PROCUREMENT PLAN for Civil Works for 2007-08 COUNTRY: WB LOAN/ CREDIT No. IN-4750 State: DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA CLEARANCE ISSUE INVITATION OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC-ATIONS OF SPECIFIC- TO BID EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- AND BID ATION AND BID REPORT AND RECOMMENDA- ATIONS AND BID DOCUMENTS TO DOCUMENTS AWARD TIONS DOCUMENTS IDA RECOMMENDATI

ESTIMATED ESTIMATED ONS TO IDA Package No. METHOD OF S.No./Package No. of Scheme of No. PROCUREMENT COST in lakh Rs. lakh in COST 12 345678910111213141516 # Comments of WB recd Cleared by WB Sent to WB Not submitted to PICU SMP under compliance with field office CE, CB, 1 1CB/1 Chanched Barrage 2 Intkhedi Tank 3 Kadampura Tank 4 Parwalia Tank Cost of Package original NCB 109.00 30.12.08 01.02.09 15.03.09 30.05.09 15.07.09 15.09.09 30.10.09

2 5CB/2 Barodia Tank 279.00 6 Shamsherpura Tank# 250.90

Cost of Package original NCB 529.90 15.09.08 31.10.08 15.10.08 15.02.09 30.10.09 30.05.10 30.10.10 15.03.11

3 CB/3 Kervan Distributories & 772.00 Minors Cost of Package 30.10.09 30.05.10 30.10.10 15.03.11 original 772.00 NCB 15.02.09 20.02.09 22.04.09 30.05.09 4 CB/4 Kethan Medium Tank- 505.20 Distri' and Minors Cost of Package 30.10.09 30.05.10 30.10.10 15.03.11 original NCB 505.20 15.02.09 20.02.09 22.04.09 30.05.09 57CB/5 Naren Medium Tank# 730.40 Cost of Package 30.10.09 30.05.10 30.10.10 15.03.11 original NCB 730.40 15.02.09 20.02.09 22.04.09 30.05.09 46549 PROCUREMENT PLAN for Civil Works for 2007-08 COUNTRY: INDIA WB LOAN/ CREDIT No. IN-4750 State: Madhya Pradesh DESCRIPTION OF EVENTS WORKS INITIATE TRANSMIT IDA CLEARANCE ISSUE INVITATION OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION PREPARATION SPECIFIC-ATIONS OF SPECIFIC- TO BID EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- AND BID ATION AND BID REPORT AND RECOMMENDA- ATIONS AND BID DOCUMENTS TO DOCUMENTS AWARD TIONS DOCUMENTS IDA RECOMMENDATI

ESTIMATED ESTIMATED ONS TO IDA Package No. METHOD OF S.No./Package No. of Scheme of No. PROCUREMENT COST in lakh Rs. lakh in COST 12 345678910111213141516 68CB/6 Langarpura Tank 41.30

Cost of Package original NCB 41.30 01.12.08 15.01.09 19.02.09 10.03.09 25.05.09 30.09.09 30.12.09 15.06.10 79CB/8 Karmodia Tank 252.40 Cost of Package original NCB 252.40 15.02.08 20.02.08 22.03.08 30.03.08 25.05.08 30.09.08 30.12.08 15.06.09 Revised 270.30 25.3.08 25.4.08 15.5.08 31.11.08 30.03.08 15.6.09 14.11.09 810CB/10 Barod Tank 205.80 Cost of Package original NCB 205.80 15.02.09 20.02.09 22.03.09 30.03.09 25.05.09 30.09.09 30.12.09 15.06.10

911CB/11 Amahi Tank 546.00 Cost of Package original NCB 546.00 15.11.08 30.11.08 15.01.09 15.02.09 25.09.09 15.03.10 30.10.10 15.03.11 PROCUREMENT PLAN for Civil Works for 2007-08 COUNTRY: INDIA WB LOAN/ CREDIT No. IN-4750 State: Madhya Pradesh DESCRIPTION OF EVENTS WORKS INITIATE TRANSMIT IDA CLEARANCE ISSUE INVITATION OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION PREPARATION SPECIFIC-ATIONS OF SPECIFIC- TO BID EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- AND BID ATION AND BID REPORT AND RECOMMENDA- ATIONS AND BID DOCUMENTS TO DOCUMENTS AWARD TIONS DOCUMENTS IDA RECOMMENDATI

ESTIMATED ESTIMATED ONS TO IDA Package No. METHOD OF S.No./Package No. of Scheme of No. PROCUREMENT COST in lakh Rs. lakh in COST 12 345678910111213141516 10 12 CB/12 Sajanmau 246.30 13 Umariya 100.00 Cost of Package original NCB 346.30 15.11.08 30.11.08 15.01.09 15.02.09 25.09.09 15.03.10 30.10.10 15.03.11 11 14 CB/13 Chhapi Tank# 493.00

Cost of Package original NCB 493.00 15.11.08 30.11.08 15.01.09 15.02.09 25.09.09 15.03.10 30.10.10 15.03.11 12 15 CB/14 Doraha Tank 566.80 Cost of Package original NCB 566.80 15.11.08 30.11.08 15.01.09 15.02.09 25.09.09 15.03.10 30.10.10 15.03.11 CE, NT Basin, 13 16 NT/2 Daloda Sagra Tank 32.50 17 Karoli Tank 34.60 Cost of Package original NCB 67.10 15.10.08 15.11.08 30.12.08 30.01.09 30.06.09 30.10.09 30.03.10 30.10.10 14 18 NT/3 Kazikhedi Tank 205.20 19 Sahibkhedi Tank 396.00 Cost of Package original NCB 601.20 15.11.08 30.11.08 15.01.09 15.02.09 25.09.09 15.03.10 30.10.10 15.03.11 PROCUREMENT PLAN for Civil Works for 2007-08 COUNTRY: INDIA WB LOAN/ CREDIT No. IN-4750 State: Madhya Pradesh DESCRIPTION OF EVENTS WORKS INITIATE TRANSMIT IDA CLEARANCE ISSUE INVITATION OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION PREPARATION SPECIFIC-ATIONS OF SPECIFIC- TO BID EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- AND BID ATION AND BID REPORT AND RECOMMENDA- ATIONS AND BID DOCUMENTS TO DOCUMENTS AWARD TIONS DOCUMENTS IDA RECOMMENDATI

ESTIMATED ESTIMATED ONS TO IDA Package No. METHOD OF S.No./Package No. of Scheme of No. PROCUREMENT COST in lakh Rs. lakh in COST 12 345678910111213141516 15 20 NT/4 Buranabad Tank 18.20 21 Rajla Tank 17.00 22 Sipara Tank 57.70 23 Bharla Tank 40.90 Cost of Package original NCB 133.80 15.10.08 15.11.08 30.12.08 30.01.09 30.06.09 30.10.09 30.03.10 30.10.10 16 24 NT/6 Narela 41.30 Cost of Package original NCB 41.30 15.10.08 15.11.08 30.12.08 30.01.09 30.06.09 30.10.09 30.03.10 30.10.10 CE, Ganga Basin, Rewa 17 25 GB/1 Amkoi Tank 26 Dubera 27 Kulgarhi 28 Tumin 29 Ramni Sagar Cost of Package original NCB 718.00 15.11.08 30.11.08 15.01.09 15.02.09 25.09.09 15.03.10 30.10.10 15.03.11 PROCUREMENT PLAN for Civil Works for 2007-08 COUNTRY: INDIA WB LOAN/ CREDIT No. IN-4750 State: Madhya Pradesh DESCRIPTION OF EVENTS WORKS INITIATE TRANSMIT IDA CLEARANCE ISSUE INVITATION OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION PREPARATION SPECIFIC-ATIONS OF SPECIFIC- TO BID EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- AND BID ATION AND BID REPORT AND RECOMMENDA- ATIONS AND BID DOCUMENTS TO DOCUMENTS AWARD TIONS DOCUMENTS IDA RECOMMENDATI

