HB2 (Act 23) of the 2012 R.S. P2 CLOC Status Current as of June 20, 2013 meeting of the State Bond Commission Report prepared by House Fiscal Division staff Source of Information provided by Department of Treasury State Bond Commission P = Priority SBC = State Bond Commission CLOC = Cash Line of Credit Green highlight: partial CLOC recommendation of the P2 appropriated to project

HB2 P2 CLOC Approved Agency # Agency Name Project Title Parish P2 Total in HB2 BDS # by SBC

Replacement of Science 19-605 LSU EUNICE 54 Laboratory Fume Hoods, ACADIA $135,000 Planning and Construction Land Acquisition for New Slip Mermentau River Construction (Mermentau River 36-P35 1255 Acadia $225,000 $225,000 Harbor & Terminal Harbor Terminal District), Planning and Construction 50-MD6 Iota 1253 Town of Iota Street Acadia Improvements, Planning and $50,000 Construction Highway 538 Water Line 50-MM4 Oil City Extension, Planning and Allen $425,000 $425,000 Construction 07-270 DOTD - Administration 25 LA 42 (US 61 to LA 44) Widening Ascension $2,000,000 $2,000,000

Intersection Improvement 07-270 DOTD - Administration 26 Program, Real Estate Acquisition, Ascension $200,000 $200,000 Planning and Construction Oak Grove Community and 50-J03 Ascension Parish 244 Recreational Center, Planning Ascension $120,000 $120,000 and Construction Lamar Dixon Development, 50-J03 Ascension Parish 245 Ascension $100,000 Purchase and Land Acquisition $100,000 Riverfront Development, 50-M68 Donaldsonville 1896 Ascension $780,000 Planning and Construction $780,000 Intersection Improvements on LA 3038, Including Patching, 50-MA5 Gonzales Repairing, and Overlaying of the Ascension $800,000 $800,000 Highway, Planning and Construction Automobile Parking Lot Ascension St. James 50-NI9 1329 Improvements for the Louisiana Ascension $50,000 Airport $50,000 Regional Airport Morganza to Gulf of Mexico Ascension, Flood Control Feasibility Study, Assumption, Planning, Design, Right of Way Iberia, Iberville, Office of Coastal and Construction of Levees, Lafourche, Pointe 01-109 Protection and 8 Floodgates and Other Flood Coupee, St. $1,500,000 $1,500,000 Restoration Control Systems ($100,000,000 Martin, St. Mary, Local Match; $25,000,000 Local In-Terrebonne, Kind Match; $442,000,000 West Baton Federal Match) Rouge

Atchafalaya Basin Protection and Assumption, Enhancement (Federal Match Avoyelles, Iberia, Natural Resources - and Local/Sponsor Match) Iberville, Pointe 11-431 1570 Office of the Secretary NOTE: P2 was $1 M in HB2; Coupee, St. $0 however, IEB moved $1 M of Landry, St. P2 to P5 on 2-21-13 Martin, St. Mary

Avoyelles Parish Police Jury - 4th 50-J05 AVOYELLES PARISH 1352 Floor Courthouse Renovation, Avoyelles $200,000 Planning and Construction Mary Bethune Community Center, previously known D. A. 50-MI6 MARKSVILLE 1260 AVOYELLES $600,000 Jordan Community Center, for the City of Marksville 2 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

HB2 P2 CLOC Approved Agency # Agency Name Project Title Parish P2 Total in HB2 BDS # by SBC

Avoyelles, Mississippi River Levee Raising, Concordia, East DOTD - Public 07-274 34 Arkansas to Old River, Planning Carroll, Madison, $500,000 Improvements $500,000 and Construction Pointe Coupee, Tensas C. Paul Phelps Emergency Backup Generators, 08-401 36 Beauregard Correctional Center Planning and Construction $210,000 Remedial Actions for State Fire C. Paul Phelps Marshal Compliance and Health 08-401 37 Beauregard $1,000,000 Correctional Center Inspection Violations, Planning and Construction Lumas Road, Planning and 50-J06 Beauregard Parish 1136 Beauregard $400,000 Construction $400,000 Community Recreational Building and Shelter, Planning and 50-M65 DeRidder 105 Construction and/or A acquisition Beauregard $250,000 $250,000 and Rehabilitation of the Existing Facility ($1,500,000 Local Match)

Beauregard Parish Water System Improvements, 50-NQV 1104 Beauregard $25,000 Waterworks District #6 Planning and Construction $25,000 Multi-Purpose Community Center, Planning and 50-M09 Arcadia 101 Bienville $500,000 Construction ($350,000 Local Match) Hwy. 71 Street Lighting Project from LA 3032 (Westgate Drive) to 50-M29 Bossier City 886 Bossier $390,000 $390,000 LA 511 (Jimmie Davis Hwy) Planning and Construction Wastewater Treatment Plant 50-MN5 Plain Dealing 1181 Improvements, Planning and Bossier $160,000 $160,000 Construction Jimmie Davis Bridge 07-270 DOTD - Administration 1991 Rehabilitation, Planning and Bossier, Caddo $1,300,000 $1,300,000 Construction Louisiana State Exhibit Museum, 04-139 SECRETARY OF STATE 1601 CADDO $200,000 Planning and Construction $200,000 High Voltage Electrical LSU Medical Center 19-604S 53 Distribution System Upgrade, Caddo $350,000 Shreveport $350,000 Planning and Construction LSU Medical Center Patient Care HVAC Replacement, 19-604S 1990 Caddo $300,000 Shreveport Planning and Construction $300,000 Children's Hospital, Renovation LSU Medical Center 19-604S and Expansion, Planning and Caddo $1,000,000 Shreveport $1,000,000 Construction New Classroom Building, Southern University 19-618 61 Southern University- Shreveport, Caddo $2,000,000 Shreveport $2,000,000 Planning and Construction Caddo Parish Fire District No. 3 50-J09 Caddo Parish 1657 Station #4 Addition, Planning and Caddo $165,000 $165,000 Construction Water and Wastewater System 50-MU6 Vivian 1185 Improvements and Extension, Caddo $250,000 $250,000 Planning and Construction Town of Vivian, Street 50-MU6 Vivian 1310 Improvements, Planning and Caddo $400,000 $400,000 Construction Port of Lake Charles Access Road, Planning and Construction 07-270 DOTD - Administration 24 Calcasieu $500,000 ($3,500,000 Local Match, $500,000 $17,500,000 Federal Match) Region 5/Lake Charles Office, 16-513 Office of Wildlife 46 Calcasieu $900,000 Planning and Construction $900,000 3 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

