CONTENTS
CHAPTER 1 -EXECUTIVE SUMMARY ...... 01
CHAPTER 2 -DETAILED PROJECT DESCRIPTION ...... 04
CHAPTER 3 -TEAM COMPOSITION APPROACH, METHODOLOGY AND SCHEDULE OF THE SOCIAL IMPACT ASSESSMENT ...... 09
CHAPTER 4 - LAND ASSESSMENT ...... 12
CHAPTER 5 -ESTIMATION AND ENUMERATION (WHERE REQUIRED) OF AFFECTED FAMILIES AND ASSETS ...... 14
CHAPTER 6 –SOCIAL ECONOMIC AND CULTURAL PROFILE (AFFECTED AREA AND RESETTLEMENT SITE)...... 16
CHAPTER 7 - SOCIAL IMPACT MANAGEMENT ...... 19
CHAPTER 8 – SOCIAL IMPACT MANAGEMENT PLAN INSTITUTIONAL FRAMEWORK...... 22
CHAPTER 9 - SOCIAL IMPACT MANAGEMENT PLAN BUDGET
AND FINANCING OF MITIGATION PLAN...... 24
CHAPTER 10 - SOCIAL IMPACT MANAGEMENT PLAN MONITORING AND EVALUATION...... 25
CHAPTER 11 - ANALYSIS OF COSTS AND BENEFITS AND RECOMMENDATION ON ACQUISITION...... 26
ANNEXURES ...... 28 SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
CHAPTER 1
EXECUTIVE SUMMARY
1.1 Project and public purpose
The proposed project is envisioned to construct APJ Abdul Kalam Technological University. For the implementation of the project an area of 39.61 hectares of land spread over Vilappil Village of Kattakkada Taluk in Thiruvananthapuram District needs to be acquired. After the establishment of the University in May 2014, the University functions inside the campus of College of Engineering Trivandrum (CET). The need for the project arises from the need for own campus for the University. As per the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 Section 2-(1)-(b)-(v), the project can be considered as a public purpose.
1.2 Location
The proposed land to be acquired is spread over an area of 39.61 hectares of land spread over Vilappil Village of Kattakkada Taluk in Thiruvananthapuram District.
1.3. Size and attributes of land acquisition
For the proposed project an extend of 39.61 hectares of land spread over 23 survey numbers in Vilappil Village of Kattakkada Taluk in Thiruvananthapuram District is to be acquired. The proposed area is located approximately 15 kms from Thiruvananthapuram Central Railway Station. The area is well connected through road facilities and frequent services is provided by KSRTC from all parts of the city to the proposed land.
1.4 Alternatives considered
The present location for the establishment of the University is located 15 kms from Thiruvananthapuram Central Railway Station and 18 kms from Thiruvananthapuram International Airport. Proposed location is well connected with road networks. The KSRTC regulates frequent bus services to the proposed location from various parts of the district. The proposed extend is the bare minimum to house all the facilities for the University. Well connected transport system is an added advantage. An alternative location with the bare minimum land Centre for Management Development, Thiruvananthapuram 1
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
which includes very few building structures (especially residential structures) and well connected transport system was not available for the construction of the University.
1.5 Social impacts
For the proposed project an extend of 39.61 hectares of land spread over 23 survey numbers in Vilappil Village of Kattakkada Taluk in Thiruvananthapuram District is to be acquired. The area is mainly used for rubber plantation. Around 19 residential buildings and a poultry farm is identified at the proposed project area, which needs to be acquired for the project. Rehabilitation for the displaced people should be provided. A water stream is also present in the proposed area. Measures should be taken to conserve the natural drainage system in the area.
1.6 Mitigation measures
To mitigate the social impact of the proposed land acquisition, R&R package should be provided to the families as per the Policies issued by Revenue(B) Department, Government of Kerala vide G.O.(MS)No.485/2015/RD dated 23/09/2015 and G.O.(Ms)No.448/2017/RD dated 29/12/2017 for the rehabilitation and resettlement package for land acquisition in the state in lieu of RFCT in LAR&R Act 2013.
The authorities should take necessary actions to ensure that the existing water bodies such as streams in the project area will not be affected during and after each stage of the implementation of the project. Reconstruction of livelihood of people is an important factor in this project. It is a very difficult task to the people to recreate their commercial enterprises in a new area. So, the assistance should be provided to them in order to successfully recreate their livelihood. The families losing place of stay should be provided with proper rehabilitation measures as per the Act. Safety of the people during the construction phase of the project and healthy disposal of wastages which may arise out of construction should be ensured.
Centre for Management Development, Thiruvananthapuram 2
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Maintaining roads, pathways, present on the proposed land should be given priorities as the people residing on the boundary of the proposed land will face difficulties for free passage.
Centre for Management Development, Thiruvananthapuram 3
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
CHAPTER 2
DETAILED PROJECT DESCRIPTION
2.1 Background of the Project including Developer’s Background and Governance/Management structure
The proposed project is intended for the construction of APJ Abdul Kalam Technological University. Currently the University is functioning from a rented facility owned by College of Engineering, Thiruvananthapuram (CET). The University was established in the year 2014 by an ordinance No. 17 of 2014 and later by an act No. 17 of 2015 of State Legislature of Kerala as a state University vide notifcation No. 8558/Leg.G2/2014/Law dated 31/08/2015 and is empowered to award degrees as specified by the University Grants Commission (UGC) under section 22 of the UGC Act 1965 through its course. At present 143 colleges across Kerala are affiliated to the University. For the proposed project an extend of 39.61 hectares of land spread over 23 survey numbers in Vilappil Village of Kattakkada Taluk in Thiruvananthapuram District is to be acquired. The District Collector Thiruvananthapuram as per letter no. K3–159990/18 dated 26/11/2019 invited proposals t o conduct Social Impact Assessment prior to the Land Acquisition for the project. The Centre for Management was entrusted with the work by the Government of Kerala vide GO(P) No. 95/2019/RD dated 23/12/2019 (Kerala Gazette No. 3184 – Vol. 8 dated 24/12/2019) to conduct the Social Impact Assessment.
2.2 Rationale for Project, including how the project fits the public purpose criteria listed in the Act.
The proposed project intends to construct an independent campus for the APJ Abdul Kalam Technological University (APJAKTU) . Currently the University is functioning from a rented facility owned by College of Engineering, Thiruvananthapuram (CET). The implementation of the project will provide an independent campus for the university. The University is established with an aim to coordinate all the activities related to 143 Engineering colleges across Kerala. The advancement of science in the modern era caters the need for interdisciplinary
Centre for Management Development, Thiruvananthapuram 4
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
technologies with research based innovations. The University has not yet established teaching and research departments so far. The establishment of various departments have to be completed in a time bound manner. The proposed campus will house seven academic and research departments, to be called as ‘Schools’. The establishment of ‘Schools’ is essential to receive development grants from the UGC The University will qualify to get 12 (B) status of UGC, only if its campus is built and it should start at least five teaching departments. The campus needs to fulfil the norms laid down by UGC/AICTE. As per the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 Section 2-(1)-(b)-(v), the project can be considered as a public purpose.
2.3 Details of Project size, location, capacity outputs, production targets, costs and risks
The area to be acquired for the proposed project is spread over 39.61 hectares of land under 23 survey numbers in Vilappil Village of Kattakkada Taluk in Thiruvananthapuram District.
The University will house 7 schools in the proposed location
i) School of Mechanical Science and Engineering ii) School of Building Sciences and Engineering iii) School of Electrical and Communication Science and Engineering iv) School of Mathematical and Computing Sciences v) School of Life Sciences and Engineering vi) School of Humanities and Social Sciences vii) School of Basic Sciences
In addition to the academic buildings, other facilities are also needed to be constructed in the campus such as class rooms, faculty rooms, laboratories, research centres, central computing facility, central library, convention centre, guest house, student residence including international students’ hostel, faculty residence, staff residence, common infrastructure facilities such as power distribution centre, STP, other basic facility required for the campus of a University/Educational Institution, etc.
Centre for Management Development, Thiruvananthapuram 5
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Fig. 2.1: Photographs of Project Area
Centre for Management Development, Thiruvananthapuram 6
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
2.4 Examination of alternatives
The present location for the establishment of the University is located 15 kms from Thiruvananthapuram Central Railway Station and 18 kms from Thiruvananthapuram International Airport. Proposed location is well connected with road networks. The KSRTC regulates frequent bus services to the proposed location from various parts of the district. The proposed extend is the bare minimum to house all the facilities for the University. Well connected transport system is an added advantage. An alternative location with the bare minimum land which includes very few building structures (especially residential structures) and well connected transport system was not available for the construction of the University.
2.5 Phases of the Project Construction
In accordance with the proposed project, an independent campus will be established for the APJ Abdul Kalam Technological University.
2.6 Core design Features, size and Type of Facilities
The proposed project aims at the construction of APJ Abdul Kalam Technological University. The project requires a total area of 39.61 hectares of land spread over Vilappil Village of Kattakkada Taluk in Thiruvananthapuram District.
2.7 Need for Ancillary Infrastructural Facilities
In addition to the establishment of the University, a good road network should be maintained at the project area. The acquisition of the proposed land include pathways used by the people residing near the area.
2.8 Workforce Requirements (temporary and permanent)
The work force for the project is not yet assessed. Both temporary and permanent workforce need be employed with modern machineries and equipment at appropriate stages of the project implementation.
Centre for Management Development, Thiruvananthapuram 7
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
2.9 Details of Social Impact Assessment/Environment Impact Assessment if Already Conducted and any Technical Facility Reports
No Social Impact Assessment/Environment Impact Assessment has been conducted previously in association with the proposed project.
2.10 Applicable legislations and policies
The land acquisition for the proposed project is governed by the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act 2013.
Centre for Management Development, Thiruvananthapuram 8
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
CHAPTER 3
TEAM COMPOSITION, APPROACH, METHODOLOGY AND SCHEDULE OF THE SOCIAL IMPACT ASSESSMENT
3.1 List of all Team Members with Qualifications
The details of the team members involved in the SIA are given in Annexure III.
3.2 Description and Rationale for the Methodology and Tools Used to collect Information for the Social Impact Assessment
An inclusive and participatory approach through involvement of multiple stakeholders such as elected representatives and project affected people including vulnerable sections such as Scheduled Castes, Scheduled Tribes, women, and those among below poverty line, at appropriate stages of the project.
3.3 Sampling Methodology Used
Qualitative information was gathered along with the field survey through public consultation/Focus Group Discussions (FGDs) with all relevant stakeholders. The public consultation encompassed the project components as well as its socio- economic impacts. The SIA team had preliminary discussions with the key officials of the district administration and gathered information regarding the status of the government procedures, the project area and intensity of the acquisition. The team also made a preliminary site visit with the officials for physical inspection and information dissemination purposes. The existing conditions of land, status of infrastructure/structures, land use pattern and the facilities available to people residing in the project area were analysed.
The quantitative information regarding the families affected by the project was collected through household surveys, in the form of structured questionnaires. The survey was conducted in all the households of the persons affected by the project. The results of the survey provided information pertaining to the demography, socio-economic status and livelihood status of the target community, and formed the basis for development of Social Impact Management Plan.
Centre for Management Development, Thiruvananthapuram 9
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
3.4 Overview of Information/Data Sources Used
The primary data was collected directly from the representatives all affected families through face to face interview. Structured questionnaires were used for collecting the details of the affected people. The results of the survey provided information pertaining to the demography, socio-economic status and livelihood status of the target community.
The secondary data was collected from the Requiring Body and the Revenue department. The SIA team had preliminary discussions with the key officials of the district administration and gathered information regarding the status of the government procedures, the project area and intensity of the acquisition.
3.5 Schedule of Consultations with Key Stakeholders
Date Details of Consultation Collection of documents form Land January 2020 Acquisition office January 2020 Meeting with the officials of Requiring Body January 2020 Field survey 12/02/2020 Public Hearing
3.6 Public Hearing
In accordance with the Section 5 of Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013, a Public Hearing was conducted at Chowalur Devi Temple Auditorium on 12/02/2020 at 10:00 am to collect the views and opinions of the people affected by the project. Prior intimation was given to all the stakeholders regarding the date and venue of the public hearing through advertisements in leading newspapers, individual letters and/or over telephone and by notices displayed at various locations in the project site.
Centre for Management Development, Thiruvananthapuram 10
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 11
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
CHAPTER 4
LAND ASSESSMENT
4.1 Description of Land with the help of Maps, Information from Land Inventories and Primary Sources
The land to be acquired for the project is spread over Vilappil Village of Kattakkada Taluk in Thiruvananthapuram District. The sketch of the land for the proposed project is shown in annexure no. VI
4.2 Entire area of impact under the influence of the project
For the implementation of the project a total area of 39.61 hectares of land from Vilappil Village of Kattakkada Taluk in Thiruvananthapuram District needs to be acquired.
4.3 Total Land Requirement for the Project
For the implementation of the proposed project an extend of 39.61 Hectares of land Vilappil Village is required.
4.4 Present Use of any Public, Utilized land in the Vicinity of the Project Area
A building owned by Vilappil Grama Panchayath, Sushanth Memorial Centre for
Continuous Education (സുശാന്ത് മെമ്മാറിയൽ സാക്ഷരത െിഷൻ തുടർ
വിദ്യാഭ്യാസ മ്േന്ദ്രം).
4.5 Land (if any) Already Purchased, Alienated, Leased or Acquired, and the intended Use for Each Plot of Land required for the project
No land has been already acquired for the proposed project.
4.6 Quantity and Location of Land Proposed to be Acquired for the Project
A total extend of 39.61 hectares of land spread over Vilappil Villages needs to be acquired for the project.
Centre for Management Development, Thiruvananthapuram 12
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
4.7 Nature, Present use and classification of Land and if Agricultural Land, Irrigation Coverage and Cropping Patterns
The proposed project area is mainly used for rubber plantation. No other commercial cultivations are present on the project area.
4.8 Size of Holding, Ownership Pattern, Land Distributions and Number of Residential Houses
Houses of 19 families will be lost on acquisition. In addition to this land owned by 76 families need to be acquired. During public hearing 106 individuals also claimed that their land also will be lost on acquiaition. The details are listed in the Annexure No. VII.
4.9 Land prices and recent changes in ownership, transfer and use of lands over the last 3 years
As per the information received from the respondents, no land transactions were done in the proposed area for the last 3 years.
Centre for Management Development, Thiruvananthapuram 13
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
CHAPTER 5
ESTIMATION AND ENUMERATION OF AFFECTED FAMILIES AND ASSETS
5.1 Estimation of families
Houses of 19 families will be lost on acquisition. In addition to this land owned by 76 families need to be acquired. During public hearing 106 individuals also claimed that their land also will be lost on acquiaition. The details are listed in the Annexure No. VII.
5.2 Family of Scheduled Tribes and other Traditional Forest Dwellers who have lost any of their Forest Rights
Not Applicable
5.3 Families which depend on Common Property Resources which will be Affected due to Land Acquisition for their Livelihood
Not applicable.
5.4 Families which have been assigned Land by the State Government for the Central Government Under any of its Schemes and such Land is Under Acquisition
Not applicable.
5.5 Families which have been Residing on any land in the Urban Areas for Proceeding three years of more prior to the acquisition of land
Not applicable
5.6 Families which have depended on the Land Being Acquired as a Primary Source of Livelihood for three years prior to the acquisition
Majority of the families living in the area receive income through rubber plantation. The loss in land will affect the source of income of these families.
5.6.1 Families which are indirectly impacted by the project (not affected directly by the acquisition of own lands)
Centre for Management Development, Thiruvananthapuram 14
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
During the implementation stage of the project, the families and shops close to the project area are prone to be affected with different types of pollutions. Most of the residents who resides near to the boundary of the proposed sketch expressed their concerns over the pathways that will get acquired as part of the land acquisition of the project. They also raised concerns for the natural drainage system.
5.6.2 Inventory of productive assets and significant lands
Project area mainly comprises of rubber plantation. No other commercial cultivations are identified at the project area.
Centre for Management Development, Thiruvananthapuram 15
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
CHAPTER 6
SOCIO-ECONOMIC AND CULTURAL PROFILE
6.1 Demographic Details of the Population in the Project Area a) Age Group of Affected Individuals Table 6.1.1. Age Group of Affected Individuals
Age in Years No. of Individual 0-18 11 19-30 31 31-45 41 46-59 55 60 and Above 28 N/A 12 Total 178
b) Gender of Affected Individuals
Table 6.1.2. Gender of Affected Individuals
Gender Number of Individuals Male 84 Female 94 TG 00 Total 178
c) Literacy of the Affected Individuals Table 6.1.3 Literacy of the Affected Individuals
Sl. Education Frequency No. 1 Lower Primary 11 2 Upper Primary & High School 23 3 SSLC 49 4 Plus Two 29 5 Diploma 05 6 Graduation 28 7 Post-Graduation 06 8 Ph.D. 02 9 N/A 25 Total 178
Centre for Management Development, Thiruvananthapuram 16
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
d) Family Pattern
Affected families maintain nuclear family structure.
