Topography Data Contents in HRD SRTM (The Shuttle Radar Topography Mission)

90m mesh Digital Elevation Model Data Source: USGS (United States Geological Survey) http://dds.cr.usgs.gov/srtm/version2_1/

Topography Data Contents in HRD Topographic Map of 1/50,000 Scale 711 ser ies o f Maps ↓ Scanned and Adjusted to fit GIS by DPWH-FCSEC (Previous JICA study) ↓ Introduced into GIS system

These data covers all over the Source: Map : NAMRIA (National Mapping and Resource Information Authority) Data : DPWH-FCSEC (Flood Control Sabo Engineering Center, Department of Public Works and Highways)

添6添10 Topography Data Contents in HRD SRTM (The Shuttle Radar Topography Mission)

Switched from SRTM to 1/50,000 automatically when zoomed in

Switched from 1/50,000 to SRTM automatically when zoomed out Map of 1/50,000 Scale One of Sales Point of this System; In this GIS Database system, The Map will automatically switched from SRTM to 1/50,000 corresponding to the display scale (when you zoom in)

3.3 Example Images of HRD Initial Screen Site Search system

Searching for the project with some key words - Name, Status, Island, Province, …, etc.

Zoom in Search Result by mouse The selected Project will be shown

“ ”

“ ”

添6添11 Example Images of HRD Search Result Project Information (1) Project Information (2) River Profile (()3) Duration Curve (4) Layout Profile (5) Site Reconnaissance (6) 3D Bird’s Eye (7) Original Data Project Information

Example Images of HRD Project Information Sheet Project Information (1) Project Information (2) River Profile PDF (3) Duration Curve file (4) Layout Profile (5) Site Reconnaissance (6) 3D Bird’s Eye (7) Original Data

River Profile

Discharge Duration Curve

Layout Profile

添6添12 Example Images of HRD

Project Information Site Reconnaissance Report (1) Project Information (2) River Profile (3) Duration Curve (4) Layout Profile (5) Site Reconnaissance (6) 3D Bird’s Eye (7) Original Data PDF file Original Data

3D Bird’s eye view

Example Images of HRD Data Updating Easy to Update the Data in HRD Window for Updating Select the project to be updated

Select the data to be modified

Easy to Find the Project by using search system

Input the appropriate data and then update by push “OK” button

Delete the data Add New Project Update the Project data

添6添13 4. Proposal of Applying HRD

~ Hyypdropower Resource Database (()HRD) ~

River River Region Province Municipality Project Name System Name

Region-04B Occidental - Aglubang No.1 Magasawangtubig Aglubang Region-04B - Aglubang No.2 Magasawangtubig Aglubang Region-04B Occidental Mindoro - No.1 Bongabong Bongabong Region-04B - Pagbahan No.2 Pagbahan Pagbahan Region-04B Oriental Mindoro - Balanaan No.1 BugsangaBugsanga Region-04B Oriental Mindoro - Cagaray Cagaray Cagaray Region-04B Oriental Mindoro - Catuiran No.1 Catuiran Catuiran de Ilog Region-04B Oriental Mindoro - Pula Magasawangtubig Aglubang Region-04B Oriental Mindoro - Balete Magasawangtubig Aglubang Region- 04B - Binaya-an Binaya- an Binaya-an A010 A009 Malaylay Region-04B Romblon - Cantingas No.1 Cantingas Cantingas A013 Region-04B Romblon - Cantingas No.2 Cantingas Cantingas Region-04B Romblon - Cantingas No.3 Cantingas Cantingas A011 Pagbahan Pulang Tubig Region-04B Romblon - Cambajao Cambajao Cambajao A012 A014 Region-04B Romblon - Lumbang Lumbang Lumbang A034 Butas Region-04B Romblon - Agbalit Canloay Agbalit Region-04-B Occidental Mindoro Victoria Aglubang - Aglubang River Pola Mag Asawang Tubig Region-04-B Oriental Mindoro Dulangan 2 -Dulangan River 1 2 A015 Region-04-B Oriental Mindoro Baco Dulangan - Dulangan River Amnay A036 A039 Pula Region-04-B Oriental Mindoro Bongabong Bongabong -Bongabong Riv A016 A037 Region-04-B Oriental Mindoro Naujan Catuiran - Catuiran River A038 Region-04-B Oriental Mindoro San Teodoro Alag - Inabasan River A035 Dulangan Hydroelectric A040 Balete Region-04-B Oriental Mindoro Baco -- 3 4 5 Ibod Power Project 10 A018 A017 Agsalin Linao-Cawayan HEP 7 A019 A041 Region-04-B Oriental Mindoro Baco -- (Lower Cascade) 6 8 9 A021 A020 Linao-Cawayan HEP A026 Region-04-B Oriental Mindoro Baco -- A042 Sumagui (Upper Cascade) Mongpong A022 A024 Bongabong Region-04-B Oriental Mindoro Bongabong Bongabong HEP - - A023 A027 Region-04-B Oriental Mindoro San Teodoro Alag HEP -- Lumintao A025 Catuiran Hydroelectric A028 A043 Region- 04- B Oriental Mindoro Naujan -- A031 Power Project Anahawin A029 Catuiran (Upper 1 2 Magbando A030 A044 Region-04-B Oriental Mindoro Naujan Cascade) Hydroelectric -- Legend Baroc A032 Power Project (A) New Potential Sites Cantakoy Hydroelectric Region-04-B Oriental Mindoro Naujan -- (B) Signed Potential Sites Power Project (C) Under Signed3 4 Potential5 Sites Inabasan Hydroelectric 10 Labangan Region-04-B Oriental Mindoro San Teodoro -- (D) Other Potential7 Sites A033 Power Project (E) Existing Dams and Weirs Cagaray Region-04-B Brooke's Point Cabinbin - Cabinbin River 6 8 9 Rivers Region-04-B Palawan Babuyan -Babuyan River River System Areas Region-04-B Palawan Puerto ProncesaLangogan - Langogan Rive Green : Name of River Systems

Legend

01020(A) New Potential30 Sites 40 50 k (B) Signed Potential Sites (C) Under Signed Potential Sites

Project Location List of Projects Project Information Site Reconnaissance On River System Map Report Outp u t from HRD sy stem

Data Provision DOE Web site Face-to-Face Service

4. Proposal of Applying HRD

 Project Information Investors  Project Information - Name, Location, Status, River - Name, Location - Basic Parameter Access DOE Promotion - Status, River  Detail Information - Basic Parameter web site and b - Power Generation Plan obtain  Contact Address - Preliminary Project Evaluation information (REMB -TSMD)  Site Reconnaissance Report Request by e -mail or Access by directly a contact, and WEB HRD DOE obtain detail Information information (REMB-HOEMD) (ITMS)

Request Information of projects are updated in HRD and upload by E-mail c a to the DOE web Investors can access the updated Information through WEB Direct b DOE makes promotion with using information through HRD Request d c Investors can send and receive e-mail from DOE through Web Investors can directly access DOE staff and receive Detail dDOE Information detail information

添6添14