Agenda Item 10, Appendix B

Communities Issues List - South CLC area

Trans-boundary • 1978 - Cycle improvement scheme – Centurion Way to Singleton – improve off-road cycle provision • 2280 - Provision of bridleways as part of the Medmerry Coastal Realignment Scheme • 2279 – Provision of bridleways and cycle routes in and around the Manhood Peninsula • Scheme for a safe crossing of Vinnetrow Road - scheme to design and install a suitable road crossing, plus lay stoned surface connecting paths on either side of Vinnetrow Road • 20 is plenty for villages in South Chichester CLC area - Itchenor, Compton and Fishbourne • Pedestrian/cycle link from expected Highways Agency bridge (across A27 near the Whyke roundabout) and crossing point, which would better link Chichester City with the south of the A27. (for further details please see note attached) • 20 is plenty for villages in South Chichester CLC area - Itchenor, Compton and Fishbourne

Speed management • 2271 – B2179 – • 2313 – A286 – Singleton to Cocking • 2278 – B2141 – Chilgrove to • 2277 – B2147 – Westbourne • 2276 – B2141 – Lavant to Chilgrove • 2273 – B2179 – • 2272 – C25 – Aldsworth • 2265 – B2146 – Funtongton to Chichester • 2264 – C25 – to • 2262 – A259 – Chichester to Bognor • 2202 – A286 – Lavant to Singleton

Simon North • 1947 – Surface improvement – Peckhams Copse Oakley Mundham Lane • 1946 – Footway – B2145 Chichester by pass to East Hunston Chichester • 1945 – Pedestrian/cycle improvement – improve surface t bridleway through Langmead development • 2924 - Roundabout crossing improvements – Walnut Tree Roundabout, Lagness Road/Vinnetrow Road • Mill Lane bridge improvements • Footpath from the bus stop at the B2166/Marsh Lane junction to Farm Shop, Oving • 1953 – New footway – Drayton Lane to • 2926 – Pedestrian crossing – Tangmere Road Tangmere • 3059 – Tangmere orbital village cycle route and links to Chichester • 1712 – SRtS Scheme – Tangmere Primary School, Middleton gardens and Malcolm Road • Review of ongoing drainage concerns within the village • Tangmere Road – Traffic calming Louise • 3137 - Parking review Goldsmith • 1915 – Provision of footways within village south of the A259 - Particularly Walton Road from A259 to the West primary school Chichester • 1831 - School Safety Zone – Bosham Primary School • Remove part of green in The Holdens to improve access and parking Fishbourne • 3143 – Parking review • 1936 – New or improved footways – Salthill Road • 1935 – Pedestrian improvements – removal of verges to install footways – Fishbourne Club • 2947 - RTPI displays at bus stops in village • 1933 – 30mph gateway treatment on A259 eastern approach to village and Salthill Road • 1932 – Speed Indicator Device on A259 • 1931 – Route safety scheme on Salthill Road between Clay Lane and railway • 20 is Plenty throughout village Funtington • SSZ – Funtington Primary School Sandra Compton • 1844 – SSZ – Littlegreen School James • 1843 – SSZ – Compton and Up Marden Primary School Bourne • 20 is plenty scheme through village Chidham and • 1920 - A259 on-street parking improvements Hambrook • 1921 – Pedestrian enhancements – near Broad Road/Drift Lane • 1842 School Safety Zone and SRtS Scheme – Chidham Parochial Primary School • Steel Lane - Review and improvements to carriageway • Cot Lane - Road widening and drainage improvements near Greenfields • 3153 – Parking review - Nutbourne Southbourne • 3158 – Parking review • 2136 – Main Road near Thorney Road – A259 convert pelican crossing to puffin • 1711 - SRtS – Southbourne Infants School and Junior School • 1710 - SSZ – Southbourne Infants and Junior School • 1852 – SRtS – Bourne Community College Stoughton • New community hall • Speed reduction through Forestside from 40mph to 30mph Westbourne • 3147 – Parking Review • 1984 – Pedestrian crossing facility – The Square • Village gateways – To ensure visitors are well aware that they are entering a village • Improved parking in The Square – installation of bays outside the Dr’s surgery • 1855 - SSZ – Westbourne primary School • 1983 – Speed management – Aldsworth • 1846 – SSZ – Thorney Island Community Primary School Margaret • Drainage issues to be investigated Whitehead • Road surface concerns Donnington • Drainage issues to be investigated South • Road surface concerns Chichester Hunston • 1942 – Improvements to canal tow path/cycle route and access points • 2932 – Improvements to footway outside Hunston Village shop on Road • 2142 – New crossing facility – Main Road near Southover Way B2145 • 2931 – Drainage improvements at the junction of the B2145 and Street End Lane • Traffic Calming in Westlands Road to stop speeding vehicles entering the cul de sac • Widen footway on east side of Selsey Road opposite Westlands Road