HB2 P2 CLOC Approved Agency # Agency Name Project Title Parish P2 Total in HB2 BDS # by SBC

McNeese State Alpha Hall Renovations, Planning 19-627 69 Calcasieu $500,000 University and Construction $500,000 Shearman Fine Arts Building - McNeese State 19-627 71 Renovation of Existing Space, Calcasieu $340,000 University $340,000 Planning and Construction Health/Human Performance McNeese State 19-627 1986 Education Complex, Planning and Calcasieu $1,000,000 University $1,000,000 Construction Contraband Bayou Erosion McNeese State 19-627 Retaining Wall Phase II, Planning Calcasieu $350,000 University $350,000 and Construction Command and Control Center at City Docks, Planning and 36-P26 Port of Lake Charles 81 Calcasieu $300,000 $300,000 Construction ($1,125,000 Federal and/or Local Match) Dockside Monopile Improvements 36-P26 Port of Lake Charles 82 Calcasieu $195,000 $195,000 (LEEVAC), Planning and Construction Gravity Sewer Trunk Mains & Pumping Stations South Ward 3 50-J10 Calcasieu Parish 85 Calcasieu $900,000 $900,000 and South Ward 4, Planning and Construction National Hurricane Museum and 50-MF9 Lake Charles 1995 Science Center, Planning and Calcasieu $300,000 $300,000 Construction Town of Vinton, Vinton Street 50-MU5 VINTON 1153 CALCASIEU $200,000 Improvements $200,000 Ellis and Linda Drive 50-MV3 Westlake 111 Improvements, City of Westlake, Calcasieu $750,000 $750,000 Planning and Construction Calcasieu Parish Facilities Improvements, Planning 50-S10 Calcasieu School Board and Construction $1,000,000 Bayou Dechene Reservoir, DOTD - Public 07-274 33 Planning, Land Acquisition and Caldwell $5,000,000 Improvements $5,000,000 Construction Columbia Port Railroad Spur, Planning and 36-P43 1516 Caldwell $670,000 Commission Construction $670,000 Wiles Road Reconstruction, 50-J11 Caldwell Parish 1477 Caldwell $80,000 Planning and Construction $80,000 Parish Detention Facility, 50-J11 Caldwell Parish 1478 Caldwell $250,000 Planning and Construction $250,000 Repair of Existing Water Well, 50-M52 Columbia 475 Caldwell Planning and Construction $380,000 Town of Homer, Town Hall 50-MC9 Homer 1178 Renovations, Planning and Claiborne $150,000 $150,000 Construction Concordia Parish Public Health 50-J15 Concordia Parish 1600 Center Renovation, Planning and Concordia $150,000 Construction Development of a Slackwater Port on the Mississippi River, 50-MU2 Vidalia 1004 Planning and Construction Concordia $1,000,000 $1,000,000 ($12,900,000 Federal and/or Local Match) NORTH DESOTO Expansion and Improvements to 50-NRS 1373 DE SOTO $100,000 WATER SYSTEM INC the Water System $100,000 Water System Improvements and Waterworks District #1 Extension, Planning and 50-NJP 119 DeSoto $100,000 $100,000 DeSoto Parish Construction ($1,977,300 Local Match) Louisiana Coalition for Town of Stonewall, Rural Medical 50-NSN Accessible and 1582 Facility, Planning and DeSoto $300,000 Sustainable Healthcare Construction 4 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

HB2 P2 CLOC Approved Agency # Agency Name Project Title Parish P2 Total in HB2 BDS # by SBC

Exterior Waterproofing at the Division of 01-107 3 State Capitol Building, Planning East Baton Rouge $360,000 Administration $360,000 and Construction Wildlife and Fisheries WLF - Office of Enforcement Training Academy 16-512 952 East Baton Rouge $300,000 Secretary and Emergency Facility, Planning and Construction LSU Agricultural Livestock Education Facility, 19-607 1947 East Baton Rouge $2,140,000 Center Planning and Construction $2,140,000 SOUTHERN Southern University Laboratory EAST BATON 19-616 UNIVERSITY 60 School Addition and Upgrades, $1,200,000 ROUGE $1,200,000 BATONROUGE Planning and Construction Laboratory School Roof Southern University 19-616 Replacement, Planning and East Baton Rouge Baton Rouge $600,000 Construction Louisiana Community Automotive Training Facility, 19-649 and Technical Colleges East Baton Rouge $2,400,000 Planning and Construction $2,400,000 System Baker Fire Training Facility, 50-M14 Baker 1675 East Baton Rouge Planning and Construction $165,000 Hooper Road Sewer 50-M20 Baton Rouge 466 Improvements ($1,200,000 Local East Baton Rouge $100,000 $100,000 Match) Water System Improvements, 50-MW3 Zachary 1012 East Baton Rouge Planning and Construction $365,000 50-MW8 Central 1349 Administration Building East Baton Rouge $150,000 $150,000

Expand, Repair, and Modify City 50-MW8 Central 1350 of Central Drainage System, East Baton Rouge $100,000 $100,000 Planning and Construction BATON ROUGE METRO Harding Field World War II EAST BATON 50-N41 1341 AIRPORT Commemorative ROUGE $130,000 Baton Rouge Children's Museum, Planning and 50-NC2 Recreation & Parks 113 Construction ($5,000,000 Local East Baton Rouge $50,000 $50,000 Commission Match) Anna T. Jordan Site and Facility Baton Rouge Improvements (Non-State Match 50-NC2 Recreation & Parks 114 Required) NOTE: P2 was $120 East Baton Rouge $0 Commission K in HB2. IEB moved $120 K of P2 to P5 on 2-21-13 Baton Rouge Central Community Sports Park, 50-NC2 Recreation & Parks 1392 East Baton Rouge $150,000 Planning and Construction $150,000 Commission Museum and Cultural Center, Louisiana Black History Planning and Construction 50-NG6 11 East Baton Rouge $400,000 Hall of Fame ($100,000 Cash and/or In-Kind Match) Old Hollywood Elementary Urban Restoration School, Site Development and 50-NN2 1525 East Baton Rouge $50,000 Enhancement Corp Improvements, Planning and Construction USDA Licensed Veterinary Professional 50-NNB 1762 Biologic Facility, Planning and East Baton Rouge Specialties $300,000 Construction Re-Opening of East Baton Rouge E BATON ROUGE Council on Aging's Kitchen, EAST BATON 50-NRU 1308 COUNCIL ON AGING Planning, Improvement, ROUGE $140,000 Equipment, Additions Hooper Road Extension (LA 37 to LA 16), Environmental, Planning, East Baton 07-270 DOTD - Administration 1129 $800,000 $800,000 Engineering, Right of Way, Rouge, Livingston Utilities and Construction 5 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

