(Draft) IND: Assam Power Sector Investment Program – Tranche 2 Initial Environmental Examination (Draft) April 2015 IND: Assam Power Sector Investment Program – Tranche 2 Prepared by Assam Power Distribution Company Limited for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 1 April 2015) Currency unit – Indian rupee/s (Re/Rs) Rs 1.00 – $0.0161 $1.00 – Rs 62.27 ABBREVIATIONS ADB – Asian Development Bank AEGCL – Assam Electricity Grid Corporation Limited AERC – Assam Electricity Regulatory Commission APGCL – Assam Power Generation Corporation Limited APDCL – Assam Power Distribution Company Limited ASEB – Assam State Electricity Board BIS – Bureau of Indian Standards CEA – Central Electricity Authority CPCB – Central Pollution Control Board, Government of India CGWB – Central Ground Water Board DC or D/C – Double Circuit DPR – Detailed Project Report EA – Executing Agency EARF – Environmental Assessment and Review Framework EHV – Extra High Voltage EIA – Environmental Impact Assessment EMoP – Environmental Monitoring Plan EMP – Environmental Management Plan ESMU – Environment and Social Management Unit FFA – Financing Framework Agreement GHG – Greenhouse Gas GoA – Government of Assam GoI – Government of India GMDA – Guwahati Metropolitan Development Authority GSS – Grid Sub-station GRM – Grievance Redress Mechanism IA – Implementing Agency IEE – Initial Environmental Examination MFF – Multi-tranche Financing Facility MOEF – Ministry of Environment and Forests, Government of India PIU – Project Implementing Unit PMU – Project Management Unit PCB – Pollution Control Board, Assam ROW – Right of Way RP – Resettlement Plan SC or S/C – Single Circuit SF6 – Sulphur Hexafluoride WEIGHTS AND MEASURES ha (hectare) - 10,000 sq. m = 2.47105 Acre km (kilometer) - 1,000 m kV - Kilovolt (1,000 volt) kW - Kilowatt (1,000 watt) kWh - Kilowatt-hour mG - milliGauss MVA - Megavolt-Amperes MW - Megawatt GWh/MU - Gigawatt-hour or Million kWh oC - degree Celsius NOTES (i) The fiscal year (FY) of the Government of India and its agencies begins on 1 April. “FY” before a calendar year denotes the year in which the fiscal year starts, e.g., FY2014 begins on 1 April 2014 and ends on 31 March 2015. (ii) In this report, "$" refers to US dollars. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. TABLE OF CONTENTS EXECUTIVE SUMMARY 1. INTRODUCTION ................................................................................................................ 1 1.1 Project Scope .......................................................................................................... 1 1.1.1 Impact and Outcome ................................................................................................ 1 1.1.2 Output ...................................................................................................................... 1 1.1.3 Investment Plan ....................................................................................................... 2 1.2 The Need for Initial Environmental Examination ....................................................... 2 1.2.1 National and State Level Requirements ................................................................... 2 1.2.2 Requirements of ADB .............................................................................................. 3 1.2.3 Objectives of the IEE ............................................................................................... 3 1.2.4 Scope and Methodology .......................................................................................... 3 1.3 Structure of the Report ............................................................................................. 4 2. POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK .................................................. 6 2.1 ADB Safeguard Policy Statement (SPS) 2009 ......................................................... 6 2.2 Applicable National and State Legislation ................................................................ 6 2.2.1 Clearance under the Forest (Conservation) Act 1980 .............................................. 7 2.2.2 National and State Environmental Assessment Requirements ................................. 7 2.3 Comparison of Environmental Requirements of ADB and GoI ................................. 