www.energoprojekt.rs 60 YEARS OF SUCCESS

60 YEARS OF SUCCESS 1951-2011 CONTENTS Regarding the Jubilee 06 1951 - 1961 The First Steps 10 1961 - 1971 Development 18 1971 - 1981 Rise 26 1981 - 1991 Prosperity 36 1991 - 2001 Persistence 46 2001 - 2011 The New Millennium 56 The Power of Knowledge 66 1951-2011 60 YEARS OF SUCCESS

60 YEARS OF BUILDING

Inspiration for achieving of victorious goals in future derives from the rich history of Energoprojekt`s creations during its sixty years of existence.

Inspiration also derives from its employees: managers who led Energoprojekt and managed its projects; engineers who designed and built; economists who took care of economics and funding of projects and the company; lawyers who carried out all legal affairs and many technicians and skilled workers who turned all drafts and projects into significant facilities and landmarks at home and worldwide. Past shall not be forgot- ten, it shall be a signpost for the future.

Selected projects listed in this monograph are only a part of Energoprojekt `s creative past. Designed, built and equipped hydro and thermal power plants, dams, irrigation systems, tunnels, thousands of miles of transmission lines and hundreds of miles of highways, conference centres, ministerial complexes, hotels, hundreds of thousands square meters of office and residential buildings, as well as numerous industrial, public and infrastructural facilities at home and abroad, all this binds employees to continue the good work and further contribute to Energoprojekt`s success.

Founded on July 11, 1951, as a small bureau ‘Hidro-Termo Elektroprojekt’ for design of hydro and thermal power plants, it has evolved into a world renowned complex business system for design, consulting, engi- neering and construction of complex infrastructural and other capital projects, traditionally on lists of the world’s largest engineering and contracting companies. For years, revenue from projects abroad significantly exceeded the revenue at home. Its markets included the countries in , , and . Projects were realized in more than 70 countries. Through its local subsidiaries, joint venture companies worldwide, or direct contracting, Energoprojekt broadened its international business. It has its own compa- nies in the world financial centres of London, New York and Frankfurt. The sequence of tragic events that af- fected our country in the 90s slowed down, but did not stop further business development of Energoprojekt at new significant international markets.

06 | ENERGOPROJEKT 1951 - 2011 Years Prva poslovna zgrada Changes and transition in the new millennium resulted in a new ownershipE nestructure.rgoprojekta Various views and discussions of the management and shareholders about the future strategic direction and development of Energoprojekt, activated Serbian Government ownership rights, expressing its interest and positive support to Energoprojekt business.

Growth and development of Energoprojekt in the following decades shall be based on teamwork of ambi- tious, professional and managerial resources, securing of prerequisites for employing and further develop- ment of young specialists, capable to apply the latest know-how and technology and continue building further the name of Energoprojekt and ensure its results, locally and internationally, for the benefit of em- ployees, shareholders, investors and local communities.

Whether the name of Energoprojekt shall build further within the existing ownership structure, or there shall be proprietary or business connections with reputable international companies and investors, this shall depend on market demand and investors, as well as expectations of shareholders and employees of Ener- goprojekt.

Celebrating the sixtieth anniversary of Energoprojekt, current management undertakes to lead Energopro- jekt returning to traditional values presented in this monograph.

Vladimir Milovanović CEO

07

1951-1961 Thet First S eps 1951-1961 ENERGOPROJEKT

THE FIRST STEPS

‘Hidro-Termo Elektroprojekt’ company was founded following the decision by the government of the National Republic of Ser- bia from July 11, 1951, and its first General Manager was Živko Mučalov.

10 | ENERGOPROJEKT 1951 - 2011 Years THE FIRST ENERGOPROJEKT OFFICE BUILDING

After working in several office buildings in (4 Nušićeva St., 25 Brankova St., 2 Carice Milice St.), in 1958 Energo- projekt designed and built its own of- fice building (18 Zeleni venac), which it used for 25 years.

Author of the ten-storey modern build- ing project, Milica Šterić, was awarded the July 7th Prize for this project (1960).

Years | ENERGOPROJEKT 1951 - 2011 | 11 12

1951 1951-1961 | ENERGOPROJEKT 1951-2011 |ENERGOPROJEKT troprojekt Termoelek- and Hidroelektroprojekt companies: two of merge a through plants, power and thermal hydro, of designfor NRS of bureaudesign a as NR of government the of sion deci- upon founded was company ‘HIDRO-TERMO ELEKTROPROJEKT’ ings were designed, too. build- public and facilities,schools plants,medical facilities.Industrial buildings,halls,ancillary machine tor: sec- architectural-construction the by designed structures high-rise of series a included Poweralso projects major citiesinSerbia. ’Viskoza’,and LoznicaAccording (1958). in wereintooperation Energoprojekttosubstationsdesigns, put 15 Mihalj’,(1953) ’Servo Zrenjanin plants power (1961), II and I Kosovo (1956), Kolubara (1951), Kostolac Veliki the In first decade Energoprojekt designed and put into operation first power and heating plants, as follows: border, Djerdap I(IronGate). includingHPP Bulgarian to Romanian from Danube the waterof using for solutions basic of (1954) initiated was Study Bistrica(1960), thefirstunitofHPP ontheriver Uvac, was putinto operation (1960). Perućica, HPP (1957), Macedonia dam, Mavrovo (1958), IV - I Vrla HPP continued: projects power larger complexand increasingly on work while (1952), Sapunčica (1952), Seljašnicalovica (1951), Soko- began: hydroplants powersmall of commissioning and WesternDesigning Danube... Morava,the and Southern the Lim, the Drina, the analysed: were Serbia in waterways major following the of Basins plants. power thermal and hydro of design with entrusted immediately was plan, five-year second its of verge the pany, whose activity was closely linked with the most urgent needs of the com- post-war new ,TheEnergoprojekt. to which was renamed on was company the employees, the of decision later,upon year A Draft solutionfor Draft HPPDjerdap I TPP Veliki Kostolac HPP Sapunčica HPP Seljašnica HPP Sokolovica power plants: Designed hydro andthermal At its 3 its At 1952 Energoprojekt changed nameofthecompany to Years rd meeting the works council works the meeting

1953 P Zonk te ie Dia con- crete Drina, dam,h=41m,4x24MW river the Zvornik, HPP HPPZvornik

1954 lns Vlk Ksoa, ooo I, Kosovo Kosovo IIandKolubara Kostolac, Veliki power plants: thermal first the operation into put and designed ergoprojekt In the first decade of its existence En-

1955 earth-fill dam,h=62m earth-fill Mavrovo dam,theriver Radika, HPP Vrla III,theriver Vrla 1956 HPP Vrla III,theriver Vrla ing 25 years. Author of the ten-storey modern building project, Milica Šterić, was awarded the July 7 July the awardedwas Šterić, Milica project, building modern ten-storey the of Authoryears. 25 ing 1958 Energoprojekt office building in was St.), designed Milice and built2 Carice (18 Zeleni venac) St., which Brankova it 25 occupied St., for the Nušiceva follow- (4 Belgrade in buildings office several in working After (1960). HPP Gujranwal (1959), reconstruction of the dam Bund (1959), Muradarranging Khan River the basin Gomal (1954), use of the Euphrates` water (1957), HPP Yarmouk (1960); Pakistan - arranging the river Kunhar (1958), basin river Oronte - Syria (1959); Blauca HPP regulation(1957), supply - Tripoliwater waterLebanon (1953); Arna - river the Greece of (1953); dam Kemer the with Askay river the - Turkey (1959); regions Deyndabo Promothe of Falam and HPP irrigation - (1957), Burma Mindat river(1952); HPP Juan (1956), Argentina San - atExperience gainedinprojects homemadeprofessional basisfor firstbusinesssteps abroad: for (1960). thisproject

