CPUSA will be including the 27 remote/start/stop/lock-out for the LS pumps in their scope. If 2 Yes this is in CPUSA's scope. not, a detail is preferred. Request for approval for Kinger Gate Valves and Kinger Check 34 2 Not approved. Valves. Wastewater Valves Section 15139 This section appears twice in Disregard duplicate Section 15139 (IFB Project Manual p.752- 35 2 the spec book with differences. 758). Refer to Addendum body for additional detail. Respectfully request AWWA C200 spiral welded steel pipe be 37 2 Not approved. added as an option to bid on all diameters. We respectfully request Tnemec Perma-Glaze Series 435 100% 38 2 Not approved. solids epoxy be acceptable as a lining material for steel pipe.

We respectfully request that Golden Harvest be named as an 39 approved equal for the stop logs in specification section 11290 2 Not approved. for the WMARSS Transfer Lift Station P2 – Lift Station project. What is the installation method of 5,650 lf of 66-inch sewer line 40 and 2,400 lf of 36-inch and 42-inch siphons being installed in the 1 Refer to plans for detail. project?

160-10710-005 PAGE 2 OF 3 2/23/2018 Page 7 of 18 RFB 2018-003, 2018-004 & 2018-005 Transfer Lift Station Project: Packages 1, 2 & 3 Addendum 6 TRANSFER LIFT STATION AND FORCE MAIN PROJECT ADDENDUM 06 ATTACHMENT 1: RESPONSE TO PREQUALIFICATION-RELATED QUESTIONS

ID QUESTION PACKAGE RESPONSE Section 15139 is included in the bidding documents twice.These 41 valve sections are not the same, please advise which pages are 2 Refer to response to question 35. the correct ones for this project. Drawings D-102, D-304, and D-506 currently show stop logs, but 43 each drawing does not state how tall each log should be. Please 2 Refer to Section 11290 in the Package 2 Project Manual. clarify the height and number of logs required for the 48” pipe. Also, can the bottom of the frames be “squared off” instead of the 44 2 No. curved design shown on D-506? Do the logs only extend upward enough to cover 48” diameter 45 2 Yes. pipe? Section 11289. Paragraph 2.2.A call for wall thimbles “per gate Clarification: Specification Section 11289 – Paragraph 2.2.A schedule…”. However, there is no gate schedule. Drawing M.102 Wall Thimble: There are no wall thimbles nor is there a gate 46 seems to indicate that gates are either embedded or surface 3 schedule for the gates at the headworks tie-in structure. mounted, not wall thimble mounted. Please clarify type of Gate installation requirements are as shown on Sheet mounting. M.102.

160-10710-005 PAGE 3 OF 3 2/23/2018 Page 8 of 18 RFB 2018-003, 2018-004 & 2018-005 Transfer Lift Station Project: Packages 1, 2 & 3 Addendum 6

Attachment 2: Revised/amended Package 1 plan set sheets

Page 9 of 18 RFB 2018-003, 2018-004 & 2018-005 Transfer Lift Station Project: Packages 1, 2 & 3 Addendum 6

