© Information contained in this website and page may be used for research and publishing purposes provided acknowledgement is given to the author and the ‘Philippine Railway Historical Society’ . We take copyrite infringement seriously, even if you don’t. For further details please feel free to email us at [email protected] MAILA

ELEVATED LIGHT RAILWAY SYSTEMS

MAP.

Map Drawn By: Brian Young Philippine Railway Railfan Group

CREDITS:

Thank you to all the management and staff of both the LRT and MRT operations without who’s generosity in sharing their systems would have resulted in so much being still unknown. Thank you to Brian Young, Brian South and the ’Philippine Railways Advocacy Group’ for their contributions to this issue. Special thanks to Paul Nicholas Domingo Cabalhin for his listing of corrections to my first version of this status update.

REFERECES:

Philippine Railway Historical Society (PRHS)- Various Websites • PRHS Homepage: http://philippine-railways.blogspot.com • PRHS Blogsite: http://philippinerailwayhistoricalsociety.blogspot.com • PRHS Database: http://prhsociety.wordpress.com PhilippineRailways Yahoogroup (Operated by PRHS) Philippine Modelling Yahoogroup (Operated by PRHS) Railways Of The —Late Reg Carter

COPYRITE Brad Peadon 2012

All rights reserved. This publication is produced by Brad Peadon for the ‘Philippine Railway Historical Society’. It is intended for personal research use of anyone interested and personal photocopying is permitted. Use of content within the publication for commercial or other publishing purposes can be granted by emailing the author ( [email protected] ) and including an appropriate credit in the final work. LRT Line 1

Website: www.lrta.gov.ph

Depot: Baclaran

Operations: to Roosevelt Station.

Timetable: Weekdays 05.00 - First train departs Baclaran station 21.30 - Last train departs Baclaran station. 22.00 - Last train departs Roosevelt station

Weekends 05.00 - First train departs Baclaran station 21.00 - Last train departs Baclaran station. 21.30 - Last train departs Roosevelt station

* Services are usually suspended during Holy Week.

Operational:

1G 1000-1036, 1038-1064 Built by BN ACEC 2G 1100-1128 Built by Hyundai Precision and Adtranz 3G 1200-1248 Built by Kinki Sharyo and Nippon Sharyo

onOperational For Repair 1G 1002, 1006, 1007, 1013, 1027, 1037 (Rizal Day Bombing Damage), 1054 2G Numerous out of use for repairs. (See separate LRT publication for latest details). 3G 1236, 1248

Ordered: 7 sets planned after line refurbishment.

System Update: Northward extension has been completed from Balintawak to North Ave to connect with MRT. However a station has yet to be built at North Ave at time of 2011 opening to Balintawak.

President Aquino announced during March 2012 that he wished the extension south be completed by 2015. Work yet to commence.

Plans for a 6.2km branchline from Baclaran station to Ninoy Aquino International Airport is currently undergoing a feasibility study (2011).