HB2 P2 CLOC Approved Agency # Agency Name Project Title Parish P2 Total in HB2 BDS # by SBC

50-J18 East Carroll Parish 598 Courthouse and Jail Renovations East Carroll $175,000 $175,000 Department of Fire Alarm / Call System, Planning 03-130 12 East Feliciana $180,000 Veterans Affairs and Construction $180,000 Replace Fire Alarm and Sprinkler Office of Aging and 09-320 41 System, Planning and East Feliciana $50,000 Adult Services $50,000 Construction Road Overlay Project, Planning 50-J19 East Feliciana Parish East Feliciana and Construction $50,000 Town of Basile Public Accommodation Recreation 50-M17 Basile 1315 Evangeline $65,000 Facility Improvements, Planning and Construction Regional Economic Development 50-J22 Grant Parish 1944 Building, Rehabilitation, Planning Grant $150,000 $150,000 and Construction Street Improvements, Planning 50-M50 Colfax 1357 Grant and Construction $100,000 Town Hall and Community 50-MJ7 Montgomery Center, Planning and Grant $75,000 Construction Planning, Permitting, Engineering Iberia Parish Levee and Right of Way Acquisition for 36-L37 Hurricane and 1676 Iberia $250,000 the Iberia Hurricane Protection $250,000 Conservation District Master Plan Five Lane Road Extension from 50-J23 Iberia Parish 265 Highway 675 to Highway 3212, Iberia $520,000 $520,000 Planning and Construction Recreational Complex, Sports Including Baseball, Planning and 50-J23 Iberia Parish 1131 Iberia $100,000 $100,000 Construction (Supplemental Funding) Road Extension from Sidney 50-J23 IBERIA PARISH 1134 Blanchard Road to Ed Broussard IBERIA $150,000 $150,000 Road, Planning and Construction

Loreauville Wastewater Treatment Plant Improvements 50-MH3 Loreauville 328 Iberia $65,000 and Demolition Project, Planning $65,000 and Construction Loreauville Water Tower 50-MH3 Loreauville 1261 Improvements, Planning and Iberia $50,000 $50,000 Construction Multi-Use Conference and Operating Center, Land 50-ML1 New Iberia 1049 Iberia $350,000 Acquisition, Planning and Construction Iberia Economic Progress Point Business Park and 50-NPD Development 1776 Airport Gateway, Land Iberia $1,075,000 $1,075,000 Authority Acquisition Louisiana Hwy 1 Resurfacing - 07-270 DOTD - Administration 1750 Plaquemine to White Castle, IBERVILLE $1,000,000 $1,000,000 Planning and Construction Turning Lane and Traffic Signals 50-MW6 St. Gabriel Iberville on LA Hwy. 74 and LA Hwy. 30 $50,000 Jackson Parish Jackson-Bienville Reservoir, 50-NFU Dugdemona Water 1154 Jackson Planning and Construction $200,000 Authority Water Distribution System WALKER COMMUNITY 50-NSI 1681 Expansion, LA-810 Extension, JACKSON $600,000 WATER SYS INC $600,000 Planning and Construction Louisiana Stadium & Zephyrs Baseball Facilities Repair, 01-124 417 Jefferson $800,000 Exposition District Renovation and Improvement $800,000 6 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

HB2 P2 CLOC Approved Agency # Agency Name Project Title Parish P2 Total in HB2 BDS # by SBC

Jefferson Parish Business Park: Jefferson Parish Port 36-P41 83 Science and Technology Academy Jefferson $500,000 District $500,000 and Conference Center Bayou Segnette Sports Complex Improvements, Including Hall B 50-J26 Jefferson Parish 87 Jefferson $4,500,000 $4,500,000 Expansion, Planning and Construction 18th Street Drainage Improvements, Edenborn Avenue 50-J26 Jefferson Parish 740 Jefferson $100,000 $100,000 Phase 2 (18th Street to West Esplanade Avenue Canal) Airline Drive(US 61) at 17th St. Canal Drainage Crossing and 50-J26 Jefferson Parish 743 Jefferson $2,000,000 $2,000,000 Railroad Bridge Replacement, Planning and Construction Bike Path along Leo Kerner Parkway (Barataria Blvd to Parc 50-J26 Jefferson Parish 750 Jefferson $65,000 $65,000 Des Familles Entrance), Planning and Construction Bonnabel Canal Rehabilitation and Bank Stabilization (Veterans 50-J26 Jefferson Parish 752 Jefferson $2,150,000 Boulevard to West Esplanade), $2,150,000 Planning and Construction Canal 10 Concrete Lining Widening Between Canal 7 and 50-J26 Jefferson Parish 755 Jefferson $50,000 $50,000 West Esplanade Avenue, Planning and Construction Codifer Boulevard, Homestead Avenue, and Brockenbraugh 50-J26 Jefferson Parish 762 Court Subsurface Drainage Jefferson $200,000 $200,000 Improvements, Planning and Construction Performing Arts Center 50-J26 Jefferson Parish 793 Jefferson $2,600,000 Modifications $2,600,000 Upper Kraak Ditch Subsurface Drainage Improvement (Upper 50-J26 Jefferson Parish 806 Kraak Drainage Pump Station to Jefferson $200,000 Earhart Expressway), Planning and Construction Woodmere Community Center, Real Estate Acquisition, Planning, 50-J26 Jefferson Parish 816 Jefferson $100,000 $100,000 and Construction ($15,000 Match) South Kenner Road Rehabilitation from Live Oak 50-J26 Jefferson Parish 1355 Jefferson $300,000 $300,000 Boulevard to River Road, Planning and Construction Martin Luther King Playground 50-J26 Jefferson Parish 1364 Improvements, Planning and Jefferson $100,000 $100,000 Construction Waggaman Subsurface Drainage 50-J26 Jefferson Parish 1807 Improvements, Planning and Jefferson $740,000 $740,000 Construction Historic Recreation 50-MB1 Grand Isle 1819 Center/Community Center, Jefferson $100,000 $100,000 Planning and Construction McDonoghville Fire Station, Land 50-MB5 Gretna 1201 Acquisition, Planning and Jefferson $1,000,000 $1,000,000 Construction Mel Ott Exterior Lighting and 50-MB5 Gretna 1204 Jefferson $225,000 Improvements $225,000 Hancock Street Canal Improvements (Kepler Street - 50-MB5 Gretna 1213 Jefferson $250,000 $250,000 Virgil Street), Planning and Construction 7 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