Sta. 39+75.15' Sta. 38+88.03' Off. 3.8' (Lt.) WMARSS Transfer Lift Off. 15.0' (Lt.) 1 Prop. Vent Pipe Prop. Vent Pipe Match Line Sta. 43+00 Station N 10543766.37 N 10543780.99 E 3305832.76 Sta. 39+80.15' E 3305828.99 10' N FL Elev = 373.26' 384 FL Elev = 373.29' Off. 3.8' (Lt.) See Note 2 Δ = 45° (Lt.) Prop. Vent Pipe N 10543771.15 E 3305834.22 Sta. 42+26.92' FL Elev = 373.34' See Note 2 Off. 15.0' (Lt.) Δ = 45° (Rt.) N 10543990.93 E 3305881.63 FL Elev = 374.44' Δ = 45° (Rt.) Waco, Texas Prop. 6" PVC Vent Pipe, Sta. 41+98.46' See Note 3 Off. 15.0' (Lt.) 1. STA 40+95 TO STA 41+65 UNCLASSIFIED MATERIAL. DISPOSE OF OFF 25' 10' Prop. Vent Pipe SITE IN ACCORDANCE WITH LOCAL REGULATIONS. 382 N 10543976.76 E 3305888.93 383 2. USE CAUTION WORKING IN VICINITY OF OVERHEAD POWER LINES. NO FL Elev = 374.36' EQUIPMENT IS ALLOWED WITHIN 25' OF ELECTRICAL STRUCTURE. 383 Δ = 45° (Rt.) Prop. 100' 381 382 380 Temporary Easement Prop. 50' 382 3. VENT PIPING TO BE INSTALLED AT A 0.5% DOWN SLOPE TOWARD THE 215 Mary Street Permanent Easement 382 SIPHON BOX. DEPTH BELOW EXISTING GRADE IS APPROXIMATE. Suite 305 Match Line Sta. 39+75.15 4. CONTRACTOR SHALL INSTALL 10' OF 12" STUB-OUT WITH PLUG FOR Waco, TX 76701 See Note 1 FUTURE CONNECTION OF 12" SEWER. Tel 254-753-9585 134.3° www.lan-inc.com 5. VENT PIPING SHALL BE SDR26 PVC PER ASTM D3034. Sta. 39+75.15' 136.5° 200 West Highway 6, 376 Tie-In to Prop. Siphon Inlet Structure 377 378 66" FL Elev = 359.64' (N & S) Prop. 50' Permanent Suite 620 N 10543764.28 391 Access Easement 392 Waco, Texas 76712 E 3305839.57 390 387 Prop. 66" FRP Refer to Sheet C.108 and D.101 SN72 Sanitary Sewer

Prop. 50' 389 388 Temporary Easement

387 381 386 Manhole 7 380 385 Sta. 42+26.92' 384 See Note 4 Proposed Vented Manhole 8911 Capital of Texas Highway North, See Detail A, Sht C.501 and Suite 2200, Austin, Texas 78759 Detail B, Sht C.504 Bore Hole - 5 Rim Elev = 381.65' KEY PLAN Sta. 41+98.46' 66" FL Elev = 359.78' (W & SE) Off. 37.0' (Rt.) 6" FL Elev = 374.44' (SW) N 10543968.38 N 10544003.28 E 335940.75 E 3305892.23 MARLIN HWY

Prop. 1.850 Acre Water/Sewer Manhole 6 and Electric Easement Sta. 41+98.46' Proposed Drop Manhole CAUTION See Detail B, Sht C.501 Rim Elev = 381.60' BRAZOS RIVER OHE 66" FL Elev = 359.77' (NW & S) 12" FL Elev = 375.00' (E) HWY 77 N 10543977.81 382 E 3305904.93

381 382 383 383 382 381 381 382 383 384 385

382 381 383

REVISIONS 396 396 BORE HOLE LEGEND Sta. 39+75.15' NO. DESCRIPTION DATE SILTY SAND 394 Tie-in to Prop. Siphon Inlet Structure 394 66" FL Elev = 359.64' (N & S) 392 Refer to Sheet C.108 & D.101 392 LEAN CLAY 390 390 FAT CLAY 388 388 STATIC WATER LEVEL READING (SHORT-TERM) 1 ADDENDUM 1 01/08/2018 STATIC WATER LEVEL READING (LONG-TERM) FILE LOG 386 386 Manager AG

384 384 Design AG

Existing Ground Draw GWM 382 Bore Hole - 5 382 Check AG 380 380 STAMP 378 378 Prop. 6" PVC Vent Pipe, 376 See Note 3 376 OF T TE EX A A T S 374 374 S ALISA GRUBER