8 2.4 Applicable International Environmental Agreements ...............................................13 2.5 Other Applicable Laws and Policies ........................................................................13 3. DESCRIPTION OF THE PROJECT ...................................................................................15 3.1 Project Description ..................................................................................................15 3.2 Project Justification and Selection Criteria ..............................................................17 3.3 Project Location ......................................................................................................18 3.4 Project Implementation Schedule ............................................................................23 3.5 Implementation Activities ........................................................................................25 3.6 Project Management and Implementation Structure................................................25 4. DESCRIPTION OF THE ENVIRONMENT .........................................................................27 4.1 Geographical Location of Assam ............................................................................28 4.2 Physical Resources ................................................................................................29 4.2.1 Topography, Geology, and Soils .............................................................................29 4.2.2 Meteorology and Climate ........................................................................................29 4.2.3 Air Quality and Noise ..............................................................................................29 4.2.4 Natural Hazards ......................................................................................................30 4.3 Biological Resources ..............................................................................................38 4.4 Socio-Economic Profile ...........................................................................................50 4.5 Cultural and Archaeological Resources ..................................................................53 5. ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES ................56 5.1 Criteria for Site and Route Selection .......................................................................56 5.2 Planning and Pre-construction Stage ......................................................................57 5.2.1 Location and Design of Substation ..........................................................................57 5.2.2 Route Selection for New 33 kV and 11 kV Distribution Lines ..................................57 5.2.3 Choice of Technology .............................................................................................58 5.3 Critical Environmental Screening Criteria ................................................................59 5.3.1 Loss of Irreplaceable Resources .............................................................................59 5.3.2 Accelerated Use of Resources for Short-Term Gains ..............................................59 5.3.3 Endangering Species ..............................................................................................59 5.3.4 Promoting Undesirable Rural to Urban Migration ....................................................59 5.4 Construction Stage .................................................................................................59 5.4.1 Workforce Organization and Orientation .................................................................60 5.4.2 Site preparation and Civil Works .............................................................................61 5.5 Operation Phase .....................................................................................................64 5.5.1 Use of mineral oil ....................................................................................................64 5.5.2 O & M of substation and distribution lines ...............................................................65 6. ANALYSIS OF ALTERNATIVES ........................................................................................67 6.1 Site and Route Selection ........................................................................................67 7. INFORMATION DISCLOSURE, CONSULTATION, AND PARTICIPATION .......................70 7.1 Consultation and Participation ................................................................................70 7.2 Information Disclosure ............................................................................................70 8. GRIEVANCE REDRESS MECHANISM .............................................................................72
Recommended publications
  • LIST of ACCEPTED CANDIDATES APPLIED for the POST of GD. IV of AMALGAMATED ESTABLISHMENT of DEPUTY COMMISSIONER's, LAKHIMPUR