HB2 P2 CLOC Approved Agency # Agency Name Project Title Parish P2 Total in HB2 BDS # by SBC

Penfold Place Drainage, Planning 50-MC1 Harahan 1488 Jefferson $50,000 and Construction $50,000 Lafitte Seafood Pavilion, Planning 50-ME1 Jean Lafitte 631 Jefferson $100,000 and Construction $100,000 Wastewater System Corrective 50-MF1 Kenner 1208 Jefferson $250,000 Measures $250,000 Lincoln Manor Subdivision 50-MF1 Kenner 1241 Drainage Improvements, Jefferson $100,000 Planning and Construction City of Kenner Emergency 50-MF1 Kenner 1732 Operations Center, Planning and Jefferson $75,000 Construction Drainage Improvements along Idaho Avenue, 26th Street to 50-MF1 Kenner 1781 Jefferson $150,000 $150,000 West Napoleon Canal, Planning and Construction Park Land and Improvements, Including Improvements to 50-MV4 Westwego 1073 Jefferson $800,000 $800,000 Existing Parks, Planning and Construction Sala Avenue Street and 50-MV4 Westwego 1075 Jefferson $150,000 Infrastructure Improvements $150,000 Water Plant Improvements, 50-MV4 Westwego 1077 Planning and Construction (50% Jefferson $1,000,000 $1,000,000 Local Match) New Hope Community New Hope Multi-Use Center, 50-NGH 1679 Jefferson Development Center Planning and Construction $15,000 Gretna Police Department, Construction of Armory, Gretna Police 50-NML 1287 Elevation/Floor Proofing/Wind Jefferson $940,000 Department $940,000 Retrofit, Planning and Construction AVONDALE BOOSTER Avondale Booster Club and 50-NPW 1251 JEFFERSON $400,000 CLUB Playground Upgrades $400,000 Third Street West Bridge Repair, 50-J27 Jefferson Davis Parish 270 Jefferson Davis $40,000 Planning and Construction $40,000

Road Maintenance 6 Parish 50-J27 Jefferson Davis Parish 1593 Jefferson Davis Equipment Sheds and Equipment $300,000

50-MV1 Welsh 1778 Town of Welsh Upgrade Electrical Jefferson Davis $50,000 Three-Lane LA 182 in the City of Broussard, Planning and 50-M32 Broussard 1286 Lafayette $150,000 $150,000 Construction ($750,000 Local Match) Rehabilitation La Hwy 182 from 50-M32 Broussard 1327 US 90 to LA Hwy 89, Planning and Lafayette $250,000 $250,000 Construction Reconstruct South Bernard Road 50-M32 Broussard 1328 From LA Hwy 182 to US Hwy 90, Lafayette $150,000 $150,000 Planning and Construction Wastewater and City 50-M39 Carencro 1987 Infrastructure Flood Damages, Lafayette $200,000 $200,000 Planning and Construction City Hall Renovations, Including 50-M39 Carencro 1994 New Roof, Planning and Lafayette $85,000 Construction Apollo Road Extension (Rue du Belier & Dulles Drive Intersection to Old Spanish Trail & Apollo 50-MQ8 SCOTT 1768 Road Intersection).Planning, LAFAYETTE $500,000 $500,000 Construction, and Land Acquisition UNTIMELY-(Replaces 544721) 8 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

HB2 P2 CLOC Approved Agency # Agency Name Project Title Parish P2 Total in HB2 BDS # by SBC

Scott Events Center, Planning and 50-MQ8 Scott Lafayette $60,000 Construction $60,000 Community Center, Planning and 50-MW2 Youngsville 1041 Lafayette $200,000 Construction $200,000 Lafayette Airport Construction of Cargo Facilities, 50-NA2 368 Lafayette $4,500,000 Commission Planning and Construction $4,500,000 LA Emergency Medical LA Emergency Medical Unit 50-NSS Lafayette $125,000 Unit Storage Facility $125,000 Parking Lot Construction - LSU Healthcare 19-610 723 Chabert, Planning and Lafourche Services Division $100,000 Construction Nicholls State Athletic Facilities, Renovation, 19-621 Lafourche $200,000 University Planning and Construction $200,000 Median Turning Lane near 50-MA3 Golden Meadow 1983 Doucet Drive, Planning and Lafourche $65,000 Construction LA Hwy 20 (N. Canal Blvd.) 50-MT5 Thibodaux 110 Widening, Planning and Lafourche $250,000 Construction Facilities Upgrade/Roof and 50-NSU Bayou Civic Club Kitchen Planning and Lafourche $135,000 $135,000 Construction Pine Hill Road Improvements, 50-J30 LaSalle Parish LaSalle $665,000 Planning and Construction $665,000 Downtown Area Sidewalk, Ramps, Curbing, and Fencing 50-MM5 Olla 1638 LaSalle $50,000 Enhancements, Planning and Construction Grambling State Library Deficiencies, Planning and 19-623 850 Lincoln University Construction $500,000 Visual Arts Building Renovation Louisiana Tech 19-625 67 for Business, Planning and Lincoln $500,000 University $500,000 Construction Louisiana Tech Water Distribution System 19-625 68 Lincoln $300,000 University Repairs and Improvements $300,000 Downsville Recreational Facility 50-M69 Downsville 1571 Improvements, Planning and Lincoln $145,000 $145,000 Construction Tarbutton Road Interstate 20 50-MQ2 Ruston 1054 Interchange and Connector Road, Lincoln $100,000 Planning and Construction 50-MR7 Simsboro 650 Water Well and Water Main Lincoln $50,000 $50,000 Village of Simsboro Renovate 50-MR7 SIMSBORO 1821 LINCOLN $100,000 "Old" Fire Station Into Town Hall $100,000 Land Acquisition and Lincoln Parish Fire Construction of Additional Fire 50-NGA 1040 Lincoln $350,000 Protection District 1 Stations, Planning and Construction LA 64 Widening from LA 16 to 07-270 DOTD - Administration Magnolia Bridge Planning and Livingston $400,000 $400,000 Construction Livingston Parish Regional Airport, Planning and 50-J32 Livingston Parish 436 Livingston $50,000 $50,000 Construction ($900,000 Federal Funds) Water System Planning and 50-MS4 Springfield 999 Livingston $400,000 Construction $400,000 Widening of Highway 447 and I- 12 Overpass Improvements, 50-MU7 Walker 1619 Environmental Phase Livingston $300,000 $300,000 Commencement, Planning and Construction 9 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