1957 HPP Vrla II,theriver Vrla

1958 earth-fill dam,h=42m,2x51.3MW earth-fill theriverHPP Bistrica, Uvac fill dam,h=42m,3MW HPP Perućica, theriver Zeta, earth- Power plant ’Viskoza’, Loznica HPP Vrla IV, theriver Vrla Finansijski Uzbekistana centar Asocijacije banaka Years 1951-2011| |ENERGOPROJEKT

1959 5 Zeleni venac, Belgrade Energoprojekt office building th Prize 13 1960 Markets of the following countries were being won: India, Iran, Tunisia, Togo... These are the first of more than 70 countries where Energoprojekt operated during these 60 years.

HPP Bajina Bašta – perspective Group of experts employed in Energoprojekt in 1951

HPP Vrla II

14 | ENERGOPROJEKT 1951 - 2011 Years TPP Kolubara (1956)

In the first decade Energoprojekt designed and put into operation first thermal power plants: Veliki Kostolac (1951), Kolubara (1956), Kosovo I and II (1961)...

Years | ENERGOPROJEKT 1951 - 2011 | 15

1961-1971 Development 1961-1971 ENERGOPROJEKT

DEVELOPMENT

Energoprojekt strongly expands its business, signing con- tracts at new markets. Contracts for design of industrial fa- cilities at home and abroad were signed, and even some con- struction and commissioning contracts.

The following factories were built: factory for agricultural machines ’Zmaj’ in Belgrade (1963); abattoirs (slaughterhouses) and cold-storage buildings in Mali (1964), (1966), Liberia (1969), Tunisia; spinning and weaving plants and leather factories in (1965-1967); fruit processing factory Grocka (1966), gold- smith and flotation Bor (1970)... Investment programs, preliminary and general designs of processes and plants were done for industrial facilities in Serbia, Macedonia and Bosnia and Herzegovina.

Projects became more complex and together with design, construction began of the first hydropower facilities abroad. To solve engineering and technical problems, Energoprojekt purchased its first computer, ELLIOT 803 B (1962). Computer centre became the germ for strong computing business which was developed in the following decades.

HPP Kpime, Togo was the first engineering work of Energoprojekt abroad and it included research, construc- tion, delivery and installation of equipment (1963).

In Serbia, according to Energoprojekt`s designs, hydro power plants Kokin Brod (1962), Bajina Bašta (1966) and Potpeć (1963) were built and put into operation.

18 | ENERGOPROJEKT 1951 - 2011 Years HYDRO POWER PLANT KPIME, TOGO

HPP Kpime, Togo was the first Energoprojekt`s engineering work abroad, and it included research, de- sign, construction, delivery and install- ing of equipment (1963).

HYDRO POWER PLANT DJERDAP I (IRON GATE I)

According to the joint project of Energoprojekt and Romanian companies, the grandiose hydropower and navigation system Djerdap I was built on the river Danube. It consisted of two navigation locks, each 310m long, a power plant with installed capacity of 2,100MW with 12 generators of 178MW individual power, a concrete 59m high dam and 14 spillways.

Years | ENERGOPROJEKT 1951 - 2011 | 19 20 1961-1971

| ENERGOPROJEKT 1951-2011 |ENERGOPROJEKT 1961 Lebanon Kadischa, river the II, Blauca Tunnel developed inthefollowing decades which business computing strong for germ Com- the became centre (1962). puting B 803 ELLIOT puter, com- first its installed Energoprojekt ences. Sci- and AcademyArts of Serbian the of member full power plants, elected thermal was Serbian of designer and creatorSavić, Dimitrije expert, Our (1970). IV and III Kosovo (1969), Obrenovac (1968), Morava (1967), II Kostolac Serbia: of system power electric the to connected and designed were plants power thermal New 3,608MW,of 15,769GWh. approximateof capacity the installed production totaland annual with operation, According to Energoprojekt`s designs, in the firsttwo decades 27 hydropower plants were built and put into power of900MW(1971). In , Energoprojekt built and put into operation the first phase of HPPKafue Gorge, with total installed 59 mhighdamand14spillways. Damwas madeontheriver Danube. power,individual concrete MW 178 of generators 12 MW,with 2,100 of capacity installed with plant power gation system Djerdap I was built on the river Danube. consistedIt of two navigation locks, each 310 m long, According to a joint project of Energoprojekt and Romanian companies, the grandiose hydropower and navi- Lebanon,In hydro BlaucaIIwas project realized (1962). Design and supervision was done for construction of dams in Macedonia: Globočica (1965) and Tikveš (1968). Chutes-Conakry, (1965);HPPKirirom-Pnom Phen, Cambodia (1967). commis- and built were lines sioned: HPP transmissionKpime-Palime, Togo of (1963); electrification ofSevala andMaskala cities, Mali (1964); miles HPP Grandes of thousands designs, Energoprojekt`s to According (1970). Egypt in Mullak El SS (1970), Guinea in Motato SS (1967), Cambodia in Phen Pnom SS in TogoLome(1963), SS countries: other and Serbia in operationinto wereput stations distribution and substations of number A and steel works Skopje, Macedonia(1967),Oilrefinery Pančevo (1968)... Iron operation: into put were plants power industrial more (1966), Belgrade New plant heating the Beside TPPMorava

dams, h=15m,16m,22m,364MW HPP Perućaca the river Zeta, earth-fill 1962 Years

1963 TPPKosovo A crete dam,h=14m Togo,Aka, river con- the Kpime, HPP

1964 eign company in Zambia, foundedthe first Energoprojekt`s for- was company ZECCO Guinea, 2x50MW Samu, river Chutes,the Grandes HPP search anddesign, theworks began re- of years ten after – Djerdap HPP

1965 3x38.5MW Heating plant NewBelgrade, 1966 flag red a with Order Work the with jekt Energopro- decoratedPresident Tito tober Prize ofBelgrade by thecity Oc- the awarded was Energoprojekt pensable and important part ofEnergoprojekt`s history. part andimportant pensable company for urban planning and architecture was founded in the same country (1966). Zambia became an indis- UNICO, construction. and design for company foreign Energoprojekt first the wasZECCO, (1965) ZambiaLusaca, venture companies. joint and own its offices, representativeforeign its opened Energoprojekt markets, world toward Oriented systems wereIrrigation Macedonia,Morocco, built inSerbia, Syria, Algeria, Burma, andCyprus. TPP Kirirom, Cambodia TPPKirirom, TPP Kosovo B

1967 2x210 MW A, Tesla Nikola TPP on began Works TPP Kostolac II,1x100MW HPP Mratinje, 2x108MWand Designing beganof

1968 production TPP Morava 1x125MW, beganits Gorqe Zambia Contract was signed for HPPKafue, complex ’Kosovo’, 1x25+1x16MW Power plant oftheminingandsteel 18.5 t/h Power plant ’Zorka’ Šabac, 1x6MW, TPP Nikola TPPNikola Tesla Finansijski Uzbekistana centar Asocijacije banaka Years 1951-2011| |ENERGOPROJEKT

1969 ished in Lusaka, Zambia(230,000m ished inLusaka, Conference Halland62villaswere fin- TPP Kosovo IIIandIV2x200MW TPP Nikola Tesla A,2x210MW; intoIncluded thepower system: 2 ) 21 1970 Energoprojekt`s experts also designed water supply systems, sewage systems, irrigation and hydro-melio- ration systems. Irrigation projects were realized in Tikveš, Macedonia (1968); irrigation system with the Po- lemidhia dam in (1969); hydro- melioration of the Tafilalet region in Morocco (1970); irrigation project with the Kalimanci dam in Macedonia (1970). Designs were made for the hydro-melioration system in Burma, North Nawin (1971); Ibar-Lepenac in Serbia (1971); irrigation and drainage system Large Perimeters in Algeria (1971); El Mullak in Egypt (1971)...

