MUNICIPAL INFRASTRUCTURE AND ASSET MANAGEMENT (Q&M) ...... 24 CURRENT AND PLANNED BORROWINGS ...... 24 PART 2 MUNICIPAL CREDIT RATING ...... 24 EMPLOYEE RELATED COSTS ...... 24 GRANTS AND SUBSIDIES ...... 24 Contents Table A4 Capital budget included here ...... 25 Budgeted Capital Expenditure by Vote, standard PART 2 ...... 1 classification and funding (A5) ...... 25 I. GOVERNANCE ...... 2 M. GOVERNMENT POLICIES AND IMPERATIVES ...... 33 MUNICIPAL POWERS AND FUNCTIONS ...... 2 CONSTITUTION OF THE REPUBLIC OF ...... 33 ROLES AND RESPONSIBILITIES WITHIN LOCAL MUNICIPAL SYSTEMS ACT (ACT 32 OF 2000) ...... 33 GOVERNMENT ...... 2 MUNICIPAL STRUCTURE ACT 117 (117 OF 1998) ...... 33 THE ROLE OF GOVERNMENT IN SUSTAINABLE SPATIAL PLANNING AND LAND USE MANAGEMENT ACT, 2013 ECONOMIC DEVELOPMENT ...... 3 ...... 34 MUNICIPAL LEGISLATIVE AUTHORITY ...... 3 MILLENNIUM DEVELOPMENT GOALS ...... 34 EXECUTIVE MAYORAL COMMITTEE ...... 4 UNITED NATIONS SUSTAINABLE DEVELOPMENT GOALS . 34 SECTION 79 COMMITTEES ...... 4 NATIONAL DEVELOPMENT PLAN ...... 35 MUNICIPAL PUBLIC ACCOUNTS COMMITTEE (MPAC) ...... 4 PROVINCIAL STRATEGIC PLAN 2014 – 2019 ...... 36 SECTION 80 COMMITTEES ...... 5 MUNICIPAL POLICIES AND SERVICE DELIVERY WARD COMMITTEES ...... 5 IMPROVEMENT PLANS ...... 36 FREQUENCY OF WARD COMMITTEE MEETINGS ...... 5 BUDGET RELATED POLICIES ...... 37 THE ADMINISTRATION ...... 5 N. JOINT PLANNING AND ALIGNMENT ...... 39 MACRO STRUCTURE ...... 6 STRATEGIC ALIGNMENT ...... 42 STAFF COMPLEMENT ...... 6 O. SITUATION ANALYSIS ...... 44 EMPLOYMENT EQUITY AND TARGETS ...... 7 DEMOGRAPHIC PROFILE ...... 44 J. IDP PROCESS ...... 8 POPULATION GROWTH RATES BY DISTRICT MUNICIPALITY K. Performance Management ...... 16 – 1996, 2001 AND 2011 ...... 44 ORGANISATIONAL PERFORMANCE ...... 16 SPATIAL ANALYSIS ...... 45 INDIVIDUAL PERFORMANCE ...... 16 TOURISM ...... 45 KEY PERFORMANCE INDICATORS (KPI'S) ...... 17 DWELLING TYPE ...... 46 PERFORMANCE REPORTING ...... 17 TAMBO TRANSIT INFORMAL SETTLEMENT ...... 47 QUARTERLY REPORTS ...... 17 GAATJIE INFORMAL SETTLEMENT ...... 48 MID-YEAR ASSESSMENT ...... 17 KURLAND INFORMAL SETTLEMENT ...... 50 ANNUAL ASSESSMENT ...... 17 INFRASTRUCTURE SERVICES ...... 50 L. MEDIUM TERM FINANCIAL PLAN ...... 18 NATURES VALLEY ...... 52 CAPACITY TO SPEND CAPITAL BUDGET ...... 18 ...... 54 INDIGENT SUPPORT ...... 18 ...... 55 Financial strategy ...... 18 , PORTION 22/422 ...... 56 Management and governance frameworks ..... 19 ACCESS TO ELECTRICITY ...... 58 Economic outlook/external factors ...... 19 ROADS AND STORM WATER ...... 59 National and provincial influences ...... 19 REFUSE REMOVAL AND WASTE MANAGEMENT ...... 59 EXPENDITURE ANALYSIS – ...... 21 SEWER AND SANITATION ...... 60 Revenue analysis – a three-year preview ...... 22 ECONOMIC DEVELOPMENT ...... 61 Equitable share ...... 23 EMPLOYMENT PROFILE ...... 63 COLLECTION RATES ...... 23 Skills levels ...... 63 REVENUE PARAMETERS ...... 23 ANALYSIS OF ECONOMIC PERFORMANCE BY SECTOR ..... 64 GROWTH PARAMETERS ...... 23 PRIMARY SECTOR ...... 64 EXPENDITURE PARAMETERS ...... 23 SECONDARY SECTOR ...... 65 REVENUE (CAPITAL AND OPERATING) ...... 23 TERTIARY SECTOR ...... 66 Table A5 Operating Budget to be included here GOVERNMENT AND COMMUNITY, SOCIAL AND PERSONAL ...... 24 SERVICES ...... 66 Budget Summary (A4) ...... 24 P. SOCIO ECONOMIC PROFILE ...... 67 Budget Financial Performance (A2) ...... 24 DEMOGRAPHICS ...... 67 Borrowings (SA17) ...... 24 EDUCATION...... 68 Transfer and grant receipts (SA18) ...... 24 HEALTH ...... 69 POVERTY ...... 71 Table SA 14 ...... 24 GDPR PER CAPITA ...... 72 MUNICIPAL CONSUMER DEBT POSITION ...... 24 BASIC SERVICE DELIVERY ...... 73

1 | P a g e INTEGRATED DEVELOPMENT PLAN

SAFETY AND SECURITY ...... 75 ROLES AND RESPONSIBILITIES WITHIN THE ECONOMY ...... 78 INFRASTRUCTURE DEVELOPMENT ...... 80 LOCAL GOVERNMENT

The constitutional objects are:

a) to provide democratic and accountable I. GOVERNANCE government for local communities; b) to ensure the provision of services to

communities in a sustainable manner; The purpose of this section is to report on the c) to promote social and economic status of governance structures and the development participation of communities in the affairs of d) to promote a safe and healthy environment; local government as required by legislation. and e) to encourage the involvement of Good governance has 8 major characteristics. It communities and community organisations is participatory, consensus oriented, in the matters of local government. accountable, transparent, responsive, effective and efficient, equitable and inclusive and The Constitution also assigns developmental follows the rule of law. It assures that corruption is duties to municipalities. Section 153 provides minimized, the views of minorities are taken into that a municipality must: account and that the voices of the most a) structure and manage its administration and vulnerable in society are heard in decision- budgeting and planning processes to give making. We have a draft public participation priority to the basic needs of the community, policy that still needs to be adopted by council and to promote the social and economic these policy is also to align our 8 major development of the community; and characteristics with the back to basic approach b) participate in national and provincial as agreed by national government. development programmes

MUNICIPAL POWERS AND FUNCTIONS In terms of the Local Government: Municipal Structures Act, No. 117 of 1998, the municipal The primary role of the municipal council is that council must meet at least quarterly. The Act of political oversight of the municipality‟s also requires the council to annually review: functions, programmes and the management of the administration. All of the powers of local a) the needs of the community government are vested in the municipal council. b) its priorities to meet those needs; It has the power to make by-laws (legislative c) its processes for involving the community; authority) and the powers to put those laws into d) its organisational and delivery mechanisms effect (executive authority). for meeting the needs of the community; and The municipal council has executive and e) its overall performance in achieving the legislative authority over the matters set out in constitutional objectives outlined above Part B of schedule 4 and Schedule 5 of the Constitution. The municipality may also The municipal council makes decisions administer any other matter assigned to it by concerning the exercise of all the powers and national or provincial legislation. In administering the performance of all the functions of the the matters assigned to local government, the municipality. The Constitution confines the municipal council must strive within its capacity performance of certain functions to the to achieve the Constitutional objects of local municipal council alone. These functions may government. not be delegated by the council under any circumstances.

2 | P a g e INTEGRATED DEVELOPMENT PLAN

Functions which may not be delegated by the Municipal Council Schedule 4 Part B Schedule 5 Part B 1. The passing of by-laws. 1. Beaches and amusement 2. The approval of budgets facilities 2. Billboards and the 1. Air pollution 3. The imposition of rates and other taxes, levies display of 2. Building regulations and duties advertisements in public 3. Child care facilities 4. The raising of loans places 4. Electricity and gas 3. Cemeteries, funeral reticulation parlours and crematoria THE ROLE OF GOVERNMENT IN SUSTAINABLE 5. Fire fighting services Local 4. Cleansing ECONOMIC DEVELOPMENT tourism 5. Control of public 6. Municipal airports nuisances 7. Municipal planning In some circles, economic development is 6. Control of undertakings 8. Municipal health services perceived as an added burden on local that sell liquor to the 9. Municipal public transport public government the contrary is true with Bitou 10. Municipal public works 7. Facilities for the Municipality. Economic development is seen as 11. Pontoons, ferries, jetties, accommodation, care pivotal enabler for poverty eradication, job piers and harbours, and burial of animals Stormwater management creation and stimulating growth and Fencing and fences systems in built-up areas development. Section 152 (c) of the constitution 8. Licensing of dogs 12. Trading regulations 9. Licensing and control of is very clear on this subject as such Bitou 13. Water and sanitation undertakings that sell Municipality is committed in stimulating services food to the public Local economic development. Figure 2.1 below amenities describes the role of government in all spheres in 10. Local sport facilities respect of economic development. 11. Markets 12. Municipal abattoirs 13. Municipal parks and

recreation 14. Municipal roads 15. Noise pollution 16. Pounds 17. Public places 18. Refuse removal, refuse dumps and solid waste disposal 19. Street trading 20. Street lighting 21. Traffic and parking Table 21 SWOT ANALYSIS Figure 2.1 The Role of All of Government towards inclusive growth and Economic Development, Source DEADP

The municipal LED strategy gives a detailed account of all programmes culminating from the diagram in Figure 2.1 above. MUNICIPAL LEGISLATIVE AUTHORITY

The Constitution states in section 156(1) that a municipality has executive authority in respect of, and has the right to administer the local government matters listed in Part B of Schedule 4 and Part B of Schedule 5. These functions are contained in the table below.

3 | P a g e INTEGRATED DEVELOPMENT PLAN

COMPOSITION OF BITOU COUNCIL Table 29 below gives the names and portfolio of each member of the Mayoral Committee:

Name of Capacity member Cllr P Lobese The Executive Mayor Cllr J Nkamkam The Deputy Executive Mayor

Cllr A Olivier The Speaker

Cllr B Nel Mayoral Committee Member Table 1: Mayoral Members SECTION 79 COMMITTEES

Council resolved to establish section 79 and Section 80 committees to support the executive in executing its mandate. MUNICIPAL PUBLIC ACCOUNTS COMMITTEE (MPAC)

Council established the Municipal Public Accounts Committee in terms of section 79 of the Local Government Structures Act, Act 117 of 1998.

That the functions the newly established MPAC also include: Table 2.1: Councillors a) To consider and evaluate the content of the annual report and to make EXECUTIVE MAYORAL COMMITTEE recommendations to Council when adopting an oversight report on the annual The Executive Mayor of the Municipality, assisted report; by the Mayoral Committee, heads the b) To examine the financial statements and executive arm of the Municipality. The Executive audit reports of the municipality and Mayor is at the centre of the system of municipal entities, and in doing so, the governance, since executive powers are vested committee must consider improvements in him to manage the day-to- day affairs. This from previous statements and reports and means that he has an overarching strategic must evaluate the extent to which the Audit and political responsibility. The key element of Committee‟s and the Auditor General‟s the executive model is that executive power is recommendations have been implemented; vested in the Executive Mayor, delegated by c) To promote good governance, transparency the Council, and as well as the powers and accountability on the use of municipal assigned by legislation. Although accountable resources; for the strategic direction and performance of d) To recommend or undertake any the Municipality, the Executive Mayor investigation in its area of responsibility, after operates in accordance with the Mayoral reviewing any investigation report already Committee. undertaken by the municipality or the Audit Committee; and

4 | P a g e INTEGRATED DEVELOPMENT PLAN

e) To perform any other functions assigned to it delivery issues as well as to improve ward through a resolution of council within its area committee functionality. This will reflect that of responsibility. Bitou Local Municipality maintains the ideal co- operational approach towards operational and The MPAC consists of three councillors and that geographical solutions. The management the following Councillors, as nominated by the team of Bitou Municipality will gain hands on respective political parties: experience on what the needs and challenges  Councillor A R Olivier (Representing the DA) of the Bitou community are.

 Councillor X Matyila…(Representing the ANC The establishment of the forum will maximize /AUF Coalition) administrative and operational efficiency and provide for adequate checks and balances.  Councillor N Jacobs ….(Representing the ANC/AUF Coalition) FREQUENCY OF WARD COMMITTEE SECTION 80 COMMITTEES MEETINGS Ward Committees used to meet monthly. After a No Portfolio Committees. review of their performance and workload, it WARD COMMITTEES was resolved that they should on a quarterly basis. Ward committees support the Ward Councillor who receives reports on development, THE ADMINISTRATION participate in development planning processes, and facilitate wider community participation. To The purpose of this section is to get an overview this end, the Municipality constantly strives to of the municipal service provision capabilities. In ensure that all ward committees function this section, the focus is on the municipal optimally with community information provision; organogram, skills levels, skills development and convening of meetings; ward planning; service municipal strategic decision taking capabilities. delivery; IDP formulation and performance A good institutional form is the one that follows feedback to communities. its function and the main function of local government is to provide basic services like Council adopted a ward committee policy on water, sanitation and waste removal. It is safe to the 22 June 2013. The municipal area was say that the current municipal structure reflects demarcated into seven wards and a ward its ability to deliver on its mandate. committee represents each of the seven wards. Bitou has a fully functional ward Bitou Municipality did well in the last two years committee system of which members are active and won a number of awards including the participants. Ward committee members Goven Mbeki Housing Award and three clean recently received SAQA accredited training on audits. Unfortunately, the recent local municipal processes and meeting procedures government elections had its effect on the in order to get them all in line with municipal municipal leadership as a result there was a legislative framework. power shift and three senior managers has since resigned. However, Council has shown The Council at its Special Council meeting held leadership and quickly appointed a Municipal 25 February 2015 adopted an item on the Manager who is an accounting officer and the establishment of a Ward Committee Forum in rest is dependent on him to expeditiously fill the order to enhance strategic relationships remaining vacant positions. between the Bitou communities and the Municipality. The forum can be used as a platform for all stakeholders to unblock service

5 | P a g e INTEGRATED DEVELOPMENT PLAN

MACRO STRUCTURE Recreation  Integrated Human Settlements The municipal structure is as follow: Engineering Services  Roads and Stormwater  Fleet Management and MUNICIPAL MANAGER Mechanical engineering Acting  Electrical Engineering  Water and Waste water Management  Project Facilitation (PMU) HEAD HEAD HEAD HEAD STRATEGIC CHIEF FINANCIAL COMMUNITY ENGINEERING CORFPORATE Table 2.3: Directorates SERVICES OFFICER SERVICESV SERVICES Mr. D SERVICES VACANT VACANT Mr B Mkhefa ACTING Friedman STAFF COMPLEMENT Figure 26: Organogram The municipality is currently busy with a work The municipality has five directorates that study that is meant to restructure the municipal perform certain functions to ensure effective organisation for the form to follow function. The and efficient service delivery. The table below new organogram will be approved with the will outline those key functionalities. 2018/2019 revised IDP. In the meantime a workforce of 583 personnel supports the Bitou DIRECTORATE CORE FUNCTIONS Municipality‟s senior management team. The Office Of The Municipal  Internal Auditing total funded positions on the approved municipal Manager  Performance Management organogram are 732.  Risk Management  Support Office of the Below is a table indicating the current number Political Office Bearers Financial Services  Budget and Financial of employees at Bitou Municipality, by race Reporting within a specific occupational category  Revenue Services (including Councillors):  Expenditure  Supply Chain Management MALE FEMALE GRAN  Information Technologies OCCUPATIO D NAL LEVEL TOTA Corporate Services  Council Support A C I W A C I W L  Administration  Human Resources Councillors 5 1 1 2 3 12  Communication  Legal Services Top 1 0 1 1 0 0 0 3  Archive and Records Management Management Senior 0 1 0 5 0 0 0 0 6 Strategic Services  Integrated Development Management Planning Professionall  Local Economic y qualified Development and

 Town Planning and Land experienced 9 7 1 5 1 3 0 1 27 Use Management specialists  Property Management and mid-  Environmental management Management Skilled  Geographic Information technically Services qualified  Air Port Management workers, Community Services  Waste Management junior  Public Safety management 19 16 1 8 39 35 0 3 121  Library and Information , supervisors, Services foremen and  Parkes, Cemeteries and superintende

6 | P a g e INTEGRATED DEVELOPMENT PLAN

nts Unskilled and 0 Semi-skilled defined 0 0 0 2 5 1 1 9 and decision making discretionary TOTAL 0 1 0 0 2 8 3 5 19 65 47 0 2 44 37 0 3 198 decision PERMANENT making Temporary 0 0 0 0 0 3 0 2 5 Unskilled and Employees defined GRAND TOTAL 0 1 0 0 2 11 3 7 24 45 0 0 35 34 0 0 183 decision 69 Table 2.5: Employment Equity Targets making TOTAL 16 11 2 12 10 2 0 7 550 PERMANENT 3 6 1 0 9 Temporary 8 6 0 2 8 7 0 2 33 Employees GRAND 17 12 2 12 11 2 0 9 583 TOTAL 1 2 3 8 6 Table 2: Municipal staff complement EMPLOYMENT EQUITY AND TARGETS

The Employment Equity Act (1998) Chapter 3, Section 15 (1) states that affirmative action measures are measures designed to ensure that suitable qualified people from designated groups have equal employment opportunities and are equitably represented in all occupational categories and levels in the workforce of a designated employer.

The table below represents the employment equity targets for the 2017/2018 financial year.

MALE FEMALE GRAND OCCUPATIONAL A C I W A C I W TOTAL LEVELS Top 0 1 0 0 0 1 0 1 3 Management Senior 0 0 0 0 0 0 0 0 0 Management Professionally qualified and 0 0 0 0 0 0 0 0 0 experienced specialists and mid- management Skilled technically qualified 0 0 0 0 0 1 0 1 2 workers, junior management, supervisors, foremen and superintendents Semi-skilled and discretionary 0 0 0 0 0 1 2 2 5 decision making 7 | P a g e INTEGRATED DEVELOPMENT PLAN

J. IDP PROCESS On 29 August 2017, the Bitou Council approved the IDP process plan required by section 29 of the MSA.

IDP/ BUDGET ACTIVITY DATE LEGAL REFERENCE MSA Section 28: IDP Process Plan: 25 Aug Each municipal council, within a prescribed period after the Submit to Mayoral Committee 25 Aug start of its elected term, must adopt a process set out in Submit to Council. writing to guide the planning, drafting, adoption and review of its integrated development plan. The municipality must through appropriate mechanisms, processes and procedures established in terms of Chapter 4, consult the local community before adopting the process. A municipality must give notice to the local community of particulars of the process it intends to follow. Submit annual financial statements and annual Aug MSA Section 126(1)(a): The accounting officer of a municipality performance report to the Auditor-General for auditing must prepare the annual financial statements of the (within two months after the end of the financial year) municipality and, within two months after the end of the financial year to which those statements relate, submit the statements to the Auditor-General for auditing Submit process plan to the Eden District Municipality and 31 Aug Best Practice the Provincial Government Give notice of the approved process plan through local 01 Sep Best Practice media Strategy Workshop 1 (councillors, municipal manager, MSA Section 56. (2) The executive mayor must - directors and selected senior managers) to reconcile Sep identify the needs of the municipality; different views and opinions of the political structures review and evaluate those needs in order of priority and administration. Strategy Workshop 2 (municipal manager, All directors Sep Best Practice and selected senior managers) to innovate and suggest solutions that contribute most to the Strategic Goal(s) applicable to each director's department. Internal Analysis – critical issues / challenges with respect Sep & Oct Best Practice to every service minimum service levels institutional financial performance Review the Long term Financial Plan Sep & Oct MSA Section 26(h): An integrated development plan must reflect a financial plan, which must include a budget projection for at least the next three years. Community involvement Interviews with key role-players MSA Section 29(1)(b): The process followed by a municipality Dialogue on key topics with nominated competent to draft its integrated development plan, including its groups consideration and adoption of the draft plan, must through Customer satisfaction survey appropriate mechanisms, processes and procedures established in terms of Chapter 4, allow for- (i) the local community to be consulted on its development needs and priorities; (ii) the local community to participate in the drafting of the integrated development plan; and (iii) Organs of state, including traditional authorities and other role players to be identified and consulted on the drafting of

8 | P a g e INTEGRATED DEVELOPMENT PLAN

IDP/ BUDGET ACTIVITY DATE LEGAL REFERENCE Sessions with Ward Committees including sector the integrated development plan. representatives and community members: All sessions start at 19:00 1. SANPARKS Community Hall 04 Oct 2. Bicycle shed Community Hall 05 Oct 3. Kranshoek Community Hall 06 Oct 4. Piesang Valley Community Hall 11 Oct 5. Kwa-Nokuthula Community Hall 12 Oct 6. New Horizon Community Hall 13 Oct 7. Green Valley Community Hall 18 Oct 8. Kurland Community Hall 19 Oct Commence with the multi-year capital and operating Sep Best Practice budget Obtain inputs from directors and division heads on Sep/Oct Best Practice preliminary capital and operating budget (including review of salary, fleet and equipment budget and tariffs) Commence with the compilation of new area plans Best Practice Workshop with BMAF/IDP Forum members and other Oct / Nov Best Practice invited stakeholders Preparation of departmental operational Nov / Dec Best Practice plans and SDBIP aligned to strategic priorities in lDP and inputs from other stakeholders including government and bulk service providers (and NER) Strategy Workshop (councillors, municipal manager, Nov Best Practice directors and selected senior managers) to consolidation all strategic inputs and to formulate the first draft of a new Strategy Chapter of the IDP. Receive audit report on annual financial statements from Nov/Dec MFMA Section 126(3): The Auditor-General must- the Auditor-General 1. audit those financial statements; and 2. submit an audit report on those statements to the accounting officer of the municipality or entity within three months of receipt of the statements. Ensure the Accounting Officer addresses any issues raised Nov/Dec Best Practice by the Auditor-General in the audit report - prepare action / audit plans to address and incorporate into the annual report. Finalise inputs from bulk resource providers (and NER) & During Dec agree on proposed price increase Review whether all bulk resource providers have lodged a During Dec request with National Treasury & SALGA seeking comments on proposed price increases Best Practice of bulk resources Finalise first draft of departmental operational plans and Dec / Jan SDBIP for review against strategic priorities Best Practice Finalise first draft of annual report incorporating financial 15 Dec Best Practice and non-financial information on performance, audit reports and annual financial statements Adjustments Budget - Best Practice Submit to Mayoral Committee 18 Jan Submit to Council 26 Jan Submit the approved adjustments budget to the 27 Jan - provincial treasury and National Treasury 3 Feb

9 | P a g e INTEGRATED DEVELOPMENT PLAN

IDP/ BUDGET ACTIVITY DATE LEGAL REFERENCE Ensure any written comments made to bulk resource Jan Best Practice providers by the municipality on the proposed increase of bulk resources are included in any submission made by the bulk resource providers to the required organs of state Review whether comments from National Treasury and Jan Best Practice SALGA have been received on proposed price increases of bulk resources Finalise detailed operating & capital budgets in the Jan / Feb Best Practice prescribed formats incorporating National & provincial budget allocations, integrate & align to IDP documentation & draft SDBIP, finalise budget policies including tariff policy Review the KPI’s and annual performance targets Jan / Feb Best Practice Finalise the draft capital and operating budget and Best Practice budget related policies Finalise area plans Best Practice Note any provincial and national allocations to Best Practice municipalities for incorporation into budget Finalise corrective measures from audit report Best Practice Receive notification of any transfers that will be made to Feb MFMA Section 37(2): In order to enable municipalities to the municipality from other municipalities in each of the include allocations from other municipalities in their budgets next three fin years (by no later than 120 days before the and to plan effectively for the spending of such allocations, the start of its budget year) accounting officer of a municipality responsible for the transfer of any allocation to another municipality must, by no later than 120 days before the start of its budget year, notify the receiving municipality of the projected amount of any allocation proposed to be transferred to that municipality during each of the next 3 financial years. Receive bulk resource providers’ price Best Practice increases as tabled in Parliament or the provincial legislature Submit draft 90 days’ budget to Budget Best Practice Steering Committee Table draft IDP and budget in Council (at least 90 days 31 March MFMA Section 16: before the start of the budget year) The council of a municipality must for each financial year Submit to Mayoral Committee approve an annual budget for the municipality before the start Submit to Council of that financial year. In order for a municipality to comply with subsection (1), the mayor of the municipality must table the annual budget at a council meeting at least 90 days before the start of the budget year.

10 | P a g e INTEGRATED DEVELOPMENT PLAN

IDP/ BUDGET ACTIVITY DATE LEGAL REFERENCE Submit the budget as well as the IDP to the 06 Apr MFMA Section 22: Immediately after an annual budget is Local Government, Provincial Treasury, tabled in a municipal council, the accounting officer of the National Treasury and other affected organs municipality must: of state (a) in accordance with Chapter 4 of the Municipal Systems Act - (i) Make public the annual budget and the documents referred to in Section 17(3); and (ii) invite the local community to submit representations in connection with the budget; (b) submit the annual budget - (i) in both printed and electronic formats to the National Treasury and the relevant provincial treasury; and (ii) in either formats to any prescribed national or provincial organs of state and to other municipalities affected by the budget. Submit the proposed revised IDP to the 06 April MSA Section 29(3)(b): A local municipality must draft its District Municipality integrated development plan, taking into account the integrated development processes of, and proposals submitted to it by the district municipality. MPPM Regulation 3(6): A local municipality that considers an amendment to its integrated development plan must- consult the district municipality in whose area it falls on the proposed amendment; and take all comments submitted to it by the district municipality into account before it takes a final decision on the proposed amendment. Make public the annual budget and invite the community April (21 MFMA Section 22: Immediately after an annual budget is to submit representations Days) tabled in a municipal council, the accounting officer of the municipality must in accordance with Chapter 4 of the Municipal Systems Act - Make public the annual budget and the documents referred to in Section 17(3); and invite the local community to submit representations in connection with the budget; submit the annual budget - in both printed and electronic formats to the National Treasury and the relevant provincial treasury; and in either formats to any prescribed national or provincial organs of state and to other municipalities affected by the budget. Publish the proposed IDP for public comment April (21 MPPM Regulation 3(4)(b): No amendment to a municipality’s Days) integrated development plan may be adopted by the municipal council unless the proposed amendment bas been published for public comment for a period of at least 21 days in a manner that allows the public an opportunity to make representations with regard to the proposed amendment. LGMTEC process April MFMA Section 23(1): When the annual budget has been tabled, the municipal council must consider any views of – the local community; and the National Treasury, the relevant provincial treasury and any provincial or national organs of state or municipalities which made submissions on the budget. Ward Public Meetings: April Best Practice BMAF/IDP Forum Meeting April Best Practice Confirm National budget for provincial and National May Best Practice allocations to municipalities for incorporation into budget

11 | P a g e INTEGRATED DEVELOPMENT PLAN

IDP/ BUDGET ACTIVITY DATE LEGAL REFERENCE Review provincial & national legislation including DoRA to May Best Practice establish potentially new reporting requirements including annual, monthly & quarterly grant & performance reports for specific new allocations & programmes (10 working days after end of month deadlines) Council must give the mayor an opportunity to respond May MFMA Section 23(2): After considering all budget submissions, to the submissions and, if necessary, to revise the budget the council must give the mayor an opportunity- and table amendments for consideration by the council to respond to the submissions; and if necessary, to revise the budget and table amendments for consideration by the council. Completion of Annual Budget amendments / refinements Before 11 Best Practice May Submit draft 30 days budget to Budget Steering Before 16 Best Practice Committee May Table final IDP and budget in Council (at least 30 days 31 May MFMA Section 24(1): The Council must at least 30 days before before the start of the budget year) the start of the budget year consider the approval of the • Submit to Mayoral Committee annual budget. Submit to Council MPPM Regulation 3(3): An amendment to a municipality’s integrated development plan is adopted by a decision taken by a municipal council in accordance with the rules and orders of the council Place the IDP, annual budget, all budget- related 5 June MFMA Section 75(1): The accounting officer of a municipality documents and all budget-related policies on the website must place on the website the following documents of the (within 5 days of the adoption of the plan) municipality: the annual and adjustments budgets and all budget-related documents; and all budget-related policies MSA Section 21A(1)(b): All documents that must be made public by a municipality in terms of a requirement of this Act, the Municipal Finance Management Act or other applicable legislation, must be conveyed to the local community by displaying the documents on the municipality’s official website, if the municipality has a website as envisaged by section 21B. MFMA Section 75(2): A document referred to above must be placed on the website not later than five days after its tabling in the council or on the date on which it must be made public, whichever occurs first. Submit a copy of the revised IDP to the MEC for local 10 June MSA Section 32(1)(a): The municipal manager of a municipality government as well as Provincial Treasury (within 10 days must submit a copy of the integrated development plan as of the adoption of the plan) adopted by the council of the municipality, and any subsequent amendment to the plan, to the MEC for local government in the province within 10 days of the adoption or amendment of the plan.

12 | P a g e INTEGRATED DEVELOPMENT PLAN

IDP/ BUDGET ACTIVITY DATE LEGAL REFERENCE Give notice to the public of the adoption of the IDP 14 June MSA Section 25(4)(a): A municipality must, within 14 days of (within 14 days of the adoption of the plan) the adoption of its integrated development plan in terms of subsection (1) or (3) give notice to the public- of the adoption of the plan; and that copies of or extracts from the plan are available for public inspection at specified places; MSA Section 21A(1)(a) and (c): All documents that must be made public by a municipality in terms of a requirement of this Act, the Municipal Finance Management Act or other applicable legislation, must be conveyed to the local community - (a) by displaying the documents at the municipality’s head and satellite offices and libraries; (c) by notifying the local community, in accordance with section 21, of the place, including the website address, where detailed particulars concerning the documents can be obtained. Publicize a summary of the IDP (within 14 days of the 14 June MSA Section 25(4)(b): A municipality must, within 14 days of adoption of the plan) the adoption of its integrated development plan in terms of subsection (1) or (3) publicise a summary of the plan. Make public the approved annual budget and supporting 10 June BUDGET & REPORTING REGULATIONS 2009, documentation (including tariffs) (within 10 working days Reg 18: Within ten working days after the municipal council after approval of the budget) has approved the annual budget of a municipality, the municipal manager must in accordance with section 21A of the Municipal Systems Act make public the approved annual budget and supporting documentation and the resolutions referred to in section 24(2)(c) of the Act. The municipal manager must also make public any other information that the municipal council considers appropriate to facilitate public awareness of the annual budget, including- Summaries of the annual budget and supporting documentation in alternate languages predominant in the community; and information relevant to each ward in the municipality. All information contemplated in sub regulation (2) must cover: the relevant financial and service delivery implications of the annual budget; and at least the previous year's actual outcome, the current year's forecast outcome, the budget year and the following two years. Submit approved budget to the provincial treasury and 10 June MFMA Section 24(3): The accounting officer of a municipality National Treasury (within 10 working days after approval must submit the approved annual budget to the National of the budget) Treasury and the relevant provincial treasury. BUDGET & REPORTING REGULATIONS 2009, Reg 20: The municipal manager must comply with section 24(3) of the Act within ten working days after the municipal council has approved the annual budget.

13 | P a g e INTEGRATED DEVELOPMENT PLAN

IDP/ BUDGET ACTIVITY DATE LEGAL REFERENCE Submit to the Executive Mayor the draft SDBIP and draft 14 June MFMA Section 69(3): annual performance agreements for the next year (within The accounting officer must no later than 14 days after the 14 days after approval of the budget) approval of an annual budget submit to the mayor a draft service delivery and budget implementation plan for the budget year. The accounting officer must no later than 14 days after the approval of an annual budget submit to the mayor drafts of the annual performance agreements as required in terms of section 57(1)(b) of the Municipal Systems Act for the municipal manager and all senior managers. Executive Mayor takes all reasonable steps to ensure that 28 June MFMA Section 53(1)(c)(ii): The mayor of a municipality must the SDBIP is approved (within 28 days after approval of take all reasonable steps to ensure that the municipality's the budget) service delivery and budget implementation plan is approved by the mayor within 28 days after approval of the budget. Place the performance agreements and all service 28 June MFMA Section 75(1): The accounting officer of a municipality delivery agreements on the website must place on the website the following documents of the municipality: performance agreements required in terms of section 57(1)(b) of the Municipal Systems Act; and all service delivery agreements BUDGET & REPORTING REGULATIONS 2009, Reg 19: The accounting officer must place on the website all performance agreements required in terms of section 57(1)(b) of the Municipal Systems Act. Submit copies of the performance agreements to Council 28 June MFMA Section 53(3)(b): Copies of such performance and the MEC for local government as well as the national agreements must be submitted to the council and the MEC for minister responsible for local government (within 14 days local government in the province. after concluding the employment contract and PERF REGS 2006 Reg(5): The employment contract and performance agreement) performance agreement must be submitted to the MEC responsible for local government in the relevant province as well as the national minister responsible for local government within fourteen (14) days after concluding the employment contract and performance agreement. Submit the SDBIP to National and Provincial Treasury 28 June BUDGET & REPORTING REGULATIONS 2009, (within 10 working days approval of the plan) Reg 20(2)(b): The municipal manager must submit to the National Treasury and the relevant provincial treasury, in both printed and electronic form the approved service delivery and budget implementation plan within ten working days after the mayor has approved the plan. Make public the projections, targets and indicators as set 28 June MFMA Section 53(3)(a): The mayor must ensure that the out in the SDBIP (within 10 working days after the revenue and expenditure projections for each month and the approval of the SDBIP) service delivery targets and performance indicators for each quarter, as set out in the service delivery and budget implementation plan, are made public no later than 14 days after the approval of the service delivery and budget implementation plan. BUDGET & REPORTING REGULATIONS 2009, Reg 19: The municipal manager must in accordance with section 21A of the Municipal Systems Act make public the approved service delivery and budget implementation plan within ten working days after the mayor has approved the plan in terms of section 53(1)(c)(ii) of the Act.

14 | P a g e INTEGRATED DEVELOPMENT PLAN

IDP/ BUDGET ACTIVITY DATE LEGAL REFERENCE Make public the performance agreements of Municipal 28 June MFMA Section 53(3)(b): The mayor must ensure that the Manager and senior managers (no later than 14 days performance agreements of municipal manager, senior after the approval of the SDBIP) managers and any other categories of officials as may be prescribed, are made public no later than 14 days after the approval of the municipality's service delivery and budget implementation plan. Table 2.4: IDP Process Plan / Time Schedule

15 | P a g e INTEGRATED DEVELOPMENT PLAN K. Performance Management The Performance Management System implemented at the Municipality is intended to provide a comprehensive, step by step planning system that helps the Municipality to manage the process of performance planning and measurement effectively. The PM System serves as primary mechanism to monitor, review and improve the implementation of the Municipality IDP and eventually the budget. The performance management policy framework was approved by Council which provided for performance implementation, monitoring and evaluation at Figure 2.2: Bitou Municipality performance management organisational as well as individual levels. framework

Figure 1 below gives a schematic diagram of the The departmental SDBIP capture the municipality‟s performance management policy performance of each defined department which framework. The municipal performance system is reflects on the strategic priorities of the supported by the ignite system which is a web Municipality. The SDBIP provides detail of each based electronic system. outcome for which the senior management is responsible for, in other words a comprehensive picture of the performance of that directorate/sub-directorate. INDIVIDUAL PERFORMANCE

The Municipality have implemented a performance management system for all its senior managers (Section 56 and 57 employees). This has led to specific focus on service delivery. Each

manager has to develop a scorecard which is Figure 1: Bitou Municipality Performance Management based on the balanced scorecard model. At the Framework beginning of each financial year (01 July 2016) all senior managers (Section 57 employees) have ORGANISATIONAL signed Performance Agreements for the 2018/19 PERFORMANCE financial year. The Municipality has instituted all performance The organisational performance of the management committees including the Municipality is evaluated by means of a municipal performance audit committee is tasked to audit scorecard (Top Layer SDBIP) at organisational performance outcomes against the planned KPI‟s level and through the service delivery budget and Targets. implementation plan (SDBIP) at directorate and To improve service delivery and employee departmental levels. The Top Layer SDBIP set out morale, the Municipality is planning to cascade consolidated service delivery targets and Performance management to the lower levels in provides an overall picture of performance for the the organisation beginning with the middle Municipality as a whole, reflecting performance managers in the initial roll-out. on its strategic priorities.

16 INTEGRATED DEVELOPMENT PLAN KEY PERFORMANCE PERFORMANCE REPORTING

INDICATORS (KPI'S) Performance is reported on a regular basis and it includes the evaluation of performance, the Section 38 (a) of the Systems Act requires identification of poor performance and corrective Municipalities to set appropriate key performance actions to improve performance. indicators as a yardstick for measuring performance, including outcomes and impact, QUARTERLY REPORTS with regard to the community development priorities and objectives set out in its Integrated Reports on the performance in terms of the Top Level Development Plan. Section 9 (1) of the SDBIP are generated from the system and Regulations to this Act maintains in this regard, submitted to Council. This report is published on that a Municipality must set key performance the municipal website on a quarterly basis. indicators, including input indicators, output Informal performance evaluations for the indicators and outcome indicators in respect of municipal manager and the heads of each of the development priorities and departments, follows after the adoption of the first objectives. quarter performance report. This is done in accordance to the performance agreements Every year, as required by Section 12 (1) of the signed by the incumbents as well as the Regulations to the Systems Act, the Municipality performance regulations governing the also set performance targets for each of the key performance of municipal managers and performance indicators. The IDP process and the managers directly accountable to the municipal performance management process are therefore manager. seamlessly integrated. In addressing the challenge of developing smart indicators the MID-YEAR ASSESSMENT following general key performance indicators are prescribed in terms of section 43 of the Act were The performance of the first 6 months of the adopted by the Municipality as a barometer of financial year should be assessed and reported writing smart KPI‟s and targets: on in terms of section 72 of the MFMA. This a) The percentage of households with access to assessment must include the measurement of basic level of water, sanitation, electricity and performance, the identification of corrective solid waste removal; actions and recommendations for the b) the percentage of households earning less adjustments of KPI‟s, if necessary. than R1100.00 per month with access to free The format of the report must comply with the basic services; section 72 requirements. This report is submitted to c) the percentage of a Municipality's capital Council for approval before 25 January of each budget actually spent on capital projects year and published on the municipal website. A identified for a particular financial year in section 72 report was adopted by Council on terms of the Municipality's integrated January 2017 (Council Resolution number: development plan; C/6/264/01/17) and it was placed on the d) the number of jobs created through municipal website as per the legal requirement. Municipality's local economic development initiatives including capital projects; ANNUAL ASSESSMENT e) the number of people from employment equity target groups employed in the three The performance of the financial year should be highest levels of management in compliance assessed and reported on in terms of section 46 of with a Municipality's approved employment the MSA. The Municipality will analyse its equity plan; performance and report on its performance f) the percentage of a Municipality's budget annually before the end of August. The actually spent on implementing its workplace performance report will be submitted to the skills plan; and Office of the Auditor-General for audit purposes g) Financial viability as expressed by the where-after it will be included in the annual report prescribed ratios. of the Municipality. The Annual Report is completed in the new format prescribed by National Treasury.

17 INTEGRATED DEVELOPMENT PLAN the inclusion of a financial plan, which should L. MEDIUM TERM include a budget projection for at least the next three years. This financial plan aims to determine FINANCIAL PLAN the financial affordability and sustainability levels of the Municipality over the medium term.