6.2 Land Use and Livelihood
The land is mainly used for rubber plantation. A poultry farm is also functioning at the project area. The acquisition of land will affect the income of people who depend on these as a source of income.
6.3 Local Economic Activities
The local economic activity for the proposed area depends on rubber plantation. A poultry farm is functioning at the proposed area. The land acquisition will affect the people depending on these sources for income.
6.4 Factors that Contribute to Local Livelihood
Local Livelihood activities include income earned from rubber plantation and a poultry farm functioning at the project area.
6.5 Kinship Patterns and Social and Cultural Organization
Majority of the property belonging to the stake holders are obtained through hereditary. The project affected people have a harmonious way of living at the location.
6.6 Administrative Organization
Not applicable.
6.7 Political Organization
Not applicable.
6.8 Community Based Civil Society Organization
Not applicable.
6.9 Regional Dynamics & Historical Change Process
Not applicable.
Centre for Management Development, Thiruvananthapuram 17
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
6.10 Quality of the Living Environment
The Quality of the Living Environment is fair in the project area with decent livelihood options and transportation facilities with access to amenities such as Schools, Hospitals, Civil Organisations, etc.
Centre for Management Development, Thiruvananthapuram 18
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
CHAPTER 7
SOCIAL IMPACT MANAGEMENT
7.1 Approach to Mitigation
The CMD team made use of a combination of two research approaches i.e., quantitative and qualitative, for the identification of various social impact and the mitigation measures. Adoption of a combination of both qualitative and quantitative methodology was indented to obtain a more comprehensive data and more holistic result without excluding any important area of assessment.
7.2 Measures to avoid, mitigate and compensate impact
For the proposed project an extend of 39.61 hectares of land spread over 23 survey numbers in Vilappil Village of Kattakkada Taluk in Thiruvananthapuram District is to be acquired. The area is mainly used for rubber plantation. Around 20 residential buildings and a poultry farm is identified at the proposed project area, which needs to be acquired for the project. Rehabilitation for the displaced people should be provided. A water stream is also present in the proposed area. Measures should be taken to conserve the natural drainage system in the area. Mitigation measures can be framed as per the details given below:
Compensation for the land owners as per the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act 2013. Resettlement and Rehabilitation procedure as per the Policy issued by Revenue(B) Department, Government of Kerala vide G.O.(Ms) No. 448/2017/RD dated 29/12/2017 for the rehabilitation and resettlement package for land acquisition in the state in lieu of RFCTLAR&R Act 2013. The authorities should take necessary actions to ensure that the existing water bodies such as streams present in the project area will not be affected during and after each stage of the implementation of the project. Reconstruction of livelihood of people is an important factor in this project. It is a very difficult task to the people to recreate their commercial enterprises in a new area. So, the assistance should be provided to them in order to successfully recreate their livelihood. Centre for Management Development, Thiruvananthapuram 19
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Safety of the people during the construction phase of the project and healthy disposal of wastages which may arise out of construction should be ensured. Maintaining roads, pathways, present on the proposed land should be given priorities as the people residing on the boundary of the proposed land will face difficulties for free passage.
7.3 Measures that are included in terms of Rehabilitation and Resettlement and Compensation as outlined in the Act
The Rehabilitation and Resettlement package as per the Policy issued by Revenue(B) Department, Government of Kerala vide G.O.(Ms)No.448/2017/RD dated 29/12/2017 for the rehabilitation and resettlement package for land acquisition in the state in lieu of RFCTLAR&R Act 2013 shall be provided to the affected people.
7.4 Measures that the Requiring Body has stated it will introduce in the project proposal
The requiring body has stated that sufficient fund has been reserved as compensation.
7.5 Alterations to project design and additional measures that may be required to address the extend and intensity of impacts across various groups as identified during SIA
The alignment for the proposed project was prepared by minimising the negative impacts. No alterations to the project design is suggested.
7.6 Detailed Mitigation Plan including detailed activities to be carried out for each mitigation strategy, timelines for each mitigation strategy
To mitigate the social impact of the proposed land acquisition, R&R package should be provided to the families as per the Policies issued by Revenue(B) Department, Government of Kerala vide G.O.(MS)No.485/2015/RD dated 23/09/2015 and G.O.(Ms)No.448/2017/RD dated 29/12/2017 for the rehabilitation and resettlement package for land acquisition in the state in lieu of RFCT in LAR&R Act 2013.
Centre for Management Development, Thiruvananthapuram 20
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Compensation for the land owners as per the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act 2013. Resettlement and Rehabilitation procedure as per the Policy issued by Revenue(B) Department, Government of Kerala vide G.O.(Ms)No.448/2017/RD dated 29/12/2017 for the rehabilitation and resettlement package for land acquisition in the state in lieu of RFCTLAR&R Act 2013. The authorities should take necessary actions to ensure that the existing water bodies such as streams present in the project area will not be affected during and after each stage of the implementation of the project. Reconstruction of livelihood of people is an important factor in this project. It is a very difficult task to the people to recreate their commercial enterprises in a new area. So, the assistance should be provided to them in order to successfully recreate their livelihood. Safety of the people during the construction phase of the project and healthy disposal of wastages which may arise out of construction should be ensured. Maintaining roads, pathways, present on the proposed land should be given priorities as the people residing on the boundary of the proposed land will face difficulties for free passage.
7.7 The Social Impact Management Plan indicating which measures the Requiring Body has committed to undertake and those that have been proposed, but not committed to be undertaken by the Requiring Body
The requiring body has stated that sufficient fund has been reserved as compensation.
Centre for Management Development, Thiruvananthapuram 21
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
CHAPTER 8
SOCIAL IMPACT MANAGEMENT PLAN INSTITUTIONAL FRAMEWORK
8.1 Description of institutional structures and key person responsible for each mitigation measures
The Government of Kerala had appointed Special Tehsildar LA General, Thiruvananthapuram to perform one or more functions of the collector under in the Right to Fair Compensation and Transparency in Land Acquisition, Resettlement and Rehabilitation Act (RFCTLARR), 2013 within their area of jurisdiction.
Also vide G. O. (P) M. No. 590/2015/RD dated 11 November 2015, Government of Kerala, in line with the sub-section (1) of section 43 of the Right to Fair Compensation and Transparency in Land Acquisition, Resettlement and Rehabilitation Act (RFCTLARR) 2013 and sub-rule (1) of rule 21 of Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement (Kerala) Rules, 2015, the Deputy Collector (Land Acquisition) in each district has been appointed as the Administrator for Rehabilitation and Resettlement, for performing the functions under the said act and Rules in respect of involuntary displacement of persons due to requisition of land. The Administrator shall be responsible for the formulation, execution and monitoring of the Rehabilitation and Resettlement scheme in respect of land acquisition.
Vide G. O. (P) M. No. 589/2015/RD dated 11 November 2015, in exercise of the powers conferred by sub-section (1) of section 44 of the Right to Fair Compensation and Transparency in Land Acquisition, Resettlement and Rehabilitation Act (RFCTLARR), 2013, the commissioner for Rehabilitation and Resettlement supervising the formulation of Rehabilitation and Resettlement scheme or plans, proper implementation of the same and post implementation of social audit.
8.2 Specify the Role of Non-Governmental Organisation, if any
Not applicable
Centre for Management Development, Thiruvananthapuram 22
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
8.3 Indicate Capacities Required and Capacity Building Plan, Including Technical Assistance, if any
Not applicable
8.4 Timelines for Each Activity
Proper timeline for each activity should be framed in accordance with the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013.
Centre for Management Development, Thiruvananthapuram 23
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
CHAPTER 9
SOCIAL IMPACT MANAGEMENT PLAN BUDGET AND FINANCING OF MITIGATION PLAN
9.1 Costs of all resettlement and rehabilitation costs
The requiring body stated that necessary budget provision exists for meeting the cost of acquisition .
9.2 Annual budget and plan of action
Not Applicable
9.3 Funding sources with break up
Not Applicable
Centre for Management Development, Thiruvananthapuram 24
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
CHAPTER 10
SOCIAL IMPACT MANAGEMENT PLAN MONITORING AND EVALUATION
10.1 Key monitoring and evaluative indicators
Monitoring is a long-term process, which should begin from the starting of the project and should continue throughout the life of the project. Its purpose is to establish benchmarks so that the nature and magnitude of anticipated social impacts can be continually assessed. Monitoring involves the continuous or periodic review to determine the effectiveness of recommended mitigation measures. The types of parameters that can be monitored may include mitigation measures or design features, or actual impacts. All the mitigation measures stated in Chapter 7 should be considered as the indicators for evaluation.
10.2 Reporting mechanisms and monitoring roles
Rehabilitation and Resettlement procedures as stated in the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement act, 2013 will be applicable.
10.3 Plan for independent evaluation
Not applicable.
Centre for Management Development, Thiruvananthapuram 25
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
CHAPTER 11
ANALYSIS OF COSTS AND BENEFITS AND RECOMMENDATION ON ACQUISITION
11.1 Final conclusions on: Assessment of public purpose, less displacing alternatives, minimum requirements of land, the nature and intensity of social impacts, and viable mitigation measures and the extent to which mitigation measures will address costs
The proposed project is envisioned to construct APJ Abdul Kalam Technological University. For the implementation of the project an area of 39.61 hectares of land spread over Vilappil Village of Kattakkada Taluk in Thiruvananthapuram District needs to be acquired. As per the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 Section 2-(1)-(b)-(v), the project can be considered as a public purpose. Around 20 residential buildings and a poultry farm is identified at the proposed project area, which needs to be acquired for the project. Rehabilitation for the displaced people should be provided. A water stream is also present in the proposed area. Measures should be taken to conserve the natural drainage system in the area.
The alignment of the proposed project was designed with an effort to reduce the number of people who will be affected with the land acquisition. Through the proper measures as per RFCTLARR Act 2013 the negative impacts of land acquisition can be mitigated.
11.2 The above analysis will use the equity principle as a framework of analysis for presenting a final recommendation on whether the acquisition should go through or not.
The acquisition of 39.61 Hectares of land spread over Vilappil Village of Kattakkada Taluk in Thiruvananthapuram District needs to be acquired for the construction of APJ Abdul Kalam Technological University. The proposed extend is the bare minimum required for the establishment of the University. --- residential structures are identified in the proposed location. The research facilities will attract international students. The University coordinates the academic activities of the 143 engineering colleges across the state. Comparing/weighing the positive against the Centre for Management Development, Thiruvananthapuram 26
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
negative impacts, it can be observed that even though the recreation of livelihood and rehabilitation to those families who lose their place of stay need to be provided with proper mitigation measures, the implementation of the project will provide ample opportunities to the technological advancement to the nation by providing quality education to the younger generation.
The families that are affected would require adequate and fair compensation. So, the authorities should make proper action plan to reconstruct the livelihood opportunities for the people who solely relied on the project area for income. It is observed that many of the negative impacts highlighted can be minimized or reduced with effective and relevant mitigation measures and strategies mentioned. So the study recommends acquisition of the land providing proper compensation to the affected people.
Centre for Management Development, Thiruvananthapuram 27
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
ANNEXURES
i. Government Notification
ii. List of key informants contacted and interacted
iii. SIA Team members
iv. Various Government Orders concerning Social Impact Assessment
v. Questionnaires used for survey
vi. Alignment sketches of the proposed project
vii. Details of Affected People
viii. Attendance Sheets from Public Hearing
ix. Concerns Raised and Corresponding Reply During Public Hearing
x. Newspaper Notification and Notice Regarding Public Hearing
Centre for Management Development, Thiruvananthapuram 28
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
ANNEXURE-I
Government Notification
Centre for Management Development, Thiruvananthapuram 29
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 30
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
ANNEXURE-II
List of Key Informants Contacted and Interacted
1. Deputy Collector, L.A, Thiruvananthapuram
2. Special Thasildhar, L.A. General, Thiruvananthapuram
3. Special Officer, APJ Abdul Kalam Technological University
4. Revenue Inspector, L.A. General, Thiruvananthapuram
Centre for Management Development, Thiruvananthapuram 31
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
ANNEXURE-III
SIA Team Members
Sl. No. Name Designation Qualification
1. Dr. G. Suresh Project Director Ph. D.
2. Shri. Riyas K. Basheer Project Coordinator MBA, B.Tech.
3. Dr. S. Remadevi Domain Expert Ph. D.
4.. Shri. Suradh K. Surendran Field Coordinator M. Tech.
5. Shri. Albin M. Field Investigator MBA
6. Shri. Josukutty Kurian Field Investigator MSW
Centre for Management Development, Thiruvananthapuram 32
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
ANNEXURE-IV Various Government Orders Concerning Social Impact Assessment on Land Acquisition
Centre for Management Development, Thiruvananthapuram 33
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 34
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
2
Centre for Management Development, Thiruvananthapuram 35
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 36
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 37
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 38
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 39
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 40
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 41
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 42
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 43
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 44
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 45
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 46
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 47
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 48
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 49
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 50
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
ANNEXURE- V Questionnaires used for survey
Centre for Management Development, Thiruvananthapuram 51
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 52
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 53
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 54
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 55
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 56
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Centre for Management Development, Thiruvananthapuram 57
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
ANNEXURE- VI Alignment sketches of the proposed project
Centre for Management Development, Thiruvananthapuram 58
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
ANNEXURE- VII Details of Affected People
Centre for Management Development, Thiruvananthapuram 59
SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Families Losing House
Sl. Survey Village Name Address Contact No. Opinions
land land
Loan No. Number Type
Usage
nature
Family
project
Type ofType
on land
the plotthe
Years of Opinion
Religion Usage of
Disputes
Category
APL/BPL
Nature ofNature
about the
Ownership
Ownership
Included in
Gähpw \Ã hne
In«Ww-Irjn \jvS-
4
1 Vilappil Anila Shima Bhavan ry re
No No
BPL OBC s¸Spw
Own Land
Trees
Family
Nuclear
Positive
Heredita
Christian
Agricultu
Gähpw \Ã hne
Santi(Late)-
In«Ww-,
ry re
2 Vilappil Sasidharan(B 9847489542 ial
No No
Own hn-I-k\w
Both
Land Land Road
Hindu Trees,
House, House,
rother) Positive
Building facilities
Heredita
Building, Building,
Residenc
Agricultu
Sivakami(Ush
3 Vilappil 7510600660 l a)
Hindu
Industria Gähpw \Ã hne
In«Ww-,tPmen Ah-
Nettayam,
k-c-§Ä Ds-¦n ]cn-
SC 4 192/12 Vilappil Sasidharan Kizhakkinkara 9847489542 70
No No
APL
Own K-Wn-¡Ww,hn-I-
Hindu
House, House,
es,Road es,Road Puthen Veedu Positive
Building Facilities k\w,\-ÃXv
Both Land Both Land
Hereditary
Agriculture
Residencial Residencial
Building,Tre
Gähpw \Ã hne
In«Ww-,tPmen Ah-
k-c-§Ä Ds-¦n ]cn-
190/1- K-Wn-¡Ww,\-
5 3,192/13, Vilappil Gilbert Shima Bhavan 9526621994 30
No No
BPL
OBC
Own
Water House, House, ÃXv,thsd hoSpw
Directly Directly
Positive
192/11-1 Animals
Building
Christian
Both Land Both Land
Purchased
Resources, Resources,
Agriculture Residencial Residencial Øe-hp-an-Ã
Building,Trees,
Nuclear Family Nuclear Gähpw \Ã hne
In«Ww-IrjnbnÂ
\n¶pÅ hcp-am\w
201/2- Karakattuvila \jvS-s¸Spw,thsd
6 Vilappil L Benjamin 9446808203 40
No No
APL
OBC
Own
1,201/3 Veedu Road
House, House, hoSpw Øe-hp-an-Ã,\-
s,Water s,Water
Positive
Building
Facilities
Christian
Both Land Both Land
Shed, Shed Shed,
Resources, Resources,
Hereditary
Compound Compound
Others: Car Others:
Agriculture Residencial Residencial ÃXv
Building,Tree
Wall,Animals, Wall,Animals, Gähpw \Ã hne
In«Ww-,thsd hoSpw
Øe-hp-an-Ã,\-
Panjavadi ÃXv,tPmen Ah-k-c-
7 201/4-4 Vilappil Yesudas 8606766002 30
No No
BPL
OBC Nilayam Own
Water House, House, §Ä Ds-¦n ]cn-K-
Positive
Building
Facilities
Christian
Both Land Both Land
Hereditary
Agriculture Residencial Residencial Wn-¡Ww
Building,Trees,
Resources, Road Road Resources,
60
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Sl. Survey Village Name Address Contact No. Opinions
land land
Loan
No. Number Type
Usage
nature
Family
project
Type ofType
on land
the plotthe
Years of Opinion
Religion Usage of
Disputes
Category
APL/BPL
Nature ofNature
about the
Ownership
Ownership
Included in
Gähpw \Ã hne
In«Ww-,\-ÃXv, hnI-
k-\w,FÃm-hcpw
\nXy tcmKn-I-fm-Wv,
8 Vilappil Albert A S Bhavan 9745347394 12
No No
BPL
OBC Own House ]p\-c-[n-hmkw In«n-
Building
Christian
Both Land Both Land
Hereditary
Compound Compound Residencial Residencial bm \ÃXv
Wall,Animals, Wall,Animals,
Road Facilities
Building,Trees, Building,Trees,
Nuclear Family Nuclear
Gähpw \Ã hne
Vasantha In«Ww-
ry re
9 216/2-1 Vilappil 9745347394 50
No No
BPL
OBC
Own Kumari Land
Trees
Positive
Heredita
Christian
Agricultu Gähpw \Ã hne
In«Ww-, \Ã-Xv, hnI-
k-\w, Gähpw \Ã
10 202/16-2 Vilappil Suraj Kumar 9605347955 9 hne In«-Ww, thsd-
No No
BPL
OBC Own
Water House hoSpw Øe-hp-
Positive
Building
Christian
Both Land Both Land Resources
Hereditary Residencial Residencial sam¶pw CÃ
Building,Trees, Building,Trees, Gähpw \Ã hne
In«Ww-,\Ã-Xv, hnI-
k-\w, tPmen Ah-
202/21,20 Valiyapurakktuvi kcw Ds-¦n ]cn-K-
11 Vilappil Karmala 7510885262 40
No No
BPL
OBC 2/24 la Puthen veedu Own
Water House, House, Wn-¡-Ww, aäv hotSm
Positive
Building
Christian
Both Land Both Land Resources
Hereditary
Agriculture Residencial Residencial Øetam H¶pw CÃ
Gähpw \Ã hne
In«Ww-, tPmen Ah-
kcw Ds-¦n ]cn-K-
Land Land
12 Vilappil Ayinjala Mol 8606130179 6
No No
BPL
OBC Own Wn-¡-Ww, aäv hotSm
House
Positive
Building
Building, Building, Christian Øetam H¶pw CÃ
Both
Hereditary
Residencial Residencial
Road Facilities
Compound wall, wall, Compound
Gähpw \Ã hne
Santal Jaya In«Ww-,aäv hotSm
,
6
13 Vilappil 8606130179 ry
No
BPL OBC Øetam H¶pw CÃ
Own
Both
Land Land Surya Road
Water
d wall, d
Positive
Building facilities
Heredita
Building, Building,
Residenc
Christian
ial House
Resource
Compoun
Gähpw \Ã hne
In«Ww-,\-ÃXv ,
ry re
14 217/8 Vilappil Sarojam Methal House 8281834850 ial
No No
BPL
OBC
Own häm¯ InWÀ Dv.
