Pengerang Terminals

Total Page:16

File Type:pdf, Size:1020Kb

Pengerang Terminals Pengerang Terminals Pengerang – Rotterdam : Linked by Concept Pengerang Terminals Sdn Bhd 8th January 2018 Shareholders & Profile PITSB : 1 of 3 JV between Dialog & Vopak 51% 49% Johor State Dialog Group Berhad (S.S.I) An integrated specialist technical services PengerangPengerang Terminals Sdn Bhd provider in the oil, gas and petrochemical Terminals Sdn Bhd industry providing services to the upstream 90% 10% and downstream sectors. Vopak Pengerang Independent World’s leading independent provider of Terminals Sdn Bhd conditioned storage facilities for bulk liquids and gasses. 150 acres RM2bil Land Area Value Johor State Incorporated (SSI) Investment arm of Johor State Government, 3 1.3mil m 6 in which Pengerang site is located. Storage Capacity Berths Background • In 2007, Dialog Group identified Pengerang as a suitable location to China develop a deepwater petroleum terminal for oil storage and trading. India • In JunePengerang 2009, Dialog Group Terminals signed an Sdn Bhd MOU with the State Government of Johor and the State Secretary, Johor Inc (“SSI”) to develop the project. Kuala Lumpur Malaysia Subsequently, Vopak joined Dialog and SSI in this venture. • The MOU granted the Group the right to reclaim the land between the coastal line of Tanjung Ayam and Tanjung Kapal with the view to build, own, maintain and Pengerang operate a deepwater petroleum terminal including tankage and marine facilities. Corporate Presentation The Vision in Mind – Pengerang Deepwater Terminals Rotterdam of The East Rotterdam Port The Largest Refining and Petrochemical Port in the World Pengerang Terminals Sdn Bhd Regional Major International Important Gateway Potentially Serving Energy Commercial Transit To the region 3 Billion Population Base Port Centre Point To the region with 24 m Water Depth Corporate Presentation Pengerang Deepwater Petroleum & LNG Terminals STRONG DEMAND More than 60% of global petroleum product growth will come from this region. Rotterdam Port • Independent storage capacity 30 mil m3 • To caterPengerang for 400 mil TerminalsEurope Sdn Bhd population base Japan Myanmar Taiwan Singapore/Malaysia India Hong Kong • Commercial storage capacity 14 mil m3 Location of Pengerang – One of the Thailand Vietnam • To cater for 3 bil Busiest Global Shipping Lanes Sri Lanka Brunei MALAYSIA population base Johor Indonesia Pengerang Australia Singapore Source: IEEJ: Supply and Demand Analysis on Petroleum Products and Crude Oils for Asia and the World Corporate Presentation Integral part of customer’s value chain Feedstock Feedstock Independent Product Production Product Independent Mid-stream production gathering storage and transmission and refining transmission storage and and end-user transshipment transshipment distribution 6 Strategic terminal portfolio criteria Industrial terminals Gas terminals Distribution terminals Hub terminals 7 Pengerang Deepwater Petroleum & LNG Terminals Buffer Industrial Land DIALOG Fabricator Pengerang PengerangTerminals Sdn BhdSPV2 Facility (DFPF) Tg Kapal SPV1 Future Tg Ayam SPV3-LNG SPV4 500 acres To be reclaimed from sea + 500 acres Buffer Land Between Tanjung Ayam and Tanjung Kapal Corporate Presentation Vision PITSB To Be The Safest Terminal With Exceptional Services Excellence • South-eastern tip of Johor • Strategically located along East-West International Trade Lanes • Close proximity to major trading hub to Singapore • Natural deep water draft up to 24 meters able to accommodate VLCCs • Natural sheltered harbor from monsoon seasons PITSB 1,284,000 PT2SB Existing Storage Capacity (cbm) 430,000 (Phase 1e) Expansion Storage Capacity (cbm) 