Energoprojekt - Urban Planning and Architecture designed numerous public, business and residential build- ings at home, such as the Panorama Hotel on Zlatar, Park in Budva, Djerdap in , Croatia in Cavtat, mo- tels in Vranje, Ovčar banja, Vlasina... Energoprojekt realized architectural and construction projects in Guinea, and Kuwait. Energoprojekt`s joint venture companies built numerous projects in Zambia: in Lusaka, Kafue, Ndola, Kitve.

For the III Non-Aligned Conference in Lusaka (1970), Energoprojekt realized a true constructional achievement. In just 107 days it designed and built the Conference Hall Mulungushi and 62 villas, a total of 230,000 m2

Cooperation with international banks and financial institutions was improved by establishment of Energoprojekt`s companies in the world business centres: INEC in London (1967), Energoprojekt Inc. in New York (1970) and ENCOM in Frankfurt (1971). At the end of this decade, 35 foreign entities of Energoprojekt were operating around the world.

HPP Mratinje HPP Kirirom, Cambodia

Croatia Hotel in Cavtat

22 | ENERGOPROJEKT 1951 - 2011 Years Conference Hall Mulungushi (1970)

For the III Non-Aligned Countries Conference in Lusaka, Zambia (1970), Energoprojekt realized a true con- struction achievement. The Conference Hall Mulungushi and 62 villas, a total of 230,000 m2, were designed and built in just 107 days

Years | ENERGOPROJEKT 1951 - 2011 | 23

1971-1981 Rise 1971-1981 ENERGOPROJEKT RISE For 20 years of successful management, Živko Mučalov, Energoprojekt`s General Manager, received the AVNOJ award, the most significant Yugoslav award (1972).

Designer of HPP Djerdap, Vukadin Djordjević, was the second expert in Energoprojekt, following arch. Milica Šterić, who won the most significant award in Serbia, the July th7 award (1973).

Business expansion of Energoprojekt continued. The following hydro power plants were built and commis- sioned: Donkea in Guinea (1971); Baoli II in the Central African Republic (1976); Bayano in Panama, with a 72m high concrete dam and installed capacity of 300 MW (1976); Sigalda in Iceland, with the installed capac- ity of 3x51.5 MW (1977). In Zambia, HE Kariba, with the installed capacity of 4x150 MW and the second phase of HPP Kafue Gorge (1977) were built and put into operation. Both power plants had the installed capacity of 1,600 MW. Works on phase I of the complex irrigation system Chira–Piura (1978) were completed and contract for phase II was signed.

The Financial Times stated that Energoprojekt, according to the International Bank for Reconstruction and Development, was one of the top ten construction companies of the world. Journalists from Panama elected Energoprojekt as ’a foreign company of the year’, for the project HPP Bayano (the most significant facility of this country after the Panama Canal).

26 | ENERGOPROJEKT 1951 - 2011 Years HPP BAYANO, PANAMA

The Financial Times stated that Energo- projekt, according to the International Bank for Reconstruction and Develop- ment, was one of the top ten construc- tion companies of the world. Journal- ists of Panama elected Energoprojekt as ’a foreign company of the year’ for the project HPP Bayano (the most sig- nificant facility of this country after the Panama Canal).

HPP MRATINJE IRRIGATION SYSTEM CHIRA - PIURA, MONTENEGRO Peru

During this decade, Energoprojekt designed and put into Works on phase I of the complex irrigation system Chira-Piura operation HPP Mratinje in Montenegro, with a 220 m high were completed and contract for phase II was signed (1978) concrete arch dam (1976)

Years | ENERGOPROJEKT 1951 - 2011 | 27 28 1971-1981

| ENERGOPROJEKT 1951-2011 |ENERGOPROJEKT 1971 (November 1970–May 1971) m 13,000 , Kampala, in built were hotel a and centre Conference tion system Chira-Piura, phase I irriga- the for signed was Contract unit putinto operation thefirst MW, 900 m, h=44 dam, fill earth- river, Kafue Gorge, Kafue HPP 1981 construction beganof oneofthelargest1981 construction Energoprojekt projects, construction ‘202 C’. gion in Libya (1977). In Nigeria, works began on the irrigation systems Yola (1977) and (1978). Kano In , in re- Garabuli semi-desert the of ha 32,000 of irrigation forprovidedwater and built were farms 1,050 (1973). Nakuru and Nairobi of cities the for supplies water and city the forThika built was system sewage Kenya, In in Aslantas HPP Turkey ofthree ofconstruction area damsintheGarabuli inLibya (1974). andsupervision of construction for services consulting full for signed was Contract (1976). Iraq in Hemrin Thefollowing hydro power plantswere designed:Koukou Tamba(1975), Gabon in Ngouni (1973), Guinea in plants made almost 40% of the Serbian electric power industry`s installedcapacity. power electric industry`s plants madealmost40%oftheSerbian Together,MW. both 1,240 B TeslaNikola TPP and MW, 1,650 of capacity installed total a has A TeslaNikola TPP V & VI (1979). Contract was signed for TPP Kostolac B (Drmno), with the power capacity of 2x348.5 MW (1980). power plant units were put into operation: Kosovo A – unit V (1975), Nikola Tesla A – units III and IV (1976) and Thermal power plant was built in Zanzur, Libya, with power capacity of 230 MW (1975). At home, new thermal dam (1976). During this decade, Energoprojekt designed and put into operation HPP Mratinje, with a 220 m high concrete arch Ibar-Lepenac system (1980). HPP as well as Zavojdesigned, (1978). Second phase were of the hydro (1978) system Vlasina was finishedBarje (1978); tunnelMiladin wasand cut through in the (1974) Ćelije Bovan, Accumulations (1973). pumped-storage Bašta and Bajina (1972) plant Sjenica HPP (1971), II Djerdap system navigation and hydropower the for tracted Ibar-LepenacFirstthe (1972). in were projectsdam began con-system Gazivode of construction Serbia, In (1972). The HPPĐerdap most important Energoprojekt`s project, HPP Djerdap I, was put into regular operation and production, production, and operation regular into put was I, Djerdap HPP project, Energoprojekt`s important most

2

in Dnb rvr cnrt dam, h=59 m,12x175MW concrete river, Danube tion, opera- into put was I Djerdap HPP 260 MW, Zanzur, Libya West, Tripoli TPP on started Works 1972 Years