Both
Land Land
Water
House, House,
Positive
Building
Heredita
Building, Building,
Residenc
Christian
Agricultu Resource
61
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Sl. Survey Village Name Address Contact No. Opinions
land land
Loan
No. Number Type
Usage
nature
Family
project
Type ofType
on land
the plotthe
Years of Opinion
Religion Usage of
Disputes
Category
APL/BPL
Nature ofNature
about the
Ownership
Ownership
Included in Gähpw \Ã hne
In«Ww-, \Ã-Xv, hnI-
Vasantha
y k-\w, ]p\-c-[n-hmkw
15 Vilappil Idamala 8907820991 70
No No
BPL
OBC
Own Glori rees,
, road
Water
Family Bhiyw
Nuclear
Positive
Building facilities
al House
Christian
Hereditar Residenci
Both Land Both Land Building,T Resources
Gähpw \Ã hne
s, In«Ww-
ry re
16 Vilappil Suganthi 8078194882 26
No No
BPL
Own
Both Land
Hindu
Water
Family
General
Nuclear
Positive
Animals
Building
Heredita
Agricultu Resource
Gähpw \Ã hne
ve
Cherupushpa 8606341467- In«Ww,tPmen {]Xo-
ry re
17 202/16 Vilappil 10
No No
BPL £n-¡p¶p
Own
Both m Syamala Land
Hindu
Water
Family
s, Road
General
Nuclear
Positi
Building
Heredita
Facilities
Agricultu Resource
Gähpw \Ã hne
Idamala Puthen 18 Vilappil Rosamma 9605686717 d In«Ww-
No No
BPL
OBC
15 +
Own
Both Veedu Land
Trees, Trees,
Water
Family
Nuclear
Directly Directly
Positive
Building
Building, Building,
Residenc
Christian
Purchase
ial House
Resource
s,Animals Gähpw \Ã hne
In«Ww-,thsd Øe-
an-Ã, hcp-am-\-an-Ãm-Xm-
176/6,176 Athira/Latha Ipw, Axn-\-\p-k-cn¨v
19 Vilappil Athira Bhavan 9645034382 27
No No
APL
Own /16-2 Nair Land
Trees Hindu \jvS ]cn-lmcw
General
Positive
Hereditary Agriculture In«Ww
62
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Affected People (Owns Land Only)
Sl. Survey Sub- Villag Contact No Numb divisio Name Address Opinions
e land land land No. Loan
Usage
. er n no. nature
project
Type ofType
the plotthe
Opinion
Years of
Religion
Usage of
Category
APL/BPL
Nature ofNature
about the
Ownership Ownership
Included in
Disputes on
Family Type (1) IÀ½e D/o. Pmbnkv, (2) aWn
Ip«³,
IrXy-amb \jvS-]-cn- S/o.
202 21 Vilapp 75108852 1 karmala henbIc-bv¡m-«p- lmcw e`y-am-I-Ww.
No No
80Y
BPL 202 24 il hnf ]p¯³ho-Sv, 62 Own
Positive
Animals
Building
Heriditary
CS-a-e, Duäp-Ip-gn, Agriculture
Both land &
Single Family
hnf-¸nÂim-e. Water Resource, sNdp-]pjv]w.sP
Pmbnkv,
D/o.henb Ic-
IrXy-amb \jvS-]-cn- bv¡m«phnf
202 22 Vilapp Cherupushpa 86063414 2 lmcw e`y-am-I-Ww.
No No
80Y
BPL
Own 202 25 il m ]p¯³hoSv, CS-a- 67 Land
Positive
e, Duäp-Ip-gn, hnf- Heriditary
Agriculture ¸nÂim-e.-]n.-H. Single Family Water Resource,
Pn³kn
D/o.
sd\n, CS-a-e
Vilapp 81298950
y
3 202 14-2-1 Jincy ta¡pw-I-c, hnf- re
No No
20Y
APL
Own
Land il 68 Road
Single
Family
¸nÂime. ]n.-H. General
Positive
Facilities
Christian
Heriditar Agricultu
Vilapp 93873885
n
4 Njanadas ry
No
Yes
80Y
BPL
Own il 20 Land
Single
Nadar
Family
Christia (1) tPmkvIp«n Heridita tbml-¶m³, hnfS/o.-hqcp sXt¡-N-
cp-hnf hoSv, hng-
hqÀ, ae-bw.-]n.-H. IrXy-amb \jvS-]-cn- 202 4 Vilapp 94468466 5 Jose kutty lmcw e`y-am-I-Ww. (2) A\nX No No
80Y
BPL
Own 202 5-1 il 99 Land
D/o. Nadar
knÂhn, hnf-hqcp Positive
Christian
Heriditary
Agriculture
sXt¡-N-cp-hnf Single Family hoSv, hng-hqÀ, ae- Road Facilities bw.-]n.-H.
63
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Sl. Survey Sub- Villag Contact No Numb divisio Name Address Opinions
e land land land
No. Loan
Usage
. er n no. nature
project
Type ofType
the plotthe
Opinion
Years of
Religion
Usage of
Category
APL/BPL
Nature ofNature
about the
Ownership Ownership
Included in
Disputes on (1) Pb-Ip- Family Type amcn.FÂ. D/o.
enÃn, tZhnI
`h³, CS-ae ]p¯³ho-Sv,
sNmÆ-f-fq-À, hnf-
¸nÂime. ]n.-H. IrXy-amb \jvS-]-cn-
202 3-1 Vilapp 80864617 lmcw e`y-am-I-Ww.
6 Chandran 33 (2) N{µ³ No No
BPL 202 12-1 il S/o. 47 Own
tKm]n-\m-Y³\m- Positive
Heriditary
Agriculture
SmÀ, tZhnI `h³, Single Family CS-ae ]p¯³ho- Sv, sNmÆ-f-fq-À, Both land & Building hnf-¸nÂime. ]n.- Animals Water resources, H. Úm\Z-m-kvZm \w
Zm\w,
IrXy-amb \jvS-]-cn-
S/o. Vilapp imtew, Bepw-]p- 944744710 lmcw e`y-am-I-Ww.
7 202 5-2 Safiya No
Yes
20Y
APL
Own il d-¯v, hnf- 5 Land
Nadar
Positive
Christian
Heriditary
¸nÂime.-]n.-H. Agriculture
\ymb-amb hne e`y-am-
Vilapp I-Ww.
&
re
8 Gilbert No No
35Y
BPL
Own il SIUC
Single Single
Nadar
Water
Family
Directly
Positive
Building
Christian , Animals
Agricultu Resource
Both land Both land (1) do\ hnae, D/o.
cPn-Xm-`-h³, (2)
cmPp chn,
6-1-4-2 IrXy-amb \jvS-]-cn-
S/o. 216 Vilapp CS-ae ]p¯³ho- 984695968 lmcw e`y-am-I-Ww.
3Y
9 6-1-3-1 Reena No No
BPL
OBC
Own 216 il Sv, sNmÆ-f-fqÀ, 7 Land
Directly Positive
Christian
hnf-¸nÂim-e. ]n.- Agriculture
Single Family Single
Road facilities H. wall, Compound Btâ-gvk¬
tPmÀÖv,
ku]ÀWn-I, än.-
IrXy-amb \jvS-]-cn-
kn.12/1345, sFIy- 903781954 Vilapp lmcw e`y-am-I-Ww.
9Y
10 216 3 Anderson No No
APL
OBC
\-KÀ, Ip¶p-Ip-gn, Own il 9 Land
Directly
Positive Xncp-h-\-´- Christian
Agriculture ]pcw.þ695035 Family Single
64
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Sl. Survey Sub- Villag Contact No Numb divisio Name Address Opinions
e land land land
No. Loan
Usage
. er n no. nature
project
Type ofType
the plotthe
Opinion
Years of
Religion
Usage of
Category
APL/BPL
Nature ofNature
about the
Ownership Ownership
Included in
Disputes on
Family Type {]Zo]v
S/o.
{^m³kn-kv,
IrXy-amb \jvS-]-cn-
Vilapp {]Zo]v `h³, CS-a- 954457875 lmcw e`y-am-I-Ww.
11 216 18-1 Pradeep No
Yes
26Y
APL
OBC
Own il e - sNmÆ-f-fq-À, 9 Land
Water
Positive
Animals
Christian
Resource, Resource,
Heriditary
hnf-¸nÂime. Agriculture Family Joint
IrXy-amb \jvS-]-cn-
Vilapp 807502874
y lmcw e`y-am-I-Ww.
&
re
12 Yesudasan No No
80Y
BPL
Own il 9 Road
Nadar
Water
d wall, d
Positive
Building
Facilities
Christian
Heriditar
Agricultu resource,
Both land Both land Compoun
IrXy-amb \jvS-]-cn-
Vilapp lmcw e`y-am-I-Ww.
& 963529305 re
13 Hariharayyer No
Yes
50Y
APL il Own
Single Single
Hindu
Water
Family
s, Road
General
Directly
Positive
Building facilities
resource
Agricultu
Both land Both land {]oU.-än.
S/o. Úm\-Zo-]w, IrXy-amb \jvS-]-cn-
lmcw e`y-am-I-Ww. 202 15-1 apcpI hnem-kw, Vilapp CS-a-e, sNmÆ-f- 952606878 aI\v tPmen {]Xo-£n- 14 202 15-2 Preetha No
Yes
30Y
BPL
OBC
Own il 4 Land ¡p¶p
Directly 202 15-3 fqÀ, hnf-¸nÂime.- Positive
Christian
Agriculture
Single Family Single
]n.-H. Road Facilities A`n-em-jv. -BÀ reources, water
cma-Ir-
S/o. \Ã \jvS-]-cn-lmcw
jvW³.-sI,
Vilapp 997220192 In«n-bm am{Xta
tkm]m-\w, CS-ae, 2Y 15 203 18-3-1 Abilash R No No
BPL sImSp-¡q.
Own il 6 Land
Hindu
General sNmÆ-f-fq-À, hnf- Directly
Agriculture
Single Family Single
¸nÂim-e.-]n.H Road Facilities
IrXy-amb \jvS-]-cn-
Vilapp 934243365
y lmcw e`y-am-I-Ww.
re
9Y
16 Aswathy No
Yes
BPL
Own il 9 Land
Single Single
Hindu
Family
General
Positive
Heriditar
Agricultu
kpK-Ôn.sP.
D/o.
Pmbn-kv, anYp³`-
IrXy-amb \jvS-]-cn-
Vilapp Sugandhi h³, CS-a-e, Duäp- 949618306 tian lmcw e`y-am-I-Ww.
LC
17 202 16-1 No No
26Y
BPL il Retnam Ip-gn, hnf- 7 Own
Water
Positive
Building
Chris
resources
Heriditary
¸nÂime. ]n.-H. Agriculture
Both land & & Both land
Family Single
65
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Sl. Survey Sub- Villag Contact No Numb divisio Name Address Opinions
e land land land
No. Loan
Usage
. er n no. nature
project
Type ofType
the plotthe
Opinion
Years of
Religion
Usage of
Category
APL/BPL
Nature ofNature
about the
Ownership Ownership
Included in
Disputes on
Family Type (1) {]oX ktcmPw,D/o. (2)
k\Â kXy-
S/o.
IrXy-amb \jvS-]-cn-
Ip-amÀ, kÖohv Vilapp 751087138 n lmcw e`y-am-I-Ww.
18 202 20-1 Preetha \nhm-kv, CS-ae, No No
14Y
BPL
Ow il 8 Land
Nadar
Positive
facilities
sNmÆ-f-fqÀ, Christian
Heriditary
Agriculture hnf¸nÂime. ]n.- Family Single H. sUbvkn -_m-bn, Road Waterresources,
APn-`-h³, CS-a-e,
IrXy-amb \jvS-]-cn-
Vilapp 960574259
y lmcw e`y-am-I-Ww. sNmÆ-f-fqÀ, hnf- &
re
19 202 10 Daisy Bai No No
80Y
BPL il 7 Own
Single Single
Nadar
Water ¸nÂim-e. Family
Positive
Building
resource
Christian
Heriditar
Agricultu Úm\Z-m-kvZm \w Both land
Zm\w,
IrXy-amb \jvS-]-cn-
S/o. Vilapp Njanadas imtew, Bepw-]p- 944744710 lmcw e`y-am-I-Ww.
4Y
20 202 5-2 No No
APL
Own il Danam d-¯v, hnf- 5 Land
Nadar
Directly
Positive
facilities
Christian
wall, Road
Compound Compound
¸nÂime.-]n.-H. Agriculture
Family Single
IrXy-amb \jvS-]-cn-
994606019 Vilapp lmcw e`y-am-I-Ww. re
21 Devika J.C No
Yes
28Y
BPL
OBC
Own il 7 Land
Single Single
Hindu
Family
Directly
Positive
Agricultu
IrXy-amb \jvS-]-cn-
Vilapp
y lmcw e`y-am-I-Ww.
& al
22 Lilly No No
70Y
BPL
Own il Road
Single Single
Nadar
Water
Family
Positive
Building
Facilities
Christian
Heriditar
resource, resource,
Residenti
Both land Both land
IrXy-amb \jvS-]-cn-
Vilapp 956719579
y
s, lmcw e`y-am-I-Ww.
re
23 Edison No No
70Y
BPL
Own
Land il 8 Road
Single Single
Nadar
Water
Family
d Wall,d
Positive
resource
Facilities
Christian
Heriditar
Agricultu
Compoun
IrXy-amb \jvS-]-cn-
Vilapp 799435314
y Y lmcw e`y-am-I-Ww. re
24 Israel No
50Y
APL
OBC
Own
Land il 3 Road
Single Single
Family
Positive
Facilities
Christian
Heriditar
Agricultu
66
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Sl. Survey Sub- Villag Contact No Numb divisio Name Address Opinions
e land land land
No. Loan
Usage
. er n no. nature
project
Type ofType
the plotthe
Opinion
Years of
Religion
Usage of
Category
APL/BPL
Nature ofNature
about the
Ownership Ownership
Included in
Disputes on
Family Type ]n.-tam-l-\³ S/o.
s]m¶-¸³, sFiz-
cy, än.-kn.15/2017
193 1 Vilapp (1), hna-\kv 944654216
25 Mohanan P No No
50Y
APL
OBC
Own 182 5-12 il tImtfPv sse³, 0 Land
Hindu
Directly
Positive
hgp-X-¡m-Sv, Xncp-h- Agriculture
Single Family Single \-´-]p-cw.14 Road Facilities
IrXy-amb \jvS-]-cn-
Vilapp Abdul 999813779
y lmcw e`y-am-I-Ww. re
26 No No
80Y
BPL
OBC
Own
Land il Rasheed 1 Road
Single Single
Water
Family
Muslim
Positive
Facilities
Heriditar kmap-h ss{_äv Agricultu resource,
eX-Ip-amcn,
&
ss{_äv hnÃ, amhn-
Vilapp 949574540 f, ]c-Wn-bw, hgn- 27 192 4 Letha Kumari No No
26Y
APL
Own il 2 Land
Nadar
Water
Positive
ap-¡v, ]pXn-b-Xp-d.- facilities
Christian
Heriditary ]n.H Agriculture Road resources, (1) djoZ JZoP, joPmD/o.-`-h³
(2) cho-{µ³\m-bÀ
192 10-1 Vilapp Ravindran \mcm-b-W-]n- 811390448 PL 28 No No
15Y S/o. B
Own 191 1-1 il Nair 1 Land ff, joPm `h³, Hindu
General
Directly
Positive
Duäp-Ip-gn, hnf- Agriculture ¸nÂim-e. ]n.-H.
ssj³ dk-e-
S/o.