10,000 to 70,000 Tank Sizes (cbm) Storage, Blending, Distribution Services (for both CPP and Crude) Timeline Tank Infrastructure Phase 1E Phase 1D Phase 1D Future plan – Phase 1D Crude (target 360 kcbm) and Phase 1E CPP (430 kcbm) Jetty Infrastructure B601 B602 B606 B603 B605 B604 5 operating berths in use (B601, B603, B604, B605 and B606) Berth B602 planned for Phase 1E expansion, targeted for Q4 2018 to be operational Pengerang Terminal Two Sdn Bhd (PT2SB) Logistics will be handled through PT2SB for all liquids 1.5 mil cbm 157 acres Storage Capacity Land Area PRPCUF Johor State (Petronas) (S.S.I) 40% 25% 25% 10% RM 6.0 bil 12 berths Value PT2SB Dedicated Industrial Terminal for Refinery and Petrochemical Integrated Development (“RAPID”) Complex SERVICES Handling Storage Distribution Jetty 2 Crude Oil, Petroleum, Chemical & Petrochemical Feedstock, Products Jetty 1 and By-Products Target Completion & Commissioning BY Q1 2019 13 Pengerang Integrated Petroleum Complex (PIPC) PIPC Masterplan 14 PMOSB Pengerang Marine Operations Sdn Bhd PMOSB is wholly owned by Dailog Group Berhad Terminal Operator License for PDT Johor Port Authority Authority/ Regulator Navigation Aids • Manage, monitor and co-ordinate of Marine Department vessel movements within marine area Pengerang Marine Operations • Provide VTMS Services Pilotage • Coordinate maintenance dredging and Security Towage services • Coordinate berthing/ unberthing of vessels • Implement marine SOP/ERP Johor Port Berhad Marine Police Malaysia Maritime Royal Malaysian Navy Enforcement Agency SPVs (e.g. PITSB) Lot PTD 4837 Jalan Persiaran Terminal 81600 Pengerang Kota Tinggi Johor Telephone +607 824 2000 Fax +607 824 2001 .
Recommended publications
  • EXECUTIVE SUMMARY Proposed Fish Landing Complex and Breakwater at Punggai, Pengerang, Kota Tinggi, Johor Darulta’Zim Preliminary Environmental Impact Assessment
    EXECUTIVE SUMMARY Proposed Fish Landing Complex and Breakwater at Punggai, Pengerang, Kota Tinggi, Johor DarulTa’zim Preliminary Environmental Impact Assessment EXECUTIVE SUMMARY INTRODUCTION 1. This report presents the salient findings of the Preliminary Environmental Impact Assessment (EIA) study that was carried out to assess the potential environmental impacts that could arise from the Proposed Fish Landing Complex and Breakwater at Punggai, Pengerang, Johor DarulTa’zim.Hereinafter it will be known as “The Project”. 2. The Preliminary EIA is a requirement under Section 34A of the Environmental Quality Act 1974 as the proposed Project is under ActivityNo. 5(a) –Construction of fishing harbours, according to the Environmental Quality (Prescribed Activities) (Environmental Impact Assessment) Order 1987. 3. The Project Proponent and the correspondence address is as below: JabatanKerja Raya Malaysia Level 23,Menara PJD No. 50, JalanTunRazak 50400Kuala Lumpur Tel :+603-4041 1979 Fax :+603-4041 1988 Email : [email protected] Contact person: Dato’ Ir. Roslan B. Md. Taha Position: Director (Department of Environment and Energy) 4. The owner of this project is the Fisheries Development Authority of Malaysia, Johor State Office. Lembaga Kemajuan Ikan Malaysia (Johor State Office) No. 6 & 8, JalanGeroda 1, Larkin 80350 Johor Bahru Tel: +607-223 1070 Fax: +607-223 2332 5. The consultant undertaking this EIA is: ERE Consulting Group Sdn. Bhd. 9, Jalan USJ 21/6 47630 Subang Jaya Selangor DarulEhsan. Tel: +603-8024 2287 Fax: +603-8024 2320 Email: [email protected]/[email protected] ERE Consulting Group ES-1 Issue 1.0/December 2014 Proposed Fish Landing Complex and Breakwater at Punggai, Pengerang, Kota Tinggi, Johor DarulTa’zim Preliminary Environmental Impact Assessment EXECUTIVE SUMMARY Contact person: Pn.