    LIST OF ACCEPTED CANDIDATES APPLIED FOR THE POST OF GD. IV OF AMALGAMATED ESTABLISHMENT OF DEPUTY COMMISSIONER's, LAKHIMPUR Date of form Sl Post Registration No Candidate Name Father's Name Present Address Mobile No Date of Birth Submission 1 Grade IV 101321 RATUL BORAH NAREN BORAH VILL:-BORPATHAR NO-1,NARAYANPUR,GOSAIBARI,LAKHIMPUR,Assam,787033 6000682491 30-09-1978 18-11-2020 2 Grade IV 101739 YASHMINA HUSSAIN MUZIBUL HUSSAIN WARD NO-14, TOWN BANTOW,NORTH LAKHIMPUR,KHELMATI,LAKHIMPUR,ASSAM,787031 6002014868 08-07-1997 01-12-2020 3 Grade IV 102050 RAHUL LAMA BIKASH LAMA 191,VILL NO 2 DOLABARI,KALIABHOMORA,SONITPUR,ASSAM,784001 9678122171 01-10-1999 26-11-2020 4 Grade IV 102187 NIRUPAM NATH NIDHU BHUSAN NATH 98,MONTALI,MAHISHASAN,KARIMGANJ,ASSAM,788781 9854532604 03-01-2000 29-11-2020 5 Grade IV 102253 LAKHYA JYOTI HAZARIKA JATIN HAZARIKA NH-15,BRAHMAJAN,BRAHMAJAN,BISWANATH,ASSAM,784172 8638045134 26-10-1991 06-12-2020 6 Grade IV 102458 NABAJIT SAIKIA LATE CENIRAM SAIKIA PANIGAON,PANIGAON,PANIGAON,LAKHIMPUR,ASSAM,787052 9127451770 31-12-1994 07-12-2020 7 Grade IV 102516 BABY MISSONG TANKESWAR MISSONG KAITONG,KAITONG ,KAITONG,DHEMAJI,ASSAM,787058 6001247428 04-10-2001 05-12-2020 8 Grade IV 103091 MADHYA MONI SAIKIA BOLURAM SAIKIA Near Gosaipukhuri Namghor,Gosaipukhuri,Adi alengi,Lakhimpur,Assam,787054 8011440485 01-01-1987 07-12-2020 9 Grade IV 103220 JAHAN IDRISH AHMED MUKSHED ALI HAZARIKA K B ROAD,KHUTAKATIA,JAPISAJIA,LAKHIMPUR,ASSAM,787031 7002409259 01-01-1988 01-12-2020 10 Grade IV 103270 NIHARIKA KALITA ARABINDA KALITA 006,GUWAHATI,KAHILIPARA,KAMRUP
    [Show full text]
  • Histrical Background Changlang District Covered with Picturesque Hills Lies in the South-Eastern Corner of Arunachal Pradesh, Northeast India
    Histrical Background Changlang District covered with picturesque hills lies in the south-eastern corner of Arunachal Pradesh, northeast India. It has an area of 4,662 sqr. Km and a population of 1,48,226 persons as per 2011 Census. According to legend the name Changlang owes its origin to the local word CHANGLANGKAN which means a hilltop where people discovered the poisonous herb, which is used for poisoning fish in the river. Changlang District has reached the stage in its present set up through a gradual development of Administration. Prior to 14th November 1987, it was a part of Tirap District. Under the Arunachal Pradesh Reorganization of Districts Amendment Bill, 1987,the Government of Arunachal Pradesh, formally declared the area as a new District on 14th November 1987 and became 10th district of Arunachal Pradesh. The legacy of Second World War, the historic Stilwell Road (Ledo Road), which was constructed during the Second World War by the Allied Soldiers from Ledo in Assam, India to Kunming, China via hills and valleys of impenetrable forests of north Burma (Myanmar) which section of this road is also passed through Changlang district of Arunachal Pradesh and remnant of Second World War Cemetery one can see at Jairampur – Nampong road. Location and Boundary The District lies between the Latitudes 26°40’N and 27°40’N, and Longitudes 95°11’E and 97°11’E .It is bounded by Tinsukia District of Assam and Lohit District of Arunachal Pradesh in the north, by Tirap District in the west and by Myanmar in the south-east.
    [Show full text]
  • International Journal of History & Scientific Approach
    International Journal of History & Scientific Approach History and Culture: A Study on the Importance of the Place Names of Chandrapur Rosie Patangia Assistant Professor and Head, Deptt of English, Narangi Anchalik Mahavidyalaya, Narengi, Guwahati-171, Dist: Kamrup (Metro), Assam, India & Ph.D Research Scholar, Folklore Department, Gauhati University, Guwahati- 781014, Assam, India Abstract: History has its culture. Every place is denoted by a name. Each place name carries its own culture and tradition. The memory of a place is deeply embedded in its history, historical characters, legendary heroes, historical events etc. Assam in general and Kamrup in particular is rich in its culture and history. The place names speak of the past history of that place and helps in building identity. In Assam, we find innumerable places connected with oral narratives, folk beliefs, culture, history, myths, and legends. The present paper is an attempt to study the place names of Chandrapur and its cultural and historical significance. Key words: History, Culture, Place, Names, Chandrapur, historical significant. Introduction Every place from the macrocosm to the microcosm embodies its community, history and culture. Robert Murphy (1986) highlights that “Culture means the total body of tradition borne by a society and transmitted from generation to generation.” The Oxford English Dictionary (2007) defines a ‘place’ as a ‘particular position or area or a portion of space occupied by or set aside for someone or something’. It defines a ‘name’ as ‘a word or words by which someone or something is known.”Each place has its own cultural and historical background. While the term ‘cultural’ refers to the ideas, customs and social behavior of a society, the word ‘historical’ relates to past events or history.