The Municipal Budget and Reporting Regulations This section will focus on analysing the municipal (MBRR) (part 2: “Budget-related policies of financial position and its ability to render services municipalities”) require the accounting officer to without available resources. This is done in the see to it that budget-related policies are background that Bitou Council received a clean prepared and submitted to Council. One of these audit for the 2016 audit and received two clean is the long term financial plan policy, which aims audits for the preceding years. The municipal to ensure that all long term financial planning is finances improved in during the past five years based on a structured and consistent and the municipality have a cash balance. The methodology, thereby securing the Municipality‟s municipality with its current cash position can pay long term financial affordability and sustainability. its operating expenses for up to 2.7 months. A Municipality‟s financial plan integrates the CAPACITY TO SPEND CAPITAL BUDGET financial relationships of various revenue and expenditure streams to give effect to the IDP. It National treasury has set the norm to spend 95 provides guidance for the development of percent of the capital budget or at least 85 current budgets and assesses financial impacts on percent. Bitou Municipality has been spending 88 outer years‟ budgets by incorporating capital – 100 percent of its capital budget because the expenditure outcomes, operating expenditure whole budget is cash based. The municipality also trends, optimal asset management plans and the established project management unit for consequential impact on rates, tariffs and other implementation of capital projects. service charges. The focus of the Capital Budget is on spending in The Municipality has to do long term financial under-developed areas in order to address the planning in order to determine the appropriate inequalities of the past. The capital budget for mix of financial parameters and assumptions 2017/18 is R 135,765 Million and capital budget is within which the Municipality should operate to funded from municipal own funds on the CRR, facilitate budgets that are affordable and Borrowings and Grant Funding. Transfers from the sustainable at least ten years into the future. This CRR equates to R42, 855 million, with loans of R30, helps to identify the consequential financial 080 million, supplemented by grants of R 62,830 impact of planned capital projects on the million. Loan funding will be spent on revenue Municipality‟s operating budget. generating assets and not on municipal operations. The planning is reviewed annually to determine the most affordable level at which the INDIGENT SUPPORT Municipality can operate optimally, taking into account the fiscal overview, economic climate, The municipality is having an indigent policy that national and provincial influences, IDP and other defines an indigent as a debtor whose total legislative imperatives, internal governance and household income is twice the amount of the community consultation. state funded social pensions or than 3500 per month. All indigent households (4600) receive 6kl Financial strategy of water and 50kwh electricity per month. Additionally an indigent debtor also receives a The 2017/18 MTREF period represents the first year subsidy on refuse removal and sewage, of the Municipality‟s next five-year IDP horizon. It depending on the household income. The total commenced with a technical analysis of previous number of indigent household has always been years‟ performance outcomes, an assessment of above 3000 households that benefits from this the economic outlook, and consultation with policy. various role players. The process encompassed the following: Section 26 of chapter 5 of the Local Government Municipal Systems Act, No 32 of 2000 prescribes  Framework for and strategic direction of the the core components of the Integrated budget; Development Plan (IDP). Section 26(h) requires  Forecast taking above direction into account. 18 INTEGRATED DEVELOPMENT PLAN  Departmental budget presentations to slow growth, such as the electricity constraints, will execute the Municipality‟s strategies, business improve in the next two years. improvement measures and implementation The value of the rand against the US dollar has readiness of capital programmes. declined continuously over the past five years,  Utility Services presentations on their proposed which can be attributed to various factors, budgets and tariff increases. including the decline in global commodity prices,  Key Financial Drivers poor business confidence and the electricity supply crisis. The BER projects that over the Ensuring congruence between the Municipality‟s medium term, the rand is expected to stabilise at strategy and budget included alignment with the: an average of R16, 60 against the dollar.  IDP; Oil prices declined over the past year, mainly  Development Strategies; driven by the supply of the commodity exceeding  Core economic, financial and technical data its demand. The fall in the oil price partly obtained at local and national level; and cushioned the impact of the weaker rand  Other issues, policies and strategies stemming exchange rate. Oil prices are projected to deemed important in this regard. average $38, 60 per barrel over the medium term. The consumer price index (CPI) has fluctuated Management and governance frameworks between 4, 3% and 6, 1% over the past five years, but is expected to surpass the South African The outcome of the modelling incorporated the Reserve Bank (SARB) inflation target range of above as well as the assumptions outlined below. between 3% and 6%. CPI forecasts for at least the The principles applied to the MTREF in determining next two years are expected to remain above the and maintaining an affordability envelope 6% upper inflation target, as per the latest BER included: forecast.

 higher-than-inflation repairs and maintenance The Municipality‟s CPI forecast for the next three provision to ensure and enhance the financial years is 5, 5%. The national inflation preservation of municipal infrastructure; forecast set out in National Treasury Circular 78 is  higher increases to selected cost elements 6%, 5, 8% and 5, 8% for the national fiscal years subjected to higher-than-average inflationary 2016 to 2018, while Circular 79 provided updated pressure, such as staff costs; CPI projections of 6, 6%, 6, 2% and 5, 9% for the  the assumption of a 100% capital expenditure same years. implementation rate; National and provincial influences  credible collection rates based on collection achievements to date, and also incorporating In drafting the MTREF, the following national and anticipated improvements in selected provincial influences received special attention: revenue items; and  national and provincial allocations as per the a) Medium-Term Budget Policy Statement (MTBPS) 2016 Division of Revenue Act (DORA) and The MTBPS highlighted that the South African  Province‟s 2017/18 MTREF allocations circular economy had grown slower compared to what to municipalities. was projected at the beginning of 2015. This slow growth is due to various factors, which include the Economic outlook/external factors global growth slowdown, energy constraints, weak business confidence and low household The slowdown in emerging markets has led to demand. downward revisions of economic growth forecasts, particularly for developing countries. To maintain healthy public finances and support The sluggish growth experienced in the South social and economic transformation, the MTBPS African economy is exacerbated by the lower set out the following measures: export commodity prices, drought conditions,  Strengthen economic performance to constraints in electricity supply and a decline in facilitate policy coherence and certainty business confidence. According to the Bureau of Economic Research (BER), real growth is where it is lacking, to give greater impetus to projected to average 1, 6% over the next three infrastructure investment, and to address years. It is expected that the factors causing the impediments to enterprise development, employment and innovation. 19 INTEGRATED DEVELOPMENT PLAN  Build the energy capacity, water and continues to put pressure on municipal transport networks and communication revenue generation and collection. These systems we need, expanding investments by circumstances make it essential for state-owned companies and the private municipalities to reprioritise expenditure and sector alongside departmental and municipal implement stringent cost-containment initiatives. measures. Keeping increases in rates, tariffs  Ensure that public debt remains affordable and other charges at levels that reflect an and that the public expenditure ceiling is appropriate balance between the interests of maintained, while flagship social and poor households and other customers, and economic programmes are protected. ensure the financial sustainability of the  Improve living standards and accelerate Municipality. social development, working with  Ensuring that municipalities‟ tariffs are municipalities to strengthen planning and adequate to at least cover the costs of bulk concentrate investment in urban hubs and services, as well as ensuring that all properties economic growth zones. are correctly billed for property rates and all  Enhance state capacity and the quality and services rendered. integrity of governance, reinforce financial  Guidelines for the MTREF electricity, water and management and procurement reforms, and sanitation tariffs. step up public-sector training and institutional renewal. Considering improving the effectiveness of revenue management processes and  Rapidly implement the National Development procedures, paying special attention to cost Plan, working with the business sector, containment measures by, inter alia, controlling organised labour and social stakeholders to unnecessary spending on nice to- have items and maintain a stable labour relations non-essential activities. environment, improve confidence and promote broad-based development. MFMA Circular 79, which provided a summary and update of the country‟s economic outlook, With regard to the measures above, the inflationary targets, financial management issues, Municipality is continuously investing in the how to give effect to National Treasury‟s MBRR, Expanded Public Works Programme (EPWP) and and the impact of the 2016 local government to implement cost containment measures, elections on municipalities. It included the including reducing the cost of national and following: international travel, catering and entertainment. These measures are revisited and assessed on an Reviewing how municipalities conduct their annual basis to ensure that maximum efficiencies business to ensure that value for money is are attained. obtained in all expenditure, that revenue administration systems are operating effectively, b) National Treasury Municipal Financial that borrowing programmes are realistic, and that Management Act (MFMA) circulars. creditors (including bulk service providers) continue to be paid timeously and in full. The key circulars relating to the MTREF are as follows: Re-evaluating the costs and benefits of universal or targeted provision of free basic services  MFMA Circular 78, which mainly focused on subsidies in order to protect their delivery to poor the 2016 local government elections, the households in particular. Examining the cost demarcation process, and the changes to the structure of providing electricity services, and local government grant allocations. It applying to NERSA for electricity tariff increases included and advised on, inter alia, the that reflect the total cost of providing the service following: so that municipalities can work towards achieving  Local government reforms and changes to financial sustainability. An update on regulations the fiscal framework, including allocations, to be issued on cost containment measures grants, MBRR requirements, reporting applicable to local government. indicators and the Municipal Standard Chart of Accounts (mSCOA).  The need for a conservative approach in projecting revenue as economic challenges 20 INTEGRATED DEVELOPMENT PLAN EXPENDITURE ANALYSIS – This formula was used in determining the staff cost provisions over the MTREF. A three-year preview General inflation outlook and its impact on Ensuring maintenance of existing assets municipal activities: CPI projected for the Repairs and maintenance: National Treasury Municipality is 6, 4% for 2017/18, 5, 7% for 2018/19 Circular 78 reminded municipalities to consider and 5, 6% for 2019/20 of the MTREF period. These the budget management issues discussed in levels are within the SARB inflation targeting range previous circulars. Circulars 54, 55 and 58 stressed of between 3% and 6%. the importance of securing the health of a Municipality‟s asset base by increased spending Management and governance framework on repairs and maintenance. Circular 55 further The Municipality‟s projected inflation rate is to stated that “allocations to repairs and remain below 6%. However, various budget maintenance, and the renewal of existing elements, including salaries, repairs and infrastructure must be prioritised. Municipalities maintenance, interest and depreciation cost, will must provide detailed motivations in their budget experience higher-than-CPI increases. This creates documentation if allocations do not meet the a fiscal gap, which necessitates higher than-CPI benchmarks”. increases. Circulars 55 and 70 set the ratio of operational Interest rates for borrowing and investment of repairs and maintenance to asset value (write- funds: Borrowing interest rates are factored in at a down value) of the Municipality‟s property, plant rate of 10% for 2017/18 and 11% for each of the and equipment (PPE) at 8%. The Municipality outer years. An average investment interest rate averages 6, 6% over the MTREF period. To give of 7% is forecast over the MTREF. effect to the above directives, but still ensure that rates and tariffs are affordable, repairs and Collection rate for revenue services: In maintenance was budgeted at 1% above CPI accordance with relevant legislation and national over the MTREF period, as opposed to 3% above directives, the Municipality‟s projected revenue CPI in previous years. recovery rates are based on realistic and sustainable trends. In calculating the debt Operating financing of capital impairment, the following collection rates were Depreciation: Calculation of depreciation on new applied: capital expenditure is based on variables such as asset class and lifespan, depending on the nature  Rates 96% of the asset. An annual capital expenditure  Electricity 98% implementation rate of 100% was assumed.  Water 88% Depreciation of existing assets is calculated  Sanitation 89% based on simulated SAP data that reflect actual  Refuse 90% values per annum. Assets under construction  Housing 55% (AUC) are calculated based on asset class lifespan and projected capitalisation dates. The collection rates for rates and service charges are expected to remain constant over the MTREF Borrowing and credit rating outlook: The period, except for refuse services. On-going debt Municipality‟s borrowing occurs in terms of management initiatives are being implemented, chapter 6 of the MFMA, according to which a which are intended to improve the collection rate long term loan will only be entered into if it is to targeted levels. The housing collection rate is affordable and sustainable. This is also influenced also expected to increase over the MTREF period. by the capital investment requirement over the MTREF period. The Municipality‟s credit rating Salary increases; demonstrates the administration‟s ability to meet A three-year salary and wage collective its short- and long term financial obligations. agreement with Unions. In the absence of an Potential lenders also use the rating to assess the agreement for the outlying years of this MTREF Municipality‟s credit risk, which in turn affects the period, the provisions for 2017/18 were assumed pricing of any subsequent loans taken. 7 for those years as well. In terms of the agreement, Factors used to evaluate the creditworthiness of the salary and wage increases are to be annually municipalities include the economy, debt, calculated for all three years using the average finances, politics, management and institutional CPI for the period 1 February of the previous year framework. to 31 January of the forecast budget year + 1%.

21 INTEGRATED DEVELOPMENT PLAN Revenue analysis – a three-year preview with bulk purchases averaging 63% of the service‟s total budget. The higher-than-CPI Growth or decline in municipal tax base average electricity tariff increase is therefore mostly attributed to the NERSA-approved Eskom a) Growth or decline in municipal tax base increase on bulk purchases, which is 7, 8% for the The current unstable economic climate has 2016/17 financial year. In addition, electricity sales restricted material service growth projections. The are reducing due to energy-saving plans, load- respective projected growth for the Municipality‟s shedding as well as elasticity as a result of services is as follows: increasing tariffs. This increase will also provide for Rates: Service growth for rates is projected at 0, the continual operating costs of the service as 25% for the 2017/18 to 2020/21 financial years, well as investments in new infrastructure. and is expected to increase to 1% in the years Water and sanitation: According to National thereafter. The projected growth can be ascribed Treasury Circular 78, “municipalities should to economic growth that is not at sustainable consider the full cost of rendering the water and levels to encourage new developments and/or sanitation services when determining tariffs home improvements. This position is expected to related to these two services. If the tariffs are low improve in the third year of the MTREF. and result in the Municipality not recovering their Water and sanitation: Water and sanitation full costs, the Municipality should develop a projected zero growth over the next three years pricing strategy to phase-in the necessary tariff there is an expected physical reduction as a result increases in a manner that spreads the impact on of water restrictions. However, due to the consumers over a period of time”. Mindful of this, adjusted tariff levels, this is neutral revenue within the water and sanitation average tariff increase the MTREF projections. Projections are based on was set at 8% for 2017/18 and 8% for each of the the latest trends flowing from current economic two outer years of the MTREF period. The higher- conditions as well as water-saving initiatives. than-CPI tariff increase is due to various factors, including the financial impact of the capital Electricity: Electricity has projected a 1, 88% programme (new infrastructure, expansion and annual growth on sales revenue over the MTREF rehabilitation of current infrastructure to address period due to the impact of increasing tariffs. capacity constraints and ensure system Refuse: A 2% service growth was applied over the efficiency), repair and maintenance MTREF period for refuse. This is as a result of growth programmes, cost of the social package in the demand for refuse services. The adverse provided, and recurring operating costs. Due to impact of the current economic climate, the the current climatic conditions, water restrictions demand for new and upgraded infrastructure, were introduced, accompanied by a 20% savings initiatives and lower demand for services reduction-level tariff. This tariff will be applicable made tariff increases at higher-than-CPI levels for the next three financial years until further inevitable. decisions regarding the water restrictions are made. Property rates: An average rates tariff increase of 8% is proposed for the next three financial years. Solid waste: Circular 78 reminds municipalities that The higher than- CPI increases will provide for budget management issues dealt with in previous recurring operating costs, new budget realities as circulars are still applicable. Circular 70 advised well as investments in new infrastructure for rates that “in many instances waste tariffs do not cover funded services. Further contributing factors the cost of providing the different components of include lower projected rates service growth and the service. Where this is the case, municipalities higher-than-CPI salary and capital cost increases. should aim to have appropriately structured, cost reflective solid waste tariffs in place by 2015”. Electricity: Eskom submitted a regulatory clearing Solid waste charges two tariffs, namely for account (RCA) application for the first year of the disposal and for refuse. The average disposal tariff third multi-year price determination (MYPD3) increase for 2017/18 is 8%, while the increase for period, i.e. the 2013/14 financial year. NERSA the two outer years is 7% and 8% 7 assessed Eskom‟s application and announced on respectively. These increases are required for 1 March 2016 the approval of an electricity tariff capital investment and related operating increase of 9, 4% for 2016/17. The Municipality will expenses. apply a 1, 88% revenue increase for the next three financial years. Business for this service comprises Housing rental (Council rental properties): The the purchasing and redistribution of electricity, monthly rental charge for the Municipality‟s 22 INTEGRATED DEVELOPMENT PLAN housing rental properties is based on a rate per REVENUE PARAMETERS square metre applied to the size of the unit being rented, coupled with a set of  Rates 8% premiums/deductions based on the location,  Electricity 1, 88% maintenance level and facilities of the specific  Water 8% property. Through addressing the economic  Sanitation 8% challenges faced by many poorer residents,  Refuse 8% particularly those residing in municipal rental stock, the total average increase in rental GROWTH PARAMETERS charges 2017/18 has been retained at an affordable level, namely an annual increase of  Rates 0, 25% 0%. Acknowledging the on-going multi-year  Electricity -1, 5% - implications of inflation on the costs associated  Water 0% with the management of rental properties,  Sanitation 0% including the maintenance of the properties as  Refuse 2% well as administrative costs, the annual increase in rental charges is not directly aligned with the full EXPENDITURE PARAMETERS economic cost of operating the rental units. Instead, the Municipality subsidises the difference  Salary increase between the rental based on economic cost  Salary increase (South African Local recovery (CPI-linked) and the actual amount Government Bargaining Council charged. agreement) 7, 5%, 7%, 7% Increment provision 2% per annum Equitable share  Interest rates The reviewed equitable share formula includes a  Interest paid 10% subsidy for the provision of free basic water,  Interest on investment 6% electricity, sanitation and refuses removal services to the poor. It also provides funds for the REVENUE (CAPITAL AND OPERATING) institutional costs of municipalities, and a Revenue sources remains under strain and in an community services component that provides attempt to balance service delivery with funding towards the provision of core municipal affordability, proposed tariff increases as taken to services not included under basic services. the public have been limited as follows: To ensure that the funds for institutional costs and  Electricity – 2.2% (7.64 in 2016/17)(NERSA‟s non-trading services are targeted at poorer final decision still pending) municipalities, the formula applies a revenue  Water – 6.4% (6%) adjustment factor reflecting municipalities‟ ability  Sewerage – 6.4% (6% for 2016/17) to generate their own revenue. The revised  Refuse removal – 6.4% (9% for 2016/17) formula used statistics from the 2011 Census,  Assessment rates decreases with -11.84% which are to be updated annually to reflect (6% for 2016/17), the decrease in the estimated population growth and projected assessment rate is the result of an increase increases in the cost of services such as water and in the general valuation roll and relates to electricity. Equitable share provisions included in a general revenue increase of 10.4%. the budget are based on the 2017 DORA. The following amounts were allocated to the Where does the Money come from? Municipality: Source Budget Year 2017/18 % Contribution to total Revenue COLLECTION RATES Property rates R 127 106 300 22.54% Electricity revenue R 137 487 192 24.38%  Rates 96% Water revenue R 54 086 066 9.59% Sanitation Charges R 45 221 423 8.02%  Electricity 98% Refuse Charges R 25 804 570 4.58% Water 88%  Grants & Subsidies R 113 488 800 20.13%  Sanitation 89% Service charges - other R 60 642 142 10.76%  Refuse 90% 100%

 Housing 55% Table 2.5: Sources of funding, Budget 2017/2018

23 INTEGRATED DEVELOPMENT PLAN Total operating revenue is projected to grow by MUNICIPAL CREDIT RATING 9.85% or R50, 563 million for the 2017/18 financial year when compared to the February 2017 EMPLOYEE RELATED COSTS Adjustments Budget. Equitable share grant in terms of DORA are used for poverty relief and an The Budgeted allocation for employee related amount of R74, 039 million has been gazetted. costs for the 2017/18 financial year totals R 220,169 million. This equals to 37.62% of the total 2017/18 Medium Term Revenue & Description Current Year 2016/17 Expenditure Framework operating expenditure and represents a growth of Budget Budget Original Adjusted Budget Year 2.28 percent from that of 35.34% of the 2016/17 R thousands Year +1 Year +2 Budget Budget 2017/18 2018/19 2019/20 Adjustments Budget. Total Revenue (excluding capital transfers 513 486 513 273 563 836 580 201 624 649 and contributions) The employee related costs is increasing due to Total Expenditure 522 388 538 402 585 168 584 656 619 538 Surplus/(Deficit) (8 902) (25 129) (21 332) (4 454) 5 111 the number of vacancies that are filled. The Transfers recognised - capital 56 960 75 579 62 867 31 594 47 061 municipality is containing employee related costs Surplus/(Deficit) for the year 48 058 50 450 41 536 27 139 52 172 to be within the norm that is less than 40 percent Table 3: Projected operating expenditure over the MTERF period, of the operating budget. source budget 2017/2018. GRANTS AND SUBSIDIES Table A5 Operating Budget to be included here A total of 6 infrastructure and/or capital Table 54: Long Term Financial Plan – Expenditure investment projects with a total budgeted value – Operating of R2, 000 million are planned by Provincial Departments for the MTEF period 2017/18 to Budget Summary (A4) 2019/20, as set out in more detail below.

Table 55: Budget Note: Your attention is drawn to the fact that the infrastructure projects and related capital projects Budget Financial Performance (A2) are in various different stages of implementation, with some being in the planning phase, others in Table 56: Financial Performance implementation with construction happening, and some are in the process of being finalized Borrowings (SA17) and therefore in the „close-out‟ phase. The information may be subject to change, Table 57: Borrowings depending on fiscal constraints and the Transfer and grant receipts (SA18) availability of resources.

Table 58: Transfers The summary of infrastructure and capital related projects, as classified in the Estimates of Provincial Table SA 14 Revenue and Expenditure (EPRE 2017) are as follows: Table 59: SA 14 i. The Department of Transport and MUNICIPAL CONSUMER DEBT POSITION Public Works is in the process with upgrades to Plettenberg Bay airport. The debtors collection rate is above 95 percent The project aims to achieve and this is the results of the municipal revenue „Economic Affairs‟ outcomes – in other enhancement programme. words, investment aims to support economic outcomes; Table 60: SA 14 ii. The Department of Education is in the MUNICIPAL INFRASTRUCTURE AND ASSET process of closing out on 3 MANAGEMENT (Q&M) infrastructure and/or capital expenditure projects aiming to Table 61: SA 14 achieve „Education‟ outcomes. Two of these projects are new primary CURRENT AND PLANNED BORROWINGS schools, and one project is a replacement school, replacing Table 62: SA 14 inappropriate structures; and

iii. The Department of Health is in the process of closing out on 1 project. The 24 INTEGRATED DEVELOPMENT PLAN project aims to achieve „Health‟ Budgeted Capital Expenditure by Vote, outcomes, and involves upgrades and additions to the New Horizons Clinic. standard classification and funding (A5) The specific projects listed in the Budget EPRE 2017 are as follows: CAPITAL BUDGET FOR THREE YEARS 2017 -2020 V DEPARTMEN ITEM NT NT IDP LINK O T NAME NAME CAPITAL CAPITA BU BU BU Number of Project Name Type of Project Economic TE SUB- L DG DG DG Infrastructure Classification [e.g. N DESCRIP FUNDI ET ET ET Projects outcome focus U TION NG YEA YEA YEA M DESCRI R R R areas] BE PTION +1 +2 R Western C846.1 Plettenberg Upgrades and Economic affairs 55 Human LAND Other Provin Basic R R R Cape: Bay Airport additions 32 Settlement ACQUISIT Land cial services 12, 724 1,4 Department 00 and Housing ION Govern and 372 ,03 07, of Transport 12 ment infrastruct ,22 8.0 820 and Public 1 Transf ure 0.0 0 .00 Works er developm 0 ent [1 Project] 55 Parks and TOOLS Plant & Asset Local R R R Western Formosa Primary School Inappropriate structuresEducation - 32 Recreation: AND equipme Financi Economic 50, 30, 30, Cape: Primary School 20 Beach EQUIPM nt ng Developm 000 000 000 Department 11 Control ENT Reserv ent .00 .00 .00 1 e of Education Kranshoek Primary SchoolNe w School Primary Education [3 projects] 55 Parks and OFFICE Plant & Asset Local R R R 32 Recreation: FURNITU equipme Financi Economic 50, 20, 20, 20 Beach RE nt ng Developm 000 000 000 New School Primary 12 Control Reserv ent .00 .00 .00 1 e Kwanokuthula Primary School Education 55 Parks and OFFICE Plant & Asset Local R R R

32 Recreation: FURNITU equipme Financi Economic 200 200 200 20 Beach RE nt ng Developm ,00 ,00 ,00 13 Control Reserv ent 0.0 0.0 0.0 Western CI810078: PHC - Clinic Health 1 e 0 0 0 Cape: Plettenberg Bay - 55 Parks and EXTENSI Plant & Asset Local R R R Department New Horizon Clinic 32 Recreation: ON OF equipme Financi Economic 100 50, 50, of Health - Upgrade and 20 Beach SLIP- nt ng Developm ,00 000 000 [1 project] Additions 14 Control WAY Reserv ent 0.0 .00 .00 1 CENTRAL e 0 Table 2.7 Budget estimates of Provincial Revenue and Expenditure 55 Parks and EQUIPM Plant & Asset Local R R R 32 Recreation: ENT AND equipme Financi Economic 50, 25, 30, 20 Beach GENERAL nt ng Developm 000 000 000 This section presents the municipal budget for the 16 Control Reserv ent .00 .00 .00 1 e MTREF period and project the funding sources by 55 Parks and SIGNAGE Plant & Asset Local R R R 32 Recreation: equipme Financi Economic 75, 30, 20, vote. 20 Beach nt ng Developm 000 000 000 17 Control Reserv ent .00 .00 .00 1 e Table A4 Capital budget included here 55 Library and FURNITU Furnitur Provin Basic R R R 33 Information RE AND e and cial services 44, - - 00 Services EQUIPM other Govern and 000 The total capital budget included for the Budge Budg Budge 08 ENT office ment infrastruct .00 1 equipme Transf ure three-year MTREF period is as follows: t Year et t Year nt er developm Capital budget over the MTREF Funded 2017/ Year +2 ent source 18 +1 2019/ 55 Library and BOOK Comput Provin Basic R R R 33 Information DETECTI ers - cial services 65, - - 2018 20 00 Services ON hardwar Govern and 000 /19 18 SYSTEM e/equip ment infrastruct .00 1 ment Transf ure er developm National Government ent 55 Library and COMPUT Comput Provin Basic R R R 33 Information ER ers - cial services 40, - - Provincial Government 00 Services EQUIPM hardwar Govern and 000 24 ENT e/equip ment infrastruct .00 District Municipality 1 ment Transf ure er developm Other transfers and grants ent 55 Library and AIR Furnitur Provin Basic R R R Transfers recognised - capital 33 Information CONDITI e and cial services 65, - - 00 Services ONERS other Govern and 000 Public contributions & donations 34 office ment infrastruct .00 1 equipme Transf ure Borrowing nt er developm ent Internally generated funds 55 Library and UPGRAD Libraries Provin Basic R R R 33 Information E OF cial services 200 - - Total Capital Funding 00 Services MINICIPA Govern and ,00 39 L ment infrastruct 0.0 Table 2.8 - Capital Expenditure 1 BUILDIN Transf ure 0 GS er developm ent 55 Library and GREEN Libraries Provin Basic R R R 33 Information VALLEY:U cial services 450 - - 00 Services PGRADE Govern and ,00 40 LIBRARY ment infrastruct 0.0 1 G Transf ure 0 er developm ent 55 Library and SECURITY Furnitur Provin Basic R R R 33 Information CAMERA e and cial services 52, - - 00 Services S other Govern and 000 41 office ment infrastruct .00 1 equipme Transf ure nt er developm 25 INTEGRATED DEVELOPMENT PLAN

ent 20 Traffic AND nt ng and ,00 57 Department COMPRE Reserv infrastruct 0.0 55 Library and FURNITU Furnitur Provin Basic R R R 1 SSOR e ure 0 33 Information RE AND e and cial services 30, - - developm 00 Services EQUIPM other Govern and 000 ent 46 ENT office ment infrastruct .00 55 Protection FIRE Furnitur Asset Basic R R R 1 equipme Transf ure 34 Services: ARMS e and Financi services 80, 100 - nt er developm 20 Traffic 9MM other ng and 000 ,00 ent 62 Department GLOCK office Reserv infrastruct .00 0.0 55 Protection TECHNIC Fire, Asset Basic R R R 1 SEMI equipme e ure 0 34 Services: Fire AL safety & Financi services 200 150 - AUTOM nt developm 00 Department RESCUE emerge ng and ,00 ,00 ent 13 EQUIPM ncy Reserv infrastruct 0.0 0.0 55 Protection TOOLS Plant & Asset Good R R R 1 ENT e ure 0 0 34 Services: Law AND equipme Financi Governan 100 60, - developm 30 Enforcement EQUIPM nt ng ce and ,00 000 ent 13 ENT Reserv Transform 0.0 .00 55 Protection UPGRAD Other Asset Basic R R R 1 e ation 0 34 Services: Fire E OF Building Financi services - 200 - 55 Protection OFFICE Furnitur Asset Basic R R R 00 Department BUILDIN s ng and ,00 35 Services: FURNITU e and Financi services 50, - - 38 GS Reserv infrastruct 0.0 00 Traffic RE other ng and 000 1 e ure 0 01 Department office Reserv infrastruct .00 developm 1 equipme e ure ent nt developm 55 Protection HAZMAT Fire, Asset Basic R R R ent 34 Services: Fire EQUIPM safety & Financi services - 500 - 55 Parks and KRANSH Plant & Nation Basic R R R 00 Department ENT emerge ng and ,00 35 Recreation: OEK: equipme al services 13, - - 55 ncy Reserv infrastruct 0.0 00 Parks UPGRAD nt Govern and 158 1 e ure 0 32 Maintenance E ment infrastruct ,00 developm 1 and SPORTS Transf ure 0.0 ent Horticulture FAC ers developm 0 55 Protection AIRPORT Fire, Asset Basic R R R ent 34 Services: Fire FIRE safety & Financi services - 500 - 55 Parks and TOOLS Plant & Asset Basic R R R 00 Department FIGHTIN emerge ng and ,00 35 Recreation: AND equipme Financi services 150 - - 58 G ncy Reserv infrastruct 0.0 00 Parks EQUIPM nt ng and ,00 1 SERVICES e ure 0 34 Maintenance ENT Reserv infrastruct 0.0 developm 1 and e ure 0 ent Horticulture developm 55 Protection UPGRAD Other Asset Basic R R R ent 34 Services: Fire E Building Financi services - 150 300 55 Parks and BOSSIES Plant & Nation Basic R R R 00 Department KURLAN s ng and ,00 ,00 35 Recreation: GIF: equipme al services - 1,0 1,0 60 D FIRE Reserv infrastruct 0.0 0.0 00 Parks UPGRAD nt Govern and 00, 00, 1 SUB e ure 0 0 36 Maintenance E SPORTS ment infrastruct 000 000 STATI developm 1 and FAC Transf ure .00 .00 ent Horticulture ers developm 55 Protection KRANSH Other Asset Basic R R R ent 34 Services: Fire OEK SUB Building Financi services - 5,0 - 55 Protection OFFICE Furnitur Asset Basic R R R 00 Department FIRE s ng and 00, 35 Services: FURNITU e and Financi services 30, 20, 20, 61 STATION Reserv infrastruct 000 00 Traffic RE other ng and 000 000 000 1 e ure .00 39 Department office Reserv infrastruct .00 .00 .00 developm 1 equipme e ure ent nt developm 55 Protection TOOLS Furnitur Asset Basic R R R ent 34 Services: AND e and Financi services 88, 150 - 55 Parks and ESTABLIS Cemeter Extern Basic R R R 20 Traffic EQUIPM other ng and 000 ,00 35 Recreation: HMENT ies al services 700 990 - 13 Department ENT office Reserv infrastruct .00 0.0 20 Cemeteries OF NEW Loans and ,00 ,62 1 equipme e ure 0 04 CEMETA infrastruct 0.0 5.0 nt developm 1 RY ure 0 0 ent developm 55 Protection TECHNIC Plant & Asset Basic R R R ent 34 Services: AL equipme Financi services 82, 60, - 55 Parks and ESTABLIS Cemeter Asset Basic R R R 20 Traffic EQUIPM nt ng and 000 000 35 Recreation: HMENT ies Financi services - 500 500 14 Department ENT Reserv infrastruct .00 .00 20 Cemeteries OF NEW ng and ,00 ,00 1 e ure 05 CEMENT Reserv infrastruct 0.0 0.0 developm 1 RIE e ure 0 0 ent developm 55 Protection LAND Other Extern Basic R R R ent 34 Services: AND Building al services 1,0 - - 55 Parks and FURNITU Furnitur Asset Basic R R R 20 Traffic BUILDIN s Loans and 00, 35 Recreation: RE e and Financi services 50, - - 32 Department GS 2 infrastruct 000 20 Cemeteries other ng and 000 1 ure .00 06 office Reserv infrastruct .00 developm 1 equipme e ure ent nt developm 55 Protection FURNITU Furnitur Asset Basic R R R ent 34 Services: RE AND e and Financi services 190 110 - 55 Parks and PLASTIC Furnitur Asset Basic R R R 20 Traffic EQUIPM other ng and ,00 ,00 35 Recreation: CHAIRS e and Financi services 600 150 150 46 Department ENT office Reserv infrastruct 0.0 0.0 40 Simunye AND other ng and ,00 ,00 ,00 1 equipme e ure 0 0 46 Centre TABLES office Reserv infrastruct 0.0 0.0 0.0 nt developm 1 FOR equipme e ure 0 0 0 ent nt developm 55 Protection TECHNIC Plant & Asset Basic R R R ent 34 Services: AL equipme Financi services 60, - - 55 Administrativ UPGRAD Other Asset Good R R R 20 Traffic EQUIPM nt ng and 000 41 e Services E OF Building Financi Governan 150 - - 53 Department ENT Reserv infrastruct .00 00 MUNICIP s ng ce and ,00 1 e ure 35 AL Reserv Transform 0.0 developm 1 BUILDIN e ation 0 ent G 55 Protection SPECIALI Plant & Asset Basic R R R 55 Administrativ FURNITU Furnitur Asset Good R R R 34 Services: SED equipme Financi services 190 - - 41 e Services RE AND e and Financi Governan 30, - - 20 Traffic EQUIPM nt ng and ,00 00 EQUIPM other ng ce and 000 54 Department ENT Reserv infrastruct 0.0 47 ENT office Reserv Transform .00 1 e ure 0 1 equipme e ation developm nt ent 55 Human FURNITU Furnitur Asset Good R R R 55 Protection BODY Plant & Asset Basic R R R 42 Resources RE AND e and Financi Governan 140 - - 34 Services: ARMOR equipme Financi services 40, - - 00 Management EQUIPM other ng ce and ,00 20 Traffic nt ng and 000 46 Services ENT office Reserv Transform 0.0 56 Department Reserv infrastruct .00 1 equipme e ation 0 1 e ure nt developm 55 Aerodrome AIRPORT Roads, Asset Local R R R ent 42 FIRESTAT Paveme Financi Economic 750 500 - 55 Protection SCBA Plant & Asset Basic R R R 20 ION - nts & ng Developm ,00 ,00 34 Services: SETS equipme Financi services - 300 - 36 FENCING, Bridges Reserv ent 0.0 0.0 26 INTEGRATED DEVELOPMENT PLAN

1 e 0 0 38 AL Reserv Transform 000 0.0 0.0 1 BUILDIN e ation .00 0 0 55 HOD: SOUND Furnitur Asset Good R R R GS 43 Corporate SYSTEM e and Financi Governan 30, - - 55 Municipal SMME Other Asset Good R R R 00 Services other ng ce and 000 72 Land and SHELTER Building Financi Governan 750 750 750 46 office Reserv Transform .00 00 Buildings S s ng ce and ,00 ,00 ,00 1 equipme e ation 31 Reserv Transform 0.0 0.0 0.0 nt 1 e ation 0 0 0 55 HOD: UPGRAD Other Asset Financial R R R 55 Planning and GPS Furnitur Asset Local R R R 51 Financial E OF Building Financi viability - 2,0 - 73 Economic HANDHE e and Financi Economic 100 - - 00 Services MUNICIP s ng 00, 00 Development LD other ng Developm ,00 35 AL Reserv 000 15 DEVICE office Reserv ent 0.0 1 BUILDIN e .00 1 equipme e 0 GS nt 55 Information COMPUT Comput Asset Financial R R R 55 Planning and FURNITU Furnitur Asset Local R R R 54 and ER ers - Financi viability 500 910 450 73 Economic RE & e and Financi Economic 30, - - 00 Communicati EQUIPM hardwar ng ,00 ,00 ,00 00 Development EQUIPM other ng Developm 000 13 on ENT e/equip Reserv 0.0 0.0 0.0 46 ENT office Reserv ent .00 1 Technology ment e 0 0 0 1 equipme e (ICT) nt 55 Information COMPUT Comput Asset Financial R R R 55 Roads, GREEN Roads, Asset Basic R R R 54 and ER ers - Financi viability 200 200 - 82 Stormwater VALLEY:S Paveme Financi services 100 50, 100 00 Communicati EQUIPM hardwar ng ,00 ,00 00 and Buildings PEED nts & ng and ,00 000 ,00 14 on ENT e/equip Reserv 0.0 0.0 15 Maintenance HUMPS Bridges Reserv infrastruct 0.0 .00 0.0 1 Technology SPARES ment e 0 0 1 e ure 0 0 (ICT) developm 55 Information DR Comput Asset Financial R R R ent 54 and SERVER/ ers - Financi viability 700 - - 55 Roads, GREEN Roads, Asset Basic R R R 00 Communicati STORAGE hardwar ng ,00 82 Stormwater VALLEY:R Paveme Financi services 1,0 - - 20 on PROJECT e/equip Reserv 0.0 00 and Buildings EHABILIT nts & ng and 00, 1 Technology ment e 0 17 Maintenance ATION HI Bridges Reserv infrastruct 000 (ICT) 1 e ure .00 55 Information COMPUT Comput Asset Financial R R R developm 54 and ER ers - Financi viability 200 200 - ent 00 Communicati REPLACE hardwar ng ,00 ,00 55 Roads, GREEN Roads, Asset Basic R R R 22 on MENT e/equip Reserv 0.0 0.0 82 Stormwater VALLEY:R Paveme Financi services - 2,5 - 1 Technology ment e 0 0 00 and Buildings EHABILIT nts & ng and 00, (ICT) 18 Maintenance ATE PINE Bridges Reserv infrastruct 000 55 Information WIRELES Comput Asset Financial R R R 1 e ure .00 54 and S ers - Financi viability 265 - - developm 00 Communicati UPGRAD hardwar ng ,00 ent 26 on ES e/equip Reserv 0.0 55 Roads, GREEN Roads, Asset Basic R R R 1 Technology ment e 0 82 Stormwater VALLEY:U Paveme Financi services - - 2,0 (ICT) 00 and Buildings PGRADE nts & ng and 00, 55 Information FIREWAL Comput Asset Financial R R R 19 Maintenance TWAK Bridges Reserv infrastruct 000 54 and L ers - Financi viability 320 - - 1 STRE e ure .00 00 Communicati UPGRAD software ng ,00 developm 28 on E & Reserv 0.0 ent 1 Technology program e 0 55 Roads, TOOLS Plant & Asset Basic R R R (ICT) ming 82 Stormwater AND equipme Financi services 100 50, - 55 Information HOST Comput Asset Financial R R R 00 and Buildings EQUIPM nt ng and ,00 000 54 and SERVEER ers - Financi viability 860 - - 23 Maintenance ENT Reserv infrastruct 0.0 .00 00 Communicati S software ng ,00 1 e ure 0 29 on UPGRAD & Reserv 0.0 developm 1 Technology E program e 0 ent (ICT) ming 55 Roads, KURLAN Roads, Asset Basic R R R 55 Information NEW Comput Asset Financial R R R 82 Stormwater D: Paveme Financi services - 1,5 - 54 and USERS ers - Financi viability 200 200 - 00 and Buildings REHABILI nts & ng and 00, 00 Communicati hardwar ng ,00 ,00 28 Maintenance TATE Bridges Reserv infrastruct 000 30 on e/equip Reserv 0.0 0.0 1 KERSHO e ure .00 1 Technology ment e 0 0 UT developm (ICT) ent 55 Information SPARES Comput Asset Financial R R R 55 Roads, KURLAN Roads, Asset Basic R R R 54 and ers - Financi viability 250 250 - 82 Stormwater D:REHAB Paveme Financi services - - 1,5 00 Communicati hardwar ng ,00 ,00 00 and Buildings ILITATE nts & ng and 00, 31 on e/equip Reserv 0.0 0.0 29 Maintenance FLOWER Bridges Reserv infrastruct 000 1 Technology ment e 0 0 1 ST e ure .00 (ICT) developm 55 Information HIGH Comput Asset Financial R R R ent 54 and SITE ers - Financi viability 80, 80, - 55 Roads, KRANSH Roads, Extern Basic R R R 00 Communicati SETUP hardwar ng 000 000 82 Stormwater OEK: Paveme al services 1,0 1,0 781 32 on e/equip Reserv .00 .00 00 and Buildings UPGRAD nts & Loans and 00, 00, ,70 1 Technology ment e 30 Maintenance E Bridges infrastruct 000 000 1.0 (ICT) 1 GRAVEL ure .00 .00 0 55 Information HALL Comput Asset Financial R R R ROAD developm 54 and CONNEC ers - Financi viability 150 - - ent 00 Communicati TIONS hardwar ng ,00 55 Roads, KURLAN Roads, Asset Basic R R R 33 on (PHONES e/equip Reserv 0.0 82 Stormwater D:NEW Paveme Financi services 500 500 500 1 Technology NETWO ment e 0 00 and Buildings WALKWA nts & ng and ,00 ,00 ,00 (ICT) 36 Maintenance YS Bridges Reserv infrastruct 0.0 0.0 0.0 55 Information MELLVILL Other Asset Financial R R R 1 e ure 0 0 0 54 and E'S Building Financi viability - 600 - developm 00 Communicati CORNER s ng ,00 ent 34 on Reserv 0.0 55 Roads, KWANO: Roads, Asset Basic R R R 1 Technology e 0 82 Stormwater REHAB Paveme Financi services - 2,0 2,7 (ICT) 00 and Buildings PAVED nts & ng and 00, 00, 55 Information OVERHE Comput Asset Financial R R R 37 Maintenance ROADS Bridges Reserv infrastruct 000 000 54 and AD ers - Financi viability 20, - - 1 PHASE e ure .00 .00 00 Communicati PROJECT hardwar ng 000 developm 37 on ORS e/equip Reserv .00 ent 1 Technology ment e 55 Roads, FURNITU Roads, Asset Basic R R R (ICT) 82 Stormwater RE AND Paveme Financi services 65, - - 55 Information CCTV Comput Asset Financial R R R 00 and Buildings EQUIPM nts & ng and 000 54 and CAMERA ers - Financi viability - 120 - 46 Maintenance ENT Bridges Reserv infrastruct .00 00 Communicati S hardwar ng ,00 1 e ure 38 on e/equip Reserv 0.0 developm 1 Technology ment e 0 ent (ICT) 55 Roads, KWANO: Roads, Asset Basic R R R 55 Municipal UPGRAD Other Asset Good R R R 82 Stormwater UPGRAD Paveme Financi services 2,0 2,0 2,0 71 Land and E OF Building Financi Governan 1,6 500 500 00 and Buildings E SW nts & ng and 00, 00, 00, 20 Buildings MUNICIP s ng ce and 00, ,00 ,00 47 Maintenance PHASE 1 Bridges Reserv infrastruct 000 000 000 1 e ure .00 .00 .00 27 INTEGRATED DEVELOPMENT PLAN