¿³, ae-b-¯p-hn-
Vilapp f, IWn-Im-Wpw-]m- 960542022
No
29 190 9 Shine NY
20Y
BPL
Own d, apf-b-d, ]n.-H, 3 Land
il water
Nadar
Directly
Positive
resource
Christian
Xncp-h-\-´-]p-cw. Agriculture
Family Single
Vilapp 989589765
re
SC
30 Siva Prabha No
Yes
BPL
19 Y
Own il 6 Land
Hindu
Water
Directly
Positive
resource
Agricultu
67
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Sl. Survey Sub- Villag Contact No Numb divisio Name Address Opinions
e land land land
No. Loan
Usage
. er n no. nature
project
Type ofType
the plotthe
Opinion
Years of
Religion
Usage of
Category
APL/BPL
Nature ofNature
about the
Ownership Ownership
Included in
Disputes on (1) im´-Ip-amcn Family Type A½ sNÃ-½- ¸n-f-f,D/o. Ipgn-hnf hoSv, sImt¡m-X-
aw-K-ew, shf-f-\mSv
hntÃPv (2) N{µ-
IrXy-amb \jvS-]-cn- ti-J-c³\m-bÀ Vilapp Chandrasekha 949562767 lmcw e`y-am-I-Ww.
31 176 13 No No
48Y
BPL
Own il ran Nair 8 Land them-bp- Hindu
General S/o. Positive
Heriditary [³]n-f-f, Ipgn- Agriculture
Single Family Single hnf hoSv, Road Facilities sImt¡m-X-aw-K-ew, shf-f-\mSv hntÃ- Pv.
kp\nX N{µn- D/o.
I, än.-kn.37/2424,
IrXy-amb \jvS-]-cn-
Vilapp KKPNRA\KÀ, Ipe-72,-ti KKP-J- 944786366
N lmcw e`y-am-I-Ww.
32 190 2 Sunitha No
70Y
APL
Own il 4 Land cw, sImSp-§m- Hindu
General
Positive
Heriditary
\qÀ.]n.-H. Xncp-h-\- Agriculture
Single Family Single
Road facilities
´-]p-cw. wall, Compound cmtP-jvIp-amÀ
]¦-Pm-£³,
S/o. 628268535
X¡-Xmb \jvS-]-cn- cmtP-jv`-h³,
2,
Vilapp nd lmcw e`y-am-I-Ww.
Bh-W-¡n³ho-f, 9Y 33 190 4 Rajesh Kumar No
Yes
OBC
Own il 949674863 La
Hindu
Directly ]f-fn-ap-¡v, t]bm- 9 Positive
Agriculture
Sv.-]n.-H. Family Single kp\n-em-P-bnwkv Waterresource ta_ÂPbnw-
S/o.
kv, F³.-N-{µ- 154 8
C/o.
X¡-Xmb \jvS-]-cn- 182 4 Vilapp Zm-kv. \nXy-hn- 956224990 stian lmcw e`y-am-I-Ww.
34 Sunila James lmÀ, Xma-c-hn-f, No No
50Y
BPL
OBC
Own 182 1 il 5 Land
Positive
Aa-c-hn-f. ]n.- Chri
Heriditary
182 2 Agriculture
Single Family Single
Hþ691522, s\¿m- Waterresource än³I-c.
68
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Sl. Survey Sub- Villag Contact No Numb divisio Name Address Opinions
e land land land
No. Loan
Usage
. er n no. nature
project
Type ofType
the plotthe
Opinion
Years of
Religion
Usage of
Category
APL/BPL
Nature ofNature
about the
Ownership Ownership
Included in
Disputes on
Family Type
{ioP.F-kv.
D/o.
iIp´-fIp-am-cn,
BZÀiv `h³, I«- X¡-Xmb \jvS-]-cn- 176 11 Vilapp bv¡mÂ, sNmÆ-f- 949530217 lmcw e`y-am-I-Ww. 35 Sreeja No No
50Y
BPL 176 18 il 3 Own
Hindu
General
Positive
fqÀ, hnf-¸nÂime.- Building
Heriditary
Agriculture
Both land & & Both land
]n.-Hþ695573. Family Single eXm-\m-bÀ.F-kv. Waterresource
kc-k-½-¸n-f- v\ymb-amb hne e`y-am-
176 16-2 Vilapp D/o. 964503438
e I-Ww. f, kc-kz-Xn-hn-em- &
36 Letha Nair No No
27Y
APL
Own 176 16 il 2 Road
Single Single
Hindu
Family
General
Positive
kw, sNmÆ-f-fq-À. Building
Facilities
Both land Both land
Agricultur X¦-¸³\mbÀ Heriditary
]m¨p-]n-f-f,
X¡-Xmb \jvS-]-cn-
S/o. 176 1 Vilapp Thankappan A`n-emjv `h³, 999568348 lmcw e`y-am-I-Ww.
37 No
Yes
40Y
BPL 176 3 il Nair sNmÆ-f-fqÀ, hnf- 3 Own
Hindu
Water
General
Positive
Animals
Building
Resource, Resource,
Heriditary
¸nÂime. Agriculture
Both land & & Both land
Family Single
X¡-Xmb \jvS-]-cn-
Vilapp 949503267 lmcw e`y-am-I-Ww. re
38 Murukesh No No
5 Y
APL
OBC
Own il 6 Land
Single Single
Hindu
Water
Family
Directly
Positive
resource
Agricultu
X¡-Xmb \jvS-]-cn-
Vilapp Rajeswari
y lmcw e`y-am-I-Ww.
& re
39 No No
20Y
APL il Bhai Own
Hindu
Water
Positive
Building
resource
Heriditar
Agricultu
Both land Both land
Vilapp Haritha
y
re
40 No
Yes
BPL
30 Y
Own il Prasad Land
Single Single
Hindu
Family
General
Positive
Heriditar IhnX{]kmZv.F- Agricultu
¨v.-BÀ. X¡-Xmb \jvS-]-cn-
D/o.
lmcw e`y-am-I-Ww. cm[½, ta\n-
166 4-10-1 Vilapp Kavitha 920766441 bqÀt¡mWw, thsd Øew H¶pw 41 No
8 Y
Yes
BPL
Own 176 9-2 il Prasad 5 Land Hindu CÃ.
General sNmÆffqÀ, Positive
Heriditary
Agriculture
hnf¸nÂime.-]n.-H. Family Single
69
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Sl. Survey Sub- Villag Contact No Numb divisio Name Address Opinions
e land land land
No. Loan
Usage
. er n no. nature
project
Type ofType
the plotthe
Opinion
Years of
Religion
Usage of
Category
APL/BPL
Nature ofNature
about the
Ownership Ownership
Included in
Disputes on
Family Type 176 8 176 7 _m_ptk\³
176 4 tIih³,
S/o.
t_mkvhnÃ, X¡-Xmb \jvS-]-cn- 176 5-1 Vilapp lukv \¼À. 93, 974682036 lmcw e`y-am-I-Ww. 42 176 5-2 Babusenan No No
8 Y
BPL
OBC
Own il 4 Land
Hindu
Directly 165 3-1 im´n-\-KÀ, Positive
Agriculture
Single Family Single
165 2 {ioIm-cyw.-]n.-H. Road Facilities
165 3
Trees, Water resource, resource, Water Trees, 164 7 hn.sI.Nn{XteJ
D/o. hk´Ipamcn,
{]_n-Pmkv, 944711132
Vilapp Ahn«w tdmUv, 0,
43 165 1-1 Chandralekha No
Yes
25Y
APL
OBC
Own il Ipam-c-]p-cw, saUn- 984604743 Land
Hindu
Positive
0 Heriditary
¡ÂtIm-tf-Pv, Agriculture
Single Family Single
Xncp-h-\-´- resources water ]pcw.þ695011
Vilapp 944711132
y
& re
44 165 1-1 Binduja V K No No
30Y
APL
OBC il 0 Own
Hindu
Water
Positive
Building
resource
Heriditar
Agricultu
Both land Both land
X¡-Xmb \jvS-]-cn-
Vilapp 944711132
y lmcw e`y-am-I-Ww.
re
4Y
45 165 1-2 Dr. Prabija No No
APL
OBC
Own
Land il 0 Road
Hindu
Positive
facilities
Heriditar
Agricultu
X¡-Xmb \jvS-]-cn-
Preetha Bhavan, lmcw e`y-am-I-Ww.
Vilapp
s
y
re
46 Thanka Mani No No
13Y BPL tPmen e`y-am-I-Ww.
Own il Idamalor, Chovalloor Land
Hindu
Water
Positive
resource
Heriditar
Agricultu
Vilapp
5Y
47 Bettigil No No
APL
OBC
land
Own
Land il Road
Single Single
Family
Barren Barren
Directly
Positive
Facilities
Christian
hnPn-Xm-Zmkv
W/o. X¡-Xmb \jvS-]-cn-
Inc¬, ImÀ¯nIv
Vilapp 974461016 lmcw e`y-am-I-Ww.
e
`h³, tImtfPv 7Y
48 163 14-1-1 Vinija Das No
Yes
BPL tPmen e`y-am-I-Ww.
Own
Joint Joint
Land il 8 Road
Water
Family
Positive
tdmUv, ]p\-emÂ. facilities
Agricultur
resources, resources, Heriditary
70
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Sl. Survey Sub- Villag Contact No Numb divisio Name Address Opinions
e land land land
No. Loan
Usage
. er n no. nature
project
Type ofType
the plotthe
Opinion
Years of
Religion
Usage of
Category
APL/BPL
Nature ofNature
about the
Ownership Ownership
Included in
Disputes on
Family Type
Vilapp
y
&
re
LC 49 Sumam No No
30Y
BPL
Own
Joint Joint il Road
Trees, Trees,
Water
Family
Positive
Animals
Building
Christian
Heriditar
Agricultu resource,
Facilities, Facilities,
Both land Both land
790706091
Vilapp
s
re
4Y
50 Reshma No No
APL
Own
Joint Joint
Land il 8 Road
Hindu
Water
Family
Directly
Positive
resource
Agricultu
Facilities, Facilities,
X¡-Xmb \jvS-]-cn-
Vilapp 949572726 lmcw e`y-am-I-Ww.
y
re
51 Ebenezar No No
BPL tPmen e`y-am-I-Ww.
40 Y
Own
Land il 4 Road
Trees, Trees,
Positive
facilities
Christian
Heriditar
Agricultu
X¡-Xmb \jvS-]-cn-
Vilapp Sethuraman lmcw e`y-am-I-Ww.
& re
No No 52 ter
20Y BPL tPmen e`y-am-I-Ww.
OBC il Chettiyar Own
Single Single
Hindu
Family
Directly
Positive
Building
resource
Agricultu
Trees,Wa
Both land Both land
178 1-1 178 2-1 apcfo[c³\mbÀ.
F¨v. 163 8 S/o. 178 1-1 lcnlc³ \mbÀ,
179 1 kar²n, X¡-Xmb \jvS-]-cn-
än.kn.50/591(1), lmcw e`y-am-I-Ww.
179 2 Vilapp Muralidharan 989507175
53 No
Yes
10Y APL tPmen e`y-am-I-Ww. 177 2-1 il Nair tIm«-sse³, Ime- 8 Own
Directly
Positive
177 2 Sn, Ipf-¯-d, Ic-a- Agriculture 180 2 \.-]n.-H. Xncp-h-\-´- 177 2 ]p-cwþ695002 Building & Both land 178 2 180 1 facilities Road Waterresources, ktcmPw D/o.
X¡-Xmb \jvS-]-cn- BKv\okv,
lmcw e`y-am-I-Ww.
s_tYÂ lukv, Vilapp 828183485 tPmen e`y-am-I- CS-a-e, sNmÆ-f-fq- 54 217 8 Sarojam No No
45Y BPL Ww.tPmen {]Xo-£n-
Own il 0 Land
Nadar
À, hnf-¸nÂim-e. Positive
Christian ¡p-¶p.
Heriditary
Agriculture
]n.-H. Road Facilities
Water resource, Waterresource, wall, Compound
71
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Sl. Survey Sub- Villag Contact No Numb divisio Name Address Opinions
e land land land
No. Loan
Usage
. er n no. nature
project
Type ofType
the plotthe
Opinion
Years of
Religion
Usage of
Category
APL/BPL
Nature ofNature
about the
Ownership Ownership
Included in
Disputes on skÂh-cmPv. sI.- Family Type
kn. anJm-
X¡-Xmb \jvS-]-cn-
tbÂ, S/o.kn.-F-kv.-än.- Vilapp 999573965 lmcw e`y-am-I-Ww.
55 217 11 Selvaraj No
Yes
20Y
BPL
Own
Land il ap-«-S, ap«-S.-]n.-H. 3 Road
Water
Positive
Facilities
resource, resource,
Heriditary
Xncp-h-\-´-]p-cw. Agriculture
Family Single
tPmen {]Xo-£n-¡p-
Vilapp
y ¶p. re
56 Balachandran No No
25Y
BPL
OBC
Own il Land
Single Single
Family
Positive
Christian
Heriditar km\µw.F-kv. Agricultu
imap-thÂ,
S/o.
Fkv.-F. `-h³,
Vilapp 938764985 ന്യായൊയന്ഷ്ടപ
sXmgp-]m-d, sNmÆ- 60 57 219 4-1 Sanandam No No
APL
OBC
Own il 9 Land രിഹാരം
f-fq-À, hnf- Positive
Christian
Hereditary ¸nÂime. ]n.-H. Agriculture familly Nuclear
Vilapp 859012568
ry re
58 Linda No No
APL
25 +
Own
SIUC
Land il 1 Road
familly
Facility
Nuclear
Positive
Heredita
Christian Fbv©-\m- Agricultu
tamÄ.sP. D/o.
Pb-Ip-amÀ, CS-a-e,
Pb-hn-em-kw, I«-
Vilapp 906101054 ന്യായൊയന്ഷ്ടപ
bv¡mÂtase 70 59 217 8-3 Ayigenamol No No
BPL
OBC il 1 Own രിഹാരം
Positive
]p¯³hoSv, facilities
Christian
Hereditary sNmÆ-f-fqÀ, hnf- Agriculture
Nuclear familly Nuclear ¸nÂim-e. ]n.-H. Waterresources,
Both Land & Building & Both Land kmâÂPb-kq-cy. - Wall, Road Compound
sP.-sP. Pb- S/o.
Ip-amÀ Pb-hn-em-
kw, I«- Vilapp Santal bv¡mÂtase 860613017 ന്യായൊയന്ഷ്ടപ
60 217 8-2 No No
BPL
60 +
Own il Jayasurya 9 SIUC രിഹാരം
]p¯³hoSv, Positive
Christian
Hereditary sNmÆ-f-fqÀ, hnf- Agriculture
Nuclear familly Nuclear ¸nÂim-e. ]n.H WaterResources Building & Both Land
72
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Sl. Survey Sub- Villag Contact No Numb divisio Name Address Opinions
e land land land
No. Loan
Usage
. er n no. nature
project
Type ofType
the plotthe
Opinion
Years of
Religion
Usage of
Category
APL/BPL
Nature ofNature
about the
Ownership Ownership
Included in
Disputes on
Family Type
X¦-cmPv.Fw S/o.
anJm-tbÂ,
ssaemSn ]p¯-³-
217 11-1 Vilapp 989520854 ന്യായൊയന്ഷ്ടപ
ho-Sv, ]pfn-b-d- 70 61 Thankaraj No No
APL
Own
SIUC 217 11-2 il 0 Land രിഹാരം
t¡mWw.]n.- Positive
Christian
Hereditary H.þ695573 Agriculture (1) Pb-Ip-amcn familly Nuclear ktcmPw (2) D/o.
Pb-Zmkv ന്യായൊയന്ഷ്ടപ
S/o.
Vilapp kXy-t\-i³, 944621485 രിഹാരം
62 217 4-1 Jaya Kumari Fbv©Â tImt«- No No
80+
APL
Own
SIUC il 0 Land മ് ാലിന്ദ്പതീക്ഷി
Positive
Pv, hen-tbm-«p-tIm- Christian
Hereditary Agriculture ക്കുന്നു
Ww, s]cp-¦m-hv.-]n.- familly Nuclear H.
cmtPjv.BÀ. cho{µ³, XmgS/o.-¯p- ho-Sv, än.-kn.13/138
(2), I®-½qe
Vilapp 984622111
12 63 216 10 Rajesh No
Yes
APL
OBC
Own il \mep-ap¡v tdmUv, 0 Land
Hindu
t]«.-]n.-H, Xncp-h-\- Agriculture
´-]p-cwþ695024 familly Nuclear jaoa.ssh.-F-kv. Purchased Directly
ssk\_,
D/o.