HB2 P2 CLOC Approved Agency # Agency Name Project Title Parish P2 Total in HB2 BDS # by SBC

New Facility for Livingston Livingston Association Association for Retarded 50-NMG for Retarded Children, 860 Livingston $230,000 $230,000 Children, Inc. Planning and Inc. Construction Hungarian Settlement Historical Hungarian Settlement 50-NNL 1234 Museum, Planning and Livingston $170,000 Historical Society $170,000 Construction Courthouse Renovations, 50-J33 Madison Parish 441 Madison Planning and Construction $100,000 Expansion and Improvements to MADISON VOL 50-NRV 1391 Activities Building, Planning and MADISON COUNCIL ON AGING $50,000 Construction Bastrop Central Fire Station, Replace Driveway City Hall, Roof 50-M19 Bastrop 1320 Morehouse $200,000 $200,000 Construction, Planning and Construction Louisiana School for HVAC Issues in Caddo Hall, 19-657 Math, Science and the 76 Natchitoches $600,000 Planning and Construction $600,000 Arts Louisiana School for Stair Railings - Addressing Code 19-657 Math, Science and the 1574 Violations, Planning and Natchitoches $70,000 $70,000 Arts Construction Old River Bridge, Planning and 50-J35 Natchitoches Parish 1961 Natchitoches $535,000 Construction $535,000 Town of Campti Multi-Purpose 50-M37 Campti 298 Community Center, Planning and Natchitoches $150,000 $150,000 Construction South Natchitoches Drainage Improvements, including Adjacent Roadwork, Planning and 50-MK9 Natchitoches 1693 Natchitoches Construction NOTE: P2 was $0 $475 K in HB2. IEB moved $475 K of P2 to P5 on 2-21-13 Reconstruct Natchitoches Parish Natchitoches Council Council on Aging Activities 50-NM3 1634 Natchitoches $700,000 $700,000 on Aging Building, Planning and Construction Natchitoches Natchitoches Parish Emergency 50-NRO Communications 1769 Communications District, Natchitoches $500,000 $500,000 District Planning and Construction Natchitoches Veterans Natchitoches Veterans and 50-NSM Memorial Park 1772 Memorial Park, Planning and Natchitoches $50,000 $50,000 Commission Construction Sports Arena Louisiana Stadium & 01-124 2020 Improvements, Planning and Orleans $21,500,000 Exposition District $21,500,000 Construction Louisiana Cancer Research Office of Business 05-252 158 Center in New Orleans, Planning, Orleans $3,000,000 Development $3,000,000 Construction, and Equipment Construction of Civil Rights Office of State 06-263 162 Museum, Planning and Orleans Museum $75,000 Construction City Park Maintenance Complex 06-A20 New Orleans City Park 857 ORLEANS $100,000 Improvements $100,000 New Tennis Center 06-A20 New Orleans City Park 1852 Improvements, Planning and ORLEANS $50,000 $50,000 Construction State Streets, Algiers Planning 07-270 DOTD - Administration 1978 Orleans $1,400,000 and Construction $1,400,000 10 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

HB2 P2 CLOC Approved Agency # Agency Name Project Title Parish P2 Total in HB2 BDS # by SBC

New Mental Health Clinic for New Orleans Behavior, Social, Metropolitan Human and Medical Support Detox 09-304 547 Orleans $2,000,000 Service District Clinic, Including Expansion and $2,000,000 Renovation of the Existing Facility, Planning and Construction New Mental Health Center for Desire/Florida Mental Health Metropolitan Human Clinic, Including the Purchase, 09-304 831 Orleans Service District Construction or Renovation of a $2,250,000 New Facility in New Orleans East, Planning and Construction Mental Health Facility, Planning, Metropolitan Human 09-304 Renovation, Construction for Orleans Service District $2,750,000 Central City New Orleans Adolescent Metropolitan Human 09-304 Hospital, Renovation of Facility, Orleans Service District $5,000,000 Planning and Construction Human Performance Center University of New Renovations for Fine Arts and 19-603 52 Orleans $200,000 Orleans Music Departments, Planning and Construction Renovations and Improvements LSU Health Sciences 19-604N for Uptown Campus, Planning Orleans Center New Orleans $2,500,000 and Construction New Orleans Center Replace HVAC System, Planning 19-673 1232 Orleans $700,000 for the Creative Arts and Construction $700,000 Press Street Studios, Furniture/Fixtures/Equipment, New Orleans Center Planning and Construction 19-673 1382 Orleans for the Creative Arts NOTE: P2 was $850 K in HB2. $0 IEB moved $850 K of P2 to P5 on 2-21-13 Milan Upland Yard 36-P17 Port of New Orleans 1585 Improvements, Planning and ORLEANS $1,000,000 $1,000,000 Construction Behrman Park Improvements - 50-ML3 New Orleans 637 New Soccer Facility, Planning and Orleans $500,000 $500,000 Construction, Master Planning Fourth District Police Station, 50-ML3 New Orleans 1979 Orleans $300,000 Planning and Construction $300,000 Algiers Playgrounds, Renovation 50-ML3 New Orleans 1980 of Restrooms, Lighting, Fencing, Orleans $225,000 $225,000 and Playground Equipment Algiers Fire Station, Planning and 50-ML3 New Orleans Orleans $150,000 Construction $150,000 Samuel Square, Renovation and Upgrades, Including Demolition of Existing Playground, 50-ML3 New Orleans Orleans Installation of New Play $250,000 Equipment and re-Grade Fields, Planning and Construction 11 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

HB2 P2 CLOC Approved Agency # Agency Name Project Title Parish P2 Total in HB2 BDS # by SBC

Taylor Pool and Playground, Renovations and Upgrades, Including Repair and Renovations of Basketball Courts and Pavilion, 50-ML3 New Orleans Orleans $250,000 Replacing Perimeter Fencing, $250,000 Installation of New Water Fountains, and Re-Grade Fields, Planning and Construction

George W. Carver Playground, Renovations and Upgrades, Including Repair and Renovations of Basketball Courts and Pavilion, Renovations to Bathrooms and 50-ML3 New Orleans Orleans $450,000 Concessions Building, Demolition $450,000 of Existing Playground and Installation of New Play Equipment, Planning and Construction