developm 02 and Buildings MPS nts & ng and 000 ent 00 Maintenance (SHP) Bridges Reserv infrastruct .00 55 Roads, PINETRE Roads, Asset Basic R R R 1 e ure 82 Stormwater ES:WALK Paveme Financi services 500 500 500 developm 00 and Buildings WAYS nts & ng and ,00 ,00 ,00 ent 48 Maintenance Bridges Reserv infrastruct 0.0 0.0 0.0 55 Roads, KRANSH Roads, Nation Basic R R R 1 e ure 0 0 0 82 Stormwater OEK- Paveme al services 5,0 5,0 7,0 developm 02 and Buildings UPGRADI nts & Govern and 00, 00, 00, ent 07 Maintenance NG OF Bridges ment infrastruct 000 000 000 55 Roads, KEURBO Roads, Asset Basic R R R 1 GRAVEL Transf ure .00 .00 .00 82 Stormwater OMS:UP Paveme Financi services - 1,0 - ers developm 00 and Buildings GRADE nts & ng and 00, ent 49 Maintenance STORMW Bridges Reserv infrastruct 000 55 Roads, PLETT: Roads, Asset Basic R R R 1 ATER e ure .00 82 Stormwater REHAB Paveme Financi services - - 1,5 developm 02 and Buildings PAVED nts & ng and 00, ent 09 Maintenance ROADS Bridges Reserv infrastruct 000 55 Roads, POORJIES Roads, Extern Basic R R R 1 (PMS) e ure .00 82 Stormwater :PARKIN Paveme al services - 1,0 5,0 developm 00 and Buildings G AREA nts & Loans and 00, 00, ent 50 Maintenance Bridges infrastruct 000 000 55 Roads, PLETT:UP Roads, Extern Basic R R R 1 ure .00 .00 82 Stormwater GRADE Paveme al services - - 1,0 developm 04 and Buildings TAXI nts & Loans and 00, ent 01 Maintenance RANK Bridges infrastruct 000 55 Roads, NEW Roads, Asset Basic R R R 1 ure .00 82 Stormwater HORIZON Paveme Financi services 500 500 500 developm 00 and Buildings S:NEW nts & ng and ,00 ,00 ,00 ent 60 Maintenance WALKWA Bridges Reserv infrastruct 0.0 0.0 0.0 55 Roads, PLETT:CB Roads, Extern Basic R R R 1 YS e ure 0 0 0 82 Stormwater D Paveme al services - - 1,0 developm 04 and Buildings RINROAD nts & Loans and 00, ent 02 Maintenance SYSTEM Bridges infrastruct 000 55 Roads, GREEN Roads, Provin Basic R R R 1 ure .00 82 Stormwater VALLEY Paveme cial services 512 93, 1,2 developm 00 and Buildings PHASE 2, nts & Govern and ,35 151 65, ent 74 Maintenance 3 & 4 Bridges ment infrastruct 0.0 .00 580 55 Roads, POORTJI Roads, Extern Basic R R R 1 Transf ure 0 .00 82 Stormwater ES:UPGR Paveme al services 6,0 6,0 6,0 er developm 04 and Buildings ADE nts & Loans and 00, 00, 00, ent 03 Maintenance BEACON Bridges infrastruct 000 000 000 55 Roads, QOLWEN Roads, Provin Basic R R R 1 WAY ure .00 .00 .00 82 Stormwater I/BOSSIE Paveme cial services 1,4 423 357 developm 00 and Buildings SGIF PH nts & Govern and 86, ,85 ,41 ent 77 Maintenance 4A (410) Bridges ment infrastruct 530 9.0 0.0 55 Roads, POORTJI Roads, Extern Basic R R R 1 Transf ure .00 0 0 82 Stormwater ES:EMBA Paveme al services - 3,2 5,0 er developm 04 and Buildings RKMENT nts & Loans and 50, 00, ent 04 Maintenance PROTECT Bridges infrastruct 000 000 55 Roads, KWANOK Roads, Provin Basic R R R 1 IO ure .00 .00 82 Stormwater UTHULA Paveme cial services 604 129 1,5 developm 00 and Buildings PHASE 5 nts & Govern and ,38 ,13 52, ent 78 Maintenance (1000) Bridges ment infrastruct 0.0 0.0 160 55 Roads, NEW Storm Asset Basic R R R 1 Transf ure 0 0 .00 82 Stormwater HORIZON water Financi services - 500 500 er developm 05 and Buildings S: ng and ,00 ,00 ent 00 Maintenance UPGRAD Reserv infrastruct 0.0 0.0 55 Roads, SHELL Roads, Provin Basic R R R 1 E e ure 0 0 82 Stormwater ULTRA Paveme cial services 672 39, - GRAVEL developm 00 and Buildings CITY nts & Govern and ,73 767 R ent 79 Maintenance (167) Bridges ment infrastruct 0.0 .00 55 Roads, NEW Storm Asset Basic R R R 1 Transf ure 0 82 Stormwater HORIZON water Financi services - 1,0 1,0 er developm 05 and Buildings S: ng and 00, 00, ent 01 Maintenance UPGRAD Reserv infrastruct 000 000 55 Roads, EBENHAE Roads, Provin Basic R R R 1 E e ure .00 .00 82 Stormwater ZER Paveme cial services 646 205 1,2 STORMW developm 00 and Buildings PORTION nts & Govern and ,97 ,13 92, AT ent 80 Maintenance S 3, 20, Bridges ment infrastruct 0.0 1.0 470 55 Roads, PLETT: Roads, Asset Basic R R R 1 42 Transf ure 0 0 .00 82 Stormwater CBD Paveme Financi services - - 1,0 er developm 05 and Buildings PEDESTRI nts & ng and 00, ent 02 Maintenance AN ZONE Bridges Reserv infrastruct 000 55 Roads, QOLWEN Roads, Provin Basic R R R 1 e ure .00 82 Stormwater I/BOSSIE Paveme cial services 342 63, 842 developm 00 and Buildings SGIF PH nts & Govern and ,84 780 ,19 ent 92 Maintenance 4B (301) Bridges ment infrastruct 0.0 .00 0.0 55 Roads, GREEN Roads, Asset Basic R R R 1 Transf ure 0 0 82 Stormwater VALLEY: Paveme Financi services 500 500 500 er developm 05 and Buildings WALKWA nts & ng and ,00 ,00 ,00 ent 03 Maintenance Y Bridges Reserv infrastruct 0.0 0.0 0.0 55 Roads, QOLWEN Roads, Provin Basic R R R 1 e ure 0 0 0 82 Stormwater I PHASE 5 Paveme cial services - - 16, developm 00 and Buildings (141) nts & Govern and 950 ent 93 Maintenance Bridges ment infrastruct .00 55 Roads, INDUSTRI Roads, Asset Basic R R R 1 Transf ure 82 Stormwater AL: Paveme Financi services 500 1,0 1,0 er developm 05 and Buildings REHAB nts & ng and ,00 00, 00, ent 06 Maintenance OF Bridges Reserv infrastruct 0.0 000 000 55 Roads, HARKERV Roads, Provin Basic R R R 1 PAVED e ure 0 .00 .00 82 Stormwater ILLE (80) Paveme cial services 58, 73, - ROA developm 00 and Buildings nts & Govern and 790 965 ent 94 Maintenance Bridges ment infrastruct .00 .00 55 Roads, KURLAN Roads, Provin Basic R R R 1 Transf ure 82 Stormwater D PHASE Paveme cial services - 2,7 128 er developm 07 and Buildings 3 & 4 nts & Govern and 59. ,53 ent 08 Maintenance Bridges ment infrastruct 00 0.0 55 Roads, NEW Roads, Asset Basic R R R 1 Transf ure 0 82 Stormwater HORIZON Paveme Financi services - 500 500 er developm 01 and Buildings S:PARKIN nts & ng and ,00 ,00 ent 02 Maintenance G AREA Bridges Reserv infrastruct 0.0 0.0 55 Roads, KRANSH Roads, Provin Basic R R R 1 e ure 0 0 82 Stormwater OEK Paveme cial services - - 384 developm 07 and Buildings PHASE 3, nts & Govern and ,77 ent 09 Maintenance 4 & 5 Bridges ment infrastruct 0.0 55 Roads, NON- Roads, Asset Basic R R R 1 Transf ure 0 82 Stormwater MOTORI Paveme Financi services 500 500 500 er developm 01 and Buildings SED nts & ng and ,00 ,00 ,00 ent 07 Maintenance TRANSPO Bridges Reserv infrastruct 0.0 0.0 0.0 55 Fleet REPLACE General Extern Basic R R R 1 RT PLAN- e ure 0 0 0 82 Maintenance MENT OF vehicles al services 4,5 9,8 9,6 C developm 40 FLEET Loans and 30, 10, 50, ent 00 VEHICLE infrastruct 000 000 000 55 Roads, KWANO: Roads, Asset Basic R R R 1 ure .00 .00 .00 82 Stormwater SPEEDHU Paveme Financi services - - 50, developm 28 INTEGRATED DEVELOPMENT PLAN

ent 00 Waste Water WWTW: ng and 00, 65 Purification NEW Reserv infrastruct 000 55 Fleet UPGRADI Furnitur Asset Basic R R R 1 CLARIFIE e ure .00 82 Maintenance NG OF e and Financi services 500 1,0 5,0 R developm 40 DEPOT other ng and ,00 00, 00, ent 31 office Reserv infrastruct 0.0 000 000 55 Water KURLAN Reticulat Asset Basic R R R 1 equipme e ure 0 .00 .00 84 Services: D:UPGRA ion Financi services - - 500 nt developm 00 Waste Water DE PUMP ng and ,00 ent 66 Purification STATION Reserv infrastruct 0.0 55 Fleet NEW Furnitur Other Basic R R R 1 4 e ure 0 82 Maintenance FIRE e and Grants services 1,2 - - developm 40 RESCUE other and and 00, ent 33 ALL IN 1 office Subsidi infrastruct 000 55 Water GREEN Reticulat Provin Basic R R R 1 (VEHI equipme es ure .00 84 Services: VALLEY ion cial services 133 24, 329 nt developm 00 Waste Water PHASE 2, Govern and ,50 272 ,76 ent 74 Purification 3 & 4 ment infrastruct 0.0 .00 0.0 55 Waste WASTE Waste Extern Basic R R R 1 Transf ure 0 0 83 Management DROP- Manage al services 1,0 1,0 1,0 er developm 00 OFF ment Loans and 00, 00, 00, ent 08 FACILITY infrastruct 000 000 000 55 Water QOLWEN Reticulat Provin Basic R R R 1 EXTERN ure .00 .00 .00 84 Services: I/BOSSIE ion cial services 387 110 93, developm 00 Waste Water SGIF PH Govern and ,33 ,44 130 ent 77 Purification 4A (410) ment infrastruct 0.0 2.0 .00 55 Water KWANOK Sewerag Nation Basic R R R 1 Transf ure 0 0 84 Services: UTHULA e al services 4,3 4,3 - er developm 00 Waste Water UPGRAD purificat Govern and 85, 85, ent 33 Purification E SEWER ion ment infrastruct 965 965 55 Water KWANOK Reticulat Provin Basic R R R 1 OUT Transf ure .00 .00 84 Services: UTHULA ion cial services 157 33, 404 ers developm 00 Waste Water PHASE 5 Govern and ,48 646 ,44 ent 78 Purification (1000) ment infrastruct 0.0 .00 0.0 55 Water TOOLS Plant & Asset Basic R R R 1 Transf ure 0 0 84 Services: AND equipme Financi services 80, 100 120 er developm 00 Waste Water EQUIPM nt ng and 000 ,00 ,00 ent 34 Purification ENT-CRR Reserv infrastruct .00 0.0 0.0 55 Water SHELL Reticulat Provin Basic R R R 1 e ure 0 0 84 Services: ULTRA ion cial services 175 10, - developm 00 Waste Water CITY Govern and ,29 362 ent 79 Purification (167) ment infrastruct 0.0 .00 55 Water WITTEDR Sewerag Other Basic R R R 1 Transf ure 0 84 Services: IFT:UPGR e Grants services 4,1 - - er developm 00 Waste Water ADE purificat and and 00, ent 52 Purification PUMP ion Subsidi infrastruct 000 55 Water EBENHAE Sewerag Provin Basic R R R 1 STATIO es ure .00 84 Services: ZER e cial services 168 53, 336 developm 00 Waste Water PORTION purificat Govern and ,58 450 ,77 ent 80 Purification S 3, 20, ion ment infrastruct 0.0 .00 0.0 55 Water DUNES:U Sewerag Asset Basic R R R 1 42 Transf ure 0 0 84 Services: PGRADE e Financi services 500 - - er developm 00 Waste Water PUMP purificat ng and ,00 ent 53 Purification STATION ion Reserv infrastruct 0.0 55 Water QOLWEN Sewerag Provin Basic R R R 1 8 e ure 0 84 Services: I/BOSSIE e cial services 89, 16, 219 developm 00 Waste Water SGIF PH purificat Govern and 330 619 ,44 ent 92 Purification 4B (301) ion ment infrastruct .00 .00 0.0 55 Water GANSEV Sewerag Asset Basic R R R 1 Transf ure 0 84 Services: ALLEI e Financi services 700 - 1,0 er developm 00 Waste Water WWTW: purificat ng and ,00 00, ent 56 Purification UPGRAD ion Reserv infrastruct 0.0 000 55 Water QOLWEN Sewerag Provin Basic R R R 1 E AERA e ure 0 .00 84 Services: I PHASE 5 e cial services - - 4,4 developm 00 Waste Water (141) purificat Govern and 20. ent 93 Purification ion ment infrastruct 00 55 Water DUNES:R Sewerag Asset Basic R R R 1 Transf ure 84 Services: EFURBIS e Financi services 1,5 - - er developm 00 Waste Water HMENT purificat ng and 00, ent 57 Purification PUMP ion Reserv infrastruct 000 55 Water HARKERV Sewerag Provin Basic R R R 1 STATI e ure .00 84 Services: ILLE (80) e cial services 15, 19, - developm 00 Waste Water purificat Govern and 320 273 ent 94 Purification ion ment infrastruct .00 .00 55 Water DUNES:R Sewerag Asset Basic R R R 1 Transf ure 84 Services: EFURBIS e Financi services - 2,1 - er developm 00 Waste Water H PUMP purificat ng and 50, ent 58 Purification STATION ion Reserv infrastruct 000 55 Water KRANSH Sewerag Asset Basic R R R 1 1 e ure .00 84 Services: OEK:UPG e Financi services 1,0 2,0 2,5 developm 01 Waste Water RADE purificat ng and 00, 00, 00, ent 03 Purification OUTFALL ion Reserv infrastruct 000 000 000 55 Water GOOSEV Sewerag Asset Basic R R R 1 S SEW e ure .00 .00 .00 84 Services: ALLEY:RE e Financi services 500 - - developm 00 Waste Water FURBISH purificat ng and ,00 ent 59 Purification PUMP ion Reserv infrastruct 0.0 55 Water UPGRADI Sewerag Extern Basic R R R 1 STA e ure 0 84 Services: NG OF e al services 1,0 - - developm 01 Waste Water PUMPST purificat Loans and 00, ent 04 Purification ATION- ion infrastruct 000 55 Water KURLAN Sewerag Asset Basic R R R 1 EFF ure .00 84 Services: D:UPGRA e Financi services 500 - - developm 00 Waste Water DE purificat ng and ,00 ent 60 Purification WWTW ion Reserv infrastruct 0.0 55 Water PIESANG Sewerag Extern Basic R R R 1 e ure 0 84 Services: VALLEY:U e al services 1,0 5,0 10, developm 02 Waste Water PGRADE purificat Loans and 00, 00, 000 ent 00 Purification PUMPS ion infrastruct 000 000 ,00 55 Water KURLAN Reticulat Asset Basic R R R 1 ure .00 .00 0.0 84 Services: D:UPGRA ion Financi services - 1,0 - developm 0 00 Waste Water DE PUMP ng and 00, ent 63 Purification STATION Reserv infrastruct 000 55 Water SECURITY Security Asset Basic R R R 1 1 e ure .00 84 Services: FOR KEYS and Financi services 500 500 500 developm 02 Waste Water ON policing ng and ,00 ,00 ,00 ent 06 Purification SITES- Reserv infrastruct 0.0 0.0 0.0 55 Water PIESANG Reticulat Extern Basic R R R 1 CRR e ure 0 0 0 84 Services: VALLEY:N ion al services - - 3,0 developm 00 Waste Water EW Loans and 00, ent 64 Purification RISING infrastruct 000 55 Water KWANO: Sewerag Extern Basic R R R 1 MAIN ure .00 84 Services: UPGRAD e al services 500 500 500 developm 03 Waste Water E purificat Loans and ,00 ,00 ,00 ent 00 Purification OUTFALL ion infrastruct 0.0 0.0 0.0 55 Water GANSEV Reticulat Asset Basic R R R 1 SEWER ure 0 0 0 84 Services: ALLEI ion Financi services - - 1,0 developm 29 INTEGRATED DEVELOPMENT PLAN

ent 00 Engineering SAFETY nt ng and ,00 ,00 ,00 23 Services EQUIPM Reserv infrastruct 0.0 0.0 0.0 55 Water GREEN Sewerag Extern Basic R R R 1 EN e ure 0 0 0 84 Services: VALLEY: e al services 1,0 - - developm 03 Waste Water UPGRAD purificat Loans and 00, ent 01 Purification E BULK ion infrastruct 000 55 Electrical and TOOLS Plant & Asset Basic R R R 1 SEW ure .00 85 Mechanical AND equipme Financi services 250 270 290 developm 00 Engineering EQUIPM nt ng and ,00 ,00 ,00 ent 46 Services ENT-CRR Reserv infrastruct 0.0 0.0 0.0 55 Water GREEN Sewerag Nation Basic R R R 1 e ure 0 0 0 84 Services: VALLEY: e al services - - 1,0 developm 04 Waste Water UPGRAD purificat Govern and 00, ent 02 Purification E BULK ion ment infrastruct 000 55 Electrical and UPGRAD Transmi Extern Basic R R R 1 SEW Transf ure .00 85 Mechanical E MV ssion & al services - 2,9 - ers developm 00 Engineering CABLES Reticulat Loans and 00, ent 48 Services PLETT ion infrastruct 000 55 Water EBENHAE Sewerag Asset Basic R R R 1 ure .00 84 Services: ZER: e Financi services - 500 3,0 developm 04 Waste Water NEW purificat ng and ,00 89, ent 03 Purification BULK ion Reserv infrastruct 0.0 036 55 Electrical and QOLWEN Transmi Asset Basic R R R 1 SEWER e ure 0 .00 85 Mechanical I: ssion & Financi services 900 1,0 2,2 SER developm 00 Engineering ELECTRIC Reticulat ng and ,00 00, 00, ent 78 Services ITY ion Reserv infrastruct 0.0 000 000 55 Water NATURES Sewerag Asset Basic R R R 1 RELOCAT e ure 0 .00 .00 84 Services: VALLEY: e Financi services 1,0 3,0 5,0 IO developm 06 Waste Water NEW purificat ng and 00, 00, 00, ent 00 Purification SEWERA ion Reserv infrastruct 000 000 000 55 Electrical and QOLWEN Transmi Asset Basic R R R 1 GE S e ure .00 .00 .00 85 Mechanical I: NEW ssion & Financi services - - 3,9 developm 00 Engineering ELECTRIC Reticulat ng and 00, ent 79 Services ITY FOR P ion Reserv infrastruct 000 55 Water HARKERV Sewerag Asset Basic R R R 1 e ure .00 84 Services: ILLE: e Financi services 800 1,0 1,0 developm 06 Waste Water NEW purificat ng and ,00 00, 00, ent 01 Purification SEWERA ion Reserv infrastruct 0.0 000 000 55 Electrical and KWANO: Transmi Nation Basic R R R 1 GE SYST e ure 0 .00 .00 85 Mechanical ELECTRIF ssion & al services 1,2 2,5 1,7 developm 00 Engineering ICATION Reticulat Govern and 70, 40, 90, ent 81 Services OF PHAS ion ment infrastruct 000 000 700 55 Water KEURBO Sewerag Asset Basic R R R 1 Transf ure .00 .00 .00 84 Services: OMS: e Financi services 4,0 4,0 - ers developm 06 Waste Water UPGRAD purificat ng and 00, 00, ent 02 Purification E ion Reserv infrastruct 000 000 55 Electrical and KWANO: Transmi Nation Basic R R R 1 AVENTU e ure .00 .00 85 Mechanical NEW ssion & al services - 1,0 1,0 RA PU developm 00 Engineering LIGHTIN Reticulat Govern and 00, 00, ent 83 Services G FOR ion ment infrastruct 000 000 55 Water MATJIESF Sewerag Asset Basic R R R 1 PHASE Transf ure .00 .00 84 Services: ONTEIN: e Financi services - - 1,0 ers developm 06 Waste Water UPGRAD purificat ng and 00, ent 03 Purification E PUMP ion Reserv infrastruct 000 55 Electrical and KWANO: Transmi Nation Basic R R R 1 S e ure .00 85 Mechanical NEW ssion & al services - - 1,0 developm 00 Engineering ELECTRIC Reticulat Govern and 00, ent 84 Services ITY FOR ion ment infrastruct 000 55 Water DUNES: Sewerag Asset Basic R R R 1 PHA Transf ure .00 84 Services: UPGRAD e Financi services - 2,0 2,5 ers developm 06 Waste Water E purificat ng and 00, 00, ent 04 Purification OUTFALL ion Reserv infrastruct 000 000 55 Electrical and ERF 4367 Transmi Asset Basic R R R 1 SEWER e ure .00 .00 85 Mechanical (ULTRA ssion & Financi services - - 1,5 developm 00 Engineering CITY): Reticulat ng and 00, ent 91 Services NEW ELE ion Reserv infrastruct 000 55 Water GOOSEV Sewerag Asset Basic R R R 1 e ure .00 84 Services: ALLEY: e Financi services - 1,0 5,0 developm 06 Waste Water UPGRAD purificat ng and 00, 00, ent 05 Purification E ion Reserv infrastruct 000 000 55 Electrical and New Transmi Asset Basic R R R 1 OUTFALL e ure .00 .00 85 Mechanical electricit ssion & Financi services - - 500 S developm 00 Engineering y for ñ85 Reticulat ng and ,00 ent 92 Services erven ion Reserv infrastruct 0.0 55 Water PIESANG Sewerag Extern Basic R R R 1 e ure 0 84 Services: VALLEY: e al services 1,0 4,0 - developm 06 Waste Water NEW purificat Loans and 00, 00, ent 08 Purification OUTFALL ion infrastruct 000 000 55 Electrical and Christma Transmi Asset Basic R R R 1 SE ure .00 .00 85 Mechanical s lights ssion & Financi services 250 - - developm 00 Engineering Reticulat ng and ,00 ent 98 Services ion Reserv infrastruct 0.0 55 Water KEURBO Sewerag Asset Basic R R R 1 e ure 0 84 Services: OMS: e Financi services - - 500 developm 06 Waste Water UPGRAD purificat ng and ,00 ent 09 Purification E RISING ion Reserv infrastruct 0.0 55 Electrical and New Transmi Extern Basic R R R 1 MAIN e ure 0 85 Mechanical switchge ssion & al services 3,5 1,1 - developm 00 Engineering ar at SS7 Reticulat Loans and 00, 00, ent 99 Services and ion infrastruct 000 000 55 Water DUNES: Sewerag Asset Basic R R R 1 cable ure .00 .00 84 Services: UPGRAD e Financi services - - 1,1 developm 07 Waste Water E RISING purificat ng and 00, ent 00 Purification MAIN ion Reserv infrastruct 000 55 Electrical and Christma Transmi Asset Basic R R R 1 e ure .00 85 Mechanical s lights ssion & Financi services 250 - - developm 01 Engineering Reticulat ng and ,00 ent 00 Services ion Reserv infrastruct 0.0 55 Water KURLAN Sewerag Provin Basic R R R 1 e ure 0 84 Services: D PHASE e cial services - 719 33, developm 07 Waste Water 3 & 4 purificat Govern and .00 490 ent 08 Purification ion ment infrastruct .00 55 Electrical and Cuba and Transmi Asset Basic R R R 1 Transf ure 85 Mechanical Angola ssion & Financi services 400 400 400 er developm 01 Engineering Valley; Reticulat ng and ,00 ,00 ,00 ent 01 Services SAPS a ion Reserv infrastruct 0.0 0.0 0.0 55 Water KRANSH Sewerag Provin Basic R R R 1 e ure 0 0 0 84 Services: OEK e cial services - 33, 100 developm 07 Waste Water PHASE 3, purificat Govern and 490 ,26 ent 09 Purification 4 & 5 ion ment infrastruct .00 0.0 55 Electrical and Qolweni Transmi Asset Basic R R R 1 Transf ure 0 85 Mechanical Valley ssion & Financi services 400 400 - er developm 01 Engineering (x2) Reticulat ng and ,00 ,00 ent 02 Services ion Reserv infrastruct 0.0 0.0 55 Electrical and HV & MV Plant & Asset Basic R R R 1 e ure 0 0 85 Mechanical TEST & equipme Financi services 800 800 500 developm 30 INTEGRATED DEVELOPMENT PLAN

ent 07 Engineering REPLACE Reticulat ng and ,00 04 Services EQUIPM ion Reserv infrastruct 0.0 55 Electrical and Green Transmi Asset Basic R R R 1 e ure 0 85 Mechanical Valley ssion & Financi services 400 400 - developm 01 Engineering (x2) Reticulat ng and ,00 ,00 ent 03 Services ion Reserv infrastruct 0.0 0.0 55 Electrical and PLETT:CB Transmi Asset Basic R R R 1 e ure 0 0 85 Mechanical D ssion & Financi services - - 2,0 developm 07 Engineering UPGRAD Reticulat ng and 00, ent 05 Services E OF ion Reserv infrastruct 000 55 Electrical and Replace Transmi Asset Basic R R R 1 MAIN e ure .00 85 Mechanical and new ssion & Financi services 1,2 1,2 - SUPP developm 01 Engineering RMU's all Reticulat ng and 00, 00, ent 04 Services area ion Reserv infrastruct 000 000 55 Electrical and PLETT:NE Transmi Asset Basic R R R 1 e ure .00 .00 85 Mechanical W ssion & Financi services 1,0 1,1 1,2 developm 07 Engineering GENERAT Reticulat ng and 00, 00, 00, ent 06 Services ORS:CRR ion Reserv infrastruct 000 000 000 55 Electrical and KEURBO Transmi Asset Basic R R R 1 e ure .00 .00 .00 85 Mechanical OMS: ssion & Financi services - - 700 developm 01 Engineering UPGRAD Reticulat ng and ,00 ent 05 Services E ion Reserv infrastruct 0.0 55 Water TOOLS Plant & Asset Basic R R R 1 TRANSFO e ure 0 86 Services: AND equipme Financi services 150 150 200 RMER developm 00 Water EQUIPM nt ng and ,00 ,00 ,00 ent 23 Distribution ENT Reserv infrastruct 0.0 0.0 0.0 55 Electrical and PLETT: Transmi Asset Basic R R R 1 e ure 0 0 0 85 Mechanical UPGRAD ssion & Financi services - 1,9 - developm 01 Engineering E Reticulat ng and 00, ent 07 Services SWITCHG ion Reserv infrastruct 000 55 Water WATER Dams & Asset Basic R R R 1 EAR AT S e ure .00 86 Services: DEMAND Reservoi Financi services 500 600 800 developm 00 Water MANAGE rs ng and ,00 ,00 ,00 ent 55 Distribution MENT Reserv infrastruct 0.0 0.0 0.0 55 Electrical and NEW Transmi Asset Basic R R R 1 (PRESS e ure 0 0 0 85 Mechanical FEEDER ssion & Financi services - 1,6 1,8 developm 01 Engineering TO Reticulat ng and 00, 00, ent 08 Services AVENTU ion Reserv infrastruct 000 000 55 Water GREEN Reticulat Provin Basic R R R 1 RA e ure .00 .00 86 Services: VALLEY ion cial services 75, 13, 187 developm 00 Water PHASE 2, Govern and 770 776 ,16 ent 74 Distribution 3 & 4 ment infrastruct .00 .00 0.0 55 Electrical and REPLACE Transmi Asset Basic R R R 1 Transf ure 0 85 Mechanical EXTERNA ssion & Financi services - 400 2,8 er developm 01 Engineering L RADIAL Reticulat ng and ,00 00, ent 09 Services SUPPLY ion Reserv infrastruct 0.0 000 55 Water QOLWEN Reticulat Provin Basic R R R 1 e ure 0 .00 86 Services: I/BOSSIE ion cial services 219 62, 52, developm 00 Water SGIF PH Govern and ,84 683 860 ent 77 Distribution 4A (410) ment infrastruct 0.0 .00 .00 55 Electrical and SECURITY Security Asset Basic R R R 1 Transf ure 0 85 Mechanical FOR KEY and Financi services 500 500 500 er developm 02 Engineering SITES- policing ng and ,00 ,00 ,00 ent 06 Services CRR Reserv infrastruct 0.0 0.0 0.0 55 Water KWANOK Reticulat Provin Basic R R R 1 e ure 0 0 0 86 Services: UTHULA ion cial services 89, 19, 229 developm 00 Water PHASE 5 Govern and 380 097 ,55 ent 78 Distribution (1000) ment infrastruct .00 .00 0.0 55 Electrical and KWANO: Transmi Nation Basic R R R 1 Transf ure 0 85 Mechanical UPGRAD ssion & al services 7,5 4,4 10, er developm 02 Engineering E BULK Reticulat Govern and 01, 77, 367 ent 17 Services ELECTRIF ion ment infrastruct 930 544 ,19 55 Water SHELL Reticulat Provin Basic R R R 1 ICA Transf ure .00 .00 5.0 86 Services: ULTRA ion cial services 99, 5,8 - ers developm 0 00 Water CITY Govern and 490 81. ent 79 Distribution (167) ment infrastruct .00 00 55 Electrical and POORTJI Transmi Extern Basic R R R 1 Transf ure 85 Mechanical ES:UPGR ssion & al services 2,8 - - er developm 04 Engineering ADE SS4 Reticulat Loans and 00, ent 04 Services ion infrastruct 000 55 Water EBENHAE Reticulat Provin Basic R R R 1 ure .00 86 Services: ZER ion cial services 95, 30, 191 developm 00 Water PORTION Govern and 680 336 ,14 ent 80 Distribution S 3, 20, ment infrastruct .00 .00 0.0 55 Electrical and GOOSEV Transmi Extern Basic R R R 1 42 Transf ure 0 85 Mechanical ALLEY:UP ssion & al services 500 1,5 1,5 er developm 04 Engineering GRADE Reticulat Loans and ,00 00, 00, ent 05 Services MAIN ion infrastruct 0.0 000 000 55 Water KURLAN Reticulat Asset Basic R R R 1 SUPPL ure 0 .00 .00 86 Services: D: ion Financi services - - 5,0 developm 00 Water UPGRAD ng and 00, ent 91 Distribution E WTW Reserv infrastruct 000 55 Electrical and PLETT:UP Transmi Extern Basic R R R 1 e ure .00 85 Mechanical GRADE ssion & al services 1,2 1,2 1,2 developm 04 Engineering MINI Reticulat Loans and 00, 00, 00, ent 08 Services SUBS ion infrastruct 000 000 000 55 Water QOLWEN Reticulat Provin Basic R R R 1 ure .00 .00 .00 86 Services: I/BOSSIE ion cial services 50, 9,4 124 developm 00 Water SGIF PH Govern and 700 32. ,55 ent 92 Distribution 4B (301) ment infrastruct .00 00 0.0 55 Electrical and BRAKKLO Transmi Extern Basic R R R 1 Transf ure 0 85 Mechanical OF:POW ssion & al services - 1,1 - er developm 04 Engineering ER Reticulat Loans and 00, ent 09 Services FACTOR ion infrastruct 000 55 Water QOLWEN Reticulat Provin Basic R R R 1 CORRECT ure .00 86 Services: I PHASE 5 ion cial services - - 2,5 developm 00 Water (141) Govern and 10. ent 93 Distribution ment infrastruct 00 55 Electrical and NEW Transmi Asset Basic R R R 1 Transf ure 85 Mechanical HORIZON ssion & Financi services 3,5 - - er developm 05 Engineering S: Reticulat ng and 00, ent 00 Services UPGRAD ion Reserv infrastruct 000 55 Water HARKERV Reticulat Provin Basic R R R 1 E OF e ure .00 86 Services: ILLE (80) ion cial services 8,6 10, - MAIN developm 00 Water Govern and 90. 939 ent 94 Distribution ment infrastruct 00 .00 55 Electrical and WITTEDR Transmi Asset Basic R R R 1 Transf ure 85 Mechanical IFT: RING ssion & Financi services - 500 - er developm 07 Engineering NETWOR Reticulat ng and ,00 ent 01 Services K ion Reserv infrastruct 0.0 55 Water KURLAN Reticulat Asset Basic R R R 1 e ure 0 86 Services: D ion Financi services 1,0 1,0 1,0 developm 01 Water WTW,W ng and 00, 00, 00, ent 02 Distribution ATER Reserv infrastruct 000 000 000 55 Electrical and NATURES Transmi Asset Basic R R R 1 SUPPLY, e ure .00 .00 .00 85 Mechanical VALLEY: ssion & Financi services - 200 - BORE developm 31 INTEGRATED DEVELOPMENT PLAN

ent 08 Water ELEMETR ng and ,00 12 Distribution Y Reserv infrastruct 0.0 55 Water UDP:KRA Dams & Nation Basic R R R 1 e ure 0 86 Services: NSHOEK Reservoi al services 6,8 7,4 7,0 developm 01 Water WATER rs Govern and 05, 00, 00, ent 03 Distribution SUPPLY- ment infrastruct 158 877 000 55 Water PIESANG Reticulat Asset Basic R R R 1 GRA Transf ure .00 .00 .00 86 Services: VALLEY: ion Financi services - 1,1 - ers developm 08 Water UPGRAD ng and 00, ent 16 Distribution E WATER Reserv infrastruct 000 55 Water NEW Dams & Asset Basic R R R 1 e ure .00 86 Services: NATURES Reservoi Financi services 1,0 2,0 5,0 developm 01 Water VALLEY rs ng and 00, 00, 00, ent 05 Distribution RESERVO Reserv infrastruct 000 000 000 55 Water DUNES: Reticulat Asset Basic R R R 1 IR & e ure .00 .00 .00 86 Services: UPGRADI ion Financi services - 700 - developm 08 Water NG ng and ,00 ent 22 Distribution RETICUL Reserv infrastruct 0.0 55 Water WDM:TE Dams & Asset Basic R R R 1 ATION e ure 0 86 Services: LEMETRY Reservoi Financi services 200 200 200 developm 02 Water @RESER rs ng and ,00 ,00 ,00 ent 00 Distribution V&PUMP Reserv infrastruct 0.0 0.0 0.0 55 Water PLETT Reticulat Asset Basic R R R 1 STATI e ure 0 0 0 86 Services: CBD: ion Financi services 700 - 900 developm 08 Water UPGRADI ng and ,00 ,00 ent 23 Distribution NG Reserv infrastruct 0.0 0.0 55 Water SECURITY Security Asset Basic R R R 1 RETICUL e ure 0 0 86 Services: FOR KEY and Financi services 250 250 250 AT developm 02 Water SITES- policing ng and ,00 ,00 ,00 ent 06 Distribution CRR Reserv infrastruct 0.0 0.0 0.0 55 Water POORTJI Reticulat Asset Basic R R R 1 e ure 0 0 0 86 Services: ES: ion Financi services 600 - - developm 08 Water UPGRAD ng and ,00 ent 24 Distribution E Reserv infrastruct 0.0 55 Water PUMP Reticulat Extern Basic R R R 1 RETICUL e ure 0 86 Services: STATION ion al services - 300 300 ATIO developm 02 Water EQUIPM Loans and ,00 ,00 ent 07 Distribution ENT-EFF infrastruct 0.0 0.0 55 Water KWANO: Reticulat Extern Basic R R R 1 ure 0 0 86 Services: UPGRAD ion al services 300 - - developm 08 Water E TANK Loans and ,00 ent 25 Distribution PUMPS infrastruct 0.0 55 Water KRANSH Reticulat Extern Basic R R R 1 AND ure 0 86 Services: OEK: ion al services 1,0 1,0 970 developm 03 Water NEW Loans and 00, 00, ,57 ent 04 Distribution WATER infrastruct 000 000 6.0 55 Water NATURES Reticulat Extern Basic R R R 1 SUPPLY ure .00 .00 0 86 Services: VALLEY: ion al services 50, - - developm 08 Water NEW Loans and 000 ent 26 Distribution RIVER infrastruct .00 55 Water HARKERV Reticulat Asset Basic R R R 1 PUMP ure 86 Services: ILLE ion Financi services 500 - - developm 03 Water BULK ng and ,00 ent 05 Distribution WATER Reserv infrastruct 0.0 Table 2.9: Budget 1 SUPPLY e ure 0 developm ent 55 Water GREEN Reticulat Nation Basic R R R 86 Services: VALLEY: ion al services - - 2,6 03 Water UPGRAD Govern and 73, 07 Distribution E BULK ment infrastruct 684 1 WAT Transf ure .00 ers developm ent 55 Water GREEN Reticulat Asset Basic R R R 86 Services: VALLEY: ion Financi services 500 500 500 04 Water UPGRAD ng and ,00 ,00 ,00 04 Distribution E BULK Reserv infrastruct 0.0 0.0 0.0 1 WAT e ure 0 0 0 developm ent 55 Water KURLAN Reticulat Provin Basic R R R 86 Services: D PHASE ion cial services - 408 19, 07 Water 3 & 4 Govern and .00 010 08 Distribution ment infrastruct .00 1 Transf ure er developm ent 55 Water KRANSH Reticulat Provin Basic R R R 86 Services: OEK ion cial services - - 56, 07 Water PHASE 3, Govern and 900 09 Distribution 4 & 5 ment infrastruct .00 1 Transf ure er developm ent 55 Water NEW Reticulat Extern Basic R R R 86 Services: WADRIFT ion al services 2,0 2,0 2,0 08 Water DAM- Loans and 00, 00, 00, 00 Distribution CRR infrastruct 000 000 000 1 ure .00 .00 .00 developm ent 55 Water DUNES:U Reticulat Asset Basic R R R 86 Services: PGRADE ion Financi services - - 1,0 08 Water WATER ng and 00, 04 Distribution PIPELINE Reserv infrastruct 000 1 S e ure .00 developm ent 55 Water KEURBO Reticulat Asset Basic R R R 86 Services: OMS:UP ion Financi services - 500 - 08 Water GRADE ng and ,00 10 Distribution BOOSTER Reserv infrastruct 0.0 1 PUMP e ure 0 developm ent 55 Water NATURES Reticulat Asset Basic R R R 86 Services: VALLEY:T ion Financi services - - 300 32 INTEGRATED DEVELOPMENT PLAN MUNICIPAL SYSTEMS ACT (ACT 32 OF 2000) M. GOVERNMENT S The planning undertaken by a municipality must be 24.(1) aligned with, and complement, the development plans and strategies of other affected municipalities and other POLICIES AND organs of state so as to give effect to the principles of co- operative government contained in Section 41 of the IMPERATIVES S Constitution. 25.(1) Each municipal council must, within a prescribed period after the start of its elected term, adopt a single, CONSTITUTION OF THE REPUBLIC OF inclusive and strategic plan for the development of the municipality which - SOUTH AFRICA (a) links, integrates and co-ordinates plans and takes into S All spheres of government and all organs of state within account proposals for 40 the development of the 41(1) each sphere must - municipality: - provide effective, transparent, accountable and (b) aligns the resources and capacity of the municipality coherent government for the Republic as a with the implementation of the plan: whole; (c) forms the policy framework and general basis on - exercise their powers and perform their which annual budget must be based; S 152 functions in a manner that does not encroach (d) complies with the provisions of this Chapter; and on the geographical, functional or institutional (e) is compatible with national and provincial integrity of government in another sphere; S 26 development plans and planning requirements binding Objects of local government on the municipality in terms of legislation.  to provide democratic and accountable government for local communities; An integrated development plan must reflect – S 153  to ensure the provision of services to (a) the municipal council’; vision for the long term communities in a sustainable manner; development of the municipality with special emphasis  to promote social and economic on the municipality’s most critical development and development; internal transformation needs: 1. to promote a safe and healthy environment; and (b) an assessment of the existing level of development in A Municipality must: the municipality, which must include an identification of 1. structure and manage its administration and communities which do not have access to basic municipal budgeting and planning processes to give services; priority to the needs of the community, and to (c) the council’s development priorities and objectives for promote the social and economic development its elected term, including its local economic of the community; and development aims and its internal transformation needs; 2. Participate in national and provincial (d) the council’s development strategies which must be development programmes. aligned with any national or provincial sectoral plans and planning requirements binding on the municipality in terms of legislation; (e) a spatial development framework which must include the provision of basic guidelines for a land use management system for the municipality; (f) the council’s operational strategies; (g) applicable disaster management plans; (h) a financial plan, which must include a budget projection for at least the next three years; and (i) the key performance indicators and performance targets determined in terms of section 41. MUNICIPAL STRUCTURE ACT 117 (117 OF 1998) S 19 (1) A municipal council must strive within its capacity to achieve the objectives set out in section 152 of the Constitution. (2) A municipal council must annually review- (a) the needs of the community; (b) its priorities to meet those needs; (c) its processes for involving the community; (d) its organisational and delivery mechanisms for meeting the needs of the community; and (e) its overall performance in achieving the objectives referred to in subsection (1). (3) A municipal council must develop mechanisms to consult the community and community organisations in performing its functions and exercising its powers

33 INTEGRATED DEVELOPMENT PLAN SPATIAL PLANNING AND LAND USE South Africa was amongst the 193 countries that agreed on meeting these goals by 2015. These MANAGEMENT ACT, 2013 MDG‟s inspired development efforts and has S 5(1) Municipal planning, for the purposes of this Act, consists helped to set global and national priorities. South of the following elements: Africa has benefited in the implementation of (a) The compilation, approval and review of integrated these goals and some effects were also felt at development plans; (b) the compilation, approval and review of the municipal levels dispute the many challenges components of an integrated development plan faced by municipalities. At Bitou it is obvious that prescribed by legislation and falling within the literacy rates have improved, child mortality has competence of a municipality, including a spatial decreased, more than 2000 HIV positive S 11 development framework and a land use scheme; and individuals have access to antiretroviral treatment (1) (c) the control and regulation of the use of land within the municipal area where the nature, scale and intensity only 2.64 percent of household reported that they of the land use do not affect the provincial planning skipped a meal for more than 5 days in a month. mandate of provincial government or the national interest. Performance on the MDG‟s varied and some countries performed very poorly while others with In the development and application of measures to more resources excelled and South Africa is monitor and support the performance of the functions of amongst the countries that performed fairly well in municipalities in terms of this Act and other legislation relating to spatial planning, land development and land addressing the MDG‟s. By 2015, the signatory use management, the national government and countries re-affirmed their commitment to the provincial governments must take into account the MDG‟s and many called for more intensified and unique circumstances of each municipality. collective actions to ensure that these goals are Table 104 Legislation achieved. MILLENNIUM DEVELOPMENT GOALS UNITED NATIONS SUSTAINABLE

The United Nations Millennium Summit in 2000 DEVELOPMENT GOALS established eight development goals which were aim at reducing global hunger, the spread of The United Nations finalised the Sustainable HIV/AIDS and reduce child mortality while Development Goals in September 2015. The improving literacy and gender equality. MDG‟s were aimed at eradicating extreme poverty and hunger, gender equality and reduce The Millennium Development Goals: child mortality. The SDG‟s are an extension of the MDG‟s and include elements of safety, economic

growth and environmental goals. Like the MDG‟s South Africa will have to report on the SDG‟s.