ESTIMATED ESTIMATED ONS TO IDA Package No. METHOD OF S.No./Package No. of Scheme of No. PROCUREMENT COST in lakh Rs. lakh in COST 12 345678910111213141516 18 30 GB/2 Chhuiya Tank 85.80 31 Mauganj Tank 271.10 32 Padar Tank 132.80 Cost of Package

original NCB 489.70 15.11.08 30.11.08 15.01.09 15.02.09 25.09.09 15.03.10 30.10.10 15.03.11 19 33 GB/3 Kanhaiya Tank 95.10 34 Atari Tank 84.70 Cost of Package original NCB 179.80 15.10.08 15.11.08 30.12.08 30.01.09 30.06.09 30.10.09 30.03.10 30.10.10 20 35 GB/4 Gaibar Diversion 36.51 36 Chakra Diversion Wier 20.06

37 Khajuriya Tank 28.69 38 Sehra Diversion 33.30 Cost of Package original NCB 118.56 15.10.08 15.11.08 30.12.08 30.01.09 30.06.09 30.10.09 30.03.10 30.10.10 CE, Yamuna Basin, 21 39 YB/6 Paronch Tank 439.00 Cost of Package original NCB 439.00 15.11.08 30.11.08 15.01.09 15.02.09 25.09.09 15.03.10 30.10.10 15.03.11 PROCUREMENT PLAN for Civil Works for 2007-08 COUNTRY: INDIA WB LOAN/ CREDIT No. IN-4750 State: Madhya Pradesh DESCRIPTION OF EVENTS WORKS INITIATE TRANSMIT IDA CLEARANCE ISSUE INVITATION OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION PREPARATION SPECIFIC-ATIONS OF SPECIFIC- TO BID EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- AND BID ATION AND BID REPORT AND RECOMMENDA- ATIONS AND BID DOCUMENTS TO DOCUMENTS AWARD TIONS DOCUMENTS IDA RECOMMENDATI

ESTIMATED ESTIMATED ONS TO IDA Package No. METHOD OF S.No./Package No. of Scheme of No. PROCUREMENT COST in lakh Rs. lakh in COST 12 345678910111213141516 CE, Dhasan Ken, Sagar 22 40 DK/2 Chiraipani Tank 246.20 41 Jabera Tank 215.30 42 Garaghat Tank 284.80 Cost of Package original NCB 746.30 15.11.08 30.11.08 15.01.09 15.02.09 25.09.09 15.03.10 30.10.10 15.03.11 23 43 DK/6 Bikrampur Tank 21.10 44 Katra Tank 51.00 Cost of Package original NCB 72.10 15.10.08 15.11.08 30.12.08 30.01.09 30.06.09 30.10.09 30.03.10 30.10.10 24 45 DK/7 Bachhlone Tank 71.40 46 Heerapur Tank 75.40 Cost of Package original NCB 146.80 15.10.08 15.11.08 30.12.08 30.01.09 30.06.09 30.10.09 30.03.10 30.10.10 PROCUREMENT PLAN for Civil Works for 2007-08 COUNTRY: INDIA WB LOAN/ CREDIT No. IN-4750 State: Madhya Pradesh DESCRIPTION OF EVENTS WORKS INITIATE TRANSMIT IDA CLEARANCE ISSUE INVITATION OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION PREPARATION SPECIFIC-ATIONS OF SPECIFIC- TO BID EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- AND BID ATION AND BID REPORT AND RECOMMENDA- ATIONS AND BID DOCUMENTS TO DOCUMENTS AWARD TIONS DOCUMENTS IDA RECOMMENDATI