    [Show full text]
  • Executive Summary Of
    EXECUTIVE SUMMARY OF Environmental Impact Assessment Report for Proposed 1×660 MW Coal Based Super Critical Thermal Power Plant at Saleki NC & Lekhapani (V), Makum Mouza & Margherita Revenue Circle(T), Tinsukia (D), Assam. (for Public Hearing as per MoEF Notification S.O.1533 Dt. 14TH Sept 2006) Submitted To State Pollution Control Board, Assam Bamunimaidam, Guwahati-21 Submitted By Assam Power Generation Corporation Limited (APGCL) Bijulee Bhavan, 3rd Floor, Paltan Bazar,Guwahati-781001 Prepared By Ramky Enviro Engineers Limited, Ramky House, Somajiguda, Hyderabad-500082 (QCI/NABET Approved - Certificate No. NABET/EIA/1013/016) 1x660 MW Coal Based Thermal Power Plant at Margherita, Assam EXECUTIVE SUMMARY 1 INTRODUCTION Assam Power Generation Corporation Limited (APGCL), situated at Bijulee Bhawan, 3rd Floor, Paltan Bazar, Guwahati in the State of Assam proposes to set up a 1x660 MW Coal based Margherita Power Station project in the district Tinsukia of the state Assam. APGCL has conceived setting up a Thermal Power Station which consists of Coal Fired Boiler, Steam Turbine Generator Units and Balanced of Plant (BOP) Units. Based on the proposed capacity, the project is supposed to fall under category A of Project Activity 1(d), Thermal Power Plants (≥ 500 MW coal/ lignite/ naptha & gas based) under the schedule as per EIA notification issued on 14th September, 2006. In order to assess the likely impacts from current project on the surrounding environment and evaluating the means of alleviating the likely negative impacts, if any, from the proposed project, APGCL has retained Ramky Enviro Engineers Ltd. as their environmental consultant. The proposal was considered by the Expert Appraisal Committee (EAC) in during its 66th Meeting on 6th February, 2013 for determination of the Terms of Reference for undertaking detailed EIA Study in accordance with the provisions of the EIA notification dated 14th September, 2006.
    [Show full text]
  • Accepted List of Peon
    Sheet1 Accepted List of Peon Roll No Applicant Name Father's Name & Address RADHIKA BARUAH, VILL-KALITAPARA. PO+PS-AZARA, 20001 ABANI BARUAH DIST-KAMRUP, ASSAM, 781017 S/O KHAGEN KALITA TANGLA TOWN, WARD NO-4 20002 ABANI KALITA HOUSE NO-81 DIST-UDALGURI PIN-784521 NAREN DAS, VILL-GARAL BHATTA PARA, PO-BHATTA 20003 ABANI KR. DAS PARA, DIST-KAMRUP, PIN-781017 20004 ABANI RAJBONGSHI, TOWN-PALLA ROAD, PO/DIST-NALBARI, PIN-781335 AHAZZAL MONDAL, GUILEZA, PO-CHARCHARIA, 20005 ABBAS ALI DIST-BARPETA, ASSAM, 781319 S/O LATE AJIBAR RAHMAN CHOUDHURY ABDUL BATEN 20006 ABHAYAPURI TOWN,NAYAPARA WARD NO-4 PO/PS- CHOUDHURY ABHAYAPURI DIST-BONGAIGAON ASSAM S/O NUR ISLAM CHAPGARH PT-1 PO-KHUDIMARI 20007 ABDUL HAKIM PS- GAURIPUR DISTT- DHUBRI HASAN ALI, VILL-NO.2 CHENGAPAR, PO-SIPAJHAR, 20008 ABDUL HAMID DIST-DARANG, PIN-784145 S/O LT. SARIF UDDIN LASKAR VILL- DUDPUR PART-III, 20009 ABDUL HANNAN LASKAR PO- DUDPUR VIA ARUNACHAL DIST- CACHAR, ASSAM Abdul Jalil 20010 Late Mafiguddin Ahmed, Mukalmua, nalbari-781126 MUZAHAR ALI AHMED, VILL- CHENGELIA, PO- 20011 ABDUL JUBBER AHMED KALAHBHANGA, DIST- BARPETA, ASSAM, 781315 MD ISHAHQUE ALI, VILL+PO-PATUAKATA, PS- 20012 ABDUL KARIM MIKIRBHETA, MORIGAON, 782104 S/o Nazrul Haque, Dabotter Barundanga, 20013 Abdul Khaleke Motherjhar, Golakgonj, Dhubri S/O MUSLEM MOLLAH VILL- GUILEZA, PO- 20014 ABDUL KHALEQUE CHARCHORRIA, DIST- BARPETA, ASSAM, PIN-781319 S/O LATE IDRISH ALI BARBHUIYA, VILL-DHAMALIA, ABDUL KHALIQUE 20015 PO-UTTAR KRISHNAPUR, DIST-CACHAR, ASSAM, PIN- BARBHUIYA, 788006 MD ANWAR HUSSAIN, VILL-SIOLEKHATI, PO- 20016 ABDUL MATIN KACHARIHAT, GOLAGHAT, 7865621 Page 1 Sheet1 KASHEM ULLA, VILL-SINDURAI PART II, PO-BELGURI, 20017 ABDUL MONNAF ALI PS-GOLAKGANJ, DIST-DHUBRI, 783334 S/O LATE ABDUL WAHAB VILL-BHATIPARA 20018 ABDUL MOZID PO&PS&DIST-GOALPARA ASSAM PIN-783101 ABDUL ROUF,VILL-GANDHINAGAR, PO+DIST- 20019 ABDUL RAHIZ BARPETA, 781301 Late Fizur Rahman Choudhury, vill- badripur, PO- 20020 Abdul Rashid choudhary Badripur, Pin-788009, Dist- Silchar MD.