50-ML3 New Orleans Donsereaux Harrison Playground Orleans $200,000 New Orleans Hall A Renovation, Planning and 50-N05 Exhibition Hall 1971 Orleans $10,000,000 Construction $10,000,000 Authority Louisiana Children's Museum Louisiana Children's 50-N12 1322 Early Learning Village, Planning Orleans $485,000 Museum $485,000 and Design WYES Katrina 50-N25 WYES TV New Orleans 1002 Rebuilding/Equipment Project, Orleans $2,000,000 $1,000,000 Planning and Construction The Jazz & Heritage Center NO Jazz & Heritage Renovation and Addition 1225 50-N51 1005 Orleans $75,000 $75,000 Foundation North Rampart, Planning and Construction National WWII Museum Campaigns Gallery Exhibits Const. and LA Memorial Pavilion Train National World War II 50-N74 1773 Station Experience Including Orleans $750,000 Museum $750,000 Connecting Higgins Ped Bridge and Canopy, Planning and Construction

Kingsley House Renovations, New 50-N98 Kingsley House 663 Orleans $100,000 Construction, and Major Repairs $100,000 OGDEN MUSEUM OF Ogden Museum/Taylor Library 50-NAY 1069 ORLEANS $265,000 SOUTHERN ART Renovation $265,000 Lighthouse for the Economic Development Project, 50-NBB 1853 Orleans $500,000 Blind Planning and Construction $500,000 Mental Health Facility, Planning 50-ND3 Orleans Parish Sheriff 2019 Orleans $100,000 and Construction $100,000 Technical Training Center, 50-NJ9 Dryades YMCA 118 Orleans Planning and Construction $450,000 Gentilly Development Milne Boys Home, Planning and 50-NQF 696 Orleans District Construction $50,000 Lewis Playground Site Hunters Brotherhood 50-NQJ 1688 Development, Planning and Orleans Alumni - NAE $175,000 Construction Eden House, Acquisition and 50-NSP Eden House 1975 Renovation, Planning and Orleans $400,000 Construction Renovate Headquarters Building, Junior League of 50-NSR 1999 Including HVAC System, Planning Orleans $65,000 Greater New Orleans $65,000 and Construction 12 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

HB2 P2 CLOC Approved Agency # Agency Name Project Title Parish P2 Total in HB2 BDS # by SBC

Renovate Thrift Shop and Annex, Junior League of 50-NSR 2000 Including Parking Lot, Planning Orleans $135,000 Greater New Orleans $135,000 and Construction Renovate Annex Building and Re- Purpose Space, Including Junior League of Installation of Handicap 50-NSR 2001 Orleans $200,000 $200,000 Greater New Orleans Accessibility Ramp and Bathroom Upgrades, Planning and Construction Downtown Improvements to Girod Street, 50-NST Orleans $300,000 Development District Planning and Construction $300,000 Downman Road Economic Downman Road Development District 50-NSV Economic Orleans $200,000 Enhancement, Beautification, Development District Planning and Construction MERCY ENDEAVORS Irish Channel St. Andrew Street 50-NT2 1389 ORLEANS $75,000 SEN CITZ CENTR Elderly Resource Center $75,000 50-S36 Orleans Parish School Medical Arts High School Board Program (Dibert Building), Orleans $1,000,000 Planning and Construction Chennault Aviation and Military Museum Hanger Building and 04-139 Secretary of State 145 Ouachita $50,000 $50,000 Equipment, Planning and Construction University of Louisiana Sandel Hall Renovation, Planning 19-629 73 Ouachita - Monroe and Construction $100,000 University of Louisiana Stubbs Hall Reroofing, Planning 19-629 74 Ouachita $635,000 - Monroe and Construction $635,000 Service Road, Planning and 50-MS7 STERLINGTON 1814 OUACHITA $120,000 Construction $120,000 Creation of a Hurricane/Disaster Shelter by Expanding the West 50-MV2 West Monroe 509 Ouachita $30,000 Ouachita Senior Center, Planning $30,000 and Construction 50-NSK RAYS OF SONSHINE 1714 Project Elevate! OUACHITA $50,000 1801 Highway 23 Elevation for Three PLAQUEMINES Miles of Emergency Route Flood 07-270 DOTD - Administration $1,000,000 $1,000,000 Protection, Planning and Construction Emergency Evacuation Complex, 50-J38 Plaquemines Parish 1818 Plaquemines $500,000 Planning and Construction $500,000 Belle Chasse Parks, Planning and 50-J38 Plaquemines Parish Plaquemines $100,000 Construction $100,000 Intracoastal Buoy Project, 50-J38 Plaquemines Parish Plaquemines Planning and Construction $200,000 Plaquemines Parish Sheriff's Training Center, 50-N62 Law Enforcement 1936 Plaquemines $60,000 Planning and Construction $60,000 District Pointe Coupee Parish Port Capital Pointe Coupee Port 36-P49 1566 Improvements, Planning and Pointe Coupee $300,000 Commission $300,000 Construction False River Ecosystem 50-J39 Pointe Coupee Parish 1616 Restoration Project, Planning and Pointe Coupee $500,000 $500,000 Construction Emergency Shelter Supply Room, Addition to the Livonia 50-MG8 Livonia 1413 Pointe Coupee $100,000 Community Center, Planning and Construction Tioga Heritage Museum, Planning 04-139 SECRETARY OF STATE 1456 RAPIDES and Construction $50,000 Office of Central Louisiana State Hospital 09-340 Developmental 1948 Relocation to Pinecrest, Planning Rapides $1,000,000 $1,000,000 Disabilities and Construction 13 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

HB2 P2 CLOC Approved Agency # Agency Name Project Title Parish P2 Total in HB2 BDS # by SBC