ESTIMATED ESTIMATED ONS TO IDA Package No. METHOD OF S.No./Package No. of Scheme of No. PROCUREMENT COST in lakh Rs. lakh in COST 12 345678910111213141516 25 47 DK/9 Jhinguwan Tank 15.30 48 Ram Nagar Tank 25.75 49 Atrar 15.36 50 Dikoli Tank 11.71 51 Dhanera Tank 30.50 52 Para Tank () 27.20 53 Chaturkari Tank 17.32 54 Bairwar Tank 15.10 Cost of Package original NCB 158.24 15.10.08 15.11.08 30.12.08 30.01.09 30.06.09 30.10.09 30.03.10 30.10.10 26 55 DK/12 Sadwa Tank 54.31 56 Bada Malahara Tank 49.35 57 Baram Sagar Tank 125.00 58 Issanagar Tank 86.59 59 Motisagar Tank 80.20 60 Jagat Sagar Tank 120.00 61 Basiya Tank 58.50 62 Geolari 61.10 Cost of Package original NCB 635.05 15.11.08 30.11.08 15.01.09 15.02.09 25.09.09 15.03.10 30.10.10 15.03.11 Total original #REF! Revised #REF! PROCUREMENT PLAN for Civil Works for 2008-09 COUNTRY: INDIA WB LOANT/ CREDIT No. IN-4750 State: Madhya Pradesh DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE INVITATION OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF TO BID EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package METHOD OF METHOD Scheme No. Scheme ONS TO IDA Package No. Package ESTIMATED ESTIMATED PROCUREMENT COST. in lakh lakh in COST. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 # Comments of WB recd Cleared by WB Sent to WB Not submitted to PICU SMP under compliance with field office AA CE, CB, Bhopal 11 CB/15 S A S Project 4,763.50 Cost of Package original NCB 4,763.50 30.10.08 15.12.08 15.01.09 15.10.09 15.03.10 30.10.10 15.03.11 2 5 CB/17 Banchhore Tank 465.89 Dahod Tank 574.02 Ratapani Tank 510.45 Gulgaon Tank 58.32 Cost of Package original NCB 1,608.68 15.11.08 30.11.08 15.01.09 15.02.09 25.09.09 15.03.10 30.10.10 15.03.11 3 7 CB/18 Khanpura Tank 28.31 Kankariya Tank 26.75 Cost of Package original NCB 55.06 15.10.08 15.11.08 30.12.08 30.01.09 30.06.09 30.10.09 30.03.10 30.10.10 4 9 CB/19 Dhamdusar Tank 246.50 Amrawad Tank# 240.50 Cost of Package original NCB 487.00 15.11.08 30.11.08 15.01.09 15.02.09 25.09.09 15.03.10 30.10.10 15.03.11 DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE INVITATION OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF TO BID EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package METHOD OF METHOD Scheme No. Scheme ONS TO IDA Package No. Package ESTIMATED ESTIMATED PROCUREMENT COST. in lakh lakh in COST. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 CE, NT Basin, Indore 5 12 NT/7 Antrai Tank 21.40 Chillore Tank 19.36 Dholana Tank 14.84 Cost of Package original NCB 55.60 15.10.08 15.11.08 30.12.08 30.01.09 30.06.09 30.10.09 30.03.10 30.10.10 6 14 NT/8 Gopalpura Tank 136.00 Poladongar Tank 71.52 Cost of Package original NCB 207.52 15.10.08 15.11.08 30.12.08 30.01.09 30.06.09 30.10.09 30.03.10 30.10.10 715 NT/9 Chillar Tank# 688.20 Cost of Package original NCB 688.20 15.11.08 30.11.08 15.01.09 15.02.09 25.09.09 15.03.10 30.10.10 15.03.11 8 19 NT/10 Unhel Tank 37.80 Bedawan Tank 23.40 Jastakhedi Tank 129.80 Padliya Tank 47.20 Cost of Package original NCB 238.20 15.10.08 15.11.08 30.12.08 30.01.09 30.06.09 30.10.09 30.03.10 30.10.10 9 20 NT/11 Telia Tank - proposed for deletion Cost of Package original NCB - DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE INVITATION OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF TO BID EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package METHOD OF METHOD Scheme No. Scheme ONS TO IDA Package No. Package ESTIMATED ESTIMATED PROCUREMENT COST. in lakh lakh in COST. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 E CE, Ganga Basin, Rewa 10 23 GB/5 Bhaiswar Tank 589.64 Kothi Weir 32.66 Jamunhai Weir 22.00 Cost of Package original NCB 644.30 15.11.08 30.11.08 15.01.09 15.02.09 25.09.09 15.03.10 30.10.10 15.03.11 11 26 GB/6 Govindgarh Tank# 439.50 Loni Tank 470.00 Kanti Anicut 25.30 Cost of Package original NCB 934.80 15.11.08 30.11.08 15.01.09 15.02.09 25.09.09 15.03.10 30.10.10 15.03.11 12 29 GB/7 Chamara Diversion 25.00 Kuniya Weir 20.00 Nimi Weir 40.50 Semra Weir 13.00 Cost of Package original NCB 98.50 15.10.08 15.11.08 30.12.08 30.01.09 30.06.09 30.10.09 30.03.10 30.10.10 DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE INVITATION OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF TO BID EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package METHOD OF METHOD Scheme No. Scheme ONS TO IDA Package No. Package ESTIMATED ESTIMATED PROCUREMENT COST. in lakh lakh in COST. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 CE, Yamuna Basin, Gwalior 13 YB/3 Lower Main Canal 2814.00 Km 0 to 50 : Slice No.3 Cost of Package original NCB 2814.00 15.09.08 15.10.08 30.10.08 10.11.08 30.12.09 15.01.09 25.09.09 15.03.10 30.10.10 15.03.11 14 31 YB/7 Khirawali Tank# 294.70 Cost of Package original NCB 294.70 15.10.08 15.11.08 30.12.08 30.01.09 30.06.09 30.10.09 30.03.10 30.10.10 Kaketo Tank 1,262.50 Cost of Package original NCB 1,262.50 15.11.08 30.11.08 15.01.09 15.02.09 25.09.09 15.03.10 30.10.10 15.03.11 15 32 YB/8 Kota Tank 165.78 Cost of Package original NCB 165.78 15.10.08 15.11.08 30.12.08 30.01.09 30.06.09 30.10.09 30.03.10 30.10.10 16 33 YB/9 Simariya Jakha 263.50 Cost of Package original NCB 263.50 15.10.08 15.11.08 30.12.08 30.01.09 30.06.09 30.10.09 30.03.10 30.10.10 17 34 YB/10 Aoda Tank 2,225.00 Cost of Package original NCB 2,225.00 15.09.08 15.10.08 30.10.08 10.11.08 30.12.09 15.02.09 25.09.09 15.03.10 30.10.10 15.03.11 18 37 YB/11 Ramowa Tank# 434.50 Jalalpur PUW 444.10 Bahadurpur PUW# 168.80 Cost of Package original NCB 1,047.40 15.10.08 15.11.08 30.12.08 30.01.09 30.06.09 30.10.09 30.03.10 30.10.10 DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE INVITATION OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF TO BID EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package METHOD OF METHOD Scheme No. Scheme ONS TO IDA Package No. Package ESTIMATED ESTIMATED PROCUREMENT COST. in lakh lakh in COST. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 CE, Dhasan Ken, Sagar 19 38 DK/11 Benisagar 926.70 Cost of Package original NCB 926.70 15.09.08 15.10.08 30.10.08 10.11.08 30.12.09 15.01.09 25.09.09 15.03.10 30.10.10 15.03.11 20 39 DK/3 Surkhi Tank 188.30 40 Machhariya- 706.10 Masurwari Complex Cost of Package original NCB 894.40 15.09.08 15.10.08 30.10.08 10.11.08 30.12.09 15.01.09 25.09.09 15.03.10 30.10.10 15.03.11 21 41 DK/13 Bila Dam 3,177.30 NCB Cost of Package original 3,177.30 15.09.08 15.10.08 30.10.08 10.11.08 30.12.09 15.01.09 25.09.09 15.03.10 30.10.10 15.03.11 22 44 DK/14 Bhartala Tank 88.80 Borina Tank 251.75 Dhorsi Regulator 38.60 Cost of Package original NCB 379.15 15.11.08 30.11.08 15.01.09 15.02.09 25.09.09 15.03.10 30.10.10 15.03.11 23 48 DK/15 Berki Nalla 12.35 Samdua# 22.75 Madarkha Tank 21.22 Rani Tal Bhelsi 35.00 Cost of Package original NCB 91.32 15.10.08 15.11.08 30.12.08 30.01.09 30.06.09 30.10.09 30.03.10 30.10.10 24 53 DK/16 Bharatpura Tank 197.40 Burha Tank 457.00 Gora Tank 273.30 Sendpa Tank 523.8 Shyamri Anicut 646.60 Cost of Package original NCB 2,098.10 15.09.08 15.10.08 30.10.08 10.11.08 30.12.09 15.01.09 25.09.09 15.03.10 30.10.10 15.03.11 25 54 DK/17 Rangawan Dam 2,520.00 Cost of Package original NCB 2,520.00 15.09.08 15.10.08 30.10.08 10.11.08 30.12.09 15.01.09 25.09.09 15.03.10 30.10.10 15.03.11 26 56 DK/18 Indora Tank 27.30 Chandiya Tank 348.80 Cost of Package original NCB 376.10 15.11.08 30.11.08 15.01.09 15.01.09 25.09.09 15.03.10 30.10.10 15.03.11 DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE INVITATION OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF TO BID EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package METHOD OF METHOD Scheme No. Scheme ONS TO IDA Package No. Package ESTIMATED ESTIMATED PROCUREMENT COST. in lakh lakh in COST. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 2757 DK/19 Tejgarh 271.30 58 Teergarh 193.80 Cost of Package original NCB 465.10 15.11.08 30.11.08 15.01.09 15.02.09 25.09.09 15.03.10 30.10.10 15.03.11 28 P/CB/1 PICU Building 308.00 original NCB 308.00 15.11.08 30.11.08 15.01.09 15.02.09 25.09.09 15.03.10 30.10.10 15.03.11 Grand Total original #REF! Revised #REF! PROCUREMENT PLAN for Civil Works for 2009-10 COUNTRY: INDIA WB LOANT/ CREDIT No. IN-4750 State: Madhya Pradesh DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF INVITATION TO EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION BID REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package Scheme No. METHOD OF METHOD ONS TO IDA Package No. ESTIMATED PROCUREMENT COST. in lakh in lakh COST. 1 2 3 456 7 89 10111213141516 # Comments of WB recd Cleared by WB Sent to WB Not submitted to PICU SMP under compliance with field office AA CE, CB, Bhopal 1 1 Dhakoni 26.5 2 Dhorra 63.3 3 Gorasingwasa 19.8 4 Jamakhedi 108.8 CB/20 5 Kadwaya 30.3 6 Munderi 30.3 7 Pachhadikheda 8.8 8 Shyamatori 16.3 Cost of Package original NCB 304.10 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 412.06 2 9 Tulsisarover 38.80 10 Bharoli 55.80 11 Fatehabad 11.80 12 CB/21 Keshopur 23.30 13 Ramnagar 30.30 14 Singhpur Chalda 11.30 15 Vikrampur 24.30 Cost of Package original NCB 195.60 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 265.04 3 16 Ghaterababaji 28.90 17 Ghosua Minor Tank 73.00 18 Bhawankhedi Minor 96.20 CB/22 Tank 19 Muradpur Minor Tank 44.30 Cost of Package original NCB 242.40 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 328.45 4 20 Phopser Minor Tank 91.00 21 Jawari Minor Tank 60.80 CB/23 22 Saklone Minor Tank 61.80 Cost of Package original NCB 213.60 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 289.43 DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF INVITATION TO EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION BID REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package Scheme No. METHOD OF METHOD ONS TO IDA Package No. ESTIMATED PROCUREMENT COST. in lakh in lakh COST. 1 2 3 456 7 89 10111213141516 523 Hataikheda 404.80 CB/24 Cost of Package original NCB 404.80 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 548.50 6 24 Geretia 428.00 25 CB/25 Karondia 44.50 original NCB 472.50 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 640.24 726 Mohri 65.80 CB/26 Cost of Package original NCB 65.80 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 89.16

