Serving the and beyond since 1967

Emery & Sons Construction is an industry leader for underground PO Box 398 utilities and site- work of all scopes and sizes. From subdivisions to 9694 Golf Club Road Stayton OR 97383 pump stations to major infrastructure projects, we have earned an

Phone: 503-769-7751 outstanding reputation for successful projects from start to finish. Fax: 503-769-5266 A complete commitment to serve our clients has helped build our company into one of the most versatile underground contractors in the industry. PROJECT PROFILES

DPSST—Public Safety Academy Salem, OR Contract Amount: $6.0 Million

Sitework & Utility Package for New Training Academy - 450,000 CY Eathwork, 140,000 TN Aggregate Placement, 8700 LF Joint Domestic / Fire Waterline, 12,000 LF Storm, 5700 Sewer, 30,000 CY Rock Blasting/Removal, 2 Mile Obsta- cle Course, 180 AC sitework.

Oregon Parks & Recreation L.L. "Stub" Stewart Memorial State Park Contract Amount: $7.8 Million Construction of 7,800 LF of new two-lane paved entrance road, park infrastructure, roads, and site grading for the proposed Devel- opment Concept Areas. The work includes traffic control, clearing and grubbing, 120,000 CY of excavation/embankment, 42,400 LF of utility installation, 25 septic tank system includ- ing drainfields and Orenco pump systems, 8,000 LF of 12" - 24" storm sewer installation, 24,000 CY of aggregate base, and installation of 30,000 gallon reservoir. PROJECT PROFILES

Mill Creek Sanitary Sewer Stayton, OR Contract Amount: $3.8 Million

The work involves the design and construction of 10,000 LF of 12" - 24" gravity sanitary sewer; 9,000 LF of 20" HDPE pressure sewer; construction of a new 3,000 GPM wastewater lift station designed for future expansion up to 8,200 gpm.

City of Salem - Northgate Avenue Extension Project

Contract Amount: $6.2 Million Clearing & Grubbing, 41,000 CY of Founda- tion Stabilization, 260,000 CY of Embankment, 14,000 SF of MSE Wall Construction, 1 Bridge constructed of 26" prestressed slabs and 1 bridge constructed of 33" prestressed box beams, Landscaping, street lighting, 2,415 LF of 18" Sanitary Sewer, 7,000 LF of storm sewer, 2,600 LF of 12" wa- terline, 7,000 ton of AC paving, curb and gutter, sidewalks, 100,000 CY of stream channel excavation and 684 LF of stream channel cleaning. PROJECT PROFILES

Carlton Vineyards Pond “G”

Contract Amount: $1.4 Million

Construction of an 80 acre-foot pond: 60,000 CY of borrow/embankment; 30,000 CY of excavation to waste; construction of an irrigation control building; 40' deep 96" wet well; construction of spillway; access road; multiple control structures; electrical equipment and instrumentation; 4,500 LF 4" - 18" site piping.

City of Salem - Convention Center

Contract Amount: $900,000 Sitework package for the City of Salem Downtown Convention Center. Included 45,000 CY of mass ex- cavation, new sanitary sewer, storm sewer, and waterline infrastruc- ture. PROJECT PROFILES

Carlton Crest Phase I & II

Contract Amount: $2.5 Million

81 lot subdivision which included clearing and grubbing, erosion control, 50,000 cy earthwork, 12,000 tons of base rock, 8,600 lf of offsite and onsite water line, 5,000 lf of storm and detention piping, 8,000 lf of sanitary sewer, 8,300 lf of curb and gutter, 3,7000 ton of asphalt paving, 450 lf of retaining walls, 50’ wide precast bridge and associated site utilities.

City of Molalla Effluent/Irrigation Force Main and Outfall

Contract Amount: $ 1.6 Million

6,300 lf of 24” HDPE force main, 3,800 lf of 8” sub-main, bypass valve assembly, road restoration, Cascade aeration structure, canal crossings, discharge monitoring structure and river outfall. PROJECT PROFILES

City of Lafayette - Waste Water Improvements Contract Amount: $5.4 Million

Installation of 3,458 LF of 10" - 18" sanitary sewer pipe, in- stallation of 16 manholes, 2 ea. 24" diameter bores, and con- struction of a new wastewater facility consisting of: dual-train SBR treatment facility, aerobic digester, tertiary filtration system, UV disinfection system, new river outfall, reconstruc- tion of existing sludge lagoons, disposal of stored biosolids, construction of new control and filter buildings, and other miscellaneous work.