P 372 372 R 95685 R O L E D F I C E E Invert FL 373.26' E E N S N S I S N G 370 370 I O N A L E 1/8/2018 CP & Y, Inc. 368 368 Texas Registered Engineering Firm F-1741 366 366 364 364 0 20 40 SCALE: HORIZ. 1"=20' 362 223.31 LF of 66" FRP SN72 San. Swr. @ 0.055% 28.46 LF of 66" 73.08 LF of 66" FRP SN72 San. Swr. @ 0.055% 362 FRP SN72 San. VERT. 1"=5' 360 Swr. @ 0.055% 360 358 358 Project No. 160-10710-002 Manhole 7 Date: JANUARYMARCH 2017 2018 356 Manhole 6 Sta. 42+26.92' 356 Sta. 41+98.46' Proposed Vented Manhole Proposed Drop Manhole See Detail A, Sht C.501 and Plan and Profile View 354 See Detail B, Sht C.501 Detail B, Sht C.504 354 Sta. 39+75.15 - Sta. 43+00 Rim Elev = 381.60' Rim Elev = 381.65' 352 66" FL Elev = 359.77' (NW & S) 66" FL Elev = 359.78' (W & SE) 352 12" FL Elev = 375.00' (E) 6" FL Elev = 374.44' (SW) Invert FL = 359.64' 350 359.81 359.71 381.68 359.82 381.56 381.62 359.80 381.64 359.78 381.63 359.77 381.69 359.75 382.17 359.74 359.73 383.24 382.64 359.70 382.62 359.69 383.12 359.67 379.98 359.66 381.16 C.109 39+00 39+50 40+00 40+50 41+00 41+50 42+00 42+50 43+00 ProjectWise: pw:\\ladpw.ladco.int:projectwise\Documents\Projects\160-10710-000\4-0-Production\4-01-Drawings\ File:C:\pwworking\cpy\pw_cpy\gmilks\d0483252\WALL9923923 C-109.dwgFile:C:\pwworking\cpy\pw_cpy\gmilks\d0483252\WALL9923923 By:Gary 7:01 AM Plotted:1/9/2018 Milks © LEO A DALY Company 2014 Page 10 of 18 RFB 2018-003, 2018-004 & 2018-005 Transfer Lift Station Project: Packages 1, 2 & 3 Addendum 6

WMARSS Transfer Lift

388 390 391 392 Station

389 388 N

12" San. Swr. San. 12" B-2 & CPT-2 Sta. 68+84.33' Prop. 50' Off. 67.1' (Lt.)

Permanent (Abandoned) Swr. San. 15" N 10544802.27 Easement E 3303340.47 Waco, Texas

389 Prop. Tunneled 66" 1. TUNNELED SECTION PIPE STIFFNESS CLASS TO BE SELECTED BASED ON TUNNEL LOADING PER SPECIFICATION SECTION 02450. CAUTION 1 FRP Sanitary Sewer Match Line Sta. 70+00 in 84" Casing OHE 2. REMOVE AND PLUG ABANDONED 15" SANITARY SEWER AS REQUIRED See Note 6 25' TO INSTALL PROPOSED 60" SANITARY SEWER AND MANHOLE (NSPI)

3. ACTUAL TUNNEL SHAFT SIZE AND CONFIGURATION TO BE DETERMINED 215 Mary Street Prop. 66" FRP SN72 BY CONTRACTOR AND APPROVED BY OWNER. Suite 305 Sanitary Sewer Waco, TX 76701 4. PLUG AND ABANDON 12" SANITARY SEWER DOWNSTREAM OF Tel 254-753-9585 137.4° PROPOSED 4' DIA. MANHOLE. 137.3° www.lan-inc.com 388 5. INSTALL PRECAST CONCRETE MANHOLE OVER EXISTING 12" SANITARY 122.6° SEWER. CONSTRUCT MANHOLE IN ACCORDANCE WITH CITY OF WACO 200 West Highway 6, Match Line Sta. 67+00 STANDARD SPECIFICATIONS FOR CONSTRUCTION SECTION 4.8. Suite 620 INSTALL DELINEATOR POST PER CITY OF WACO STANDARD DETAIL G-9 Manhole 15 (SHEET C.506). Waco, Texas 76712 Sta. 68+22.21' 1 Proposed Drop Manhole 6. CONTRACTOR SHALL INSTALL 10' OF 8" STUB OUT WITH PLUG FOR See Detail B, Sht C.501 Prop. 12" PVC SDR26 391 FUTURE CONNECTION OF 8" SEWER. Rim Elev = 388.55' Sanitary Sewer 105.0° Approx Tunnel 390 390 66" FL Elev = 361.21' (NW & E) End Bypass Shaft Location, 12" FL Elev = 376.92' (N) Pumping See Note 3 8" FL Elev = 376.50' (S) 8911 Capital of Texas Highway North, N 10544793.10 Manhole 16 Suite 2200, Austin, Texas 78759 E 3303431.46 389 See Note 2, Sta. 69+13.45' 387 4, and 5 Proposed Manhole KEY PLAN See Detail A, Sht C.501 Rim Elev = 388.00' 66" FL Elev = 361.26' (W & SE) MARLIN HWY N 10544865.94 E 3303376.51 388 386 Prop. 100' Manhole 15-A Temporary Sta. 68+96.38' Easement Offset 21.0' (Rt.) Proposed 4' Dia. Standard Manhole BRAZOS RIVER See Detail S-6, S-7A, and S-8 on Sht. C.505 387 Rim Elev = 388.26' HWY 77 12" FL Elev = 377.32' (NE) 12" FL Elev = 377.06' (S) N 10544864.96 E 3303403.56 386 Exist. 30' San. Swr. Easement