8 27 Agar-Agri Tank 19.50 28 Baiheda Tank 11.80 29 Malawar Tank 10.60 CB/27 30 Napanera Tank 13.90 31 Banda Bedra Tank 19.30 32 Hedapura tank 19.90 Cost of Package original NCB 95.00 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 128.73 9 33 Jamunia Rao tank 54.80 34 Mandawar tank 49.50 35 Pipliya Bay 10.30 CB/28 36 Sinka Tank 17.80 37 Tinonia Tank 34.80 38 Burda LIS 40.50 Cost of Package original NCB 207.70 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 281.43 10 39 Dedla Tank 19.10 CB/29 Cost of Package original NCB 19.10 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 25.88 11 40 Chandana Tank 48.80 41 Makhani Tank 96.50 42 CB/30 Sehora Tank 49.00 43 Sudra Tank 65.80 44 Piplai Tank 93.98 Cost of Package original NCB 354.08 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 479.78 DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF INVITATION TO EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION BID REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package Scheme No. METHOD OF METHOD ONS TO IDA Package No. ESTIMATED PROCUREMENT COST. in lakh in lakh COST. 1 2 3 456 7 89 10111213141516 12 45 Dhamniya tank 21.30 46 Chhapni Tank 95.00 47 Kasturipura Tank 15.50 48 Kolukhedi Tank 19.30 49 CB/31 Sanwasara Tank 61.50 50 Amanpur Tank 13.70 51 Deopur Tank 13.40 52 Deory Tank 16.70 53 Fatehpur Tank 12.10 Cost of Package original NCB 268.50 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 363.82 13 54 Moondla 70.80 55 Bamyliya Bhatti 11.80 56 Bhoura 44.00 57 Bhouri 88.30 CB/32 58 Gurada Roopchand 64.80 59 Maina-I 37.80 Cost of Package original NCB 317.50 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 430.21 14 60 Gyaras Pura 106.30 61 Jamuniya 88.80 CB/33 62 Khai Kheda 25.00 63 Silkheda 133.80 Cost of Package original NCB 353.90 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 479.53 DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF INVITATION TO EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION BID REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package Scheme No. METHOD OF METHOD ONS TO IDA Package No. ESTIMATED PROCUREMENT COST. in lakh in lakh COST. 1 2 3 456 7 89 10111213141516 CE, NT Basin, Indore 15 64 Bhaniyakhedi 48.00 65 Borsali 10.00 66 Burlai 31.70 67 Polaikhurd 18.80 68 NT/12 Semlichacha 16.30 69 Kheda(New) 27.80 70 Kheda(Old) 20.30 71 Ranthbhanwar 14.30 72 Baorikheda Tank 19.70 Cost of Package original NCB 206.90 Revised 280.35 16 73 Ambawati 11.10 74 Barotha 14.70 75 Nagda 100.00 76 NT/13 Satbarli 48.80 77 Sindhani 22.50 78 Aghera 33.30 79 Bhutia 37.50 Cost of Package original NCB 267.90 Revised 363.00 17 80 Chidawad 15.50 81 Lakumadi 14.80 82 Padliya 21.30 83 NT/14 Pipalrawa 17.80 84 Sadakpipaliya 21.50 85 Deogarh S/D 203.80 86 Mendia 49.50 Cost of Package original NCB 344.20 Revised 466.39 18 87 Momanpura 45.00 88 Neori P.U.W 15.30 89 Kaliadeh 14.80 NT/15 90 Koop Tank 24.80 91 Patadi 17.50 92 Siya 33.00 Cost of Package original NCB 150.40 Revised 203.79 DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF INVITATION TO EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION BID REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package Scheme No. METHOD OF METHOD ONS TO IDA Package No. ESTIMATED PROCUREMENT COST. in lakh in lakh COST. 1 2 3 456 7 89 10111213141516 19 93 Takrawad Tank 11.00 94 NT/16 Gahntonda Tank 65.00 95 Dhabla Deval Tank 36.60 Cost of Package original NCB 112.60 Revised 152.57 20 96 Bani Tank 23.30 97 Kundaliya Tank 27.30 98 NT/17 Dhangaon Tank 60.50 99 Lasur Tank 56.00 100 Malgarh Tank 36.00 Cost of Package original NCB 203.10 Revised 275.20 21 101 Devikheda Tank 79.80 102 Kadodia Tank 17.90 103 Kanardi (New) Tank 16.20 NT/18 104 Kanardi (Old) Tank 10.70 105 Kharkhedi Tank 29.50 106 Khatikhedi Tank 15.80 Cost of Package original NCB 169.90 Revised 230.21 22 107 Nainawad Tank 12.10 108 Ramabaloda 27.00 NT/19 109 Undadasa Tank 60.80 110 Tankaria 129.00 Cost of Package original NCB 228.90 Revised 310.16 23 111 Billi Tank 11.90 NT/20 112 Poladongar PUW 25.80 Cost of Package original NCB 37.70 Revised 51.08 DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF INVITATION TO EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION BID REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package Scheme No. METHOD OF METHOD ONS TO IDA Package No. ESTIMATED PROCUREMENT COST. in lakh in lakh COST. 1 2 3 456 7 89 10111213141516 E CE, Ganga Basin, Rewa 24 113 Bankuiya Tank 64.80 114 GB/8 Bansa Reg. 29.50 115 Naubasta Tank 18.50 Cost of Package original NCB 112.80 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 152.84 25 116 Amara Nalla Wier 175.00 117 GB/9 Lilgee Reservoir 259.00 118 Chheuda Tank 48.00 Cost of Package original NCB 482.00 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 653.11 26 119 Nungara Diversion 63.50 120 Singhpur Tank 159.50 GB/10 121 Amua Fiedar 25.00 122 Amua Tank 85.00 Cost of Package original NCB 333.00 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 451.22 27 123 Birahna Tank 420.30 124 GB/11 Chitehra Tank 87.00 125 Khutaha Diversion 15.00 Cost of Package original NCB 522.30 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 707.72 28 126 Kuri Tank 188.30 127 Badkhar Wier 80.00 GB/12 128 Asarar Tank 125.00 129 Digarahat Tank 27.00 Cost of Package original NCB 420.30 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 569.51 29 130 Jamuna 82.50 131 Jhura Nalla Wier 18.30 132 Khatkhari Wier 17.50 GB/13 133 Magardha Wier 162.00 134 Sagauni Wier 101.30 135 Tapa Diversion 40.00 original NCB 421.60 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 571.27 DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF INVITATION TO EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION BID REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package Scheme No. METHOD OF METHOD ONS TO IDA Package No. ESTIMATED PROCUREMENT COST. in lakh in lakh COST. 1 2 3 456 7 89 10111213141516 30 136 Chhaya sagar Tank 17.50 137 Jagdish Sagar Tank 22.50 138 Kirhai Tank 47.00 139 GB/14 Koka Tank 205.00 140 Mahudar Tank 20.00 141 Mauhariya Nalla Wier 81.00 142 Mukunkpur Tank 30.30 original NCB 423.30 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 573.57 DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF INVITATION TO EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION BID REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package Scheme No. METHOD OF METHOD ONS TO IDA Package No. ESTIMATED PROCUREMENT COST. in lakh in lakh COST. 1 2 3 456 7 89 10111213141516 CE, Yamuna Basin, Gwalior 31 143 Udalpara Tank 56.70 144 YB/12 Himmatgarh Tank 86.30 145 Sirsa Dam 10.10 Cost of Package original NCB 153.10 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 207.45 32 146 YB/13 Chhaper 40.50 Cost of Package original NCB 40.50 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 54.88 DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF INVITATION TO EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION BID REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package Scheme No. METHOD OF METHOD ONS TO IDA Package No. ESTIMATED PROCUREMENT COST. in lakh in lakh COST. 1 2 3 456 7 89 10111213141516 CE, Dhasan Ken, Sagar 33 147 Baheria 52.50 148 Bansi Chikhli 100.30 149 Chandna-Harrai 19.80 DK/20 150 Dhan Gaur 58.80 Cost of Package original NCB 231.40 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 313.55 34 151 DK/21 Daroli 357.30 Cost of Package original NCB 357.30 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 484.14 35 152 Hardua Panji 16.30 153 Hardua Pondi 113.80 154 Hardua-Sadak 10.00 155 Jalehari-Ghana 54.00 DK/22 156 Jamnera 