FORM – 1 & 1 a for “ RIVERVIEW CITY”
Total Page:16
File Type:pdf, Size:1020Kb
FORM – 1 & 1 A For “ RIVERVIEW CITY” AT Gat nos. 1 to 21, 23 to 41, 43 to 57, 58/A to D, 59 to75, 76/2, 77 to 124, 126 to 129, 202, 400, 405, 407, 419, 443, 448, 460, 471, 483, 509, 511, 520, 523, 540/1 to 3, 541, 543, 551 to 553, 1059 to 1068, 1070 to 1077, 1081 to 1093, 1099 to 1111, 1125 to 1131, 1132/1 to 1132/3, 1136 to 1149, 1150 (part), 1151, 1152/ 1 & 2, 1153 to 1156, 1158, 1159, 1160/ 1 to 5, 1163 to 1167 village Kadamvakvasti, Tal. Haveli, Dist. Pune, Maharashtra. By M/s. Riverview City Constructions Ltd. Pune FORM – 1 For “ RIVERVIEW CITY” AT Gat nos. 1 to 21, 23 to 41, 43 to 57, 58/A to D, 59 to75, 76/2, 77 to 124, 126 to 129, 202, 400, 405, 407, 419, 443, 448, 460, 471, 483, 509, 511, 520, 523, 540/1 to 3, 541, 543, 551 to 553, 1059 to 1068, 1070 to 1077, 1081 to 1093, 1099 to 1111, 1125 to 1131, 1132/1 to 1132/3, 1136 to 1149, 1150 (part), 1151, 1152/ 1 & 2, 1153 to 1156, 1158, 1159, 1160/ 1 to 5, 1163 to 1167 village Kadamvakvasti, Tal. Haveli, Dist. Pune, Maharashtra. By M/s. Riverview City Constructions Ltd. Pune 1 Form 1, “RIVERVIEW CITY” at Village Kadamwakvasti, Pune APPENDIX - I (See paragraph - 6) FORM 1 (I) Basic Information # Item Details 1. Name of the project/s “RIVERVIEW CITY” 2. S. No. in the schedule 8 (b) 3. Proposed capacity/ area/length/ Area of total plot : 21,03,951.00 m2 tonnage to be handled/command Net Plot Area: 19,46,951.00 m2 area/lease area/number of wells to be drilled 4. New/Expansion/Modernization New 5. Existing Capacity/ Area etc. New project 6. Category of project i.e.‟ A‟ or „B‟ Category B1 Township project 7. Does it attract the general Not Applicable condition? If yes, please specify. 8. Does it attract the specific Not Applicable condition? If yes, please specify. 9. Location Village- Kadamwak vasti, Tal. Haveli, Dist. Pune, State - Maharashtra Plot/Survey/Khasra No. Gat nos. 1 to 21, 23 to 41, 43 to 57, 58/A to D, 59 to75, 76/2, 77 to 124, 126 to 129, 202, 400, 405, 407, 419, 443, 448, 460, 471, 483, 509, 511, 520, 523, 540/1 to 3, 541, 543, 551 to 553, 1059 to 1068, 1070 to 1077, 1081 to 1093, 1099 to 1111, 1125 to 1131, 1132/1 to 1132/3, 1136 to 1149, 1150 (part), 1151, 1152/ 1 & 2, 1153 to 1156, 1158, 1159, 1160/ 1 to 5, 1163 to 1167 Villages Kadamwak vasti Tehsil Haveli District Pune State Maharashtra 10. Nearest railway station Loni railway station : 1 km Nearest airport Pune Airport : 21 km 11. Nearest Town, city, Pune District headquarters along with distance in kms. 12. Village Panchayats, Zilla Grampanchayat Kadamwak vasti Parishad, Municipal Corporation, Sanctioning Authority : PMRDA Local body (complete postal address with telephone nos. to be given) 13. Name of the applicant M/s. Riverview City Constructions Ltd. 14. Registered Address “MEGASPACE”, 2nd Floor, 13 Solapur Bazar Road, Off East Street , Pune- 411001 15. Address for correspondence M/s. Riverview City Constructions Ltd. “MEGASPACE”, 2nd Floor, 13 Solapur Bazar Road, Off East Street , Pune- 411001 Name Shri. Satish Magar Designation Managing Director (Owner/Partner/CEO) Address M/s. Riverview City Constructions Ltd. “MEGASPACE”, 2nd Floor, 13 Solapur Bazar Road, Off East 2 Form 1, “RIVERVIEW CITY” at Village Kadamwakvasti, Pune # Item Details Street , Pune- 411001 Pin Code 411001 E-mail [email protected] Telephone No. +91-9767101486 Fax No. -- 16. Details of Alternative Sites Not applicable in this case. examined, if any. Location of these sites should be shown on a topo-sheet. 17. Interlinked Projects No 18. Whether separate application of Not applicable interlinked project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves Not applicable approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22. Whether there is any Government (i) Notification for Development of Townships, No. TPS Order/Policy relevant/ relating to 1816/CR-368/15/20 (4)/UD-13 dated 26.12.2016 the site? (ii) Notification for Locational Clearance Dated 20.10.2015 and Amendment dated 01.06.2016, (iii) Application for revised locational clearance dated 30.12.2016 The copies are attached in the hard copy. 23. Forest land involved (hectares) No 24. Whether there is any litigation No pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Order /directions of the Court, if any and its relevance with the proposed project. Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.) 