385 REVISIONS

NO. DESCRIPTION DATE Start Bypass Pumping FL Elev = 377.34±

BORE HOLE LEGEND 1 ADDENDUM 1 01/08/2018 392 1 Bore Hole - 2 392 390 390 LEAN CLAY FILE LOG Manager AG Existing Ground 1 FAT CLAY 388 388 Design AG CLAYEY SAND 386 386 Draw GWM Check AG SILTY CLAYEY SAND 384 384 SILTY SAND Sta. 68+87.30 STAMP 382 Exist. 12" San. Swr. 382 FL Elev = 377.32'± SAND 24.90 LF of 66" FRP SN72 380 380 FIRST WATER LEVEL READING (DURING DRILLING) OF T TE EX San. Swr. @ 0.055% A A T S S 378 Sta. 69+38 378 STATIC WATER LEVEL READING (SHORT-TERM) Begin Tunnel ALISA GRUBER

STATIC WATER LEVEL READING (LONG-TERM) P 376 376 R R 95685 O L E F I C E D E E E N S N S I S N G 374 44 LF of 66" Tunnel in 84" Casing 374 I O N A L E 1/8/2018 CP & Y, Inc. 372 372 Texas Registered Engineering Firm F-1741 370 370 368 368 0 20 40 366 366 SCALE: HORIZ. 1"=20' VERT. 1"=5' 364 364 122.21 LF of 66" FRP SN72 San. Swr. @ 0.055% 61.75 LF of 66" FRP SN72 61.65 LF of 66" FRP San. Swr. @ 0.055% 362 San. Swr. @ 0.055% 362 Project No. 160-10710-002 Date: JANUARYMARCH 2017 2018 360 360 Manhole 15 Invert FL = 361.28 358 Sta. 68+22.21' Manhole 16 358 Plan and Profile View Proposed Drop Manhole See Detail B, Sht C.501 Sta. 69+13.45' Sta. 67+00 - Sta. 70+00 Rim Elev = 388.55' Proposed Manhole 356 66" FL Elev = 361.21' (NW & E) See Detail A, Sht C.501 356 12" FL Elev = 376.92' (N) Rim Elev = 388.00' 8" FL Elev = 376.50 (S) 66" FL Elev = 361.26' (W & SE) 354 361.31 361.21 390.97 391.30 361.30 388.23 361.28 361.27 388.20 361.25 387.88 361.24 361.23 388.68 388.86 361.20 388.56 388.29 361.17 388.05 361.19 387.84 387.64 361.16 387.45 361.14 C.116 67+00 67+50 68+00 68+50 69+00 69+50 70+00 ProjectWise: pw:\\ladpw.ladco.int:projectwise\Documents\Projects\160-10710-000\4-0-Production\4-01-Drawings\ File:C:\pwworking\cpy\pw_cpy\gmilks\d0483252\WALL9923923 C-116.dwg Plotted:1/9/2018 Milks By:Gary 8:43 AM © LEO A DALY Company 2014 Page 11 of 18 RFB 2018-003, 2018-004 & 2018-005 Transfer Lift Station Project: Packages 1, 2 & 3 Addendum 6

WMARSS Transfer Lift 1 Station - Package I

Waco, Texas N UE

UE

215 Mary Ave., Suite 305 50' UTILITY EASEMENT Waco, TX 76701 UE Tel 254-753-9585 www.lan-inc.com

UE

40+00 200 West Highway 6, Suite 620 Waco, Texas 76712 15' UE COORDINATE TERMINATION WITH RESTRAINED 4" ODOR CONTROL CONTRACTOR FOR POTABLE WATER LINE

PACKAGE 2 (TRANSFER UE LIFT STATION - 160-10710-003): SEE 8911 Capital of Texas Highway North, SHEET M.103 Suite 2200, Austin, Texas 78759

UE KEY PLAN 3" ODOR CONTROL DRAIN LINE

UE

44'

14' UE

3.6' PROVIDE NON-FREEZE YARD HYDRANT PER INSTALL BACKFLOW UE 4/C.512 PREVENTER PER CITY 14.25' OF WACO STANDARD DETAIL W-18.