Unit Update Status 1001 11/2011 In Service 1036 3/2012 In Service 1002 11/2011 Baclaran For Repair 1037 3/2012 Baclaran - Rizal Day Bomb Damage 1003 3/2012 Baclaran For Repairs 1038 11/2011 In Service 1004 3/2012 In Service 1039 11/2011 In Service 1005 3/2012 Reserve 1040 3/2012 In Service 1006 11/2011 Baclaran For Repairs 1041 3/2012 In Service 1007 11/2011 Baclaran For Repairs 1042 3/2012 Baclaran For Repairs 1008 11/2011 In Service 1043 3/2012 In Service 1009 3/2012 In Service 1044 3/2012 In Service 1010 11/2011 In Service 1045 11/2011 In Service 1011 3/2012 Baclaran For Repairs 1046 11/2011 In Service 1012 3/2012 In Service 1047 11/2011 In Service 1013 3/2012 Baclaran For Repairs (Roosevelt) 1048 3/2012 In Service 1014 3/2012 Baclaran For Repairs (Roosevelt) 1049 3/2012 In Service 1015 3/2012 Reserve 1050 3/2012 In Service 1016 3/2012 In Service 1051 3/2012 In Service 1017 3/2012 In Service 1052 3/2012 In Service 1018 3/2012 In Service 1053 3/2012 In Service 1019 3/2012 In Service 1054 11/2011 Baclaran For Repairs 1020 3/2012 In Service 1055 3/2012 In Service 1021 3/2012 In Service 1056 3/2012 In Service 1022 11/2011 In Service 1057 3/2012 In Service 1023 11/2011 In Service 1058 3/2012 In Service 1024 11/2011 In Service 1059 11/2011 In Service 1025 3/2012 In Service 1060 3/2012 In Service 1026 3/2012 In Service 1061 11/2011 In Service 1027 11/2011 Baclaran For Repairs (Balintawak) 1062 11/2011 In Service 1028 11/2011 In Service 1063 11/2011 In Service 1029 11/2011 In Service 1064 11/2011 In Service 1030 11/2011 In Service 1031 11/2011 In Service 1032 11/2011 In Service 1033 11/2011 In Service 1034 Believed In Service 1035 Believed In Service

Where no date is shown, there has been no confirmed sighting in recent times. All vehicles shown as ‘Believed In Service’ are likely in service, but have not been sighted since this listing began.

Sightings always required. Unit Update Status Unit Update Status 1101 3/2012 In Service 1115 3/2012 In Service 1102 3/2012 Depot, OOS 1116 3/2012 Depot, OOS 1103 3/2012 In Service 1117 3/2012 Depot, OOS 1104 3/2012 In Service 1118 3/2012 Depot, OOS 1105 3/2012 Depot, OOS 1119 3/2012 Depot, OOS 1106 3/2012 In Service 1120 3/2012 Depot, OOS 1107 3/2012 Depot, OOS 1121 3/2012 Depot, OOS 1108 3/2012 In Service 1122 3/2012 Depot, OOS 1109 3/2012 In Service 1123 3/2012 Depot, OOS 1110 3/2012 In Service 1124 3/2012 Depot, OOS 1111 3/2012 In Service 1125 3/2012 Depot, OOS 1112 3/2012 In Service 1126 3/2012 Depot, OOS 1113 3/2012 In Service 1127 3/2012 Depot, OOS 1114 3/2012 In Service 1128 3/2012 Depot, OOS

Unit Update Status In Service 1201 3/2012 Mock Up - Stored Baclaran 1225 3/2012 In Service 1201 3/2012 In Service 1226 3/2012 In Service (2) 1202 3/2012 In Service 1227 3/2012 In Service 1203 3/2012 In Service 1228 3/2012 In Service 1204 3/2012 In Service 1229 3/2012 In Service 1205 3/2012 In Service 1230 3/2012 In Service 1206 3/2012 In Service 1231 3/2012 In Service 1207 3/2012 In Service 1232 3/2012 In Service 1208 3/2012 In Service 1233 3/2012 In Service 1209 3/2012 In Service 1234 3/2012 In Service 1210 3/2012 In Service 1235 03/2012 In Service 1211 3/2012 In Service 1236 3/2012 Depot, Damage Repairs 1212 3/2012 In Service 1237 3/2012 In Service 1213 3/2012 In Service (Replaced by 1235 in set 1238 3/2012 In Service 12-15 by 3/2012) 1214 3/2012 In Service 1239 3/2012 In Service 1215 3/2012 In Service 1240 3/2012 In Service 1216 3/2012 In Service 1241 3/2012 In Service 1217 3/2012 In Service 1242 3/2012 In Service 1218 3/2012 In Service 1243 3/2012 In Service 1219 3/2012 In Service 1244 3/2012 In Service 1220 3/2012 In Service 1245 3/2012 In Service 1221 3/2012 In Service 1246 3/2012 In Service 1222 3/2012 In Service 1247 3/2012 In Service 1223 3/2012 In Service 1248 3/2012 Depot, Damage Repairs 1224 3/2012 In Service LRT Line 2

Website www.lrta.gov.ph

Depot : Santolan

Operations: to Santolan Station

Timetable: Weekdays 05.00 - Operations commence 21.30 - Last train departs Santolan station. 22.00 - Last train departs Recto station

Weekends 05.00 - Operations commence. 21.30 - Last train departs Recto station

* Services are usually suspended during Holy Week.