Vilapp alÀ_, ]S- 805502462
4
64 216 1-2 Shameema No No
APL
OBC
Own il h³tIm-Sv, hnf- 3 Land
Muslim
Directly Directly
Positive
Purchased
¸nÂim-e. Agriculture
Vilapp ന്യായൊയന്ഷ്ടപ
7 d
re
65 Sheeba No No
Road
BPL
OBC
Own il Both
Water രിഹാരം
familly
Land & & Land
s,
Nuclear
Directly Directly
Positive
Building facilities
resource
Christian
Purchase
Agricultu
Vilapp 811390430 ന്യായൊയന്ഷ്ടപ
ry re
ial
66 Sujatha No No
BPL
OBC
Own 3 Both il 100 + d wall d രിഹാരം
House,
familly
Land & & Land
Nuclear
Positive
Building
Heredita
Residenc
Christian
Agricultu
Compoun
73
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Sl. Survey Sub- Villag Contact No Numb divisio Name Address Opinions
e land land land
No. Loan
Usage
. er n no. nature
project
Type ofType
the plotthe
Opinion
Years of
Religion
Usage of
Category
APL/BPL
Nature ofNature
about the
Ownership Ownership
Included in
Disputes on
Family Type
sI.X¦¿³ S/o.
sI.IpªpIpªv, മ്വമറസ്ഥലംഇലലത
164 1-1 t]cqÀ¡S ZÀi³ ക്കതായന്ഷ്ടപരി
Vilapp 984739830
\Kdn lukv 28 67 164 1-2 Priya No No ഹാരംേിട്ടണം
BPL
OBC il 6 Own
Water
Directly Directly
facilities 216 19 \¼À.sI.]n.9 Building Christian മ് ാലിന്ദ്പതീക്ഷി
Purchased
Agriculture 815/F. Nn¯nc, & Both Land
Nuclear familly Nuclear resources, Road Road resources, ക്കുന്നു cmtP-jv.-sI.-kn.
N{µ³,
S/o.
tcjvam-`-h³, ന്യായൊയന്ഷ്ടപ
Vilapp 965693239
5
68 216 17-1 Rajesh K C No No
APL
Own
Land il CtSa-e, hnf- 3 Road Water രിഹാരം
familly
Nuclear
Directly Directly
Positive
facilities
Christian
resources, resources,
Purchased
¸nÂim-e.-]n.H Agriculture
(1) efnX
W/o.
kptc-{µ³ (2)
kptc-{µ³
S/o.
i¦-c³, kuay Vilapp Lalitha, 963365286 ന്യായൊയന്ഷ്ടപ
6
69 216 16 \nhmkv, Ipcp- No No
APL
Own il Surendran 8 Land Hindu രിഹാരം In³apIÄ, Icp-hn- General
Agriculture
em-©n, hnf- familly Nuclear
Waterresources ¸nÂime.-]n.H Purchased Directly tdmk-½ & kpaw.
sIknb, CS-
D/o. Vilapp ae ]p¯³hoSv, 960568671
15
70 203 20 Rosamma No No
BPL il sNmÆ-f-fq-À, hnf- 7 Own
Water
House
Directly Directly
Positive
Building
Christian
resources
Purchased
¸nÂime Residencial
Joint Family Joint & Both Land
Vilapp 701240351 ന്യായൊയന്ഷ്ടപ 6 d
71 Sree kutty A M No
Yes
APL
land
Own
Land il 7 Road Hindu രിഹാരം
familly
Barren Barren
Facility
General
Nuclear
Directly Directly
Positive
Purchase
72
74
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Sl. Survey Sub- Villag Contact No Numb divisio Name Address Opinions
e land land land
No. Loan
Usage
. er n no. nature
project
Type ofType
the plotthe
Opinion
Years of
Religion
Usage of
Category
APL/BPL
Nature ofNature
about the
Ownership Ownership
Included in
Disputes on
Family Type
_nPp.F-kv. S/o.
im´, C½m-\p-
th lukv, CS- Vilapp ae, sNmÆ-f-fqÀ, 984739820 ന്യായൊയന്ഷ്ടപ 73 202 18 Biju No No
APL
50 + il 5 Own
Hindu Water രിഹാരം
General
Positive
hnf-¸nÂime. ]n.- Building
resources
Hereditary
Agriculture H. & Both Land (1) dmWn familly Nuclear N{µnI, än.- D/o.
kn.23/1298, taem-d- ¶qÀ, Ic-a-\.-]n.-H,
Xncp-h-\-´-]pcw
Xmeq-¡v, (2) inh-
Ip-amÀ inhm-
S/o. ന്യായൊയന്ഷ്ടപ 219 10 Vilapp \-µ³, Ing-t¡- 890782099
74 Vasantha No No
BPL
70 + 219 2-4 il ¡c inh-hn-em- 1 Own രിഹാരം
Positive
kw, ]pe-b-¶n- Hereditary bqÀtIm-Ww, familly Nuclear s]mä-bnÂ, hnf- Building & Both Land
hqÀ¡Â tZiw, Agriculture House, Residecial hnf-hqÀ¡Â facilities Road Waterresources, hntÃPv {io[-c³\m -bÀ,
sXmgp-]m-d-tate
166 5 Vilapp Sreedharan ]p¯³ hoSv, 953991124 ന്യായൊയന്ഷ്ടപ
and
35
75 No No
BPL
sNmÆ-f-fqÀ, hnf- Own 166 7 il Nair 5 L
Hindu Water രിഹാരം
familly
General
Nuclear
Directly Directly Positive
Resources ¸nÂim-e.-]n.-H. Purchased N{µ³\m-bÀ.Pn. Agriculture
KwKm-[-c³\m-
Vilapp Vimalamma, S/o. 996134349 ultur ന്യായൊയന്ഷ്ടപ
e
d
bÀ, B\-µ-`-h³, 13
76 218 4-1 No No
APL
Own
Land il Chandran Nair 5 Road Hindu രിഹാരം
familly
Facility
General
Nuclear
Directly Directly sNmÆ-f-fq-À. Positive
Purchase Agric
75
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Details of Affected People Collected During Public Hearing
Opinio
Sl. Fami n Contact Nature of Usage of Included in the No Name Address ly about Opinions
land No. land land Loan plot
Usage
nature
Village
Survey
Type of Type
Religion Yearsof
Number
. APL/BPL Type the
Category
Ownership Ownership Disputes onDisputes project
Nucl
IrXy-amb \jvS-]-cn-
75108852 ear Both land Agricultur Water Resource,
1 karmala y Positive lmcw e`y-am-I-Ww. No No
BPL
80Y 62 Famil Own & Building e Animals
Vilappil
Christian y Heriditar
Nucl
IrXy-amb \jvS-]-cn-
Cherupushpa 86063414 ear Agricultur
2 y Land Water Resource, Positive lmcw e`y-am-I-Ww. No No
BPL
80Y m 67 Famil Own e
Vilappil
Christian y Heriditar
Nucl
81298950 ear Agricultur
3 Jincy y Land Road Facilities Positive No No
20Y
APL 68 Famil Own e
Vilappil
General
Christian y Heriditar
Nucl
93873885 ear
4 Njanadas y Land No
Yes
BPL
80Y 20 Famil Own
Nadar
Vilappil
Christian y Heriditar
Nucl
IrXy-amb \jvS-]-cn-
94468466 ear Agricultur
5 Jose kutty y Land Road Facilities Positive lmcw e`y-am-I-Ww. No No
BPL
80Y 99 Famil Own e
Nadar
Vilappil
Christian y Heriditar
Nucl
IrXy-amb \jvS-]-cn-
80864617 ear Both land Agricultur Water resources,
y lmcw e`y-am-I-Ww.
6 Chandran 33 Positive No No
BPL 47 Famil Own & Building e Animals
Hindu
Vilappil y Heriditar
IrXy-amb \jvS-]-cn-
944744710 7 Safiya Land Agriculture Positive lmcw e`y-am-I-Ww.
No
Yes
20Y
APL 5 Own
Nadar
Vilappil
Christian
Heriditary
Nucle
\ymb-amb hne e`y-am-
ar Both land Water Resource, Gilbert Directly Agriculture Positive I-Ww. 8 No No
BPL
35Y SIUC Famil Own & Building Animals
Nadar
Vilappil Christian y
Nucle
IrXy-amb \jvS-]-cn-
984695968 ar Compound wall, lmcw e`y-am-I-Ww.
Reena 3Y Directly Land Agriculture Positive 9 No No
BPL
OBC 7 Famil Own Road facilities
Vilappil Christian y
76
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Opinio
Sl. Fami n Contact Nature of Usage of Included in the No Name Address ly about Opinions
land No. land land Loan plot
Usage
nature
Village
Survey
Type of Type
Religion Yearsof
Number . APL/BPL Type the
Category
Ownership Ownership Disputes onDisputes project
Nucle
IrXy-amb \jvS-]-cn-
903781954 ar lmcw e`y-am-I-Ww.
Anderson 9Y Directly Land Agriculture Positive 10 No No
APL
OBC 9 Famil Own
Vilappil Christian y
IrXy-amb \jvS-]-cn-
Joint 954457875 Heridita Water Resource, Pradeep Famil Land Agriculture Positive lmcw e`y-am-I-Ww. 11 No
Yes
26Y
APL
OBC 9 Own ry Animals
Vilappil y Christian
IrXy-amb \jvS-]-cn- Water resource, 807502874 Heridita Both land Yesudasan Agriculture Compound wall, Positive lmcw e`y-am-I-Ww. 12 No No
BPL
80Y 9 Own ry & Building
Nadar
Vilappil Road Facilities Christian
Nucle
IrXy-amb \jvS-]-cn-
ar Both land Water resources, Hariharayyer 963529305 Directly Agriculture Positive lmcw e`y-am-I-Ww. 13 No
Yes
50Y
APL Famil Own & Building Road facilities
Hindu
General Vilappil y IrXy-amb \jvS-]-cn-
Nucle
lmcw e`y-am-I-Ww.
952606878 ar water reources, 14 Preetha Directly Land Agriculture Positive aI\v tPmen {]Xo-£n-
No
Yes
BPL
30Y
OBC 4 Famil Own Road Facilities ¡p¶p
Vilappil Christian y
Nucle \Ã \jvS-]-cn-lmcw
997220192 ar In«n-bm am{Xta
Abilash R 2Y Directly Land Agriculture Road Facilities 15 No No BPL sImSp-¡q. 6 Famil Own
Hindu
General Vilappil y
Nucle
IrXy-amb \jvS-]-cn-
934243365 ar Heridita lmcw e`y-am-I-Ww.
Aswathy 9Y Land Agriculture Positive 16 No
Yes
BPL 9 Famil Own ry
Hindu
General Vilappil y
Nucle
IrXy-amb \jvS-]-cn-
Sugandhi 949618306 ar Heridita Both land lmcw e`y-am-I-Ww.
LC Agriculture Water resources Positive 17 No No
BPL
26Y Retnam 7 Famil Own ry & Building
Vilappil Christian y
Nucle
IrXy-amb \jvS-]-cn-
751087138 ar Heridita Water resources, Preetha Land Agriculture Positive lmcw e`y-am-I-Ww. 18 No No
BPL
14Y 8 Famil Own ry Road facilities
Nadar
Vilappil Christian y
77
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Opinio
Sl. Fami n Contact Nature of Usage of Included in the No Name Address ly about Opinions
land No. land land Loan plot
Usage
nature
Village
Survey
Type of Type
Religion Yearsof
Number . APL/BPL Type the
Category
Ownership Ownership Disputes onDisputes project
Nucle
IrXy-amb \jvS-]-cn-
735695102 ar Heridita Bijimol Land Agriculture Water resource Positive lmcw e`y-am-I-Ww. 19 No
Yes
BPL
23Y 4 Famil Own ry
Nadar
Vilappil Christian y
Nucle
IrXy-amb \jvS-]-cn-
960574259 ar Heridita Both land Daisy Bai Agriculture Water resource Positive lmcw e`y-am-I-Ww. 20 No No
BPL
80Y 7 Famil Own ry & Building
Nadar
Vilappil Christian y
Nucle
IrXy-amb \jvS-]-cn-
Njanadas 944744710 ar Compound wall, lmcw e`y-am-I-Ww.
21 4Y Directly Land Agriculture Positive
No No
APL Danam 5 Famil Own Road facilities
Nadar
Vilappil Christian y
Nucle
IrXy-amb \jvS-]-cn-
994606019 ar Devika J.C Directly Land Agriculture Positive lmcw e`y-am-I-Ww. 22 No
Yes
BPL
28Y
OBC 7 Famil Own
Hindu Vilappil y
Nucle
IrXy-amb \jvS-]-cn-
ar Heridita Both land Water resource, Lilly Residential Positive lmcw e`y-am-I-Ww. 23 No No
BPL
70Y Famil Own ry & Building Road Facilities
Nadar
Vilappil Christian y
Nucle
IrXy-amb \jvS-]-cn- Water resources, 956719579 ar Heridita Edison Land Agriculture Compound Wall, Positive lmcw e`y-am-I-Ww. 24 No No
BPL
70Y 8 Famil Own ry
Nadar
Vilappil Road Facilities Christian y
Nucle
IrXy-amb \jvS-]-cn-
799435314 ar Heridita
Israel Land Agriculture Road Facilities Y Positive lmcw e`y-am-I-Ww. 25 No
50Y
APL
OBC 3 Famil Own ry
Vilappil Christian y
Nucle
944654216 ar Mohanan P Directly Land Agriculture Road Facilities Positive 26 No No
50Y
APL
OBC 0 Famil Own
Hindu Vilappil y
Nucle
IrXy-amb \jvS-]-cn-
999813779 ar Heridita Water resource, Abdul Rasheed Land Agriculture Positive lmcw e`y-am-I-Ww. 27 No No
BPL
80Y
OBC 1 Famil Own ry Road Facilities
Muslim Vilappil y
78
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Opinio
Sl. Fami n Contact Nature of Usage of Included in the No Name Address ly about Opinions
land No. land land Loan plot
Usage
nature
Village
Survey
Type of Type
Religion Yearsof
Number . APL/BPL Type the
Category
Ownership Ownership Disputes onDisputes project
949574540 Heridita Water resources, 28 Letha Kumari Land Agriculture Positive
No No
26Y
APL 2 Own ry Road facilities
Nadar
Vilappil
Christian
811390448 Ravindran Nair Directly Land Agriculture Positive 29 No No
BPL
15Y 1 Own
Hindu
General
Vilappil
Nucle
960542022 ar
Shine Directly Land Agriculture NY water resource Positive 30 No
BPL
20Y 3 Famil Own
Nadar
Vilappil Christian y
989589765
Siva Prabha SC Directly Land Agriculture Water resource Positive 31 No
Yes
BPL
19 Y 19 6 Own
Hindu
Vilappil
Nucle
IrXy-amb \jvS-]-cn-
Chandrasekhar 949562767 ar Heridita Land Agriculture Road Facilities Positive lmcw e`y-am-I-Ww. 32 No No
BPL
48Y an Nair 8 Famil Own ry
Hindu
General Vilappil y
Nucle
IrXy-amb \jvS-]-cn-
944786366 ar Heridita Compound wall,
Sunitha Land Agriculture N Positive lmcw e`y-am-I-Ww. 33 No
70Y
APL 4 Famil Own ry Road facilities
Hindu
General Vilappil y
628268535 Nucle
X¡-Xmb \jvS-]-cn-
2, ar lmcw e`y-am-I-Ww.
Rajesh Kumar 9Y Directly Land Agriculture Water resource Positive 34 No
Yes
OBC 949674863 Famil Own
Hindu Vilappil 9 y
Nucle
X¡-Xmb \jvS-]-cn-
956224990 ar Heridita 35 Sunila James Land Agriculture Water resource Positive lmcw e`y-am-I-Ww.
No No
BPL
50Y
OBC 5 Famil Own ry
Vilappil Christian y
Nucle
X¡-Xmb \jvS-]-cn-
949530217 ar Heridita Both land Sreeja Agriculture Water resource Positive lmcw e`y-am-I-Ww. 36 No No
BPL
50Y 3 Famil Own ry & Building
Hindu
General Vilappil y
79
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Opinio
Sl. Fami n Contact Nature of Usage of Included in the No Name Address ly about Opinions
land No. land land Loan plot
Usage
nature
Village
Survey
Type of Type
Religion Yearsof
Number . APL/BPL Type the
Category
Ownership Ownership Disputes onDisputes project
Nucle
v\ymb-amb hne e`y-am- 964503438 ar Heridita Both land Letha Nair Agriculture Road Facilities Positive I-Ww. 37 No No
27Y
APL 2 Famil Own ry & Building
Hindu
General Vilappil y
Nucle
X¡-Xmb \jvS-]-cn-
Thankappan 999568348 ar Heridita Both land Water Resource, Agriculture Positive lmcw e`y-am-I-Ww. 38 No
Yes
BPL
40Y Nair 3 Famil Own ry & Building Animals
176/3
Hindu
176/1, 176/1,
General Vilappil y
Nucle
X¡-Xmb \jvS-]-cn-
949503267 ar Murukesh Directly Land Agriculture Water resource Positive lmcw e`y-am-I-Ww.