1973 bezi river, 4x150MW, Zambia Zam- Kariba, HPP on started Works 300 MW, Panama Works onHPPBayano, started 1973) 1972–May (June ’Pionir’ Hall Sports

1974 the beginning ofworks Lagos, in Fair Trade International TPP Tripoli West, Libya, completed TPP Kosovo V, 1x200MW

1975 300 MW, Panama m, h=72 dam, concreteBayano, HPP African Republic Central Mbaldi, river the II, Boali HPP 150 MW, Iceland m, h=50 dam, earth-fill Sigalda, HPP concrete dam, h=220m,3x114MW river, Piva Mratinje, HPP Completed: 1976 Lagos, a complex of 19 ministries, with an area of 270,000 m tion projects of Nigeria followed. ofNigeria tion projects Electrification of 60 towns inNigeria ended with a total length of lines 1,000km (1975), while new electrifica- public buildings in Dschuba, Sudan (1973); Trade Fair in Lagos with the area of 110,000 m 110,000 of area the with Lagos in FairTrade(1973); Sudan Dschuba, in buildings public several (1973); headquarters Bank and (1971) Uganda Kampala, in Countries African of Organization the of Energoprojekt designed and (or) built significant architectural structures: Conference Centre for the meeting area of 65,000 m Al Khulafa block in Baghdad, Iraq (1980); ophthalmological clinic in Kaduna, Nigeria (1981). Nigeria blockinBaghdad, (1980);ophthalmologicalAl Khulafa Iraq clinicinKaduna, Ministerial Complex, Ministerial Kuwait Trade Fair inLagos 2 , Nigeria (1976); Conference Centre in Libreville, Gabon (1977); buildings of two ministries in

1977 tion system Kano, Nigeria irriga- the for signed was Contract wasgeria, finished Ni- Lagos, in FairTrade International er, concrete dam,600MW pumped-storage riv- Drina started, of Bašta Bajina plant project The from 123 stations. pumping by supplied wasirrigation turalfarms,completed.was Water for agricul- 1,050 of equipping and tion 32,000 ha of desert land and construc- Garabuli–project for improvement of Gorge, Kafue Zambia, was putinto operation HPP of Unit last The

1978 Chira-Piura -phaseII project oftheirrigation construction Contract was signed for design and was completed First Chira-Piura phaseof theproject plex began inKuwait (270,000m com- of19ministries` Construction

Conference Centre and a Hotel, Uganda Kampala, 2 in Kuwait (1978); residential and administrative Finansijski Uzbekistana centar Asocijacije banaka Years 1951-2011| |ENERGOPROJEKT 2 ) 1979 in Banjabegan Višnjička ofresidentialConstruction buildings 2x348MW lac B(Drmno), Contract was siugned for TPP Kosto- 2 and exhibition and 29 1980 Sports Hall ’Pionir’ (1973), Belgrade

At home, among others, the following was designed and constructed: Sports Hall ’Pionir’, Belgrade (1973); repair institute ’Jastreb’ in Batajnica; 1,000 apartments in Nova Galenika, Belgrade (1976). Construction of a housing project began in Višnjička Banja in Belgrade, with a total of 1,054 apartments (1979).

Ice Hall of the Sports Hall ’Pionir’ Housing Project Višnjička Banja

Industrial facilities were designed: cement factory in Tanzania (1974); iron and steel works in Zambia (1976); ferronickel smelter in Glogovac, Serbia (1979); ceramic tiles factory ’Kerub’ at Ub, was designed and built (1978)...

Energoprojekt purchased (1972) one of the biggest computers in the country, UNIVAC 1106, thus greatly improving its IT business. Up-to-date methods are used in the field of technical projects and analyses, simulation, production planning and programming, automation of monitoring financial and business resources, banking...

30 | ENERGOPROJEKT 1951 - 2011 Years TPP Nikola Tesla A

TPP Nikola Tesla A has total installed capacity of 1,650 MW, and TPP Nikola Tesla B 1,240 MW. Together, both plants made almost 40% of Serbian electric power industry`s installed capacity.

TPP Nikola Tesla A TPP Nikola Tesla B

Years | ENERGOPROJEKT 1951 - 2011 | 31 In addition to IT services necessary for Energoprojekt`s business systems, computer engineering was greatly growing, with delivery of hardware and software to users in all Yugoslav republics. First computer services were rendered abroad for hardware and software support to execution of Energoprojekt`s projects: Al Khu- lafa, Baghdad in Iraq (1980), Chira-Piura in Peru (1980), 202C in Iraq (1981).

On the list of the American magazine Engineering News Report (ENR), in 1979, Energoprojekt was at the high 20th position among 200 largest engineering companies of the world. Since then it has been in the group of the largest, both in contracting and consulting.

Conference Centre, Libreville, Gabon

Ministerial complex, Kuwait

32 | ENERGOPROJEKT 1951 - 2011 Years TPP Tripoli-West, Libya

Tunnel Karaburma, Belgrade HPP Sigalda, Island

Years | ENERGOPROJEKT 1951 - 2011 | 33

1981-1991 Pros perity 1981-1991 ENERGOPROJEKT

PROSPERITY

Energoprojekt was one of the most important Yugoslav ex- porters of equipment and materials. In total export of con- struction works Energoprojekt participated with more than 30%.

Activities in the oil-exporting countries intensified: Iraq, Kuwait, Iran, Libya, Nigeria. Design and supervi- sion was performed for construction of large dams on the Tigris and Euphrates rivers in Iraq: Hemrin (1981), Haditha (1989), Badush I and II and HPP Bekhme on the river Great Zaab, with an earth-fill dam 230 m high (1989-1991). In a consortium with three Swiss firms, Energoprojekt signed a contract for construction man- agement of the huge Mosul dam (1990). Kiri dam in Nigeria (1984) and Kiambere dam in Kenya (1987) were built, too

At home, according to Energoprojekt`s designs, construction of the pumped-storage plant Bajina Bašta (1982), HPP Djerdap II (1984) and HPP Zavoj (1990) was completed.

HPP Bajina Bašta HPP Djerdap

36 | ENERGOPROJEKT 1951 - 2011 Years MOSUL DAM, IRAQ

In a consortium with three Swiss firms, Energoprojekt signed a contract for construction management of the huge Mosul dam (1990).