    [Show full text]
  • Balancing Shipping and the Protection of the Marine Environment of Straits
    University of Wollongong Research Online University of Wollongong Thesis Collection University of Wollongong Thesis Collections 2012 Balancing shipping and the protection of the marine environment of straits used for international navigation: a study of the straits of Malacca and Singapore Mohd Hazmi Bin Mohd Rusli University of Wollongong Recommended Citation Mohd Rusli, Mohd Hazmi Bin, Balancing shipping and the protection of the marine environment of straits used for international navigation: a study of the straits of Malacca and Singapore, Doctor of Philosophy thesis, Australian National Centre for Ocean Resources and Security, University of Wollongong, 2012. http://ro.uow.edu.au/theses/3511 Research Online is the open access institutional repository for the University of Wollongong. For further information contact Manager Repository Services: [email protected]. Balancing Shipping and the Protection of the Marine Environment of Straits Used for International Navigation: A Study of the Straits of Malacca and Singapore. A thesis submitted in fulfilment of the requirements for the award of the degree DOCTOR OF PHILOSOPHY from the UNIVERSITY OF WOLLONGONG By MOHD HAZMI BIN MOHD RUSLI LLB_HONS (IIUM, Malaysia) MCL (IIUM, Malaysia) DSLP (IIUM, Malaysia) Australian National Centre for Ocean Resources and Security 2012 CERTIFICATION I, Mohd Hazmi bin Mohd Rusli, declare this thesis, submitted in fulfillment of the requirements for the award of Doctor of Philosophy, in the Australian National Centre for Ocean Resources and Security, University of Wollongong, is wholly my own work unless otherwise referenced or acknowledged. This document has not been submitted for qualifications at any other academic institution. Mohd Hazmi bin Mohd Rusli 14 February 2012 i ABSTRACT The importance of the Straits of Malacca and Singapore for the global shipping industry and world trade can’t be underestimated.
    [Show full text]
  • Petrochemical Industry
    Malaysia’s Petrochemical Industry A Perfect Time to Benefit from Malaysia’s Petrochemical Infrastructure hrough the harnessing of its oil and gas reserves and the forging Tof smart partnerships with some of the world’s largest petroleum companies, Malaysia has established the ideal infrastructure to support a vibrant petrochemical industry. Over the years, a significant number of domestic and foreign companies have established their presence in Malaysia and continued upgrading or expanding their plant capacity. To name a few of these influential companies include Hengyuan (formerly known as Shell Refining), Petron, BASF, Lotte Chemical Titan, Idemitsu, Toray Group, Penfibre, Kaneka, Petrochemical Industry Eastman Chemicals, Eternal, Polyplastic, UPC Group, Recron, Synthomer, Dairen, Mitsui and Reliance Group. The existence of these MNCs created spin off investment which potential investors could leverage on through the availability of the feedstock in the country. This favourable environment demonstrates Malaysia’s potential as a strategic investment location for petrochemical industries. Potential investors could also benefit from the facilities that are already in place. Integrated petrochemical complexes offer centralised utilities, efficient storage services, and a comprehensive transportation network that help The ASEAN Bintulu Fertiliser reduce capital and operation costs. plant in Bintulu, Sarawak In addition, Malaysia also provides a wide range of tax incentives to meet the varying needs of investor. From 2000 to 2019, the US