62.50 157 Jhalone 34.30 158 Kalapani 70.30 159 Kalrewa 38.30 Cost of Package original NCB 399.50 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 541.32 36 160 Muhra 53.50 161 Piparia-Jugraj 30.30 162 Pondi 170.50 163 Anoo 39.00 DK/23 164 Barpati 60.00 165 Basni 17.00 166 Hardua-Mudar 75.80 167 Jamuniya 165.80 Cost of Package original NCB 611.90 30.3.09 10.4.09 25.5.09 30.6.09 15.8.09 30.8.09 15.9.09 30.09.09 30.03.10 30.07.10 30.12.10 29.03.11 Revised 829.12 37 168 Keolari 39.50 169 Nonpani 71.50 170 Patna 45.30 171 Sanyasi 17.30 172 DK/24 Chhoti-Deori 85.30 173 Datia 145.30 174 Kuluwa 36.80 175 Majhgawan-Village 16.80 176 Patna 49.30 Cost of Package original NCB 507.10 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 687.12 38 177 DK/25 Mala Tank 498.50 Cost of Package original NCB 498.50 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 675.47 DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF INVITATION TO EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION BID REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package Scheme No. METHOD OF METHOD ONS TO IDA Package No. ESTIMATED PROCUREMENT COST. in lakh in lakh COST. 1 2 3 456 7 89 10111213141516 39 178 Sugwan Tank 30.50 179 DK/26 Deori Regulator 20.30 180 Gorha Bandha 66.80 Cost of Package original NCB 117.60 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 159.35 40 181 Bakhleta Tank 37.00 182 Gurjee Tank 40.50 183 Hardawara Tank 33.40 DK/27 184 Patonha Tank 34.50 185 Simra Kudri 111.00 186 Kaina Tank 9.00 Cost of Package original NCB 265.40 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 359.62 41 187 Brijpura Tank 17.70 188 Dilari Tank 60.70 189 Kasar Tank 35.40 190 DK/28 Motigarh Tank 25.30 191 Tank 25.30 192 Anghor Tank 27.80 193 Bagha Tank 145.80 Cost of Package original NCB 338.00 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 457.99 42 194 Basiya Regulator 50.80 195 Kishan Sagar Tank 81.00 196 Pipat Tank 25.30 197 Ram Sagar Tank 25.30 DK/29 198 Bagota Tank 22.50 199 Banyara Tank 50.60 200 Matgawan Tank 25.30 201 Raxapurwa Tank 11.30 Cost of Package original NCB 292.10 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 395.80 43 202 Gilonha Bandhi 35.50 203 Jhinna Tank 45.50 204 Kail Anicut 101.30 205 Bamhoripurwa Tank 55.70 206 DK/30 Gopital Tank 11.00 207 Lohrak Anicut 20.30 208 Manoria Tank 17.80 209 Sohai Anicut 10.00 210 Tulatal Tank 112.50 Cost of Package original NCB 409.60 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 555.01 DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF INVITATION TO EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION BID REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package Scheme No. METHOD OF METHOD ONS TO IDA Package No. ESTIMATED PROCUREMENT COST. in lakh in lakh COST. 1 2 3 456 7 89 10111213141516 44 211 DK/31 Gangasagar Tank 46.50 Cost of Package original NCB 46.50 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 63.01 45 212 Hinota Khamrau 66.50 213 Teora Tank 17.00 214 DK/32 Basari Tank 12.60 215 Garhola Tank 64.20 216 Malthone Tank 40.50 Cost of Package original NCB 200.80 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 272.08 46 217 Adhar Sagar Tank 83.70 218 Barachh Tank 112.40 219 Bhapatpur Tank 52.50 220 Dubeytal Tank 12.00 221 DK/33 Hatupur Tank 49.00 222 Jamunhai Tank 44.20 223 Lokpal Sagar Tank 115.40 224 Mutwa Tank 50.00 225 Ranital Tank 14.00 Cost of Package original NCB 533.20 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 722.49 47 226 Kakarhai Tank 34.50 227 Koha Tank 14.80 228 Pawaiya Tank 20.00 229 Sungraha Rajatal Tank 15.20 230 DK/34 Amder Tank 71.20 231 Badagaon Tank 16.60 232 E/I Patori Tank 10.00 233 Khero Tank 15.00 234 Kuatal Tank 18.60 Cost of Package original NCB 215.90 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 292.54 48 235 Kunwarpur Tank 15.00 236 Raiyasata Tank 13.00 237 Shyamgiri Tank 12.40 DK/35 238 Sungraha tank No.1 10.70 239 Sungraha Tank -No.-2 11.00 240 Umri Tank 14.80 Cost of Package original NCB 76.90 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 104.20 DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF INVITATION TO EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION BID REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package Scheme No. METHOD OF METHOD ONS TO IDA Package No. ESTIMATED PROCUREMENT COST. in lakh in lakh COST. 1 2 3 456 7 89 10111213141516 49 241 Dumduma 22.80 242 Ladpura 19.80 243 Niwari 74.50 244 DK/36 Putrikhera Reg. 20.30 245 Sakuli 18.30 246 Sindur Sagar 182.30 247 187.82 Cost of Package original NCB 525.82 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 712.49 50 248 Ram Sagar 50.50 249 Baharoo Tank 71.30 250 Bairwar 15.10 251 Balwantpura Tank 131.00 252 DK/37 Bela Tal 23.80 253 Chanderi 43.00 254 Chita Nalla 73.00 255 Dadgain 30.30 256 Deri Tank 94.80 Cost of Package original NCB 532.80 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 721.94 51 257 Dharam Sagar 535.60 DK/38 Cost of Package original NCB 535.60 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 725.74 52 258 Dudian Khera 98.80 259 DK/39 Ghoogsi 30.30 260 Ghoora 84.30 Cost of Package original NCB 213.40 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 289.16 53 261 DK/40 Gwal Sagar 425.00 Cost of Package original NCB 425.00 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 575.88 54 262 Hanumatpura Tank 22.50 263 Keeratwari 53.80 264 Khurera 274.30 265 Kotra 58.80 266 DK/41 Lakhera Tank# 37.00 267 Lar Tank 31.30 268 Laxmanpura Tank 15.00 Cost of Package original NCB 492.70 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 667.61 DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF INVITATION TO EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION BID REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package Scheme No. METHOD OF METHOD ONS TO IDA Package No. ESTIMATED PROCUREMENT COST. in lakh in lakh COST. 1 2 3 456 7 89 10111213141516 55269 DK/42 Madan Sagar 289.30 270 Madan Sagar 244.00 T.() Cost of Package original NCB 533.30 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 722.62 56271 DK/43 Matol Tank 45.50 272 Narosa Nalla, Anicut 101.30 Cost of Package original NCB 146.80 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 198.91 57 273 DK/44 Padma Sagar 321.80 Cost of Package original NCB 321.80 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 436.04 58 274 Tank 39.30 275 Phuter Tank 40.50 276 Phutera 48.50 277 Pokhna Tal 82.00 DK/45 278 Pureniya 66.30 279 Ratan Sagar 25.30 Cost of Package original NCB 301.90 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 409.07 59 280 Regora Tank 176.00 281 Sarkanpur Tank 129.00 282 Upat Sagar Tank 56.50 DK/46 283 Vindhyawasini 80.50 Cost of Package original NCB 442.00 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 598.91 60 284 Acharra 20.30 285 Aston Tank 34.50 286 Atarra Tank 21.30 287 DK/47 Barana Bambhuri 177.00 288 Bijarawan Reg. 51.50 Cost of Package original NCB 304.60 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 412.73 61 289 Brikhbhanpura 163.80 290 Chirolghat Stop Dam 29.50 291 Dargain Kala 15.30 292 Dargainkhurd 21.30 293 Darretha 27.30 294 Deep Sagar Kan Tank 50.00 295 DK/48 Dibora 133.00 296 Dushiyara 42.50 297 Hanuma Sagar Tank 28.80 298 Heera Nagar Tank 19.50 299 Hira Nagar Weir 18.30 Cost of Package original NCB 549.30 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 744.30 DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF INVITATION TO EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION BID REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package Scheme No. METHOD OF METHOD ONS TO IDA Package