TAPP II: Infrastructure Tracker as of November 20, 2017 Funding Type Cost Private Phase/Status No. Sector Project Name Agency Description (GPH, ODA, PPP, Date of Information (in PhP or US$ B) Counterpart (Completion Date) Private) Road, Expressway, BRT, and Bridge Projects

A 4-lane, 7.75 km elevated expressway and 2.22 km at-grade feeder road that will provide access to NAIA Terminals I, II, and III and link Phase 2A and Phase 2B Vertex and - Toll Expressway. It operation commenced on Road Tollways starts at the existing Skyway then follows September 22, 2016 and 1 NAIA Expressway Project (Phase II) ₱ 17.93 DPWH PPP 20-Nov-17 Project Development existing road alignments over Sales Avenue, December 20, 2016, Inc. , , and NAIA respectively. Fully opened on Road, and has entry/exit ramps at Roxas June 1, 2017. Boulevard, , and PAGCOR City.

14.82 km. 6-lane elevated toll road and last of 3 stages of Skyway System. It is Toll intended to connect SLEX to Balintawak in QC Awarded in 2014; Road CITRA 2 Metro Manila Skyway (MMS) Stage 3 Project ₱ 37.43 Regulatory before NLEX through Central Metro Manila PPP On-going construction at 31%; 23-Jul-17 Project (San Miguel) Board Area by using predominantly median of Target completion: 2018 Quirino, G. Araneta and A. Bonifacio road networks.

8 km. 4-lane elevated expressway over PNR right of way. It starts from C3 Road in Caloocan through Manila crossing Espana DOTC approved project (May towards PUP, Sta. Mesa connecting Metro 2010) Manila North Manila Skyway Stage 3. Once completed, Pre-Construction (i.e. finalization Road Tollways 3 NLEx-SLEx Connector Road ₱ 23.20 DPWH NLEX-SLEX Connector road is expected to PPP of the updated Conceptual 23-Jul-17 Project Corporation decongest by providing Engineering Design, ROW (MNTC) an alternative to C-5 Road, EDSA, and other acuisition, etc.) major thoroughfares, and cut travel time Target completion: May 2019 between NLEX and SLEX to 15-20 minutes from an hour. 4-lane 44.20 km. closed-system toll Awarded in 2015; expressway connecting CAVITEX and SLEX. Groundbreaking June 19, 2017 Project will start from CAVITEX in Kawit, Pre-Construction (Right-of-Way MPCALA Cavite and end at SLEX-Mamplasan Road Acquisition ongoing for remaining 4 Cavite - Laguna (CALA) Expressway ₱ 35.43 DPWH Holdings Inc. Interchange in Biñan, Laguna. It will have PPP 20-Nov-17 Project sections. Total accomplishment (MPIC) interchanges in 8 locations namely; Kawit, for the ROW activities has Open Canal, Governor’s Drive, Aguinaldo reached 56.09% as of October Highway, Silang East, Sta. Rosa-Tagaytay Rd., 25, 2017.) Laguna Blvd., and Technopark. Funding Type Cost Private Phase/Status No. Sector Project Name Agency Description (GPH, ODA, PPP, Date of Information (in PhP or US$ B) Counterpart (Completion Date) Private) Road, Expressway, BRT, and Bridge Projects Segment 8.2 is a proposed 8.35-kms 4-lane divided expressway from Segment 8.1 at to Republic Avenue turning Segment 8.2 - DPWH ROW right to Luzon Avenue up to Commonwealth in Segment 8.2 - PhP Task Force was created for the Manila North . 7.5 billion acquisition of the ROW Road NLEX-Harbor Link Project (Segments 8.2 Tollways 5 DPWH PPP 23-Jul-17 Project and 10) Corporation Segment 10 is a 5.65-km. 4-lanes divided Segment 10 - PhP Segment 10 - DPWH ROW Task (MNTC) (2x2) elevated expressway connecting 9.0 billion Force was created for the McArthur Highway in Valenzuela City and C-3 in acquisition of the ROW Caloocan City. It will utilize the existing PNR railroad tracks that cut across Valenzuela City and Malabon City.