    [Show full text]
  • Johor 81900 Kota Tinggi
    Bil. Bil Nama Alamat Daerah Dun Parlimen Kelas BLOK B BLOK KELICAP PUSAT TEKNOLOGI TINGGI ADTEC JALAN 1 TABIKA KEMAS ADTEC Batu Pahat Senggarang Batu Pahat 1 TANJONG LABOH KARUNG BERKUNCI 527 83020 BATU PAHAT Tangkak (Daerah 2 TABIKA KEMAS DEWAN PUTERA JALAN JAAMATKG PADANG LEREK 1 80900 TANGKAK Tangkak Ledang 1 Kecil) 3 TABIKA KEMAS FELDA BUKIT BATU FELDA BUKIT BATU 81020 KULAI Kulai Jaya Bukit Batu Kulai 1 Bukit 4 TABIKA KEMAS KG TUI 2 TABIKA KEMAS KG. TUI 2 BUKIT KEPONG 84030 BUKIT KEPONG Muar Pagoh 1 Serampang BALAI RAYAKAMPUNG PARIT ABDUL RAHMANPARIT SULONG 5 TABIKA KEMAS PT.HJ ABD RAHMAN Batu Pahat Sri Medan Parit Sulong 1 83500 BATU PAHAT 6 TABIKA KEMAS PUTRA JL 8 JALAN LAMA 83700 YONG PENG Batu Pahat Yong Peng Ayer Hitam 2 7 TABIKA KEMAS SERI BAYU 1 NO 12 JALAN MEWAH TAMAN MEWAH 83700 YONG PENG Batu Pahat Yong Peng Ayer Hitam 1 39 JALAN BAYU 14 TAMAN SERI BAYU YONG PENG 83700 BATU 8 TABIKA KEMAS SERI BAYU 2 Batu Pahat Yong Peng Ayer Hitam 1 PAHAT TABIKA KEMAS TAMAN BUKIT NO 1 JALAN GEMILANG 2/3A TAMAN BUKIT BANANG 83000 BATU 9 Batu Pahat Senggarang Batu Pahat 1 BANANG PAHAT 10 TABIKA KEMAS TAMAN HIDAYAT BALAI SERBAGUNA TAMAN HIDAYAT 81500 PEKAN NANAS Pontian Pekan Nanas Tanjong Piai 1 11 TABIKA KEMAS TAMAN SENAI INDAH JALAN INDAH 5 TAMAN SENAI INDAH 81400 SENAI Kulai Jaya Senai Kulai 1 TABIKA KEMAS ( JAKOA ) KG SRI BALAI TABIKA KEMAS JAKOA KAMPUNG SRI DUNGUN 82000 12 Pontian Pulai Sebatang Pontian 2 DUNGUN PONTIAN 13 TABIKA KEMAS (JAKOA ) KG BARU TABIKA JAKOA KG BARU KUALA BENUT 82200 PONTIAN Pontian Benut Pontian 1 14 TABIKA
    [Show full text]
  • A Case Study of Pengerang Region in Johor Malaysia
    International Journal of Academic Research in Business and Social Sciences Vol. 10, No. 6, June, 2020, E-ISSN: 2222-6990 © 2020 HRMARS Inclusive Regional Development: A Case Study of Pengerang Region in Johor Malaysia Maqsood Rezayee, Gabriel Hoh Teck Ling, Rahmatullah Ibrahimy and Wahidullah Sadat To Link this Article: http://dx.doi.org/10.6007/IJARBSS/v10-i6/7290 DOI:10.6007/IJARBSS/v10-i6/7290 Received: 26 April 2020, Revised: 28 May 2020, Accepted: 12 June 2020 Published Online: 20 June 2020 In-Text Citation: (Rezayee et al., 2020) To Cite this Article: Rezayee, M., Ling, G. H. T., Ibrahimy, R., & Sadat, W. (2020). Inclusive Regional Development: A Case Study of Pengerang Region in Johor Malaysia. International Journal of Academic Research in Business and Social Sciences, 10(6), 329–345. Copyright: © 2020 The Author(s) Published by Human Resource Management Academic Research Society (www.hrmars.com) This article is published under the Creative Commons Attribution (CC BY 4.0) license. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and non-commercial purposes), subject to full attribution to the original publication and authors. The full terms of this license may be seen at: http://creativecommons.org/licences/by/4.0/legalcode Vol. 10, No. 6, 2020, Pg. 329 – 345 http://hrmars.com/index.php/pages/detail/IJARBSS JOURNAL HOMEPAGE Full Terms & Conditions of access and use can be found at http://hrmars.com/index.php/pages/detail/publication-ethics 329 International Journal of Academic Research in Business and Social Sciences Vol. 10, No.
