NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes Mileposts:N/A DBNUM: NS0311 Section 14th Street The 14th street viaduct in the City of Hoboken and Union City was constructed in 1910. Despite several emergency repairs, the structure is very poor condition. This project will investigate the long-term rehabilitation and/or replacement alternatives for the deteriorated structure.This project is multi-year funded under the provisions of Section 13 of P.L. 1995, c.108. Total Federal aid needed is anticipated to be $45.0 million for construction.

EAST RUTHERFORD GUTTENBERG CO505 Counties: RUTHERFORD NORTH BERGEN WEST NEW YORK Hudson US1 NJTPI-95 NJ495 SECAUCUS Municipalities: Hoboken City / Union City

CO501 WEEHAWKEN UNION CITY Project Type: Local Aid NS0311 7 0 RCIS Category:

KEARNY HOBOKEN NJ139 Sponsor: Hudson County T Hudson I-78 Est. Total Project Cost: NJ440 (Million) $49.500 Jersey City

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $49.500 Information PHASE SOURCE 2008 2009 2010 2011 2012 DES STP-NJ $4.500 CON STP-NJ $14.000 $31.000 $4.500 $14.000 $31.000

Hudson Page 1 of 33 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes Mileposts:N/A DBNUM: 02311 Section 69th Street NJ Transit will construct a new bridge to provide a grade separation at 69th Street over the North Bergen Railroad Yard, The project is located on 69th Street between West Side Avenue and Nolan Avenue which is to the west of US Route 1&9. A grade separation at 69th Street would eliminate the current at-grade crossing which causes frequent automobile delays due to long freight trains moving through this area. The grade separation would eliminate the at-grade crossing of the CSX and NYS&W rail lines, as well as the Hudson Bergen Light Rail System. This project is multi-year funded under the provisions of Section 13 of P.L. 1995, c.108. Total construction funding needed is anticipated to be $65.000 million.

CO501 Counties: NJ63 I-95 FAIRVIEW NJTP Hudson CARLSTADT Municipalities: North Bergen Twp. US1 Project Type: 02311 System Management RCIS Category: NORTH BERGEN Bridges SECAUCUS GUTTENBERG Sponsor: CO505 NJ TRANSIT

WEST NEW YORK Est. Total Project Cost:

NJ495 (Million) Not Available

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $65.000 Information PHASE SOURCE 2008 2009 2010 2011 2012 ERC STATE $10.000 $15.000 $20.000 $20.000 $10.000 $15.000 $20.000 $20.000

Hudson Page 2 of 33 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes Mileposts:N/A DBNUM: 98551 Section Baldwin Avenue, Intersection Improvements The existing road will be realigned and widened to accommodate increased traffic due to improvements along the waterfront.

This project is funded under the provisions of Section 13 of P.L. 1995, c.108. This is a multi-year funded Federal-aid construction project. Total Federal-aid needed for construction is anticipated to be $5,000,000.

The following special Federal appropriations were allocated to this project. TEA-21/Q92 $2,562,748 (balance available $2,562,748); SAFETEA-LU Section 3577 $1,600,000 (available 20% per year). J495 Counties: Hudson Municipalities:

or Weehawken Twp. rid or C W E E H A W K E N Project Type: U N I O N C I T Y Local Aid RCIS Category:

DBNUM 98551 Road Enhancement Sponsor: US1 Weehawken Twp.

Est. Total Project Cost: (Million) Not Available

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $3.843 Information PHASE SOURCE 2008 2009 2010 2011 2012 CON DEMO $2.563 CON HPP20 $1.280 $3.843

Hudson Page 3 of 33 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes Mileposts:N/A DBNUM: 98537 Section Bergen Arches through Jersey City Palisades Funding is provided for a Needs Assessment/CMS/Concept Development Study/Feasibility Assessment of the Bergen Arches rail through the Jersey City Palisades for the provision of improved east-west transit and/or vehicular access to the Hudson County Waterfront.

The following special Federal appropriation was allocated to this project. TEA-21/Q92 $28,190,236 (balance available $25,813,457).

e Counties:

B Hudson

e

r g

e

n

L H O B O K E N Municipalities: i Ess n e e x Line Jersey City NJ7 NJ139 Project Type:

DBNUM Local Aid PA 1 TH 98537 .Hoboken Term RCIS Category: HUDSON Bridges . 11TT Sponsor: Local Lead .Newport Pavonia NJTP Est. Total Project Cost: (Million) Not Available I-78 .Grove Street

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $26.193 Information PHASE SOURCE 2008 2009 2010 2011 2012 LFA DEMO $1.000 LPD DEMO $25.193 $1.000 $25.193

Hudson Page 4 of 33 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes Mileposts:N/A DBNUM: 06342 Section Castle Point Walkway, Phase 2 - Stevens Institute This project will provide for the continuation of construction of the Hudson River Waterfront Walkway in Hoboken in front of Stevens Institute. The project is sponsored by NJ Department of Envrionmental Protection in conjunction with Stevens Institute.

The following special Federal appropriation was allocated to this project. SAFETEA-LU, $800,000 (available 20% per year).

P NJ495 US1 WEST NEW YORK Counties: SECAUCUS Hudson LYNDHURST NORTH BERGEN CO505 CO501 WEEHAWKEN Municipalities: UNION CITY Hoboken City Project Type: 06342 Other KEARNY HOBOKEN RCIS Category: NJ139 Bike/Ped

Hudson I-78 Sponsor: DEP/Stevens Institut

NJ440 Est. Total Project Cost: Jersey City (Million) Not Available

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $1.640 Information PHASE SOURCE 2008 2009 2010 2011 2012 CON CMAQ $1.000 CON HPP20 $.640 $1.640

Hudson Page 5 of 33 Revision 1 As of 11/29/2007 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes Mileposts:N/A DBNUM: NS0103 Section JFK Boulevard/32nd Street Pedestrian Crossing The county will investigate solutions, including an underpass or overpass, for safely and conveniently moving pedestrians across Kennedy Boulevard in the vicinity of 32nd Street.