    [Show full text]
  • Gazetteer of India Tirap District
    Gazetteer of India ARUNACHAL PRADESH Tirap District GAZETTEER OF INDIA ARUNACHAL PRADESH TIRAP DISTRICT ARUNACHAL PRADESH DISTRICT GAZETTEERS TIRAP DISTRICT Edited by S. DUTTA CHOUDHURY GOVERNMENT OF ARUNACHAL PRADESH 1980 Published by Shri R.N. Bagchi Director of Information and Public Relations Government of Arunachal Pradesh, Shillong Printed by N.K, Gossain & Co. Private Ltd. 13/7ArifFRoad Calcutta 700 067 © Government of Arunachal Pradesh First Edition: 1980 First Reprint Edition: 2008 ISBN--978-81-906587-1-3 Price: Rs. 225/- Reprinted by M/s Himalayan Publishers Legi Shopping Con^jlex, BankTinali,ltanagar-791 111. FOREWORD I am happy to know that the Tirap District Gazetteer is soon coming out. This will be the second volume of District Gazetteers of Arunachal Pradesh — the first one on Lohit District was published during last year. The Gazetteer presents a comprehensive view of the life in Tirap District. The narrative covers a wide range of subjects and contains a wealth of information relating to the life style of the people, the geography of the area and also developments made so far in various sectors. The Tirap District Gazetteer, 1 hope, would serve a very useful purpose as a reference book. Raj Niwas R. N. Haldipur ltanagar-791111 Lieutenant Governor, Arunachal Pradesh May 6. 1980 PREFACE The present volume is the second in the series of Arunachal Pradesh District Gazetteers. The publication of this volume is the work of the Gazetteers Department of the Government of Arunachal Pradesh, carried out persistently over a number of years. In fact, the draft of Tirap District Gazetteer passed through a long course of examinations, changes and rewriting until the revised draft recommended by the Advisory Board in 1977 was approved by the Government of Arunachal Pradesh in 1978 and finally by the Government of India in 1979.
    [Show full text]
  • DIVERSITY and EX SITU CONSERVATION of ORCHID SPECIES in LEKHAPANI.Pmd
    J. Orchid Soc. India, 33: 113-119, 2019 ISSN 0971-5371 DIVERSITY AND EX SITU CONSERVATION OF ORCHID SPECIES IN LEKHAPANI RESERVE FOREST UNDER MAKUM COAL FIELD, ASSAM Kuntala N Barua, Bonanya Bora, and Abhinab Borah Rain Forest Research Institute, Jorhat- 785 001, Assam, India Abstract Orchids are fascinating group of angiosperms that have attracted the admiration of scientists, horticulturists, and industrialists because of their amazing ornamentation, brilliant color combinations, and extended blooming period. They are very sensitive and have high specificity towards pollution free environment of their niches and need much more care for protection of their habitat for their existence. The process of open-cast coal mining involves removal of top overlying soil layer with vegetation cover, leading to denudation and total elimination of the forest cover. Majority of the orchids are found as epiphytes and destruction of trees has created permanent elimination of these epiphytes. Assam is blessed with wide-range of eco-climatic suitability to fulfill the specific micro-climatic requirement for the growth of orchids. The present study deals with the natural diversity of orchids within Lekhapani Reserve Forest of Makum Coal Field in Digboi Forest Division under Dihing-Patkai Wildlife Sanctuary. The reserve forest covers an area of 1158.46 hectares. Lekhapani- Tipongpani Mining lease lies on the South West border with Arunachal Pradesh. Bio-geographically, the study site is situated in the Eastern Himalayan province where the major forest type is Assam Valley Tropical Wet Evergreen Forest dominated by Canarium resiniferum Brace ex King., Dipterocarpus retusus Blume., Lagerstroemia speciosa (L.) Pers., Terminalia bellerica (Gaertn.) Roxb., T.