The Sustainable Development Goals must be achieved by 2030 the same period set out for the achievement of the National Development Plan. The Sustainable Development Goals are detailed below:

Figure 2: Millennium Development Goals

Goal 1: Eradicating extreme poverty and hunger Goal 2: Achieving universal primary education Goal 3: Promoting gender equality and empowerment Goal 4: Reducing child mortality rates Goal 5: Improving maternal health Goal 6: Combating HIV/AIDS malaria and other diseases Goal 7: Ensuring environmental sustainability Goal 8: Developing a global partnership for development

Figure 2.5 34 INTEGRATED DEVELOPMENT PLAN Goal End poverty in all its form to eliminate poverty and reduce inequality by 1 everywhere Figure 57: Sustainable 2030. Expressed in real values the NDP seeks to: Gola End hunger, achieve food Development Goals 2 security and improved  Eliminate income poverty by reducing the nutrition and promote proportion of households with a monthly sustainable agriculture Goal 15: Protect, restore and income of R419.00 (in 2009 prices) per person Goal Ensure healthy lives and promote sustainable use of from 39percent to zero; and 3 promote well-being for terrestrial ecosystems,  Reduce inequality by reducing the Gini all ages sustainably manage forests, coefficient from 0.70 to 0.60 combat desertification, and halt Goal Ensure inclusive and and reserve land degradation and The National Development Plan (NDP) developed 4 equitable quality halt biodiversity loss education and promote key targets that with the help of communities, civil lifelong learning Goal 16: Promote peaceful and society, state and business will assist in the opportunities for all inclusive societies for sustainable elimination of poverty and the reduction of development, provide access to Goal Achieve gender equality justice for all and build effective, inequality. 5 and empower all women accountable and inclusive and girls institutions at all levels South Africa can realise these goals by drawing on the energies of its people, growing an inclusive Goal Ensure availability and Goal 17: Strengthen the means of economy, building capabilities, enhancing the 6 sustainable management implementation and revitalize the of water and sanitation global partnership for sustainable capacity of the state, and promoting leadership for all development and partnerships throughout society. In order to do this, a number of enabling milestones are Goal Ensure access to 7 affordable, reliable, detailed: sustainable and modern energy for all  Increase employment from 13 million in 2010 to 24 million in 2030. Goal Promote sustained,  Raise per capita income from R50 000 in 2010 8 inclusive and sustainable economic growth, full to R120 000 by 2030. and productive  Increase the share of national income of the employment and decent bottom 40 percent from 6 percent to 10 work percent. Goal Build resilient  Establish a competitive base of infrastructure, 9 infrastructure, promote human resources and regulatory frameworks. inclusive and industrialization to foster  Ensure that skilled, technical, professional and innovation managerial posts better reflect the country's racial, gender and disability makeup. Goal Reduce inequality within 10 and among countries  Broaden ownership of assets to historically disadvantaged groups. Goal Make cities and human  Increase the quality of education so that all 11 settlements inclusive, safe, resilient and children have at least two years of preschool sustainable education and all children in grade 3 can read and write. Goal Ensure sustainable 12 consumption and  Provide affordable access to quality health production patterns care while promoting health and wellbeing.  Establish effective, safe and affordable public Goal Take urgent action to 13 combat climate change transport. and its impact  Produce sufficient energy to support industry at competitive prices, ensuring access for Goal Conserve and sustainably 14 use the ocean, seas and poor households, while reducing carbon marine resources for emissions per unit of power by about one- sustainable development third.

 Ensure that all South Africans have access to Table 2.9 – UN Sustainable Development Goals clean running water in their homes. NATIONAL DEVELOPMENT PLAN  Make high-speed broadband internet universally available at competitive prices. In 2012 the planning commission launched the  Realise a food trade surplus, with one-third National Development Plan (NDP). This plan aims produced by small-scale farmers or households.

35 INTEGRATED DEVELOPMENT PLAN  Ensure household food and nutrition security. In addition to the PSG‟s several game changers  Entrench a social security system covering all were prioritised to catalyse the implementation of working people, with social protection for the the PSG‟s. The implementation of the PSG‟s and poor and other groups in need, such as game changers will be implemented in a children and people with disabilities. partnership approach between  Realise a developmental, capable and government, other spheres of government, civil ethical state that treats citizens with dignity. society, private sector and individual citizens.  Ensure that all people live safely, with an Provincial Game Changers independent and fair criminal justice system.  Broaden social cohesion and unity while 1. Broadband and e-learning. To enable young redressing the inequities of the past. people to be well-equipped for the 21st  Play a leading role in continental century world of work, information technology development, economic integration and must be an integral part of their learning and human rights. lives. 2. After school facilities. Over the past five years, PROVINCIAL STRATEGIC PLAN 2014 – 2019 the Western Cape Government instituted an The PSP is rooted in a very clear vision that the after school programme, with what is called Western Cape Government set out in 2009: (Mass Opportunity and Development) MOD namely, to realise an open-opportunity society for centres, which now covers more than 180 all, so that residents of the Province can use their schools. freedom to live lives they value. The PSP thus gives 3. Alcohol harms reduction. The Western Cape expression to a strong view that progress must be has a long history of alcohol abuse, with built on a “whole-of-society” approach in which significant social, economic and health costs. citizens, civil society and business actively partner Injury (both intentional and unintentional) with the state – encapsulated in the Western constitutes a very high proportion of the costs Cape Government‟s “Better Together” slogan. of alcohol abuse (some 40 percent). 4. The Economy: “People and Power”. Jobs and The PSP is also closely aligned with the NDP, which growth are the number one priority of the commits South Africa to ending poverty by 2030; Western Cape Government. To enable our as well as the Medium-term Strategic Framework youth to aspire to a future in which they can 2014-19, the national implementation framework be responsible adults, we have focused the for the NDP. The PSP also reflects the Provincial skills Game Changer on a few prioritised Spatial Development Framework – a critical occupations and sectors – particularly the enabler for development – and the longer-term green economy, oil and gas services, tourism OneCape 2040 vision. Finally, the PSP is and agri-processing. underpinned by the six core values of the Western 5. Better Living: addressing the legacy. Cape Government: Caring, Competence, All the major cities in South Africa are Accountability, Integrity, Innovation and grappling with the apartheid legacy of severe Responsiveness. shortages of housing stock for the poor, exacerbated by rapid urbanisation. The PSP was streamlined to from 11 provincial strategic objectives to five Provincial Strategic It is important to note all the international, Goals. Below are the five provincial strategic national, provincial and district development gaols: strategies and goals as municipalities prepare their strategic plans. Bitou Municipality is taking note off all of the above as reporting on the SDG‟s and NDP might be cascaded down to municipalities as an institution Bitou Municipality will be ready to report on these one the time come. MUNICIPAL POLICIES AND SERVICE DELIVERY IMPROVEMENT PLANS

The Municipality has the following policies, Figure 2.9: Provincial Strategic Goals service delivery improvement plans and systems to support the workforce in delivering on the 36 INTEGRATED DEVELOPMENT PLAN strategic objectives and to promote institutional Revised Substance Abuse: Alcohol And 4 viability and cohesion: Drug Policy And Procedure 5 Revised Recruitment And Selection Policy SECTION 1: OFFICE OF THE MUNICIPAL MANAGER 6 Employment Equity Policy N Council Policy description 7 Scarce Skills Policy o resolutions 8 Employee Study Aid Policy 1 Anti-fraud and corruption strategy 9 Dress Code Policy Expanded public works programme 10 Communication Strategy 2014 - 2017 C/3/72/09/13 2 (EPWP) policy and implementation C/1/88/03/14 11 Customer Care Strategic Plan C/3/72/09/13 guidelines Legal Plan And Standard Operating 12 C/3/73/09/13 SECTION 2: FINANCE Procedures/Policy Council's In- N SECTION 4: COMMUNITY SERVICES Policy description Principle Council's In- o N approval Policy description Principle Draft investment and cash management o 1 approval policy Bitou Municipality: Liquor Trading Hours C/2/174/05/1 1 2 Funding and reserve policy By-Law 4 2 Sporting Facilities By-Law C/2/174/05/1 3 Tariffs policy 3 Sport Policy And Procedure Document 4 Integrated Waste Management Plan C/2/174/05/1 4 4 Asset management policy (IWMP) 4 SECTION 5: MUNICIPAL SERVICES & INFRASTRUCTURE C/2/174/05/1 5 Property rates policy DEVELOPMENT 4 Council's In- N C/2/174/05/1 Policy description Principle 6 Virement policy o 4 approval C/2/174/05/1 Bitou municipal water services 7 Budget process policy 1 C/5/39/12/13 4 development plan C/2/174/05/1 8 Borrowing policy SECTION 6: STRATEGIC SERVICES 4 Council's In- N C/2/174/05/1 Policy description Principle 9 Long term financial planning policy o 4 approval C/2/174/05/1 Policy for the management of immovable C/6/180/09/1 10 Credit control and debt collection policy 1 4 property assets of the Bitou municipality 3 C/2/174/05/1 Local economic development strategy C/6/182/09/1 11 Overtime policy 2 4 implementation plan 3 C/2/174/05/1 12 Recruitment and selection policy BUSINESS RETENTION EXPANSION AND 4 NEW INVESTMENT POLICY (Mandate C/6/184/09/1 Computer and information technology C/2/130/09/1 3 13 requested from Council to develop the 3 policy 3 policy) C/2/130/09/1 Draft spatial development framework 14 It disaster recovery and backup plan 4 3 implementation strategy C/2/130/09/1 Draft amended performance management C/6/193/09/1 15 Change management and control policy 5 3 framework 3 Information technology (it) governance C/2/131/09/1 C/6/204/12/1 16 6 Bitou municipality encroachment policy framework 3 3 Draft unauthorised, irregular, fruitless and Bitou staff housing policy and market 17 7 wasteful expenditure policy related rental value Draft creditors, councillors and personnel C/6/224/03/1 18 8 Draft outdoor advertising policy payment policy 4 19 Preferential procurement policy 9 Draft outdoor advertising by-law C/2/157/03/1 Implementation of SPLUMA and new C/6/229/03/1 20 Municipal supply chain management policy 10 4 planning by-law 4 C/2/171/05/1 21 Draft travelling allowance policy Table 105 Policies and Plans 4 SECTION 3: CORPORATE SERVICES Council's In- BUDGET RELATED POLICIES N Policy description Principle o approval Council Approval 1 Revised Overtime Policy C/3/68/06/13 Policy Title Resolution Date 2 Placement Policy 16-Oct-14 3 Revised Leave Policy Expanded Public Works Programme C/3/95/10/ 37 INTEGRATED DEVELOPMENT PLAN Council Approval Council Approval Policy Title Resolution Date Policy Title Resolution Date

(EPWP) Policy and Implementation 14 Procurement Guidelines Investment & Cash Management C/2/235/05 Investment and Cash Management C/3/95/10/ Policy /15 27-May-15 Policy 14 16-Oct-14 C/2/235/05 Asset Management Policy Computer and Information C/3/95/10/ /15 27-May-15 Technology Policy 14 16-Oct-14 C/2/235/05 Property Rates Policy C/3/95/10/ /15 27-May-15 Disaster Recovery and Backup Plan 14 16-Oct-14 C/2/235/05 Indigent Support Policy Change Management and Control C/3/95/10/ /15 27-May-15 Policy 14 16-Oct-14 C/2/235/05 Long-Term Financial Planning Policy Unauthorised, Irregular, Fruitless C/3/95/10/ /15 27-May-15 and Wasteful Expenditure Policy 14 16-Oct-14 C/2/235/05 Virement Policy Creditors, Councillors and Personnel C/3/95/10/ /15 27-May-15 Payment Policy 14 16-Oct-14 C/2/235/05 Travelling Allowance Policy Communication Strategy 2014 - C/3/95/10/ /15 27-May-15 2017 14 16-Oct-14 ICT Operating System Security C/3/123/06 C/3/95/10/ Controls Policy /15 25-Jun-15 Customer Care Strategic Plan 14 16-Oct-14 C/3/123/06 ICT Security Controls Policy Sport Policy and Procedure C/3/95/10/ /15 25-Jun-15 Document 14 16-Oct-14 C/3/123/06 ICT User Access Management Policy Bitou Municipal Water Services C/3/95/10/ /15 25-Jun-15 Development Plan 14 16-Oct-14 Municipal Corporate Governance of Policy for the Management of Information and Communication C/2/295/05 Immovable Property Assets of the C/3/95/10/ Technology Policy /16 31-May-16 Bitou Municipality 14 16-Oct-14 Bitou Municipality ICT Data Backup C/2/295/05 Bitou Municipality Encroachment C/3/95/10/ and Recovery Policy /16 31-May-16 Policy 14 16-Oct-14 C/2/297/05 Borrowing Policy and guidelines C/3/95/10/ /16 31-May-16 Outdoor Advertising Policy 14 16-Oct-14 C/2/297/05 Petty Cash Policy C/4/68/10/ /16 31-May-16 Housing Selection Policy for Bitou 14 16-Oct-14 Credit Control & Debt Collection C/2/297/05 C/2/235/05 Policy /16 31-May-16 Borrowing Policy and guidelines /15 27-May-15 C/2/297/05 Tariff Policy C/2/235/05 /16 31-May-16 Petty Cash Policy /15 27-May-15 Creditors, Councillors and Personnel C/2/297/05 Credit Control & Debt Collection C/2/235/05 Payment Policy /16 31-May-16 Policy /15 27-May-15 Liquidity, Funding and Reserves C/2/297/05 C/2/235/05 Policy /16 31-May-16 Tariff Policy /15 27-May-15 Supply Chain Management Policy Creditors, Councillors and Personnel C/2/235/05 Incorporating Preferential C/2/297/05 Payment Policy /15 27-May-15 Procurement /16 31-May-16

Liquidity, Funding and Reserves C/2/235/05 Investment & Cash Management C/2/297/05 Policy /15 27-May-15 Policy /16 31-May-16

C/2/235/05 C/2/297/05 Supply Chain Management Policy Asset Management Policy Incorporating Preferential /15 27-May-15 /16 31-May-16 38 INTEGRATED DEVELOPMENT PLAN Council Approval Policy Title Resolution Date N. JOINT PLANNING AND C/2/297/05 Property Rates Policy /16 31-May-16 ALIGNMENT

C/2/297/05 Indigent Support Policy /16 31-May-16 As the municipality embarks on a journey to re- C/2/297/05 write the IDP as prescribe by legislation it has to Long-Term Financial Planning Policy /16 31-May-16 consult with communities and at the same time consider sectoral requirements for balanced and Budget Implementation and C/2/297/05 sustainable development. Development is not Monitoring Policy /16 31-May-16 only the provision of housing, water, sanitation but C/2/297/05 multi-sectoral and multi-dimensional, Travelling Allowance Policy /16 31-May-16 It is also with mentioning that sector plans should C/2/297/05 Overtime Policy not be developed as a compliance tool but as a /16 31-May-16 planning instrument that will assist the municipality C/2/297/05 in analysing, prioritising, resources and Insurance Policy /16 31-May-16 implementing programmes that my positively enhance the lives of people and the natural C/2/297/05 Recruitment and selection Policy environment in which they live. /16 31-May-16 Another very crucial aspect that is normally Table 106 Budget Related Policies overlooked when dealing with issues of alignment It is Council‟s intention to develop a schedule of are cross cutting issues like: all policies and by-laws that will indicate an 1. Natural Environment annual action plan for reviewing all policies and 2. Spatial Dimension by-laws. This process will assist the Municipality to 3. Economic Dimension be developmental and innovative in conducting 4. Institutional Dimension its business. 5. Gender Equity 6. HIV/AIDS 7. Poverty Alleviation 8. Youth Development 9. Urban and Rural Development

The municipality must pronounce and clearly define its role in addressing some of the cross cutting dimensions. The Mayor‟s office is currently dealing with some of this issue like Gender and youth but unfortunately they are not mainstreamed.

Some sectors requirements like the Municipal Disaster Management and Spatial Development Framework are legislative requirements and must

be adhered to and complied with.

It would have been ideal if the revision or writing up of sector plans coincided with the IDP process. It could have been ideal as well if municipalities had readily available resources to produce most of these sector plan because at the moment it is costly to produce and reproduce sector plans. Without provincial or district intervention it will be

difficult for municipalities especially Bitou Municipality to produce these sector plans.

39 INTEGRATED DEVELOPMENT PLAN It is worth mentioning that all sector plans status Implementat quo remains until they are revised in progression ion Plan with implementation of the 2017 – 2018 integrated Local The May Annually C/5/32/05/ Integrated Revised 2013 13 development plan. This section will therefore Transport LITP was present an overview of some content. Plan approved by Council SECTOR STATUS DATE DATE COUNCIL (revised PLAN OF PLAN APPROVE WHEN RESOLUTIO chapters D REVIEW N NUMBER 3,6, 8) IS DUE Long Term Not in n/a 2015/20 Air Quality In place 27/06/20 2017 C/4/47/06/ Financial place yet 16 Managemen 13 13 Plan t Plan Pavement Approved June June C/5/34/06/ Disaster 1st Level 2008 Septem M4/02/08 Managemen and being 2013 2016 13 Managemen Disaster ber 2013 t System implemen t Plan Managem ted ent Plan Updated approved June 2011 New plan Public Safety Approved June Annually c/4/43/06/ to be Master Plan 2013 13 developed Performance Approved May 2014/15 C/6/19309/ for Council Managemen and in 2013 13 approval t Policy process of Electricity Approved March 2016 C/5/18/06/ Framework being Master Plan and in 2013 12 implemen process of ted being Risk Plan 2008 2013/14 C/2/10/06/ implemen Managemen completed 08 ted t Plan and HIV/Aids The policy Approve Lack adopted Policy was d 26 resource by Council approved March s - To be and need 2009 reviewed urgent Sewer Available 2008 2014/15 revision. Master Plan and needs Integrated The October 2013/14 to be Coastal Municipali 2012 reviewed Managemen ty does Spatial Approved Septemb 2018/19 C/6/186/09 t Strategy not yet Developmen er 2013 /13 have a t Framework strategy Storm Water Available Under 2014/15 but Master Plan only for review collaborat town area ed with / Eden DM Plettenber when g Bay Eden Water In place 2010 2014/15 drafted a Demand and being District Managemen implemen plan. t Strategy ted Integrated The IHSP August Ongoing M/4/48/08/ Water Currently 2009 MARCH Human was 2013 13 Master Plan being 2017 Settlement approved reviewed Plan by Council Water Safety In place Reviewe Reviewe Integrated The draft Septemb Annually M/4/50/09/ nd Plan and being d d Waste 2 er 2013 13 implemen annually annually Managemen generatio ted t Plan n IWMP Water Currently Oct 2013 Annually C/5/39/12/ was Services being 13 approved Developmen reviewed by Council t Plan and Workplace Approved June Annually C/3/67/06/ Local Are March MARCH M/64/03/1 Skills Plan and in 2013 13 Economic Approved 2012 2017 2 process of Developmen being t Strategy implemen and LED ted and 40 INTEGRATED DEVELOPMENT PLAN revised DEADP. annually Waste Waste management or landfilling is a Table 4: Status on Sector Plans Management challenge at the moment and the Plan municipality is spending large sums of many The table above gives a summary report on the to transport waste to . The status of sector plans. Some of the sector plans municipality cannot sustain the are out-dated and some are still within in the transportation of waste. The rehabilitation of the existing landfill site is important. period of five years and were reviewed during the drafting of this IDP. The municipality urgently The new waste management plan should requires the support of the Provincial government provide the municipality with viable in developing or updating some of the plans listed alternatives and partnership options even if it below. means that cross border partnerships has to be entered into. Transversal partnering (between line-function Rural 15 percent of Bitou’s population lives in rural Development areas where there is no or poor services. Departments within the Municipality and with Strategy Employment is a challenge and municipal entities) unemployment very high. Alcohol abuse is the other of the day and there are no land Inter-governmental partnering (between the reform programmes for potential farmers. Municipality and other spheres of Government, The rural development strategy will guide the municipality on areas of concern and help in public entities and state-owned companies) prioritising government expenditure. This strategy will also address land reform and Cross-boundary partnering (partnerships with tenure security on rural and farming land. other municipalities across municipal boundaries, Cross-border and transversal partnerships within a functional region) will be entered into for the development of this strategy Cross-sector partnering (partnering with external Table 5: Sector support required by Bitou Municipality role-players such as business or civil society)

Plan Motivation Disaster Last summer was very disastrous for Bitou, Management Plan there were veld fires everywhere and some areas are prone to floods. Global warming is very real and annually the weather patterns are changing and having devastating consequences. There is a need to urgently draft or amend the existing Disaster Management Plan. Cross-boundary partnering (partnerships with other municipalities across municipal boundaries, the District Municipality and Provincial Government will be involved within the Municipal area)

Water Services Development Plan Local Integrated Cross-boundary partnering with the Eden Transport Plan District Municipality to help the municipality with reviewing and amending the Local Integrated Transport Plan (LITP) Air Quality Air Quality Management has become very Management crucial for sustainable development and the Plan municipality’s role is to ensure that its residents breath clean air. Cross-boundary partnering with the Eden District Municipality will assist with the development of an Air Quality Management Plan. Environmental Due to lack of resources and internal Management capacity, the municipality is unable to Plan produce an Environmental Management Plan and therefore would require inter- governmental partnering with the support of 41 INTEGRATED DEVELOPMENT PLAN STRATEGIC ALIGNMENT

ALIGNMENT OF MILLENNIUM DEVELOPMENT GOALS, NDP, PSG AND EDEN STRATEGIC GOALS

Back to Basics Millennium 2016 NDP 2030 National WC Strategic 2012 -2017 BITOU Development Sustainable Outcomes Plan MUNICIPAL Revised Chapter Goals 2015 Development (2010) Eden Strategic STRATEGIC 9 Outcomes (2014-2019) Goals GOALS (Responsive, Goals accountable, Provincial effective and Strategic Goals efficient developmental local government system

B2B 1: MDG 1: SDG 1: No Chapter 10: Outcome 2: A PSG 3: SG 1: Healthy Public Eradicate Poverty Health Care for long and Increasing and Socially participation: Members of extreme poverty all healthy life for Wellness, Safety stable Create an active society have and hunger SDG 2: No all South and Tackling communities and engaged sustainable and Hunger Africans Social Ills citizenry, able to reliable access to MDG 4: Reduce engage with and SDG 3: Good Chapter 11: basic services child mortality shape the Health Social Protection municipality’s MDG 5: Improve Outcome 7: programme. maternal health SDG 6: Clean Vibrant, Water and equitable and MDG 6: combat Sanitation sustainable HIV/AIDS, rural

malaria and communities other diseases and food security for all

B2B 3: MDG 3: Promote SDG 4: Quality Chapter 9: Outcome 1: PSG 2: Increase SG 2: Build a Public gender equality Education Improving Improve the education capacitated participation: Democratic, well and empower Education, quality of basic outcomes workforce and Create an active governed and women SDG 5: Gender training and education communities and engaged effective Equality innovation Improving citizenry, able to municipal Outcome 5: A Education engage with and SDG 8: Good institutions skilled a capable Outcomes and shape the Jobs and capable of workforce to Opportunities municipality’s Economic Chapter 15: carrying out their support for Youth programme. developmental Growth Nation building inclusive growth Development mandate as per and Social SDG 10: the constitution. Cohesion Reduced Inequalities

B2B 3: SDG 7: Clean Chapter 4: Outcome 6: An PSG 1: Create SG 3: Conduct universal access Energy efficient, Opportunities regional bulk to decent quality Democratic, well Economic competitive and for Growth and infrastructure of services governed and SDG 9: Infrastructure responsive Jobs planning and effective Innovation and economic implement Chapter 5: municipal Infrastructure infrastructure PSG 2: projects, roads Inclusive rural institutions network Improving maintenance and SDG 11: Economy capable of Education public transport: Sustainable carrying out their Outcomes and manage and Cities and developmental Opportunities develop council Communities mandate as per for Youth fixed assets the constitution. Development

42 INTEGRATED DEVELOPMENT PLAN BB2B 3: MDG 7: Ensure SDG 7: Clean Chapter 5: Outcome 3: All PSG 4: Enabling SG 4: Promote spatially environmental Energy Environmental people in South a Resilient, sustainable integrate areas Democratic, well sustainability Sustainability and Africa protected Sustainable, environmental separated by governed and SDG 12: resilience and feel safe Quality and management apartheid, effective Responsible Inclusive Living and public safety promote access municipal Consumption Chapter 12: Outcome 10: Environment for poor to work, institutions Protection and recreational and SDG 13: Protect Building safer capable of enhancement commercial the Planet communities carrying out their of Environ- opportunities developmental mental assets SDG 14: Life mandate as per and natural below water the constitution. resources SDG 15: Life on Outcome 11: A Land better South Africa, a better and safer Africa and world

B2B : 4 Chapter 13: Outcome 9: A PSG 5: SG 5: Ensure responsive and Embedding financial viability Sound Financial Building a accountable, Good of the Eden Management capable and effective and Governance and District developmental efficient local Integrated Municipality state government Service Delivery system through Chapter 14: Partnerships Fighting and Spatial corruption Alignment

B2B 2: MDG 8: Develop Outcome 9: A PSG 5: G6: Promote build a capable, a global responsive, Embedding Good corruption-free Strengthened partnership for SDG 17: Chapter 13 accountable, Good Governance administration inter- development Partnerships for effective and Governance and that is able to Building a governmental the Goals efficient local Integrated deliver on capable and arrangements for government Service Delivery developmental SDG 16: Peace developmental a functional system through mandate and Justice state system of Partnerships cooperative Outcome 12: An Manage SDG 10: Chapter 14: and Spatial governance for efficient, expenditure Reduced Fighting Alignment local government effective and prudently, grow Inequalities corruption development - PSG 2: revenue base and SDG 12: Chapter 15: orientated Improving build long term Responsible public service Education financial Consumption Nation building and an Outcomes and sustainability so and social empowered, Opportunities as to invest in cohesion fair and for Youth social and inclusive Development economic citizenship. development

B2B: 5 MDG 1: SDG 8: Good Chapter 3: Outcome 4: PSG 1: Create G7: Grow the grow local jobs and Economy and Decent Opportunities district economy economy, create Local public Eradicate economic Employment employment for Growth and jobs, empower employment extreme poverty growth through Jobs previously programmes and hunger Chapter 6: inclusive disadvantaged, expanded economic PSG 2: transform Inclusive rural through the growth Improving ownership economy Community Work Education patterns 2. Programme Outcome 6: An Outcomes and Economic (EPWP) efficient, Opportunities development of competitive and for Youth local economy responsive Development economic infrastructure network

Table 2.8: Alignment table, supplied by Eden District Municipality

43 INTEGRATED DEVELOPMENT PLAN O. SITUATION ANALYSIS 70000 DEMOGRAPHIC PROFILE Population 59157 Households 60000 R² = 0.9555 49162 rt 50000 * Note: Caution against use of CS2007 39002 40000 29182 30000 21914 18010 16645 20000 12,645 R² = 0.9173 8763 10000 5039

0 Cen. 1996Cen. 2001 CS 2007 Cen. 2011 CS 2016

Figure 2.10 Number of households POPULATION GROWTH RATES BY DISTRICT

Figure 32.9 : Bitou Demography Year MUNICIPALITY – 1996, 2001 AND 2011

The actual growth rate of the Bitou population has been Population growth has slowed down across the 8.7 percent more than PWC2011 – 2040 estimates. province with the exception of Cape Winelands, Bitou Growth Rate has slowed down from 9.19% per which remained largely unchanged, and the City annum (1996-2001), to 5.2 percent per annum (2001- of Cape Town, that experienced a faster growth in the period 2001–2011. Of note is the 5, 0 percent 2011) and is now at 4.21 percent per annum (2011- growth for Overberg between 1996 and 2001 and 2016) – above the Provincial and District averages. the decline to 2, 4 percent during the period 2001– Eden DM Bitou 2011. 2001 *Census 454923 29182 StatsSA 2011 *Census 574265 49162 StatsSA 2016 *Census 611278 59157 StatsSA 2016 *PWC 606893 54413 2020 *PWC 631005 58369 2030 *PWC 682199 67376 2040 *PWC 721367 75418 Table 6: Population growth estimates Western Cape Government

According to the graph below, the number of households are not growing at the same rate as the Figure 2.11: Population growth rate by district population. The population of Bitou is expected to increase and the population is 90 percent urbanised.

44 INTEGRATED DEVELOPMENT PLAN

SPATIAL ANALYSIS 15% of the total population in 2001 to approximately 10% as a proportion of the 2011 population. There is still marginal absolute growth in the non-urban areas.  The population increase is approximately 2 000 persons per annum, and youth 0-14 makes up almost a quarter of the population. The total population of Bitou is set to increase with th approximately 10 000 people during the 4 Generation IDP period, and will reach the 70 000 to 75 000 mark over the next decade or so should the growth patterns continue.  The biggest growth occurs in the areas comprising Plettenberg Bay, Kwa-Nokuthula and Kranshoek (the latter is experiencing the fastest growth of all settlements in Bitou). Specific attention needs to be paid to urban efficiencies and the provision of facilities and amenities in an integrated manner. The SDF and IDP strategies need to provide clear guidance for public investment in this regard in these areas.  Bossiesgif / New Horizons are the most vulnerable communities: Focussed strategies are required to address service delivery and development needs in this area. This area is comparatively very highly endowed with working age males with relatively low levels of education and low levels of formal dwellings.  Population densities are highest in Bossiesgif and in Kwa-Nokuthula. Human settlement place- making responses are required to ensure quality living environments and inclusive and integrated development.  Specific strategies are required to address issues Figure 4: High growth Nodes PRIMARY OBSERVATIONS OR involving the youth, female-headed households CONCLUSIONS have increased and an integrated response to education strategies needs specific attention.  Even though the population growth rate has slowed down, the Bitou population growth rate TOURISM is set to continue into the foreseeable future. Household formation is in most settlements is Tourism and related sectors such as catering and significantly higher than the population growth – accommodation remain central to the economic driving the demand for basic services and access well-being of Plettenberg Bay. to amenities.  Bitou is approximately 90% urbanised, and the The formation of an independent tourism total non-urban population has decreased from organization has been key, taking a fragmented 45 | P a g e INTEGRATED DEVELOPMENT PLAN

marketing and product offering and giving it more The PTVA utilises a variety of marketing tools to focus and direction, and a better brand identity and promote the area as a tourist destination, e.g. its positioning. website; brochures, print media; line advertising; social media; exhibitions; educational as well as In addition, the tourism office has been the driving consumer and trade shows. force behind the creation of events to counter the seasonality inherent in the sector in Plettenberg Bay. Name Description Whilst still in the early introductory stages, events Brand Develop unique brand and strategy for use by all such as: Strategy related stakeholders Events Market events outside of Bitou area to draw new  The Sasfin Plett Wine and Bubbly festival Marketin investors, visitors and tourists  The Plett MAD Festival g Brand  Tour de Plett Market “Plettenberg Bay and Surrounds” as tourism Marketin and investment destination These are products with long-term possibilities. In g addition, the Plett slack-packing route, as well as the Develop Developing tourism businesses in PDI areas, and ment developing PDI businesses for integration into nascent birding route both offers potential to bring tourism mainstream tourism products up-market tourists throughout the year. Table 2.10 Marketing tools The development of further projects such as the DWELLING TYPE Qolweni backpacker’s project have the potential to move tourism products out of the central town into The number of formal dwellings increased with the surrounding communities. more than 6, 000 dwellings from 1996 to 2011. The It should be noted development and bringing to increase in the number of dwellings can be market of viable products will be critical to a more attributed to the population increase. At the same inclusive tourism industry. time, the number of informal dwellings nearly trebled from 2001 to 2011. Bitou had 1, 478 In terms of holiday accommodation, Plettenberg Bay informal dwellings in 2001, which increased to 4 049 is served by the iconic Beacon Island Resort Hotel as in 2011. The map in figure 10 below gives a spatial well as high-end boutique hotels located within the link to informal dwellings. The informal dwellings in town itself and the surrounding rural areas. There is wards 5 and 4 are mostly back yard dwellings on a large B & B and guest house sector, as well as plots with formal dwellings. holiday house rentals. The table below gives the actual figures of the Tourism is outsourced to an existing tourism dwelling types whilst figure 8 schematic organisation namely the Plett Voluntary Tourism demonstration of trends since 1996. Association (PTVA) which acts as an executive and coordination organ for the promotion of sustainable DWELLING TYPE 1996 2001 2011 tourism and tourism development in the municipal Formal dwelling 3879 6989 12013 area by means of a strategic partnership with the Traditional dwelling 93 223 168 Municipality. The responsibilities are based on a Informal dwelling 960 1478 4059 Service Level Agreement which includes 3 important Other 48 72 405 areas such as marketing, administration and Unspecified 59 0 0 development. They receive an annual grant from the TOTAL 5039 8762 16645 Municipality but also receive membership fees from Table 7: Number of dwellings by type of dwelling members who belong to the organisation.

46 | P a g e INTEGRATED DEVELOPMENT PLAN

TAMBO TRANSIT INFORMAL SETTLEMENT

Figure 2.13: Percentage size of household dwelling type

The integrated Human settlement plan provides a strategic and a policy framework to deal with human settlement issues.

Figure 2.15 Demographics

Figure 2.14: Informal Dwellings by Ward

The map above indicates the wards with the most number of informal dwellings in Bitou. The Western Cape government’s human settlements section conducted an informal human settlement profile in Figure 2.16: Tambo Transit Camp all wards and in the following section some of the elements of that study will be highlighted. This The community of Tambo transit camp was report also provide for possible actions to be taken relocated from Kranshoek after a fire destroyed by the municipality to address the plight of informal their settlement. There relocation was said to be settlement dwellers. temporary but they have remained in Tambo square ever since.

Tambo Transit Camp is a very high-densely populated settlement located inside the urban edge on land that is zoned as public open space. The settlement experiences natural hazards of sinking soil, flooding, rock falls, locational hazards of being situated on a slope greater than 18 as well as being situated under power lines. These hazards can be improved through the incremental formalisation of 47 | P a g e INTEGRATED DEVELOPMENT PLAN

the settlement. As such, the settlement is GAATJIE INFORMAL SETTLEMENT considered ideal for in-situ upgrading. The settlement has adequate access to water and sanitation services. A maintenance plan must be developed and include a protocol for reporting broken infrastructure. The community has identified priorities such as access to employment opportunities. The municipality should make use of local labour by developing a maintenance plan and appointing EPWP workers. The municipality will engage the community leadership structure to agree Figure 2.17 Gaatjie Informal Settlement with the implementation of priorities. The settlement is well located and enjoys access to a clinic, socio-economic amenities and educational facilities. The community experiences a range of social problems linked to drug and alcohol-related violence, petty crime and gangsterism. There is no police station located inside the settlement. The municipality should engage the Sout African Police Service to provide a mobile police station and fix street lights as a form of passive surveillance to improve the community’s safety. The municipality should also facilitate social programmes from various state departments and social organisations to raise awareness around drug and alcohol use and abuse. Figure 2.18: Gaatjie informal settlement Short term priorities: The residents were from Gaatjie. They were moved to a settlement known as Salon. From there, the

1. Access to shelter: Residents require safety of residents were moved to the current Pine Tree tenure, thus an emphasis on the need for settlement. Pinetree is a medium density settlement houses. located on land owned by the municipality with no

2. Access to employment opportunities: People zoning; however a portion of the land is to be used must be employed according to qualifications by a school. The settlement experiences locational not according to the political party hazards since it is located in a flood-prone area,

3. Access to community facilities: There are no close to a garbage dump, on sinking soil, on a slope community facilities in the settlement, all the and under power lines. A portion of the settlement facilities are very far away has been categorised for in situ upgrading and

4. Serviced Sites: If the municipality is unable to urgent relocation for the portion located under provide houses, then they must provide sites power lines. The effects of other hazards such as and services. flooding can be solved by providing an adequate formal storm water drainage system and hardening surfaces, in order to mitigate the effects of sinking soil. Man-made hazards such as inadequate sanitation, inadequate waste management, a poor street network and water logging drainage can be 48 | P a g e INTEGRATED DEVELOPMENT PLAN

addressed by incrementally upgrading the municipally owned land and on an electrical settlement. The settlement is well-located in servitude. The community experiences a range of relation to a clinic and educational amenities. locational hazards and risks such as being located in However, socio-economic and community facilities a flood-prone area, close to a garbage dump, next to are absent. The community needs to organise itself a road, on a slope greater than 18 and under power with the help of the municipality to lead lines. The community has settled here for the past development initiatives. The municipality must use 20 years. Hazards and risks can be mitigated by the EPWP to employ locals in cleaning up the formalising the settlement through upgrading road settlement so that the community takes ownership infrastructure and drainage channels. The of its infrastructure. The community has made community has adequate access to basic services. reference to a time when they assisted the The settlement needs an infrastructure maintenance municipality with building the infrastructure for plan facilitated and funded by the municipality. Basic toilets. This same rationale must be applied to service shortfalls should be prioritised in order to implementing community priorities. address the living conditions on the ground. Health and educational amenities are not located far from Short term interventions the settlement but it takes time for community members to walk to them and as such, the  Apply concrete to community dug out channels municipality should ensure accessible transport for to improve storm water drainage. the community. The settlement is suitable for in situ  Provide a communal skip and black bags for upgrading. The electrical servitude should be individual household waste management. addressed by re-blocking the settlement. Given that  1 additional communal water standpipe to meet alcohol and drug-related violence is common in the national standards settlement, the community would like the  Provide 3 additional flush toilets to meet municipality to facilitate active law enforcement in national standards. the area.  Provide 15 households with prepaid electrical Short term priorities: connections and additional street lights  Access to educational facilities: Children must

wakeup early and travel a long distance to access school.  Access to health facilities: The existing clinic has got long queues, people have to wait for a long time and it is located very far.  Access to community facilities: The police station is far and sometimes when the community reports crime, it is not dealt with until the next day.  Security of tenure: Land security is important  Access to employment: Most families depend on child support grants. Unemployment is very high. Figure 2.19: Industria Informal Settlement

Most community members migrated from the to look for employment opportunities. Industria is a very low-density settlement located on 49 | P a g e INTEGRATED DEVELOPMENT PLAN

KURLAND INFORMAL SETTLEMENT the risks associated with living in this location. The settlement is well-located with regards to socio- economic amenities, education and healthcare facilities and employment opportunities.

Most of the hazards can be alleviated by improving service delivery and maintenance as well as implementing clear strategies to reduce hazards such as fires and flooding. The municipality must attempt to expropriate the portion of the settlement that is located on private land. The municipality should also attempt to spatially organise the settlement in order to minimise the effects of the electrical servitude. The municipality must carry out the upgrading process in an environmentally sensitive manner as 61 percent the land falls into a Figure 5: Kurland Informal Settlement critical biodiversity area.

Short term priorities

 Shelter  Access to employment opportunities  Access to community facilities  Maintenance operations  Access to educational facilities

INFRASTRUCTURE SERVICES

ACCESS TO WATER The number of household with piped water inside Figure 6: Kurland Informal Settlement dwelling increased from 2, 300 in 1996 to 9, 743 in Some residents were evicted from a nearby 2011. The number of households with access to campsite and other residents came from the Eastern piped water in the yard also increased from 1, 109 in Cape to look for employment opportunities. 1996 to 3, 999 in 2011 and households with access to potable water from an access point also increased Kurland is a very high-density settlement located on from 1, 041 in 1996 to 2, 649 in 2011. At the same land that is zoned as mixed use, of which 80 percent time the number of households with no access to is owned by the municipality and 20 percent is piped water decreased from 563 in 1996 to 254 in privately owned. The settlement is situated on an 2011. electrical servitude and the community experiences numerous hazards and risks such as a high incidence PIPED WATER of fire, some floods, inadequate sanitation and PIPED PIPED FROM NO WATER WATE ACCESS ACCES sinking soil. All these factors point to relocation, INSIDE R POINT S TO however the municipal pipeline indicates that this THE INSIDE OUTSID PIPED CENSU DWELLIN THE E THE WATER UNSPECIFIE TOTA community will not receive housing within the next S YEAR G YARD YARD D L 3 years. Therefore, the settlement should be 1996 2300 1109 1041 563 26 5039 upgraded in situ and formalised in order to reduce

50 | P a g e INTEGRATED DEVELOPMENT PLAN

2001 4132 2863 1404 364 0 8763 The map below presents the wards with the highest 1664 number of households with no access to water. All 2011 9743 3999 2649 254 0 5 water projects should be directed in addressing the Table 2.12: Number of households with access to water above water backlogs. the RDP standards. (Source StatsSA)

The table above indicates the number of households with access to clean drinking water beyond RDP standards and the graph below demonstrates the trend in which the Municipality delivered potable water over the past censuses.