RIDGEFIELD FAIRVIEW Counties: CARLSTADT CLIFFSIDE PARK NJ120 CARLSTADT EDGEWATER Hudson EAST RUTHERFORD EAST RUTHERFORD Municipalities: RUTHERFORD GUTTENBERG North Bergen Twp. / Union City CO505 NORTH BERGEN WEST NEW YORK Project Type:

NJTPI-95 NJ495 Local Aid NS0103 SECAUCUS RCIS Category: WEEHAWKEN Bike/Ped UNION CITY Sponsor: 7 Hudson County 0 JerseyJERSEYJERSEY CityCITYCITY Est. Total Project Cost: HOBOKEN (Million) $4.250 NJ139 US1T

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $4.650 Information PHASE SOURCE 2008 2009 2010 2011 2012 DES STP-NJ $.400 ROW STP-NJ $.250 CON STP-NJ $4.000 $.400 $.250 $4.000

Hudson Page 6 of 33 THIS PAGE HAS BEEN REPLACED BY REVISION 1 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes Mileposts:N/A DBNUM: NS0103 Section JFK Boulevard/32nd Street Pedestrian Crossing The county will investigate solutions, including an underpass or overpass, for safely and conveniently moving pedestrians across Kennedy Boulevard in the vicinity of 32nd Street.

RIDGEFIELD FAIRVIEW Counties: CARLSTADT CLIFFSIDE PARK NJ120 CARLSTADT EDGEWATER Hudson EAST RUTHERFORD EAST RUTHERFORD Municipalities: RUTHERFORD GUTTENBERG North Bergen Twp. / Union City CO505 NORTH BERGEN WEST NEW YORK Project Type:

NJTPI-95 NJ495 Local Aid NS0103 SECAUCUS RCIS Category: WEEHAWKEN Bike/Ped UNION CITY Sponsor: 7 Hudson County 0 JerseyJERSEYJERSEY CityCITYCITY Est. Total Project Cost: HOBOKEN (Million) $4.250 NJ139 US1T

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $4.250 Information PHASE SOURCE 2008 2009 2010 2011 2012 ROW STP-NJ $.250 CON STP-NJ $4.000 $.250 $4.000

Hudson Page 7 of 33 New Project Addition Revision 1 As of NJTPA 11/1/2007 Transportation Improvement Program Fiscal Years 2008 - 2011 Routes Mileposts: DBNUM: 06318C Section North Jersey Railroad Doublestack Clearance This project will raise the overhead clearances on Conrail's National Docks Secondary Line from the exisitng 19'6" to the industry intermodal standard od 20'6". These clearance improvements will be achieved through a combination of rock and brick tunnel liner removal (Bergen Tunnel), complete removal of the tunnel roof to the surface (Waldo Tunnel) and removal of two unused overhead railroad bridges. This line serves as one of the main access links for intermodal and automotive rail traffic between the Port of New York and and the U.S. rail network. This access is currently constrained by height limitations in two rail tunnels: the Waldo Tunnel and the Bergen Tunnel, both located in Jersey City. This project is also funded through a special appropriation, FY06 SAFETEA-LU, NRS-1301, Liberty Corridor, $12,000,000. Counties: Hudson Municipalities: Jersey City Project Type: Other RCIS Category: Freight Sponsor: CONRAIL

Est. Total Project Cost: (Million) Not Available

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $24.000 Information PHASE SOURCE 2008 2009 2010 2011 2012 CON HPP10 $12.000 CON OTHER $2.500 $9.500 $14.500 $9.500

Hudson Page 8 of 33 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes Mileposts:N/A DBNUM: 98552 Section Secaucus Connector This project will provide for a highway connector between Route 1&9 (Tonnelle Avenue) and at Secaucus Intermodal Transfer Rail Station and Trans-Hudson Corridor at Bergen Arches. Work will not be initiated on this project until a decision has been made regarding the Bergen Arches study. Any action taken on this project must be coordinated with the NJ Department of Transportation.

The following special Federal appropriations were allocated to this project. TEA-21-Q92 $3,587,847 (balance available $3,587,847).

M B Counties: a e i n r g L e i n n Hudson e L

i n e Municipalities: Bo onton Line Secaucus Town

NJTP DBNUM or Project Type: rrid 98552 Co st ea Local Aid rth No RCIS Category: Road Enhancement CO508 NJ7 Sponsor: sex Line Morris & Es NJ Turnpike Auth

Est. Total Project Cost: NJ139 (Million) Not Available PA US1T TH US1

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $3.588 Information PHASE SOURCE 2008 2009 2010 2011 2012 ERC DEMO $3.588 $3.588

Hudson Page 9 of 33 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes Mileposts:N/A DBNUM: 98549 Section Union City Intermodal Facility, Bergenline Avenue This project will provide for the construction of an intermodal facility on Bergenline Avenue in order to replace the former NJ TRANSIT bus garage that NJ TRANSIT has leased to Union City.

The following special Federal appropriations were allocated to this project. TEA-21/Q92 $2,050,199 (balance available $2,050,199). NJTP CO501 W E S T N E W Y O R K Counties: Hudson NJ495 Municipalities: Union City

S E C A U C U S Project Type: DBNUM Other 98549 RCIS Category: or rid or W E E H A W K E N C Transit Enhancement st ea rth U N I O N C I T Y No Sponsor: NJ TRANSIT

Est. Total Project Cost: (Million) Not Available US1

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $2.050 Information PHASE SOURCE 2008 2009 2010 2011 2012 ERC DEMO $2.050 $2.050

Hudson Page 10 of 33 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 1&9 Mileposts:60.56 - 61.10 DBNUM: 9240 Section NYS&W RR Bridge (23) The existing structure contains two travel lanes in each direction; the approach roadways have four travel lanes. The new bridge will provide two 11-foot travel lanes in each direction and an 8-foot on the southbound side of the structure. The new structure will provide for 7-foot on both sides. The adjacent roadway approaches will also contain two 11- foot travel lanes and eight-foot shoulder in each direction. A four-foot will be provided on both sides of the roadway. A traffic signal will be installed at the intersection of Route 1&9 and a private road. This project will be mostly bicycle/pedestrian compatible.This project is multi-year funded under the provisions of Section 13 of P.L. 1995, c.108. Total construction funding needed is anticipated to be $30.2 million. NJ63NJ63 gh US46US46 US46US46 NJ93NJ93 Fort Lee borough Counties: Palisades Park borough . . Little Ferry borough NJ67 Bergen / Hudson Moonachie borough NJ5NJ5

CO503CO503 Municipalities: Fairview Boro / North Bergen 200 Ridgefield borough Carlstadt borough Twp.

