Brief Summary of the Project

1. Introduction M/s. Bangur Cement Unit (A unit of Shree Cement Ltd.) has obtained NoC from State Pollution Control Board for Cement Blending Unit (5.5 Million TPA) near Village: Rohi -Udasar, Tehsil: , District: Sri-Ganganagar (Rajasthan) vide their letter no. F (Tech)/Shri-Ganganagar (Suratgarh)/120(1)2016-2017/515-516 dated 29th Aug., 2016.

2. Project Proposal M/s. Bangur Cement Unit (A unit of Shree Cement Ltd.) is planning to install Clinker Grinding Unit of 5.5 Million TPA Cement Production Capacity and D.G. Sets of 1250 KVA (1000 KVA / 2 x 500 KVA & 250 KVA) instead of Cement Blending (5.5 Million TPA) Unit near Village: Rohi Udaipur-Udasar, Tehsil: Suratgarh, District: Sri-Ganganagar (Rajasthan). Details of the products with capacities are given in the table below:

S. No. Unit Proposed Capacity 1. Clinker Grinding Unit (Million TPA) 5.5 2. DG Set (MW) 1250 KVA {(1000 KVA / 2 x 500 KVA) + 250 KVA}

3. Screening Category As per EIA Notification dated 14th Sept., 2006 as amended from time to time, this project falls under S. No. 3 (Material Production), Project Activity ‘3 (b)’ Cement Plants.

4. Brief Description of Project Location Details:  Village : Rohi Udaipur-Udasar  Tehsil : Suratgarh  District : Sri-Ganganagar  State : Rajasthan

Area Details:  Total Project Area: 30.75 ha (75.45 acres)  Greenbelt / Plantation Area (ha): 33% of the total project area (i.e. 10.15 ha / 24.9 acres) will be developed under greenbelt / plantation.

No National Park, Wildlife Sanctuary, Biosphere Reserve, Reserve Forests (RF) / Protected Forests (PF) falls within 10 km radius from the project site.

Water Bodies falls within 10 km radius from the project site are as below:  Lift Canal (~1.5 km in NW direction)  Indira Gandhi Nahar (~3.5 km in NW direction)  Sakha (Indira Gandhi Nahar) (~4.0 km in North direction)

1 Cost Details:  Total Cost of the Proposed Project: Rs. 425 Crores  Cost for Environment Management Plan:  Capital Cost - Rs. 8.0 Crores  Recurring Cost - Rs. 40 Lacs / annum.

Basic Requirements for the Project  Water Requirement (KLD): Total water requirement for the project is 200 KLD. Source: Ground Water

 Power Requirement (MW): Total power requirement for the project will be around 19.5 MW. Source: Rajasthan Vidyut Vitaran Nigam Limited (RVVNL) and and D.G. Sets (for back-up).

 Manpower Requirement: Total manpower requirement for the proposed project will be 80 persons. Source: Unskilled / Semi-skilled - local area, skilled - outside/ local.

 Raw Material Requirement: Raw materials required for the proposed project is Clinker which will be sourced from Existing Cement Plants of Shree Cement Limited & others units; Gypsum (Chemical, Synthetic, Mineral Gypsum) will be procured from Rajasthan, own plant in Rajasthan and Imported; Fly ash will be procured from STPS, Suratgarh and other nearby sources.

******