Operational: 2000-2072 Built by Hyundai ROTEM of South Korea. 2003

System: Plans (2011) exist for a west extension to the Divisoria area (Delpan Street), however work has not commenced as of March 2012.

Plans (2011) exist for a west extension to the Antipolo area (Cnr Sumulong and Marco Highways), however work has not commenced as of March 2012.

LRT2 passing over the top of the MRT3 system at Cubao. Unit Update Status Unit Update Status 2001 1/2012 In Service 2037 1/2012 In Service 2002 1/2012 In Service 2038 1/2012 In Service 2003 1/2012 In Service 2039 1/2012 In Service 2004 1/2012 In Service 2040 1/2012 In Service 2005 1/2012 In Service 2041 1/2012 In Service 2006 1/2012 In Service 2042 1/2012 In Service 2007 1/2012 In Service 2043 1/2012 In Service 2008 1/2012 In Service 2044 1/2012 In Service 2009 1/2012 In Service 2045 1/2012 In Service 2010 1/2012 In Service 2046 1/2012 In Service 2011 1/2012 In Service 2047 1/2012 In Service 2012 1/2012 In Service 2048 1/2012 In Service 2013 1/2012 In Service 2049 1/2012 In Service 2014 1/2012 In Service 2050 1/2012 In Service 2015 1/2012 In Service 2051 1/2012 In Service 2016 1/2012 In Service 2052 1/2012 In Service 2017 1/2012 In Service 2053 1/2012 In Service 2018 1/2012 In Service 2054 1/2012 In Service 2019 1/2012 In Service 2055 1/2012 In Service 2020 1/2012 In Service 2056 1/2012 In Service 2021 1/2012 In Service 2057 1/2012 In Service 2022 1/2012 In Service 2058 1/2012 In Service 2023 1/2012 In Service 2059 1/2012 In Service 2024 1/2012 In Service 2060 1/2012 In Service 2025 1/2012 In Service 2061 1/2012 In Service 2026 1/2012 In Service 2062 1/2012 In Service 2027 1/2012 In Service 2063 1/2012 In Service 2028 1/2012 In Service 2064 1/2012 In Service 2029 1/2012 In Service 2065 1/2012 In Service 2030 1/2012 In Service 2066 1/2012 In Service 2031 1/2012 In Service 2067 1/2012 In Service 2032 1/2012 In Service 2068 1/2012 In Service 2033 1/2012 In Service 2069 1/2012 In Service 2034 1/2012 In Service 2070 1/2012 In Service 2035 1/2012 In Service 2071 1/2012 In Service 2036 1/2012 In Service 2072 1/2012 In Service MRT Line 3

Website: http://www.dotcmrt3.gov.ph/

Depot : Trinoma

Operations: North Avenue Station to EDSA Station

Timetable: All Days First Service 05.00 Last Service 22.00

Operational 001-073 Built by CKD (now part of Siemens AG) in the Czech Republic. 1999

Unoperational 002 & 013 (Reportedly unoperational)

System Update:

2006 - 48 U-Bahn cars from Vienna were arranghed to expand network. Vehicles yet to arrive. 2010 - Then president Arroyo announces that linking the MRT3 and LRT1 systems was a national priority. No update (2012) 2011 - Interest reported in leasing a number of vehicles from LRT1. (Unconfirmed, No Update 2012) Unit Update Status Unit Update Status 001 11/2011 In Service 038 11/2011 In Service 002 11/2011 Depot, Damage Repairs 039 11/2011 In Service 003 11/2011 In Service 040 11/2011 In Service 004 11/2011 In Service 041 11/2011 In Service 005 11/2011 In Service 042 11/2011 In Service 006 11/2011 In Service 043 11/2011 In Service 007 11/2011 In Service 044 11/2011 In Service 008 11/2011 In Service 045 11/2011 In Service 009 11/2011 In Service 046 11/2011 In Service 010 11/2011 In Service 047 11/2011 In Service 011 11/2011 In Service 048 11/2011 In Service 012 11/2011 In Service 049 11/2011 In Service 013 11/2011 Depot, Damage Repairs 050 11/2011 In Service 014 11/2011 In Service 051 11/2011 In Service 015 11/2011 In Service 052 11/2011 In Service 016 11/2011 In Service 053 11/2011 In Service 017 11/2011 In Service 054 11/2011 In Service 018 11/2011 In Service 055 11/2011 In Service 019 11/2011 In Service 056 11/2011 In Service 020 11/2011 In Service 057 11/2011 In Service 021 11/2011 In Service 058 11/2011 In Service 022 11/2011 In Service 059 11/2011 In Service 023 11/2011 In Service 060 11/2011 In Service 024 11/2011 In Service 061 11/2011 In Service 025 11/2011 In Service 062 11/2011 In Service 026 11/2011 In Service 063 11/2011 In Service 027 11/2011 In Service 064 11/2011 In Service 028 11/2011 In Service 065 11/2011 In Service 029 11/2011 In Service 066 11/2011 In Service 030 11/2011 In Service 067 11/2011 In Service 031 11/2011 In Service 068 11/2011 In Service 032 11/2011 In Service 069 11/2011 In Service 033 11/2011 In Service 070 11/2011 In Service 034 11/2011 In Service 071 11/2011 In Service 035 11/2011 In Service 072 11/2011 In Service 036 11/2011 In Service 073 11/2011 In Service 037 11/2011 In Service MRT Line 7

Website: None

Depot Location: Currently Unknown

Operations: North Ave Station to San Jose del Monte Station

Timetable: Not Operational

Ordered: Reported to be as many as 108 vehicles, to run in 36 x 3-car formations.

System: 2010 - Project commenced by Arroyo government. 2012 - Project reported to be halted pending Aquino government review on affect to bus and drivers along route.

OTHER PROPOSALS

PROJECT AOUCED STAGE STATUS COMMECED

UNIVERSITY OF Proposed 2011 - Internal system to serve the campus. Work expected PHILIPPINES to commence shortly. MONORAIL Proposed - Work yet to commence. MONORAIL 2011 (BCDA) 2016 Completion date.

EDSA TRAMWAY Proposed - Proposal for a street level tramway along EDSA to MMDA 2011 assist the elevated MRT. WEBSITES OF PHILIPPIE RAILFA ITEREST. LRT http://www.lrta.gov.ph/ Philippine Railway Historical Society and Forums (PRHS) MRT http://philippine-railways.blogspot.com http://www.dotcmrt3.gov.ph/

Philippine Railway ews & Historical Chat (PRHS) Philippine Railway Advocacy Group http://groups.yahoo.com/group/PhilippineRailways http://philippinerailways.blogspot.com

Philippine ational Railways Modelling The Philippines (PRHS) http://www.pnr.gov.ph/ http://groups.yahoo.com/group/Philippine_Modelling

COTRIBUTIOS/ADDITIOS These are always needed and would appreciate your sending them to [email protected]. We are also working on current and historic lists covering known information on PR locomotives, DMUs, and rollingstock, as well as the overhead railway operations. Your contributions will be acknowledged.

When in Australia, come to Sydney’s lineside Fili pino store in beautiful downtown arwee.

PROUDLY SUPPORTIG

THE

PHILIPPIE RAILWAY HISTORICAL SOCIETY.

PHILIPPIE RAILWAY HISTORICAL SOCIETY Since 1999

Website: Information, ews, Photos & Forums. http://philippinerailways.blogspot.com

[email protected]