Edgewater borough CO501CO501 Cliffside Park borough Project Type:

Project 9240 System Preservation

33 RCIS Category: Bridges US1US1 Sponsor:

Guttenberg town NJDOT

B North Bergen township rrr I-95I-95I-95 ggg eeee West New York town nnn Est. Total Project Cost: nnn

LLL iiii NJ495NJ495 (Million) nnn $44.518 nnn .

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $27.800 Information PHASE SOURCE 2008 2009 2010 2011 2012 CON BRIDGE $10.800 $17.000 $10.800 $17.000

Hudson Page 11 of 33 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 1&9 Mileposts:51.5 - 55.9 DBNUM: 03356 Section Pulaski Skyway This study will investigate the long term needs and implications of improving this historic structure.

CO Counties: CO501 NORTH BERGEN Hudson / Essex NJ21 SECAUCUS Municipalities: SPUR Jersey City / Kearny Town /

KEARNY Newark City CO508 HOBOKEN HARRISON NJ139 Project Type: 0 03356 System Preservation Hudson US1T RCIS Category:

Newark I-95 Bridges Sponsor: Jersey City NJDOT NJ440 NJTP

I-78 Est. Total Project Cost: (Million) Not Available

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $3.500 Information PHASE SOURCE 2008 2009 2010 2011 2012 CD BRIDGE $3.500 $3.500

Hudson Page 12 of 33 Revision 4 As of 8/18/2008 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 1&9 Mileposts:51.52-52.18; DBNUM: 04322 53.17-55.87 Section Pulaski Skyway, Interim Repairs, Contract 1 This project will provide for interim repairs on the Pulaski Skyway. This interim project may include, but is not limited to, repairs to the balustrade, deck, pier caps, structural steel and spot painting, electrical safety, installation of protective netting over the NJ Turnpike and concrete encasement removal. Due to the size of the structure, there may be additional contracts to provide for the interim repairs.

This project is funded under the provisions of Section 13 of P.L. 1995, c.108. This is a multi-year funded Transportation Trust Fund design/construction project. Total Transportation Trust Fund needed for design/construction is anticipated to be $175,000,000.

NORTH ARLINGTON CO Counties: LYNDHURST CO501 NORTH BERGENUNION CITY Hudson / Essex NJ21 SECAUCUS SECAUCUS Municipalities: PUR Jersey City / Kearny Town /

8508 Newark City KEARNY HOBOKEN HARRISON Project Type: NJ139 System Preservation 0 Newark 04322 Newark US1T Hudson RCIS Category: Bridges Sponsor: Jersey City NJDOT I-95 NJ440 NJTP Est. Total Project Cost: (Million) Not Available

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $66.108 Information PHASE SOURCE 2008 2009 2010 2011 2012 EC AC-STATE $10.000 EC BRIDGE $26.108 $10.000 $10.000 $10.000 $10.000 $36.108 $10.000 $10.000 $10.000

Hudson Page 13 of 33 THIS PAGE HAS BEEN REPLACED BY Revision 3 As of 6/12/2008 REVISION 4 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 1&9 Mileposts:51.52-52.18; DBNUM: 04322 53.17-55.87 Section Pulaski Skyway, Interim Repairs, Contract 1 This project will provide for interim repairs on the Pulaski Skyway. This interim project may include, but is not limited to, repairs to the balustrade, deck, pier caps, structural steel and spot painting, electrical safety, installation of protective netting over the NJ Turnpike and concrete encasement removal. Due to the size of the structure, there may be additional contracts to provide for the interim repairs.

This project is funded under the provisions of Section 13 of P.L. 1995, c.108. This is a multi-year funded Transportation Trust Fund design/construction project. Total Transportation Trust Fund needed for design/construction is anticipated to be $175,000,000.

NORTH ARLINGTON CO Counties: LYNDHURST CO501 NORTH BERGENUNION CITY Hudson / Essex NJ21 SECAUCUS SECAUCUS Municipalities: PUR Jersey City / Kearny Town /

8508 Newark City KEARNY HOBOKEN HARRISON Project Type: NJ139 System Preservation 0 Newark 04322 Newark US1T Hudson RCIS Category: Bridges Sponsor: Jersey City NJDOT I-95 NJ440 NJTP Est. Total Project Cost: (Million) Not Available

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $68.608 Information PHASE SOURCE 2008 2009 2010 2011 2012 EC AC-STATE $10.000 EC BRIDGE $28.608 $10.000 $10.000 $10.000 $10.000 $38.608 $10.000 $10.000 $10.000

Hudson Page 14 of 33 THIS PAGE HAS BEEN REPLACED BY Revision 2 As of 3/27/2008 REVISION 4 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 1&9 Mileposts:51.52-52.18; DBNUM: 04322 53.17-55.87 Section Pulaski Skyway, Interim Repairs, Contract 1 This project will provide for interim repairs on the Pulaski Skyway. This interim project may include, but is not limited to, repairs to the balustrade, deck, pier caps, structural steel and spot painting, electrical safety, installation of protective netting over the NJ Turnpike and concrete encasement removal. Due to the size of the structure, there may be additional contracts to provide for the interim repairs.

This project is funded under the provisions of Section 13 of P.L. 1995, c.108. This is a multi-year funded Transportation Trust Fund design/construction project. Total Transportation Trust Fund needed for design/construction is anticipated to be $175,000,000.