No No 39 5 Y
APL
OBC 6 Famil Own
Hindu Vilappil y
X¡-Xmb \jvS-]-cn- Heridita Both land Rajeswari Bhai Agriculture Water resource Positive lmcw e`y-am-I-Ww. 40 No No
20Y
APL Own ry & Building
Hindu
Vilappil
Nucle
ar Heridita Haritha Prasad Land Agriculture Positive 41 No
Yes
BPL
30 Y 30 Famil Own ry
Hindu
General Vilappil y X¡-Xmb \jvS-]-cn-
Nucle
lmcw e`y-am-I-Ww.
920766441 ar Heridita 42 Kavitha Prasad Land Agriculture Positive thsd Øew H¶pw
No
8 Y
Yes
BPL 5 Famil Own ry Hindu CÃ.
General Vilappil y
Nucle
X¡-Xmb \jvS-]-cn- Trees, Water
974682036 ar Babusenan Directly Land Agriculture resource, Road Positive lmcw e`y-am-I-Ww.
No No 43 8 Y
BPL
OBC 4 Famil Own
Hindu
Vilappil Facilities y
944711132 Nucle
0, ar Heridita Chandralekha Land Agriculture water resources Positive 44 No
Yes
25Y
APL
OBC 984604743 Famil Own ry
Hindu Vilappil 0 y
944711132 Heridita Both land Binduja V K Agriculture Water resource Positive 45 No No
30Y
APL
OBC 0 Own ry & Building
Hindu
Vilappil
80
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Opinio
Sl. Fami n Contact Nature of Usage of Included in the No Name Address ly about Opinions
land No. land land Loan plot
Usage
nature
Village
Survey
Type of Type
Religion Yearsof
Number . APL/BPL Type the
Category
Ownership Ownership Disputes onDisputes project
X¡-Xmb \jvS-]-cn-
944711132 Heridita lmcw e`y-am-I-Ww.
Dr. Prabija 4Y Land Agriculture Road facilities Positive 46 No No
APL
OBC 0 Own ry
Hindu
Vilappil
X¡-Xmb \jvS-]-cn-
Preetha Bhavan, Heridita lmcw e`y-am-I-Ww. Thanka Mani Idamalor, Land Agriculture Water resources Positive 47 No No
BPL 13Y tPmen e`y-am-I-Ww. Own ry
Hindu
Vilappil Chovalloor
Nucle
ar Barren
Bettigil 5Y Directly Land Road Facilities Positive 48 No No
APL
OBC Famil Own land
Vilappil Christian y
X¡-Xmb \jvS-]-cn-
Joint
974461016 Heridita Water resources, lmcw e`y-am-I-Ww.
49 Vinija Das Famil 7Y Land Agriculture Positive
No
Yes BPL tPmen e`y-am-I-Ww. 8 Own ry Road facilities
Hindu
Vilappil y
Joint Trees, Water
Heridita Both land
Sumam LC Famil Agriculture resource, Road Positive 50 No No
BPL
30Y Own ry & Building
Vilappil y Facilities, Animals Christian
Joint
790706091 Road Facilities,
Reshma Famil 4Y Directly Land Agriculture Positive 51 No No
APL 8 Own Water resources
Hindu
Vilappil y
X¡-Xmb \jvS-]-cn-
949572726 Heridita lmcw e`y-am-I-Ww. Ebenezar Land Agriculture Trees, Road facilities Positive 52 No No
BPL
40 Y 40 tPmen e`y-am-I-Ww. 4 Own ry
Vilappil
Christian
Nucle X¡-Xmb \jvS-]-cn-
Sethuraman ar Both land Trees,Water lmcw e`y-am-I-Ww. Directly Agriculture Positive 53 No No
BPL
20Y
OBC tPmen e`y-am-I-Ww. Chettiyar Famil Own & Building resource
Hindu Vilappil y
X¡-Xmb \jvS-]-cn-
Muralidharan 989507175 Both land Water resources, lmcw e`y-am-I-Ww. Directly Agriculture Positive 54 No
Yes
10Y APL tPmen e`y-am-I-Ww. Nair 8 Own & Building Road facilities
Hindu
Vilappil
81
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Opinio
Sl. Fami n Contact Nature of Usage of Included in the No Name Address ly about Opinions
land No. land land Loan plot
Usage
nature
Village
Survey
Type of Type
Religion Yearsof
Number . APL/BPL Type the
Category
Ownership Ownership
Disputes onDisputes project X¡-Xmb \jvS-]-cn-
lmcw e`y-am-I-Ww.
Water resource, 828183485 Heridita tPmen e`y-am-I- Sarojam Land Agriculture Compound wall, Positive 55 No No
BPL 45Y Ww.tPmen {]Xo-£n- 0 Own ry
Nadar
Vilappil Road Facilities Christian ¡p-¶p.
Nucle
X¡-Xmb \jvS-]-cn-
999573965 ar Heridita Water resource, 56 Selvaraj Land Agriculture Positive lmcw e`y-am-I-Ww.
No
Yes
BPL
20Y 3 Famil Own ry Road Facilities
Hindu Vilappil y
Nucle
tPmen {]Xo-£n-¡p-
ar Heridita Balachandran Land Agriculture Positive ¶p. 57 No No
BPL
25Y
OBC Famil Own ry
Vilappil Christian y
Nucle
938764985 ar Heredit ന്യായൊയന്ഷ്ടപ
Sanandam 60 Land Agriculture Positive 58 No No
APL
OBC 9 famill Own ary രിഹാരം
Vilappil Christian y
Nucle
859012568 ar Heredit Linda Land Agriculture Road Facility Positive 59 No No
APL
25 + 25 1 SIUC famill Own ary
Vilappil Christian y
Nucle
Water resources,
906101054 ar Heredit Both Land ന്യായൊയന്ഷ്ടപ
Ayigenamol 70 Agriculture Compound Wall, Positive 60 No No
BPL
OBC 1 famill Own ary & Building രിഹാരം
Vilappil Road facilities Christian y
Nucle
Santal 860613017 ar Heredit Both Land ന്യായൊയന്ഷ്ടപ Agriculture Water Resources Positive 61 No No
BPL
60 + 60 Jayasurya 9 SIUC famill Own ary & Building രിഹാരം
Vilappil Christian y
Nucle
989520854 ar Heredit ന്യായൊയന്ഷ്ടപ
Thankaraj 70 Land Agriculture Positive 62 No No
APL 0 SIUC famill Own ary രിഹാരം
Vilappil Christian y
Nucle ന്യായൊയന്ഷ്ടപ
944621485 ar Heredit രിഹാരം 63 Jaya Kumari Land Agriculture Positive
No No
APL 80+
SIUC 0 famill Own ary മ് ാലിന്ദ്പതീക്ഷി
Vilappil
Christian y ക്കുന്നു
82
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Opinio
Sl. Fami n Contact Nature of Usage of Included in the No Name Address ly about Opinions
land No. land land Loan plot
Usage
nature
Village
Survey
Type of Type
Religion Yearsof
Number . APL/BPL Type the
Category
Ownership Ownership Disputes onDisputes project
Nucle
Directly
984622111 ar
Rajesh 12 Purchas Land Agriculture 64 No
Yes
APL
OBC 0 famill Own
Hindu
Vilappil ed y
Directly
805502462
Shameema 4 Purchas Land Agriculture Positive 65 No No
APL
OBC 3 Own
Muslim Vilappil ed
Nucle
Directly
ar Both Land Water resources, ന്യായൊയന്ഷ്ടപ
Sheeba 7 Purchas Agriculture Positive 66 No No
BPL
OBC famill Own & Building Road facilities രിഹാരം
Vilappil ed Christian y
Nucle
Residencia 811390430 ar Heredit Both Land ന്യായൊയന്ഷ്ടപ Sujatha l House, Compound wall Positive 67 No No
BPL
OBC
Own 3 famill + 100 ary & Building രിഹാരം
Vilappil Agriculture Christian y മ്വമറസ്ഥലംഇലലത
Nucle
Directly ക്കതായന്ഷ്ടപരി
984739830 ar Both Land Water resources,
Priya 28 Purchas Agriculture 68 No No ഹാരംേിട്ടണം
BPL
OBC 6 famill Own & Building Road facilities
Vilappil ed Christian y മ് ാലിന്ദ്പതീക്ഷി ക്കുന്നു
Nucle
Directly
965693239 ar Water resources, ന്യായൊയന്ഷ്ടപ
Rajesh K C 5 Purchas Land Agriculture Positive 69 No No
APL 3 famill Own Road facilities രിഹാരം
Vilappil ed Christian y
Nucle
Directly
Lalitha, 963365286 ar ന്യായൊയന്ഷ്ടപ
70 6 Purchas Land Agriculture Water resources
No No
APL Surendran 8 famill Own Hindu രിഹാരം
General Vilappil ed y
Joint Directly
960568671 Both Land Residencia
Rosamma Famil 15 Purchas Water resources Positive 71 No No
BPL 7 Own & Building l House
Vilappil y ed
Christian
Nucle
Directly
701240351 ar Barren ന്യായൊയന്ഷ്ടപ
Sree kutty A M 6 Purchas Land Road Facility Positive 72 No
Yes
APL 7 famill Own land Hindu രിഹാരം
General Vilappil ed y
83
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Opinio
Sl. Fami n Contact Nature of Usage of Included in the No Name Address ly about Opinions
land No. land land Loan plot
Usage
nature
Village
Survey
Type of Type
Religion Yearsof
Number . APL/BPL Type the
Category
Ownership Ownership Disputes onDisputes project
Nucle
984739820 ar Heredit Both Land ന്യായൊയന്ഷ്ടപ Biju Agriculture Water resources Positive 73 No No
APL
50 + 50 5 famill Own ary & Building Hindu രിഹാരം
General Vilappil y
Nucle
Residecial 890782099 ar Heredit Both Land Water resources, ന്യായൊയന്ഷ്ടപ Vasantha House, Positive 74 No No
BPL
70 + 70 1 famill Own ary & Building Road facilities Hindu രിഹാരം
Vilappil Agriculture y
Nucle
Directly
Sreedharan 953991124 ar ന്യായൊയന്ഷ്ടപ
35 Purchas Land Agriculture Water Resources Positive 75 No No
BPL Nair 5 famill Own Hindu രിഹാരം
General Vilappil ed y
4 Nucle
-
Directly
Vimalamma, 996134349 ar ന്യായൊയന്ഷ്ടപ
13 Purchas Land Agriculture Road Facility Positive 76 No No
APL Chandran Nair 5 famill Own Hindu രിഹാരം
General Vilappil ed 202/17 y വീ絍പൂർണ്ണൊയും
4 Saumya Nivas,
- .
ന്ഷ്ടമെട്ടു Edamala, 952618522 Heredit 77 Sudha ന്യായൊയന്ഷ്ടപ
BPL Chovallur, 7 OBC ary
Vilappil
Christian 202/17 Vilappilsala P O രിഹാരംആവശയ ൊണ്.
.
Pradeep Bhavan, വീ絍ഉൾമെടുത്തി Edamala, 854784406 ന്യായൊയന്ഷ്ടപ 78 Francis Chovallur, 8 രിഹാരംആവശയ
216/18
Vilappil
Christian Vilappilsala P O ൊണ്.
.
1 812907940 മ്ലാട്ട്ൊന്ദ്തം
-
1 Sharavan - 1 ന്യായൊയന്ഷ്ടപ 79 Shailan Bhavan, Vitiyam, 944746139 Hindu രിഹാരംആവശയ
Vilappil Peyad 166/6 3 ൊണ്. മ്ലാട്ട്മെലാഡി.
790280503 T C 7/302, V K P മ്ലാട്ട്ൊന്ദ്തം. 8 80 Shailaja Nagar, 965630393 ന്യായൊയന്ഷ്ടപ
Hindu
Vilappil Kanjirampara 3 രിഹാരംആവശയ ൊണ്.
84
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Opinio
Sl. Fami n Contact Nature of Usage of Included in the No Name Address ly about Opinions
land No. land land Loan plot
Usage
nature
Village
Survey
Type of Type
Religion Yearsof
Number . APL/BPL Type the
Category
Ownership Ownership Disputes onDisputes project
Renjith Bhavan, 984781798 മ്ലാട്ട്ൊന്ദ്തം. 81 Rejina L Mulayara, 5 . Hindu റബ്ബർമ്താട്ടം
Vilappil Mulayara P O
1
- Shima Bhavan, 894302398 82 Anila Nettayam, 4
Hindu
Vilappil Kizhakkinkara.
192/13 Sharan,
Valiyakarakattuvi 949619696 മ്ലാട്ട്ൊന്ദ്തം. 83 William Raj la, Pthen Veedu, 0 റബ്ബർമ്താട്ടം.
Vilappil Chovallur, Christian Vilappilsala P O
Grace Home,
3 - Edamala, 938896710 മ്ലാട്ട്ൊന്ദ്തം. 84 Baby Abraham
217 Chovallur, 6 റബ്ബർമ്താട്ടം.
Vilappil Valiasala P O Christian
1 - 892140582 മ്ലാട്ട്ൊന്ദ്തം. 85 Richard Das 7 റബ്ബർമ്താട്ടം.
217/3
Vilappil
Christian
984678975 മ്ലാട്ട്ൊന്ദ്തം. 86 Stephenson 7/12 5 റബ്ബർമ്താട്ടം.
Vilappil
Christian
217/1,21
Vrinda Bhavan,
Aruthelampoad, മ്ലാട്ട്ൊന്ദ്തം. 87 Vrinda Vijayan 623886635 Konniyoor, . Hindu റബ്ബർമ്താട്ടം
176/21 Vilappil Perukavu P O
85
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Opinio
Sl. Fami n Contact Nature of Usage of Included in the No Name Address ly about Opinions
land No. land land Loan plot
Usage
nature
Village
Survey
Type of Type
Religion Yearsof
Number . APL/BPL Type the
Category
Ownership Ownership Disputes onDisputes project രണ്ട്മ്പര്ക്ക്മ് ാ Agriculture ലിലഭ്ിക്കണം. 21 Others:Wh ലക്ഷംരൂപമസꅍറ് ile trying ഒന്നിന്ലഭ്ിക്കണം. (2 to മസഡുംമ്റാ蕍, dismantle െരങ്ങൾ, the old house and െറ്റുവൃക്ഷങ്ങൾ) Berakha,
Exten build the െുതലായവപരിഗ
Santhosh Pallimukku, Trees, Water 949530290 ded Heredit new ണിക്കണം. Kumar. S, Peyad P O, Land resources, Road Positive 88 No No
APL
OBC + 50 1 Famil Own ary house, APJ 201/4 േഞ്ഞുങ്ങൾക്ക്ഭ്ാ Vilappil Manju V S Trivandrum- facilities Christian y Abdulkala 695573 വിന്ലലതാേണം. m Institute became ൊതാപിതാക്കളു aware of മടവതുവാങ്ങി the project വീ絍പണിയാന്ും, and put off വിദ്യാഭ്യാസംെുത the house ലായഭ്ാവിോരയ plan. ങ്ങൾമെയ്യുവാന്ും .
T C 14/1104 (1), 944790669 Exten
Residencia Building, Trees, ഒരുമ് ാലി.
Puliyadi House, 3 ded Heredit Both Land
SC Sivakami S 43 l House, Water Resources, Positive 89 No No വതുവിന്തക്കതാ
Parottukonam, 940079269 Famil Own ary & Building
190/6
Hindu
Vilappil Agriculture Road Facilities Nalanchira P O 3 y യവില.
86
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Opinio
Sl. Fami n Contact Nature of Usage of Included in the No Name Address ly about Opinions
land No. land land Loan plot
Usage
nature
Village
Survey
Type of Type
Religion Yearsof
Number . APL/BPL Type the
Category
Ownership Ownership Disputes onDisputes project
T C
-
2
46/38,Pallitheruv 989589765 Exten
-
ഒരുമ് ാലി. Trees, Water
u, Ambalathara, 6 ded Heredit
Siva Prabha. S 43 Land Agriculture resources, Road Positive 90 No വതുവിന്തക്കതാ
BPL Poonthura P O, 759292410 Famil Own ary Yes (
190/6
Hindu
Lakhs)
Vilappil facilities .