Constructed within a site area of 4.59 ha at PRA property beside Asia World/Uniwide along Coastal Road, Paranaque City. It will connect passengers from Cavite to LRT Line 1 Awarded in 2015 Road Southwest Integrated Transport System MWM South Extension, city bus, taxi, and other public 6 ₱ 2.50 DOTr PPP Under construction at 33.11% 01-Oct-17 Project (ITS) Project Terminals utility vehicles that are serving inner Metro Target completion: 2018 Manila. Project will include passenger terminal buildings, arrival and departure bays, public information systems, ticketing and baggage handling facilities, and park-ride facilities.

Constructed within a site area of 4.7 ha at Food Terminal Inc. property in FTI Compound, City. It will connect passengers coming from Laguna/Batangas to transport systems Road Awarded in 2015 7 South Integrated Transport System Project ₱ 5.20 DOTr Ayala Land that are serving inner Metro Manila. Project will PPP 30-May-17 Project Pre-Construction include passenger terminal buildings, arrival and departure bays, public information systems, ticketing and baggage handling facilities, and park-ride facilities. Funding Type Cost Private Phase/Status No. Sector Project Name Agency Description (GPH, ODA, PPP, Date of Information (in PhP or US$ B) Counterpart (Completion Date) Private) Road, Expressway, BRT, and Bridge Projects

A mass transportation intermodal terminal north of EDSA that will connect passengers coming from Northern Luzon to other transport system Road Integrated Transport System-North Terminal serving inner Metro Manila. Project will include 8 ₱ 4.21 DOTr TBD PPP Under Development 30-May-17 Project Project passenger terminal buildings, arrival and departure bays, public information systems, ticketing and baggage handling facilities and park-ride facilities.

A 4-lane, 91-km expressway starting from La Mesa Parkway in Bulacan and stretching northwards to Nueva Ecija. It aims to spur provincial and regional economic activities, Ongoing preparation of Draft Road 9 NLEX East Expressway TBD DPWH TBD provide improved and prompt delivery of PPP Terms of Reference (TOR) by 23-Jul-17 Project services to people in serviced areas and to PPP Center enhance transport network and accessibility between provinces and municipalities particularly in North Luzon Region.

Metro Pacific Road A 20km expressway to connect C-5 to Unsolicited proposal for 10 C-5 Overhead Expressway ₱ 50.00 DPWH Investments PPP 30-May-17 Project CAVITEX (Manila-Cavite Expressway). submission Corp. (MPIC)

The construction of Plaridel Bypass Road involves a total length of 24.61 km. and 11 Road Awarded in 2016 11 Plaridel Bypass Road (Phase I-IV) ₱ 151.79 DPWH JICA bridges. It traverses the vast agricultural lands ODA 30-May-17 Project Under Construction of 5 municipalities in Bulacan namely; Balagtas, Guiguinto, Plaridel, Bustos and San Rafael. A 4-lane extension of CLLEX Phase I that connects Cabanatuan City and San Jose City passing through municpalities of Talavera and Llanera in Nueva Ecija of about 35.70 km. in Road Central Luzon Link Expressway (CLLEX) 12 TBD DPWH TBD road length that will provide free-flowing PPP Under Development 01-Oct-17 Project Phase II alternative route and decongest traffic along Pan Philippine Highway (PPH) between said cities of Nueva Ecija and town of Plaridel in Bulacan. Funding Type Cost Private Phase/Status No. Sector Project Name Agency Description (GPH, ODA, PPP, Date of Information (in PhP or US$ B) Counterpart (Completion Date) Private) Road, Expressway, BRT, and Bridge Projects

Section 1 (Tarlac-Rosales, Pangasinan) - Substantially completed. Opened to motorists on 31 October 2013. Collection of toll fees started on 06 January An 89 km 4-lane expressway currently under 2014 construction north of Manila. It connects central Private Infra Road to northern Luzon, with its southernmost Section 2 (Rosales-Urdaneta) - 13 Tarlac–Pangasinan–La Union Expressway ₱ 24.40 DPWH Dev Corp. PPP 20-Nov-17 Project terminal located in Tarlac City and its planned Substantially completed. Opened (PIDC) northernmost terminus currently slated to be to traffic last 17 February 2015. at Rosario, La Union. Collection of toll fees started 17 March 2015