Multi-Purpose Academic Center, 19-602 LSU Alexandria 209 Rapides Planning and Construction $500,000 Sugarhouse Road/Eddie Williams Blvd. to LA Hwy. 1, Phase I and 50-M05 Alexandria 100 Phase II, Planning and Rapides $500,000 $500,000 Construction ($5,000,000 Local Match) Sewer Extensions in the Springhill 50-M16 Ball 462 Rapides Road Area $50,000 Renovation of Community Facilities, Planning and 50-M93 Forest Hill 479 Rapides $150,000 $150,000 Construction ($375,000 Local Match) England Airpark Hospital England Economic and Renovations and Conversion of 50-N33 Industrial 1943 School to Outpatient Facility, Rapides $6,800,000 $6,800,000 Development District Planning and Construction ($5,000,000 Local Match) Maintenance Barn for Town of Coushatta Public Works 50-M56 Coushatta 1760 Red River $55,000 Department, Planning and Construction Sapa Drive Improvements, 50-J42 Richland Parish 1984 Richland $250,000 Planning and Construction $250,000 Richland Parish Recreational and 50-M61 Delhi 476 Learning Center, Planning and Richland $100,000 $100,000 Construction Railroad Spur, Planning and 50-MO9 Rayville 1985 Richland $250,000 Construction $250,000 Plainview Road Rehabilitation, 50-J43 Sabine Parish 272 Sabine $1,000,000 Planning and Construction $1,000,000 South Toledo Bend Esto Booster Station Discharge 50-NCN 372 Sabine $65,000 Waterworks District and Supply Line Replacement $65,000 Rehabilitation of Dock #1 Section 36-P20 St. Bernard Port 1820 A Seawall, Planning and St. Bernard $3,800,000 $3,800,000 Construction St. Bernard Parish Arabi Sub-Station, Planning and 50-N07 657 St. Bernard Sheriff Construction $200,000 West Bank Hurricane Protection 50-J45 St. Charles Parish 1127 St. Charles $525,000 Levee $525,000 Taylor Street Bridge, Planning 50-MB3 Greensburg St. Helena and Construction $50,000 Administration Building, 50-MJ8 Montpelier 1757 Acquisition, Planning and St. Helena $190,000 $190,000 Construction Drainage and Parking 50-NER St. Helena Hospital 522 Improvements, Planning and St. Helena $55,000 Construction Liquid Petroleum Dock Facility in Port of South 36-P21 1433 St. James Parish, Planning and St. James Louisiana $55,000 Construction St. James Parish Land Acquisition, 50-J47 St. James Parish 994 St. James $1,000,000 Planning and Construction $1,000,000 Eastbank Master Drainage Plan 50-J47 St. James Parish 1539 St. James Study $130,000 Port of South Warehouse, Planning and St. John the 36-P21 1957 $100,000 Louisiana Construction Baptist $100,000 Hurricane Evacuations and Homeland Security Coordination 50-J49 St. Landry Parish 1997 St. Landry $195,000 and Related Renovations, $195,000 Planning and Construction 14 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

HB2 P2 CLOC Approved Agency # Agency Name Project Title Parish P2 Total in HB2 BDS # by SBC

Police and Utility Departments Roof, Air Conditioning Unit for 50-MA9 Grand Coteau Town Hall, Handheld Meter St. Landry $60,000 $60,000 Reader, Abandon and Plug Water Well Road Improvements on Four-Mile 50-J50 St. Martin Parish 1228 Bayou Road, Planning and St. Martin $200,000 $200,000 Construction Municipal Complex, Planning and 50-MM8 Parks 1404 St. Martin Construction $50,000 Sewer Upgrade, Planning and 50-MQ5 St. Martinville 1562 St. Martin $350,000 Construction $350,000 Infrastructure Improvements at 50-J51 St. Mary Parish 97 the Charenton Canal Industrial St. Mary $150,000 $150,000 Park Installation of Culverts and Associated Infrastructure in Middle Road Drainage Canal - 50-J51 St. Mary Parish 1299 Bayou Vista LA for Sub-Gravity St. Mary $460,000 $460,000 Drainage District #1 of St Mary Parish Gravity Drainage District #2, Planning and Construction Lake End Parkway Cabins, 50-MK2 Morgan City 1588 St. Mary $1,000,000 Planning and Construction $1,000,000 St. Tammany Parish Fishing Pier, 50-J52 St. Tammany Parish 1273 St. Tammany $400,000 Planning and Construction $400,000 Emergency Shelter and Livestock 50-J52 St. Tammany Parish 1733 Facility Addition, Planning and St. Tammany $980,000 $980,000 Construction Extensions and Improvements to 50-M57 Covington 1385 Water Distribution System, St. Tammany $220,000 Planning and Construction Road and Street Repairs, 50-M90 Folsom 478 Planning and Construction (Cash St. Tammany $15,000 and/or In-Kind Match Required) Mandeville Trailhead Property 50-MH8 MANDEVILLE 1485 ST. TAMMANY $400,000 Acquisition $400,000 Pearl River Museum, Planning 50-MN1 Pearl River 492 St. Tammany and Construction $25,000 Town Hall Renovations, Planning 50-MT1 Sun 500 St. Tammany and Construction $15,000 Northshore Harbor Center Northshore Harbor 50-NG2 525 Purchase of Additional St. Tammany $175,000 Center $175,000 Equipment Division of Local Government Assistance 01-107 1 Statewide $10,000,000 Administration Program $10,000,000 Division of Community Water Enrichment 01-107 2 Statewide $5,000,000 Administration Program $5,000,000 Statewide Roofing, Division of Waterproofing, and Related 01-107 397 Statewide $2,625,000 Administration Repairs and Equipment Replacement Program Major Repairs for State Buildings Division of Based on Statewide Condition 01-107 409 Statewide Administration Assessment, and Infrastructure, $9,000,000 Planning and Construction Statewide Backlog of Maintenance and Repair (BMAR), Department of Military 01-112 9 Phase 3, and Statewide Statewide $500,000 Affairs $500,000 Infrastructure Rehabilitation, Phase 3 Economic Development Award Office of Business Program For Infrastructure 05-252 15 Statewide $10,000,000 $10,000,000 Development Assistance (Supplemental Funding) 15 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

HB2 P2 CLOC Approved Agency # Agency Name Project Title Parish P2 Total in HB2 BDS # by SBC