Sidlesham • 2984 – Provide a crossing of the B2145 for cyclists and pedestrians as part of cycle route which travels from Ferry Corner and Pagham Harbour Visitor Centre down to Selsey – Chichester Cycle Forum and manhood Peninsula partnership, RSPB and Environment Agency • 2983 – Continuation of footway from (Ferry Corner) and Pagham Harbour visitor centre down to Selsey – Manhood Peninsula partnership, RSPB and Environment Agency • 1971 – Pedestrian crossing facility – B2145 near Keynor Lane • 1969 – Road realignment and footway enhancement – Bend near Anchor Public House to the garage • 1970 – Pedestrian enhancements – Selsey Road near Mill Lane • 1999 – SSZ Sidlesham Primary School Jeremy Hunt • 1832 – School Safety Zone – Boxgrove Primary School North • Verge removal and parking bays installed in St Chichester Blaises Road and St Marys Road – to deal with high level of car parking on verges causing damage • Improve crossing point on The Street near the community centre – high level of use by school children and concerns with visibility • route safety scheme - Speed limit reduction and traffic calming measures on this section of the A285 • Drainage issues East Dean • Drainage issues • Traffic calming measures through village – concerns with speeding through village Lavant • 2956 – Signed directions for the Centurion Way bike route through Lavant • 2930 – Parking bay increase – Meadow Close • 1678 – Provision of a link from Centurion Way to the village • 1944 – Pedestrian crossing facility – A286 near post office • 2120 – Pedestrian crossing facility at St Nicholas Corner Singleton • 1974 – Town Lane footway between Singlton and Weald and Downland Museum • SSZ – Singleton Primary School • Verge removal/or hardening at the junction of The Leys and Charlton Road – to allow adequate parking for local residents and visitors to the community centre • Drainage issues –particularly on A285 near Upwaltham Barns • 1713 Cycle facility improvements – shared use cycleway along Stane Street from end of current cycleway until Old Arundel Road • 2933 – Traffic calming on Madgwick Lane • Village gateways • Controlled crossing on Stane Street near Claypit Lane – School children crossing West Dean • Request for Church Lane to become a southerly one way system between the junctions with Cemetery Lane and Millers Lane Bernard Selsey • 3156 – Parking review Smith • 1962 – High street review and improvements • 1960 – Pedestrian crossing facility – Chichester Selsey Road near Police Station • 1958 – Pedestrian crossing facility – Chichester Road/Church Road • 2925 – Crossing facility – Beach Road to Orchard Parade shops • 2137 – Crossing facility – High Street near Malthouse Road • 2929 – Traffic calming measures and pedestrian crossing points – Hillfield Road • Provision of Manhood Greenways Project - Access improvements including new footways, shared use (cycleway/footway) improvements to enable better access between key locations i.e - shared use footway/cycleway from Sidlesham and Pagham harbour visitor centre down to Selsey Pieter • 2934 - Traffic calming on Sidlesham Lane – Birdham Montyn straight until Mapsons Lane • 1925 – Footpath installation along Clappers Lane The East Wittering • 3138 – parking review Witterings and • 1707 – Pedestrian crossing point – Bracklesham Lane Bracklesham near the Lively Lady public house • 1926 – Footways improvements Shore Road • SSZ – East Wittering School • 2866 – parking restrictions on bends in Longlands Road • 20 is plenty scheme for village West • 3162 – Parking review Wittering • 1981 – Footway and cycleway improvement – Cakeham Manor • 2802 – Improvements on footways – Rookwood Road and Southcote Avenue

Chichester City Local members – Simon Oakley, Louise Goldsmith, Margaret Whitehead and Jeremy Hunt

Air Quality • 2011 – AQ – public transport improvements • 2016 – AQ – St Pancras (A286 section) • 2015 – AQ – A286 Orchard Street • 2014 – AQ – A27/A286 Stockbridge Roundabout • 2012 - Schemes to reduce traffic generated ait pollution in AQMA’s. The study should have regard to City arterial/feeder routes and existing/new assessments that consider the impact of development proposals (e.g. existing NE sector Transport Assessments • 2010 – AQ - Park and ride scheme • 2009 - HGV and local direction signing • 2008 – AQ – Speed limit changes – Orchard Street • 2007 – AQ – MOVA traffic signal optimisation (Orchard Street and city) • 2006 – AQ – variable Message Signing (VMS) – A27 trunk road (Stockbridge) • 2005 – AQ – CCTV cameras (plus 3G technology) • 2004 – AQ – minor bus infrastructure improvements including bus transponders • 2003 – AQ – Study of the benefits of wider and individual traffic signal optimisation • 2002 – AQ – Introduce bus lane(s) at approach to A27/A259 roundabout • 2013 – Transport Strategy – AQ management areas

Cycling • Cycle Improvement Scheme – Terminus Road to Canal Wharf allowing a safe route to be developed that links to the City centre and other cycle routes – Cycle Forum • Cycle Route – NW Chichester allowing a sustainable route to be developed to join communities of Summerdale estate to the City centre and Centurion Way • Chichester to Bognor cycle route • Cycle route joining Selsey, Bracklesham and West Wittering communities to Chichester • Chichester to and interlinking villages • Shared use Cycleway/footway along College Lane, Chichester

Pedestrian Improvements • Access strategy – facilities for mobility impaired/pedestrian enhancements • Pedestrian crossing facility in Sherborne Road near Parklands School • Broyle Road to Norwich Road – Footway improvements • St Pancras near Bridge Road – A259 convert pelican crossing to puffin • Portsmouth Road near Creek End – A259 convert pelican crossing to puffin • New crossing facilities – Oaklands Way Toucan • New crossing facility and provision of new footway– Brandy Hole lane • Westhampnett Road near St James Industrial Estate – A285 convert pelican crossing to puffin • 2109 – Broyle Road pedestrian refuge north of The Broadway • 2106 – Pedestrian/cycle improvements – A259 from Tesco over bridge on Cathedral Way – linked to Fishbourne crossing closure • 2101 – Pedestrian enhancements – Tower Close to The Providence • 2153 – New crossing facility – Florence Road near recreation ground (south) • 2151 – New crossing facility – Florence Road near recreation ground (north) • 2131 – Westhampnett Road near Spitalfield lane – Convert pelican crossing to puffin • 2133 - Spitalfield lane near Adelaide Road B2178 – Convert pelican crossing to puffin • 2150 – New crossing facility – Spitalfield Lane near Oaklands Way

School Safety Zones • Jessie Younghusband School • St Richard’s Catholic Primary School • St Anthony’s School • Kingsham Primary School • Fordwater School • Bishop Luffa CofE School