NORTH ARLINGTON CO Counties: LYNDHURST CO501 NORTH BERGENUNION CITY Hudson / Essex NJ21 SECAUCUS SECAUCUS Municipalities: PUR Jersey City / Kearny Town /

8508 Newark City KEARNY HOBOKEN HARRISON Project Type: NJ139 System Preservation 0 Newark 04322 Newark US1T Hudson RCIS Category: Bridges Sponsor: Jersey City NJDOT I-95 NJ440 NJTP Est. Total Project Cost: (Million) Not Available

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $69.608 Information PHASE SOURCE 2008 2009 2010 2011 2012 EC AC-STATE $10.000 EC BRIDGE $29.608 $10.000 $10.000 $10.000 $10.000 $39.608 $10.000 $10.000 $10.000

Hudson Page 15 of 33 THIS PAGE HAS BEEN REPLACED BY Revision 1 As of 12/17/2007 REVISION 4 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 1&9 Mileposts:51.52-52.18; DBNUM: 04322 53.17-55.87 Section Pulaski Skyway, Interim Repairs, Contract 1 This project will provide for interim repairs on the Pulaski Skyway. This interim project may include, but is not limited to, repairs to the balustrade, deck, pier caps, structural steel and spot painting, electrical safety, installation of protective netting over the NJ Turnpike and concrete encasement removal. Due to the size of the structure, there may be additional contracts to provide for the interim repairs.

This project is funded under the provisions of Section 13 of P.L. 1995, c.108. This is a multi-year funded Transportation Trust Fund design/construction project. Total Transportation Trust Fund needed for design/construction is anticipated to be $175,000,000.

NORTH ARLINGTON CO Counties: LYNDHURST CO501 NORTH BERGENUNION CITY Hudson / Essex NJ21 SECAUCUS SECAUCUS Municipalities: PUR Jersey City / Kearny Town /

8508 Newark City KEARNY HOBOKEN HARRISON Project Type: NJ139 System Preservation 0 Newark 04322 Newark US1T Hudson RCIS Category: Bridges Sponsor: Jersey City NJDOT I-95 NJ440 NJTP Est. Total Project Cost: (Million) Not Available

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $38.358 Information PHASE SOURCE 2008 2009 2010 2011 2012 EC BRIDGE $8.358 $10.000 $10.000 $10.000 $10.000 $8.358 $10.000 $10.000 $10.000

Hudson Page 16 of 33 THIS PAGE HAS BEEN REPLACED BY REVISION 4 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 1&9 Mileposts:51.52-52.18; DBNUM: 04322 53.17-55.87 Section Pulaski Skyway, Interim Repairs, Contract 1 This project will provide for interim repairs on the Pulaski Skyway. This interim project may include, but is not limited to, repairs to the balustrade, deck, pier caps, structural steel and spot painting, electrical safety, installation of protective netting over the NJ Turnpike and concrete encasement removal. Due to the size of the structure, there may be additional contracts to provide for the interim repairs.

This project is funded under the provisions of Section 13 of P.L. 1995, c.108. This is a multi-year funded Transportation Trust Fund design/construction project. Total Transportation Trust Fund needed for design/construction is anticipated to be $175,000,000.

NORTH ARLINGTON CO Counties: LYNDHURST CO501 NORTH BERGENUNION CITY Hudson / Essex NJ21 SECAUCUS SECAUCUS Municipalities: PUR Jersey City / Kearny Town /

8508 Newark City KEARNY HOBOKEN HARRISON Project Type: NJ139 System Preservation 0 Newark 04322 Newark US1T Hudson RCIS Category: Bridges Sponsor: Jersey City NJDOT I-95 NJ440 NJTP Est. Total Project Cost: (Million) Not Available

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $40.000 Information PHASE SOURCE 2008 2009 2010 2011 2012 EC BRIDGE $10.000 $10.000 $10.000 $10.000 $10.000 $10.000 $10.000 $10.000 $10.000

Hudson Page 17 of 33 Revision 2 As of 2/28/2008 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 1&9T Mileposts:1&9T: 3.60 - DBNUM: 051 4.20; 1&9: 54.60 - 55.00 Section St. Paul's Avenue/Conrail Bridge (25) This project will replace the existing St. Paul's Avenue Viaduct with a new structure on a new alignment north of the existing structure. This new viaduct will provide direct connections to Route 1&9T, Route 7 , Pulaski Skyway, Route 139 and the local network of streets in Jersey City. The structure will typically consist of 12-foot outside shoulders, 12-foot lanes, 1-foot inside shoulders with concrete median barriers. The project will maintain sidewalks to St. Paul's Avenue and extend to existing sidewalks. The design also includes sidewalks to Tonnelle Avenue. In addition the following structures will also be replaced--Tonnele Avenue over NJ TRANSIT (0902150), Tonnele Avenue (0902151), and Ramp D/Tonnele Circle (0906158). No special bicycle accommodations were made throughout the project; however, there are shoulders. This project is a part of Phase I of Portway, New Jersey's Intermodal Connection to World Trade.

This project is multi-year funded under the provisions of Section 13 of P.L. 1995, c.108. Total construction funding needed is anticipated to be $236.4 million. This project is also funded through a special appropriation, FY06 SAFETEA-LU, NRS-1301, Liberty Corridor, $15,000,000.

The following special Federal appropriations were allocated to this project. FY 2004/Section 115/H17 $2,000,000 (balance available $0).

n L e i n U N I O N C I T Y e Counties: Boo nton Line Hudson

r ido NJTP orr t C as Municipalities: rthe O508 No Jersey City NJ7 K E A R N Y Project Type: DBNUM 051 H O B O K E N Line System Preservation NJ139 PA TH RCIS Category: S1 .Hoboken Term US1T HUDSON Bridges 95 .Journal Square Sponsor: .Newport Pavonia NJDOT NJ440 . Est. Total Project Cost: J E R S E Y C I T Y .Exchange Place (Million) $342.204

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $261.343 Information PHASE SOURCE 2008 2009 2010 2011 2012 CON BRIDGE $29.815 $48.147 $38.440 $50.031 $.000 CON NHS $18.273 $29.509 $23.560 $23.568 $.000 $48.088 $77.656 $62.000 $73.599

Hudson Page 18 of 33 THIS PAGE HAS BEEN REPLACED BY Revision 1 As of 12/17/2007 REVISION 2 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 1&9T Mileposts:1&9T: 3.60 - DBNUM: 051 4.20; 1&9: 54.60 - 55.00 Section St. Paul's Avenue/Conrail Bridge (25) This project will replace the existing St. Paul's Avenue Viaduct with a new structure on a new alignment north of the existing structure. This new viaduct will provide direct connections to Route 1&9T, Route 7 Wittpenn Bridge, Pulaski Skyway, Route 139 and the local network of streets in Jersey City. The structure will typically consist of 12-foot outside shoulders, 12-foot lanes, 1-foot inside shoulders with concrete median barriers. The project will maintain sidewalks to St. Paul's Avenue and extend to existing sidewalks. The design also includes sidewalks to Tonnelle Avenue. In addition the following structures will also be replaced--Tonnele Avenue over NJ TRANSIT (0902150), Tonnele Avenue (0902151), and Ramp D/Tonnele Circle (0906158). No special bicycle accommodations were made throughout the project; however, there are shoulders. This project is a part of Phase I of Portway, New Jersey's Intermodal Connection to World Trade.

