Inland XXXI at Logistics Park Kansas

31800 W. 196th Street, Edgerton, Kansas 221,621 SF Modern Warehouse / Distribution Space XXXI

NorthPoint Development has recently completed the of a 378,022 square foot, speculative, state-of- the-art distribution center at Logistics Park Kansas City (LPKC) with 221,621 SF available. Located in Edgerton, Kansas, a suburb southwest of Kansas City, LPKC is a 1,700-acre master-planned development served by BNSF Railway’s newest intermodal facility.

Inland Port XXXI at 31800 W. 196th Street can accommodate manufacturing, warehouse and distribution tenants of varying size. Inland Port XXXI will be located near the entrance of BNSF’s intermodal facility, which offers access to international and domestic container service along with heavy haul corridor access.

221,621 S.F.

INLAND PORT XXXI Logistics Park Kansas City Inland XXXI 378,022

Gate

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

2 Dock / Leveler Positions

Flag Pole

A A

MIC MIC REF. REF. MIC DW COFFEE MIC

UTILITY Vending Vending ROOM B B ASSEMBLY AREA AREA ±16,559sf C C Vending Vending Vending Vending Recycle

D Vending D T T Vending

Vending Gate

COFFEE 221,621 SF Leased DW REF. BREAK E E SHELTER Spec XXXI ±3,762sf 378,022 sf

F F MANUFACTURING AREA

G G TOTAL PREMISES AREA 156,401sf

H H

3 Dock / Leveler Positions

i i

Drive-In

Trailer Staging

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Gate N

1 Inland Port XXXI · Project Wing: Premises Plan Option 'D' · Edgerton, KS · 04.29.16 · 16" = 1'-0" SpecificationsS:\02-PROJECTS-NEW\01-ACTIVE PROJECTS\EDGERTON INTERMODAL\ELHC XXXI - INLAND PORT 31\11-STUDIONORTH\PROSPECTS\TRIUMPH\DRAWINGS\TRIUMPH_TI BASE.DWG : 4/29/2016 10:16:16 AM : rwaters Size ± 378,022 SF Future Trailer Storage 25+Trailer Positions (Expandable) Availability / Divisibility ± 221,621 SF Electric Service 1,500 Amps 480V 3P Taxes Estimated $0.62 / SF (fixed) Lighting T-5 HO Insurance Estimated $0.05 / SF Heat High E Gas Fired MAU’s CAM Estimated $0.18 / SF 1/2,000 SF (expandable) Dimensions ± 420’ x 1,486’ Logistics Park Office Space Build-to-Suit Year Built 2016 Construction Concrete Tilt-up Water JC WD 7 Clear Height 32’ + Outside Speed Bay Sewer Edgerton – New Treatment Facility Floor 7” Concrete Slab Electricity KCP&L Bay Spacing 52’ x 50’ Loading Bays Gas Kansas Gas Energy Fire Protection ESFR Fire Protection JC-1 Loading 30 Dock-high (expandable); 4 Drive-in Intermodal Access ±2 Miles to BNSF Gate Truck Court 60’ Concrete Aprons, 8” Concrete I-35 ±2 Miles Project Advantages • Strategically and centrally located • Optimize your supply chain • Master-planned distribution and • 1,700 acres of developable space warehouse development • 17 million square feet of building capacity • Efficient movement of global goods • Access to heavy-haul corridor • Reduced transportation costs

LPKC is a cost-efficient solution for logistics-oriented companies focused on development. Benefits include: • Competitive lease rates • Low net expenses • Affordable utilities • Immediate access to BNSF Railway’s Intermodal Facility • Financial incentives • Significant savings on dayage rates • A strong, available workforce • Convenient interstate highway access • Benefits of Foreign Trade Zone

For more information about the benefits of co-locating a facility at LPKC, visit logisticsparkkc.com.

Contact For leasing opportunities at Inland Port XXXI or LPKC, contact the exclusive commercial real estate agents Phil Algrim and Kevin Wilkerson at JLL, 913.469.4600. www.jll.com/kansas-city.

Edgerton, KS • logisticsparkkc.com