Secretary's Emergency Fund for Bridge Damages, Other Reimbursements, Local Matching 07-270 DOTD - Administration 28 Statewide $2,500,000 Dollars, Federal Funds, and $2,500,000 Opportunity Grants Subject to the Provisions of R.S. 48:232 Highway Program (Up to 07-270 DOTD - Administration 976 $4,000,000 for Secretary's Statewide $20,000,000 Emergency Fund) Corrections - Statewide Fencing Project, 08-400 35 Statewide $600,000 Administration Planning and Construction $600,000 Land Acquisition for Post 19-671 Board of Regents 1630 Secondary Educational Statewide $2,500,000 Institutions Repairs and Renovation at the Hammond North Lake Supports and Services 09-344 Tangipahoa $500,000 $500,000 Developmental Center Center, Planning and Construction Computer Science and Southeastern Technology Facility 19-634 75 Tangipahoa $1,000,000 $1,000,000 Louisiana University Improvements and Expansion, Planning and Construction South Tangipahoa Port Manchac Terminal 36-P33 Parish Port 1931 Improvements, Planning and Tangipahoa $470,000 $470,000 Commission Construction Courthouse and Courthouse Annex Renovations and 50-J53 Tangipahoa Parish 1559 Expansions, Acquisitions, Tangipahoa $490,000 $255,000 Planning and Construction ($500,000 Local Match) Air Traffic Control Tower, 50-MB9 Hammond 106 Planning and Construction Tangipahoa $750,000 $750,000 ($450,000 Local Match) Police Station, Acquisition and 50-MB9 Hammond 1604 Renovation, Planning and Tangipahoa $600,000 $600,000 Construction Sewerage Treatment and Sewer/Water Lines Repairs, 50-MD5 Independence 1473 Tangipahoa $20,000 Planning and Construction (Cash $20,000 and/or In-Kind Match Required) 50-MD5 Independence 1740 Independence Area Community Tangipahoa Pavilion, Planning and $155,000 $155,000 Construction Drainage Improvements on 50-MT6 Tickfaw 1249 Highway 442 East and West, Tangipahoa $115,000 $115,000 Planning and Construction Tensas Parish Port/Port Priority 50-J54 Tensas Parish 456 Site Plan, Planning and Tensas $100,000 Construction Diesel Marine, Welding and L.E. Fletcher Technical Transportation Building for 19-731 236 Terrebonne $200,000 $200,000 Community College Fletcher Technical Community College Integrated Petroleum L.E. Fletcher Technical Technologies Program (IPT) Lab 19-731 1823 Terrebonne $4,000,000 $4,000,000 Community College and Classroom Building, Planning and Construction Slip Dredging and Improvements Terrebonne Port 36-P23 1749 for Terrebonne Port Commission Terrebonne $710,000 Commission $710,000 Government Multi-Use Complex

Terrebonne Parish Consolidated Government, Upper Bayou 50-J55 Terrebonne Parish 1808 Terrebonne $200,000 Dularge Pump Station, Planning $200,000 and Construction 16 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

HB2 P2 CLOC Approved Agency # Agency Name Project Title Parish P2 Total in HB2 BDS # by SBC

Union Village Fire Station, 50-M85 Farmerville 617 Acquisitions, Planning and Union $70,000 Construction New Law Enforcement/Services/Training/ Union Parish Law Emergency Shelter Complex, 50-NW1 704 Union $50,000 Enforcement District Planning and Construction $50,000 ($500,000 Local In-Kind Match; $1,100,000 Federal Match) Water Distribution and Storage 50-M60 Delcambre 1335 System Improvements, Planning Vermilion $450,000 $450,000 and Construction Street Improvements, Planning 50-MB7 Gueydan 314 and Construction ($112,000 Local Vermilion $150,000 $150,000 Match) Public Safety Complex, Planning 50-ME8 Kaplan 319 Vermilion $150,000 and Construction $150,000 Wastewater Treatment Facility 50-MI8 Maurice 331 and Collection System Upgrade Vermilion $250,000 ($1,792,800 Federal Match) Vernon/Fort Polk Thoroughfare, 50-J58 Vernon Parish 99 Vernon $5,700,000 Planning and Construction $5,700,000

Emergency Connection with West Vernon Waterworks District 50-MD1 Hornbeck 1103 Vernon $300,000 and Inline Booster Station, $300,000 Planning and Construction Emergency Connection with 50-MD1 Hornbeck 1295 Anacoco Water System, Planning Vernon $300,000 $300,000 and Construction Street Improvements, Planning 50-ML2 New Llano Vernon $75,000 and Construction $75,000 Rosepine Wastewater Treatment 50-MQ1 ROSEPINE 1094 VERNON $550,000 Plant Improvements $550,000 Water System Improvements, 50-MQ1 ROSEPINE 1095 VERNON $200,000 Town of Rosepine $200,000 50-M27 Bogalusa 1163 Cassidy Park Improvements and Washington Renovation, Planning and $160,000 Construction Emergency Sewer Collection 50-M27 Bogalusa 1164 System Evaluation and Repairs, Washington $160,000 $55,000 Planning and Construction Extension of Willis Avenue to 50-M27 Bogalusa 1636 Highway 21, Planning and Washington $95,000 Construction Industrial Park Property and 50-M95 Franklinton 1862 Washington Acquisition and Development $35,000 Multi-Purpose Recreation Washington Parish Facility, Land Acquisition, Master 50-NNR 538 Washington $100,000 Recreation District #1 Planning, Design and Construction Conversion of Gym into 50-MC5 Heflin 1472 Multipurpose Facility, Planning Webster $150,000 $150,000 and Construction Potable Water Ground Storage 50-MJ5 Minden 1331 Webster $215,000 Tank, Planning and Construction $215,000 Wastewater Collection 50-MR2 Sibley 1183 Improvements, Planning and Webster $100,000 $100,000 Construction Wastewater Collection System 50-MS5 Springhill 1534 Improvements, Planning and Webster $75,000 $75,000 Construction Horseshoe Road Water Horseshoe Water System, 50-NLR 690 Webster $125,000 System, Inc. Planning and Construction $125,000 17 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

HB2 P2 CLOC Approved Agency # Agency Name Project Title Parish P2 Total in HB2 BDS # by SBC

Inland River Marine Terminal Greater Baton Rouge Dock and Access Roadway West Baton 36-P03 1996 $1,000,000 $1,000,000 Port Commission Construction Project, Planning Rouge and Construction New Police Department West Baton 50-M33 Brusly 296 Headquarters and Sub District #2 Rouge $275,000 Fire Station West Carroll Parish Jail Education West Carroll Parish 50-NAH 664 and Visitation Room, Planning West Carroll Sheriff $55,000 and Construction Electrical Distribution System Louisiana State 08-402 39 Upgrade, Planning and West Feliciana $300,000 Penitentiary $300,000 Construction Main Prison Shower and Louisiana State 08-402 823 Cellblock Plumbing Upgrade, West Feliciana $165,000 Penitentiary $165,000 Planning and Construction Natural Gas Distribution System 50-MQ3 St. Francisville 1000 Rehabilitation and Improvement, West Feliciana $305,000 $305,000 Planning and Construction Village of Sikes Water System 50-MR4 SIKES 1544 WINN $1,000,000 Extensions and Improvements $1,000,000 $253,875,000 $189,595,000