Jacinta Allan MP Minister for Transport Infrastructure Minister for the Suburban Rail Loop The Big Build Key statistics

165 18,000 100 million $80 billion projects workers hours worked worth of investments Suburban Rail Loop $2.2 billion for Stage One BOX HILL Interchange with Belgrave and Lilydale lines

BURWOOD RINGWOOD New underground station servicing GLEN WAVERLEY Interchange with Glen Waverley line CAULFIELD FERNTREE GULLY

MONASH New underground EMERALD station servicing the university CLAYTON Transport super hub connecting regional passengers

CHELTENHAM DANDENONG Interchange with

Frankston line MORDIALLOC

HAMPTON PARK Fast Rail Sunshine Footscray $4 billion for Stage 1 South Kensington

Spotswood Southern Cross Yarraville STAGE 1 New bridges; signalling Seddon upgrades

Newport

Laverton

Aircraft Altona North Williamstown

Hoppers Crossing Williamstown Beach Westona Seaholme Williams Landing Williamstown

Werribee STAGE 1 New track Little River

Lara

Corio North Shore

North Geelong

Geelong Geelong South Geelong-Waurn

Ponds Duplication STAGE 3 STAGE 2 Geelong tunnel Station $901 million for Stage 2 upgrade

South Geelong

STAGE 2 Track duplication and signalling upgrade

STAGE 1 Marshall Additional platform and pedestrian link STAGE 2 Station upgrade

Geelong Waurn Ponds Line Upgrade Geelong $260 million for Stage 2 STAGE 2 New passing loop South Geelong Birregurra Waurn Ponds

Sherwood Park Camperdown Colac Winchelsea Marshall

STAGE 2 STAGE 1 Signalling upgrade 12 Level crossing upgrades

Warrnambool

Melbourne

Geelong Warrnambool STAGE 1 Upgrade to stabling to enable fifth daily return Line Upgrade service $400 million for Stage 3 Shepparton STAGE 2 New stabling for VLocity trains north of Shepparton

STAGE 3 STAGE 3 Expanding the stabling facility being delivered as part of Stage 2 Signalling and track upgrades for speeds up to 130kmh Mooroopna STAGE 2 Platform extension

STAGE 2 STAGE 2 Level crossing Murchison East Platform extension

STAGE 1 New crossing loop to allow extra future services

Nagambie STAGE 2 Shepparton Platform extension

Seymour

Seymour PARKVILLE Excavation and base slab pour completed

STATE LIBRARY Excavation under way

South Kensington North Melbourne Melbourne Flagstaff Central

ARDEN Construction of columns and inner walls above the Southern Cross Parliament TOWN HALL concourse slab Road headers tunnelling between City Square and Federation Square

Flinders St Richmond ANZAC Roof slab completed and construction of first station Metro Tunnel South Yarra entrance (in the grounds of the Construction update Shrine) underway.

Tunnelling complete Tunnelling underway Big Build

West Gate Tunnel -Moama Bridge line Upgrade Princes Hwy East -Sale

High-capacity signalling Line Upgrade North East Link 75 Level Crossing Removals