UE SECURITY FENCING N: 10543760.10 REVISIONS ODOR CONTROL E: 3305853.19 STRUCTURE 14.25' NO. DESCRIPTION DATE UE 3' SIDEWALK REFER TO C206 FOR INLET SIPHON BOX WATER SERVICE ALIGNMENT. INVERTED SIPHON INLET STRUCTURE UE

UE

12" MOW STRIP 1 ADDENDUM 1 1/26/18

44' UE FILE LOG

UE Manager RDO

UE 6.4' Design JSC UE UE N: 10543746.47 Draw DAH UE E: 3305819.20 Check UE DENSE BRUSH 8' UE UE UE STAMP UE 40' UTILITY EASEMENT

UE UE ELECTRIC SERVICE TO INLET OF T UE N: 10543739.07 TE EX A A SIPHON BOX BY PACKAGE 2 E: 3305846.74 T S CONTRACTOR (160-10710-003). UE S LOCATION OF TERMINATION UE SHOWN IS APPROXIMATE. UE LEE B. HAMM UE P COORDINATE WITH PACKAGE 2 R 106029 R O L E D UE F I C E E CONTRACTOR AS NECESSARY. E E N S N S I S N G UE I O N A L E UE UE 67' Lockwood, Andrews & Newnam, Inc. UE Texas Registered Engineering Firm F-2614 UE 1/26/18 UE UE UE 0 5 10 UE SCALE: 1"=5'

Project No. 160-10710-002 Date: January 2016

INVERTED SIPHON INLET SITE PLAN

C.202 ProjectWise: pw:\\ladpw.ladco.int:projectwise\Documents\Projects\160-10710-002\4-0-Production\4-01-Drawings\ File:C:\projectwise\kmthorman2\d0359283\C-202.dwg Plotted:1/26/2018 8:30 AM By:Dearing, Karen © LEO A DALY Company 2015 Page 12 of 18 ProjectWise: pw:\\ladpw.ladco.int:projectwise\Documents\Projects\160-10710-002\4-0-Production\4-01-Drawings\ File:C:\projectwise\kmthorman2\d0359283\C-206.dwg Plotted:1/26/2018 9:48 AM By:Dearing, Karen N: 10544919.76 N: 10544895.61 E: 3305115.24

E: 3305085.99

W W DETAIL W-14A PROVIDE SERVICE OF WACOSTANDARD CONNECTION PERCITY EX. WATERMETER(APPROXIMATELOCATION) EX. WATERVALVE(APPROXIMATELOCATION) EX. FIREHYDRANT(APPROXIMATELOCATION) EASEMENT. REFERTO PROPOSED INLETSIPHON BOX ACCESSROADAND SHEETS C.127-129 E: 3305151.50 N: 10544817.62 E: 3305606.02 N: 10544565.51 RFB 2018-003,2018-004&2018-005TransferLift Station Project: Packages 1,2&3Addendum6 INSTALL RESTRAINED4"POTABLE PIPING MATERIALS. EMBEDMENT AND SPECIFICATIONS 4.7&4.9FOR STANDARD DETAILG-8FOR SPECIFICATIONS. REFERTO STANDARD DETAILSAND WATER LINEPERCITYOFWACO Page 13 of18 N: 10544000.94 E: 3305948.61 N: 10544293.12 E: 3306084.33 N: 10544284.02 E: 3306103.33

8'

UE 42" SIPHON PIPE 50' UTILITY EASEMENT

36" SIPHON PIPE

42" SIPHON PIPE

UE UE UE UE UE UE UE

UE E: 3305875.93 N: 10543763.51 REFER TOC.202FOR DETAIL OFWATERSERVICE SIPHON BOX. TERMINATION ATINLET UE E: 3306105.13 N: 10544339.46 UE