01 02

03 04

ACCORDING TO ENERGOPROJEKT`S DESIGNS THE FOLLOWING WERE PUT INTO OPERATION:

1) two units of TPP Pljevlja (2x339 MW) in Montenegro (1982) 2) two units of TPP Nikola Tesla B, total power 620 MW (1983 and 1985) 3) two units of TTP Kosovo B (1983 and 1984) 4) two units of TPP Kostolac B, 348.5 MW each (1987 and 1991)

Years | ENERGOPROJEKT 1951 - 2011 | 37 38 1981-1991

| ENERGOPROJEKT 1951-2011 |ENERGOPROJEKT 1981 The tunnel Vračar was cutthrough osrcin ea o te Naval the Academy, of100,000m of began Construction was finished Nigeria Yolain system irrigation The wait was completed Ku- in ministries 19 of complex The Baghdad, Iraq residential- the in administrative Khulafa complexAl on began Works slavia (1986). On thelistofENRmagazine,slavia (1986).On Energoprojekt was the 13 (1987). Belgrade in Energoprojekt`stopexperts. constructed of wereworkand Three substationsdesigned of years At home, second phase of the Yugoslav transmission network was put into operation (1984), the result of ten built in Togo, and Nigeria Thailand (1990). and designed were lines Power 1988). and (1986 completed were Panama of electrification of stages Two Celebrating its 35 its Celebrating 348,5 MW each (1987 and 1991). with total power of 620 MW (1983 and 1985), two units of TPP Kosovo B (1983 and 1984), two unitswere put intoof operation: TPP Kostolactwo units (2x210 B,ofTPP MW) Pljevlja inMontenegro (1982), two units ofTPP Nikola Tesla B accordinghome,Energoprojekt(1989-1991)AtIraqbuilt.todesigned andwasinShemaldesigns, facilities Al TPP levels, at depthof40m(1989). four in built was station The junction. railway Belgrade the of facility important most the spomenik’began, gest hydro-technical tunnels in Europe (1989). In Belgrade, works on the underground railway station ‘Vukov lon- the of one Zavoj, tunnel the and (1987) tube left Karaburma, (1981); Vračarthrough: cut wereTunnels ontheriverbridge Muar, andtheroad Portal inUganda(1991). Mityana-Fort long m 334 the and overpasses 12 with (1989) Malaysia in built was Lumpur-Singapore Kuala highway The (1989). Cyprus, In phase. third water system transport was designed (1987). Contract wasthe signed for the navigation lock Al Nasiriyah in Iraq for signed was contract and completed was (1985) Peru in Chira-Piura system irrigation the of phase second constructed; and designed was (1984) Iraq in Jassan Badra system Irrigation Irrigation System Irrigation Badra JassaninIraq 2 , inLibya th anniversary, Energoprojekt was awarded the AVNOJ prize, the greatest recognition in Yugo- in recognition greatest the prize,AVNOJ the awarded was Energoprojekt anniversary, Designing ofHPP Djerdap IIbegan Energoprojekt and moved there completed The new Head Office building Office m Head (50,000 new The 1982 Years 2 i Nw egae was Belgrade New in )

1983 work (380 kV) work was (380 put kV) into operation net- Yugoslav electrical high-voltage put into operation was B Tesla Nikola TPP of unit One put into operation was B Kosovo TPP of unit One th designcompany oftheworld (1988).

1984 Hospital inKuwait Contract was signed for theMilitary was completedIraq system BadraIrrigation Jassanin Iraq, was completed inBaghdad,The Al project Khulafa

1985 was finished The Naval Academy in Tripoli, Libya, long Malaysia, 56km Ayerthe section Keroh-Pagoh in highway Kuala Lumpur-Singapore, worksConstruction beganonthe Hotel inZimbabwe, were completed Conference Centre andSheraton 1986 ‘202 C’ (1984), ‘1050’ (1989)and ‘1100’ (1991). In Iraq, special-purpose complexes were designed and built: a giant project worth more than USD 500 million Ferronickel smeltingcomplex in Glogovac inKosovo was completed (1981). inKalush,Ukraine ofthewallpaper (1991). struction factory ecution of complex works on four facilities of the agricultural-industrial combine Kuban in Russia (1989) and con- ex- Union: Soviet the of market the at projects first for signed were Contractscontinued. industry the in Activities of theBelgrade railway junction. The station was builtinfour levels at depthof40m(1989). undergroundrailwaystationthe on facility Belgrade,works In spomenik’important most ‘Vukov the began, Underground Railway Station ‘Vukov Spomenik’

1987 Uganda Portal, Mityana-Fort road the construc-of tion for signed was Contract pleted com- was Kuwait in Hospital Military was put into operation (Drmno) B Kostolac TPP of unit One

1988 nels inEurope of thelongesthydro-technical tun- Tunnel Zavoj was cutthrough, one seats) inMalaysia was completed stadiumShahAlam (71,300 Sports Energoprojekt isthe13 company oftheworld th top design Years 1951-2011| |ENERGOPROJEKT

1989 Straževica at Belgrade bypass began ofthetunnel Construction Malaysia was completed ofthehighwayConstruction in HPP Zavoj was putinto operation spomenik’‘Vukov began worksConstruction for thestation 39 1990 Residential-administrative complex Al Khulafa Agricultural-industrial complex Kuban, Russia

The following facilities are built: Sports stadium Shah Alam in Malaysia (1985), Naval Academy, complex of buildings of 100,000 m2 in Tripoli, Libya (1986), military hospital in Kuwait (1987), building of the Central Bank of Iraq (1989), building of ZANU party in , (1990). According to its own projects, Energopro- jekt builds two complexes of recognizable architecture - the residential-administrative complex Al Khulafa in Baghdad (1984) and the Congress Centre with the Sheraton Hotel in Harare (1985).

Energoprojekt designed and built its new head-office building of 50,0002 m (1982) which it occupies today. For this project, the author, architect Aleksandar Keković, was awarded the Borba Prize for architecture. For the Hyatt Hotel in Belgrade, some design and finishing works were done, and expert assistance was rendered in organization and coordination.

In this decade Energoprojekt`s IT business was intensely developing. Energoprojekt installed a new com- puter, Sperry 1170. It spread its business at the then Yugoslav market which was automating banks, post offices and large systems. Energoprojekt became a leader in implementation of large computer networks. Hardware and software of the world’s leading IT companies were delivered. Its own line of TIM computers was developed and produced to automate businesses of post offices and banks. Software was developed to meet the needs of large business systems, while foreign software was customized to domestic market`s work conditions. Support centres were formed in all major cities of the Yugoslav republics.

Some of the clients at home were: Jugobanka, Belgrade, with over 100 branch offices and 300 workstations and SW for business (1981); Privredna banka, Sarajevo (1984); JIK banka, Belgrade (1984); Serbian Post Office, Belgrade, a network of 25 regional centres, 100 post offices and over 700 workstations with SW (1981); Tito- gradska banka, Titograd, Montenegro (1985); Montenegro Post Office, Titograd, with more than 250 comput- ers and SW for business (1986)... Computer centres were formed and IT support for Energoprojekt projects continued abroad: Badra Jassan in Iraq (1982), Kiambere in Kenya (1985), in Panama (1986)... Its own IT proj- ects were done in Iraq, Bulgaria, Turkey, Hungary

40 | ENERGOPROJEKT 1951 - 2011 Years Hotel Hyatt, Belgrade (1990)

For the Hyatt Hotel in Belgrade, some design and finishing works were done, and expert assistance was pro- vided in organization and coordination.

Highway Kuala Lumpur – Singapore

The highway Kuala Lumpur-Singapore was built in Malaysia (1989), with 12 overpasses and 334 m long bridge on the river Muar.

Years | ENERGOPROJEKT 1951 - 2011 | 41 Congress Centre and Sheraton Hotel, Harare, Zimbabwe

42 | ENERGOPROJEKT 1951 - 2011 Years Naval Academy Complex of buildings of 100.000 m2, Tripoli, Libya

Years | ENERGOPROJEKT 1951 - 2011 | 43

1991-2001 Persistence 1991-2001 ENERGOPROJEKT

PERSISTENCE

At the beginning of the decade Energoprojekt carried out or- ganizational and ownership transformation. Energoprojekt was the first major company in the country whose majority of the ownership share belonged to employees and retirees (1991).