No. ESTIMATED PROCUREMENT COST. in lakh in lakh COST. 1 2 3 456 7 89 10111213141516 62 300 DK/49 Jamni Canal 605.00 Cost of Package original NCB 605.00 30.3.09 10.4.09 25.5.09 30.6.09 15.8.09 30.8.09 15.9.09 30.09.09 30.03.10 30.07.10 30.12.10 29.03.11 Revised 819.78 63 301 Jamrar Nadi causeway 36.00 302 Jamrar Weir 36.50 303 DK/50 Jeron 261.00 Cost of Package original NCB 333.50 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 451.89 64 304 Keshavgarh Stop Dam 25.30 305 Kumhedi 152.00 306 Kuwanrpura 15.30 307 Ladwari 25.30 DK/51 308 Mahendra Sagar Tank 101.30 309 Majal Tank 39.50 Cost of Package original NCB 358.70 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 486.04 65310 DK/52 Mohangrah 293.80 Cost of Package original NCB 293.80 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 398.10 66 311 DK/53 Nandan wara 619.00 Cost of Package original NCB 619.00 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 838.75 67 312 DK/54 Rajendra Sagar Tank 618.00 Cost of Package original NCB 618.00 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 837.39 68 313 Simra 16.30 DK/55 314 Tudiyara 20.00 Cost of Package original NCB 36.30 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 49.19 DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF INVITATION TO EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION BID REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package Scheme No. METHOD OF METHOD ONS TO IDA Package No. ESTIMATED PROCUREMENT COST. in lakh in lakh COST. 1 2 3 456 7 89 10111213141516 CE, Rajghat 69 315 Badoni 36.80 RG/1 316 Ram Sagar 216.60 Cost of Package original NCB 253.40 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 343.36 70 317 RG/2 Bhew 14.30 Cost of Package original NCB 14.30 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 19.38 71 318 Jigna 10.30 319 Satari PUW 35.30 RG/3 320 Somla 32.50 321 Seer Banskheri PUW 23.00 Cost of Package original NCB 101.10 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 136.99 DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF INVITATION TO EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION BID REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package Scheme No. METHOD OF METHOD ONS TO IDA Package No. ESTIMATED PROCUREMENT COST. in lakh in lakh COST. 1 2 3 456 7 89 10111213141516 CE, Wainganga Basin, Seoni 72 322 Kotarnall Tank 172.75 323 Raipur Tank 16.25 WG/1 324 Badgaon Tank 51.75 325 Badal Behra Tank 16.25 Cost of Package original NCB 257.00 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 348.24 73 326 Lilamata 22.25 327 Sita dongari Tank 121.50 WG/2 328 Hudditotal Tank 65.75 329 Amanalla 107.75 Cost of Package original NCB 317.25 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 429.87 74 330 Usri Tank 72.80 331 BadalPur Tank 36.80 332 Lungsha Tank 9.80 WG/3 333 Sharekha Tank 11.00 334 Sharekha Tank-II 20.20 335 Khairi Tank 9.60 Cost of Package original NCB 160.20 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 217.07 75 336 Dorli Chhatarpur - Regulator 337 Ari Tank 10.20 WG/4 338 Tighra Tank 12.20 339 Shakari Tank 17.80 340 Rumpuri Regulator 26.40 Cost of Package original NCB 66.60 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 90.24 76 341 Keshla Regulator 33.40 342 Katanganalla D/W 12.80 343 WG/5 Pipariya Tank 37.20 344 Puran Tank 13.20 345 Khandasa Tank 8.00 Cost of Package original NCB 104.60 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 141.73 77 346 Bonkala Tank 9.00 347 Jeonara Tank 23.40 348 WG/6 Patan Tank 20.20 349 Pindari Tank 30.00 350 Riddi Tank 17.80 Cost of Package original NCB 100.40 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 136.04 DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF INVITATION TO EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION BID REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package Scheme No. METHOD OF METHOD ONS TO IDA Package No. ESTIMATED PROCUREMENT COST. in lakh in lakh COST. 1 2 3 456 7 89 10111213141516 78 351 Masur nalla 51.80 352 Takhalakala Tank 12.40 353 WG/7 Harduli Tank 12.60 354 Malara 8.40 355 Bhirloi 15.40 Cost of Package original NCB 100.60 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 136.31 79 356 Pipariya Tank 10.20 357 Singpur Tank 16.20 358 WG/8 Butte Tank 14.00 359 Peeperwani 11.40 360 Sonkhar 8.20 Cost of Package original NCB 60.00 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 81.30 80 361 Wahidabad 11.40 362 Halon L.I.S. 12.15 363 WG/9 Pindari Tank 13.40 364 Ghoushela 54.00 365 Bijaypani 8.20 Cost of Package original NCB 99.15 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 134.35 81 366 Bharghat 11.40 367 Dharna Kala 8.40 368 Khurshipar 9.60 369 Panderwani 8.40 370 Chandrapur 8.60 371 Maili No.2 8.00 WG/10 372 Ghodegaon 8.00 373 Ramli 8.60 374 Shahjpuri L.I.S. 6.30 375 Ghawranalla Anicut 40.40 376 Umarwara Tank 9.00 377 Maili No.1 9.60 Cost of Package original NCB 136.30 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 184.69 82 378 WG/11 Latgaon 8.60 379 Pratapgarh 93.20 Cost of Package original NCB 101.80 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 137.94 83 380 Roomal Tank 598.00 WG/12 Cost of Package original NCB 598.00 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 810.29 84 381 WG/13 Bori Tank 607.20 Cost of Package original NCB 607.20 30.3.09 10.4.09 25.5.09 30.6.09 15.8.09 30.8.09 15.9.09 30.09.09 30.03.10 30.07.10 30.12.10 29.03.11 Revised 822.76 DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF INVITATION TO EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION BID REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package Scheme No. METHOD OF METHOD ONS TO IDA Package No. ESTIMATED PROCUREMENT COST. in lakh in lakh COST. 1 2 3 456 7 89 10111213141516 85 382 WG/14 Chichband Tank 445.20 Cost of Package original NCB 445.20 1.1.09 1.2.09 1.03.09 25.03.09 30.07.09 30.10.09 30.03.10 24.09.10 Revised 603.25 86 383 WG/15 Ari Tank 850.20 Cost of Package original NCB 850.20 30.3.09 10.4.09 25.5.09 30.6.09 15.8.09 30.8.09 15.9.09 30.09.09 30.03.10 30.07.10 30.12.10 29.03.11 Revised 1,152.02 87 384 WG/16 Sagamadi Tank 331.00 Cost of Package original NCB 331.00 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 448.51 88 385 WG/17 Bijna Tank 429.00 Cost of Package original NCB 429.00 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 581.30 89 386 Atarwara Tank 18.09 387 Pindari Kalan Tank 21.33 WG/18 388 Bargaon 46.76 389 Kotalvardi 33.26 Cost of Package original NCB 119.44 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 161.84 90 390 Mendki Tank 21.25 391 WG/19 Palari Tank 21.82 392 Gohar goan 24.04 Cost of Package original NCB 67.11 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 90.93 91 393 Tamni 32.95 WG/20 394 Mohi Tank 42.54 Cost of Package original NCB 75.49 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 102.29 92 395 WG/21 Wadhya Nala Tank 197.00 Cost of Package original NCB 197.00 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 266.94 93 396 Wara Main Tank 381.00 397 Waratar Tank 71.78 398 WG/22 Jam Mohgaon 225.00 399 Dongarbodi Tank 178.00 400 Ratta Weir 61.00 Cost of Package original NCB 916.78 30.3.09 10.4.09 25.5.09 30.6.09 15.8.09 30.8.09 15.9.09 30.09.09 30.03.10 30.07.10 30.12.10 29.03.11 Revised 1,242.24 DESCRIPTION OF EVENTS INITIATE TRANSMIT IDA ISSUE OPEN BIDS TRANSMIT IDA CLEARANCE AWARD CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION WORKS PREPARATION SPECIFIC- CLEARANCE OF INVITATION TO EVALUATION OF CONTRACT 25% COMPLETE 50% COMPLETE 75% COMPLETE 100% COMPLETE OF SPECIFIC- ATIONS AND BID SPECIFIC-ATION BID REPORT AND RECOMMENDA-