Sangam യവില
Trivandrum 5 y Sahakarana
Muttathara 695026
Nucle
1
- Directly
790280503 ar
Shylaja S Mailadi SC Purchas Land Agriculture Positive 91 No
BPL 8 famill Own
Hindu
164/4 Vilappil ed y
Heredit Nucle Residencia
P Thankappan Abhlash Bhavan, ary,
999568348 ar l house, - Building, Trees,
17 Nair, V Vimala Chovallur, Directly Building Positive 92 No
Co
OBC
Own
3 famill Industrial, Bank) Water Resources
Hindu
Vilappil Kumari Vilappilsala P O Purchas y Agriculture operative ,176/3,176/ ed Yes( Service S S View,
Oottukuzhi, Joint Directly
956729806
L Rosamma Chekkittapara, Famil 40 Purchas Land Agriculture Positive 93 No
APL
OBC 4 Own
201/1
Vilappil Vilappilsala P O, y ed
Christian Trivandrum
Nucle
Directly
Sanjali, B P 938745528 ar വതുവിന്തക്കതാ Akhil Manual 6 Purchas Land Agriculture Positive 94 No No
APL
OBC Nagar, Peyad 5 famill Own .
,191/2 യവില
Vilappil ed Christian y
190/10,191/1
ന്യായൊയവിലല . 2, 2, ഭ്ിക്കണം
- Shiva Parvathy െേൾക്ക്മതാഴില്
3 Bhavan, 953907091 Nucle
-
Directly Building, Trees, ലഭ്ിക്കണംമ്യാഗയ Edamala, 3 ar Both Land Residencia
1, 202/17 1, Divya R Purchas Water Resources, Positive . 95 No തഅന്ുസരിച്ച്
APL
- Chovallur, 953920511 famill Own & Building l House
Hindu
2
Operative Bank) Operative
-
General
Vilappil
ed Compound wall
202/17 Vilappilsala P O, 7 y - ന്യായവിലലഭ്ിച്ചാ PIN: 695573 ല്ഞങ്ങൾതമന്നപു
202/17 ന്രധിവാസംേണ്ടു
Yes (Co പിടിക്കാം.
87
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Opinio
Sl. Fami n Contact Nature of Usage of Included in the No Name Address ly about Opinions
land No. land land Loan plot
Usage
nature
Village
Survey
Type of Type
Religion Yearsof
Number . APL/BPL Type the
Category
Ownership Ownership Disputes onDisputes project ന്യായൊയവിലല ഭ്ിക്കണം. േുടുംബത്തിമലഒ രാൾക്ക്മ് ാലി. ഒറ്റത്തവണമ്പെꅍ റ്ആയിതുേലഭ്ി ക്കണം.
Thanal, 953937232
1
- Joint ഇന്ിയുള്ളെീറ്റിംഗു kukkuruni, 4 Heredit Trees, Road Saritha V Famil Land Agriculture Positive 96 No No േൾമ്രഖാെൂലംഅ
APL
OBC Kattaykode P O, 974526718 Own ary facilities
203/6 Vilappil y Kattakada 1 Christian റിയിക്കണം. േുട്ടിേൾക്ക്ഭ്ാവി മ്ക്കേണ്ടിഇതുമ്പാ മലഒരിടംേമണ്ട ത്താꅍപറ്റിലല. പൂര്വിേസേത്ത്ന് ഷ്ടൊേുന്നതിꅍമറെ മ്ന്ാവിഷെം. പദ്ധതിവരുന്നത്ന് ലലതുതമന്ന. പമ്ക്ഷന്ലലവിലേിട്ട ണം. എന്ിന്ദ്ക്കണ്ട്മപണ് െക്കളാണ്.
Sharon, Valiya Nucle
,
Residencia അവരുമടഭ്ാവി
Karakkattu vila 949619696 ar Heredit Land &
William Raj. A 60 l House, 97 No മ്വമറവരുൊന്ംഒ
APL
OBC veedu, Chovallur, 0 famill Own ary Building
Vilappil Agriculture vilappilsala. P O Christian y ന്നുംഇലല. ഞങ്ങളുമടെക്കൾ ക്ക്ഓമ്രാമ് ാലിത രണം. മ്വമറവതുവാ ങ്ങിതാെസിക്കാꅍ ഉള്ളരൂപേിട്ടണം.
88
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Opinio
Sl. Fami n Contact Nature of Usage of Included in the No Name Address ly about Opinions
land No. land land Loan plot
Usage
nature
Village
Survey
Type of Type
Religion Yearsof
Number . APL/BPL Type the
Category
Ownership Ownership Disputes onDisputes project
Nucle
Siva Sailam, Directly D Sree 974675551 ar Industrial, Trees, Road ന്യായൊയവിലല Chovallur, Purchas Land Positive 98 No No
APL kumaran Nair 9 famill Own Agriculture Facilities . 218/8 Hindu ഭ്ിക്കണം
Vilappil Vilappilsala ed y
- T C 11/1382 (2), Puthurkonam
Nucle ന്യായൊയവിലല
House, Directly
3
- 944632445 ar ഭ്ിക്കണം.
3,216/6
3
-
- Monsi R Parottukonam, Purchas Land Agriculture Positive 99 No No
APL
4
Own
1 - 5 famill േുടുംബത്തിമലഒ
Vilappil Nalanchira P O, ed Christian y Trivandrum- രാൾക്ക്മ് ാലി. 216/6 695015 Gigi Nivas, Nedumkuzhy, vilappilsala P O, ന്ാടിꅍമറവിേസ
Trivandrum
. ന്ം 10 695573 / 994099821 Heredit Trees, Water Gimi G R Land Agriculture Positive No No ഭ്ൂെിേൃഷിയാവ
OBC Thenguvilakam 4 Own ary resources 0 193/8
Vilappil House, Christian ശയത്തിന്ുവാങ്ങാ Koottappuli, ꅍ Kaliyikkavilai P O 629153 Others:
ഇഷ്ട ഒരുമ് ാലിലഭ്യൊ
Exten
.) Bethel House,
10 894383676 ded ദ്ാന് Both Land Building, Trees, േും.
Seleena Puttumel konam 45 Agriculture Positive
No
BPL
OBC 1 Famil Own & Building Water Resources 1 217/9 ൊയി
ഇലല ഈന്ദ്പമ്ദ്ശംവിേ
ഇമ്ൊൾ
Vilappil Vilappilsala P O
Christian y േിട്ടി സിക്കും. യത് Yes(
1
- Thekke Heredit
Nucle
Cheruvila, ary & 10 Josekutty & 944684669 ar Trees, Compound ന്ലലവിലേിട്ടണം. Vizhavoor, Directly Land Agriculture Positive
No No
BPL 2 Anitha 9 famill Own Wall, Road Facilities ഒരുമ് ാലിേിട്ടണം.
Vilappil Malayam P O, Purchas Christian y
202/4,202/5 Vilavoorkal. ed
89
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
Opinio
Sl. Fami n Contact Nature of Usage of Included in the No Name Address ly about Opinions
land No. land land Loan plot
Usage
nature
Village
Survey
Type of Type
Religion Yearsof
Number . APL/BPL Type the
Category
Ownership Ownership Disputes onDisputes project
Yamuna Bhavan, Nucle
Directly
10 Kizhakkekara, 954450728 ar Trees, Road ന്യായൊയവിലല
Valsalan Nair N 20 Purchas Land Agriculture Positive
No
Yes
APL Chovallur, 0 famill Own Facilities . 3 Hindu ഭ്ിക്കണം
218/19
Vilappil ed Vilappilsala y
. മ്ലാട്ട്ൊന്ദ്തം
1) 812907940 Nucle
-
1 . 10 - Sarovan Bhavan, 1 ar റബ്ബർമ്താട്ടം ന്യായ Adarsh(Sailon) Land Agriculture Positive
No No
APL Vittiyam, Peyad 944746139 famill Own 4 Hindu ൊയവിലലഭ്ിക്ക
Vilappil 166(6 3 y ണം.
-
3,
2
-
-
10 Arunodayam, 999567981 Heredit
1 Jaya Kumar Land
APL Edamala 3 Own ary 5 Hindu
General
Vilappil
203/17
203/17 ARRA - 73 B,
Avittom Road, Nucle Trees, Water
1
-
10 V K Chithra Kumarapuram, 984604743 ar Heredit Resources,
30 Land Agriculture Positive
No
Yes
Lekha Medical College 0 famill Own ary Compound wall, 6 Hindu
165/1 Vilappil Post, Trivandrum y Road Facilities – 695011
90
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
ANNEXURE-VIII
Attendance Sheets from Pubic Hearing
91
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
92
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
93
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
94
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
95
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
96
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
97
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
98
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
99
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
100
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
101
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
102
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
103
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
104
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
105
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
106
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
107
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
108
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
109
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
110
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
111
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
112
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
113
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
114
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
115
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
116
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
117
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
118
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
119
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
120
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
121
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
122
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
123
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
124
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
125
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
ANNEXURE-IX
Concerns Raised and Corresponding Reply During Public Hearing
{Ia {]Xn-I-cn¨ Bfp-sS D¶-bn¨ Bi-¦-IÄ \¼À t]cv {]Xn-I-c-W-§Ä skâv Øe-ap•v. 8 AXn skâv Øew _nPp Gsä-Sp-¡p6.5-¶p. _m¡n- 1. bpÅ Øew IqSn Gsä-Sp- ¡ptam? F.-]n.-sP. A_vZpÄ -F.-]n.-sP. A_vZpÄ Iemw kmt¦-XnI kÀÆ-I-em-ime Iemw kmt¦-XnI hcp-¶-Xnsâ `mK-ambn kÀÆ-I-em-ime hcp- Øew Gsä-Sp-¡p-¶p-•v. ¶-Xnsâ `mK-ambn Gsä-Sp-¡p¶ Øe-¯n\v Øew Gsä-Sp-¡p-¶p- \ym-b-amb hne In«ptam? •v. At¸mÄ km[m- IpSpw-_-¯nse HcmÄ¡v c-W-bmbn P\- tPmen e`n-¡ptam? §Ä¡p-•m-Ip¶ Bi-¦-bmWv Øe- ¯n\v IrX-y-amb \jvS-]-cn-lmcw e`n- ¡ptam F¶-Xv. \n§-fpsS Øe- ¯nsâ hne \nÝ-bn- ¡p-¶Xv Icw AS-¨- Xn-s\-¡p-dn¨pw, ]ns¶ \n§Ä \S- am[mkv ¯nb FÃm CS-]m-Sp- 2. I-sf-¡p-dn¨pw hy-à- amb ]T\w \S-¯n-b- Xn\p tij-am-bn- cn¡pw dh-\yq hIp¸v hne \nÝ-bn-¡p-¶-Xv. B hne \n§Ä¡v Xr]vXn-I-c-a-sÃ-¦n AÀln-¡p¶ \jvS-]- cn-lmcw In«p-¶-Xn\v kÀ¡m-cn-t\mSv Bh- i-y-s¸-Smw. Ct¸mÄ AXn-s\-¡p-dn¨v hy- à-ambn ]d-bm³ km[n-¡n-Ã. Cu tbmK-w \n§-fpsS {]iv\-§-sf-¡p-dn¨v ]d-bm\pw a\-Ên-em- ¡m\pw th•n-bmWv.
126
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
{Ia {]Xn-I-cn¨ Bfp-sS D¶-bn¨ Bi-¦-IÄ \¼À t]cv {]Xn-I-c-W-§Ä \n§-fpsS {]iv\- §Ä a\-Ên-em¡n kÀ¡m-cn\v dnt¸mÀ«v kaÀ¸n-¡m\pw th•n-bm-Wv tbmKw IqSn-bXv.
Øew hn«p-sIm-Sp-¡p¶ P\-§Ä¡v IrX-y-amb \jvS-]-cn-lmcw In«-Ww. hngnªw ]²-Xn-bn sImSp¯ Øe-¯nsâ \jvS-]-cn-lmcw Xs¶ R§Ä¡pw In«-Ww. Øe-¯n\v hne \nÝ-bn- jm-tcm¬ \nhmkv 3. ¡p-t¼mÄ \nIpXn IqSn DÄs¸-Sp-¯n- aqe-y-\nÀWbw \S-¯-Ww. DtZ-ym-K-ØÀ R§Äs¡m¸w \n¶v R§Ä¡v Int«• \ym-b- amb Bh-i-y-§Ä e`yam¡p¶-Xn\v klm-bn- ¡-Ww. ChnsS \S-¡p¶ Øe- ¯nsâ {]am-W-§Ä t\m¡n AXnsâ aS§p t]cv shfn-s¸-Sp-¯n- hne \nÝ-bn-¨mepw IrX-y- bn-«nà am-bn-«pÅ \jvS-]-cn-lmcw 4. In«n-Ã-. AXp-sIm•v R§Ä¡v AÀl-amb hne \nÝ-bn-¡Ww F¶mWv Fsâ A`n-{]m-bw. F\n-¡p-ÅXv skâv Øehpw aq¶p 7 a¡-fp-am- Wv. Pohn-¡m-\pÅ FÃm kml-N-c-y-§-fp-ap-•v. ]s£ ChnsS \S-¡p¶ Øew CS-]m-Sp-IÄ IW- {^m³kv ¡n-se-Sp¯v hne \nÝ-bn- 5. ¨m thsd hoSpw Øehpw hm§m-\pÅ \jvS-]-cn-lmcw In«n-Ã. AXp-sIm•v hngnªw ]²Xn sImSp¯ \jvS-]-cn- lmcw In«n-bmte Chn-sS-
127
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
{Ia {]Xn-I-cn¨ Bfp-sS D¶-bn¨ Bi-¦-IÄ \¼À t]cv {]Xn-I-c-W-§Ä bpÅ FÃm P\-§fpw Øew hn«p sImSp-¡m³ X¿m-dm-Iq. `qan-bpsS hne `qan DS- abpw DtZ-ym-K-Ø\pw IqSn Xocp-am-\n-¡-Ww. If-IvSsd hnfn¨p hcp¯n P\-{]-Xn-\n[n hne-sb-¡p-dn¨v hy-à-ambn 6. kwkm-cn-¡-Ww. kÀÆ-I-em-ime hcp-t¼mÄ Bfp-IÄ¡v tPmen \ÂI- Ww.
kÀÆ-I-em-ime hcp-t¼mÄ P\-§-fpsS hy-àn-]- P\-§Ä ]än-¡-s¸-S-cp-Xv. c-amb {]iv\-§Ä \n§Ä P\-§-fpsS Øew Adn-bp-¶-Xn\pw Gsä-Sp-¡p-t¼mÄ P\-§- AXn-s\-¡p-dn¨v tfmSv Fs´Ãmw \ÂIp-¶p- dnt¸mÀ«v X¿m-dm-¡p- sh¶v hy-à-ambn ]d-b- ¶-Xn\pw th•n-bm- tim-`\ Ipamcn Ww. Wv C¶s¯ tbmKw 7. P\-{]-Xn-\n[n P\-§sf ]än-¨n«v Hcp ]²- kwL-Sn-¸n-¨Xvv Xn-Ifpw \S-¸n-em-¡p-hm³ hnesb kw_-Ôn¨ R§Ä A\p-h-Zn-¡n-Ã. Imc-y-§Ä C¶s¯ tbmK-¯n hy-à- ambn ]d-bm³ km[n- ¡n-Ã. AXv ]n¶oSv Adnbn¡pw. tbmK-¯nsâ Hmtcm L«- ¯nepw \n§Ä¡v Bfp-I- fpsS tNmZ-y-¯n\v hy-à- amb adp-]Sn \ÂIm³ km[n-¡p-¶n-Ã. \n§Ä ]d- bp-¶Xv ASp¯ L« tbmK-¯n hy-à-amb A-i-zXn adp-]Sn \ÂImw F¶m-Wv. 8. C§-s\-sbmcp adp-]-Sn-bà R§Ä \n§-fn \n¶pw {]Xo-£n-¡p-¶-Xv. \n§Ä Xs¶ tbmKw IqSn-bn«v hyà-amb Xocp-am-\- §fpambn hcWw F¶mWv Fsâ A`n-{]m- bw. Zo]p Øew Gsä-Sp-¡p-t¼mÄ ]²-Xn-¡m-h-i-y-amb 9.