Despite the extremely difficult operating conditions caused by the war and disintegration of Yugoslavia and the UN sanctions, Energoprojekt preserved its international markets and won new ones.

Contracts were arranged and carried out for power and hydro-technical facilities:

Yurakmayo dam in Peru, the Andes, at the altitude of 3,500 m (1995); HPP Tis Abay, Ethiopia (1997); HPP Han Tuam in Vietnam (1998). Rain drains were constructed in Argentina (1998). Sullana dam in Peru was com- pleted within the framework of the irrigation system Chira-Piura III (1997). In Serbia, Rovni dam was designed and the works began.

Yurakmayo Dam, Peru HPP Tis Abay , Ethiopia

46 | ENERGOPROJEKT 1951 - 2011 Years ROVNI DAM

In Serbia, Rovni dam in Jablanica was designed and works began. The reservoir of the Rovni dam was to supply drinking water to municipalities of: Valjevo, Laza- revac, Lajkovac, Mionica and Ub, and the cogeneration plant ’Kolubara’ with tech- nical water.

Dam height: 75 m Surface of the reservoir: 2.4 km2

CEREMONIAL OPENING OF THE RAILWAY STATION ‘VUKOV SPOMENIK’, BELGRADE (1995) Platform surface of 2,500 m2 at depth of 40m. Sloping tunnel with three escalators, 7.5 m in diameter, 65 m length and the angle of 30 degrees. Entrance hall on three levels, with the total area of 4,735 m2.

Years | ENERGOPROJEKT 1951 - 2011 | 47 560 km of transmission lines and 36 substations were built in Sri Lanka (1991). The same year Energoprojekt won a new market – , signing a contract for consulting services for phase IV of the electricity transmis- sion system development project, and in , a joint venture consulting company was founded (1997). More projects were done in Nigeria, three substations and underground cable in Abuja, as well as transmis- sion line HPP Shiroro - Abuja (2001).

Potable and waste water treatment plants were designed and built in Belgrade, Valjevo, Kragujevac, Arandjelovac, Zaječar, Milanovac, Jagodina...

Congress Centre in Accra, Ghana (1991)

Energoprojekt was increasingly building in the field of transportation infrastructure. City roads were built in Tariha in Bolivia (1991), the highway Butterworth Bukit Tambun in Malaysia (1994), roads: Ilo-Desaguardero at the al- titude of 4,500m and La Mersed-Satipo in Peru (1998). Reconstruction began of 166 km of the road section Alma Ata-Astana, (2001). In Serbia, works began on the tunnel Straževica within the framework of the Bel- grade bypass project (1991), and on the railway station Prokop (1996). Right tube of the Karaburma tunnel was completed (1998).

Biscuit factory, Tyumen (1993) and chemical complex, Kirishi (1998) were built in Russia. More production facilities were designed for Hemofarm, Galenika, Banat...

1991-2001

1992 1994

Congress Centre was opened in Ac- Contract was signed for construction Belgrade Arena in block 25 – raising In July 1995, the underground cra of the Rovni dam of the roof structure (two weeks), railway station ‘Vukov spomenik’ in considered as a civil engineering Belgrade was opened

1991 Consortium Energoprojekt-Napred 1993 event of the season 1995 (EPNA) was formed for construction In block 12, , the of the Belgrade Arena in block 25 last of four buildings, part of the 36 substations and 560 km of trans- administrative complex - phase I, mission lines were built in Sri Lanka was completed

48 | ENERGOPROJEKT 1951 - 2011 Years BUSINESS -RESIDENTIAL CENTRE MAZAYA, (1999)

High-rise structure building projects are executed and completed: Congress Centre in Accra, Ghana (1991), eight hospitals in Zimbabwe (1991), banks in Pskov, Moscow and Volgograd (1996) and a bank in Tula (1999), hotel complex Lazurnaya in Sochi (1998) – Russia; in Dubai, business-residential centre Mazaya (1999) and telecommunications building (2000).

Works on rebuilding the country after bombing

Business-residential centre Mazaya, 63,000 m2, was completed

Phase IV of the transmission system in Qatar was finished after nine years

1996 1998 of work 2000

Contract was signed for the Interna- Reconstruction of the road Ilo-Desa- Presidential Palace – White House in Works began in Kazakhstan, tional Financial Centre in Tashkent, guadero, Peru, was contracted Tashkent, Uzbekistan reconstruction of the road Alma Ata Uzbekistan - Astana, 166 km section

1997 Contract was signed for a hotel com- 1999 Sports Centre in Igalo and apart- Construction of rain drain in Argen- plex in Krasna Poljana in Sochi ment complex in Savina were tina was contracted Contract was signed for the sewage contracted system of the city of Nicosia and its Contract for the HPP Tis Abay in Ethi- Several projects began in Nigeria, suburban municipalities ‘Pećina’ plant near Valjevo was put opia was signed worth more than USD 100 million into operation, the largest drinking water treatment plant in Serbia Years | ENERGOPROJEKT 1951 - 2011 | 49 New markets were entered: Vietnam, Kazakhstan, Uzbekistan and Jamaica. A residential building was de- signed and office building built in Vietnam (1995, 1996); Presidential residences were built in Aktau, Kazakh- stan and Tashkent, Uzbekistan (1999), and in Jamaica electromechanical installation works were performed in three hospitals (2000).

In Tashkent, International Financial Centre was designed, constructed and equipped (2000).

50 | ENERGOPROJEKT 1951 - 2011 Years Belgrade Arena

Belgrade Arena has an area of 48,000 m2, arranged in 6 levels. Capacity of the arena is 20,000 to 25,000 seats, depending on the event. It has 68 luxury boxes, which can accommodate 768 visitors, and a VIP lounge with 38 seats that can be used for press conferences.

Residential-business complex, Block 12, New Belgrade

Elite location was developed for construction of residential and business buildings with a total area of 180,000 m2.

Years | ENERGOPROJEKT 1951 - 2011 | 51 In Belgrade, Sports Hall Arena was designed and its construction began (1991); the underground railway station ‘Vukov spomenik’ was completed (1995). Elite location, block 12 in New Belgrade, was developed for construction of residential and business buildings, with a total area of 180,000 m2 (1993). A hotel com- plex was designed and built in Crni Vrh (1995). Office building of Naftagas in was designed and equipped.

After the NATO bombing campaign, Energoprojekt, as a design, engineering and contracting company, partici- pated in reconstruction of Serbian towns: Aleksinac, Valjevo, Ćuprija, Surdulica, Kraljevo, Vranje, Bor...

At the end of the decade, intensive introduction of non-cash information services in banks of Serbia began. Control centres were delivered, installed and maintained, with ATM network for electronic banking (1997).

Substation in Abuja,Nigera

52 | ENERGOPROJEKT 1951 - 2011 Years Shah Alam Sports Stadium, Malaysia

In 1994. the Shah Alam Stadium, Malaysia, with 71,300 seats, was officially opened.

White House

Presidential Palace, Tashkent, Uzbekistan.

Years | ENERGOPROJEKT 1951 - 2011 | 53

2001-2011 THE NEW MILLENNIUM 2001-2011 ENERGOPROJEKT

The New Millenium

In the new millennium, Energoprojekt completed the biggest project in its history, the water-management system Chira-Pi- ura in Peru, whose total investment value was more than USD 555 million (2009).