    [Show full text]
  • The Historical Road for Common Prosperity of South East Asia
    International Journal of Humanities and Social Science Vol. 4, No. 9(1); July 2014 The Historical Road for Common Prosperity of South East Asia Dr (Mrs) Juri Gogoi Konwar Assistant Professor, Dept of Cultural Studies Tezpur Central University Assam India – 784028 Abstract During the Second World War, the road from Ledo, North East Frontier rail station of Assam, India, to Kunming of Yunnan province, China via Lekhapani, Jairampur, Nampong and Pangsau pass of Patkai range, Shindbwiyang, Upper Chindwin, Hukawng and Mogaung valleys, Bhamo, Burma (Myanmar) road and then to Wanting, at China border was constructed by the Allied Forces for maintaining military supply by road. Starting on December 1, 1942 the construction was completed on May 20, 1945. The road passed through some of the most difficult mountainous terrains of the world having 700 bridges over big and small rivers. After the war, for some time the road was maintained, thereafter it remained to be almost completely neglected. In the light of ‘Open Market Policy’ adopted by the international community, desire of the South East Asian countries to have common economic prosperity and ‘Look East Policy’ of India, it is important for the concerned countries to reconstruct and reopen the road. The paper presents an account of its possible utilization for the socio-cultural and economic linkages of the connected and nearby countries for peace and prosperity. Keywords: Ledo-Stilwell road, heritage, prosperity, South East Asia Introduction During one hundred twenty one years of British administration of Assam in India, there was a road from her eastern most small town Ledo to Myanmar.
    [Show full text]
  • List of Candidates Called for Preliminary Examination for Direct Recruitment of Grade-Iii Officers in Assam Judicial Service
    LIST OF CANDIDATES CALLED FOR PRELIMINARY EXAMINATION FOR DIRECT RECRUITMENT OF GRADE-III OFFICERS IN ASSAM JUDICIAL SERVICE. Sl No Name of the Category Roll No Present Address Candidate 1 2 3 4 5 1 A.M. MUKHTAR AHMED General 0001 C/O Imran Hussain (S.I. of Ploice), Convoy Road, Near Radio Station, P.O.- CHOUDHURY Boiragimath, Dist.- Dibrugarh, Pin-786003, Assam 2 AAM MOK KHENLOUNG ST 0002 Tipam Phakey Village, P.O.- Tipam(Joypur), Dist.- Dibrugarh(Assam), Pin- 786614 3 ABBAS ALI DEWAN General 0003 Vill: Dewrikuchi, P.O.:-Sonkuchi, P.S.& Dist.:- Barpeta, Assam, Pin-781314 4 ABDIDAR HUSSAIN OBC 0004 C/O Abdul Motin, Moirabari Sr. Madrassa, Vill, PO & PS-Moirabari, Dist-Morigaon SIDDIQUEE (Assam), Pin-782126 5 ABDUL ASAD REZAUL General 0005 C/O Pradip Sarkar, Debdaru Path, H/No.19, Dispur, Ghy-6. KARIM 6 ABDUL AZIM BARBHUIYA General 0006 Vill-Borbond Part-III, PO-Baliura, PS & Dist-Hailakandi (Assam) 7 ABDUL AZIZ General 0007 Vill. Piradhara Part - I, P.O. Piradhara, Dist. Bongaigaon, Assam, Pin - 783384. 8 ABDUL AZIZ General 0008 ISLAMPUR, RANGIA,WARD NO2, P.O.-RANGIA, DIST.- KAMRUP, PIN-781365 9 ABDUL BARIK General 0009 F. Ali Ahmed Nagar, Panjabari, Road, Sewali Path, Bye Lane - 5, House No.10, Guwahati - 781037. 10 ABDUL BATEN ACONDA General 0010 Vill: Chamaria Pam, P.O. Mahtoli, P.S. Boko, Dist. Kamrup(R), Assam, Pin:-781136 11 ABDUL BATEN ACONDA General 0011 Vill: Pub- Mahachara, P.O. & P.S. -Kachumara, Dist. Barpeta, Assam, Pin. 781127 12 ABDUL BATEN SK. General 0012 Vill-Char-Katdanga Pt-I, PO-Mohurirchar, PS-South Salmara, Dist-Dhubri (Assam) 13 ABDUL GAFFAR General 0013 C/O AKHTAR PARVEZ, ADVOCATE, HOUSE NO.