    [Show full text]
  • Pengerang Eco-Industrial Park
    PENGERANG ECO-INDUSTRIAL PARK PROVIDING ACCESS TO BUSINESS OPPORTUNITIES IN THE OIL, GAS, PETROCHEMICAL, POWER GENERATION AND MARINE INDUSTRIES peip.com.my 1 Project Owner 14 & 15 Floor Menara Serba Dinamik, Presint 3.4, Persiaran Perbandaran Seksyen 14, +(603) 7931 9368 40100 Shah Alam, Selangor, Malaysia. [email protected] All art renderings, pictures and diagrams in this document are illustrations only. They may not necessarily reflect the final outcome. All plans, layouts, features, amenities, facilities, utilities, infrastructure, features, information and specifications in this document are subject to changes and will not form part of any offer for sales or any contractual agreement. The project owner reserves the right to make any changes or modifications. Information as at 7 September 2018 CONTENTS INTRODUCTION Our Vision 6 Malaysia 8 ABOUT PEIP Master Plan 12 Pengerang Eco-Industrial Park 14 PEIP ZONES MRO Global Centre 22 of Excellence IRM Global Centre 26 of Excellence Plant Turnaround Village 30 2 Logistics Hub 32 T-VET City 34 LOCATION Strategic Location 38 of PeIP Road and Sea Access and 39 Deepwater Terminals Markets for Investors in PeIP 40 Vendor Development 43 Programme PENGERANG INTERNATIONAL 46 COMMERCIAL CENTRE SERBA INTEGRATED 50 TURNAROUND CENTRE SERBA DINAMIK: OWNER 52 AND ANCHOR UNIQUE SELLING POINTS 54 4 INTRODUCTION 5 INTRODUCTION OUR VISION MALAYSIA’S FIRST MRO AND IRM GLOBAL CENTRE OF EXCELLENCE Our PeIP incorporates a Logistics Hub to provide transportation services and warehousing of equipment, parts and pipes. We have a technical and vocational educational and training (TVET) centre to provide a steady supply of skilled manpower.
    [Show full text]
  • Bina Puri Gets Letter of Intent to Build Affordable Homes Under PR1MA in Johor Bahru
    PRESS RELEASE BINA PURI HOLDINGS BHD No. 88, Wisma Bina Puri, 26th October 2015 Jalan Bukit Idaman 8/1, FOR IMMEDIATE RELEASE Selayang 68100, Selangor Darul Ehsan. Tel. : +603 6136 3333 Fax : +603 6136 9999 www.binapuri.com.my Bina Puri gets Letter of Intent to build affordable homes under PR1MA in Johor Bahru KUALA LUMPUR: Bina Puri Holdings Bhd has joined the rank of concerned developers undertaking the construction of affordable homes to enable the lower income group to have a roof over their heads. The group received a Letter of Intent (LOI) from PR1MA Corporation Malaysia (PR1MA) for the construction of 994 units of PR1MA Homes comprising of apartments and 20 units of shops in Johor Bahru. In a filing to Bursa Malaysia, Bina Puri Holdings Bhd said the new PR1MA Homes for Johor would be on 18.23 acres of freehold land at Mukim Plentong, Masai. The contract sum is estimated at RM230 million and the project is to be completed within 36 months. It will have 4 blocks of apartments; of which 3 blocks will be 18-storey high with 252 units in each block and 1 block 17-storey high with 238 units. The floor space in the apartments are between 950 sq ft to 1,100 sq ft while the shops units will be 1,630 sq ft each. Group Executive Director Matthew Tee said the group looked forward to secure this project soon. “In line with the recent budget where construction being one of the major beneficiary with a targeted growth in excess of 8%, the group is confident that we will be one of the major players Page 2 especially with our presence in Sabah, Sarawak, Kuala Lumpur and Johor, the four main growth cities identified in the 11MP,” he said.
    [Show full text]
  • Desaru, Malaysia Hotel Market Overview
    Singapore: Hotel Market Market Report - March 2019 Source: Anantara, Desaru Coast MARKET REPORT Desaru, Malaysia Hotel Market Overview MARCH 2021 Desaru Coast, Malaysia Market Report - March 2021 Source: : One&Only, Desaru Coast Reawakening Desaru: Malaysia’s with the plan to create a premium integrated destination once best kept secret resort. One part of this objective was to develop a lifestyle Located along Johor’s eastern coast, Desaru is situated and meeting destination that possessed supporting facilities in the Kota Tinggi District that faces the South China Sea to draw visitors. with nearly 22 kilometres of beachfront coastline. Desaru is located approximately 79 kilometres from Johor Bahru’s Desaru Coast master plan development city centre, about 83 kilometres from Senai International Khazanah Nasional (Khazanah) unveiled a multi-billion- Airport (SIA), approximately 78 kilometres to Woodlands ringgit development plan to rejuvenate Desaru about six Checkpoint, 114 kilometres to Tuas Checkpoint and just years ago. With 1,618 hectares (3,998 acres) of land and a short of 400 kilometres from Kuala Lumpur. 22-kilometre coastline, the integrated resort development is planned over multiple phases. As it stands now, Desaru During the 1980s, Desaru was given glorified expectations Coast includes four hotels, two world-class golf courses, on the rides of several mega projects that aimed at a waterpark, riverside retail and restaurants, and a attracting foreign investments and visitors. However, convention centre. those ambitions did not materialise. Historically, Desaru was a well-kept secret for Malaysians, and the occasional Phase one development covers about 2,000 acres, Singaporeans, to enjoy this scenic beach destination.