This project is multi-year funded under the provisions of Section 13 of P.L. 1995, c.108. Total construction funding needed is anticipated to be $236.4 million. This project is also funded through a special appropriation, FY06 SAFETEA-LU, NRS-1301, Liberty Corridor, $15,000,000.

The following special Federal appropriations were allocated to this project. FY 2004/Section 115/H17 $2,000,000 (balance available $0).

n L e i n U N I O N C I T Y e Counties: Boo nton Line Hudson

r ido NJTP orr t C as Municipalities: rthe O508 No Jersey City NJ7 K E A R N Y Project Type: DBNUM 051 H O B O K E N Line System Preservation NJ139 PA TH RCIS Category: S1 .Hoboken Term US1T HUDSON Bridges 95 .Journal Square Sponsor: .Newport Pavonia NJDOT NJ440 . Est. Total Project Cost: J E R S E Y C I T Y .Exchange Place (Million) $342.204

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $202.800 Information PHASE SOURCE 2008 2009 2010 2011 2012 CON BRIDGE $33.713 $56.500 $62.000 $35.587 $32.413 CON HPP10 $15.000 $48.713 $56.500 $62.000 $35.587

Hudson Page 19 of 33 THIS PAGE HAS BEEN REPLACED BY REVISION 2 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 1&9T Mileposts:1&9T: 3.60 - DBNUM: 051 4.20; 1&9: 54.60 - 55.00 Section St. Paul's Avenue/Conrail Bridge (25) This project will replace the existing St. Paul's Avenue Viaduct with a new structure on a new alignment north of the existing structure. This new viaduct will provide direct connections to Route 1&9T, Route 7 Wittpenn Bridge, Pulaski Skyway, Route 139 and the local network of streets in Jersey City. The structure will typically consist of 12-foot outside shoulders, 12-foot lanes, 1-foot inside shoulders with concrete median barriers. The project will maintain sidewalks to St. Paul's Avenue and extend to existing sidewalks. The design also includes sidewalks to Tonnelle Avenue. In addition the following structures will also be replaced--Tonnele Avenue over NJ TRANSIT (0902150), Tonnele Avenue (0902151), and Ramp D/Tonnele Circle (0906158). No special bicycle accommodations were made throughout the project; however, there are shoulders. This project is a part of Phase I of Portway, New Jersey's Intermodal Connection to World Trade.

This project is multi-year funded under the provisions of Section 13 of P.L. 1995, c.108. Total construction funding needed is anticipated to be $236.4 million. This project is also funded through a special appropriation, FY06 SAFETEA-LU, NRS-1301, Liberty Corridor, $15,000,000.

The following special Federal appropriations were allocated to this project. FY 2004/Section 115/H17 $2,000,000 (balance available $0).

n L e i n U N I O N C I T Y e Counties: Boo nton Line Hudson

r ido NJTP orr t C as Municipalities: rthe O508 No Jersey City NJ7 K E A R N Y Project Type: DBNUM 051 H O B O K E N Line System Preservation NJ139 PA TH RCIS Category: S1 .Hoboken Term US1T HUDSON Bridges 95 .Journal Square Sponsor: .Newport Pavonia NJDOT NJ440 . Est. Total Project Cost: J E R S E Y C I T Y .Exchange Place (Million) $342.204

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $189.500 Information PHASE SOURCE 2008 2009 2010 2011 2012 CON BRIDGE $20.413 $58.009 $51.922 $44.156 CON HPP10 $15.000 $35.413 $58.009 $51.922 $44.156

Hudson Page 20 of 33 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 3 Mileposts:8.49 - 8.50 DBNUM: 99417 Section (eastbound and westbound) Rehabilitation An immediate design and construction contract is required to repair and slow the rate of deterioration to these structures. These bridges exhibit severe deterioration; if no significant repairs are initiated, the useful service life of these structures is compromised. Since the complete replacement of these structures is considered to be unfundable, it is recommended that this rehabilitation effort be undertaken. The rehabilitation design may likely result in more than one construction contract; however, at this time only one construction project is shown. This project is multi-year funded under the provisions of Section 13 of P.L. 1995, c.108. Total construction funding needed is anticipated to be $50.0 million. N C Counties: CLIFTON CO507 RIDGEFIELD Bergen / Hudson RUTHERFORD CARLSTADT NJ120 Municipalities: NJ21 CO503 East Rutherford Boro / EAST RUTHERFORD EAST RUTHERFORD Secaucus Town NJ17 I-95 NJ3 LYNDHURST Project Type: 99417 US1 System Preservation

NJTP RCIS Category: CO505 NORTH BERGEN 06 Bridges SECAUCUS NJ495 Sponsor: NJDOT

WEEHAWKEN Jersey City Est. Total Project Cost: KEARNY (Million) Not Available

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $42.000 Information PHASE SOURCE 2008 2009 2010 2011 2012 DES BRIDGE $2.000 CON STATE $7.166 $32.834 $2.000 $7.166 $32.834

Hudson Page 21 of 33 Revision 1 As of 2/28/2008 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 7 Mileposts:0.20 - 0.60 DBNUM: 075A Section Hackensack River (Wittpenn) Bridge, Contract 1 This project will provide for the new river piers and fender system for a new vertical-lift bridge over the Hackensack River. The new bridge will be located approximately 200 feet north of the existing bridge. There will also be interim mechanical, electrical and structural repairs made to the existing Wittpenn Bridge.

