6.3 M – 05 May 2014 MELOR LASH Typhoon ATSANI 4.6 M – 12 Dec 2006 (Nona) Update 13 December 2015 5.9 M – 22 Apr 1983 F

23 Aug o 19 Aug h o

15 Dec h h c b 14 Dec

Typhoon MELOR b v h (Nona) d t THE . Typhoon 'Melor' (local name 'Nona') which (Dodong) on 8 May 2015 developed since 11 December 2015 has gained strength and will continue to move northwest, threatening the central part of the THAILAND INDONESIA LAO PDR Philippines. Based on the Philippine Atmospheric, Geophysical and l o HFlood (Ongoing since 16-09-13) HFlood OStorm (Ongoing since 18-09-13) Astronomical Service Administration (PAGASA), Typhoon 'Melor' is l http://adinet.ahacentre.org/report/view/426 http://adinet.ahacentre.org/report/view/437 http://adinet.ahacentre.org/report/view/428 currently located 440 km East of Catarman, Northern . The Heavy rains caused flooding in Central and Due to the heavy rainfall, flood occurred in Sigi, Tropical Depression from South Cina Sea maximum sustained wind is 140 kph near the centre with cruising Estimated Rainfall of Northern part of Thailand claiming for 31 death. Central Sulawesi Province. This incident causing flood in Champasack, Saravanne, speed of up to 19 kph. Public Storm Warning Signal No.2 (with Signal More than 3 million families have been affected affected 400 people and damaged 50 houses. Savannakhet, Sekong and Attapeu, impacting with more than 1,000 houses were damaged. 200,000 people and causing 4 deaths and Level 5 as maximum) has been issued for several provinces in Luzon BTwister damaging 1,400 houses. and Visayas: , , , Ticao Island, Northern and CAMBODIA http://adinet.ahacentre.org/report/view/438 . In the next 24 hours, the wind speed may peak to up to HFlood (Ongoing since 24-09-13) VIET NAM Twister occurred in Binjai, North Sumatra OStorm 180 kph (Category 3). With the current forecast, the typhoon may Regional Disaster Risk Reduction and http://adinet.ahacentre.org/report/view/434 Province. The wind damaged 328 houses and 2 http://adinet.ahacentre.org/report/view/436 office buildings. bring the strong winds and high rainfall intensity over the Bicol Region, Management Council of Region VI based in

The monsoon and storm have triggered flooding Tropical Storm Wutip has generated flood, Calabarzon, Central Luzon and the National Capital Region (NCR) in the Iloilo City reviews their preparedness and in 68 districts. As reported, 39 people died and landslide and strong wind in 10 provinces. next 48 hours. Flood, landslide and strong winds are associated with response options for Typhoon 'Melor' over 400,000 people have been affected due to Current casualty numbers are 14 death, 225 the flood. Over 50,000 ha of plantation are also this type of hazard. Hence, cities and areas with high population during their pre-disaster risk assessment injured and more than 200,000 houses are damaged. damaged and inundated. density such as Manila, Legazpi, Naga may be vulnerable when it meeting held 12 December 2015.

landfalls in the next 24 hours.

Regional Disaster Risk Reduction and Management Councils (RDRRMC) have been put on high alert especially those in the projected typhoon path. RDRRMCs of Southern Luzon and Central Visayas have already conducted pre-disaster risk assessment in each of their respective areas of responsibility.

The AHA Centre Disaster Monitoring and Response System (DMRS) estimates that Typhoon 'Melor' will be dissipate on 17 December 2015. Affected State/Region Photo Courtesy of DVB (www.dvb.no) SOURCE: DISCLAIMER ASEAN Disaster Monitoring and Response System The use of boundaries, geographic names and (DMRS), National Disaster Management Office related data shown are not warranted to be error (NDMO) and news agencies. free or implying official endorsement from ASEAN Member State.