    [Show full text]
  • DATA ASAS NEGERI JOHOR BASIC DATA on the STATE of JOHOR 2017 ISI KANDUNGAN / Contents
    DATA ASAS NEGERI JOHOR BASIC DATA ON THE STATE OF JOHOR 2017 ISI KANDUNGAN / CONTENTS Prakata 6 SEKTOR PERTANIAN/ AGRICULTURAL SECTOR Acknoledgement Pengeluaran Komoditi Pertanian Utama Negeri Johor, 2013 - 2017 23 Lambang Negeri Johor 8 Production Of Major Agriculture Commodities, The State Of Johor, The Coat of Arms of The State of Johor Darul Ta’zim 2013 - 2017 Bendera Negeri Johor 9 Keluasan Bagi Pertanian Utama Negeri Johor 2013 - 2017 24 Johor State Flag Size Area Of Main Crops, The State Of Johor, 2013 - 2017 Lagu Negeri Johor 9 Hasil Pengeluaran Felcra Mengikut Jenis Pertanian Di Negeri Johor, Johor State Anthem 2013 - 2017 25 Felcra Total Production By Type In Johor State, 2013 - 2017 Peta Johor 10 Map Of Johor Hasil Pengeluaran Felda Mengikut Jenis Pertanian Di Negeri Johor, 2012 – 2016 26 Felda Total Production By Type In Johor State, 2012 – 2016 PENDUDUK/ POPULATION Pengeluaran Ternakan Mengikut Jenis Di Negeri Johor (Tan MetrIk), 27 Taburan Penduduk Mengikut Daerah Di Negeri 13 2013 - 2017 Johor, 2013 - 2017 Livestock Production By Type In Johor State (Metric Tonnes), 2013 - 2017 Population Distribution By District In Johor State, 2013 - 2017 Eksport Ternakan Utama Di Negeri Johor (Tan Metrik), 2013 - 2017 28 Taburan Penduduk Mengikut Jantina, Etnik Dan Usia 14 Export Of Major Livestock In Johor State (Metric Tonnes), 2013 - 2017 Di Negeri Johor, 2013 - 2017 Population Distribution By Sex, Ethnic And Age In Johor State, 2013 - 2017 Pengeluaran Perikanan Utama Negeri Johor (Tan Metrik) , 2013 - 2017 29 Major Fishery Production
    [Show full text]
  • 6 EXISTING ENVIRONMENT 6.1 Site Setting
    Pengerang Energy Complex Sdn Bhd Environmental Impact Assessment Pengerang Energy Complex 6 EXISTING ENVIRONMENT 6.1 Site Setting The PEC’s 250 acre or 101.2 ha site is broadly rectangular, oriented west to east, where it tapers to a triangular section at its eastern end. The site ranges in length from a maximum of ~1,800 m measured along the northern boundary to a minimum of ~1,390 m along the southern boundary. In breadth, it measures a maximum of 660 m measured along the western boundary, reducing to 600 m just before it tapers to a minimum breadth of 115m at its eastern end. The PEC’s southern boundary is between 280m to 330m north of the PIC/ RAPID project border and, at minimum, 500m from the PIPC boundary to public areas to the west and north of the PEC. An analysis of land use within 5 km of the PEC site is provided in the sections below. The PEC site/ PIP is located within the JPDC sponsored, Pengerang Integrated Petroleum Complex (PIPC), a wider, 80 km2 (> 20,000 acre) area zoned for integrated downstream oil and gas industries. Ongoing projects in the PIPC (Phase 1) are the 6,277 acre, Pengerang Integrated Complex (PIC), which includes the Petronas RAPID Project, and the Pengerang Deepwater Terminal (PDT), the PIPC’s 1,355 acre Centralised Tank Farm area including Dialog’s bulk storage terminal and jetty operated by Pengerang International Terminals (PIT). 6.1.1 Site Access Current road access to the PEC project site from Kuala Lumpur or Johor Bahru is across the Johor River on the Senai-Desaru highway (Route E22), followed by a 25 km drive south along Jalan Kota Tinggi – Sg.