Hee Hee Illahee RV Resort Salem, OR

Contract Amount: $2.9 Million Earthwork Grading, Paving, landscaping, and Utilities for a new 139 lot Rv Park in Salem. Included a 3500 LF 60” underground detention system. PROJECT PROFILES

West Meadows Phase 6 Salem, Contract Amount: $ 2.5 Million

The most recent of the West Meadows subdivisions completed by Emery & Sons, this project encompasses moving 150,000 cy of dirt, large diameter storm detention systems, subdivision pipe systems, road widening, and parking lot construction

Oleson Road Hillsboro, Oregon

Contract Amount: $ 13.4 Million This project improves the two existing travel lanes on Oleson Road between Fanno Creek and Hall Boule- vard. Sidewalks and bike lanes will be added for the entire length of the project. Left turn lanes will be added at selected locations and a new traffic signal will be installed at 80th Avenue. CLIENT LIST

Baugh/Skanska Value Year Oregon State University Kelley Engineering $ 870,000 2005

BBF Development Clover Ridge Phase III and IV $ 741,000 2005 Avalon Place $ 772,000 2006 Clover Ridge Phase IV $ 453,000 2006

Breadner Parker & Associates Edgewater at Clover Ridge Phase I $ 1.1 Million 2005 Edgewater at Clover Ridge Phase II $ 723,000 2006

City of Albany Emergency Sanitary Sewer Repairs $ 820,000 2000 Sanitary Sewer—Oak/20th/Takena $ 505,000 2001 Goldfish Farm Road Waterline $ 500,000 2001 Maple Street Pump Station $ 480,000 2002 14th to Queen Sanitary Sewer Improvements $ 980,000 2005 Hill Street Rehabilitation $ 1.6 Million 2005 Calapooia Sewer Rehabilitation $ 165,000 2005 19th & Main Sewer Improvements $ 504,000 2006

City of Amity Lagoon Improvements $ 2.4 Million 2004

City of Beaverton South Central Utilities $ 2.2 Million 2000 Barrows Road/Tigard Intertie $ 479,000 2002 Fanno Creek Bridge Pipeline Repair $ 104,000 2002 Waterline $ 800,000 2003 Brockman.Greenway/125th Intersection Imp. $ 2.5 Million 2004

City of Cascade Locks Industrial Park Construction $ 491,000 2001

City of Columbia City K Street Reservoir $ 403,000 2003

City of Colton Water System Improvements $ 504,000 2005

City of Corvallis Mary’s River Lift Station $ 1.5 Million 2000

City of Gervais Sewer Lagoon Improvements $ 823,000 2002

City of Gresham 185th Avenue Improvements $ 1.5 Million 2002

City of Hillsboro Quatama Sewer $ 41,000 2002 CLIENT LIST

City of Independence Central Immediate School $ 390,000 2001

City of Lafayette Water System Improvements $ 5.2 Million 2006

City of Lake Oswego Waluga Junior High Ball Field Improvements $ 765,000 2000 Palisades Reservoir # 2 $ 1.1 Million 2003 Hwy 43 Drainage Improvements $ 174,000 2005

City of Lebanon Santiam Canal Crossing $ 519,000 2000 Lebanon Schools $ 817,000 2001 West side interceptor Phase 2A $ 424,000 2005

City of Lowell Water Treatment Plant Improvements $ 690,000 2001

City of Mill City Waterline Improvements $ 2.2 Million 2005

City of Molalla Irrigation Force Main & Outfall Project $ 1.6 Million 2006

City of Oregon City Glen Oak Road $ 1.5 Million 2003

City of Portland Whitwood Reservoir $ 882,000 2000 Insley Parallel Trunk Sewer $ 2.8 Million 2001 Sewer Separation, Phase 3 $ 9.7 Million 2006