Rs. ATIONS AND BID DOCUMENTS TO AND BID AWARD TIONS DOCUMENTS IDA DOCUMENTS RECOMMENDATI Package Scheme No. METHOD OF METHOD ONS TO IDA Package No. ESTIMATED PROCUREMENT COST. in lakh in lakh COST. 1 2 3 456 7 89 10111213141516 94 401 Mandwajhri Tank 297.50 402 Sarrathi Tank 1,362.00 403 Moorumnalla 630.00 WG/23 404 Kharadi Tank 281.13 405 Chawarpani Tank 430.00 406 Gangulpara Tank 1,035.00 Cost of Package original NCB 4,035.63 30.3.09 10.4.09 25.5.09 30.6.09 15.8.09 30.8.09 15.9.09 30.09.09 30.03.10 30.07.10 30.12.10 29.03.11 Revised 5,468.28 95 407 Wainganga Canal 4,391.52 WG/24 System Cost of Package original NCB 4,391.52 30.3.09 10.4.09 25.5.09 30.6.09 15.8.09 30.8.09 15.9.09 30.09.09 30.03.10 30.07.10 30.12.10 29.03.11 Revised 5,950.51 96 408 Dorlee Tank 125.00 409 Dokariya Chapawier 147.69 410 WG/25 Kamthi Tank 125.00 Cost of Package original NCB 397.69 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 538.87 97411 WG/26 Katangjhari Tank 250.00 Cost of Package original NCB 250.00 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 338.75 98 412 Amai Tank 175.00 413 Shankarpipariya Tank 50.00 414 WG/27 Ambajhri Tank 75.00 415 Chikhala No.2 50.00 416 Bhajjyadand Tank 50.00 Cost of Package original NCB 400.00 1.3.09 1.4.09 1.05.09 25.05.09 30.12.09 30.06.10 30.10.10 24.03.11 Revised 542.00 Grand Total original 37,420.06 Revised 50,704.18 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD 1 PROCUREMENT PLAN for Civil Works for 2007-08 2 COUNTRY: INDIA WB LOAN/ CREDIT No. IN-4750 3 State: Madhya Pradesh 4 DESCRIPTION OF Year-2007-08 Year 2008-09 WORKS S.No. JAN JAN FEB FEB APR OCT OCT DEC DEC MAY NOV MAY NOV AUG AUG MAR MAR JULY JULY SEPT SEPT JUNE JUNE Package APRIL AREA IN HECTARES CONTRACT CONTRACT METHOD OF AMT. in lakh Rs. lakh in AMT. 5 PROCUREMENT 6 7 8 1 1 Harsi-Main Canal 5742.00 9 Cost of Package NCB 5,742.00 10 2 1 Salwai PUW 292 11 Cost of Package NCB 292.00 12 3 1 Harsi Dam 400 13 Cost of Package NCB 400.00 4 1 Distry of D-9A to D14B 1065.00 14 of Harsi M.C. 15 Cost of Package NCB 1,065.00 16 5 2 Koyalkhedi 17 3 Laxmipura 18 4 Pachola 19 Cost of Package NCB 205.00 20 6 5 Gurma Medium 1472.00 21 Cost of Package NCB 1,472.00 22 7 6 Devendra Nagar 23 7 Brijpur 24 Cost of Package NCB 1,092.00 25 8 8 Sakarra Project 76.70 26 Cost of Package NCB 76.70 27 9 9 Kethan-Dam & MC 241.00 28 Cost of Package NCB 241.00 10 9 Kethan Medium Tank- 82.77 29 Gates 30 Cost of Package NCB 82.77 31 11 10 Joran 32 11 Jhinjhan 33 12 Dhubela 34 Cost of Package NCB 121.00 35 12 13 Bandha 36 14 Gakariya 37 15 Kamodpura 38 16 Panwari 39 17 Phutwari 40 18 Sidhsagar 41 Cost of Package NCB 183.00 42 13 19 Aamkhera 43 20 Nandgaon 44 21 Bhirata 45 22 Matagaon 46 Cost of Package NCB 150.00 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD 1 PROCUREMENT PLAN for Civil Works for 2007-08 2 COUNTRY: INDIA WB LOAN/ CREDIT No. IN-4750 3 State: Madhya Pradesh 4 DESCRIPTION OF Year-2007-08 Year 2008-09 WORKS S.No. JAN JAN FEB FEB APR OCT OCT DEC DEC MAY NOV MAY NOV AUG AUG MAR MAR JULY JULY SEPT SEPT JUNE JUNE Package APRIL AREA IN HECTARES CONTRACT CONTRACT METHOD OF AMT. in lakh Rs. lakh in AMT. 5 PROCUREMENT 6 47 14 23 Bhat Khamaria 87.00 48 Cost of Package NCB 87.00 49 15 24 Bhonhari Tank 41.00 50 Cost of Package NCB 41.00 51 16 25 Nanhi Tehri 52 26 Prem Sagar Tank 53 Cost of Package NCB 69.00 17 27 Majhgawan Hansraj 205.00 54 55 Cost of Package NCB 205.00 56 18 28 Silarkhedi Tank 208.00 57 Cost of Package NCB 208.00 58 19 i SWaRA 581.43 59 Cost of Package NCB 581.43 60 20 ii SWaTReC 287.70 61 Cost of Package NCB 287.70 21 30 Rehabilitation of 14500.00 62 CRMC Km 0 to 60 63 Cost of Package NCB 14,500.00 64 22 31 Kerwan 370.9 65 Cost of Package NCB 370.90 23 30 Ambah Branch Canal 8671.00 Km 0 to 143.4 66 Slice No.2 67 Cost of Package ICB 8671.00 24 30 Morena Branch Canal 2943.00 Km 0 to 36.1 68 Slice No.4 69 Cost of Package ICB 2943.00 25 1 Distibutory of D-1 of 833.00 70 Harsi MC 71 Cost of Package NCB 833.00 26 30 Chambal Right Main 5300.00 Canal Km 60 to 93 72 Slice No. 1a 73 Cost of Package NCB 5300.00 27 30 Chambal Right Main 6394.00 Canal Km 93 to 160 74 Slice No. 1b 75 Cost of Package NCB 6394.00 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD 1 PROCUREMENT PLAN for Civil Works for 2007-08 2 COUNTRY: INDIA WB LOAN/ CREDIT No. IN-4750 3 State: Madhya Pradesh 4 DESCRIPTION OF Year-2007-08 Year 2008-09 WORKS S.No. JAN JAN FEB FEB APR OCT OCT DEC DEC MAY NOV MAY NOV AUG AUG MAR MAR JULY JULY SEPT SEPT JUNE JUNE Package APRIL AREA IN HECTARES CONTRACT CONTRACT METHOD OF AMT. in lakh Rs. lakh in AMT. 5 PROCUREMENT 6 28 1 Distibutory of D-15 A to 3,184.00 76 D-17 of Harsi MC 77 Cost of Package NCB 3,184.00 29 1 Distibutory of D-3 A of 1,722.00 78 Harsi Main Canal 79 Cost of Package NCB 1,722.00 30 B/6(AWater quality NCB 3784 enhancement Swarna 80 Rekha River 81 Cost of Package 3784 82 31 CB/ Jamwar Tank 76.10 83 9/3 Ghatera Pura Tank 163.80 84 4 Bardha Tank 89.30 85 Cost of Package NCB 329.20 86 32 35 Siloda 87 Cost of Package NCB 146.58 88 33 36 Morwan 89 Cost of Package NCB 597.54 90 34 37 Jajon 91 Cost of Package NCB 417.85 92 35 38 Koncha 93 39 Mola 94 Cost of Package NCB 1,410.24 95 36 40 Narayanpura 96 41 Baraitha Tank 97 42 Binaika Tank 98 43 Ramtoria Tank 99 44 Bamnora Tank 100 45 Dalipura Tank 101 46 Kirat Sagar 102 Cost of Package NCB 234.64 103 37 47 Tigoda Tank 104 Cost of Package NCB 30.39 105 38 48 Paniya Tank 106 49 Tank 107 Cost of Package NCB 35.30 108 39 50 Morpariya 109 51 Airora Tank 110 52 Chhutaki Tank 111 53 Gidwasan Tank 112 54 Bund ka Murraha A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD 1 PROCUREMENT PLAN for Civil Works for 2007-08 2 COUNTRY: INDIA WB LOAN/ CREDIT No. IN-4750 3 State: Madhya Pradesh 4 DESCRIPTION OF Year-2007-08 Year 2008-09 WORKS S.No. JAN JAN FEB FEB APR OCT OCT DEC DEC MAY NOV MAY NOV AUG AUG MAR MAR JULY JULY SEPT SEPT JUNE JUNE Package APRIL AREA IN HECTARES CONTRACT CONTRACT METHOD OF AMT. in lakh Rs. lakh in AMT. 5 PROCUREMENT 6 113 55 Kharon Tank 114 56 Para Tank (Puraniya) 115 57 Kudiyala Tank 116 58 Mamon Tank 117 59 Bilwari Tank 118 60 Bhitarwar 119 61 Shahpur Tank 120 62 Kandwa Tank 121 Cost of Package NCB 391.63 122 40 63 Pali Tank 123 64 Pabra Tank 124 Cost of Package NCB 88.52 125 TOTAL 64,109.17 126 100% INITIATE PREPARATION OF SPECIFICATIONS AND BID DOCUMENTS 900% CONSTRUCTION 25% COMPLETE 127 2 TRANSMIT SPECIFICATIONS AND BID DOCUMENTS TO IDA 10 CONSTRUCTION 50% COMPLETE 128 3 IDA CLEARANCE OF SPECIFICATION AND BID DOCUMENTS 11 CONSTRUCTION 75% COMPLETE 129 4 ISSUE INVITATION TO BID 12 CONSTRUCTION 100% COMPLETE 130 5 OPEN BIDS 131 6 TRANSMIT EVALUATION REPORT AND AWARD RECOMMENDATIONS TO IDA 132 7 IDA CLEARANCE OF RECOMMENDATIONS 133 8 AWARD CONTRACT PROCUREMENT PLAN FOR GOODS _Year 2007-08 MADHYA PRADESH WATER SECTOR RESTRUCTURING PROJECT (MPWSRP) WB LOAN No. 4750-IN Annexure - D