The existing movable Wittpenn Bridge currently provides four ten-foot travel lanes (two eastbound and two westbound) with no shoulders. There is no physical separation between opposing traffic on the bridge. The new vertical-lift structure will carry two 12-foot through lanes, a 12-foot auxiliary lane and an 8 to 10-foot right shoulder in each direction as well as a six-foot sidewalk along the eastbound roadway. An eight-foot median consisting of two three-foot left shoulders and a two-foot raised median barrier will separate opposing traffic flows. The new structure will accommodate pedestrian and bicycle traffic.This project is funded under the provisions of Section 13 of P.L. 1995, c.108. This project is multi-year funded under the provisions of Section 13 of P.L. 1995, c.108. Total Federal aid needed is anticipated to be $81.0 million for construction. This project carries federal demonstration funding as follows: FY 2006 SAFETEA-LU/PL 109-59 $0.8M (ID# NJ 195 available 20% per year). $180,300,000, and FY06 SAFETEA-LU, NRS-1301, Liberty Corridor, $10,000,000. Counties:

UNION CITY Hudson SECAUCUS Municipalities:

I-280 Kearny Town / Jersey City CO508

KEARNY Project Type:

NJ7 System Preservation 075A HOBOKEN NJ139 RCIS Category: Bridges NNewarkewark US1 Hudson County Sponsor: NJTPI-95 US1T NJDOT I-78 Est. Total Project Cost: Jersey City NJ440 Jersey City (Million) $113.253

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $40.438 Information PHASE SOURCE 2008 2009 2010 2011 2012 UTI HPP10 $10.000 CON BRIDGE $29.680 $60.000 CON HPP20 $.758 $10.000 $30.438

Hudson Page 22 of 33 THIS PAGE HAS BEEN REPLACED BY REVISION 1 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 7 Mileposts:0.20 - 0.60 DBNUM: 075A Section Hackensack River (Wittpenn) Bridge, Contract 1 This project will provide for the new river piers and fender system for a new vertical-lift bridge over the Hackensack River. The new bridge will be located approximately 200 feet north of the existing bridge. There will also be interim mechanical, electrical and structural repairs made to the existing Wittpenn Bridge.

The existing movable Wittpenn Bridge currently provides four ten-foot travel lanes (two eastbound and two westbound) with no shoulders. There is no physical separation between opposing traffic on the bridge. The new vertical-lift structure will carry two 12-foot through lanes, a 12-foot auxiliary lane and an 8 to 10-foot right shoulder in each direction as well as a six-foot sidewalk along the eastbound roadway. An eight-foot median consisting of two three-foot left shoulders and a two-foot raised median barrier will separate opposing traffic flows. The new structure will accommodate pedestrian and bicycle traffic.This project is funded under the provisions of Section 13 of P.L. 1995, c.108. This project is multi-year funded under the provisions of Section 13 of P.L. 1995, c.108. Total Federal aid needed is anticipated to be $81.0 million for construction. This project carries federal demonstration funding as follows: FY 2006 SAFETEA-LU/PL 109-59 $0.8M (ID# NJ 195 available 20% per year). $180,300,000, and FY06 SAFETEA-LU, NRS-1301, Liberty Corridor, $10,000,000. Counties:

UNION CITY Hudson SECAUCUS Municipalities:

I-280 Kearny Town / Jersey City CO508

KEARNY Project Type:

NJ7 System Preservation 075A HOBOKEN NJ139 RCIS Category: Bridges NNewarkewark US1 Hudson County Sponsor: NJTPI-95 US1T NJDOT I-78 Est. Total Project Cost: Jersey City NJ440 Jersey City (Million) $113.253

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $91.000 Information PHASE SOURCE 2008 2009 2010 2011 2012 UTI HPP10 $10.000 CON BRIDGE $51.000 $29.680 CON HPP20 $.320 $10.000 $51.320 $29.680

Hudson Page 23 of 33 Revision 1 As of 2/28/2008 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 7 Mileposts:0.0 - 0.60 DBNUM: 075B Section Hackensack River (Wittpenn) Bridge, Contract 2 This project will provide for the off-line portions of the new bridge over the Hackensack River and the improvements to the interchange of Fish House Road. The new vertical-lift span will be constructed under Contract 3. There will be minimal traffic impacts with the construction as the bridge and ramps are on a new alignment approximately 200 feet north of the existing bridge.

The existing movable Wittpenn Bridge currently provides four 10-foot travel lanes (two eastbound and two westbound) with no shoulders. There is no physical separation between opposing traffic on the bridge. The new vertical lift structure will carry two 12-foot through lanes, a 12-foot auxiliary lane and an 8 to 10-foot right shoulder in each direction as well as a six-foot sidewalk along the eastbound roadway. An eight-foot median consisting of two three-foot left shoulders and a two-foot raised median barrier will separate opposing traffic flows. The new structure will accommodate pedestrian and bicycle traffic.This project is funded under the provisions of Section 13 of P.L. 1995, c.108. This is a multi-year funded Transportation Trust Fund construction project. Total Transportation Trust Fund eeded for construction is anticipated to be $104,000,000. CO501 Counties: NORTH BERGEN Hudson SECAUCUS 07 Municipalities: Kearny Town / Jersey City

KEARNY CO508 I-280 Project Type: NJ7 HOBOKEN 075B System Preservation NJTP NJ139 RCIS Category: US 1&9 Hudson Bridges

Newark US1T I-78 Sponsor: NJDOT Jersey City Est. Total Project Cost: 5 (Million) $130.890 NJ440

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $100.840 Information PHASE SOURCE 2008 2009 2010 2011 2012 DES BRIDGE $7.340 ROW STATE $13.500 CON STATE $40.000 $40.000 $24.000 $20.840 $40.000 $40.000

Hudson Page 24 of 33 THIS PAGE HAS BEEN REPLACED BY REVISION 1 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 7 Mileposts:0.0 - 0.60 DBNUM: 075B Section Hackensack River (Wittpenn) Bridge, Contract 2 This project will provide for the off-line portions of the new bridge over the Hackensack River and the improvements to the interchange of Fish House Road. The new vertical-lift span will be constructed under Contract 3. There will be minimal traffic impacts with the construction as the bridge and ramps are on a new alignment approximately 200 feet north of the existing bridge.