    [Show full text]
  • THE GAUHATI HIGH COURT at GUWAHATI (The High Court of Assam, Nagaland, Mizoram and Arunachal Pradesh) PRINCIPAL SEAT at GUWAHATI
    THE GAUHATI HIGH COURT AT GUWAHATI (The High Court of Assam, Nagaland, Mizoram and Arunachal Pradesh) PRINCIPAL SEAT AT GUWAHATI Writ Petition (C) No.4863/2008 1. SMT. ANIMA RAY, D/O DUGDHANATH RAY, VILL. KHAMARPARA, P.O. SRIJANGRAM, DIST. BONGAIGAON, ASSAM. 2. SRI RAMDA CH. SARKAR, S/O HAREKRISHNA CH. SARKAR, VILL. & P.O. DUMERGURI, DIST. BONGAIGAON, ASSAM. 3. MD. MOZIBOR RAHMAN, S/O BILAT ALI, VILL. PAHARTOLI, P.O. ABHAYAPURI, DIST. BONGAIGAON, ASSAM. 4. SHAHJAHAN ALI, S/O LT. AKBAR ALI, VILL. & P.O. MALEGARH, DIST. BONGAIGAO, ASSAM. 5. MD. AZIBAR RAHMAN, S/O AHAMMAD ALI, VILL. & P.O. TOPGAON, DIST. BONGAIGAON, ASSAM. 6. MD. MOTIUR RAHMAN, S/O LT. ABDUL HAMID, VILL. KACHERIPETY, P.O. SRIJANGRAM, DIST. BONGAIGAON, ASSAM. 7. SRI ACHINTYA KUMAR SARMAH, S/O THANESWAR DEV SARMAH, VILL. DEOHATI, P.O. ABHAYAPURI, DIST. BONGAIGAON, ASSAM. 8. MD. MOFIOR RAHMAN SK. S/O SODAGAR ALI SK, R/O VILL. 4 NO. BASHBARI, P.O. TILPUKHURI, DIST. BONGAIGAON, ASSAM. …… PETITIONERS. -Versus- 1. THE STATE OF ASSAM, REPRESENTED BY THE COMMISSIONER AND SECRETARY TO THE GOVT. OF ASSAM, EDUCATION DEPARTMENT, DISPUR, GUWAHATI-6. 2. THE COMMISSIONER & SECRETARY TO THE GOVT. OF ASSAM, FINANCE DEPTT. DISPUR, GUWAHATI-6. 3. THE DIRECTOR OF ELEMENTARY EDUCATION, ASSAM, KAHILIPARA, GUWAHATI-19. 4.THE DISTRICT ELEMENTARY EDUCATION OFFICER, DIST. BONGAIGAON, ASSAM. 5. THE DEPUTY INSPECTOR OF SCHOOLS, NORTH SALMARA, ABHAYAPURI, BONGAIGAON, DIST. BONGAIGAON, ASSAM. 6. THE HEAD MASTER OF PAKHIRIGURI M.V. SCHOOL, P.O. SRIJANGRAM, DIST. BONGAIGAON, ASSAM. 7. THE HEAD MASTER OF LENGTISINGA M.E. SCHOOL, P.O. DHUMERGURI, DIST. BONGAIGAON, ASSAM.