Description Estimate Prepared & Bids Contract Award decided

of of Works Invitation Opened on Evaluation Bank's No e No.

Packag (Date) (Date) and Objection completi on of Contrac of of Procure ment No Objectio n to Estimat ed Cost per as Cost table Method ICB/NC Esti mate Prep arati Appr oval from PICU (Dat Contrac t Packagi ng and Prepara Bank's Bidding Contrac signed t of Issue Work order Contrac t No. Contrac tors mobiliza tion Name National ** WBR No. Date t Expendi ture incurred to Date Sl.No. of of Conctra ctor/ 1 2 3 4 5 6a 6b 7 8 9 10 11 12 13 14 15 16 17 18 19 NIL *PP:Target dates agreed as per Procurement Plan R:Revision 1,2 etc. A:actual dates WBR No.: World Bank Reference Number ** Applicable in case of 'Prior Review' by Bank Note A For Colum 5, state ICB/NCB/Direct Contracting/Shopping as appropriate. For Colum Nos. 6 to 19 fill the information for all the three elements I.e. PP, R and A, as applicable, against each contract. B Prior review thresholds - US $ 500,000 equivalent and above for Consultancy. C * Works US '$ 10 million and above D In addition to above, office equipments, furniture HDPE Pipe, Farm equipment and material for demonstration etc., are also plan to be procured during the first eighteen months of the project. These items will be procured through de- POSITION OF DIFFERENT CONSULTANCIES UNDER MP WSRP EoI Short listing ToR RFP Technical Proposal & Evaluation Combined Evaluation Negotiated Document Date of Preparatio Total NOC Date of Consult Date to n to Basic Man - Date of Date of Date of from WB Date of sending Revised ancy Date of Date of Date to Date to Date to sent to Tech. NOC for Date of Negotiated S.N Cost in months NOC NOC NOC for Tech. & Combined notice to Agreement Name of Consultancies Cost in Period NOC EoI sent to sent to sent to shortlist proposal Tech. Opening of Document NOC from Remark o. Rs. of key Received received received minutes Fin. Evaluation successful signed Lakhs in from receivin WB for WB for WB for ed sent to WB Proposal Fin. and WB Lakhs personn from from from of pre- Proposal sent to WB consultant months WB g NOC NOC NOC consulta for NOC from WB Proposal sending to el WB WB WB proposal received s for nts WB for conferenc negotiation NOC e 1 2 345678910111213141516171819222324252627 28 1 Development of 330 1229 30 184 10.3.05 27.4.05 3.10.05 18.1.06 22.4.06 28.11.06 22.4.06/ 28.11.06 24.2.07 cleared 28.6.2007 13.08.07 07.08.08 20.08.08 29.08.08 30.08.08 11.09.08 Awaited Sustainable BP & DSS 10.11.06 by Bank

2 Implementation Support 225 1389 48 348 10.3.05 27.4.05 3.10.05 18.1.06 1.5.06 5.7.06 1.5.06 5.7.06 18.7.06 13.10.06 23.11.06 15.3.07 11.6.07/ 5.7.07 28.7.07 NOC NoC form bank is awaited. for Project Management 14.6.07( awaited M&L recd. date) from Bank 3 Institutional 800 1356 36 486 10.3.05 27.4.05 3.10.05 / 22.1.06 27.1.06 9.6.06 27.1.06 9.6.06 11.7.06 13.10.06 24.11.06 15.3.07& 11.6.07/ 5.7.07 4.8.07 12.09.07 sent to NOC from yes Agreement signed Strengthening 16.1.06 Revision 14.6.07( Bank WB recd on suggested recd. date) 29.10.07 05.11.07 by Bank 4 Enterprises IMS Design 300 1030 36 145 10.3.05 27.4.05 3.10.05 30.12.05 4.11.06 14.12.06 4.4.06 24.11.06 21.12.06 cleared 28.6.2007 08.10.07 07.02.08 14.02.08 14.02.08 17.03.08 / 30.06.08 10.07.08 12.08.08 Agreement signed & Implementation Corrected by Bank 21.05.08 Support sent on 4.11.06 5 Scheme Productivity 2180 2443 36 330 10.3.05 27.4.05 16.6.06 29.6.06 25.8.06 18.10.06 25.8.06 18.10.06 27.10.06 13.2.07 13.3.07 30.5.07/ 22.10.07 31.10.07 sent to bank sent 14.11.07 4.12.07 yes Agreement signed Improvement clarificatio n on 25.8.07 6 Assessment of Tourism 82.76 135 6 60 6.12.05 30.1.06 4.12.06 3.2.07 5.12.05 18.1.06 N/A N/A 19.2.07 Post 22.5.07 14.8.07 12.10.07 24.8.07 24.08.07 30.10.07 sent to bank NOC from yes Agreement signed Potential in Water review WB recd on Reservoirs 05.11.07 7 Sindh Basin Water 137.57 137.57 12 60 23.1.06 21.3.06 1.12.06 2.2.07 14.11.06 21.08.07 7.2.07 21.08.07 16.10.07 21.11.07 13.12.07 01.03.08 30.07.08 22.08.08 29.08.08 23.08.08 11.09.08 Awaited Technical Evaluation in progress Quality Enhancement / Project 19.10.07 8 Reservoir Fish 180 394 38 161 16.01.06 20.04.0 03.07.07 14.11.07 27.05.06 13.02.07 22.11.07 Comments on RFP received in hard Production Enhancement 7 copy from Bank. Fisheries.

9 Basic Training in 500 500 24 380 09.6.06 11.8.06 4.11.06 3.2.07 9.2.07/ 16.7.07 9.2.07/ 16.7.07 14.8.07 recd. And 4.12.07 04.04.08 25.07.08 21.08.08 22.08.08 29.08.08 11.09.08 Awaited Re-evaluation of DSS approved by E-in Computer Use Revised Revised sent to C level committee on 1.2.08. Case on on Consultant under Submission to WB 20.6.07 20.6.07 s 10 Capacity Building of GIS 360 360 22.01.08 28.02.0 Received EoI published and Remote Sensing 8 evaluatio Application: n on 22.09.08 11 Technical Examination of 200 3407 24 03.12.08 30.08.0 Short Work 8 listing is under scrutiny Total 5295.3 12380.6