UE

UE

UE

UE UE

UE UE N: 10544024.54 E: 3306323.95

UE

UE N: 10543883.14 E: 3306316.16 PACKAGE 2PLANS ELECTRICAL SERVICEBY (160-10710-003). OTHERS. REFERTO

UE

UE

UE

UE UE UE UE UE

N 1 Check Draw Design Manager Suite 2200,Austin,Texas78759 8911 CapitalofTexasHighwayNorth, NO. C.206 UTILIY SERVICEPLAN INVERTED SIPHONINLET Station -PackageI 215 MaryAve.,Suite305 Tel 254-753-9585 Waco, TX76701 www.lan-inc.com WMARSS TransferLift Waco, Texas Date: Project No. STAMP FILE LOG REVISIONS KEY PLAN 1 Texas RegisteredEngineeringFirmF-2614 Lockwood, Andrews&Newnam,Inc. 0 SCALE: DESCRIPTION ADDENDUM 1

RDO DAH JSC

P

R

O

1"=60' F S E

LEE B.HAMM T January 2016 160-10710-002

S A

L

S T I

I

C E 106029 O

Suite 620

200 WestHighway6,

Waco, Texas76712 E N

O 60

N

A F

L S

E T

E E

1/26/18 D

N X © G A

LEO ADALY Company2015 I N S E E R 120 1/26/18 DATE RFB 2018-003, 2018-004 & 2018-005 Transfer Lift Station Project: Packages 1, 2 & 3 Addendum 6

WMARSS Transfer Lift Station - Package I

2' TYP OUTSIDE DIA. 3.5' TYP OUTSIDE DIA. OUTSIDE DIA.

2' 2' Waco, Texas EXCAVATION OR SHALE WALL

215 Mary Ave., Suite 305 Waco, TX 76701 Tel 254-753-9585 www.lan-inc.com

200 West Highway 6, Suite 620

2' TYP Waco, Texas 76712

BOTTOM OF EXCAVATION OR 8911 Capital of Texas Highway North, SHALE Suite 2200, Austin, Texas 78759

CONCRETE ENCASEMENT DETAIL KEY PLAN 2 NONFREEZE YARD HYDRANT SCALE: N.T.S. 1 SCALE: N.T.S. 1

REVISIONS

NO. DESCRIPTION DATE

1 ADDENDUM 1 1/26/18 FILE LOG

Manager RDO

Design JSC SAFETY FENCING & Draw DAH SWING GATE DETAIL Check 3 SCALE: N.T.S. STAMP

OF T TE EX A A T S S

LEE B. HAMM

P R 106029 R O L E D F I C E E E E N S N S I S N G I O N A L E

Lockwood, Andrews & Newnam, Inc. Texas Registered Engineering Firm F-2614

1/26/18

14"-20" DIAMETER FIELD ROCK

6-8 OZ GEOTEXTILE FABRIC Project No. 160-10710-002 Date: January 2016

3'-4' DIAMETER ROCK TOE TRENCH ROCK RIP RAP DETAIL SITE DETAILS 2 4 SCALE: N.T.S.

C.512 ProjectWise: pw:\\ladpw.ladco.int:projectwise\Documents\Projects\160-10710-002\4-0-Production\4-01-Drawings\ File:C:\projectwise\kmthorman2\d0359283\C503-DTLS.dwg Plotted:1/18/2018 5:23 PM By:Dearing, Karen © LEO A DALY Company 2015 Page 14 of 18 RFB 2018-003, 2018-004 & 2018-005 Transfer Lift Station Project: Packages 1, 2 & 3 Addendum 6

Attachment 3: U.S. Army Corps of Engineer letter of authorization (Package 1)

Page 15 of 18 RFB 2018-003, 2018-004 & 2018-005 Transfer Lift Station Project: Packages 1, 2 & 3 Addendum 6

DEPARTMENT OF THE ARMY FORT WORTH DISTRICT, CORPS OF ENGINEERS P. 0. BOX 17300 FORT WORTH, TEXAS 76102~0300

February 5, 2018

Regulatory Division

SUBJECT: Project Number SWF-2016-00086, Transfer Lift Station & Force Main

Mr. Charles Leist City of Waco P.O. Box 2570 Waco, Texas 76702

Dear Mr. Leist:

This letter is in regard to information received November 16, 2017, and subsequent submittals received December 21, 2017, January 4, 2018, and January 15, 2018, concerning a proposal by the City of Waco to construct a transfer lift station and force main in the city of Waco, McLennan County, Texas. This project has been assigned Project Number SWF-2016- 00086. Please include this number in all future correspondence concerning this project.