    [Show full text]
  • E4182 V1: Draft Final Report Vol. I
    Public Disclosure Authorized Consultancy Services for Undertaking Environmental Assessment for the Rural Water Supply & Sanitation Project in Assam Public Disclosure Authorized March 2013 DRAFT FINAL REPORT VOLUME I Public Disclosure Authorized Submitted To: Chief Engineer (PHE), Assam. World Bank Project, Hengrabari,Guwahati-781036 Submitted By: IPE Global Pvt. Ltd. Public Disclosure Authorized (Formerly Infrastructure Professionals Enterprise (P) Ltd.) Address: IPE Towers, B-84, Defence Colony, Bhisham Pitamah Marg, New Delhi – 110024, India Tel: +91-11-40755920, 40755923; Fax: +91-11-24339534 Consultancy Services for Undertaking Environmental Assessment for the Rural Water Supply & Sanitation Project in Assam Draft Final Report Table of Contents Abbreviations and Acronyms ...............................................................................................................9 Executive Summary .......................................................................................................................... 11 1. INTRODUCTION ......................................................................................................................... 21 1.1 Background ....................................................................................................................... 21 1.2 Present World Bank Assisted Rural Water Supply and Sanitation Project............................... 23 1.2.1 Components............................................................................................................... 23
    [Show full text]
  • List of Selected Applications for the Post of Process Server in the Office of the Principal Judge,Family Court-Ii,Kamrup(M)
    LIST OF SELECTED APPLICATIONS FOR THE POST OF PROCESS SERVER IN THE OFFICE OF THE PRINCIPAL JUDGE,FAMILY COURT-II,KAMRUP(M) Sl. No. Name Father's Name Address Date of Birth Vill- Charaimari, P.O.- 1 SANJIB CHOUDHURY Dimbeswar Kalita Charaimari, Dist- Baksa, Pin.- 1/1/1988 781377 Qrt. No. 102, Block-C, Dispur Law College Road, Dispur Last 2 BROJEN BARMAN Girish Barman 27/11/1994 Gate, P.S.- Dispur, Guwahati, Assam-781006. Gitanagar, Batgastall,Giripath Mother teresa Road, P.O.- 3 NITU THAKURIA Deben Thakuria 26/11/1986 Bamunimaidan, Dist.- Kamrup(Assam), Pin- 781021. Hengrabari Public Health 4 ANUP TALUKDAR Aswini Talukdar Complex, (H) block, House No- 13/12/1994 4, Guwahati-781036, Assam Rupnagar, Pialy Path-M-20, P.O.- Indrapur, Pin- 781032, 5 BRAJEN DUTTA Manik Ch. Dutta 1/5/1975 Guwahati- 32, Dist.- Kamrup(M) Assam. House No.- 154 B, GMCH Road Near Birubari Bazar, Pin- 6 FIROZ AHMED Mukhtaruddin Ahmed 25/06/1993 781016, P.S.- Paltan Bazar, P.S.- Gopinath Nagar. Guwahati, P.O.- Pandu, P.S.- 7 HRISHIKESH UPADHYAYA Khem Prasad Upadhyaya Jalukbari, Dist.- Kamrup(M), 4/1/1988 Assam. Guwahati.-781012. LIST OF SELECTED APPLICATIONS FOR THE POST OF PROCESS SERVER IN THE OFFICE OF THE PRINCIPAL JUDGE,FAMILY COURT-II,KAMRUP(M) Vill- Gadhoputa, P.O.- Rajapara, P.S.- Boko, Dist.- 8 SAMIRAN RABHA Subhash Rabha 27/12/1981 Kamrup® Assam, Pin.- 781135 Vill- B.B. Road Bazar, Barpeta, 9 NILOTPAL DAS Dipak Kumar Das P.O.- Barpeta, Dist.- 18/02/1991 Barpeta,Assam, Pin-781301. Vill- Gabhara, P.S.- Sipajhar,P.o- 10 UTPAL CHAMUA Nandeswar Chamua Duni, Dist.- Darrang, Pin- 30/06/1988 784148.
    [Show full text]