128
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
{Ia {]Xn-I-cn¨ Bfp-sS D¶-bn¨ Bi-¦-IÄ \¼À t]cv {]Xn-I-c-W-§Ä km¼-¯nIw DÅ-h³, Øew Gsä-Sp-¡p-¶- CÃm-¯-h³ F¶v Xcw Xn C§-s\-bpÅ Xncn-¡msX FÃm-h-cn Xcw-Xn-cn-hp-IÄ CÃ. \n¶pw Xpe-y-ambn Øew \n§Ä ]dª Gsä-Sp-¡-Ww. Øew ImWn¨p X¶m R§Ä AXp ]cn-tim-[n¨v hy-à-amb Hcp adp- ]Sn \ÂIpw. C§-s\-bpÅ tbmK§Ä FÃm-h-cp-sSbpw IqSp-¶-Xn\pw AXn-s\-¡p- t^m¬ \¼À In«n- dn¨v Adn-bp-¶-Xn\pw bn-«n-Ã. In«n-bm t]cv shfn-s¸-Sp-¯n- t^mWn IqSn satÊPv DSs\ C§-s\-bpÅ 10. bn-«nà Ab-¨m \Ã-Xm-bn-cn-¡pw. tbmK-§-sf-¡p-dn- s¨Ãmw satÊPv Ab¨p Xcm³ R§Ä X¿m-dm-Wv. ]²-Xn-bpsS `mK-ambn kmaq-ly BLmX R§-fpsS Øehpw D]-Po- ]T-\-¯nsâ `mK-am- h\ amÀ¤-hp-amWv \jvS-am- bn-«mWv C¶n-hnsS Ip-¶-Xv. CXn-s\-¡p-dn¨v IqSn-t¨À¶-Xv. kmaq-ly BLmX ]T-\- \n§Ä hy-X-y-kvX- ¯nsâ DtZ-ym-K-ØÀ amb tNmZ-y-§fpw ASp¯ tbmK-¯n-se- A`n-{]m-b-§fpw D¶- ¦nepw hy-àamb adp-]Sn bn-¨n-«p-•v. hnI-k-\- \ÂI-Ww. ¯nsâ `mK-ambn Øew Gsä-Sp-¡p- t¼mÄ Øe-¯nsâ DS-abv¡v Fs´m-s¡- bmWv \jvS-am-Ip-¶- Xv, AXv GXp Xc- {]kmZv ¯n-emWv \jvS-am-Ip- 11. ¶-Xv, AXn IqSn \n§Ä¡p-•m-Ip¶ {]iv\-§Ä Fs´m- s¡-bm-Wv. hy-X-y- kvX-amb Irjnbpw sXmgnepw \jvS-s¸- Sp-¶-Xp-amb Imc-y- §Ä DÄs¸-Sp-¯pw. C¶v \n§Ä ]dª Imc-y§sfÃmw DÄ s¸-Sp¯n \n§Ä¡p- •m-Ip¶ \jvS-§-sf- ¡p-dn¨v hy-à-amb dnt¸mÀ«v D•m¡n
129
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
{Ia {]Xn-I-cn¨ Bfp-sS D¶-bn¨ Bi-¦-IÄ \¼À t]cv {]Xn-I-c-W-§Ä kÀ¡m-cn\p \ÂIpw. Hcp Xocp-am-\hpw D•m- \nb-a-¯nsâ ASn- ImsX F{X Znhkw Øm-\-¯n C§s\ tbmKw IqtS•n am{Xta Hmtcm Im hcpw. c-y-§fpw sN¿m³ km[n-¡p-I-bp-Åq. AXp sIm•mWv Hmtcm tbmK-§fpw IqSp-¶-Xv. tbmKw IqSp-¶-Xn-t\m- sSm¸w P\-§-fpsS ]e Xc-¯n-epÅ A`n-emjv {]iv\-§fpw a\-Ên- 12. em-¡m\pw th•n- bm-Wv. AXn-\m CXp-t]m-epÅ tbmKw C\nbpw IqtS•n hcpw. C\n-bpÅ tbmK-§- sfÃmw If-IvSÀ Xe- ¯n Bbn-cn-¡pw. AhÀ Bbn-cn¡pw A´na Xocp-am-\- §Ä FSp-¡p-I. \ym-b-hn-e-sb-¡p-dn¨v Adn- kÀ¡mÀ \ÂIp¶ bWw F¶p•v hne-bmWv \ym-b-hn- e. Hmtcm Øe-¯n- sâbpw LS-\-IÄ t]cv shfn-s¸-Sp-¯n- A\p-k-cn-¨mWv \ym- bn-«nà b-hne Xocp-am-\n-¡p- 13. ¶-Xv. AXnsâ ASn- Øm-\-¯n-em-bn- cn¡pw \n§-fpsS `qan¡pw \ym-b-hne \nÝ-bn-¡p-¶-Xv. Øew hn«p-sIm-Sp-¡p¶ P\-§Ä¡v IrX-y-amb \jvS-]-cn-lmcw In«-Ww. R§-fpsS ]©m-b¯v F P\-{]-Xn-\n[n t{KUv ]©m-b-¯m-Wv. 14. AXn-\m A\-Xn\v A\p- k-cn-¨pÅ hne \nÝ-bn-¡- Ww. hngnªw ]²-Xn-bn sImSp¯ Øe-¯nsâ
130
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
{Ia {]Xn-I-cn¨ Bfp-sS D¶-bn¨ Bi-¦-IÄ \¼À t]cv {]Xn-I-c-W-§Ä \jvS-]-cn-lmcw Xs¶ R§Ä¡pw In«-Ww. hngnªw ]²-Xn¡p th•n Øew Gsä-Sp-¯Xv t]cv shfn-s¸-Sp-¯n- ]¯p hÀjw ap¼m-Wv. 15. bn-«nà AXn-\m R§-fpsS Øe-¯n\v AXn-s\-¡mÄ IqSp-X hne In«-Ww. Øew Af¶v IÃn-Sp-¶- Xn BÀ¡pw k½-X-a-Ãm- bn-cp-¶p. F¶n«pw AhÀ IÃn-«p. R§Ä Øew Xcm³ X¿m-dm-Wv. F¶m t]cv shfn-s¸-Sp-¯n- AÀln-¡p¶ \jvS-]-cn- 16. bn-«nà lmcw In«msX Øew Xcm³ X¿m-d-Ã. ImcWw R§-fpsS Ip«n-I-fpsS `mhn-sb-¡qSn R§Ä t\mt¡-•-Xp-•v. BsI Bdp skâv `qan-bm-Wp-Å- Xv. BsI-bp-ÅXv ]¯p skâv Ignª tbmK-¯n Øehpw hoSp-am-Wv. AXp hni-Z-amb hnh-c- IqSn sImSp-¯m Pohn- §Ä Xcm-¯-Xpw ¡m-\pÅ CS-amWv \jvS-am- R§Ä hnfn-¡m-¯- Ip-¶-Xv. AXn-\m Ct¸m- Xp-amb Bfp-IÄ {ipXn gpÅ Øew hm§m\pw tbmK-¯n\p tijw 17. hoSv \nÀ½n-¡m-\p-apÅ \n¡-Ww. \n§- \jvS-]-cn-lmcw In«-Ww. fpsS hni-Z-amb hnh- t^m¬ \¼À sImSp-¯n c-§Ä tiJ-cn-¡p-¶- «pw F´p-sIm-•mWv hnfn- Xm-bn-cn-¡pw. ¡m-¯Xv F¶v Adn-b-Ww. t\m«o-kn \n§Ä X¶n-cn- t\m«o-kn X¶n-cn- ¡p-¶Xv A_vZpÄ Iemw ¡p-¶ Bh-i-y-ap- kmt¦-XnI kÀÆ-I-em-im-e- s•t¶m Bh-iyw bv¡p- th•n Øew Bh- D•m-tb¡mw i-y-ap-s•t¶m Bh-iyw Ft¶m hm¡p-IÄ Ai-zXn D•m-tb¡mw F¶mWv. kÀ¡m-cnsâ 18. CX-\p-k-cn¨v \n§Ä Gsä- \nÀt±iw A\p-k-cn- Sp-¡p¶ Øew kÀÆ-I-em- ¨p-Å-Xm-Wv. F´m- im-ebv¡p th•n Xs¶ bmepw Øew Gsä- BtWm-sb¶v R§Ä¡v Sp-¡pw. \nÀt±-i- kwibw tXm¶n-¸n-¡p¶ §Ä \n§-fn-te¡v coXn-bn BWv. CXn\v F¯n-¡p-¶-Xn\v Hcp
131
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
{Ia {]Xn-I-cn¨ Bfp-sS D¶-bn¨ Bi-¦-IÄ \¼À t]cv {]Xn-I-c-W-§Ä Hcp hy-àX hcp-¯-Ww. coXn-bp-•v. AX-\p- kÀÆ-I-em-ime F´m- k-cn-¨mWv t\m«okv sW¶v hy-à-am-¡mtam? X¿m-dm-¡p-¶-Xv. \n§Ä ChnsS \n¶v t]mI-t¼mÄ hnj-a- t¯mSp IqSn t]mtI•n hcn-Ã. \n§Ä¡v AÀln-¡p- ¶Xv \ÂIpI Xs¶ sN¿pw. tIc-f-¯n-epÅ kmt¦-XnI hnZ-ym-`-ym- k-¯nsâ apgp-h³ Npa-X-e-Ifpw hcp- ¶Xv kÀÆ-I-em- imebpsS Iogn BWv. CXn IqSn kmt¦-XnI hn Z-ym-`-ym-k-¯nsâ \ne- hmcw sa¨-s¸-Sp- ¯m³ km[n-¡pw. FÃm Imc-y-§-fp- sSbpw Xocp-am\w FSp-¡p-¶Xpw kÀÆ- I-em-ime Bbn-cn- ¡pw. AXnsâ \nÀ½m-W-¯nsâ Bh-i-y-¯n\p th•n-bmWv Øev Gsä-Sp-¡p-¶-Xv. G¡À Øew am{X- AsX P\-{]-Xn-\n[n atÃ100 kÀÆ-I-em-im-ebv¡p 19. th•n Gsä-Sp-¡p-¶p-Åq. hn-gnªw ]²-Xn-¡m-bpÅ `qanbpsS hne-sb-¡p- Øew Gsä-Sp¯t¸mÄ dn¨v hni-Z-ambn Adn- \ÂInb hne-sb-¡mfpw bp-¶Xv kÀtÆ hn`m- IqSp-X hne In«-Ww. K-¯n-\mWv. kÀÆ-I- ImcWw hngnªw ]²-Xn- em-im-e-bv¡m-bpÅ tPmkv Ip«n ¡mbn Øew Gsä-Sp-¯n«v Øew Af-¡p-¶- 20. ]¯p hÀjw Ign-ªp. Xn\v Bfp-Isf In«n- `qan-bpsS hne AXn- bm hcp¶ BgvN- s\¡mÄ Ct¸mÄ IqSn-bn-«p- I-fn Øew Af- •v. ¡p-hm³ km[n-t¨- Chn-Ss¯ hn]-W\ ¡pw. hnebv¡v Øew hn«p Xcp- Chn-Ss¯ hn]-W-\-
132
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
{Ia {]Xn-I-cn¨ Bfp-sS D¶-bn¨ Bi-¦-IÄ \¼À t]cv {]Xn-I-c-W-§Ä hm³ R§Ä X¿m-d-Ã. hne ]cn-tim-[n¨v \n§-fpsS `qan-bpsS \ym-b-hne \nÝ-bn- ¡pw. kÀ¡mÀ Xcp¶ hne \n§Ä¡v Xr]vXn-I-c- a-sÃ-¦n IqSp-X hne In«p-¶-Xn\v Bh-i-y-s¸-Smw. F´m-bmepw \n§Ä¡v AÀln- ¡p¶ \ym-b-amb hne-bm-bn-cn¡pw e`n- ¡p-¶-Xv. `qan-bpsS khn-ti-j-X-I- hne \nÝbn¡p¶Xv fpsS ASn-Øm-\-¯n F.- `qan-bpsS khn-ti-j- _n. kn. F¶v Xcw -Xn-cn- X-I-fpsS ASn-Øm-\- ¨mtWm Gsä-Sp-¡p¶ `qan- ¯n F.- _n. kn. bpsS hne \nÝ-bn-¡p-¶-Xv. F¶v Xcw- Xn-cn- ¨mWv. Hmtcm Øe- ¯n\pw hy-X-y-kvX- amb hne \nÝ-bn- ¡p-¶p. CsXmcp {]mcw-`-L« tbmK-am- Wv. CXn IqSn t]cv shfn-s¸-Sp-¯n- \n§-fpsS {]iv\- 21. bn-«nà §Ä ]Tn-¡m³ th•n-bmWv IqSn-bn- «p-ÅXv. AXn-\m \n§-fpsS FÃm kwi-b-§Ä¡pw hy- à-ambn adp-]Sn km[n-¡n-Ã. hcp¶ Znh-k-§-fn IqSp¶ tbmK-§-fn \n§Ä¡v hy-à-am- sbmcp adp-]Sn \ÂIpw. \n§Ä ]d-bp¶ FÃm LS- Pq¬ amk-t¯mSp \-Ifpw Xocp-¶-Xn\v F{X IqSn FÃm Imc-y- t]cv shfn-s¸-Sp-¯n- kabw FSp-¡pw. §fpw ]qÀ¯n-bm- ¡m³ km[n¡pw 22. bn-«nà F´p-sIm-•mWv \n§Ä kwibw ]d-bp-¶-Xv. hy-à- F¶mWv Icp-Xp-¶-Xv. am-¡n-¯-cWw. Hmtcm L«-§fpw Xocp-¶Xv Xocp-am-\n¨
133
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
{Ia {]Xn-I-cn¨ Bfp-sS D¶-bn¨ Bi-¦-IÄ \¼À t]cv {]Xn-I-c-W-§Ä Xob-Xn-IÄ Ign-ªn- «m-Wv. AXn-\m IrX-y-amb Hcp XobXn ]d-bm³ km[n-¡n-Ã. Cu hcp¶ ]²-Xn-¡mbn Bh-i-y-amb ^•v D•v. AXp-sIm- •mWv ]e Imc-y- §fpw s]s«¶v Xocp- am-\n-¡p-¶-Xv. ASp¯ tbmKw Ft¸m- ASp¯ tbmKw t]cv shfn-s¸-Sp-¯n- gmWv? hcp¶ Hcp amk-¯n- 23. bn-«nà \p-Ån D•m-Ip-¶- Xm-Wv. kÀ¡m-cn\v Øew hn«p \ÂIp-¶-Xn\v X¿m-dm-Wv. F¶m thsd Øew hm§m\pw hoSv \nÀ½n-¡m- ktcmP \p-apÅ \jvS-]-cn-lmcw 24. In«-Ww. kÀ¡mÀ R§- fpsS AhØ a\-Ên-em¡n R§Ä¡v AÀln-¡p-¶Xv Xc-Ww. FSp¯ Øe-¯nsâ \n§Ä Gsä-Sp-¡p¶ _m¡n hcp¶ Øew IqSn hkvXp GXm-sW¶v Gsä-Sp-¡mtam? ]dªp a\-Ên- joe em¡n. AXn-\m 25. AXn-\p-th• \S-]-Sn- IÄ FSp-¡p-¶-Xm-bn- cn-¡pw. Øe-¯n\v \nIpXn D•m- \nba{]Imcw DÅ hnà F¶mWv Xl- Imc-y-§Ä t]cv shfn-s¸-Sp-¯n- knÂZmÀ ]d-ª-X-v. sNbvXm aXn-bm- 26. bn-«nà F¶m `qan¡v \nIpXn Ipw. AS-bvt¡•n hcp-sa-¶v Ct¸mÄ ]d-bp¶p. tdmUnsâ ASp¯v InS- t]cv shfn-s¸-Sp-¯n- bn-«nà ¡p¶ Øe-¯n\v {]tX-y-I- 27. ambn hne \nÝ-bn-¡-Ww. FÃm Øe-¯n\pw Xpe-y- t]cv shfn-s¸-Sp-¯n- amb hne In«-Ww. bn-«nà AÃmsX Hmtcm `qan-bp- 28. sSbpw khn-ti-j-X-IÄ A\p-k-cn¨v hne \nÝ-bn-
134
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
{Ia {]Xn-I-cn¨ Bfp-sS D¶-bn¨ Bi-¦-IÄ \¼À t]cv {]Xn-I-c-W-§Ä ¡-cp-Xv. kÀÆ-I-em-im-ebv¡p kÀÆ-I-em-im-e-bpsS th•n `qan Gsä-Sp-¡p-¶- kz´w ^•mWv Xn\v am{Xw F{X ]W-amWv CXn\p th•n amän P\-{]-Xn-\n-[n amän h¨n-cn-¡p-¶-Xv. h¨n-cn-¡p-¶-Xv. 29. sam¯w XpI-sb-¡p- dn¨v hy-à-ambn ]d- bm³ km[n-¡n-Ã. Øew Gsä-Sp-¡-ensâ F{X kÀtÆ D•m- t]cv shfn-s¸-Sp-¯n- `mK-ambn C\n F{X kÀtÆ Ip-sa¶v Ct¸mÄ hy- 30. bn-«nà IqSn D•mIpw? à-ambn ]d-bm³ Ign-bn-Ã. Gsä-Sp-¡p¶ `qan-bpsS AXn-s\-¡p-dn¨pÅ \jvS-]-cn-lmcw \ÂIn-b- hnh-c-§Ä Ct¸mÄ t]cv shfn-s¸-Sp-¯n- Xn\p tij-amtWm `qan hy-à-a-Ã. 31. bn-«nà Gsä-Sp-¡p-¶-Xv? \jvS-]-cn-lm-c-¯pI _m¦v A¡u-•n hcptam?
135
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
ANNEXURE-X
Newspaper Notifications and Notice Regarding Public Hearing
Janmabhoomi Dated 29/01/2020
Mangalam Dated 29/01/2020
136
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
137
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
138
Centre for Management Development, Thiruvananthapuram SIA of Land Acquisition for the Construction of APJ Abdul Kalam Technological University
139
Centre for Management Development, Thiruvananthapuram
CENTRE FOR MANAGEMENT DEVELOPMENT (An Autonomous Institution Sponsored by the Government of Kerala) THYCAUD, THIRUVANANTHAPURAM KERALA – 695014