The following table reflects the census results on the perception of residents on the quality of water services in the Municipality. Almost 90percent of residents rates the quality of water as good and less than 5percent regard water services as being poor. 1 Figure 2.23: Map indicating wards with piped water and number Rating of the overall quality of the water services for of households with no access to piped water (source StatsSA) Household weight, WC047: Bitou Good 19289 88.02 OVERVIEW OF WATER RESOURCE ISSUES: BITOU Average 1582 7.22 Poor 908 4.14 Water is supplied via independent water distribution No access 119 0.54 systems to Plettenberg Bay (Including Kranshoek, Do not use 17 0.08 Kwa-Nokuthula, New Horizons, Wittedrift / Green Unspecified - Valley and ), Kurland and Natures Total 21914 100 Valley. Plettenberg Bay relies on seawater Table 2.13 – Stats SA Census 2016 – Quality of water services (Desalination Plant), surface and groundwater 70.0 Households with access to water sources, while bulk water supply to Kurland and 60.0 Natures Valley is only from surface water sources. 50.0 40.0 Bitou Municipality (BM) further also operates its 30.0 own Water Treatment Works (WTW) and Waste 20.0 Percenatge 10.0 Water Treatment Works (WWTW). 0.0 Piped Piped No The table below gives an overview of the major water water access water infrastructure components, for the various inside Unspeci inside to water distribution systems in Bitou Municipality’s the fied the piped dwellin Management Area. (Source WSDP 2014/2015) yard water g Water Bulk WTW Bulk and Numb Total 1996 45.6 22.0 20.7 11.2 0.5 Distributi Supply (Capacity Network er Storag on (Resources in ML/d) Reticulati of e 2001 47.2 32.7 16.0 4.2 0.0 System ) on (km) Water Capaci 2011 58.5 24.0 15.9 1.5 0.0 Pump ty Statio (ML) ns Figure 2.22: Percentage of households with access to portable Plettenbe Keurbooms Plettenbe Bulk: Raw 52.876 water rg-Bay River rg Bay 54.395 (2) ML (Weir), WTW km Piesang (27 Ml/d), Potabl River Desalinati Reticulati e (19) (Roodefont on Plant on: 1 Stats SA 2016 Perception of quality of water services ein Dam), (2 Ml/d) 241.775 51 | P a g e INTEGRATED DEVELOPMENT PLAN

Groundwat km UPGRADES TO THE RISING MAIN er and Seawater The 150 mm diameter AC rising main which supplies (Desalinati treated water from the Pumpstation at the WTW to on) Kurland Wit River 0.6 Bulk: Raw 1.5 ML the existing reservoir, is very old and the weakened ML/day 2.335km (1) asbestos cement material causes a lot of pipe Reticulati breakages. The pipeline will therefore have to be on: 4.945 km replaced with a new 160 mm diameter pipeline. Natures Groot River 1ML/day Bulk: Raw 0.6 ML Valley 0.765 km (1) UPGRADES TO THE GRAVITY MAINS Reticulati on: Potabl Water is supplied from the reservoir to the township 10.065 e (1) via a 110 mm diameter – and a 75 mm diameter AC km pipeline. There is also a connector pipe Table 7 Existing main water infrastructure (approximately 75 mm diameter) from the reservoir NATURES VALLEY to the camp site. The pipelines are old and deteriorated and a lot of disruptions in water supply The only bulk water resource to Nature’s Valley is occur due to pipe breakages. The pipelines also do the abstraction point and pump station in the Groot not have sufficient capacity to satisfy the future River. The capacity of the pump station and the demand and causes pressure drops in peak water treatment works (WTW) is sufficient for the consumption periods. The pipelines will therefore future water demand. The rising main, reservoir and have to be replaced by a new 200 mm diameter supply pipelines though are more than 25 years old supply pipeline to the township and 110 mm and have deteriorated in such a way that the water pipeline to the campsite respectively. supply is not reliable and sustainable anymore. The FUNDING REQUIRED scheme will therefore have to be upgraded by the replacement of this existing infrastructure with new The total funding required for this project for the infrastructure which will be capable of providing next three (3) financial years is summarised below: reliable supply to Nature’s Valley for at least the Descriptio 2016/201 2017/201 2018/201 Total next 25 years. n 7 8 9 Amount

The Water Services Development Plan (WSDP) 2014 July- June July- June July- June (VAT stressed that the biggest challenge for Nature’s Excluded Valley will be the rehabilitation and maintenance of ) existing infrastructure. Total R1 Million R 3.4 R 4 Million R 8.4 project Million Million Lyners Consulting Engineers was appointed by Bitou cost Municipality in 2016 to investigate the different options available for upgrading the system and to Table 2.15 Funding Required recommend the most favourable and sustainable Sharples Environmental Services cc (SES) was method to upgrade the existing Bulk Water Supply appointed by Lyners Consulting Engineers in 2016 on Scheme to the Nature’s Valley Township. behalf of Bitou Municipality to undertake the Basic UPGRADES TO THE RESERVOIR Assessment Process for the proposed upgrade of the The reservoir capacity required will be 2 x average Reservoir and the bulk water supply scheme. A peak month daily demand i.e. 2 x 718 = 1 436 Kℓ. It Notice of intent for this project was submitted to will therefore be necessary to replace the existing DEA&DP on 1 August 2016. The Pre-Application deteriorated 0, 6 Mℓ reservoir with a new 1, 5 Mℓ Basic Assessment report for the proposed upgrade reservoir.

52 | P a g e INTEGRATED DEVELOPMENT PLAN

was released on 16 January 2017 and was available Lyners Consulting Engineers has projected the future for comment until 23 February 2017. demand as well as the Water Treatment Works Capacity as follows: KURLAND The only bulk raw water resources to Kurland is the Year abstraction point and pump-station in the Wit River. 2032 2042 The maximum capacity of the source and the water (15 (25 treatment works (WTW) is 600 Kℓ/day and will Projected Water Demand kL/day 2017 years) years) satisfy the peak demand to the year 2017 only. It is Average annual daily demand 411 636 862 therefore important to investigate different options Average peak month daily demand 599 929 1258 to increase the bulk sustainable and reliable raw Available source / WTW water supply and the water treatment works Capacity 600 600 600 capacity in order to satisfy the water demand of Source / WTW capacity required Kurland at least for the next 15 years. (KL/d) - 329 658 Source / WTW capacity required Lyners Consulting Engineers was appointed by Bitou (L/s) 3.8 7.6 Municipality in 2015 to investigate different options WTW individual units capacity required (x1.25 L/s) - 4.8 11.8 in order to find the most favourable solution to Table 2.17 Future water demand increase the sustainable and reliable bulk raw water supply to the Kurland Township and surrounding The current capacity of 600 Kℓ/day of the areas. abstraction point in the Wit River is insufficient to satisfy the projected peak month demand of 929 This would therefore be a bulk infrastructure project Kℓ/d in 2032 and it is also not reliable in dry periods. due to the fact that the infrastructure will enlarge the capacity of the water resource and the WTW DIFFERENT OPTIONS and connect the resource with the WTW over a vast distance of about 12 km. The following different options to increase the source capacity have been investigated by Lyners FUTURE DEMAND Consulting Engineers:

Lyners Consulting Engineers, projects that the a. A portion of the capacity of 350 Mℓ of an population of Kurland will grow over the next 25 existing irrigation dam on the property of years as follows: Feroli might be available for the use of Bitou Municipality for the Kurland area. 201 201 202 202 Year 1 6 1 6 2031 2036 2041 b. A portion of the capacity of an existing dam Higher of 50 Mℓ on the private property of Kurland Income 120 156 204 265 365 448 582 Estate might be utilized to increase the Lower 391 507 658 855 1109 1439 1868 sources for the Kurland community. Income 2 7 8 0 5 8 4 c. Four existing boreholes on the property of 403 523 679 881 1146 1484 1926 Total 2 3 2 5 0 6 6 Kurland Estate which are currently not in Table 2.16 Future Demand use. d. On the site of the Kurland water treatment This is consistent with information in the 2014/2015 works, which is the property of Bitou WSDP. In 2041 an eventual total of 19, 266 people Municipality, there is a suitable site for a will benefit from this project which will include an new borehole and it is envisaged that a new estimated total of ±18, 684 poor (indigent) people. borehole will be drilled, tested, developed This equates to 97 percent of the total population of and pumping equipment installed. 19, 266 people. 53 | P a g e INTEGRATED DEVELOPMENT PLAN

e. Bulk Supply from the Keurbooms Top The 150mm diameter uPVC pipeline and pump Reservoir- A 160mm diameter rising main of station will have to be upgraded to accommodate a approximately 9km long must be laid along new 355mm diameter rising main and a 145ℓ/s the N2 highway and a pump-station capable pump station pumping to a 5Mℓ reservoir. From the of delivering 15 L/s to Kurland Reservoir 5Mℓ reservoir water will be pumped by a 92ℓ/s must be built at the Keurbooms Top pump station and 315mm diameter rising main to Reservoir two 4Mℓ reservoirs. From the 4Mℓ reservoirs, water will gravitate through 450mm and 400mm diameter Lyners Consulting Engineers recommended that pipelines to the Kranshoek reservoir and water Options c, d and e above, be implemented as well as tower, as well as the surrounding residential and the upgrading of the WTW. This will ensure a industrial sectors. Additional bulk link pipelines will reliable and sustainable water supply back-up need to be connected to the Phase 1 pipelines. The scheme to Kurland and it will have the advantage existing pump station building at the existing that if the supply from the Wit River and the two Brakkloof reservoir will not be able to accommodate boreholes near Kurland are inadequate in dry the bigger rising main and pump sets required and seasons, treated water can be supplied from will thus have to be abandoned. Once the upgrades Keurboom Strand Reservoir which is supplied by are complete, the existing 150mm diameter uPVC Plettenberg Bay WTW. The pipeline from Keurboom rising main will be re-used as a gravity feed to be Strand will in eventually be approximately 12 km reticulated as part of the new infrastructure. long and if breakages occur, water to Kurland can be supplied from Wit River and the boreholes. Sharples Environmental Services cc (SES) was appointed by Lyners Consulting Engineers in 2016 on STATUS QUO behalf of Bitou Municipality as the independent Funding application for RBIG funds was submitted to Environmental Assessment Practitioner (EAP) to DWS. Omar Essa followed up with DWS on progress conduct the Basic Assessment Process and Water and the application was re-submitted. Use Application for the Proposed Kranshoek Bulk Water Supply Scheme in the Bitou Local KRANSHOEK Municipality.

Kranshoek is a residential township located west of WATER SUPPLY the town of Plettenberg Bay in the Bitou Municipal The 150mm diameter uPVC pipeline and pump Area. The Bitou Municipality water treatment works station needs to be upgraded to accommodate a (WTW), on the western side of Plettenberg Bay, new 355mm diameter rising main and a 145 L/s supplies potable water to the Brakkloof reservoir. pump station pumping to a 5ML reservoir. From the Following which, the water is pumped via an existing 5ML reservoir water will need to be pumped by 150mm unplasticised polyvinyl chloride (uPVC) means of a 92 L/s pump station and 315mm pipeline to the Kranshoek area. Currently, there is a diameter rising main to an 8ML reservoir. From the 8 limited supply of water to the Kranshoek community ML reservoir, water will gravitate through a 400mm and the broader area. Therefore, it is proposed that diameter pipeline to the Kranshoek reservoir and the existing bulk water supply to Kranshoek and water tower and the residential and industrial surrounds be augmented to ensure sufficient water sectors. Additional bulk link pipelines will need to be supply for the future expected growth of the area. connected to the main items explained above to The proposed project will necessitate the services the required sectors. The upgrades are construction and upgrading of bulk water pipelines, crucial for any future developments in the area. The storage reservoirs, and associated infrastructure. pipeline, reservoir and pump station upgrades were proposed as part of the 2008 CES Water & Sewer 54 | P a g e INTEGRATED DEVELOPMENT PLAN

Design and Management Information System long run. In order to meet the projected demand up (Master Plan) for the BITOU Municipal area. to 2025, the storage capacity of the current bulk water supply infrastructure will have to be increased Status Quo by approximately 3 million m3. Numerous studies Sharples Environmental Services cc (SES) was have been conducted into potential augmentation appointed by Lyners Consulting Engineers in 2016 on options to supply the projected long term urban behalf of Bitou Municipality to undertake the Basic water demand of the Plettenberg Bay area. The Assessment Process for the proposed upgrade of the surface water abstraction scheme Kranshoek bulk water supply scheme. A Notice of has been identified as the preferred long-term intent for this project was submitted to DEA&DP on source of supply. 10 August 2016. A phased infrastructure development approach has The limited MIG allocation will not allow the project been recommended. The Water Augmentation to be implemented within one financial year. We are Study for the Bitou Municipality conducted in 2003 currently in phase 1 of this project which involves recommended the upgrading of a section of the site investigations, environmental assessment and existing diversion pipeline from the Keurbooms preliminary design that have already commenced in River (Phase A), construction of the remainder of the 2015/16 and is currently in progress. The aim is to new pipeline (Phase B) and a 3 million m3 off receive Environmental Authorization, complete the channel dam (Phase C). As noted these components Detailed Design and Tender Documentation before were scheduled into three phases. the end of 2016/17 with construction due for Phase A has already been completed, Phase B is implementation from 2017/18. The Pre-Application under construction and Phase C, the off-channel Basic Assessment report for the proposed upgrade dam, is still in the planning phases. In 2007 updated was released and was available for public comment historical firm yields for the existing water supply until 22 February 2017. The Draft Basic Assessment system and for the proposed future additions to the Report (BAR) is due for submission early in March scheme was determined. An off-channel Dam with a for further public comment. The Final BAR will be storage capacity of at least 3 million m3 is therefore submitted to DEADP in May 2017 for approval. required to increase the historic firm yield of the PLETTENBERG BAY Keurbooms River scheme sufficiently to meet the expected 2025 demand. The Municipality has already experienced problems Aurecon did a study in 2010 to re-examine the in meeting the water demand because of a number different options available to achieve the necessary of dry years. There is a need to augment storage augmentation. The study re-examined the capacity to ensure continuity of supply. Construction Keurbooms run-of-river abstraction scheme, the of an additional storage dam and pump stations will Wadrif off-channel dam scheme and the potential of be required to maintain an adequate supply of an on-channel dam on the Keurbooms River. water. The study confirmed that the preferable option to The Greater Plettenberg Bay area, for which the achieve this augmentation would be to implement Bitou Municipality is responsible, is located in the the 450 ℓ/s Keurbooms run-of-river scheme in south-eastern part of the Western Cape Province. conjunction with the doubling up of the transfer Studies conducted for the Bitou Municipality in capacity of the Roodefontein Dam pipeline to 290 1996, 1999 and 2003 have identified the Keurbooms ℓ/s. Such a scheme could deliver 4.33 Mm3/a at a River as the most economical source of surface reliability of supply of 98.8 percent. water supply for the Plettenberg Bay area, in the

55 | P a g e INTEGRATED DEVELOPMENT PLAN

To increase supply even further the supply system to assist with the development of a water supply at would need additional storage. It was determined Harkerville. It should be emphasized that this project that the favoured dam, from a cost and is in fact part of a bigger project. The whole project environmental perspective, would be a 4.5Mm3 off- is seen as the provision of upgraded bulk sewer and channel dam at the Wadrif Site. The total historical water infrastructure for the Harkerville Agri-Village firm yield would then be 10.58 Mm3/a. It was proposed that two boreholes be drilled, one It was also determined that the eradication of alien of which would be used for production and the vegetation from the Keurbooms and Palmiet River other as a standby or backup borehole. catchments is a very worthwhile project to pursue. STATUS QUO The total yield would then increase to 11.52 Mm3/a at a reliability of supply of 98.9 percent. This The whole process of drilling and testing of the deliverable yield would be sufficient to supply the boreholes were completed on 20 January 2017 and demands of Plettenberg Bay until around 2032. the drilling of the two exploration boreholes on Portion 22/422, Harkerville has resulted in the Status Quo establishment of two boreholes each capable of Environmental Authorization (EA) for the meeting the water demand of the community which construction of the off stream Wadrift Dam on they are intended to serve. BH2 can yield 350 KL/d portion 5 of the Farm Doukamma no.221, of potable water and can be pumped on a Plettenberg Bay, was granted by DEA&DP on 21 continuous basis, if needed. BH1 can yield 190 KL/d, November 2014, with a correction notice dated 9 with an 18 hr/d pumping regime being December 2014. An appeal against this EA was recommended. consequently lodged by the Plettenberg Bay A technical report as required for a MIG funding Environmental Forum. application as a possible multi-year project was On 6 June 2016, after careful consideration of the submitted to finance this project and to complete it. appeal, the Western Cape Minister of Local PROVISION OF SANITATION Government, DEA&DP, dismissed the appeal in terms of section 43 of the National Environmental PROJECT: BITOU –UPGRADING OF MAIN OUTFALL Management Act, 1998 (NEMA). This allowed for the SEWER FROM-KWA-NOKUTHULA TO GANSE-VLEI work to proceed. A technical Report was submitted WWTW to secure RBIG funding to drive this project to completion. Stormwater and sewer spillage erosion has undermined the existing outfall pipeline and it is at HARKERVILLE, PORTION 22/422 risk. Tuiniqa Consulting Engineers was appointed by Bitou Municipality in 2015 as consulting Engineers Sufficient water is currently required to supply an for the proposed construction and upgrading of the informal settlement of about 80 shacks located on existing gravitating bulk outfall sewer and associated Portion 22/422, Harkerville. The property is owned works. This project is designated to serve the by the Bitou Municipality, who currently sources existing and future formal housing, informal water for the community from a nearby farmer. housing, business and industrial developments in mainly the Kwa-Nokuthula and New Horizons Aurecon Consulting Engineers was appointed by the township areas located within the boundary of Bitou Municipality in 2016 as the consulting Engineers for Municipality. this Project. Parsons and Associates Specialist Groundwater Consultants cc was accordingly Installation of the upgraded main outfall sewer is appointed by Aurecon on behalf of the Municipality required as the existing system is overloaded and is 56 | P a g e INTEGRATED DEVELOPMENT PLAN

required to accommodate already approved and STATUS QUO planned low cost housing schemes in Kwa- Designs are currently underway for the upgrading of Nokuthula and New Horizons. The existing residents, the pump station. Construction works is due to existing commercial and industrial developments commence in March 2017 for completion in June will also be serviced by this scheme. The proposed 2017. upgrading will include the rehabilitation of the embankment supporting the existing and proposed KRANSHOEK PUMPSTATION 1 UPGRADE-PHASE 2: new upgrading of the bulk outfall sewer. The Estimated budget for the project is R7 062 996 over Tuiniqua Consulting Engineers was appointed in 3 years, and a technical report was submitted to 2016 by Bitou Municipality for the provision of secure MIG Funds to complete the project. consulting engineering services to upgrade and repair identified problems with specific reference to The existing population contributing to the Kwa- the Sewage Pumpstation 1 at Kranshoek. The pump Nokuthula outfall sewer is as follows: station has been upgraded and security improved. The gravity mains were upgraded to a 250 mm pipe  Low cost residential units in Kwa-Nokuthula and buried to stop vandalism. Cameras and an  Low cost residential units in New Horizon electric fence was installed. A temporary screen was  Economical residential, institutional and installed and an emergency storage tank was commercial units in New Horizons constructed.  Low cost residential units in Bossiesgif and Qolweni There is currently only one pump working and  Low cost residential units in Kranshoek and sewage spillages still occur. The standby generator contributors to the Piesang valley scheme has been linked to activate on power failure. There  Industrial area was no telemetry installed and failures go un- noticed for extended periods of time. It was STATUS QUO proposed that the telemetry be installed if at all Site investigations, environmental assessment and possible. The 2008 Sewer Master Plan recommends preliminary design have commenced in 2015/16 and that the pump station be upgraded to 24 l/s capacity is currently in progress. The aim is to receive (BPS5.3). Environmental Authorization, complete the Detailed The following work is required: Design and Tender Documentation before the end of 2016/17 with construction due for implementation  construction of a secure pump house on top from 2017/18. The limited MIG allocation will not of the existing emergency storage tank with allow the project to be implemented within one concrete roof financial year. The Draft Basic Assessment Report  Installation of a mechanical screen with (BAR) was submitted on 06 February 2017 and is associated works currently in a 30-day public comment period. The  Extension of security perimeter if required. Final BAR will be submitted to DEADP in April 2017  Installation of a close off valve on the inflow for approval. mains  Installation of alarm system in new pump- UPGRADING OF AVENTURA PUMP STATION house The Pump station is currently posing some  Pipework to connect main inflow to sump. challenges with reported spillages into the  Valves to close off sumps Keurbooms Estuary. Upgrades to the pump station  Obtain a quote to provide Telemetry. are critical as it is currently monitored by DEA&DP.  Connecting standby generator

57 | P a g e INTEGRATED DEVELOPMENT PLAN

 Revise existing panel to suit new pumps and The vision of all water conservation and demand screen management endeavours should be the efficient and  Light fittings effective use of water by all and the minimisation of  Level sensors loss or wastage of water. Conservation is the  Supply and install 2 x pumps that can deliver efficient use and saving of water achieved through 24l/s measures such as water saving devices, water- efficient processes, water demand management and STATUS QUO water rationing.

Project completed and practical completion Water demand management is a strategy to inspection held on 06 Sep 2016. The Contractor is influence the water demand and usage of water in busy with fixing defects. Completion was scheduled order to meet objectives like economic efficiency, for 14 Sep 2016. Operational problem exists with environmental protection, sustainability of water one pump that is still out of service with only one supply and services and should be an integral part of pump operating. Inspection of existing sewer mains the planning processes for management, water was not done. Tender document for this work was supply and the provisions of water services due by 9 December 2016. The responsibility of the Municipality is to ensure UPGRADE OF WITTEDRIFT SEWERAGE the availability of water and it must do everything in PUMPSTATION its power to ensure a constant supply of water for The provision of upgraded bulk sewer and upgrade use in the area under its jurisdiction and to create a of the Wittedrift pump station is at this stage crucial water conservation and demand management for any developments to continue in Green Valley. culture between the service provider and users. The upgrades are needed for the Green Valley Therefore, this Drought Policy determines a set of Subsidized housing project of between 500-800 rules for the effective and efficient measures for sites. Another 21 fast-tracked housing units needs to water conservation and demand management. The be developed near the Green Valley Community rivers in Bitou flow rate are up normal low and the Hall. The scope of the work will include the water level in the Roodefontein dam is 81.4percent. interconnection of pipework (rising main and gravity The implementation of water restrictions will start main) to the Aventura sewer pump station. as prescribe in the Drought Policy when the water STATUS QUO level in the Roodefontein dam is 60 percent

A funding application was submitted to DWS for ACCESS TO ELECTRICITY ACIP Funding in September 2016 for Upgrading of Wittedrift Sewerage Pump Station at a cost of R4.6m The table below show the different sources of in the 2017/18 financial year. We await energy used by households since 1996 census. confirmation of funding approval from DWS who Electricity has been the main source of energy since indicated that they will notify successful 1996. The number of households with access to municipalities in February 2017. This project is electricity increased from 73, 9 percent in 1996 to 94 critical and will prevent any further housing percent in 2011. development in Green Valley or Wittedrift if not Electr G Para Can Sol Oth No Unspec implemented soon. icity as ffin dles ar er ne ified

WATER CONSERVATION AND DEMAND 19 73.9 0. 12.9 11.9 0.0 0.0 0.0 0.7 MANAGEMENT 96 6 20 80.7 0. 7.9 10.7 0.2 0.1 0.0 0.0 01 3 58 | P a g e INTEGRATED DEVELOPMENT PLAN

20 94.0 0. 1.6 3.8 0.2 0.0 0.2 0.0 percentage of households who has access to 11 2 municipal waste removal services increased from 75, Table 2.19: Energy source for lighting (source StatsSA) 8 percent in 1996 to 87, 7 percent in 2011. The graph below illustrates the trend in which the REMOVED BY REMOVED COM OW NO O U municipality connected citizens to the grid. LOCAL BY LOCAL MUNA N RUB T N AUTHORITY AUTHORITY L REF BISH H SP AT LEAST LESS REFUS USE DISP E EC ONCE A OFTEN E DU OSAL R IFI Households with access WEEK DUMP MP E D to electicity 19 75.8 4.5 2.0 14.3 1.5 0 1. 96 . 7

100.0 0 80.0 20 86.6 0.2 3.1 8.1 1.9 0 0. 60.0 01 . 0 40.0 20.0 0 0.0 20 87.7 0.8 4.7 4.3 1.1 1 0. Elec Uns Para Can Sola Oth Non 11 . 0 tricit Gas pecif ffin dles r er e 3 y ied Table 2.19: Refuse removal (source StatsSA) 1996 73.9 0.6 12.9 11.9 0.0 0.0 0.0 0.7

percentagehousehold 2001 80.7 0.3 7.9 10.7 0.2 0.1 0.0 0.0 The map below presents the increasing trend of 2011 94.0 0.2 1.6 3.8 0.2 0.0 0.2 0.0 households accessing municipal waste removal

services. Figure 2.24: Household percentage with access to electricity (source StatsSA) Household access refuse removal

Since 100.0 90.0 80.0 Rating of the overall quality of electricity supply services for 70.0 60.0 Household weight, WC047: Bitou 50.0 40.0 Good 17233 78.64 30.0 percentage 20.0 Average 2736 12.49 10.0 0.0 Poor 1747 Remo 7.97 ved by Remo local ved by No No access 81 0.37 Comm author local Own rubbis unal Unspe Do not use 83 0.38 ity at author refuse h Other refuse cified least ity dump dispos dump Unspecified 33 0.15 once less al Total 21914 100 a often week Table 2.18 – Rating of electricity services 1996 75.8 4.5 2.0 14.3 1.5 0.0 1.7 2001 86.6 0.2 3.1 8.1 1.9 0.0 0.0 Almost 79% of Bitou respondents rated the supply of 2011 87.7 0.8 4.7 4.3 1.1 1.3 0.0 electricity as good. Only 8% rated it as poor, showing a good response from electricity users.2 Table 2.20: Household percentage with access to municipal waste removal services ROADS AND STORM WATER More than 80% of residents rate the quality of refuse removal services as good. REFUSE REMOVAL AND WASTE Rating of the overall quality of refuse removal services MANAGEMENT for Household weight, WC047: Bitou

There was an increase in households that access Good 18 217 83.13 Average 2 265 municipal waste removal services since 1996. The 10.34 Poor 1 164 5.31 No access 231 1.05 Do not use 11 0.05 2 Stats SA 2016 Perception of the quality of services 59 | P a g e INTEGRATED DEVELOPMENT PLAN

Unspecified 27 0.12 Total 21 914 100 Table 2.21 Census 2016 Community Perception of Services

Figure 2.26: Garden waste

Figure 8: Wards with households with no access to municipal Illegal dumping is a serious problem amongst the waste removal services communities. People are dumping on all open spaces that they see and some instances people The municipality is no longer doing landfilling; the transport waste from affluent areas to dump illegally municipal landfill site has exhausted its life span. in some areas. The municipality has constructed a waste transfer station where waste is sorted, compacted and Communities have been complaining about a transported. Waste is transported to the landfill site lack of facilities for green and building waste. of PetroSA in Mosselbay at a hefty cost. The municipality must expeditiously construct the waste drop-off facilities. The municipality procured two trucks that run every day from Plettenberg Bay to Mosselbay. The SEWER AND SANITATION challenge associated with this arrangement is: Seventy-five percent of households have access to a  The increasing cost of land filling; water bourn sanitary system. The municipality  The increase in operational coast e.g. fuel refutes the notion that there is a form of a bucket and vehicle maintenance costs; and toilet system in Bitou and this dispute was raised at  The effect on the road surface over time. a highest level at Statistics South Africa as a result the questionnaire for the community survey will be The cost for providing transferring waste to revised. Mosselbay is then pushed onto the consumer who already has a heavy tax burden. Inflation in Flus Flus Che Pit Pit Buck Othe Non h h mica toile toile et r e rendering waste removal services in Bitou has gone toile toile l t t toile way above the norm and the general inflation t t toile with with t (con (wit t venti out announced by statistics South Africa. Some nect h latio venti municipality in the District are using double digits to ed septi n latio to c (VIP) n inflate waste removal services because they are sew tank sharing the same problem as Bitou Municipality. erag ) e If no sustainable solution is devised, waste removal syst em) will be very high and might result in a non-payment 200 71.0 10.2 1.64 1.83 3.57 3.39 0.00 8.19 of services and increase illegal dumping. 1 9 8 201 75.6 8.40 0.23 3.55 8.07 0.75 0.86 2.54 1 1

60 | P a g e INTEGRATED DEVELOPMENT PLAN

Table 2.27: Household percentage with access to toilet facilities ECONOMIC DEVELOPMENT (source StatsSA)

Almost 90% of residents rate the quality of LABOUR FORCE sanitation services at the Bitou municipality as good The municipality did not receive new labour force or average. Less than ten percent of residents rate it figures therefore the analysis on the 1996 – 2011 as poor. censuses remain. As soon as StatsSA makes the community survey stats available then the labour Rating of the overall quality of toilet/sanitation services for Household weight, WC047: Bitou force figures are updated. The assumption given is Good 17350 79.17 that the current trend is up and there are more Average 2180 9.95 discouraged job seekers. Poor 2045 9.33 EMPLOYMENT STATUS No access 234 1.07 The official unemployment rate in Bitou Municipality Do not use 64 0.29 is 30.1 percent according to Census data, the highest Unspecified 41 0.19 Total 21914 100 of the seven local municipalities in Eden district. The Table 2.20 Quality of sanitation services unemployment rate increased by 3.8 percent from 2001 to 2011. The percentage increase is also the The map below demonstrates the trend of providing highest in the district. Bitou is having a very young sanitation to households since 2001. population that compels the municipality to look into youth employment. 37.9 percent of youth are Households with access to sanitation unemployed in 2011 this figure is up from 33.4 80.00 percent in 2001 census. 70.00 60.00 50.00 LABOUR MARKET 40.00 UNEMPLOYMENT RATE % Youth unemployment rate % 30.00 2001 2011 2001 2011 percentage 20.00 10.00 26,3 30,1 33,4 37,9 0.00 Table 2.21: The official unemployment rate in Bitou. (Source Flush Pit Pit StatsSA) toilet toilet toilet Che Buck (with with with Othe mical et None septi ventil out r The graph below gives a schematic representation toilet toilet c ation ventil on the unemployment per age cohort as in 2011. tank) (VIP) ation 2001 71.09 10.28 1.64 1.83 3.57 3.39 0.00 8.19 2011 75.61 8.40 0.23 3.55 8.07 0.75 0.86 2.54 1500

1000 Figure 9: Household percentage of households with access to toilet facilities. (Source StatsSA) 500

The municipality is disputed the bucket system as a 0

result Statistics South Africa redefined the bucket

15- 19 15-

40 - 44 - 40 25 - - 25 29 - 30 34 - 35 39 - 45 49 - 50 54 - 55 59 - 60 64 system as a result the municipality do not have any - 20 24 bucket services. There is a need to provide Unemployment additional toilets at some informal settlements. Figure 2.28: Unemployment per age cohort (source StatsSA)

This unemployment phenomenon requires high level intervention from all stakeholders so that decent and sustainable work is created. In addition, a

61 | P a g e INTEGRATED DEVELOPMENT PLAN

comprehensive skill development programme must services Community 8.7 264 3.7 6.6 0.2 2.4 be developed and aligned to the economic growth , social sectors of Bitou. and personal GDPR PERFORMANCE services General 11.4 349 5.7 7.1 5.9 4.8 The primary sector contributed 5.9 per cent to the governmen GDPR of the Bitou municipal area in 2015, compared t Total Bitou 3 to 3.2 per cent in the Eden District. The secondary Municipalit 100 3.4 5.8 -0.1 2.4 051 sector contributed 21.9 per cent to the GDPR of the y Table2.21: GDPR performance by sector, source Quantec, 2016 municipal area, compared to 22.2 per cent in the Eden District; whilst the tertiary sector contributed The sectors that contributed the most to Bitou’s 72.2 per cent to Bitou compared to 74.6 per cent in GDPR in 2015 included: the District. This indicates that the primary sector is stronger in Bitou than in the Eden District whilst the  Construction (12.2 per cent) -the average secondary sector is more or less on par with the growth during 2004 and 2015 was 6.6 per cent, Eden District. This indicates a strong presence of with positive growth before the recession (12.7 manufacturing and possible agro-processing and per cent), during the recession, albeit at less agricultural activities. Table 2.13 indicates Bitou’s than half the pre-recession rate (4.3 per cent) GDPR performance per sector. and an even lower positive growth rate (3 per cent) after the recession (2009 - 2015). This Bitou GDPR performance per sector indicates that the construction industry may be

Average GDPR growth (%) in decline in Bitou. R Tre  Wholesale and retail trade, catering and Contribut milli nd Pre- ion on 200 recessi Recessi Recov accommodation (18.6 per cent) - the average to GDPR valu 4 - on on ery growth during 2004 and 2015 was 3.4 per cent, (%) e 201 2004 - 2008 - 2009 - Sector 2015 2015 5 2008 2009 2015 with positive growth before the recession (5.3 Agriculture, 5.8 176 3.1 7.0 1.6 0.8 per cent), contraction during the recession (-1.6 forestry and fishing per cent), and the economy recovering Mining and 0.1 4 3.4 4.5 -0.7 3.5 positively (3 per cent) after the recession (2009 - quarrying Manufactur 8.8 270 3.2 6.4 -12.4 3.6 2015). ing  Finance, insurance, real estate and business Electricity, 0.9 29 3.4 7.9 1.1 0.9 gas and services (26.7 per cent) -the average growth water during 2004 and 2015 was 2.5 per cent, with Constructio 12.2 373 6.6 12.7 4.3 3.0 n positive growth before the recession (4.0 per Wholesale 18.6 566 3.4 5.3 -1.6 3.0 cent), during the recession (1.1 per cent) and and retail after the recession (1.6 per cent), but at a lower trade, catering rate (2009 to 2015). This indicates a robust and and resilient financial and business services sector in accommod ation the Bitou Municipality. Transport, 6.8 206 1.7 3.8 -2.4 1.0  General government (11.4 per cent) - the storage and average growth during 2004 and 2015 was 5.7 communica per cent, with positive growth before the tion Finance, 26.7 814 2.5 4.0 1.1 1.6 recession (7.1 per cent), during the recession insurance, (5.9 per cent), and after the recession (4.8 per real estate and cent) (2009 to 2015). This indicates a robust business government sector in Bitou. 62 | P a g e INTEGRATED DEVELOPMENT PLAN

Overall, between 2004 and 2015, every economic  Construction (14.2 per cent) - the industry sector in Bitou grew positively in terms of GDPR. showed positive job creation throughout 2004 Furthermore, all the economic sectors are showing and 2015 (798 jobs), as well as before the positive recovery after the recession. recession (695 jobs). The area experienced job losses during the recession (-207 jobs), however EMPLOYMENT PROFILE 310 jobs were created after the recession.  Wholesale and retail trade, catering and The next table indicates the trend in employment accommodation (23.7 per cent) - the industry growth within each economic sector in Bitou. showed job creation between 2004 and 2015 (1 Employment (net change) 708 jobs), with 1 140 jobs created before the Tre Contribu Num nd Pre- recession, a limited amount of 13 jobs during tion to ber 200 recessi Recessi Recov the recession, and 555 jobs created after the employm of 4 - on on ery ent (%) jobs 201 2004 - 2008 - 2009 - recession (2009 and 2015). This trend is not on Sector 2015 2015 5 2008 2009 2015 par with the GDPR data in that GDPR is Agriculture, 7.7 1 531 - -492 -172 290 recovering faster than job creation for this forestry 374 and fishing sector. Mining and 0.0 4 -3 0 -1 -2  Finance, insurance, real estate and business quarrying Manufactur 5.1 1 018 - 103 -161 -66 services (15.3 per cent) - the industry showed ing 124 job creation between 2004 and 2015 (835 jobs), Electricity, 0.1 19 8 5 -1 4 gas and with 572 jobs created before the recession water (2004 - 2008), 113 jobs shed during the Constructio 14.2 2 823 798 695 -207 310 n recession (2008 and 2009), and 376 jobs again Wholesale 23.7 4 713 1 1 140 13 555 created after the recession (2009 to 2015). and retail 708 trade,  Community, social and personal services (19.3 catering per cent) - the industry showed job creation and accommod between 2004 and 2015 (1 306 jobs), with 736 ation jobs created before the recession, during the Transport, 5.5 1 103 381 314 -26 93 storage and recession (79 jobs) after the recession (491 jobs) communica (2009 to 2015). tion Finance, 15.3 3 044 835 572 -113 376 insurance, Overall, between 2004 and 2015, almost every real estate sector showed job creation except for the and business agriculture, forestry and fishing sector, mining, services quarrying, and manufacturing sectors. The latter two Community 19.3 3 848 1 736 79 491 , social and 306 sectors were the only sectors that recorded job personal losses after the recession. services General 9.1 1 823 837 339 91 407 governmen Skills levels t 19 5 Total Bitou 100 3 412 -498 2 458 Education levels in any given market area will 926 372 Table 2.22: Employment growth per sector, source Quantec, influence economic and human development. It is 2016 clear that low education levels lead to a low skills base in an area while high education levels have the In terms of employment, sectors that contributed opposite effect, producing a skilled or highly skilled the most to Bitou’s employment in 2015 were: population. There is also no doubt that household and personal income levels are either positively or 63 | P a g e INTEGRATED DEVELOPMENT PLAN

adversely affected by education levels. In addition, a municipality would also like to commend Provincial population that is skilled does not necessarily aspire treasury for their support with the municipal socio- to employment but to entrepreneurship, which will economic profile and the MERO reports. The data add businesses to the area, increase economic used in this section is obtained from the above activity and consequently increase the number of source documents. jobs available. Table 2.15 indicates the skills levels of Bitou. PRIMARY SECTOR

AGRICULTURE, FORESTRY AND FISHING This sector comprised R133.95 million (or 6.1 Formal Skill level Average Number employment by contribution (%) growth (%) of jobs percent) of the Municipality’s GDP in 2015. It skill 2015 2004 - 2015 2015 displayed steady growth of 2.8% for the period 2005 Skilled 21.2 2.1 2 906 - 2015, but growth has nevertheless slowed in the Semi-skilled 42.6 0.6 5 836 Low skilled 36.2 1.2 4 968 post-recessionary period (the sector experienced a Total Bitou 100 1.1 13 710 relatively low growth rate of 0.9% over the period Table 2.23 - Bitou skills levels - Source: Quantec Research, 2016 2010 – 2015).