Section 3 (Urdaneta-La Union) - Summary of accomplishment for Section 3 is 47.04%

22km, 4-lane (2 on each way) viaducts above River from Delpan Bridge in Manila Road Integrated Viaduct and Personal Rapid DOTr and AKH General 14 ₱ 52.00 through / to PPP Unsolicited proposal submitted 30-May-17 Project Transit System DPWH Contractor Napindan Bridge in Taguig where it will intersect Metro Manila Circumferential 6

CLGP 17.7-km Manila to Taguig Expressway; would Philippine rise “mostly along ” and connect DOTr and Road Holdings, Inc. Rizal province through Pasig, , and Under Evaluation by Concerned 15 Manila to Taguig Expressway ₱ 50.00 PNR PPP (unsolicited) 30-May-17 Project and P.T. Citra Manila. Links San Miguel Corp.’s Metro Manila Agencies DPWH Persada Skyway Stage 3, and Metro Manila Expressway Infrastruktur C-6. 102-km Manila to Quezon Expressway; a Grand Metro- tollroad that would cross Laguna de Bay and Road Manila Gateway link Pasig City and Candelaria, Quezon. This Proposal submitted 2016 16 Manila to Quezon Expressway ₱ 66.70 DPWH PPP 30-May-17 Project Company, Inc. will have have interchanges at C5 extension, For Evaluation (GMMGCI) Binangonan, Pililla, Jala Jala, Pila, San Pablo, Dolores and Candelaria. Funding Type Cost Private Phase/Status No. Sector Project Name Agency Description (GPH, ODA, PPP, Date of Information (in PhP or US$ B) Counterpart (Completion Date) Private) Road, Expressway, BRT, and Bridge Projects

Starts at Delpan in Manila, passing through Ayala Ave in Makati and end on Marcos Hiway Road in Marikina through Pasig River. It is an 17 Delpan-Pasig-Marikina Expressway TBD DPWH TBD PPP For Feasibility Study 30-May-17 Project elevated expressway and has an indicative length of 26.84 km. for Option 1 alignment and 24.72 for Option 2 alignment.

South Luzon A 4-lane toll road from Sto. Tomas, Batangas Road (SLEx)-Toll Road Awarded in 2015 18 ₱ 13.10 DPWH Tollways to Tayabas/Lucena City in Quezon, 56.862 km PPP 30-May-17 Project 4 (TR4) Pre-Construction: ROW ongoing Corporation long

The project will start about 2 km from end of Road 19 Quezon-Bicol Expressway (QuBEx) TBD DPWH TBD the proposed TR-4 project and end before PPP For Feasibility Studies 30-May-17 Project start of proposed Camarines Sur Expressway.

Provincial 16 km and it is envisaged to serve through Road 20 Camarines Sur Expressway Project TBD DPWH Government of traffic going to southern and eastern PPP Under Development 30-May-17 Project Camarines Sur municipalities of the province.

A 73.75 km highway with 2 km tunnel. It is divided into three segments: Talisay-Cebu City- Road 21 ₱ 18.02 DPWH Mandaue (Segment 1), Consolacion-Liloan- GPH Under Development 30-May-17 Project Compostela-Danao (Segment 2), and Naga- Minglanilla (Segment 3).

A 21.8 km – 4 lane road including 3 bridges and 2 way bike lane that would serve as an Road 22 Bacolod Economic Highway ₱ 5.79 DPWH alternate circumferential road bypassing the GPH Under Development 30-May-17 Project busy Bacolod City Central Business District that lies in the interior of Bacolod City. Funding Type Cost Private Phase/Status No. Sector Project Name Agency Description (GPH, ODA, PPP, Date of Information (in PhP or US$ B) Counterpart (Completion Date) Private) Road, Expressway, BRT, and Bridge Projects

The 45km bypass road is needed to reduce traffic congestion of Davao City urban center where average travel speed is less than 20-km Road per hour; disperse urbanization outside (the 23 Davao Bypass Road ₱ 19.10 DPWH JICA ODA For Feasibility Studies 30-May-17 Project urban center), which is already over saturated and strongly support economic activities of not only Region XI (Panabo) but also the entire Mindanao.