The existing movable Wittpenn Bridge currently provides four 10-foot travel lanes (two eastbound and two westbound) with no shoulders. There is no physical separation between opposing traffic on the bridge. The new vertical lift structure will carry two 12-foot through lanes, a 12-foot auxiliary lane and an 8 to 10-foot right shoulder in each direction as well as a six-foot sidewalk along the eastbound roadway. An eight-foot median consisting of two three-foot left shoulders and a two-foot raised median barrier will separate opposing traffic flows. The new structure will accommodate pedestrian and bicycle traffic.This project is funded under the provisions of Section 13 of P.L. 1995, c.108. This is a multi-year funded Transportation Trust Fund construction project. Total Transportation Trust Fund eeded for construction is anticipated to be $104,000,000. CO501 Counties: NORTH BERGEN Hudson SECAUCUS 07 Municipalities: Kearny Town / Jersey City

KEARNY CO508 I-280 Project Type: NJ7 HOBOKEN 075B System Preservation NJTP NJ139 RCIS Category: US 1&9 Hudson Bridges

Newark US1T I-78 Sponsor: NJDOT Jersey City Est. Total Project Cost: 5 (Million) $130.890 NJ440

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $102.000 Information PHASE SOURCE 2008 2009 2010 2011 2012 DES BRIDGE $8.500 ROW STATE $13.500 CON STATE $40.000 $40.000 $24.000 $22.000 $40.000 $40.000

Hudson Page 25 of 33 Revision 1 As of 10/22/2007 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 139 Mileposts:1.30 - 1.65 DBNUM: 053C Section Contract 3 (Hoboken and Conrail ) This project will provide for rehabilitation of the Hoboken Viaduct, as well as deck replacement and superstructure rehabilitation of the Conrail Viaduct. The project is not designed to accommodate bicycle/pedestrian facilities.

This project is multi-year funded under the provisions of Section 13 of P.L. 1995, c.108. Total construction funding is anticipated to be $176.0 million for construction.

The following Federal appropriations were allocated to this project. FY06 SAFETEA-LU/HPP $1,600,000 (available 20% per year). This appropriation also includes Route 139, Contract 2. in e r do i B orr Counties: t C e as r he g ort e N n Hudson

L

i n

e NJ7 Municipalities: ex Line H O B O K E N Jersey City

DBNUM 053C Project Type: NJ139 PA System Preservation US1 TH US1&9 . HUDSON RCIS Category: .Journal Square S1T1T Bridges I-78 .Newport Pavonia Sponsor: NJ440 NJDOT .Grove Street J E R S E Y C I T Y .Exchange Place Est. Total Project Cost: (Million) $196.454

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $92.856 Information PHASE SOURCE 2008 2009 2010 2011 2012 CON BRIDGE $24.188 $26.782 $40.286 $54.494 CON HPP20 $1.600 $25.788 $26.782 $40.286

Hudson Page 26 of 33 THIS PAGE HAS BEEN REPLACED BY REVISION 1 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 139 Mileposts:1.30 - 1.65 DBNUM: 053C Section Contract 3 (Hoboken and Conrail Viaducts) This project will provide for rehabilitation of the Hoboken Viaduct, as well as deck replacement and superstructure rehabilitation of the Conrail Viaduct. The project is not designed to accommodate bicycle/pedestrian facilities.

This project is multi-year funded under the provisions of Section 13 of P.L. 1995, c.108. Total construction funding is anticipated to be $176.0 million for construction.

The following Federal appropriations were allocated to this project. FY06 SAFETEA-LU/HPP $1,600,000 (available 20% per year). This appropriation also includes Route 139, Contract 2. in e r do i B orr Counties: t C e as r he g ort e N n Hudson

L

i n

e NJ7 Municipalities: ex Line H O B O K E N Jersey City

DBNUM 053C Project Type: NJ139 PA System Preservation US1 TH US1&9 .Hoboken Terminal HUDSON RCIS Category: .Journal Square S1T1T Bridges I-78 .Newport Pavonia Sponsor: NJ440 NJDOT .Grove Street J E R S E Y C I T Y .Exchange Place Est. Total Project Cost: (Million) $196.454

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $104.524 Information PHASE SOURCE 2008 2009 2010 2011 2012 CON BRIDGE $24.188 $26.782 $51.954 $42.826 CON HPP20 $1.600 $25.788 $26.782 $51.954

Hudson Page 27 of 33 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 139 Mileposts:N/A DBNUM: 053D Section Traffic Mitigation This project will provide funding for traffic mitigation resulting from two construction contracts on Route 139 which is the entrance and exit roadway to and from the in Jersey City, Hudson County. This traffic mitigation will be required for a number of years in this region. These funds will be used for a public awareness campaign using mass media. Also, funds will be used for NJ TRANSIT initiatives such as park and ride expansions, expanded light rail service, increase in bus service as well as possible increase in ferry service.

NORTH ARLINGTON CO505 Counties: LYNDHURST WEEHAWKEN Hudson NORTH BERGEN SECAUCUS UNION CITY Municipalities: Jersey City

CO508 Project Type: KEARNY I-280 HOBOKEN Allocate 053D

NJ139 RCIS Category: US1T Hudson Bridges

CO501 S1 Sponsor: Newark NJDOT Jersey City NJ440 Est. Total Project Cost:

I-78 (Million) Not Available

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $2.500 Information PHASE SOURCE 2008 2009 2010 2011 2012 EC CMAQ $2.500 $2.500

Hudson Page 28 of 33 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 280 Mileposts:15.30 - 16.80 DBNUM: 04353 Section 4th Street to Newark-Jersey City Turnpike, Resurfacing Pavement milling 2" and resurfacing EB - 4" and WB - 6". Existing drainage will be cleaned. Route I-280 runs in a general west to east direction. Guiderail will be reset and upgraded. Concrete pavement and approach slabs will be fixed. The project begins just east of the Stickel Bridge at mp 14.7 and terminates just prior to the Newark-Jersey City Turnpike at mp 16.8. Counties: NJ7 NJ21 Hudson

CO507 Municipalities: Harrison Town / Kearny Town Project Type: EAST NEWARK System Preservation KEARNY Newark RCIS Category: 04353 Road Preservation

HARRISON Sponsor: NJDOT

US1T Est. Total Project Cost: NJTPI-95 (Million) $8.209

US1

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $8.237 Information PHASE SOURCE 2008 2009 2010 2011 2012 CON I-MAINT $8.237 $8.237

Hudson Page 29 of 33 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 280 Mileposts:14.92 - 16.00 DBNUM: 04305 Section Harrison Township Operational Improvements This project proposes consolidation of interstate ramps at a single location at the east end of Harrison to serve access needs to the southeastern part of town and alleviate traffic bottlenecks. The feasibility assessment is being handled as a local lead project.