3 Form 1, “RIVERVIEW CITY” at Village Kadamwakvasti, Pune Plot History: The plot is owned by M/s. Riverview City Constructions Ltd. It is to be developed as Integrated Township Project. Presently, plot is generally an open land, awaiting development, with few farm structures. The plot is located at village Kadamwakwasti, Loni Kalbhor, Pune, State - Maharashtra. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate Sr. Yes / quantities / rates, wherever Information/Checklist confirmation No. No possible) with source of information data 1.1 Permanent or temporary change in land Yes The plot under reference is in the use, land cover or topography including Agricultural NDZ, DP area, Truck increase in intensity of land use (with terminus & Parking zone and respect to local land use plan) Industrial zone. However, now Locational Clearance is granted by Urban Development Department to erect Special Integrated Township Project. 1.2 Clearance of existing land, vegetation Yes Land: nearly level. and building? Vegetation: Tree census undertaken. Orientation planned to save maximum trees. Buildings: small huts and homes of villagers shall be demolished. 1.3 Creation of new land uses? Yes Township Development 1.4 Pre-construction investigation e.g. bore Yes Investigation done. Report is houses, soil testing? attached as Annexure 1. Groundwater – available, but will not be tapped Sub surface strata – suitable for load bearing & vegetation 1.5 Construction works? Yes Special Integrated Township Project Development including Truck Terminus 1.6 Demolition works? Yes Nominal. small huts and homes of villagers shall be demolished. 1.7 Temporary sites used for construction Yes Majority workers in construction works or housing of construction phase will be day workers coming workers? from nearby villages. For some workers, labour camp with facilities like drinking water, toilets etc. shall be provided. 1.8 Above ground building, structures or Yes Nearly level ground. Cutting – filling earthworks including linear structures, nearly balances. Top soil used for cut and fill or excavations greening. Excavation in the form of rubble will be partly used for back filling and as substructure for roads. 1.9 Underground works including mining or No -- Tunneling? 4 Form 1, “RIVERVIEW CITY” at Village Kadamwakvasti, Pune Details thereof (with approximate Sr. Yes / quantities / rates, wherever Information/Checklist confirmation No. No possible) with source of information data 1.10 Reclamation works? No. -- 1.11 Dredging? No -- 1.12 Offshore structures? No -- 1.13 Production and manufacturing No This is an integrated Township processes? project. 1.14 Facilities for storage of goods or Yes During construction phase temporary materials? storing facilities shall be created to store the construction raw material. 1.15 Facilities for treatment or disposal of Yes Construction Phase: solid waste or liquid effluents? (a) Liquid effluent: Mobile toilets Solid waste: Segregation. Bio-degradable waste shall be used for composting. Non-biodegradable waste: sold to authorized recycler. Operation Phase: (a) Liquid effluent: STP. Wastewater shall be recycled for flushing, HVAC and gardening. For hospital, pre-treatment will be done before sending it to STP. (b) Solid waste: Segregation. Bio-degradable waste shall be used for biogas and vermi-composting. Non-biodegradable waste: sell to authorized recycler. Biomedical waste: shall be sent to authorized agency. E-waste, battery waste: shall be sent to authorized agency. STP sludge shall be used as manure 1.16 Facilities for long term housing of No -- operational workers? 1.17 New road, rail, or sea traffic during Yes No new rail or sea traffic. construction or operation? For construction phase: using existing approach road. For operation phase: 18 m wide approach road shall be provided 1.18 New road, rail, air waterborne or other Yes 90 m wide Ring Road is also transport infrastructure including new or proposed by State Govt. altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport No -- routes or infrastructure leading to 5 Form 1, “RIVERVIEW CITY” at Village Kadamwakvasti, Pune Details thereof (with approximate Sr. Yes / quantities / rates, wherever Information/Checklist confirmation No. No possible) with source of information data changes in traffic Movements? 1.20 New or diverted transmission lines or Yes Electrical Power and Water supply pipelines? will be received from Govt. Sources. 1.21 Impoundment, damming, culverting, Yes Nominal as trenching of Nala. realignment or other change of the hydrology of watercourses or aquifers? 1.22 Stream crossings? Yes By culverting on local stream.