The 13.8-km road will have three roundabouts Road that are intended as jogging areas, esplanades 24 Davao Coastal Road ₱ 27.00 DPWH JICA ODA For Feasibility Studies 30-May-17 Project for locals and tourists, and fish landing docks to benefit fisherfolk.

The MLIN road project shall improve the logistics infrastructure network in Northern Mindanao, Davao, Soccksargen and Carga. This project is geared towards enhancing the Road Mindanao Logistics Infrastructure Network 25 ₱ 80.41 DPWH agribusiness competitiveness in Mindanao by GPH Under Development 30-May-17 Project (MLIN) developing an intermodal logistics system that will address the constraints caused by high cost of transport and inadequate logistics infrastructure, among others.

Located around 7.5 km south of the existing Awarded in 2017 Bridge Mandaue Bridge, the infrastructure will have a 26 Cebu-Cordova Link Expressway ₱ 28.00 DPWH MPIC PPP Under Construction 01-Oct-17 Project total of 8.25-kms toll reach, connecting Target completion: 2022 mainland Cebu and Cordova. Sta. Monica-Lawton Bridge involves the construction of a 4-lane bridge across Pasig to Ortigas Road Link River and a 4-lane viaduct structure traversing Bridge 27 Project, Sta. Monica-Lawton Bridge and ₱ 4.01 DPWH onwards the entrance of GPH Groundbreaking: July 19, 2017 19-Jul-17 Project Viaduct (Phase I & II-A) Bonifacio Global City and the ramp before in the City of Makati. The total length of the projects is 961.427 k.m. Funding Type Cost Private Phase/Status No. Sector Project Name Agency Description (GPH, ODA, PPP, Date of Information (in PhP or US$ B) Counterpart (Completion Date) Private) Road, Expressway, BRT, and Bridge Projects The construction of Pangul Bay Bridge will Bridge connect the City of Tangub in Misamis 28 Panguil Bay Bridge ₱ 4.86 DPWH GPH Under Development 30-May-17 Project Occidental and Municipality of Tubod in Lanao del Norte

A 21.8 km – 4 lane road including 3 bridges and 2 way bike lane that would serve as an Bridge 29 Bacolod Economic Highway ₱ 5.79 DPWH alternate circumferential road bypassing the GPH Under Development 30-May-17 Project busy Bacolod City Central Business District that lies in the interior of Bacolod City.

BRT Line 1 Project will cost $109 M, of which $65 M will come from World Bank and Clean World Bank, Technology Fund. GPH will provide funding BRT Clean equivalent to $45 M. 30 EDSA Bus Rapid Transit (BRT) System $ 0.11 DOTr Private/GPH 11-May-17 Project Technology Fund The 49km project will also develop support infrastructure along España- route.

BRT - Line 1 Project spans 12.3 km from to Manila City Hall via BRT Metro Manila Bus Rapid Transit - Line 1 for project procurement 31 ₱ 4.80 DOTr N/A , Quezon Avenue, and Espana ODA 26-May-17 Project (Quezon Avenue BRT) (Dec 2018) Boulevard. It is expected to serve 291,500 passengers daily in its first year of operations.

EDSA BRT is a proposal to establish and implement a 48.6 km high-quality bus-based mass transportation system and corresponding BRT Metro Manila Bus Rapid Transit - Line 2 pedestrian and bicycle greenway network. The for project procurement 32 ₱ 37.70 DOTr N/A ODA 26-May-17 Project (Central Corridor) system consists of four corridors: a main (Mar 2019) corridor along EDSA, and spur corridors along Ayala Ave. to World Trade Center, Ortigas to Bonifacio Global City, and NAIA terminals. BGC–NAIA BRT mass transport system that will traverse through Bonifacio Global City, BRT BGC to NAIA Bus Rapid Transit (BRT) 33 ₱ 22.00 DOTr N/A Bonifacio South, , NAIA ODA for project development 26-May-17 Project System Terminal (1-3) up to Ninoy Aquino Station of proposed LRT-1 Extension Project.

A 23km BRT corridor (Bulacao-Ayala- BRT Talamban) with segregated BRT bus-ways for project implementation 34 Cebu Bus Rapid Transit ₱ 10.60 DOTr N/A ODA 26-May-17 Project from Bulacao to Ayala, and a link to Cebu’s (Nov 2019) South Road Property.