PREFEASIBILITY REPORT
SAND MINING GHAT AT MOTEGAON
TALUKA: CHIMUR DISTRICT: CHANDRAPUR
Proponent
M/s Danish Construction Mr. Shahbaz A. Siddiqui
DECEMBER 2017
1
CHAPTER 1 EXECUTIVE SUMMARY o M/s Danish Construction, Mr. Shahbaz A. Siddiqui have been granted sand ghat mining at village Motegaon in tehsil Chimur of Chandrapur district by Government of Maharashtra, Collector Chandrapur vide Letter no. Kr. Sasha/Karya- 11/A.Ka./Re.Li./2017/345 dated 02/12/2017 o Sand is being and will continue to be used exclusively to cater building requirement. o Sand has +90 % SiO2 and mesh size of about 30. o Lease area is 0.60 Ha and is located at village Motegaon of Chimur - Tahsil of Chandrapur District o Environmental clearance is now become necessary as per EIA notification for minor minerals. o Hence proposal for grant of environmental clearance is submitted to DEIAA Chandrapur being proposal categorized as B2 o Permission was granted for mining of sand @ 2120 Brass /up to 30.09.2018 . o Mining plan is approved by Deputy Director, Directorate of Geology and Mining, Govt. of Maharashtra, Chandrapur vide letter MA/MP/170 III/2017-18/127 dated 24/01/2018.
2
CHAPTER 2
INTRODUCTION
2.1 Project background
This proposal is for grant of environmental clearance of sand mining at village Motegaon in Chimur tehsil of Chandrapur district.
2.2 Need for the project
Sand is very important constituent in building industry. Sand will be locally made available to these user industries in the vicinity.
2.3 The proposal o It is proposed to mine sand shown in Figure 1.
o Latitude and longitude are 20°31' 46.2866"N and 79°57' 2.0755"E respectively. o Location is shown in Figure 2. o Lease area is 0.60 ha. o Production capacity is @ 4 Brass/day. o Method – manual open cast using spade/fawad/ labours o Transportation – closed/covered tractors/trucks.
3
Google Image FIGURE 1
4
Location of Sand Mine on Toposheet
FIGURE 2
LOCATION ON TOPOSHEET 55 P/7
5
Location of site
2.4 Objectives :
o Project Proponent will continue mining only at optimized rate and use sand to cater building requirement in the vicinity after grant of environmental clearance. o Indiscriminate /non-scientific mining will not be resorted. o In short project proponent will continue and ensure sand removal in an environment friendly extraction
2.5 Present practice
o It is a proposed sand mining. o Land is already degraded and mining carried out over extent – 0.60 ha o Mining plan is approved for manual opencast mining using spade and labours o Transportation will be done by covered tractor/tippers. o Mining will be carried out as per approved mining plan.
2.6 Impact
o Proposed Sand lease is at a distance of 4 Km from Tadoba Andheri Protected Forest.
6
o Percent of moisture in sand is low and silt (particles <75×µm) percentage is low. Therefore emissions of particulate matter predicted by equation Eb= 0.0018{S/5][U/5][M/2]-2 [Y/6]-1, where M & S are moisture & silt percentages respectively. o Adverse impact either on air, water or land environment is not likely in this case because of favourable environment- setting.
2.7 Management
o Project Proponent has appointed a consultant to continue to monitor environmental quality, carry out sensitivity analysis and advise accordingly. o Project Proponent will continue to abide by all the prevailing rules. 2.8 Salient Features of Mining Plan
Sand Mine
Sr. No. Details Method
1 Name of lease M/s Danish Construction
2 Name of lessee Mr. Shahbaz A. Siddiqui
3 Location Motegaon
4 Area in ha 0.60
5 Survey No. 472,473,475
6 Status of Land Non forest / Govt River Stretch
7 Mineral Ordinary Sand
7
8 Lease Order Kr.Sasha/Karya-11/A.Ka./Re.Li./2017/ 345 dated 02/12/2017.
9 Lease Execution Kr.Sasha/Karya-11/A.Ka./Re.Li./2017/ 345 dated 02/12/2017
10 Coordinates 20°26' 10.116"N and 79°29' 37.0153"E
11 Proposed Production 2120 Brass /up to 30.09.2018
12 Reserves 2120 Brass /up to 30.09.2018
13 Mine Life Anticipated up to 30.09.2018
14 Approval of Mining Plan MA/MP/170 III/2017-18/127 dated 24/01/2018
15 Silica Grade SiO2-96.15%,Al2O3-1.00 %,Fe2O3-2.12%
16 Use of Mineral Use as Building Material
17 Machinery Tractors/ Trucks /Labours
18 Primary Mining by Labours
19 Secondary Process Nil
Land Use
Head Present Land Use Conceptual (Area in Ha) Land Use (Area in Ha)
Area under Mining 0.0 0.600
Infrastructure 0.00 0.00
Roads 0.00 0.00
Green Belt 000 0.0
Unused 0.600 00.00
Total 0.600 0.600
8
2.9 Fugutive Sources
Fugutive sources are inventorized as 1] Transportation
9
3.0 Environmental Management Plan
S. Dust Source Control measure No 1 Haul Road Compaction, gradation and drainage on both sides & development of green belts Proper maintenance. Regular water spraying. Avoiding over filling of tippers/tractors and consequent spillage on the roads Air quality will be regularly monitored both in the core zone and the buffer zone. 2 Truck /Tractor No overloading of trucks. Movement Sandcarrying trucks will be effectively covered by tarpaulin to avoid escape of fines to the atmosphere. Enforcing speed limit. Regular monitoring of the exhaust fumes.
3 Sand pit Green belt along bank Provision of dusk masks.
5 Occupational ● Providing a working environment that is conducive to safety & Health & Safety h-ealth
Measures to ● The management of occupational safety & health is the prime Control Dust responsibility of mine owner. Inhalation ● Provision of necessary personal protective equipments
● Ensuring employees at all levels receive appropriate training and are competent to carry out their duties and responsibilities
10