Only formal employment numbers can be used to Agriculture, forestry and fishing employed 7.9 determine the skills level in the area. In Bitou, there percent of the Municipality’s workforce. were 13 710 formally employed individuals, Employment growth over the period 2005 – 2015 indicating that 6 216 individuals were informally has contracted by 0.8 percent per annum on employed in 2015. The majority of Bitou’s formally average. Employment picked up significantly after employed individuals are semi-skilled (42.6 per cent) the recession and grew at a rate of 4.4 percent per compared to 36.2 per cent of low skilled, and 21.2 annum on average since 2010. On net employment, per cent skilled. Skill levels of formal employees 226 jobs have been lost since 2005- not all of the have been increasing positively between 2004 and jobs lost prior to and during the recession have been 2015, and skilled employees have increased at the recovered. highest rate of 2.1 per cent during the same period. This could be indicating up-skilling in Bitou through The labour force in the primary sector is either better access to education as well as characterised by a relatively large proportion of low up-skilling opportunities through employers. skilled labour. The majority (40.3 percent or 614 workers) of the workforce in agriculture, forestry ANALYSIS OF ECONOMIC PERFORMANCE and fishing operate within the semi-skilled sector, BY SECTOR which has experienced a contraction of 0.7 percent since 2005, nevertheless grew by 4.6 percent per This section will analyse the performance of each annum over the post-recession period (2010 – economic sectors from the primary sector which is 2015). mainly the economic activities taking place in The low-skilled sector employs 572 workers and the agriculture and forestry, the secondary sector which sector has contracted at a rate of 2.0 percent per is more in creating value chain or beneficiation on annum since 2005 but experienced a notable the primary sector and lastly the tertiary sector. The recovery of 3.9 percent per annum over the post- analysis will be examining the GDP contribution of recession period term (2010 – 2015). The skilled each of the sectors and the number of jobs created sector employs the smallest proportion of the by these sectors. Later in the document the industry’s workforce (10.2 percent or 155 workers). municipality discuss how it will utilize the This segment has shown robust growth post- opportunities presented by these sectors to advance recession (5.7 percent per annum), but a 0.4 percent or grow Bitou’s economy in the next five years. The 64 | P a g e INTEGRATED DEVELOPMENT PLAN

per annum growth rate over the long term (2005 – (26.2 percent) operate within the informal sector. All 2015). The informal sector makes up 12.1 percent of the aforementioned categories have failed to record the industry’s workforce and was the only sector to meaningful growth rates and hence meaningful experience meaningful long-term growth as employment growth in the post-recessionary period. employment grew by 2.7 percent per annum over GDP 2015 Trend 2005 Recovery the period 2005 – 2015. Informal employment – 2015 2010 – 2015 within the agriculture, forestry and fishing industry R195 3.1% 3.9% furthermore experienced robust growth of 4.4 million percent per annum since 2010. Employment 978 -1.1% -0.8% Skills Skilled 127 0.7% 0.7% GDP 2015 Trend 2005 Recovery Semi- 402 -1.8% -1.6% – 2015 2010 – 2015 skilled Low- 193 -1.1% -1.1% R133.95 2.8% 0.9% million skilled Informal 256 -0.4% 0.3% Employment 1 525 -0.8% 4.4% Table 2.25 GDP Skills Skilled 155 0.4% 5.7% Semi- 614 -0.7% 4.6% skilled CONSTRUCTION Low- 572 -2.0% 3.9% The construction sector comprised R225.7 million skilled (or 10.3 percent) of the municipality’s GDP in 2015, Informal 184 2.7% 4.4% making it the smallest sector in the region. Table 2.24: GDP recovery rate 2010 - 2015 Construction has nevertheless been the fastest SECONDARY SECTOR growing industry since 2005, with growth averaging 7.0 percent per annum. GDP growth has MANUFACTURING nevertheless slowed since the recession and The manufacturing sector comprised R195 million averaged 3.6 percent over the period 2010 – 2015 as (or 8.9 percent) of the Municipality’s GDP in 2015. the sector struggles to fully recover after the The sector has experienced robust growth of 3.1 recession but maintains its position as fastest percent per annum on average over the period 2005 growing industry. – 2015. GDP growth in the latter half of the decade The construction sector employed only 15.1 percent (3.9 percent for period 2010 – 2015) outstripped the of the Municipality’s workforce. Employment in the municipal growth rates when compared with the municipality’s construction sector has grown by 3.7 long term trend for the industry and the overall percent per annum since 2005. Approximately 2 925 municipal GDP growth rate (2.5%) over the period jobs have been created on net since 2005. However, under review. subdued growth has been witnessed over the period The manufacturing industry employed 5.1 percent of 2010 – 2015 (where employment growth averaged the Municipality’s workforce. Employment growth 2.3 percent per annum). has contracted over the past decade hovering at -1.1 The majority (50.8 percent) of the workers percent per annum over the period 2005 – 2015. employed in the construction industry operate Employment has nevertheless remained at a similar within the informal sector. Employment growth level in the post-recessionary period, contracting at within this sector has been consistently high since 0.8 percent per annum. A disproportionally large 2005 (9.0 percent per annum on average). Low- number of workers employed in the manufacturing skilled employment makes up 10.1 percent and sector are classified as semi-skilled (41.1 percent) semi-skilled employment makes up 35.5 percent of and low-skilled (19.7 percent). Only 13.0 percent of the workforce in the construction industry, and both those employed in the manufacturing sector are sectors have been experiencing sharp contractions categorised as skilled and a slightly larger number

65 | P a g e INTEGRATED DEVELOPMENT PLAN

post- recession. Workers employed in these sectors A large proportion (33.6 percent) of the industry’s who have lost their jobs may have found workforce are classified as semi-skilled, while 12.9 employment in the informal sector. Skilled percent are classified as low-skilled and 14.6 percent employment makes up only 3.6 percent of the are classified as skilled. The low-skilled/semi- construction industry’s workforce, and has skilled/skilled workforce has shown moderate experienced robust growth over the past decade, growth both prior to and post-recession. Informal with growth nevertheless slowing since 2010. employment within the commercial services industry makes up 38.9 percent of the industries GDP 2015 Trend 2005 Recovery – 2015 2010 – 2015 workforce and has experienced robust growth of R225.7 7.0% 3.6% 11.4 percent per annum since 2005, and lower but million still strong growth of 5.0 percent per annum over Employment 2 925 3.7% 2.3% the last 5 years. Skills Skilled 105 3.6% 1.1% Semi- 1 039 0.9% -1.4% GDP 2015 Trend 2005 Recovery skilled – 2015 2010 – 2015 Low 296 -1.9% -4.3% R1.23 3.1% 2.1% skilled billion Informal 1 485 9.0% 8.1% Employment 8 602 3.8% 2.3% Table 2.26 - GDP Skills Skilled 1 258 0.6% 0.5% Semi- 2 891 1.3% 0.9% TERTIARY SECTOR skilled Low- 1 107 1.4% 1.1% Commercial services encompass the wholesale & skilled Informal 3 346 11.4% 5.0% retail trade, catering & accommodation, transport, Table 2.28DP storage & communication and finance, insurance, real estate & business services industries. This sector GOVERNMENT AND COMMUNITY, SOCIAL comprised R1.23 billion (or 56.2 percent) of the AND PERSONAL SERVICES Municipality’s GDP in 2015 (the largest sector in the region). The industry grew steadily over the period The general government and community, social and 2005 – 2015 (3.1 percent per annum compared to personal services is relatively small (comprising only the overall municipal average of 3.6 percent), the 17.6 percent or R385.80 million of the Municipality’s sector also performed modestly in the post- overall GDPR in 2015). The industry experienced recessionary period continuing to grow at a rate of GDPR growth of 4.4 percent over the period 2005 – 2.1 percent per annum on average. This sector 2015 (and a marginally decreased to a rate of 4.0 employed 44.5 percent of the municipality’s percent per annum since 2010). The industry workforce (making it the largest employer). however employs a noteworthy share (27.3 percent) of the Municipality’s workforce and its employment Employment has shown moderate growth growth over the period 2005 – 2015 averaged 4.2 throughout the past decade recording a 3.8 percent percent per annum. Employment growth has growth rate per annum. Employment growth has tapered off somewhat (3.4%) since the recession. not maintained this trajectory, tapering off (2.3%) over the period 2010 – 2015 as the sector remains The majority (50.4 percent) of 2015 Trend Recovery the industry’s workforce are 2005 – 2010 – 2015 on par with the sluggish growth across other classified as low-skilled, while 2015 industries in the Municipality post-recession (overall 15.6 percent falls within the R385.80 4.4% 4.0% municipal employment growth averaged 2.5 percent semi-skilled category and million 17.8 percent are classified as per annum over this period). The commercial skilled. Employment in the services industry has created 2 568 jobs on net since skilled category grew moderately at 3.9 percent 2005. over the period 2005 2015 66 | P a g e INTEGRATED DEVELOPMENT PLAN

overall, and has slowed as well as for planning welfare systems. With this slightly since 2010 recording a short, but informative overview, the SEP tries to figure of 3.6 percent. Semi- skilled employment grew at a help the municipalities in their budgeting rate of 2.1 percent per annum process by delivering precise data as a solid since 2005. The growth has persisted in the post- foundation for future decisions. recessionary period at 2.0 percent. Employment growth POPULATION among the low-skilled workforce grew by 2.9 250,000 percent for the period 2005 – 2015. The informal sector 200,000 employed only 16.2 percent of the industries workforce, but grew at a rate of 18.0 150,000 percent per annum over the period 2005 – 2015 (this growth nevertheless 100,000 stemming from a small base). GDP 50,000 Employment 5 269 4.2% 3.4% Skills Skilled 939 3.9% 3.6% Semi-skilled 820 2.1% 2.0% 0 Georg Hesse Kann Knysn Mosse Oudts Low-skilled 2 655 2.9% 2.2% Bitou e qua aland a l Bay hoorn Informal 855 18.0% 9.8% Table 2.29 GDP 2018 56,422 212,120 55,559 25,340 74,606 99,319 95,859 2019 57,404 214,613 55,945 25,420 75,372 100,626 95,807 2020 58,369 217,057 56,322 25,500 76,113 101,903 95,741 P. SOCIO ECONOMIC 2021 59,321 219,452 56,692 25,579 76,830 103,149 95,660 2022 60,259 221,798 57,053 25,656 77,523 104,366 95,565 PROFILE 2023 61,184 224,095 57,406 25,734 78,196 105,556 95,456 Figure 2.29 Population Data source: Department of Social Development, 2017 DEMOGRAPHICS

This first chapter of the SEP focusses on the In 2018, Bitou municipal area will have an people living in Bitou itself. A demographic estimated population of 56 422, after five years perspective on a municipality allows to observe this population is estimated to be 61 184. This not only simple changes in population growth, equates to an estimated growing rate in this but also to look at other various developments time span of 8.5 per cent. The estimated that influence the social life of every citizen. population growth rate of Bitou is therefore 3.9 Demographics allows to emphasise aspects of percentage points higher than the estimated society like, e.g. gender, race, migration or life population growth of its Eden District which is 4.6 expectancy. Decisions made by politicians as per cent. well as by the administration affect in almost AGE COHORTS every case at least one aspect of Working Dependency Demographics. Therefore, a good Children: Age: Aged: Ratio Year understanding of this area is crucial for the 0 - 14 Years 15 - 65 65 + government‟s work. Years 2011 12 386 33 649 3 128 46.1 The overview of key demographic factors given in this chapter comprises of the estimates of 2018 14 159 38 197 4 066 47.7 population size, the distribution of population 2023 14 483 41 820 4 881 46.3 within age cohorts and furthermore the dependency ratio, which is of high importance Table 2.30 Age Cohorts for understanding economic activity in the area Source: Department of Social Development, 2017

67 | P a g e INTEGRATED DEVELOPMENT PLAN

The above table depicts the population LEARNER ENROLMENT composition regarding age cohorts. The total 40,000 population is broken down into three different 35,000 groups: Age 0 - 14: children; Age 15 - 65: working age population; Age 65+: seniors. A comparison 30,000 with the base year of 2011 and the estimated 25,000 numbers for 2023 show a growth in the 20,000 percentage of seniors, a decline in the percentage of children despite a slight growth in 15,000 total numbers, and a steady percentage in the 10,000 working age population. 5,000 This is an important factor in the calculation of 0 Geor Hesse Kann Knysn Mosse Oudts Bitou the dependency ratio. In Bitou, this ratio was ge qua aland a l Bay hoorn 46.1 in 2011 and will be 46.3 in 2023, after a peak 2014 7,535 34,15 8,520 4,685 11,72 15,67 18,86 of 47.7 in 2018. This ratio expresses the 2015 7,659 34,46 8,585 4,671 12,00 16,10 18,92 dependency of people who are part of the 2016 7,920 34,78 8,566 4,651 12,10 16,40 18,58 workforce (age 15 - 65) and those, who are depending on them (children and seniors). A Table 2.30 Learner Enrolment higher dependency ratio means a higher pressure on social systems and the delivery of Learner enrolment in Bitou increased at a growth basic services. rate of 5.1 per cent between 2014 and 2016, which is an indication that access to education EDUCATION has improved within the Bitou municipal area. LEARNER-TEACHER RATIO Education and training improves access to employment opportunities and helps to sustain GRADE 12 DROP-OUT RATES and accelerate overall development. It A total of 25.9 per cent of students that enrolled expands the range of options available from in Grade 10 in 2014 dropped out of school by which a person can choose to create the time they reached Grade 12 in 2016. This is a opportunities for a fulfilling life. Through indirect further slight improvement from the 2015 rate of positive effects on health and life expectancy, 26.9 per cent. These high levels of drop-outs are the level of education of a population also influenced by a wide array of economic factors influences its welfare. including unemployment, poverty, indigent Data source: Western Cape Education households, high levels of households with no Department, 2017 income or rely on less than R515 a month and teenage pregnancies.

EDUCATIONAL FACILITIES The availability of adequate education facilities such as schools, FET colleges and schools equipped with libraries and media centres could affect academic outcomes positively.

68 | P a g e INTEGRATED DEVELOPMENT PLAN

12 Figure 2:31 Education Facilities

10 EDUCATION OUTCOMES Education remains one of the key avenues 8 through which the state is involved in the economy. In preparing individuals for future 6 engagements in the broader market, policy decisions and choices in the sphere of 4 education play a critical role in determining the extent to which future economy and poverty 2 reduction plans can be realised. This section measures the matric pass rate within the 0 Bitou municipal area. Number of Schools with Total Number of Libraries Schools 2014 6 10 2015 6 10 100.00% 2016 7 11 90.00% 80.00% Figure 2:30 Education Facilities 70.00% Source: Western Cape Education Department, 2017; Annual 60.00% Survey of Public and Independent Schools (ASS), 2015 50.00% Bitou had 11 schools in 2016. Given the tough 40.00% economic climate, schools have been reporting 30.00% an increase in parents being unable to pay their 20.00% school fees. However, the proportion of no-fee 10.00% schools increased slightly from 80.0 per cent in 0.00% 2014 to 81.8 per cent in 2016. The number of Moss Oudt Geor Hess Kann Knys Bitou el shoo schools equipped with libraries increased from 6 ge equa aland na to 7 between 2014 and 2016, which could in Bay rn future affect the overall education outcomes 2014 73.90 81.90 85.90 85.30 72.20 83.00 84.50 within the Bitou area. 2015 74.80 84.60 88.30 92.40 81.60 88.10 91.30 2016 76.40 83.40 93.60 88.90 77.90 87.40 93.10 100.0%

90.0% Figure 2:32 Education Outcomes 80.0% Bitou matric pass rate increased since 2014. In 70.0% 2016 the matric pass was 76.4 per cent, while it 60.0% was at 73.9 per cent in 2014. The matric pass 50.0% rate within the Bitou area remains well below the District‟s average of 85.8 per cent. 40.0% 30.0% HEALTH 20.0%

10.0%

0.0% Health is another major factor contributing to Proportion of no-fee schools the general quality of life in Bitou. It is therefore 2014 80.0% important to monitor the public health facilities 2015 80.0% as well as a variety of factors such as diseases 2016 81.8% like HIV or TB and general topics that affect the 69 | P a g e INTEGRATED DEVELOPMENT PLAN

community, like maternal health. This Socio- or district hospitals in the region, there are 2 non- economic Profile provides the basic statistics fixed clinics. concerning those issues. Since this profile focusses on the public health facilities, private EMERGENCY MEDICAL SERVICES facilities do not appear in it. Access to emergency medical services is critical for rural citizens due to rural distances between Data source: Department of Health, 2017 towns and health facilities being much greater than in the urban areas. Combined with the HEALTHCARE FACILITIES relatively lower population per square kilometre All citizens‟ right to access to healthcare services in rural areas, ambulance coverage is greater in are directly affected by the number and spread rural areas in order to maintain adequate of facilities within their geographical reach. coverage for rural communities.

Registered HIV Provision of more operational ambulances can Number of new patients Transmission provide a greater coverage of emergency ART patients Area receiving ART Rate medical services. Bitou with 0.3 ambulances per 20 20 20 20 20 20 20 20 20 10 000 inhabitants in 2016, is slightly higher than 14 15 16 14 15 16 14 15 16 Eden District‟s average 2.9 ambulances per 1 2 2 Bitou 326 458 451 0.8 2.2 2.6 10 000 population. 837 327 783 Ede HIV/AIDS n 14 17 20 3 3 3 1.6 1.4 1.8 Distri 805 391 127 278 820 603 ct South Africa‟s healthcare system is geared in Table 2:31 HIV/AIDS such a way that people have to move from Bitou‟s total registered patients receiving ARTs is primary, with a referral system, to secondary and steadily rising from 2014 to 2016. Patients tertiary levels. receiving antiretroviral treatment increased by 946 between 2014 and 2016. The 2 783 patients 9 8 receiving antiretroviral treatment in 2016 are 7 treated in seven clinics or treatment sites. A total 6 5 of 20 127 registered patients received 4 3 antiretroviral treatment in Eden District in 2016. 2 Bitou at 2 783 patients represent 13.8 per cent of 1 0 the patients receiving ART in Eden District. Total Number number Number Number The number of new antiretroviral patients of PHC Number of PHC Commun of ART of TB Clinic - of PHC facilities decreases to 451 in 2016 from 458 in 2015. HIV ity Day clinics/ clinics/ non-fixed Clinics - (Fixed Centres treatmen treatmen transmission rate for the Bitou shows an increase (mobiles/ Fixed Clinics, t sites t sites satelite) CHCs and from 0.8 in 2014 to 2.6 in 2016 and is higher than CDCs) the District‟s average of 1.8. 2014 1 7 3 4 8 5 TUBERCULOSIS 2015 1 7 2 4 7 5 2016 1 7 2 4 7 5 500 390 400 370 Figure 2:33 Healthcare Facilities 321 300 2014 In 2016, Bitou had a total number of 5 primary 2015 healthcare facilities – 4 fixed PHC clinics as well 200 2016 as 1 community day centre. In addition, there 100 are 7 ART and 7 TB treatment sites within the municipal area. Although there are no regional 0 Number of TB patients 70 | P a g e INTEGRATED DEVELOPMENT PLAN

Bitou municipal area based on most recent data including Statistics South Africa‟s Non-Financial

Census of Municipalities 2016 and Quantec. Figure 2.31 TB Health Indicator Bitou Eden District Source: Department of Health, 2017 Maternal Mortality Ratio 0 0.1

Contrary to the rising numbers of HIV/AIDS cases, Delivery Rate to Women 0 6.7 Bitou experienced a general decline in under 18 years tuberculosis (TB) cases. In 2016, Bitou has a total Termination of Pregnancy 0.0 0.5 321 TB patients. Rate CHILD HEALTH Economic theory suggests that when an economy prospers its households are expected The Department of Health strongly advises to enjoy a good standard of living. On the mothers to protect their children from infectious contrary, a declining economy tends to lower diseases by getting them vaccinated from birth the standards of living of people. This section to when they are 12 years old. Vaccination is uses indicators in terms of GDP per capita, free of charge at all health facilities. The income inequality, human development, as well Department also runs immunisation campaigns as indigent households and free basic services and health workers are sent to nursery schools to show the current reality of households residing and crèches to immunise the children. The in the Bitou municipal area. immunisation rate in Bitou area has declined from 79.9 per cent in 2014 to 70.9 per cent in The deteriorating financial health of households 2016. and individuals under the weight of economic The malnutrition rate increased from 0.5 per cent pressures, specifically between 2011 and 2015, in 2014 to 1.2 per cent in 2016. Bitou‟s neonatal has resulted in an increase in the poverty levels, mortality rate continues to be zero since 2014. according to the Poverty Trends in South Africa The indicator for low birth weight remains at zero report released by Statistics South Africa in 2017. since 2014. The report cites rising unemployment levels, low commodity prices, higher consumer prices, MATERNAL HEALTH lower investment levels, household dependency Maternal mortality rate: Very positively, the on credit, and policy uncertainty as the key maternal mortality rate remained at zero across contributors to the economic decline in recent the last three years in Bitou. times. These recent findings indicate that the country will have to reduce poverty at a faster There were no births to teenage mothers in Bitou rate than previously planned. in 2016. According to the report the categories of Bitou‟s termination of pregnancy rate was also people vulnerable to poverty remained to be zero in 2016. African females, children 17 years and younger, people from rural areas, and those with no Health Indicator Bitou Eden District Immunisation 70.9% 83.7% education. Inflation-adjusted poverty lines show Malnutrition 1.2 3.5 that food poverty increased from R219 in 2006 to Neonatal R531 per person per month in 2017. The lower- 0.0 6.9 mortality rate bound poverty line has increased from R370 in Low birth weight 0.0% 14.6% 2006 to R758 per person per month in 2017 while Table 2.33 Health Indicators the upper-bound poverty line has increased POVERTY from R575 in 2006 to R1 138 per person per month in 2017. This section shows living conditions and economic circumstances of households in the 71 | P a g e INTEGRATED DEVELOPMENT PLAN

GDPR PER CAPITA 0.66

0.64 An increase in real GDPR per capita, i.e. GDPR per person, is experienced only if the real 0.62 economic growth rate exceeds the population 0.60 growth rate. Even though real GDP per capita reflects changes in the overall well-being of the 0.58 population, not everyone within an economy will 0.56 earn the same amount of money as estimated by the real GDPR per capita indicator. 0.54 Bitou Eden Western Cape 70,000 2010 2011 2012 2013 2014 2015 2016 60,000

50,000 Figure 2.34 Income inequality

40,000 Income inequality levels are significantly higher

30,000 in Bitou than in the Eden District and the Western Cape. Bitou‟s Gini coefficient was in 2016 GDPR per capita 20,000 calculated to be 0.65. 10,000 HUMAN DEVELOPMENT 0 200 200 200 200 200 201 201 201 201 201 201 201 The United Nations uses the Human 5 6 7 8 9 0 1 2 3 4 5 6 Development Index (HDI)3 to assess the relative Western Cape 54,3 56,5 59,2 60,6 58,8 59,1 60,4 61,0 61,6 61,9 61,7 61,1 Eden 40,9 42,5 44,5 45,9 44,9 45,2 46,1 46,7 47,2 47,6 47,5 47,1 level of socio-economic development in Bitou 40,5 41,5 43,1 43,6 42,5 42,4 42,5 42,5 42,5 42,4 41,9 41,4 countries.

Figure 2.35 - GDPR 0.74

At 41 481 in 2016, Bitou‟s real GDPR per capita is 0.72 below that of the Eden District as well as the Western Cape. 0.7 INCOME INEQUALITY 0.68 The National Development Plan has set a target 0.66 of reducing income inequality in South Africa from a Gini coefficient of 0.7 in 2010 to 0.6 by 0.64 2030. Income inequality has increased between 2010 and 2015, and declined slightly in 2016. 0.62 Bitou Eden WC

2010 2011 2012 2013 2014 2015 2016

Figure 2.35HumanDevelopment

3 The HDI is a composite indicator reflecting education levels, health, and income. It is a measure of peoples' ability to live a long and healthy life, to communicate, participate in the community and to have sufficient means to be able to afford a decent living. The HDI is represented by a number between 0 and 1, where 1 indicates a high level of human development and 0 represents no human development. 72 | P a g e INTEGRATED DEVELOPMENT PLAN

There has been a general increase in the HDI in This section reflects on housing and basic Bitou, Eden District and the whole of the Western services access levels (Census 2011) and the Cape between 2010 and 2015, with the incremental progress municipalities have made exception of a drop in HDI levels for Bitou and hereto within the last 5 years (Community Survey the Western Cape in 2016. Indicators that 2016). measure human development are education, housing, access to basic services and health. SERVICE STANDARD DEFINITION: Households with access to Bitou‟s HDI was estimated to be 0.70 in 2016. a formal dwelling.

INDIGENT HOUSEHOLDS Averag Averag e The objective of the indigent policies of Total e annual increas annual municipalities is to alleviate poverty in Area 2011 2016 increas e 2011 growth economically disadvantaged communities. e - 2016 2011 - 2011 - 2016 Table 2.38 Income inequality 2016 72.2 76.6 Source: Department of Local Government, 2017 Bitou 4 775 955 6.9% % % Eden The Bitou area experienced an increase in the 83.8 85.7 Distri 24 878 4 976 3.4% number of indigents between 2014 and 2015. In % % ct

2016, the Municipality managed to reduce Table 2.39 Access to formal dwelling those numbers. In contrast, the overall number In order to ensure basic service delivery to all, of indigent households has increased in the municipal budget allocations should be Eden District as well as in the whole Province informed by credible and accurate assumptions every year. regarding the number of households within a municipal area.

Access to formal housing and services in Bitou is Average measured against a total number of households Average annual of 16 645 in 2011 and 21 914 in 2016 Area 2011 2016 annual growth increase 2011 - HOUSEHOLDS 2016 16 21 Bitou 1 054 5.7% Area 2014 2015 2016 645 914 164 189 Eden District 5 047 2.9% Bitou 3 722 4 370 4 197 110 345 Eden 38 852 43 789 43 882 Western 404 413 505 585 516 321 Cape BASIC SERVICE DELIVERY Table 2.41 Households The Constitution of the Republic of South Africa states that every citizen has the right to access ACCESS TO HOUSING to adequate housing and that the state must The number of formal dwellings in Bitou take reasonable legislative and other measures within its available resources to achieve the increased by 4 775 between 2011 and 2016, at progressive realisation of this right. Access to an average annual rate of 6.9 per cent, which housing also includes access to services such as translates into approximately 955 additional potable water, basic sanitation, safe energy formal dwellings per year over this period. This sources and refuse removal services, to ensure increase in formal dwellings results in the that households enjoy a decent standard of proportion of formal households increasing from living. 72.2 per cent in 2011 to 76.6 per cent in 2016. 73 | P a g e INTEGRATED DEVELOPMENT PLAN

Averag Averag e ACCESS TO WATER Total e annual increas annual Given the Western Cape‟s current drought Area 2011 2016 increas e 2011 growth situation, great focus is currently placed on e - 2016 2011 - 2011 - water availability and supply. This goes hand in 2016 hand with due consideration for water quality. 2016 84.2 95.3 Access to safe potable water is essential to Bitou 6 863 1 373 8.3% % % prevent the contraction and spread of diseases Eden 85.8 94.3 and maintaining a healthy life. Distri 37 895 7 579 4.9% % % ct

SERVICE STANDARD DEFINITION: Households with access Table 2.42 Access to flush toilet to piped water inside the dwelling or yard or within 200 Bitou experienced significant progress in metres from the yard. household access to sanitation as the proportion

of households with access to acceptable Averag Averag e standards of sanitation services increasing from Total e annual 84.2 per cent in 2011 to 95.3 per cent in 2016. increas annual Area 2011 2016 increas e 2011 growth The Municipality was able to provide an e - 2016 2011 - additional 1 373 households with access 2011 - 2016 annually; access growing at an average annual 2016 98.5 94.5 rate of 8.3 per cent. Bitou 4 327 865 4.8% % % ACCESS TO ELECTRICITY Eden 97.6 96.9 Distri 23 188 4 638 2.7% % % Energy is essential for human life; generally ct

Table 2.40 Access to water in dwelling identified household uses include energy for Although Bitou experienced an annual increase cooking, heating and lighting. Energy sources of household access to piped water (to within also have usage risks; for example, health and 200 metres of the yard) of approximately 865 safety risks especially in the use of paraffin and households per annum between 2011 and 2016, open flame usage. The information below the proportion of households with access relates to the use of electricity for lighting declined over this period from 98.5 per cent in purposes. 2011 to 94.5 per cent in 2016. This is indicating that access to piped water was unable to keep SERVICE STANDARD DEFINITION: Households with access to pace with the growth in the total number of electricity as the primary source of lighting. households. Averag Averag e ACCESS TO SANITATION Total e annual increas annual Access to sanitation promotes health and Area 2011 2016 increas e 2011 - growth e dignity through the provision of safe disposal 2016 2011 - 2011 - 2016 and treatment of human waste. Where 2016 sanitation systems are inadequate, negative 94.0 98.2 Bitou 5 861 1 172 6.6% health effects can be extremely serious. The % % Eden current drought highlights challenges in the use 91.1 96.1 Distric 32 538 6 508 4.0% % % of potable water within the sanitation services t process. Table 2.44 Access to electricity The annual growth in household access to

SERVICE STANDARD DEFINITION: Households with access to electricity of 1 172 outstripped the total a flush or chemical toilet connected to the sewerage system. household growth of approximately 955 on average per annum. This coincides with an increase in the proportion of households with 74 | P a g e INTEGRATED DEVELOPMENT PLAN

access to electricity, increasing from 94.0 per and business. Without the respect of person and cent in 2011 to 98.2 per cent in 2016. property, it would be impossible for people to live peacefully, without fear of attack and for ACCESS TO REFUSE REMOVAL businesses to flourish. Refuse removal is an essential service that ensures that health related problems are kept at The extent of crime in South Africa does bay. A lack of or inadequate service is likely to however not only have a significant impact on result in uncontrolled and unregulated dumping. the livelihood of citizens, but also affects the There are growing concerns around the land general economy. Crime hampers growth and and environmental limitations in the creation discourages investment and capital and lifespan of landfill sites. This would benefit accumulation. If not addressed with seriousness, greatly from the „reduce – reuse – recycle‟ it has the potential to derail both social and approach, that firstly encourages non-wasteful economic prosperity. consumption practices (reduce), the reuse of products where possible (reuse) and the People‟s general impressions, as well as official recycling of the product where its use in current statistics on safety and crime issues, mould form has been exhausted (recycle). perceptions of areas as living spaces or places in which to establish businesses. The discussion in SERVICE STANDARD DEFINITION: Households who have this section that follows is limited to the reported contact and property-related crime such as waste removed by local authorities at least weekly. murder and sexual crimes, as well as crime Averag Averag e heavily dependent on police action for Total e annual detecting drug-related crimes and driving under increas annual Area 2011 2016 increas e 2011 growth the influence of alcohol/drugs. e - 2016 2011 - 2011 - 2016 Note: Percentage change calculation will differ 2016 from the actuals reflected due to rounding 87.7 88.6 Bitou 4 823 965 5.9% down to per 100 000 population. % % Eden 86.4 88.8 Data source: The data depicted in the following section was Distric 26 307 5 261 3.5% % % sourced from the 2017 Crime Statistics released by the South t African Police Service (SAPS) in October 2017. Incidences of Table 2.45 Weekly waste removal crime per 100 000 were calculated using actual crime and estimated population figures provided by SAPS. Also note that Household access to refuse removal services in although the crime data contained in the following section is for Bitou has increased from 87.7 per cent in 2011 to ease of reference depicted as a single calendar year, it is in actual fact referring to criminal activity within a financial year 88.6 per cent in 2016; household access to this i.e. incidences of murder for 2016 is referring to service increasing slightly faster (additional 965 occurrences within the period April 2016 to households annually) than the growth in formal March 2017. households (955 annually). The information relating to fatal crashes and SAFETY AND SECURITY crash fatalities were sourced from the Department of Transport and Public Works. The Constitution upholds the notion that MURDER everybody has the right to freedom and security of the person. The safety of persons and property is therefore vitally important to the physical and emotional well-being of people

75 | P a g e INTEGRATED DEVELOPMENT PLAN

SEXUAL OFFENCES Area 2016 2017 % Change

Table 2.46 Sexual Offenses Bitou 32 38 20.0 (per 100 000) Definition: Sexual offences includes rape Eden District 32 28 -11.4 (updated to the new definition of rape to (per 100 000) provide for the inclusion of male rape), sex work, Table 2.45Murder pornography, public indecency and human trafficking. Definition: Murder is a social contact crime resulting in the loss of life of the victim, but The rate of sexual violence in South Africa is excludes cases where the loss of life occurred as amongst the highest in the world. In addition, a a result of a response to a crime, for example number of sexual offence incidences often go self-defence. unreported (as in the case of rape).

Crime remains a prominent issue in South Africa The cases of sexual offences in the Bitou area at a high socio-economic cost. Overall, the declined by 14.8 per cent from 179 in 2016 to country has a very high rate of murder when 152 in 2017 (per 100 000 population). The cases of sexual offences in the Eden District area % Area 2016 2017 overall increased by 9.8 per cent from 146 in Change 2016 to 161 in 2017 (per 100 000 population). Bitou Bitou shows a positive trend despite the District‟s 1 287 1 210 -6.0 (per 100 000) negative development in that field.

Eden District 1 520 1 691 11.2 DRUG-RELATED CRIMES (per 100 000) compared to most countries. Table 2.46 Drug Related Crime Within the Bitou area, the murder rate showed Definition: Drug-related crimes refers to the situation where the perpetrator is found to be in possession of, an increase of 20.0 per cent from 32 in 2016 to under the influence of, or selling illegal drugs. This is a 38 in 2017 (per 100 000 population). The murder crime detected through police activity rather than rate within the Eden District decreased by reports by members of the public. An increase in 11.4 per cent from 32 in 2016 to 28 in 2017. The crimes of this nature may therefore reflect an increase in police.

Area 2016 2017 % Change Drug-related crimes have a negative impact on human development by degrading the quality of life Bitou 228 128 -44.0 as it infiltrates all aspects of society including families, (per 100 000) health, the work environment and the economy. Eden District Drug-related crimes within the Bitou area displays a 237 223 -5.7 (per 100 000) decrease in 2017, down by 6.0 per cent from 1 287 cases in 2016 to 1 210 cases in 2017 (per murder rate remains a grave concern 100 000 population). The Eden Districts trend is on an throughout the Eden District; especially in the increasing trajectory, with drug-related crimes Bitou area where the rate of change in the increasing by 11.2 per cent from 1 520 in 2016 to 1 691 number of murder cases per 100 000 population in 2017 (per 100 000 population). is high for 2017.

DRIVING UNDER THE INFLUENCE 76 | P a g e INTEGRATED DEVELOPMENT PLAN

Table 2.47 Driving under the influenc Africa. Residential burglary cases within the Bitou

Definition: DUI refers to a situation where the driver of a vehicle is found to be over the legal Area 2016 2017 % Change blood alcohol limit. This is a crime detected Bitou through police activity rather than reports by 179 152 -14.8 (per 100 000) members of the public. Eden District 146 161 9.8 Despite concerted efforts by government our (per 100 000) roads are still considered amongst the most area decreased by 16.2 per cent from 1 565 in dangerous in the world. Reckless driving and 2016 to 1 312 in 2017 (per 100 000 population). alcohol consumption remain the top reason for Residential burglaries within the Eden District also show a decline of 6.7 per cent from 939 in 2016 % Area 2015 2016 Change to 876 in 2017 (per 100 000 population). Although declining, the number of cases of residential Bitou 4 7 75.0 burglaries crimes remain a serious concern throughout the Eden District area. Eden District 97 113 16.5 FATAL CRASHES road accidents. Table 2.49 Fatal Crashes

The number of cases of driving under the Definition: A crash occurrence that caused influence of alcohol or drugs in the Bitou area immediate death to a road user i.e. death upon impact, flung from the wreckage, burnt to % Area 2015 2016 death, etc. Change Above table indicates that in 2015 there were a Bitou 4 7 75.0 total of 4 fatal crashes involving motor vehicles, motorcycles, cyclists and pedestrians within the Eden District 137 126 -8.0 jurisdiction of the Bitou Municipality. This (very low) number increased by 75.0 per cent to 7 in shows a significant decrease of 44.0 per cent 2016. The number of fatal crashes in the broader from 228 in 2016 to 128 in 2017 (per 100 000 Eden District increased by 16.5 per cent from 97 population). In the Eden District area, the crashes in 2015 to 113 in 2016. number of cases dropped by 5.7 per cent from 237 in 2016 to 223 in 2017 (per 100 000 ROAD USER FATALITIES population). % Area 2016 2017 RESIDENTIAL BURGLARIES Change Table 2.48 Residential Burglaries Bitou 1 565 1 312 -16.2 Definition: Residential burglary is defined as the (per 100 000) unlawful entry of a residential structure with the Eden District intent to commit a crime, usually a theft. 939 876 -6.7 (per 100 000) Given its regular occurrence and the Table 2.50 Road User Fatalities psychological impact on victims, residential burglaries are an obstinate concern in South Definition: The type of road user that died in or 77 | P a g e INTEGRATED DEVELOPMENT PLAN

during a crash i.e. driver, cyclist, passengers, on the manner in which the drought impacts pedestrians. upon the short and medium term financial and economic sustainability of local authorities. According to a recent study, the majority of road fatalities in Africa fall within the working ECONOMIC SECTOR PERFORMANCE age cohort - between the ages of 15 - 44 years - whilst three out of four fatalities were found to The Bitou municipal area has a regional gross be male (Peden et al., 2013). The untimely death domestic product amounting to R2.79 billion in of these primary breadwinners therefore impacts 2015. Economic activity in the Bitou municipal directly upon not only the livelihood of family area is dominated by the tertiary sector which structures, but deprive society of active amounted to R1.97 billion (or 70.7 per cent) in economic participants that contribute towards 2015. The tertiary sector is estimated to have growth and development. The socio-economic grown by 1.6 per cent in 2016, boosted by the impact of such road fatalities has proven to be finance, insurance, real estate and business particularly devastating in South Africa where services sector and the wholesale, retail trade, the majority of road users hail from poor and catering and accommodation sector (see Table vulnerable communities. below). The finance, insurance, real estate and The previous section specified that a total of 7 business services sector recorded an average fatal crashes occurred within the Bitou region in growth of 2.7 per cent between 2005 and 2015, 2016. This gave rise to a total of 7 road users and has continuously reported high growth rates succumbing in those crashes. This is 3 more post the 2008 recession. deaths than the 4 recorded in 2015 which The secondary sector has also been recovering equates to a 75 per cent increase in road user from the 2008 recession with even higher growth fatalities. It indicates also, that every fatal crash rates than the tertiary sector. The secondary had only one casualty. sector, which totalled R671 million in 2015, grew Additional, lower-level information regarding the by an average of 4.2 per cent between 2005 time, location, gender, ages of above specified and 2015. Real GDPR growth for the secondary crashes are available from the Department of sector is slower in 2016 compared to 2012 but still Transport and Public Works upon request. positive, with a recording of 1.8 per cent growth estimated for 2016. The secondary sector within THE ECONOMY the Bitou municipal economy is largely supported by the construction industry which Economic growth at the municipal level is recorded high growth rates in 2012 and 2013 at essential for the attainment of economic 5.0 per cent and 4.8 per cent respectively. development, the reduction of poverty and However, this high growth in the construction improved accessibility. Fostering this growth industry slowed down a little in 2016 with 2.0 per requires an in-depth understanding of the cent. The primary sector, which totalled R145 economic landscape within which each million in 2015, continues to struggle in terms of respective municipality operates. growth. Both agriculture, forestry and fishing subsector, as well as mining and quarrying are Most municipalities within the Western Cape are estimated to decline significantly by 5.5 per cent currently experiencing hydrological drought and 7.5 per cent respectively. conditions where the severe weather is affecting groundwater levels in natural springs, streams, Bitou GDPR performance per sector, 2005 - 2016 reservoirs and dams to the extent that potable Contrib ution R water has reached alarmingly low levels. An to millio Trend Real GDPR growth (%) overview of the current economic reality facing GDPR n Sector (%) value the municipalities of the Western Cape would therefore not be complete without elaborating 78 | P a g e INTEGRATED DEVELOPMENT PLAN

2005 2010 Bitou GDPR performance per sector, 2005 - 2016 - - 20 20 20 20 20 201 Contrib 2015 2015 2015 2015 11 12 13 14 15 6e ution R Primary 5. 2 2 1. 1. 2. 6. - - to millio Trend Real GDPR growth (%) Sector 2 14 . . 5 4 7 5 1. 5. GDPR n 5. 4 2 1 5 (%) value 7 2005 2010 Agricultur 5. 2 2 1. 1. 2. 6. - - - - 20 20 20 20 20 201 e, forestry 0 14 . . 5 7 7 5 1. 5. Sector 2015 2015 2015 2015 11 12 13 14 15 6e and 0. 6 3 1 5 7 fishing 6 Table 2.51GDPR Performance per Sector Mining 0. - 0 1. - 1. 5. - - and 2 5. 1 . 4 5. 6 2 0. 7. Source: Quantec Research, 2017 (e denotes estimate) quarrying 1 . 5 3 6 5 8 Secondar 2 4 3 3. 4. 3. 2. 2. 1. y Sector 4. 67 . . 0 7 0 9 3 8 LABOUR 1 1. 2 2 6 There were approximately 19 306 people Manufact 9. 2 2 4. 3. 1. 1. 3. 2. employed within the Bitou municipal area in uring 4 26 . . 9 3 4 3 6 2 2. 8 9 2015, translating to 8.6 per cent of employment 3 in the Eden District. The area is only the sixth Electricity 1. 1 4 2. 2 - - - - largest employer in the District, after George, , gas and 0 28 . . 5 0. 1. 0. 0. 6. water .4 9 1 4 0 8 5 2 Mossel Bay, , and Hessequa Construct 1 6 3 1. 5. 4. 4. 1. 2. municipal areas. The table below indicates the ion 3. 38 . . 2 0 8 6 4 0 trend in employment growth within each 7 1. 0 4 0 economic sector in Bitou municipal area. Tertiary 7 1 3 2 3. 2. 2. 2. 1. 1. Sector 0. 96 . . 2 8 6 2 6 6 The tertiary sector employed 13 834 people (or 7 8. 0 5 3 71.7 per cent) in 2015, and most of the jobs were Wholesal 1 3 2 3. 4. 2. 1. 1. 1. in the wholesale and retail trade, catering and e and 8. 52 . . 8 1 7 6 5 7 accommodation sub-sector (4 557 or 23.6 per retail 8 4. 0 7 cent), followed by community, social and trade, 4 catering personal services (3 676 or 19.0 per cent) and and the finance, insurance, real estate and business accom modatio services (2 908 or 15.1 per cent). The difference n between jobs created and jobs lost (net Transport 7. 1 0 2. 1. 0. 1. - 0. employment) has remained positive for the , storage 9 21 . . 2 1 4 0 1. 7 and 9. 9 7 2 tertiary sector although the positive balance commun 7 shrinked between 2011 and 2016. ication Finance, 2 2 2 2. 1. 2. 1. 2. 1. The secondary sector is mainly driven by the insuranc 5. 71 . . 3 8 1 5 0 1 e, real 7 6. 7 0 construction industry contributing 2 959 jobs estate 6 (15.3 per cent) to Bitou‟s total employment. and business The primary sector in the Bitou municipal services economy employed 1 507 people (or 7.8 per General 1 5 5 7. 4. 6. 5. 2. 3. governm 0. 28 . . 4 8 4 1 5 2 cent) in 2015, with almost all of the jobs falling ent 1 1. 2 3 under the agriculture, forestry and fishing sector 6 (1 501). Commu 8. 3 2 2. 3. 2. 3. 1. 1. nity, 1 22 . . 1 4 5 7 4 7 social 6. 3 6 Bitou employment growth per sector, 2005 - 2016 and 0 personal Contrib services ution to Num employ ber Trend Employment (net change) Total 1 2 3 2 3. 3. 2. 2. 1. 1. ment of Bitou 0 78 . . 1 1 7 6 5 2 Sector (%) jobs 0 5. 2 6 79 | P a g e INTEGRATED DEVELOPMENT PLAN

200 201 Bitou employment growth per sector, 2005 - 2016 5 - 0 - 201 201 20 20 20 20 20 201 Contrib 2015 2015 5 5 11 12 13 14 15 6e ution to Num employ ber Trend Employment (net change) ment of (%) jobs

200 201 Unemployment Rates for the Western Cape (%) 5 - 0 - 201 201 20 20 20 20 20 201 Sector 2015 2015 5 5 11 12 13 14 15 6e

2016e

Area

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Finance, 1 2 8 4 67 38 79 65 16 -5 insuranc 5 908 0 1 5

e, real . 6 4 estate 1 and

Bit business ou services

22.3 22.1 22.2 21.5 22.2 22.8 23.5 24.4 24.1 25.0 26.3 27.9

General 8 1 6 3 88 54 57 13 -5 57 governm . 662 7 2 3

Eden ent 6 2 7

16.6 16.0 16.1 15.5 15.9 16.1 16.5 17.0 16.6 17.1 17.8 18.7

Commun 1 3 1 7 48 12 24 15 20 71 ity, social 9 676 2 7 1 0 9 6

Cape Western and . 8 4 personal 0 3

16.5 15.8 15.7 15.3 15.8 16.1 16.4 17.0 16.7 17.2 17.8 18.7 services

Total 1 19 4 3 44 58 73 56 90 64 Bitou 0 306 5 2 2 1 5 6 8 Primary 7 1 - 3 - 1 9 - 2 -9 0 9 3 Sector . 50 2 6 1 2 4 4 0 3 2 8 7 5 6 7 5 3 7 Table 2.52 Bitou employment growth 3 Source: Quantec Research, 2017 (e denotes estimate) Agricultur 7 1 - 3 - 12 96 - 20 -9 e, . 501 2 6 17 5 43 7 After years of stability between 2005 and 2010, forestry 8 5 8 the unemployment rate in Bitou started going up and 0 fishing from 2011 to 2016 resulting then in a rate of 27.9 Mining 0 6 - - - - -2 - - - per cent. This could be explained with a shortly and . 3 2 quarrying 0 delayed impact of the economic crisis and a

Seconda 2 3 3 4 92 59 94 13 76 65 lack of stabilisation in its aftermath. ry Sector 0 965 9 5 1 . 0 2 5 Table 2.53 Unemployment rates Manufac 5 989 - - -8 - 32 - 20 - turing . 2 2 43 27 23 Source: Quantec 2017 (e denotes estimate) 1 2 6 4

Electricity 0 17 5 2 - - - 1 1 1 INFRASTRUCTURE DEVELOPMENT , gas and . water 1 Economic theory and empirical work suggest Construc 1 2 6 4 10 10 62 15 55 87 tion 5 959 0 7 0 2 7 that public investment in infrastructure will boost . 9 6 3 economic growth by stimulating related private

Tertiary 7 13 4 2 36 39 54 47 62 8 sector investments – the so-called “crowding-in Sector 1 834 4 4 7 7 7 8 5 . 5 1 effect” – as well as providing a solid foundation 7 6 4 for social development (Swilling, 2006). In South Wholesal 2 4 1 7 15 14 12 13 17 53 Africa the importance of infrastructure has not e and 3 557 3 3 9 2 3 2 5 retail . 3 1 only been emphasised at national level but also trade, 6 0 catering at regional level. The Western Cape and accomm Government‟s main infrastructure budgets and odation investment, both in social and economic Transport, 5 1 3 1 5 42 48 - 84 - infrastructure over the 2017 MTEF, includes storage . 031 6 6 11 16 and 3 5 8 8 spending by provincial government communi cation

80 | P a g e INTEGRATED DEVELOPMENT PLAN

departments and public entities; as well as Western Cape Government has dedicated spending on public private partnerships. R28.0 billion towards infrastructure development across the 2017 Medium Term Expenditure In the Western Cape, the region needs efficient Framework (MTEF). This amount will be spent on transport systems, water and sanitation, new assets, replacements assets maintenance telecommunications and power supplies in order and repairs, upgrades and additions, to influence the standard of living of their rehabilitation, renovation as well as the populations and regional economic growth. refurbishment of existing assets (Western Cape There is, thus, a pressing need to determine Estimates of Provincial Revenue and whether government‟s strategy on infrastructure Expenditure, 2017). Of this total, an amount of investment will yield the desired economic R26.1 billion has been set aside for physical growth benefits at micro (i.e. project or sector infrastructure developments whilst R231.0 million level) or at national or macro level. and R1.7 billion will respectively be channelled PROVINCIAL INFRASTRUCTURE SPEND towards broadband connectivity and public private partnerships. Empirical evidence at a National level has The total Provincial Infrastructure budget for shown that investment in economic 2017/18 amounts to R8.6 billion which will be split infrastructure has a positive impact on amongst the various municipal districts by taking economic growth. This growth however into consideration a wide array of depends crucially on provincial and municipal socio-economic variables, most notably performance. All municipalities are tasked with anticipated population growth trends as well as basic service delivery objectives in order to estimated economic growth potential, the latter stimulate local economic development. being influenced largely by the 2014 Growth Population growth and deteriorating Potential Study of Towns (Donaldson et al, 2014). infrastructure has continued to place strain on For the financial year 2017/18, the City of Cape infrastructure budgets. The objective of this Town assumes the majority of the Western section is to determine if there is a relationship Cape‟s infrastructure allocations with an between infrastructure investment and growth in estimated infrastructure spend of R2.4 billion the Eden District and Bitou and to show the (28 per cent of Provincial allocation). The Eden District is another notable receiver of success the region has had in providing Infrastructure funding with approximately infrastructure. R1 billion (12 per cent of Provincial allocation) [CATEGORY allocated from the Provincial Government. As [CATEGORY NAME] NAME]R731.5 million [CATEGORY will be discussed during the course of this R416.0 million[PERCENTAGE] NAME] [PERCENTAGE] R2.6 billion chapter, it‟s the mirroring of Provincial [CATEGORY [PERCENTAGE] NAME] infrastructure allocation with Municipal R1 billion [PERCENTAGE] infrastructure budgets and plans which will truly set the Municipality and the Province on a higher growth path and improved socio- economic environment.