The following special Federal appropriations were allocated to this project. SAFETEA-LU FY 2005: Transportation Improvements $3,000,000; High Priority Funding $2,000,000 and $8,000,000; these amounts are available over a five-year period. FY 2005/Interstate Mainenance $661,333 (balance available $661,333) and FY 2005/National Corridor Planning and Border Development program $992,000 (balance available $992,000); FY06 SAFETEA-LU $3,000,000 and $8,000,000 (available 20% per year).

GSP NJTPI-95 Counties: BELLEVILLE BLOOMFIELD NORTH ARLINGTON Hudson LYNDHURST Municipalities: CO508 EAST ORANGE

NJ21 Harrison Town / Kearny Town

EAST NEWARK Project Type:

NJ58 System Management 04305 04305 KEARNY CO510 RCIS Category: HARRISON Road Enhancement

US1T Sponsor: Newark Local Lead Jersey City NJ440 Est. Total Project Cost: US1 CO509 (Million) NJ27 Not Available I-78 C

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $3.000 Information PHASE SOURCE 2008 2009 2010 2011 2012 LFA HPP10 $1.000 LPD HPP20 $2.000 $3.000

Hudson Page 30 of 33 New Project Addition Revision 1 As of NJTPA 8/20/2008 Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 440 / 1&9 Mileposts:N/A DBNUM: 06307 Section Boulevard through Jersey City The proposed project intends to allow Rt. 440/Rt. 1&9 to function as a principal arterial and as a neighborhood main street. The project will improve connections between the local street network and address safety concerns for pedestrians and bicyclists. Part of the plan is the creation of an urban boulevard along Rt. 440/1&9 in order to separate local and express traffic. Light rail expansion and other aesthetic improvements will be included in the study.

The Federal SAFETEA-LU legislation provided a special appropriation for a study and preliminary engineering designs for a boulevard on Route 440 and Route 1&9 through Jersey City.

The following special Federal appropriations were allocated to this project: FY05 SAFETEA LU/HPP $1,800,000. Bill lines #350 and #3567 Counties: Hudson Municipalities: Jersey City Project Type:

RCIS Category: Road Enhancement Sponsor: Jersey City

Est. Total Project Cost: (Million) Not Available

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $1.530 Information PHASE SOURCE 2008 2009 2010 2011 2012 ERC HPP 20 $1.220 $.310 $1.220 $.310

Hudson Page 31 of 33 Revision 1 As of 4/22/2008 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 495 Mileposts:0.8 - 1.0 DBNUM: 06373 Section Route 1&9/Paterson Plank Road Bridge An immediate design and construction contract is required to repair, and to slow the rate of deterioration to this structure. Several elements of this bridge exhibit severe deterioration and if no significant repairs are initiated, the useful service lift of this structure will be compromised. Since the complete replacement of this structure is considered unfundable, it is recommended that this rehabilitation effort be undertaken. The rehabilitation design may likely result in more than one construction contract; however, at this time, only one construction project is shown. This project is multi-year funded under the provisions of Section 13 of P.L. 1995, c.108. Total construction funding needed is anticipated to be $39.65 million. Counties: EAST RUTHERFORD Hudson

LYNDHURST CO505 NORTH BERGEN Municipalities: North Bergen Twp. US1 WEST NEW YORK NJTP NJ495 SECAUCUS 06373 Project Type: System Preservation WEEHAWKEN CO501 I-95 UNION CITY RCIS Category: Bridges

KEARNY Sponsor: KEARNY HOBOKEN 8 Jersey City NJDOT

NJ139 Est. Total Project Cost: (Million) $54.613 T Hudson I-78

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $28.600 Information PHASE SOURCE 2008 2009 2010 2011 2012 DES BRIDGE $3.600 CON BRIDGE $7.500 $17.500 $3.600 $7.500 $17.500

Hudson Page 32 of 33 THIS PAGE HAS BEEN REPLACED BY REVISION 1 NJTPA Transportation Improvement Program Fiscal Years 2008 - 2011 Routes 495 Mileposts:0.8 - 1.0 DBNUM: 06373 Section Route 1&9/Paterson Plank Road Bridge An immediate design and construction contract is required to repair, and to slow the rate of deterioration to this structure. Several elements of this bridge exhibit severe deterioration and if no significant repairs are initiated, the useful service lift of this structure will be compromised. Since the complete replacement of this structure is considered unfundable, it is recommended that this rehabilitation effort be undertaken. The rehabilitation design may likely result in more than one construction contract; however, at this time, only one construction project is shown. This project is multi-year funded under the provisions of Section 13 of P.L. 1995, c.108. Total construction funding needed is anticipated to be $39.65 million. Counties: EAST RUTHERFORD Hudson

LYNDHURST CO505 NORTH BERGEN Municipalities: North Bergen Twp. US1 WEST NEW YORK NJTP NJ495 SECAUCUS 06373 Project Type: System Preservation WEEHAWKEN CO501 I-95 UNION CITY RCIS Category: Bridges

KEARNY Sponsor: KEARNY HOBOKEN 8 Jersey City NJDOT

NJ139 Est. Total Project Cost: (Million) $54.613 T Hudson I-78

Unconstrained FY 2008 - 2011 TIP Cost: (Million) $26.500 Information PHASE SOURCE 2008 2009 2010 2011 2012 DES BRIDGE $1.500 CON BRIDGE $7.500 $17.500 $1.500 $7.500 $17.500

Hudson Page 33 of 33