    [Show full text]
  • Rate and Service Guide Daily Rates Malaysia Effective July 11, 2021 1
    2021 UPS® Domestic Rate and Service Guide Daily Rates Malaysia Effective July 11, 2021 1 Area of Service Area of Service West Malaysia – Area of Service within Peninsular FEDERAL TERRITORY Sungai Rambai Temangan Intan Banting Kuala Lumpur Sungai Udang Tanah Merah Jeram Batang Berjuntai Labuan Tanjong Kling Tumpat Kampar Batang Kali Putrajaya Kampong Gajah Batu 9 Cheras NEGERI SEMBILAN PAHANG Kampong Kepayang Batu Arang JOHOR Seremban Kuantan Kamunting Batu Caves Johor Bahru Bahau Bandar Pusat Jengka Kuala Kangsar Beranang = Ayer Hitam Bandar Baru Serting Benta Kuala Kurau Behrang Bakri Batu Kikir Bentong Kuala Sepetang Bukit Rotan Batu Anam Gemas Cameron Highlands Lahat Cyberjaya Batu Pahat Gemencheh Genting Highlands Lambor Kanan Dengkil Bekok Johol Jerantut Langkap Hulu Langat Benut Juasseh Karak Lumut Jenjarom Bukit Gambir Kuala Pilah Kuala Lipis Maliam Nawar Jeram Bukit Pasir Labu Kuala Rompin Mamban Diawan Kajang Chaah Lenggang Lanchang Manong Kapar Endau Linggi Maran Matang Kerling Gelang Patah Mantin Mentakab Menglembu Klang Gerisik Nilai Pekan Padang Rengas KLIA Jementah Pedas Raub Pangkor Kota Kemuning Kahang Port Dickson Tanah Rata Pantai Remis Kuala Kubu Bahru Kg Kenangan Tun Dr Ismail Rembau Temerloh Parit Kuala Selangor Kluang Rompin Parit Buntar Pelabuhan Klang Kota Tinggi Seri Menanti PENANG Pengkalan Hulu Petaling Jaya Kukup Siliau Pulau Pinang Sauk Puchong Kulai Titi Ayer Itam Selama Pulau Carey Labis Balik Pulau Selekoh Pulau Indah Layang-Layang KEDAH Batu Ferringghi Seri Manjong Pulau Ketam Masai Alor Setar Batu Maung
    [Show full text]
  • Iskandar Inflexion Point Driven by Industrial Boom
    April 4, 2013 MALAYSIA STRATEGY SHORT TERM (3 MTH) LONG TERM Conviction| | Notes from the Field Iskandar inflexion point driven by industrial boom We took investors for a 3-day tour of various sites in Johor and hosted several briefings as well. The visits reinforced our bullish view on Iskandar as many projects there are shaping up nicely while the shift of Singapore industries to Johor appear to be picking up speed. Terence Wong CFA T (60) 3 20849689 Figure 1: Iskandar Malaysia visit E [email protected] Mar-28 UEM Land briefing at Horizon Hills Ivy Ng Lee Fang CFA Site tour of Nusajaya (Horizon Hills, Nusa Idaman, AfiatHealthpark, Nusa Bayu, SiLC, EduCity T (60) 3 20849697 LegoLand, Kota Iskandar, Puteri Harbour, Marlborough College and East Ledang) E [email protected] Site tour of Setia Eco Gardens Sharizan Rosely Site tour of Setia Business Park T (60) 3 20849864 Mar-29 Benalec briefing E [email protected] Johor Petroleum Development Corp briefing Kulim Malaysia briefing Axis REIT briefing Site tour of Port of Tanjung Pelapas Site tour of Danga Bay Mar-30 Site tour of Meridin@Medini Site tour of Johor Premium Outlets SOURCES: CIMB, COMPANY REPORTS No changes to our Neutral weighting Iskandar was reached in 2012. More on Malaysia as election risks remain surprising is how strong demand is “The growth of economies the key overhang. Post elections, we for industrial property in the state. depends on the growth will likely review our call on the For example, SP Setia's non-Bumi and survival of industries market and the property and industrial properties in Setia and firms.” construction sectors.
    [Show full text]