[CATEGORY [CATEGORY [CATEGORY NAME] NAME] Provincial Infrastructure Allocations: Eden District NAME] R1.3 billion R2.4 billion R127.7 million[PERCENTAGE] With the growing emphasis on infrastructure [PERCENTAGE] [PERCENTAGE] investments within the Eden District have continued in their efforts to improve Figure 2.33 Residential Burglaries infrastructure availability. Some municipalities Source: Provincial Treasury, 2017 have had relatively more success in addressing In fulfilment of Provincial Strategic Goal 1 (PSG 1: backlogs within their jurisdictions than others. The Grow the economy and create jobs), the results of the 2014 Growth Potential Study of 81 | P a g e INTEGRATED DEVELOPMENT PLAN

Roads Towns conducted by Donaldson et al (2014)

revealed that the best performing municipalities 198 049 145 453 574 102

84 84 200 71 000 69 000 in the Eden District using the Infrastructure index4 4 400 2 000

-

are Mossel Bay, Hessequa and George Municipality. Oudtshoorn and Knysna ent Developm Social

Municipality were rated as medium performers

------whilst Kannaland and Bitou were rated low

Total

1 0291 472

222509 12 118356 228192 180519 108642

according to the infrastructure index. This 42374

6 6806 2002 difference in performance may be a result of

the differences in real infrastructure expenditure that have been recorded across the Table 2.48 Provincial Infrastructure Allocations municipalities or differing management Source: Provincial Treasury, 2017 practices. As can be seen over the period under analysis infrastructure investment was higher in The above table presents the Provincial Mossel Bay, Hessequa and George Municipality. allocation for infrastructure in 2017/18 across the Kannaland and Bitou Municipality appear to Eden District. The Provincial expenditure on have made the lowest contributions to infrastructure is concentrated in George infrastructure expenditure within the District; (R228.2 million) followed by Oudtshoorn (R180.5 whilst Oudtshoorn and Knysna Municipality were million) and Hessequa (R122.2 million). medium performers. Overall, the provincial Infrastructure spend within Bitou amounts to allocation for infrastructure in 2017/18 is set at R42.4 million and will mainly be attributed approximately R8.6 billion of which R1.0 billion towards human settlement projects. (12 per cent) is allocated to the Eden region. The table below shows the current Top

R’000 Vote

EdenDistrict

Oud

Mossel Bay Kannaland infrastructure projects in Bitou Municipality in

Hessequa

George

Knysna

Bitou Total terms of the financial value of the project.

ts

hoorn

20

20 20 Tot

18

ature CapeN 17 19 al /1 /1 /2 MT Sector Project/Programme Name 9

------8 0 EF

Education

101 101 108 R’0 R’0 R’0 R’0 15 15 800 21 000 33 300 31 008 00 00 00 00

- - -

Huma 3063-02 - Plettenberg Bay 32 - - 32

Health n Kwanokuthula (357 units) 40 40

37 37 931 42

3 500 Settle IRDP 0 0

250 856 537

ments

- - - -

ts Settlemen Human

265 265 104 Huma Title Deeds Restoration 3 - - 3

22 22 200 25 500 65 800 35 066 40 374 74 134

2 030 n Project - Bitou 07 07 Settle 4 4

- ments

Works Public

24 24 460 22 161 46 621 Huma 3061-xx - Plettenberg Bay - 3 - 3

n Shell Ultra GAP (125 00 00

------Settle services) IRDP 0 0 ments

Huma Qolweni-Bossiesgif Phase 3 2 - - 2 n (433 units) IRDP4 00 00 Settle 0 0 ments

Transp C846.1 Plettenberg Bay 2 - - 2 ort Airport 00 00 4Their final core indicators where vacant industrial stands, distance to 0 0 nearest scheduled airport, distance to nearest small harbour and slipway, percentage households with in-house access to water, Huma 3061 - Plettenberg Bay 1 - - 1 percentage household with access to electricity, and spare capacity n Shell Ultra GAP 60 60 of waste water treatment works (WWTW) (Donaldson 2010:66). 82 | P a g e INTEGRATED DEVELOPMENT PLAN

Audited Outcome Audited Outcome Audited Outcome Audited

Full Year Forecast Full Year

Adjusted Budget Adjusted

Original Budget Settle (125 services) IRDP - (125 0 0 R thousand Description ments units) FLISP 2017/18 2018/19 2019/20

Huma 3347 - Qolweni-Bossiesgif 1 - - 1

n Phase 4 (350 services - 350 20 20

Settle units) UISP 0 0 Government National

ments

Huma 3564-02 Plettenberg New 10 - - 10

n Horizon (62 units) IRDP 0 0 16 229 2 32 203 27 253 27 253 27 253 43 458 29 417 37 428

6 914 Settle ments

Grant (MIG) Infrastructure Municipal 42 3 45

Total 37 00 - 37 14 845 18 914 22 122 19 253 19 253 19 253 33 458 21 417 22 428 4 0 4

Table 2.49Top Infrastructure Projects (INEG) Program Electrification National Integrated

Source: Bitou Municipality, 2017/18 Approved Budget 10 000 15 000 Schedules (SA 36) 5 000 7 000 8 00 8 000 8 000 8 000

0

-

ACIP

MUNICIPAL INFRASTRUCTURE SPEND

1 104 3 000 3 081 National and Provincial Transfers

------

The main sources of infrastructure funding at Partnership Development Neighbourhood municipal level mostly emanate from either internal (own) revenue sources and National or

Provincial Government grants. These grants are ------

complimentary to municipal own funding and Drought Relief Municipal are aimed to address historical social and

economic infrastructure backlogs.

------

t Managemen Side Demand Eskom

In 2017/18 the largest amount of funds

continued to go towards Infrastructure in the 280

------

guise of the MIG (R35.0 million) while the Human RBIG Settlement Development Grant (R84.5 million) by

far exceeds other line item allocations for

------

2017/18. In relation to the socio-economic Government Provincial environment, an allocation of R4.1 million is

19 435 16 125 29 707 47 794 47 794 made which is encouraging given the resources 6 699 2 022

- -

required to gain momentum on improved socio-

economic indicators for the region. Housing

18 589 14 889 28 514 46 601 46 601

6 115

The following table contains the total capital

- - -

transfers and grants received by the Witzenberg Facilities Recreation Sport and Municipality from National and Provincial

Government over the 2017/18 MTREF. The

------

information depicted below was obtained from GrantMRF Services Library

the budget schedules within the Municipality‟s 1 080 1 033 1 033 1 033

320 228 572

-

2017/18 approved budget. The names of - -

specific grants may therefore differ from their Grant Audit Internal

150 official wording.

------

Grant Conditional Services Library

2017/18

Medium Term 1 450

201 Revenue and 525 206 156 160 160 160

-

- -

3/1 2014/ 2015/ Current Year Expenditure 4 15 16 2016/17 Framework

83 | P a g e INTEGRATED DEVELOPMENT PLAN

Mun District

Road Plett: Rehab Paved Roads 6 140 6 140 6 140

icipality

5 172

transport (PMS) 351 351 351

658

------

Matjiesfontein: Upgrade 5 200 4 000

: Municipality District

Sanitation Pump S 000 000 -

2 586

4 988

329

Sanitation Tools and equipment-CRR 375 - -

------

NDMC NDMC Funding Emergency Other 4 530 6 180 6 600

assets Upgrading of Depot 000 000 000

2 586

329 Establishment of New 4 307

------

Community Cemetery 018 - -

Grants and Transfers Capital Total Green Valley: Christmas 3 500 1 100 Electricity lights 000 000 -

17 412 27 120 37 531 27 413 27 413 27 45 480 29 417 37 428

413 New Horizons: Upgrade 3 464 Community sports facility 912 - -

Table 2.51 Priority Projects Table 2.50 Infrastructure Allocations Source: Bitou Municipality, 2017/18 Approved Budget Source: Bitou Municipality, 2017/18 Approved Budget Schedules (SA36) Schedules (SA 18)

The Municipality receives support from National It is clear that the Municipality is prioritising water Government in the form of the Municipal infrastructure, followed by roads infrastructure, Infrastructure Grant (MIG) which should sanitation and refuse These projects all align to exclusively be applied towards infrastructure for the Municipality‟s developmental needs the delivery of basic services. MIG funding outlined within the 2017/18 Integrated allocations should be applied towards Development Plan (IDP). upgrading and building new infrastructure or to rehabilitate existing infrastructure. The MIG allocation towards the Municipality amounted 1. Demographics to R33.5 million in 2017/18 and will gradually  Population: Department of Social decrease to R22.4 million in 2019/20. Development, 2017  Age cohorts: Department of Social Bitou Municipality‟s capital budget is Development, 2017 substantially funded through the National and 2. Education Provincial allocations as well as internally  Learner enrolment: Western Cape Education generated funds and external borrowings. The Department, 2017; Annual Survey of Public current state of the economy puts pressure on and Independent Schools (ASS), 2016  Learner-teacher ratio: Western Cape the national fiscus which may subsequently lead Education Department, 2017; Annual Survey to a reduction in transfers and grant support of Public and Independent Schools (ASS), towards local authorities. This scenario will not 2016 only impact upon the enhanced roll-out of  Grade 12 drop-out rates: Western Cape municipal infrastructure projects. The Education Department, 2017; Annual Survey Municipality should therefore strive to increase of Public and Independent Schools (ASS), own-revenue as a percentage of its total capital 2016 budget.  Educational facilities: Western Cape Education Department, 2017; Annual Survey The Municipality will apply the allocations of Public and Independent Schools (ASS), received from above specified funding sources 2016 to prioritise the following projects for 2017/18:  Educational outcomes: Western Cape Education Department, 2017; Annual Survey Sector Project description 2017/18 2018/19 2019/20 of Public and Independent Schools (ASS), 7 501 4 477 10 367 2016 Electricity Poortjies: Upgrade SS4 930 544 195 3. Health Road Poortjies: Embankment 6 150 transport protection 000 - -  Healthcare facilities: Department of Health,

6 140 6 140 6 140 2017 Water New Natures Valley Reservoir 351 351 351 84 | P a g e INTEGRATED DEVELOPMENT PLAN

 Emergency medical services: Department of Health, 2017 Disaster Management Plan  HIV/AIDS: Department of Health, 2017  Tuberculosis: Department of Health, 2017 INTRODUCTION  Child health: Department of Health, 2017  Maternal health: Department of Health, 2017 4. Poverty The Eden DM has a fully functional Disaster  GDP per capita: Statistics South Africa, 2017; Management Centre (DMC). The centre is equipped own calculations with a joint operational command and tactical  Income Inequality: IHS Global Insight, 2017  Human Development: IHS Global Insight, 2017 decision areas. In order to stay abreast with regional  Indigent households: Department of Local emergency related activities a 24/7 call centre has Government, 2017 been established adjacent to the DMC. The 24/7 call 5. Basic Services centre is operated in conjunction with provincial  Households: Statistics South Africa, Census Emergency and Medical Services (EMS) and renders 2011 and Community Survey 2016 an emergency call taking and dispatch platform  Access to housing: Statistics South Africa, Census 2011 and Community Survey 2016 servicing the district as a whole. During this year the  Access to water: Statistics South Africa, Eden Call Centre updated the newly acquired Care Census 2011 and Community Survey 2016 Monix software system, this system is similar to the  Access to electricity: Statistics South Africa, system used by the Provincial Emergency Medical Census 2011 and Community Survey 2016 Services (EMS).  Access to sanitation: Statistics South Africa, Census 2011 and Community Survey 2016 The Eden DMC strive to deliver cost effective and Access to refuse removal: Statistics South  efficient services to ensure that the Eden district Africa, Census 2011 and Community Survey 2016 remains a safe and secure destination, not only to its 6. Safety and Security inhabitants, but all those visiting the area. Due to  Murder: South African Police Service (SAPS), financial constraints the DMC management has been 2017 forced to “plan out of the box” the past year, this  Sexual offences: South African Police Service includes the partnering with existing programs and (SAPS), 2017 organisations in order to achieve economies of  Drug-related crimes: South African Police Service (SAPS), 2017 scale.  Driving under the influence: South African Police Service (SAPS), 2017 Once again the mitigation and risk avoidance  Residential burglaries: South African Police measures started in the former two years led to a Service (SAPS), 2017 remarkable decrease in significant structural or  Fatal crashes: Department of Transport and environmental damages. Although the region had to Public Works, 2017 endure no less than 22 (twenty two) severe related  Road user fatalities: Department of Transport weather episodes, no significant structural or and Public Works, 2017 7. Economy environmental damages were reported. This could  Sector Performance: Quantec Research, partially be contributed to the lesser severity of the 2017 cut-off low systems, but it also reflects on the  Labour: Quantec Research, 2017 successes of early warning dissemination, the 8. Infrastructure Development implementation of contingency plans and mitigation  Provincial Infrastructure Spend: Provincial Treasury, 2017 work done over the last 6 years.  Municipal Infrastructure Spend: Municipal This said the Eden Disaster Centre still had to deal Budget Schedules (SA18 & SA36) with devastating bush and veld fires in the De Vught and areas as well as to provide assistance

85 | P a g e INTEGRATED DEVELOPMENT PLAN

to the Central Karoo DM after fires in the Prins GUIDING Albert and Swartberg mountain areas proved to be a POLICIES/PROCEDURES/STRATEGIES/FRA challenge. MEWORKS

In the first quarter of the year the DMC had to act as N Policy Revie Workshop Date Council the coordination platform after major disruption o w Date Approv Resolution occurred in the George Municipal area, following Statu ed by Number incidents of civil unrest due to the implementation s Council of the Go George bus service. 1 National To be n/a n/a - Disaster revie Following the summer holiday season saw the first Manageme wed death of an elderly man after being infected with nt Framework the Vibrio Vulnificus virus after swimming in the 2 Provincial To be n/a n/a - Kaaimans River. This placed emphasis on the Manageme revie statement that in future the role of any DMC would nt wed be “business unusual” as the effects of climate Framework change is presenting itself in different forms 3 District Draft To be set after To be - Manageme National and submit thorough the district. nt Provincial ted Framework frameworks The Eden DMC assisted both the Oudtshoorn as well have been as Kannaland local authorities during the below revised to be in line with normal rainfall period in the second and third the amended quarter of this book year. Fortunately with the DM Act . assistance from all spheres of government 4 Eden curre n/a Adopte mitigation and risk reduction measures could be Corporate nt d by Disaster council implemented to limit the impact on communities in manageme March these areas. nt plan 2015 5 Standard Draft February 2017 To be - On the pro-active side the EDMC in collaboration operating discuss with the Provincial Disaster Management Centre, procedures ed by for call LLF PDMC, managed to update the Oudtshoorn as well centre staff as Kannaland local municipal disaster risk assessments. The EDMC further assisted regional local authorities with the compilation and update of ORGANISATIONAL STRUCTURE AND their contingency plans. ACCOUNTABILITY The Executive Manager: Community Services is GUIDING LEGISLATION directly accountable to the Municipal Manager and

the Manager Disaster Management reports directly  The 1996 Constitution RSA to the Executive Manager.  Disaster Management Amendment Act, 16 of 2015 DEPARTMENT: Community Services  Disaster Management Amendment Act, 57 of 2002 DIVISION: Disaster Management  National Disaster Management Framework, MUNICIPAL DESIGNATION GN 654 OF 2005 OFFICIAL  The Municipal Systems Act 32 of 2000  The Municipal Structures Act 117 of 1998 Gerhard Otto Manager Disaster Management

86 | P a g e INTEGRATED DEVELOPMENT PLAN

Wouter Jacobs Disaster Management has called for local authorities to have level 1 Coordinator disaster management plans by 2006, level 2 plans by 2007 and level 3 plans by 2008 none of the local Stella Bouwer Call Centre Supervisor authorities in the Eden District have been able to Gail Bekeer Administrative Assistant meet these legislative requirements. This was mainly due to a lack of capacity at local authority level. Stenden Disaster Management interns University final focusing on disaster related Over the last 5 years the Eden DMC has been year students research assisting in the building of local capacity at local authority level, facilitating formal as well as informal The following people will be activated to render training sessions as well as the development of assistance to the DMC when the Eden Joint concept plans and guidelines to be used by local Operational Centre is activated in terms of the authorities. district disaster response plan In the absence of National guidelines the Eden DMC Section : Systems Support did a macro disaster risk assessment (inclusive of a hazard-, vulnerability as well as capacity assessment) I T section Koos Nieuwoudt in 2004 as well as in 2015 and then provided all the Section : Spatial Information local authorities with the five highest risks that they would have to prioritize in their local planning. GIS section Salman Damons The Eden DMC then requested assistance from the Section : Finance Provincial Disaster Management Centre (PDMC) to CFO Louise Hoek assist local municipalities with the compilation of local ward based disaster risk assessments. Section : Corporate services To date local risk assessments have been completed Executive Trix Holtzhausen for all the local authorities with the assessment for Manager Hessequa LM to be completed in March 2017. Corporate services Then next step would be to link disaster risk reduction plans (DRR) and actions to address the Section : Roads risks identified in the previous two exercises.

Executive Hans Ottervanger CHALLENGES Manager Roads  The lack of dedicated disaster management Section: Risk & Logistics officials at local authority level to ensure effective implementation of all the sectors of DMC building Mario Appels the disaster management continuum i.e. preparedness, mitigation, prevention, Call Centre Tippie Bouwer development recovery and response; JOC Wouter Jacobs  The willingness of local authorities in the district to establish a multi-disciplinary one stop emergency call centre;  The absence at National, Provincial and Local PROBLEM STATEMENT level of a fund aimed specifically at reducing Although the Disaster Management Act, disaster risk; promulgated in 2002 but enforceable since 2004, 87 | P a g e INTEGRATED DEVELOPMENT PLAN

 The lack of disaster risk reduction projects listed EDEN VISION Eden, A united Future Empowered as part of the local authority level IDP and Through Excellence included into multi –year budgets;  In order to place emphasis on prevention and Disaster Building towards a district of mitigation a dedicated section involved with Management resilient communities where disaster risk research needs to be established to Centre’s vision vulnerable people are able to advise the Head of Centre at the DMC on issues prepare for, mitigate against, like loss of biodiversity (natural disaster recover from and adapt to barriers), climate change trends as well as hazards and a changing climate. Heath issues; STRATEGIC The Eden DMC believe in the OBJECTIVES 'added value' and OPPORTUNITIES complementarity of working together to achieve shared  The DMC include a 24/7 emergency call centre objectives and goals by that could be used as a one stop emergency call undertaking joint actions and taking and dispatch facility for the entire mutual support. The interaction District; between district role-players is  The DMC is in direct communication with not guided by shared values of trust, only the South African Weather Service but also other early warning institutions to ensure 24/7 mutual accountability; gender response to and coordination of any major equity; a respect for diverse hazards; identities, perspectives and  The DMC is equipped with a Joint Operational beliefs; a commitment to inclusion Command platform (JOC) that provides a and participation; and openness platform from where regional emergency to sharing and learning to build situations could be coordinated; consensus and mutual  The DMC has well established lines of understanding. communication to both Provincial (PDMC) as well as National (NDMC) counterparts that can INPUTS (WHAT Disaster risk assessments, be used to disseminate information to the WE USE TO DO research, GIS mapping, provincial highest level of decision making; THE WORK) decision support tool, weather  The Disaster Management legislation , as data, RADAR data, early warnings amended, gives the DMC the legislative mandate to cut across departments involved ACTIVITIES/MIS Building resilience against disaster with disaster risk management as well as to SION (WHAT risk report failures to address disaster risk issues to WE DO) the highest level of decision making; OUTPUT Disaster risk assessments, disaster  The DMC has the potential to render shared disaster management services to all the Local (WHAT WE response and mitigation plans, Authorities in the district; PRODUCE OR disaster risk reduction plans. DELIVER) Rehabilitation and reconstruction after disasters to “build back

ROLES AND RESPONSIBILITES: better” Render disaster management and emergency call taking and dispatch services by ensuring legal PREDETERMINE Developing a disaster resilient compliance with regards to the roles and D OUTCOMES district. responsibilities allocated to be done by the district (WHAT WE disaster management centre (DMC). WISH TO

88 | P a g e INTEGRATED DEVELOPMENT PLAN

ACHIEVE) ecosystem and community based adaptation; IMPACT (WHAT To build the capacity at local  To involve more strategic partners in order to WE AIM TO authority level to pro-actively plan spread the current risk i.e. CHANGE) and implement mitigation as well insurance industries; as adaptation strategies and 4) Since the opening of the Eden DMC a range disaster risk reduction actions to of collaborative platforms have been limit the exposure to as well as established to influence policies and the possible impact of future practices at national, provincial and local disastrous events. levels. The intention would be not only to build on the existing but also to establish more platforms to critically evaluate and to OPERATIONAL PLANNING develop new policies to disaster proof the district as well as the institutional 1) To empower newly elected political strengthening of existing networks and stakeholders in terms of the concept of facilitating formation of new networks at disaster risk reduction (DRR) as well as the regional, provincial and national levels for implementation of the amended disaster enhanced collaboration; management act on both local as well as 5) By sharing experiences and knowledge district level; gained during these collaborative actions, as 2) To work towards the closing the well as to identify key challenges still to be implementation gap that exists between addressed; national policies – what is intended, and 6) To build on the engagement with risk local practices – what actually happens; owners to ensure that risk avoidance 3) To align the Eden DMC action planning to strategies take into account local realities, the goals set by the Sendai framework as such as complexity and vulnerability; these goals have been endorsed by 7) The focus in the next 5 years would be to be government in March 2015. instrumental in the roll-out of the amended Disaster Management Act and to build partnerships with local authorities; 3.1 This would include:

8) Another focus area would be the  To develop an understanding of the context strengthening of public education campaigns of DRR and resilience at each local and awareness raising at all levels of society; authority as well as an understanding of the organisational and institutional roles relating to DRR and resilience, ACCOMPLISHMENTS: DISASTER RISK REDUCTION  To ensure a much broader engagement of CONTINGENCY PLANNING stakeholders especially the most 2015/2016 vulnerable groups in order to empower and to build capacity at local level; Emergency Breaching of the Swartvlei Estuary  To assist local authorities to convene local In July 2015 the Eden Disaster Centre convened a platforms to address DRR; workshop with all the stakeholders involved in the  To focus on the concept of “Build Back emergency breaching of the Swartvlei estuary. Over Better”, which enables synergy with the last couple of years a protocol with regards to 89 | P a g e INTEGRATED DEVELOPMENT PLAN

the premature breaching of the Swartvlei estuary Oudtshoorn and Kannaland community/ ward has been established but in order to ensure that the based Disaster Risk Assessments actions are implemented well in advance and with To support the Oudtshoorn Local Municipality (OLM) enough fore warning the trigger levels had to be re- and Kannaland Local Municipality (KLM) in assessed. completing a Disaster Risk Assessment, the Western With the help of the SANTAM BAAM initiative the Cape Disaster Management (PDMC) in collaboration services of the SANTAM technical flood risk with Eden District Municipality Disaster specialist, with specific expertise in flooding and Management Centre (Eden DMC) facilitated engineering, could be obtained to review the current community based disaster risk assessments in hydrological data of the vlei, the size of the accordance with the Western Cape standardized risk catchment as well as the run-off values and the assessment methodology. drainage possibilities and the mouth of the system. The draft disaster risk assessments for both OLM as At the workshop various possibilities to better well as KLM have been completed and distributed address the current flood risk were discussed but it for comment. was clear that more data and modelling would have Eden DMC interventions with regards to the to be done before a way forward could be decided. Reduction of Disaster Risk identified during the SANTAM and San Parks committed to work together 2014/2015 disaster risk assessment to assist the Eden DMC to find an amicable solution During this year attempts to address the risks for the future. identified during last year’s macro risk assessment Shared Risk Management collaboration in the Eden mostly centreed on the identification of the risk District owners as well as to sensitise the risk owners to ensure that disaster risk reduction planning and risk During July 2015 in collaboration with WWF and reduction actions should be aligned to address the SANTAM a workshop with the following role-players newly identified risks. nl: The George Municipality; Provincial Disaster Management; Cape Pine; San Parks; Cape Nature; ACSA Joint Emergency Exercise DAFF; The George business chamber; The On the 20th of October 2015 a joint emergency Oudtshoorn business chamber, NMMU the CSIR and exercise were executed in collaboration with all the various independent scientist were held at the emergency response agencies and ACSA George. George Lodge with the intention to compare notes on current as well as planned risk reduction The exercise managed to highlight various areas of initiatives. concern, this have been tabled in a report to be addressed by the role-players. The meeting resolved that the need exist for a platform to be able to sensitize decision makers of DRR Actions Addressed To Date the current as well as foreseen risks as well ways and means where the environment could act as a The update of the regional preparedness plans to barrier against possible disaster risks. address communicable diseases as well as capacity building amongst first responders with specific In order to address this gap a work group reporting reference to addressing any forseen communicable to the Eden Disaster Management Advisory Forum disease outbreak. The compilation of a guideline to (EDMAF) under the leadership of Mr. Vernon Gibbs- be used for the emergency breaching of estuaries to Halls was established with the mandate to report to prevent flooding of previously identified high risk, the EDMAF at quarterly meetings. mainly in areas around estuaries, during extreme

90 | P a g e INTEGRATED DEVELOPMENT PLAN

weather events. The enhancement of water monitor water quality. Mossel Bay is following suit resources for both the towns , Zoar and by purifying waste water by way of a reverse Oudtshoorn ( as well as ) to osmosis process. augment current domestic water supply during Maintenance and upgrades of water supply extended periods of below normal rainfall. The infrastructure alignment of current programmes aimed at the reduction of alien invasive plants. In Knysna much needed maintenance has been done to the Akkerkloof Dam pipeline, large-scale upgrades As part of Eden’s commitment to ensure a safe and to the Sedgefield Water Treatment Works are healthy environment for all it’s inhabitants as well as underway and all the coastal municipalities (with the the visitors to the area a comprehensive capacity exception of Hessequa), are maintaining their building program to train First Aiders were launched desalination plants, although these are not currently a couple of years ago. This program is continued operational and kept as ‘insurance’ in times of need every year, training on average more than 200 .One area of concern was the Kannaland LM area, disaster management volunteers per year. The focus where sufficient water supply was often a challenge. of the training is on building local capacity in terms This has been addressed through several of first aid but basic disaster risk avoidance as well interventions in collaboration with the Eden DMC. as how to develop a disaster contingency plan for Ladismith’s limited water supply from the Jan F le each household is also addressed. Grange dam (which has a seepage problem) can be Incident Command Training (ICS) augmented with groundwater from additional boreholes in the drier months. By working The training of all senior staff (Shift Leader and collaboratively with the Cape Agency for Sustainable higher) in the basic principles of incident command Integrated Development in Rural Areas (CASIDRA) in order to be able to implement the internationally Zoar’s water supply problem has been addressed recognised incident command system (ICS) for all and a project to link the existing Blossoms boreholes incidents type 3 and bigger. to the Klein Karoo Rural Water Supply Scheme is also Updating of water management plans underway. Although much work still needs to be done, these wells can be accessed to supplement Since 2009 local municipalities adapted their water supply to the Oudtshoorn and areas is management plans to include early warnings to pre- necessary. empt possible problems before they become a crises. For instance when a dam level reaches a Fire and flood awareness campaigns certain percentage, water restrictions will be Fire, Flood and Drought Awareness Campaigns were implemented much earlier than used to be the case held in collaboration with the Western Cape Disaster before 2010.Stream flow in rivers, water run-offs Management Centre and SANTAM. and the salt levels in estuaries are also monitored more consistently since 2009 as a decrease in river The project was funded by SANTAM under the flow or an abnormal rise in estuarine salinity BAAM (Business-Adopt-a-Municipality) initiative. (indicating that less water in coming into the Seventeen schools in the Northern parts of the Eden estuaries) would immediately trigger alarm bells. District Municipal area were identified. With the The reuse of water is gaining momentum with help of a theater group called the Kambro Diggers George Municipality taking the lead with its more than 4400 scholars were reached and advanced ultra-filtration plant through which they awareness regarding fire, flood and drought were can treat waste water for indirect use. The raised on a practical and implementable manner. municipality also upgraded its water laboratory to

91 | P a g e INTEGRATED DEVELOPMENT PLAN

N2 Incident Management Exercises 167,00) as well as Knysna (R2 887 243,00 ) left to submit their proof of expenditure reports before the In preparation for the December 2016 holidays the final amounts, indicated in brackets next to these Eden DMC in collaboration with the South African authorities, will be transferred as well. National Roads Agency Ltd (SANRAL) SOC (the company mandated by the Department of Transport to ensure that Incident Management is DISASTER RESPONSE implemented on all national roads across the country) executed two accident simulations on the In comparison to the previous year the following N2. emergency calls were dealt with by the Eden DM emergency call centre The first simulation was held near Sedgefield on the 17th of November 2015 and the second simulation Details 2014/15 2015/16 was held near the Gouritz Bridge on the 24 of Flooding None None November 2015. The aim of this exercises were to Structure / Hazmat calls 8 20 assess how services respond to emergency incidents Fires calls 719 684 and how the scene is managed according to RIMS procedures and protocols. Motor Vehicle Accidents calls 530 450 Special services calls 417 420 The scenario involved a hazardous material and Rescue calls 48 24 various vehicles with entrapped passengers and Medical calls 20 22 drivers. A short wrap-up was done on scene after Water related calls 1 161 1300 each exercise. Sewerage related calls 1 465 1490 2011/2012 MTEF Disaster Recovery & Electricity related calls 2 262 2180 Rehabilitation Funding.

After the flooding event that took place in 2011 the DISASTER MANAGEMENT following disaster recovery & rehabilitation funding INTERGOVERNMENTAL RELATIONS was paid to the effected local municipalities with in The section consults regularly at various platforms the Eden District area during this year. with other Government Departments.

Bitou Municipality R 1 215 293 The Eden DM has a fully functional District Disaster Knysna Municipality R 2 887 243 Management Advisory Forum (DMAF) as well as a George Municipality R 4 342 167 Safety and Security Cluster Joints structure that Mossel Bay R 1 545 922 meets on a quarterly basis, with B-Municipalities Hessequa Municipality R 9 325 044 and other stakeholders. These meetings are Kannaland Municipality R 1 532 037 followed up with quarterly attendance of both the TOTAL R 20 847 706 heads of disaster centre as well as the Provincial Advisory Forum meetings. At these meetings A memorandum of Understanding (MOU) were regional matters that could not be addressed at signed with all the local authorities. As part of this district level is escalated to Provincial- as well as MOU the six Local municipalities that submitted National governmental level. projects to be funded form the R&R fund had to Frequent meetings is held with senior officials from submit monthly expenditure reports. the Departments of Social Development, Water To date R 47 635 366,00 has been paid to the Affairs, Environmental Affairs, Education and various municipalities with only George (R4 342 Training, Heath, Agriculture and Transport as well as

92 | P a g e INTEGRATED DEVELOPMENT PLAN

NGO’s including the Red Cross, Garden Route implementation has posed significant challenges, Initiative, South Cape Land Initiative (SCLI) etc. particularly at the level of local municipalities. The purpose for the review of the Disaster Management In addition to this local engagements with major role Act was to tackle the challenges by maximising the players i.e. ACSA, Petro SA, Cape Nature, San Parks, effect of DM legislation to communities, especially the South Cape Fire Protection Association (SCFPA) those most at risk. the local industry i.e. Cape Pine, PG Bison etc. is held. Views on amending the principal Act were expressed by the political leadership, the South African Local Forum TO Is Frequ Forum purpose Foru Forum name R? foru ency m chairp Government Association (SALGA), the Disaster m of comp erson Management Institute of Southern Africa (DMISA), activ meet ositio e? ings n the National Disaster Management Advisory Forum (NDMAF), practitioners, academics and others in the DMAF YES YES Bi - Discuss regional Regio Eden disaster management fraternity. annu disaster nal Portfoli ally management o issues Chairp Key issues highlighted by these stakeholders have erson also been emphasised in a number of research

PDMAF YES YES Quart Discuss Provi Head reports and submissions, including those from the erly provincial ncial Of SALGA, the International Federation of the Red Cross disaster Centre and Red Crescent Societies (IFRC) and the Financial management issues and Fiscal Commission (FFC).

SAPS YES YES Bi- Discuss district Regio Maj. Considering the views, reports and implementation Cluster Mont safety and nal Gen. challenges, the need was established to call for a joints hly security Reddy concerns review of the principal Act to make it

Climate YES YES Bi - Discuss district Regio Head  simpler to implement, Change annu climate change nal of  strengthen certain regulatory provisions, Adapta ally adaptation Eden tion matters DMC  avoid ambiguity, and  provide greater legal certainty SCLI YES YES Bi - Discuss invasive Regio Kobus annu alien plant nal Meirin ally eradication g In reviewing the disaster management legislation, SCFPA YES YES Quart Discuss the roll Regio Paul due consideration was given to, among other things, erly out of fire nal Gerber protection the Government's Programme of Action and the 18 associations, key targets of the National Development Plan. integrated fire management The amended disaster management approach pays and pro-active fire response. specific attention to the pressing needs of poor communities in relation to both natural and human induced disasters in the context of a developmental LATEST DEVELOPMENTS: DISASTER MANAGEMENT and capable state. AMENDMENT ACT, 16 OF 2015 The principal Act was amended in order to address The Disaster Management Act, Act 57 of 2002, is the need for better coordination, more involvement internationally reputed for its emphasis on of sectors, improved disaster management planning prevention and its relative comprehensive approach capacity of local municipalities, better integration of to Disaster Risk Reduction (DRR). However the disaster risk reduction in development policies,

93 | P a g e INTEGRATED DEVELOPMENT PLAN

plans and programmes, and more emphasis on Clarity on specific information and reporting preventive measures. requirements to municipal and provincial intergovernmental forums, the National Disaster Key issues addressed in the Disaster Management Management Centre (NDMC) and the National Amendment Act (DMAA) Treasury. (See sections 9 and 10 of the Amendment

Act); Definitions: Reporting requirements on the implementation of The use of terminology which was addressed by policy and legislation relating to disaster risk providing for definitions such as adaptation, climate reduction as well as the management of funding change, disaster risk reduction, ecosystem, risk allocated for post disaster rehabilitation and assessment; and substituting the definitions of reconstruction measures to municipal and provincial emergency preparedness, mitigation, organ of state, governments. (See section 10 of the Amendment vulnerability, etc. (See section 1 of the Amendment Act); Act); Disaster Management Plans: Role of Traditional Leaders: The contents of disaster management plans by Strengthening the representation of traditional organs of state and making relevant information leaders in disaster management structures. The available to disaster management centres. The Amendment Act provides for traditional leaders to Amendment Act was enhanced to provide for the serve in disaster management advisory forums logical sequencing of events, i.e. conducting a risk across the spheres of government. (See sections 2, assessment prior to planning and to ensure that 12 and 16 of the Amendment Act); disaster management plans of organs of state Inclusion of the Hyogo Framework for Action (HFA) indicate the way in which the concept and principles and Sendai Framework obligations: of disaster management are to be applied in its functional area, including expected climate change The need to incorporate the obligations set out in impacts and risks for the organ of state. Organs of the HFA adopted by UN in 2005 as well as the recent state should also identify and map risks, areas, Sendai Framework into the National Platform for ecosystems, communities and households that are Disaster Risk Reduction. The Amendment Act exposed and vulnerable to physical and human- provides for the National Disaster Management induced threats. (See sections 11, 13, 17 and 18); Advisory Forum to serve as the South African National Platform for Disaster Risk Reduction to The role of municipalities: coordinate and give policy guidance on disaster risk Re-affirming the role of municipalities to establish reduction. (See section 2(b) of the Amendment Act); capacity for the development and coordination of a Clarity on the roles and responsibilities of organs of multi-sector disaster management plan and the state: implementation of a disaster management function for the municipality. (See section 14 of the Clarity on the roles and responsibilities of organs of Amendment Act); state in terms of disaster management and emphasising the need for organs of state to assist Establishment of disaster management centres on the disaster management structures in the event of LM level: a disaster or a potential disaster. The need in some areas to establish a disaster (See sections 7, 11 and 15 of the Amendment Act); management centre in a Local Municipality (LM). The Amendment Act subsequently provides for the Reporting requirements: 94 | P a g e INTEGRATED DEVELOPMENT PLAN

establishment of a disaster management centre for the development of disaster a LM in terms of a service level agreement with the management plans. relevant district municipality. (See section 14 of the The definitions of Emergency preparedness: The ‘emergency preparedness’ focus is moved from only being Amendment Act); and and ‘mitigation’ have been able to mobilise, organise, and vastly expanded and by provide to now also anticipate, Uncertainty around Declaration& Classification and implication responsibilities to respond to and recover from a Professionalisation -Regulations: ensure the reduction of disaster. sources driving climate Individuals‘, professionals’ and The Amendment Act amends section 59 of the change. spheres of governments principal Act to provide authority to the Minister to knowledge and capacity itself is regulate on disaster management education, now valued under the concept training and research matters as well as the of being ‘prepared’, again emphasizing proactivity in declaration and classification of disasters. (See assessing and being prepared section 19 of the Amendment Act) for a disaster. Meaning that having certain Salient Points Emanating from the DMAA persons constantly involved in The following amendments were effected: either early detection mechanisms or other proactive Various definitions such as - mechanism is now a Amendment Possible impact of this requirement to qualify as being amendment emergency prepared instead of The insertion of ‘climate Climate change impacts and trying to procure such services change’ to the adaptation thereto is a new after an emergency is declared. definitions. Climate change consideration included within The mitigation of a disaster is impacts and adaption thereto the ambit of Disaster expanded to include human- must also now be considered Management by all spheres of induced. The effect of a when compiling Disaster government. disaster is expanded to Management Plans and included hazard, exposure and considering risk reduction vulnerability to a community. measures. And mitigation of climate The addition of the word The word ‘significant’ is defined change is specified as a factor ‘significant’ to the definition as being serious or ‘sufficiently to consider whenever any of “disruption of life of a great or important to be sphere of government is community” as an element of worthy of attention’. required to plan in such a way a disaster – this affects the Meaning that a higher standard to mitigate any disaster. threshold for disaster of disruption is required prior Any reference to climate classifications; to a situation being able to be change will have the most far classified as a disaster and not reaching effect as this includes just any disruption would a duty to address a reduction qualify. of sources driving climate A definition of ‘disaster risk The amendments require all change through means of reduction’ has been inserted spheres of government to planning. to the definitions. This affects become proactive in Risk The definition of ‘post- The normality in conditions the reporting responsibilities reduction through means of disaster recovery and caused by a disaster is restored of functionaries. management of plans, restoration’ has been by the restoration, and preventative policies and early expanded to set out in improvement, where alert mechanisms. greater detail what is appropriate, of facilities, A definition ecosystem has A new concept of risk expected from responsible livelihoods and living conditions been inserted to the reduction and climate change entities when attending to of disaster-affected definitions. adaptation is introduced and disaster recovery and communities, including efforts requires specific focus on the restoration. to reduce disaster risk factor. ecosystem and community This means that efforts should based adaptation by means of be employed to not only