Realization of hydro-technical projects continued. In Algeria, contracts were signed for the northern Algeria groundwater study, project of hydro-melioration of 11,000 ha near the town Tufano, and design, technical assistance and supervision of the water transfer between the Serf and Ayn Dalia dams (2004). Energoprojekt was in charge of supervision over building of the water transportation system in Oman (2005) and the deri- vation dam and tunnel Shifa in Algeria (2007), design and supervision of the hydro-melioration system El Tarf, Algeria (2008), design for the sewage system of Nicosia at Cyprus (2008), design and supervision of the dam and HPP Tekeze in Ethiopia (2009), reconstruction of the irrigation system Chavimochic in Peru (works in progress), design and construction supervision of the Ourkiss dam in Algeria (in progress), the dam and HPP Sveta Petka in Macedonia (in progress), the riverbed of the river Zarumilla in Peru was regulated (2010). Mokri Lug rain drain was built in Serbia (2005).

Business was expanding in the . Supervision over construction of three transmission systems was performed in Oman, as well as on the project of Oman and the UAE power systems interconnection (2003). Supervision was performed over construction of three substations in Dubai (2004) and consulting services were provided for construction of a gas power plant with a desalination plant (2005). Consulting contracts were arranged in Qatar for phases VI-VIII for power transmission system (2005-2007), as well as for phase IX. In , according to Energoprojekt consulting services, three substations were built (2007). Works on the TPP Al Shemal project in Iraq resumed (2008).

Construction of two parallel transmission lines was contracted, each of 240 km length, and of a substation in Lagos, Nigeria (2006). At the same time, in Ireland, a distribution network was reconstructed.

In Serbia, electrostatic precipitators were reconstructed in two units of TPP Nikola Tesla A (2006, 2007), as well as the electrostatic precipitator and the ash-handling system in TPP Kolubara A (2009). In cooperation with local electro-mechanical engineering companies, unit B2 of TPP Kostolac B is completely being revital- ized (works in progress). The international transmission line section Niš-Leskovac was built, as well as the section Leskovac-Macedonian border (works in progress).

56 | ENERGOPROJEKT 1951 - 2011 Years PAPER FACTORY, Syktyvkar, RUS- SIA Investor: Mondi, Syktyvkar, Russia Construction period: 2008-2010

RECONSTRUCTION OF THE FIFTH AND SIXTH RAILWAY TRACKS AT THE RAILWAY STATION BELGRADE CENTRE

TWO PARALLEL TRANSMISSION LINES, REHABILITATION OF ELECTROSTATIC PRECIPITATORS, SECTION ENUGU-IKOT-EKPENE, NIGERIA TPP NIKOLA TESLA A

Years | ENERGOPROJEKT 1951 - 2011 | 57 58 2001-2011

| ENERGOPROJEKT 1951-2011 |ENERGOPROJEKT 2001 in f h Mki u ri dan in Belgrade drain rain Lug Mokri the of construc- tion for signed was Contract Tis Abay were completed HPP the of works Construction pleted com- was Dubai in Etisalat building Telecommunications-administrative shopping (Aktau)centre inKazakhstan first the of construction and design for signed was Contract According to Energoprojekt`s architectural designs, a sports hall was built in Igalo (2007) and apartment apartment and (2007) complex Savina inMontenegro (2008). Igalo in built was hall sports a designs, architectural Energoprojekt`s to According for signed was Contract ofahotel inAktauconstruction (2011). (2007). Russia Syzran, in summit Europe-Russia the for Uzbekistan building in top-level building (2005), Senate built: were architecture exceptional of facilities more some decade, this In governor ofthefederal (works state inprogress). Aqua inNigeria Ibon the of palace the and Abuja in building parliament progress), in (works Ghana in buildings office business works were performed in other markets, too: a hotel in Syktyvkar in Russia (2007), a hotel, sports stadium and Construction (2007). Aktau in buildings office business and industry oil the of centreresearch (2006), Atirau Two metro stations were(2009and2010). Kazakhstan finishedin Alma Ata in progress). in Yanacocha-Hualgayoc(works and (2009) Trujillo-Shiran-Huamachuco (2005), (2003), Abankay Peru, town.In roadswereChaluanka- built: aroundNakasongola bypassprogress) the in (worksand ro-Kafu Roads were built in Uganda: Kyegegwa-Kyenjojo (2005), Kampala - Gayaza-Zirobwe (2008), Kawempe-Luwe- energy supplysystem oftheClinicalCentre was builtandputinto ofSerbia operation. new the for plant) power and heat (combined plant cogeneration Energoprojekt, of leadership the Under and built shopping centres in Aktau, Atirau and Uraljsk (2002-2008), an apartment building of 30,000 m 30,000 of building apartment an (2002-2008), Uraljsk and Atirau Aktau, in centres shopping built and designed It Kazakhstan. in worked intensively has Energoprojekt buildings, high-rise of construction for As Novi Sad. tunnel the on highway works Belgrade-Croatian border was reconstructed (2005) and construction works are in progress on (2010), the bypass around Thebegan. progress) in reconstructed(works Boulevard the of werereconstruction and progress) in (works Straževica Prokop station railway the at platforms (2009), regulated were streets city the (2005), Belgrade in built was Park Pionirski garage underground The Works ontheMetro Station inAlma Ata, Kazakhstan

m (180,000 Belgrade New complex 12, block in residential-business of phase the last the of Construction was completed (Aktau) Kazakhstan in centre shopping first the of Construction 2002 2 ), was completed Years

2003 70,000 m built inBelgrade, block29,total area Residential-business complex was was completedlong section, 166km Ata-Astana inKazakhstan, oftheroad AlmaReconstruction longsection in Uganda,a51km tion oftheroad Kyegegwa-Kyenjojo Contract was signed for construc-

Abuja, Nigeria Three substations were completed in was finished Nigeria Ibadan, in factory Tobacco ParkPionirski inBelgrade garage underground the on began In February 2003, construction works 2 total area 45,000 m Atirau, Kazakhstan, in complex ness residential-busi- the of and construction design for signed was Contract osrcin f egae rn in Arena block 25was completed Belgrade of Construction substations was inDubai contracted overSupervision construction of three 2004 rnmsin ie 30V Shiroro- (330kV) Abuja, was completed line double transmission km 144 the of Construction Tashkent in building Senate the for works craft construction- for signed was Contract was section, completed long km 56 Abankay, Chaluanka- road the of Construction 2 2 in