Under Section 404 of the Clean Water Act the U.S. Army Corps of Engineers (USACE) regulates the discharge of dredged and fill material into waters of the United States, including wetlands. USACE responsibility under Section 10 of the Rivers and Harbors Act of 1899 is to regulate any work in, or affecting, navigable waters of the United States. Based on the description of the proposed work, and other information available to us, we have determined this project will involve activities subject to the requirements of Section 404 and Section 10.

We have reviewed this project under the pre-construction notification procedures of Nationwide Permit General Condition 32 (Federal Register, Vol. 82, No. 4, Friday, January 9, 2017). We have determined the discharge of dredged or fill materials into waters of the United States associated with this project appears to qualify for Nationwide Permit 12 for Utility Line Activities. To use this permit, the permittee must ensure the work is in compliance with the specifications and conditions listed on the enclosures and the special conditions listed below. Additionally, all activities must comply with the water quality certification conditions of the Texas Commission on Environmental Quality (TCEQ) located at http://www.swf.usace.army.mil/Portals /47/Users/053/21/821/NWP%20201 7%20Texas%20401 cert.pdf.

The special conditions are as follows:

1. The permittee shall use a phased cofferdam system for the crossing of the Brazos River as depicted on the “Inverted Siphon Plan & Profile Sheet I of 2” received via electronic mail January 15, 2018, prepared by Lockwood, Andrews & Newman, Inc. The phased cofferdam system shall be used to maintain low flows of the Brazos River.

Page 16 of 18 RFB 2018-003, 2018-004 & 2018-005 Transfer Lift Station Project: Packages 1, 2 & 3 Addendum 6

-2-

2. The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration.

Failure to comply with these specifications and conditions invalidates the authorization and may result in a violation.

Our verification for the construction of this activity under this nationwide permit is valid until March 18, 2022, unless prior to that date the nationwide permit is suspended, revoked, or modified such that the activity would no longer comply with the terms and conditions of the nationwide permit on a regional or national basis. The USACE will issue a public notice announcing the changes when they occur. Furthermore, activities that have commenced, or are under contract to commence, in reliance on a nationwide permit will remain authorized provided the activity is completed within 12 months of the date of the nationwide permit’s expiration, modification, or revocation, unless discretionary authority has been exercised on a case-by- case basis to modify, suspend, or revoke the authorization in accordance with 33 CFR 330.4(e) and 33 CFR 330.5(c) or (d).

The USACE based this decision on a preliminary jurisdictional determination (PJD) that there are waters of the United States on the project site. A PJD is not appealable. At any time you have the right to request and obtain an Approved Jurisdictional Determination (AJD), which can be appealed. If it is your intent to request an AJD, do not begin work until one is obtained.

Our review of this project also addressed its effects on threatened and endangered species. Based on the information provided, we have determined this project will not affect any species listed as threatened or endangered by the U.S. Fish and Wildlife Service within our permit area. However, please note you are responsible for meeting the requirements of General Condition 18 on endangered species.

The permittee must sign and submit to us the enclosed certification that the work, including any proposed mitigation, was completed in compliance with the nationwide permit. The permittee should submit the certification within 30 days of the completion of work.

This permit should not be considered as an approval of the design features of any activity authorized or an implication that such construction is considered adequate for the purpose intended. It does not authorize any damage to private property, invasion of property rights, or any infringement of federal, state, or local laws or regulations.

Thank you for your interest in our nation’s water resources. If you have any questions concerning our regulatory program, please refer to our website at

Page 17 of 18 RFB 2018-003, 2018-004 & 2018-005 Transfer Lift Station Project: Packages 1, 2 & 3 Addendum 6

-3-

http://www.swf.usace.army.mil/Missions/Regulatory or contact Mr. Eric Dephouse at the address above or telephone (817) 886-1820.

Please help the regulatory program improve its service by completing the survey on the following website: http://corpsmapu. usace. army. mil/cm_apexff?p=regulatory_survey

Sincerely, ORIGINAL SIGNED Stephen L Brooks Chief, Regulatory Division

Enclosures

Copy Furnished (Without Enclosures): i-Ms. Bonnie Doggett Blanton & Associates, Inc. 5 Lakeway Centre Court, Suite 200 Austin, Texas 78734