95 | P a g e INTEGRATED DEVELOPMENT PLAN

restore facilities, livelihoods Section 10 has been The amendment stating that and living conditions to pre- amended to state that the the Minister, and no longer the disaster conditions, but further Head of the NDMC now DG, must approve the National to try to improve such to a reports to the Minister, and Centre’s conduct when giving better and more resilient no longer necessarily holds advice and guidance. situation. office in the Department. By removing the reference to Efforts regarding the built Section 22 adds to the the NDMC being part of a environment and confirmation that the department and now stating reconstruction of damaged Minister now enjoys that the Head will report infrastructure also endeavor to oversight of the National directly to the Minister, build-back-better. This means Centre. provides interdepartmental that the materials and independence and implies that technologies utilised should be the Minister will be directly of a higher quality than those involved in the decision making that were damaged. process especially having The same goes for livelihoods regard to section 22. that speaks to softer issues and This opens the possibility of living conditions. establishing the NDMC as an A definition risk assessment The risk assessment should be independent government has been inserted to the of a scientific calculation and institution should the need so definitions. analysis by determining the require. (Like FEMA in the USA) nature and extend of the risk and vulnerability of the Section 15 - targeted community in order to Section 15 has been Prior to the amendment the move towards conditions of amended to give the National NDMC had some challenges in strength and resilience. Centre the authority to call order to obtain the assistance Section 5 and 37- upon the SANDF, SAPS or any of the South African Defence other organ of state to assist Force or the South African Section 5 has been amended The selection of traditional disaster management Police Service. The procedure to now also require the leaders were not prescribed structures. could cause a delay in the presence of representatives meaning that essentially any immediate action required in from umbrella organisations person classified as a certain circumstances. for women, children, the traditional leader present, will The NDMC in practice already elderly and people with qualify. Now the selection request the assistance of any disabilities on the National process is clearly established. organ of state as the Disaster Management Representivity of associations circumstances dictates directly, Advisory Forum. on a national level representing however by providing a In terms of Section 37 similar women, children, the elderly legislative duty on the SANDF changes have been made in and persons with disabilities and SAPS allows for respect of Provincial disaster are required, which assist as streamlining the procedure management advisory the Act now requires organs of from that institutions side. forums. state to make special Meaning they may deviate This forum will also now arrangements in disaster plans from their normal authorising serve as the South African for these groups. procedures. National Platform for By implication the Eden DMC Disaster Risk Reduction. can now activate these Sections 10 and 22 - National resources via the NDMC. Section 23,24 and 25 as well as 38, 39 and 52,53

96 | P a g e INTEGRATED DEVELOPMENT PLAN

Section 23(1) has been The new paragraph places a Section 25(3) has been The National Centre will now amended to include an duty on any organ of state to amended to include also have to make available obligation on the National report on a quarterly basis to obligations on Major Public applicable disaster Centre to inform the the NDMC on any occurrence Entities to submit disaster management plans of organs provincial centre of its leading to a declaration of a management plans. of state to provincial and classification decisions, once disaster. municipals centres; it has classified a disaster. This shifts the duty away from By implication ESKOM, Each national organ of state Section 23(5) relating to the NDMC to request the TRANSNET, PETRO SA etc. must first procure and conduct Provincial Disaster information from relevant would also have to submit a proper risk assessment prior classifications, has been organs of state in order to their comprehensive disaster to preparing or implementing a amended to remove ensure that the NDMC report management plans to the disaster management plan. 23(5)(a)(iii) – meaning that to the Minister is up to date NDMC. Such an assessment would cross-boundary relating any potential disaster. ensure that real and potential municipalities have been Effectively this means that the risks are properly identified and removed from the NDMC will be provided with addressed in any draft plan. classification triggers. the information from the The assessment is not only to Section 24 now includes affected organ of state, alerting relate to risks to the functional greater reporting obligations the NDMC to potential area in general but must relate on affected organs of state disasters instead of the NDMC to: such as: having to request information  Ecosystems –  quarterly reporting unnecessarily. meaning an to the National Provinces and municipalities environmental Centre, must now also prepare and component  quarterly progress submit progress reports  Communities as a reports on policy relating to disaster risk collective implementation, reduction policies and  Households in specific  financial progress legislation ensuring effective reports where Further the assessment must information sharing. funding is involved, also include physical or human- These reporting obligations  expenditure and induced threats of any kind. triples the current performance The NDMC must not only administrative burden on reports relating to report on the failure of a District Disaster Centres funds, received to national organ of state to

be delivered to adhere to this clause but also National Treasury, Organs of state now has a duty should a major public entity  copies of all these to develop reduction fail to do so. reports is to be mechanisms and must report Section 31A has been added delivered to on how such mechanisms will and sets out the staffing of National Treasury be implemented, provincial disaster centres and affected The measures must have the Head of the centre disaster centres. special focus on: appears to have the authority  Risk reduction, and to appoint staff in the centre. Section 25(1) has been  Climate change replaced with a more adaptation. Section 43 has been Previously it was the duty of comprehensive list of Once such risks are identified amended to include distinct Municipal Entities indicated in obligations on national organs of state must also obligations on local the national, provincial or organs of state. Similar develop early warning municipalities to establish municipal disaster changes have been made in mechanisms and procedures. capacity to: management framework to respect of Provincial organs This is to ensure that all organs  develop and co- prepare disaster management of state and provinces of state are not only reactive ordinate disaster plans (section 52 pre- (sections 38 and 39) as well to a disaster, proactive in risk- management plans amendment). and as Municipal organs of state avoidance but also in a  the and municipalities (sections position to react quickly and Municipalities are required to implementation of 52 and 53); effectively. incorporate Disaster a disaster Management Plans within their management Integrated Development Plans function within the (section 26 (g) of the Municipal 97 | P a g e INTEGRATED DEVELOPMENT PLAN

municipality Systems Act 32 of 2000.  disaster management Section 43(3) now calls for a Now each local municipality education, local municipality to establish must establish capacity for:  disaster capacity for the development - the development and co- management and coordination of a ordination of a plan, training, and disaster management plan and  disaster management and the implementation of a - implementation of a disaster research disaster management management frameworks function for the municipality function The Minister may now make which forms part of the In the original act each District regulations concerning the disaster management plan as Municipality was required to declaration and classification approved by the relevant establish Disaster Management of disasters. municipal disaster Centres which would service management centre. the Local Municipalities within Section 43 (4) A local its district. These amendments to the DM Act should be municipality may establish a The amendment however does noted, effected and the implications discussed disaster management centre provide a Local Municipality with various Local Municipalities at the next in consultation with the with the discretion to establish DCF and DFC Tech with the view on entering relevant district municipality a centre depending on the into shared services agreements between the in accordance with the terms requirements, capacity and set out in a service level strategic objectives of each Eden DM and Local Municipalities in terms of agreement between the two municipality. disaster management activities and role parties, in alignment with Such a centre must be clarification. national norms and established in accordance with standards. a SLA concluded between the A summary of major incidents/ severe weather District and Local Municipality alerts coordinated by the EDMC is depicted in table to clearly define which centre will be responsible for what 1 below: duties and address allocation of funds. DISASTER RESPONSE The establishment and staff of In comparison to the previous year the following MDMC is now brought in line with the NDMC and PDMCs. emergency calls were dealt with by the Eden DM Section 45(a) Staff of emergency call centre municipal disaster The PDMC guideline in terms management centre. of the minimum staffing level Details 2014/15 2015/16 for a district municipal disaster The staff of a municipal centre is as follow: Flooding None None disaster management centre Head of Centre and one person consists of: per section of the disaster Structure / Hazmat calls 8 20 (a) the head of the management continuum i.e. municipal disaster Prevention, Mitigation, Fires calls 719 684 management Preparedness, Response, centre; and Recovery and Development. Motor Vehicle Accidents calls 530 450

(b) suitably qualified Total of 7 people persons appointed Special services calls 417 420 in the administration of Rescue calls 48 24 the municipality. Section 59 now empowers Medical calls 20 22 the Minister to make regulations concerning the Water related calls 1 161 1300 focus areas of national disaster management, Sewerage related calls 1 465 1490 meaning: 98 | P a g e INTEGRATED DEVELOPMENT PLAN

Details 2014/15 2015/16 dry conditions towards the end of 2015 and continuing into 2016. Electricity related calls 2 262 2180 The SAWS also foresee high probabilities of below-

normal rainfall from mid-summer, which is expected EDEN DISASTER SITUATION SYNOPSIS to continue into autumn with small chances of localized above-normal rainfall and they warn that Economic perspective “the condition could promote a regional or localized drought”. Eden is an important economic growth area for the Western Cape. It has an expanding population on Eden DM council commitment account of immigration from other parts of the country, bringing a dynamic mix of skills and cultures Eden District Municipality Council recognises that if to the district. The relatively high percentages of the objective of achieving sustainable development households with no income in areas with higher in the area of Eden is to be realised, a concerted population density, creates several social challenges. effort is required to reduce recurrent disaster risks in its area. Basic services and infrastructure

Problems on basic services infrastructure are This can only be achieved by: experienced in the municipalities that have seen  creating resilience amongst its people and rapid population growth. The natural environment its infrastructure; and its resources of the EDM are sensitive and  strengthening capacity to anticipate susceptible to over-exploitation or inappropriate significant events and disasters; and use.  improving the management of such events in order to limit the effects wherever Condition of natural “disaster barriers” possible

The Garden Route has largely intact wetlands which It also requires the development and attenuate water; prevent erosion and flooding and implementation of appropriate disaster risk which naturally purify the water. However, many reduction (DRR) methodologies and the integration wetlands are being slowly degraded through illegal of such methodologies into development plans, channelling, the removal of reeds, peat and other programmes and initiatives as well as the water flora by transgressors who abstract water, management of high risk developments. These DRR mostly for agricultural purposes. plans should be included into the IDP and SDF of each local authority with sustainable implementable Seasonal climatic outlook for 2016 projects and plans aligned to the budget.

In its Seasonal Climate Watch Report for the period During the 2014 macro disaster risk assessment October 2015 to February 2016, the South African the following new risks have been identified for the Weather Service (SAWS), along with other region: international forecasting systems, predict “the strengthening of an El-Niño episode towards the 1. Alien Plant Invasion – Entire District; summer season with the expectation to continue 2. Coastal Erosion (Sea Level Rise) – Bitou, throughout the autumn season”. Knysna, George, Mossel Bay and Hessequa LM’s; This indicates that South Africa and the Eden District 3. Petro-Chemical Fire Hazards- Mossel Bay may continue to experience extremely warm and LM;

99 | P a g e INTEGRATED DEVELOPMENT PLAN

4. Predator Animals- Kannaland and equates to a low risk and any hazard preparedness Oudtshoorn LM; plans are sufficient for these risks. 5. Seismic hazards - Entire District; 6. Service Disruptions- Entire District; 7. Social Disruptions - Entire District; 8.2 DRR ACTIONS ADDRESSED IN THE 8. Storm Surges - Bitou, Knysna, George, CURRENT YEAR: Mossel Bay and Hessequa LM’s;

9. Structural Integrity Old Gouritz Bridge - DRR actions addressed in the current year (2015/16) Mossel Bay LM; include the following:

During this year attempts to address these newly  The update of the regional preparedness identified risks mostly centred around the plans to address communicable diseases as identification of the risk owner as well as to sensitise well as capacity building amongst first the risk owners to ensure that DRR planning and responders with specific reference to DRR actions should be aligned to address the newly addressing any foreseen communicable identified risks, in line with the following guidelines: disease outbreak.

Extremely High Risks: Should the relative risk  The compilation of a guideline to be used priority of a particular hazard event impacting on a for the emergency breaching of estuaries to community be rated as extremely high, that prevent flooding of previously identified community faces a potentially destructive risk with a high risk, mainly in areas around estuaries, high probability of occurrence, for which they are during extreme weather events. unprepared. This combination equates to an  The enhancement of water resources for extremely high risk and is a disaster in the making. both the towns Ladismith Zoar and For these extremely high risks you must prepare Oudtshoorn (Dysselsdorp as well as De Rust) urgent risk reduction interventions. to augment current domestic water supply during extended periods of below normal High Risks: If the relative risk priority of a particular rainfall. hazard event impacting on a community is rated as  The alignment of current programs aimed high, the risks to which these communities are at the reduction of alien invasive plants. exposed are potentially destructive, but the  The building of bush and veldt fire response community is modestly prepared for the hazard capability: event occurrence. This combination equates to a  A additional 4x4 bush and veldt fire high risk and you must prepare a combination of risk response tanker was purchased; reduction interventions and preparedness plans for  The SLA with the SCFPA were strengthened, these risks. this lead to the addition of three additional WOF teams; Tolerable Risks: if the relative risk priorities of a  The inclusion of an additional landing strip particular hazard event impacting on a community is in Denneoord (George) to be used for fixed rated as tolerable, it translates into an acceptable wing aerial firefighting in order to ensure risk for a largely prepared community. This one landing strip per 50 km² in the entire combination equates to a tolerable risk and you Eden DM district; must prepare preparedness plans for these risks.  The erection of a centrally located WOF base camp at Denneoord (George) to be Low Risks: Relative risk priorities of a particular used for WOF teams from outside the Eden hazard event impacting on a community is rated as DM boundaries; low risk, it translates into a very small risk for a  The addition of two firefighters per shift at largely prepared community. This combination the George fire station, this brings the total staff component at the 24/7 George fire 100 | P a g e INTEGRATED DEVELOPMENT PLAN

base to 6 trained professional firefighters seepage problem) can be augmented with per shift; ground water from additional boreholes in  The training of all senior staff (Shift Leader the drier months.By working collaboratively and higher) in the basic principles of incident with the Cape Agency for Sustainable command in order to be able to implement Integrated Development in Rural Areas the internationally recognised incident (CASIDRA) Zoar’s water supply problem has command system (ICS) for all incidents type been addressed and a project to link the 3 and bigger; existing Blossoms boreholes to the Klein  Since 2009 local municipalities adapted Karoo Rural Water Supply Scheme is also their water management plans to include underway. Although much work still needs early warnings to pre-empt possible to be done, these wells can be accessed to problems before they become a crises. For supplement supply to the Oudtshoorn and instance when a dam level reaches a certain Calitzdorp areas is necessary. percentage, water restrictions will be  As part of Eden’s commitment to ensure a implemented much earlier than used to be safe and healthy environment for all it’s the case before 2010.Stream flow in rivers, inhabitants as well as the visitors to the area water run-offs and the salt levels in a comprehensive capacity building program estuaries are also monitored more to train First Aiders were launched a couple consistently since 2009 as a decrease in river of years ago. flow or an abnormal rise in estuarine salinity  During this year a total of 220 first aiders (indicating that less water in coming into the were once again successfully trained to the estuaries) would immediately trigger alarm skill level of First Aid level 3.This group bells.The reuse of water is gaining includes temporary staff employed as part momentum with George Municipality taking of the Eden extended public works program the lead with its advanced ultra-filtration as well as all the newly recruited lifesavers plant through which they can treat waste working on the beaches of the George LM. water for indirect use. The municipality also upgraded its water laboratory to monitor water quality. Mossel Bay is following suit by 8.3 EDEN DM CORPORATE DISASTER purifying waste water by way of a reverse osmosis process. MANAGEMENT PLAN  Maintenance and upgrades of water supply In May 2015 the Eden Council approved the Eden infrastructure is also receiving more DM Corporate Disaster Management Plan. This plan attention. In Knysna much needed provides a framework for the institutionalisation of maintenance has been done to the DRR at all Departments of the district authority. Akkerkloof Dam pipeline, large-scale upgrades to the Sedgefield Water Treatment The aim for the coming year would be for each Works are underway and all the coastal Department to develop their own line function municipalities (with the exception of specific DRR plans to be collated into one Eden Hessequa), are maintaining their Disaster Management Plan. desalination plants, although these are not currently operational and kept as ‘insurance’ To date the DRR plan the IT section has been in times of need .One area of concern was received. the Kannaland LM area, where sufficient water supply was often a challenge. This has 8.4 DISASTER ASSISTANCE TO LOCAL been addressed through several interventions in collaboration with the Eden AUTHORITIES DMC. Ladismith’s limited water supply from the Jan F le Grange dam (which has a 101 | P a g e INTEGRATED DEVELOPMENT PLAN

 During the past year the Eden Disaster Summary of major incidents/ severe weather alerts Management section intervened and acted for the period 1/07/2014 to 30/06/2015 as Estimate leading coordinator during cut -off low and Date Incident Comment related severe weather events. damages 04/07/2014 Heavy rainfall No major Contingency to warning damages plans  Assistance was also rendered to the 06/07/2014 reported to implemented Oudtshoorn Local Municipality with regards the Eden DMC i.e. pro- to the active water crisis reported to the PDMC during emergency breaching of March 2015. estuaries. July 2014 Ebola outbreak No cases in Contingency  In the latter part of the year the relevant – West Africa Eden DM area planning officials form local authorities have been updated 17/07/2014 Heavy rainfall No major Contingency working with the Eden DMC to develop to warning damages plans contingency plans to address extended 19/07/2014 reported to implemented periods of power outages. To date two the Eden DMC i.e. pro- separate workshops have been hosted by active the Eden DMC with all the relevant emergency breaching of emergency- and technical staff from local estuaries. authorities in the Eden District to exchange 24/07/2014 Heavy rainfall No damages Pro-active ideas as well as to highlight specific areas of to warning opening of concern to the PDMC. Should the district be 26/07/2014 river mouths faced with an extended power outage of 10 17/08/2014 Gysmanshoek 19100 Ha and to pass fire fire lines of to 14 days it will be a challenge to say the 26/08/2014 approximately least, but at least detailed contingency 18 kilometers. planning have been done and plans to 18/08/2014 Civil Unrest Several small Situation was ensure the delivery of essential services has to Mossel Bay fires made by controlled by 19/08/2014 protesters No Mossel Bay been addressed. people SAPS evacuated  Eden and role-players rolled out a Water 27/08/2014 Heavy rainfall No major Contingency Campaign in Kannaland following indications to warning damages plans that the domestic water supply to the town 28/08/2014 reported to implemented the Eden i.e. pro- was severely stressed. Eden District DMC. active Municipality would like to extend a word of emergency appreciation to the Department: Water breaching of Affairs and Sanitation, including Ms Khuva estuaries. Makumbana, Department: Local 17/09/2014 Gale Force No damages Pro-active to winds warning warning Government including Mr Richard Haridien, 18/09/2014 received disseminated Department of Communication, officials to roll from Kannaland Municipality including the High Seas players Mayor, Ald. Jeffery Donson and Municipal warning received Manager, Mr Morne Hoogbaard, as well as 29/09/2014 Heavy rainfall No major Contingency Kannaland’s Director: Corporate Services warning damages plans who served as the Program Director of the reported to implemented event, for the successful roll out of the the Eden i.e. pro- campaign. DMC. active emergency breaching of estuaries. 102 | P a g e INTEGRATED DEVELOPMENT PLAN

Estimate Estimate Date Incident Comment Date Incident Comment damages damages 30/09/2014 Hail storm- 56 informal Eden MDMC 11/02/2015 Gamkaskloof 80 000 ha Eden DM fire Kannaland settlements provided 200 to fire and rescue (Ladismith) 118 adults blankets and 13/02/2015 teams and 66 60 food responded children parcels 11/02/2015 Waboomskraal 70 ha Eden DM fire affected. to Fire and rescue 6/10/2014 Fire at 15 000 Ha 13/02/2015 teams to Gouritzmond responded 11/10/2014 03/03/2015 Blombos Fire 30 000 ha Eden DM fire 01/11/2014 Heavy rainfall No major Contingency to and rescue to warning damages plans 06/03/2015 teams 04/11/2014 reported to implemented responded the Eden i.e. pro- 13/03/2015 Ladismith R20 mil First teams DMC. active Cheese Factory on scene emergency fire within 10 breaching of minutes estuaries. 23/03/2015 Heavy rainfall Bus and Eden DMC 26/11/2014 KKRWS water Water Eden water warning : vehicles informed all to crisis demand tankers used Flood in entrapped , stakeholders 1/12/2014 exceeds the to transport Meiringspoort one fatality to be on high supply of rural water to alert; scheme areas in Eden DM fire boreholes and Dysselsdorp and rescue although the teams assist areas to the with rescue West of actions Oudtshoorn 04/04/2015 Heavy rainfall No major Contingency (, to warning : damages plans Calitzdorp 05/04/2015 reported to implemented etc.) is the Eden i.e. pro- covered the DMC. active areas to the emergency East breaching of (Vlakteplaas, estuaries. Le Roux Station and Dysselsdorp) do experience Penny pinchers Lions Karoo to Coast Mountain Bike very low Challenge water pressures and Once again the Eden Fire and Rescue service the peak water demand provided a rescue and safety service to the Penny cannot be pinchers Lions Karoo to Coast Mountain Bike supplied Challenge that was hosted between Uniondale and 14/01/2015 Kammanassie Eden DM fire Knysna on the 20th of September 2015. fire and rescue teams responded Oudtshoorn and Kannaland community based 30/01/2015 Kannaland Situation Disaster Risk Assessments request mitigated disaster To support the Oudtshoorn Local Municipality and declaration Kannaland Local Municipality in completing a 08/02/2015 Paardebond 230 000 Eden DM fire to fire hectares and rescue Disaster Risk Assessment, the Western Cape Disaster 13/02/2015 teams Management Centre in collaboration with Eden responded District Municipality Disaster Management Centre 103 | P a g e INTEGRATED DEVELOPMENT PLAN

(Eden DMC) has commenced with the facilitation of a community based disaster risk assessment in Eden District Municipality’s DMC team was accordance with the Western Cape standardized risk announced as the “Best Team” that helped to assessment methodology. prepare and execute this year’s successful DMISA Conference. This prestigious award was presented Hazard specialists to be interviewed have been to the Eden team by the President of DMISA, Dr. identified and the risks previously identified for the Johan Minnie. area have been tabled. Logistical arrangements such as: the coordination of DMISA Conference 2015 security services, fire safety, coordination of the media, registration of delegates at the event, etc. On the 9th and 10th of September the Eden DMC and were amongst the many tasks the team had to the Disaster Management Institute of South Africa oversee and execute. (DMISA) co-hosted the annual Disaster Risk Reduction Conference. This conference was Shared Risk Management collaboration in the Eden attended by more than 300 delegates from various District institutions from the African continent including delegates from outside the African borders, as far as On the 22nd of July 2015 in collaboration with WWF Slovenia and Romania. and Santam a workshop with the following role- players: The George Municipality; Provincial Disaster The theme of this year’s Conference was: “The 2030 Management; Cape Pine; San Parks; Cape Nature; Resilience: Sustainability and Adaptation Mandate: A DAFF; The George business chamber; The New Action for Disaster Risk Reduction” and the Oudtshoorn business chamber, NMMU the CSIR and focus of the conference were to share ideas and various independent scientist were held at the best practices in the profession of Disaster George Lodge with the intention to compare notes Management. on current as well as planned risk reduction initiatives. Eden’s Acting Executive Mayor, Cllr Lionel Esau, delivered the key note address at the opening The meeting resolved that the need exist for a function with an overview of the district and the platform to be able to sensitize decision makers of Western Cape MEC for Local Government, the current as well as foreseen risks as well ways Environmental Affairs and Development Planning, and means where the environment could act as a Mr Anton Bredell, highlighted that to date through barrier against possible disaster risks. the Western Cape’s proactive awareness campaigns, more than 70 000 learners at 85 schools have been In order to address this gap a work group reporting reached in the province. to the Eden Disaster Management Advisory Forum (EDMAF) under the leadership of Mr. Vernon Gibbs- Professionalizing the field of Disaster Management Halls was established with the mandate to report to was also under discussion during the conference the EDMAF at quarterly meetings. when Dr. Mal Reddy, Immediate Past President of DMISA, announced that the job description Disaster Emergency Breaching of the Swartvlei estuary Management Professional was recently approved by SAQA and that DMISA has been approved as the On the 21st of July the Eden Disaster Centre official body to oversee the formal registration convened a workshop with all the stakeholders process. involved in the emergency breaching of the Swartvlei estuary. Over the last couple of years a Eden DMC received the “Best Team” award for protocol with regards to the premature breaching of their contribution to the success of the 2015DMISA the Swartvlei estuary has been established but in Conference order to ensure that the actions are implemented 104 | P a g e INTEGRATED DEVELOPMENT PLAN

well in advance and with enough fore warning the has explicitly demonstrated the trigger levels had to be re-assessed. comprehensive policies and strategies on disaster risk management that Malawi has With the help of the SANTAM Baam initiative the in place including Monitoring and Evaluation services of the SANTAM technical flood risk Frameworks and a Communication Strategy. specialist, with specific expertise in flooding and This is an area in which South Africa can engineering, could be obtained to review the current build on its own existing policies and hydrological data of the vlei, the size of the strategies. catchment as well as the run-off values and the drainage possibilities and the mouth of the system.  The Department of Disaster Management Affairs in Malawi is located in the Office of At the workshop various possibilities to better the Vice President. This has been a address the current flood risk were discussed but it demonstration of the commitment to was clear that more data and modeling would have disaster management at the highest level of to be done before a way forward could be decided. the executive, in addition to enabling effective cross-sectoral coordination. South SANTAM and San Parks committed to work together Africa has located matters of disaster to assist the Eden DMC to find an amicable solution management within the Department of for the future. Cooperative Governance and Traditional Affairs and could benefit from elevating Malawi Peer review disaster management to the Office of the Deputy President, as this will create high From 1-10 December 2015 the Eden Manager for level interaction on disaster strategies and Emergency Services formed part of the South challenges. African team to perform a peer review to determine the status with regards to disaster risk reduction  The Peer Review demonstrated that there (DRR) in Malawi.The process was led and organized are areas for greater cooperation between by hosts from Malawi and included three peers each countries within the SADC region on from Mozambique, South Africa and Zimbabwe, two matters relating to disaster management. from SADC, as well as one external consultant The current debate within SADC on the serving as secretariat and editor of the mission’s inclusion of a standing Sub-Committee on report. Disaster Management under the Ministerial Committee of the Organ is thus timely. Key interviewees were drawn from various ministries, departments and organizations  Malawi as the first African country that (international and NGO”S) throughout Malawi. volunteered to be peer reviewed for effective implementation of national 8.4 SOUTH AFRICAN LESSONS LEARNED disaster risk reduction actions have paved the way for other African countries. South  The Peer Review to the Republic of Malawi Africa too will take under consideration the has been a valuable tool to consider the possibility of volunteering to be peer progress achieved by the country in terms of reviewed on its disaster risk management disaster risk management. At the same time systems. the Peer Review provided experience to the participants from the region in terms of the  Mozambique has an excellent early peer review process, in addition to allowing warning system in communities. They have for the sharing of expertise and best a flag system and once the red flag is hoisted practices within the region. The Peer Review it becomes mandatory for the community to evacuate. 105 | P a g e INTEGRATED DEVELOPMENT PLAN

approach in terms of roads, storm water and  Zimbabwe annually ring fence 1% of their domestic water sections at Municipalities. He total budget for disaster management; reflected on the lessons learned in Singapore to include storm water harvesting as part of the water bouquet to augment surface water, groundwater,  Malawi has indicated that they would be re-use of effluent as well as desalination resources. interested in twinning arrangements or assistance relevant to curriculum expansion It was also noted that the CSIR has been instructed as well as offering formal qualifications in to revise the current storm water design disaster management. In addition they have parameters, also referred to as the red book. The also requested peers to host study tours in revision should consider the impact of climate relation to agriculture, economic change and increased storm water run-off. development and environmental affairs. 8.6 EXTENSION OF THE CURRENT CALL 8.5 WATER FOR THE FUTURE CENTRE SERVICE DELIVERY AGREEMENT SYMPOSIUM-DEPARTMENT OF (SLA) BETWEEN THE EDEN DM AND THE ENVIRONMENTAL AFFAIRS AND MOSSEL BAY LOCAL MUNICIPALITY DEVELOPMENT PLANNING Since 1/07/2010 the Eden DM have been delivering From 4 to 5 February the Department of a call taking and dispatch service of both life Environmental Affairs and Development Planning threatening as well as municipal calls on behalf of hosted a symposium with the theme “Water for the the Mossel Bay Municipality. The current service th Future” The Eden DMC was invited to share their delivery agreement (SLA) will terminate on the 30 lessons learned after the 2009/2010 drought. of June 2016.

At this symposium the key note speaker, Dr. Jakkie Due to changes in the Labour Law with regards to Cilliers, from the Institute for Security Studies, the contractual employment of staff, the terms of emphasized the emerging water crisis in the RSA. He the current SLA had to be re-negotiated with the indicated that the RSA have reached a point where Mossel Bay Municipality. In principal the Mossel Bay the current dams are being used at their exploitable Municipality agreed that should the Mossel Bay limit and our water demand per capita is far above Municipality cancel the SLA with the Eden DM the world average. He further indicated that nearly before the proposed new expiry date of 30 June 25% of municipal water is lost due to leaks. By 2035 2019, or decide not to renew the agreement for any more than 80% of the RSA population will be reason after the actual expiry date, the Mossel Bay urbanized with a predicted increase of 22% in water Municipality will take over all the appointed staff demand. Our current withdrawal exceeds supply on total costs to company, which includes transfer and our current planning is not sufficient to cater cost and/or severance packages, or any other for the foreseen demand. benefits as applicable and prescribed by Labour Law at that point in time. Various new water conservation technologies were showcased and the Eden DMC received a commitment from the National Cleaner Production 8.7 MAJOR FIRES FOR THE PAST Centre (NCPC) that their focus for the 2016/2017 financial year would be to assist high end water SUMMER SEASON consumer industries in the Eden District with water conservation devices. Summary of fires attended to by Eden DM Fire & Rescue Services Professor Niel Armitage from UCT called for a move to a systems approach to replace the current silo (01/12/2015 – 12/02/2016)

106 | P a g e INTEGRATED DEVELOPMENT PLAN

Date Type Area Date Type Area 05/01/2016 Veld Fire Van Niekerkshek near 03/12/2015 Veld Fire Riversdale near PowerStation Heidelberg 06/12/2015 Veld Fire George at Syferfontein 10/01/2016 Veld Fire Albertinia near the Steg 06/12/2015 Veld Fire Ruitersbos 10/01/2016 Veld Fire Calitsdorp, Mnr van der 09/12/2015 Veld Fire 14km from Ladismith in the Merwe’s Farm direction of Laingsburg 11/01/2016- Veld fire Mosselbay, near N2 09/12/2015 Veld Fire Droëkloof Farm near Ladismith 12/01/2016 14/12/2015 Veld Fire / Wolweklip 15/01/2016 Structure Ladismith 15/12/2015 Veld Fire and Blombos Fire 18/12/2015 Veld Fire Buisplaas 17/01/2016 Veld Fire Zoar, Hoog str 18/12/2015 Veld Fire Blombos Road 18/12/2015 Veld Fire Kerkplaas near Ladismith 18/01/2016- Veld Fire Bergoord near the Cango Caves 19/12/2015 Veld Fire Blombos 21/01/2016 20/12/2015 Veld Fire assisted George 19/01/2016 Veld Fire Calitsdorp Municipality 21/01/2016 Structure Riversdale, BP Gerage 21/12/2015 Veld Fire Road Fire 21/12/2015 Veld Fire Malanstreet, Bergsig in 27/01/2016 Veld Fire Maalgate bridge near N2 Calitsdorp 28/01/2016 Structure Ladismith, house fire 21/12/2015 Veld Fire Opsoek near Calitsdorp Fire 21/12/2015 Veld Fire Hectorskraal near Albertinia 30/01/2016 Veld Fire Hoogekraal 23/12/2015 Veld Fire Robertson Pass 31/01/2016 Veld Fire Knysna, Sparrabos 24/12/2015 Veld Fire Holgate 06/02/2016 Veld Fire Ladismith,Algerynskraal 26/12/2015 Veld Fire Assisted George Municipality 07/02/2016 Veldfire Wittedrift Plettenberg Bay with fire at Heidedal Primary -08/02/2016 School 11/02/2016 Veldfire Kamanasie / Jonck Farm 26/12/2015 Veld Fire Assisted George Municipality with fire at Hoogekraal Primary School Challenges 26/12/2015 House Fire Assisted George Municipality with fire in Smartie Town Due to limited staff per shift the Eden fire and 30/12/2015 Veld Fire Blombos rescue response is limited to one fire per station at 30/12/2015 Veld Fire Olynberg / Rooiberg near Van any point in time. It must be noted that during day Wyksdorp shifts only two trained firefighters in on duty at the 30/12/2015 Veld Fire / Avontuur Riversdale fire station, 4 firefighters at Ladismith and – 6 at George. This limits the response to fires to one 07/01/2016 fire per region. 30/12/2015 Veld Fire Herbertsdale – At this point in time after-hour response in 31/12/2015 Ladismith as well as Riverdale is done with staff on 01/01/2016 Veld Fire standby; this is also the position for the activation of any Incident Command structure required in terms 02/01/2016 Veld Fire Heidelberg of Eden’s MOU with the Provincial Government. 02/01/2016 Vehicle and Ladismith

Veld Fire 02/01/2016 Veld Fire Seweweekspoort near Zoar 8.8 MTEF DISASTER RECOVERY AND – REHABILITATION FUNDING (2011/2012) 09/01/2016 107 | P a g e INTEGRATED DEVELOPMENT PLAN

After the flooding event that took place in 2011 and Laser pointers to be used during first aid R 600,00 2012 the DORA (Division of Revenue Act, Act 2 of training as well as public awareness presentations 2013) allocated an amount of R 54 864 772.00 to be paid over a tree year period to the six affected Local Municipalities within the Eden District.

In the first year (2013/2014) an amount of R Operational Budget 6 584 000.00 was transferred to the six LM’s after which according to a signed MOU by all the relevant Local Municipalities they had to present monthly 2017/18 expenditure reports on their listed projects. Project Amount Expenditure reports and verification thereof was completed and the second year (2014/2015) to the Upgrade of digital emergency radio system R425 000,00 amount of R 27 433 000.00 was transferred to the (One high site at Baileys Peak and the link to six LM’s. George) The erection of a hybrid weather monitoring R300 000,00 None of the six LM’ has to date provided full station at Swartvlei expenditure reports on the year 2 allocation therefor the amount of R 20 847 776.00 included as Video Conferencing equipment to be used in R250 000,00 part of their year 3 allocation could not be Eden JOC transferred yet. Light delivery vehicle with 4x4 capability to R550 000,00 replace Nissan Navara Meetings have been scheduled to take place in the week 15/02/2016 to 19/02/2016 with all the relevant LM’s in order to fast track the submission of their required expenditure reports to finalise 2018/19 payment of the LM’s. Project Amount

BUDGET REQUIREMENTS (2012 – 2017) Upgrade of digital emergency radio system R450 000,00 (One high site at Mannetjies berg and the IDP prioritization for budgetary inclusion shall be link to George) objectively determined through Risk Assessment The erection of a hybrid weather monitoring R300 000,00 station at Touw River processes. Incident command vehicle to be used at FCP R 1000 000,00 Capital Budget

2016/17 2019/20 Project Amount Upgrade of digital emergency radio system R 400 000,00 Project Amount (One high site at Blouberg and the link to George) The erection of a hybrid weather monitoring R300 000,00 Major Incident alarm system to detect as well R 215 000,00 station at Great Brak as disseminate severe weather early warnings Mobile weather stations to log weather data R 50 000,00 Incident command training equipment R250 000,00 at FCP Mobile showers and toilets to be used during R180 000,00 Camera to capture digital records of all major R 15 000,00 incidents major joint unified command activation Replacement of chairs in Joint Operational R 45 000,00 Replacement of emergency call centre R750 000,00 Centre (JOC) hardware as well as chairs Map hangers to be used in JOC R 1500,00

108 | P a g e INTEGRATED DEVELOPMENT PLAN

Summary of Major Incidents / Severe Weather Alerts for the Period 01/07/2015 to 30/06/2016 Date Incident Estimate damages Comment

16/02/2016 - Louterwater Fire Approximately 1 000 ha Fire was contained by natural 19/02/2016 elements 29/02/2016 - Blouberg Fire Approximately 100 000 ha Across border fire between Eden 07/03/2016 DM and SKDM 03/03/2016 - Uncomfortable Conditions Hot and Dry No major damages were reported to Contingency plans implemented. 06/03/2016 Advisory the Eden DMC Early warning disseminated 04/03/2016 - 05/03/2016 Veld Fire Conditions Warning No major damages were reported to Contingency plans implemented. the Eden DMC Early warning disseminated 25/03/2016 Flash Flooding Oudtshoorn No major damages were reported to Contingency plans implemented. the Eden DMC Early warning disseminated 02/04/2016 Ganzekraal / Louvain Fire Approximately 200 ha 05/04/2016 - 06/04/2016 Damaging Winds Warning No major damages were reported to Contingency plans implemented. the Eden DMC Early warning disseminated 22/04/2016 - 23/04/2016 Heavy Rain Warning No major damages were reported to Contingency plans implemented. Strong Winds Warning the Eden DMC Early warning disseminated Gale Force Winds Watch High Seas Warning Storm Surges Watch Veld Fire Conditions Warning 25/04/2016 - 26/04/2016 High Seas Warning No major damages were reported to Contingency plans implemented. the Eden DMC Early warning disseminated 28/04/2016 - 30/04/2016 High Seas Warning No major damages were reported to Contingency plans implemented. Heavy Rain Watch the Eden DMC Early warning disseminated Flooding Watch Intense Cold Front Advisory Strong Winds Warning High Fire Danger Warning 05/05/2016 - 06/05/2016 Damaging Winds Warning No major damages were reported to Contingency plans implemented. the Eden DMC Early warning disseminated 31/05/2016 Veld Fire Conditions Warning No major damages were reported to Contingency plans implemented. Damaging Winds Advisory the Eden DMC Early warning disseminated 03/06/2016 Heavy Rain Watch No major damages were reported to Contingency plans implemented. the Eden DMC Early warning disseminated 09/06/2016 - 10/06/2016 Heavy Rain Watch No major damages were reported to Contingency plans implemented. Veld Fire Conditions Warning the Eden DMC Early warning disseminated 14/06/2016 - 15/06/2016 Heavy Rain Warning No major damages were reported to Contingency plans implemented. Flooding Watch the Eden DMC Early warning disseminated 19/06/2016 Damaging Winds Advisory No major damages were reported to Contingency plans implemented. the Eden DMC Early warning disseminated 26/06/2016 Veld Fire Conditions Warning No major damages were reported to Contingency plans implemented. the Eden DMC Early warning disseminated 30/06/2016 - 01/07/2016 Damaging Winds Advisory No major damages were reported to Contingency plans implemented. Very Cold Conditions Advisory the Eden DMC Early warning disseminated Heavy Rain Advisory Localised Flooding Advisory 17/07/2015 - 18/07/2015 Flooding Watch No major damages were reported to Contingency plans implemented i.e. Heavy rainfall Watch the Eden DMC pro-active emergency breaching of estuaries. 20/07/2015 Heavy rainfall Warning Although tree ARS measured more Contingency plans implemented i.e. than 50mm of rain no major damages pro-active emergency breaching of were reported to the Eden DMC estuaries. 23/07/2015 - 24/07/2015 Heavy rainfall Warning No major damages were reported to Contingency plans implemented i.e.

109 | P a g e

INTEGRATED DEVELOPMENT PLAN

Flooding Watch the Eden DMC pro-active emergency breaching of estuaries. 24/07/2015 High Seas Warning No major damages were reported to Contingency plans implemented i.e. the Eden DMC pro-active emergency breaching of estuaries. 27/07/2015 - Minibus Taxi Protest No major damages were reported to JOC activated and contingency plans 28/07/2015 the Eden DMC implemented. 29/07/2015 - 30/07/2015 Heavy rainfall Warning No major damages were reported to Contingency plans implemented i.e. Flooding Warning the Eden DMC pro-active emergency breaching of Damaging Winds Watch estuaries. 03/08/2015 - 04/08/2015 Damaging Winds Warning No major damages were reported to Contingency plans implemented i.e. the Eden DMC pro-active emergency breaching of estuaries. 19/08/2015 - 21/08/2015 Civil Unrest - Go George Busses Four Go George busses were destroyed Eden DM JOC activated by fire

17/07/2015 - 18/07/2015 Flooding Watch No major damages were reported to Contingency plans implemented i.e. the Eden DMC pro-active emergency breaching of Heavy rainfall Watch estuaries.

20/07/2015 Heavy rainfall Warning Although tree ARS measured more Contingency plans implemented i.e. than 50mm of rain no major damages pro-active emergency breaching of were reported to the Eden DMC estuaries.

23/07/2015 - 24/07/2015 Heavy rainfall Warning No major damages were reported to Contingency plans implemented i.e. the Eden DMC pro-active emergency breaching of Flooding Watch estuaries.

24/07/2015 High Seas Warning No major damages were reported to Contingency plans implemented i.e. the Eden DMC pro-active emergency breaching of estuaries.

27/07/2015 - Minibus Taxi Protest No major damages were reported to JOC activated and contingency plans the Eden DMC implemented. 28/07/2015

29/07/2015 - 30/07/2015 Heavy rainfall Warning No major damages were reported to Contingency plans implemented i.e. the Eden DMC pro-active emergency breaching of Flooding Warning estuaries.

Damaging Winds Watch

03/08/2015 - 04/08/2015 Damaging Winds Warning No major damages were reported to Contingency plans implemented i.e. the Eden DMC pro-active emergency breaching of estuaries.

19/08/2015 - 21/08/2015 Civil Unrest - Go George Busses Four Go George busses were destroyed Eden DM JOC activated by fire

31/08/2015 - 01/09/2015 Flooding Warning No major damages were reported to Contingency plans implemented i.e. the Eden DMC pro-active emergency breaching of Heavy Rain Warning estuaries. Several roads were closed due to flooding

30/09/2015 Heavy rainfall Warning No major damages were reported to Contingency plans implemented i.e. the Eden DMC pro-active emergency breaching of

110 | P a g e

INTEGRATED DEVELOPMENT PLAN

Flooding Warning estuaries.

10/10/2015 Veld Fire Conditions Warning No major damages were reported to Contingency plans implemented. Damaging Winds Watch the Eden DMC Early warning disseminated

01/11/2015 Flooding Warning No major damages were reported to Contingency plans implemented i.e. the Eden DMC pro-active emergency breaching of Heavy Rains Warning estuaries. Several roads were closed due to flooding

31/12/2015 - 07/01/2016 Avontuur / De Vlught Fire Approximately. 70 000 ha This fire started as result of lightning

25/01/2016 Heavy Rain Watch No major damages were reported to Contingency plans implemented i.e. the Eden DMC pro-active emergency breaching of estuaries

03/02/2016 Heavy Rain Warning No major damages were reported to Contingency plans implemented i.e. the Eden DMC pro-active emergency breaching of estuaries

10/02/2016 Vibrio Vulnificus Kaaimans River Elderly man died due to Vibrio Contingency planning updated Vulnificus infection.

12/02/2016 - 16/02/2016 Heimersrivier Fire Approximately 5 000 ha All resources including Aerial support was used to contain this fire

111 | P a g e