B I D S C H E D U L E CONTRACT NO. 17HC0043 CONTRACT TITLE CLUSTER 9 - CY 2017 Local Infrastructure Program Repair/Rehabilitation of Multi-Purpose Buildings at: A.) CLARIN, 1. Bonbon B.) SAN ISIDRO, BOHOL 1. Barangay Poblacion C.) SAGBAYAN, BOHOL 1. Barangay San Vicente Sur CONTRACT LOCATION Clarin, San Isidro and Sagbayan, Bohol ITEM ESTIMATED SCOPE OF WORK TO BE DONE UNIT COST TOTAL COST NO. QUANTITY A.) CLARIN, BOHOL 1. Barangay Bonbon PART II - OTHER GENERAL REQUIREMENTS B.5 1.00 each Project Billboard P P B.7 2.00 mos Occupational Safety and Health Program PART III - CIVIL, MECHANICAL, ELECTRICAL AND SANITARY/PLUMBING WORKS PART A : EARTHWORKS 803(1)a 5.80 m3 Structure Excavation (Common Soil) PART B : PLAIN AND REINFORCED CONCRETE WORKS 900(1) 5.79 m3 Reinforced Concrete PART C : FINISHING 1014(1) b1 160.00 m² Pre-painted Metal Sheets 1047(1) 1.00 L.S. Structural Steel SUB-TOTAL = P

B.) SAN ISIDRO, BOHOL 1. Barangay Poblacion PART II - OTHER GENERAL REQUIREMENTS B.5 1.00 each Project Billboard P P B.7 2.00 month Occupational Safety and Health Program PART A : EARTHWORKS 803(1)a 16.00 m3 Structural Excavation 804(1)b 7.80 m3 Embankment PART B : PLAIN AND REINFORCED CONCRETE WORKS 900(1) 14.00 m3 Reinforced Concrete PART C : FINISHING 1009(1) 3.36 m² Windows (Jalousie Window) 1014(1)b1 92.00 m² Pre-painted Metal Sheets 1027(1) 165.00 m² Cement Plaster Finish 1032(1)a3 70.00 m² Painting Works (Steel) 1046(1)a 90.00 m² CHB Load Bearing (Including Renforcing Steel) 1047 1.00 L.S. Metal Structure SUB-TOTAL = P C.) SAGBAYAN, BOHOL 1. Barangay San Vicente Sur PART II - OTHER GENERAL REQUIREMENTS B.5 1.00 each Project Billboard P P B.7 2.00 mos Occupational Safety and Health Program

sheet 1 of 2 B I D S C H E D U L E CONTRACT NO. 17HC0043 CONTRACT TITLE CLUSTER 9 - CY 2017 Local Infrastructure Program Repair/Rehabilitation of Multi-Purpose Buildings at: A.) CLARIN, BOHOL 1. Barangay Bonbon B.) SAN ISIDRO, BOHOL 1. Barangay Poblacion C.) SAGBAYAN, BOHOL 1. Barangay San Vicente Sur CONTRACT LOCATION Clarin, San Isidro and Sagbayan, Bohol ITEM ESTIMATED SCOPE OF WORK TO BE DONE UNIT COST TOTAL COST NO. QUANTITY PART A : EARTHWORKS 803(1)a 5.00 m3 Structure Excavation (Common Soil) PART B : PLAIN AND REINFORCED CONCRETE WORKS 900(1) 3.51 m3 Reinforced Concrete PART C : FINISHING 1002(5) 1.00 L.S. Plumbing Fixtures 1003(1) d2 140.00 m² Ceiling (Wood Frame) 1005(5) 16.00 m² Grille Windows 1010(2)a 2.10 m² Doors (Flush) 1014(1)b2 20.00 m² Prepainted Metal Sheets (Corrugated) 1018(1) 87.60 m² Unglazed Tiles and Trims 1027(1) 80.00 m² Plain Cement Plaster 1032(1)a.1) 480.00 m² Painting Works 1046(2)a 34.00 m² CHB Non Load Bearing (including Reinforcing stee) (100mm) 1103(1) 1.00 L.S. Lighting Fixtures SUB-TOTAL = P GRAND TOTAL = P

DURATION TIME : TOTAL IN FIGURES : TOTAL IN WORDS :

SIGNATURE : NAME & TITLE OF SIGNATORY: SIGNATURE OF WITNESS : NAME & TITLE OF WITNESS :

SUBSCRIBED AND SWORN TO BEFORE this ______day of ______2017 affiant exhibited to me his Residence Certificate No. ______issued on ______at ______

Doc. No. : Page No. : Book No. : Series of :

sheet 2 of 2