City of Salem Sanitary Sewer Improvements North Central Basin $ 325,000 2000 Septage Receiving Facility $ 218,000 2001 Brentwood Drive Waterline $ 245,000 2001 B Street Phase III Sanitary $ 780,000 2001 Steel Tanks Seismic Retrofit $ 565,000 2002 Lone Oak Sanitary Sewer $ 620,000 2002 Lansford Waterline $ 420,000 2002 Macleay Village—Onsite Truck Sewer $ 169,000 2002 Windsor Island Sanitary Sewer $ 1.8 Million 2005 Downtown Interceptor $ 3.5 Million 2005 Illahee Offsite Improvements $ 950,000 2005 Northgate Avenue Extension $ 6.2 Million 2005 Willow Lake Site Package $ 483,000 2005 Aumsville Highway Road Improvements $ 1.1 Million 2005 Sanitary Sewer & Water Improvements DPSST $ 3.9 Million 2005

CLIENT LIST

City of Silverton Reservoir & Abiqua River Intake Improvements $ 639,000 2001

City of Springfield Highway Storm Drain $ 373,000 2000 Public Improvements to MLK Parkway Sanitary $ 1.4 Million 2005

City of Stayton Mill Creek Sanitary Sewer Project $ 3.7 Million 2006

City of Tualatin Koch Sewer Project $ 162,000 2002

City of Wilsonville Improvements to New Treatment Plant $ 230,000 2000

City of Woodburn Mill Creek Pump Station $ 379,000 2002 Alley Sewer Reconstruct $ 71,000 2002

Clean Water Services Huber Trunk Service $ 418,000 2001 Alice Park Sewer $ 181,000 2001 Bluff Cipole Sewer Project $ 277,000 2002 Pine Lodge Pump Station Upgrade $ 220,000 2005

Evergreen School District Evergreen School Sitework $ 1.9 Million 2000

Hoffman Construction DPSST Public Safety Academy $ 5.2 Million 2005

Kelly Home Center Commercial Warehouse Site Utilities $ 897,000 2005

LCG Pence Project Sail $ 1.2 Million 2005

Linn County 50th Avenue Reconstruction $ 900,000 2002 Clover Ridge Road Reconstruction $ 330,000 2005

Marion County Silverton Road/Lancaster Drive Improvements $ 2.5 Million 2004

CLIENT LIST

Netarts Oceanside Sanitary District Sanitary Sewer Improvements $ 2.2 Million 2006

Oak Lodge Sanitary Sewer District Pump Stations $ 950,000 2001

Oregon Department of Transportation Waterline $ 63,000 2003

Oregon Parks & Recreation Department Silver Falls Utility Improvement Project $ 1.7 Million 2000 L.L. Stub Stewart Memorial State Park $ 7.4 Million 2006

Premier Properties, LLC Carlton Vineyards Pond G $ 1.3 Million 2005

Raleigh Water District Pump Station & Waterline Improvements $ 249,000 2005

RJ Armstrong Bailey Ridge Subdivision $ 1.1 Million 2005

Ross Investments Spring Terrace Subdivision $ 722,000 2005

Rushforth Construction City of Salem Convention Center $ 880,000 2005

Salem Keizer School District West Salem High School $ 2.1 Million 2001 Battle Creek School $ 660,000 2001 Jesse Harrit School $ 494,000 2002

Salem Golf Club Various Projects $ Million 2001

Salem Hospital Hospital Expansion $ 1.7 Million 2001

Siletz Tribe Hee Hee RV Resort $ 2.9 Million 2006

Tranco Pioneer Village Subdivision $ 2.9 Million 2005

Tualatin Valley Irrigation District Pipeline Relocation $ 624,000 2001

CLIENT LIST

Tualatin Valley Water District Waterline Installation on Hart Road $ 56,000 2004 Florence Lane Reservoirs Seismic Upgrade $ 480,000 2004

Washington County Cory Street Improvements $ 1.1 Million 2003 Hart Road & 185th Avenue $ 5.2 Million 2004 Oleson Road Improvements $ 13.4 Million 2006

Wildcat Development Carlton Crest Phase I & II $ 2.6 Million 2006-07

Willamette Development Highberger Meadows $ 789,000 2005

Wyant Companies West Meadows Estates $ 1.4 Million 2005 Astoria Street $ 976,000 2006