2005 lcrcl oe tasiso in Qatar transmission power electrical the of construction contracted of VII phase for was work Consulting station inAlma Ata was contracted underground the of Construction the transmission system inQatar of VI phase for signed was Contract 2006 plant withadesalination plant gas-electrical a of construction for contracted were services Consulting with atotal area of12,000m top 200consultants andcontractors oftheworld. the among company Serbian only the been time the all has Energoprojekt Balkans. south-western the of region the and Serbia in company construction and consulting largest the still is Energoprojekt millennium new the In Engineering works were realized for Velefarm inBelgrade (2006)andJugoremedia inZrenjanin (2010). plants JUBinŠimanovci andwarehousesceljeva (2008),manufacturing for (2009)... thepaint factory gas stations for Lukoil (2005), distribution centres for Metro Cash in Rauch (2007), Ko- and juiceCarry factory and products petroleum for warehouses Serbia: in investorsforeignfor performed were works Engineering a of construction and design complex for (2010). inSariagash wineproduction and (2010) Aktu and Pavlodar in bases oil of building Kazakhstan: in began projects Some (2009). Russia in Syktyvkar in mill paper (2005), Russia in Tyumenin factory pharmaceutical (2003), Nigeria in Ibadan in complexes:factory tobacco industrial equipped and constructed Energoprojekt

total of 180,000 m 180,000 of a total with 12, block Centre’ in Business ‘Yu complex residential-business the in finished was building last The from designtofully participated, construction andfinishing works. A remarkable architectural achievement, Belgrade Arena, is completed (2004), in whose realization Energoprojekt 70,000m office building of 50,000 m 50,000 of building office Office Building, Office Belgrade Block26, 2 was built (2006). 540 apartments were built in Bežanijska kosa (2005-2008). In block 26, high-class were block 26, waskosa high-class (2005-2008). In built (2006). 540 apartments built in Bežanijska

2 of residential and business space. In New Belgrade, block 29, a residential complex of complex residential a 29, block Belgrade, New In space. business and residential of 2007 City, NewBelgrade electro-mechanical Delta centre shopping the in works of Execution completed plex in Abuja (phase I) in Nigeria, was Com- Assembly National the of ping equip- and building of project The Abu Dhabi in substations three of building for contracted were services Consulting the transmission system inQatar of phase VIII for signed was Contract nel Straževica was cutthrough. On the bypass around Belgrade, tun- TPP Nikola Tesla. electrostatic A4, unit the in done precipitatorwas the of Rehabilitation 2 was completed (2009). In 2011, construction of apartments began in began Voždovac,apartments of construction 2011, In completed(2009). was 2 .

2008 (Etisala a stadiuminGhana Contract was signed for buildingof paper millinSyktyvkar Contract was signed for buildinga contracted ground station inAlma Ata was ofthesecondConstruction under- 166 km, was contracted 166 km, atotal of Kawempe–Luwero-Kafu, oftheroad, Reconstruction section Telecommunication Administrative Building t), Dubai Years 1951-2011| |ENERGOPROJEKT

2009 completed ground station inAlma Ata was ofthefirst under-Construction amount of USD 555 million the works considerably exceeded the history of Energoprojekt. Total value of Piura make the biggest project in the completed. The three phases of Chira- Phase III of the project Chira-Piura was of unit 2, TPP Kostolac B was contracted. modernization and maintenance Major Qatar of network transmission the of IX phase forwerecontracted services Consulting was centreopened inAktau Shopping-recreational

59 2010 Business Office Building in Block 26, Belgrade

60 | ENERGOPROJEKT 1951 - 2011 Years Senate Building in Tashkent, Uzbekistan (2005)

In this decade, some other buildings of incredible architecture were constructed: Senate building in Uzbeki- stan (2005), top-class building for the Europe-Russia summit in Syzran, near Samara in Russia (2007). Con- struction of a hotel was contracted in Aktau (2011). Residential-business Complex, Block 15, Bežanijska Kosa, Belgrade

Years | ENERGOPROJEKT 1951 - 2011 | 61 Business-Commercial Centre, Aktau, Kazakhstan

62 | ENERGOPROJEKT 1951 - 2011 Years Block 29, Residential-business Complex (70,000 m2)

HPP Tekeze, Ethiopia The Power Engineering magazine, in December 2010, declared the project HPP Tekeze in Ethiopia as the project of the year in the category of sustainable projects.

Years | ENERGOPROJEKT 1951 - 2011 | 63

1951-2011 60 YEARS OF SUCCESS

THE POWER OF KNOWLEDGE

Activities of Energoprojekt include areas on which survival and progress of the mankind is based, which substantially af- fect economic and social development – water, energy, envi- ronment...

Technical and technological development is the prerequisite for satisfying increasing needs for energy, wa- ter, food, information, healthier environment, in short, for a better quality of life.

Energoprojekt began spreading its business around the world and began cooperation with developing countries with a transfer of technical and technological know-how. Understanding the needs of these coun- tries, Energoprojekt began to perceive their developmental problems and offered them an interdisciplinary approach for their solving. Versatility of Energoprojekt`s experts, qualified for research, design, consulting, engineering, construction, selection, delivery and installation of equipment, contributed to its advantage and reputation. In the first decade already, Energoprojekt gained a valuable potential, employing world-class experts, while its continuous process of modernization of all activities became its permanent technological orientation.

In Serbia there is no engineering company which, like Energoprojekt, has an integrated multi-disciplinary ac- tivity, vast experience in various fields of implemented projects at different markets, therefore Energoprojekt may be considered as a Serbian brand.

Development of the world`s science, engineering and technology eliminates competitors who lag behind. In order to be up to technical and technological developments of the world, Energoprojekt was from its beginnings involved in the global division of labour, and always up-to-date with the latest techniques and technologies, which has ensured its stable growth and development.

Since its founding, Energoprojekt has believed it of great importance to cooperate with large foreign compa- nies, with creative adoption of positive world experiences, their implementation and adjustment to markets at which it worked.

66 | ENERGOPROJEKT 1951 - 2011 Years Prva poslovna zgrada Energoprojekta Using its most important resource, the intellectual capital which has been created in the past decades, with more than a hundred experts with the M.Sc. or Ph.D. titles, Energoprojekt institutionalized the research-de- velopment function in the 80s, and formed its Scientific-Research and DevelopmentPosle rada Centre u poslovnim and introduced prostorima u a professional magazine. Beogradu (Nušićeva 4., Brankova 25., Carice Milice 2...) 1958 projektuje se i At the beginning of the 90s, Energoprojekt was among the first in the countrygradi to introduce sopstvena a poslovna quality system zgrada (Zele- according to ISO 9000 standards. Declaration was adopted on the policy of qualityni venac control 18) u and kojoj training Energoprojekt was radi organized for quality management. A model of business excellence was introducedsledećih 25which godina. raised the effi- ciency of operations, brought satisfaction to investors, employees, shareholders, business partners and the broader social community. Autor projekta moderne desetospratne zgrade, Milica Šterić, nagrađena je Tragic events in former Yugoslavia in the last decade of the 20th century didSedmojulskom not bypass nagradomEnergoprojekt. za projekat However, staff core has been preserved, which is the basis for development and(1960). implementation of modern technologies in all sectors. Enormous intellectual capital was acquired in the past six decades. It lies in the competence of experts and the international reputation of Energoprojekt (references, acquired image, good relations...).

The global concept of sustainable development implies opening of national markets to international com- petition. In order to develop further all companies must ensure high competitiveness. Open nature of world markets results in a struggle for skilled labour, therefore acquiring and use of know-how becomes an impera- tive. Energoprojekt has a good tradition in this. Since its founding, it has stimulated acquiring of new know- how, and its strategic plans pay particular attention to training and development of its experts. Challenges of competition are not strange to Energoprojekt.

Energoprojekt is still, as always, a socially responsible company which respects the principles of a socially responsible business.

Years | ENERGOPROJEKT 1951 - 2011 | 67 1951-2011 60 GODINA USPEHA

Monograph on the occasion of the 60th anniversary of Energoprojekt

EDITOR Energoprojekt Holding plc.