2016 2016 CSR Report of YUDEAN GROUP

Total Page:16

File Type:pdf, Size:1020Kb

2016 2016 CSR Report of YUDEAN GROUP CSR Report of YUDEAN GROUP for 2016 YUDEAN GROUP CSR Report of 2016 CSR Report of YUDEAN GROUP Create Green Energy Diligently Post code: 510630 Website: http://www.gdyd.com Address: Yuedian Plaza, No. 8, East Tianhe Road, Guangzhou City, Guangdong Province Scan to acquire Scan to acquire This report is made by degradable environmental this report official account protection recycled paper. ABOUT THIS REPORT GUANGDONG YUDEAN GROUP CO., LTD. is also referred to as "YUDEAN GROUP", "YUDEAN", "the company", or "we". Timeframe of This Report This is the seventh CSR report of YUDEAN GROUP, covering the period from January 1, 2016 to December 31, 2016. In order to increase the YUDEAN GROUP tries to ensure that the report is substantial, complete, and comparability and prospectiveness of the report, some contents may not belong to the above said period. balanced and can systematically represents the company's philosophy, system, act, performance, and planning of pursuing maximization of the comprehensive value in safety, economy, environment, and society. We try best to ensure the information is truly, objectively, and timely disclosed, and hope to strengthen Release Cycle of the Report communications and exchanges with stakeholders, and deepen our mutual understandings and recognition of values through issuing the report, so as to realize the sustainable development of the company. The CSR report of YUDEAN GROUP is an annual report. Report Boundary Unless otherwise specifed, data, cases, and most information contained in this report come from YUDEAN GROUP and its branches and controllable subsidiaries; part information may relate to uncontrollable units, such as upstream enterprises, downstream enterprises or partners. Reference Standard of the Report This report is prepared by reference to China-CSR (CASS-CSR3.0) and Sustainability Reporting Guidelines (G4) of Global Reporting Initiative (GRI). Please refer to the index part at the end of this report for the disclosure of relevant indexes in this report. Data Specifcation of the Report All data quoted in this report are from the company's relevant statistical reports and offcial documents. Besides this report, information about the company's social responsibility is also disclosed on the company's Annual Report and offcial website; if there are differences, the latest disclosure shall prevail. Access to the Report This report will be released in two editions; one is in Chinese and the other one is in English. The Chinese edition will be submitted for review. The report will be released to the public in both printing form and electronic form. You can download the electronic text of this report from our website (http://www.gdyd.com/), or scan the QR Code to obtain this report, or download and consult our Company's previous reports to understand our fulfllment of social responsibility comprehensively. Scan to get this report 如对报告内容有疑问或者需要纸质报告,请发邮件至 [email protected],或致电 86-020-85136662。 CSR Report of YUDEAN GROUP for 2016 TABLE OF CONTENTS 05 Address 07 About us 07 Key Performance Safe YUDEAN Company Profile 09 37 Work safety management 17 Ten Big Events 39 Work safety activities Green YUDEAN 19 Company Credits 40 Benchmarking management Reliability of generation sets 41 Resource and energy 69 Contingency management conservation 95 Report Index 44 Scientific and technological Emission reduction and innovation 72 97 Terminology 45 contamination abatement Application of information 48 technology 74 Protection of the ecological environment 48 Expectations 77 Development of clean energy 80 Expectations Responsibility Topic 21 Strengthening ultra-low emission transfor- mation of coal-burning units comprehen- Excellent YUDEAN sively to make the blue sky bluer 51 Core businesses Harmonious YUDEAN 53 Power source development New breakthroughs in the financial 25 Growth of workers and staff sector stimulating new vigor for 57 Diversified industry 83 diversified development 61 Industrial distribution 89 Mutual cooperation 63 Funds, assets management 92 Public activities Responsibility Management and capital operation 94 Expectations Law abidance and Responsibility management and strengthening 29 64 compliance 32 Topics on substantial social responsibility 66 Risk control 33 Communications with stakeholders 66 Expectations 03 04 CSR Report of YUDEAN GROUP for 2016 ADDRESS Corporate social responsibility is an important way for an enterprise to realize sustainable development. YUDEAN GROUP, which is a responsible province-owned power generation group, has always been keeping in mind the corporate mission of "shouldering due social responsibility and contributing to the whole society", and is practicing its commitment to "create green energy wholeheartedly" with practical actions. Despite of our own development, we also actively perform and regulate our social responsibility, and work hand in hand with all stakeholders to realize harmonious development and achieve reciprocity and mutual benefts. Li Zhuoxian, Party Committee Secretary, Huang Zhenhai, Director, General Board Chairman Manager, Vice Secretary of the Party Committee The year 2016 is the start year for us to implement the 13th Five Year Plan, as well as a crucial year for us to continuously strengthen, optimize the on-grid energy throughout the year was 99.462 billion kwh; we tried hard to change our way of development, continued improving the industrial and improve our work safety, operation development, energy conservation and environment protection, and enterprise management. In this year, we structure and energy resource distribution, and paid attention to the synchronous improvement of development quality and beneft; the total installed tackled diffculties head on, worked harder, and responded actively to the diffculties and challenges caused by the slow growth rate of power demand, capacity under construction throughout the year reached about 8 million kilowatts, and that of clean energy project exceeded 4.7 million kilowatts, aggravated excess capacity, increasing pressure on energy conservation and emission reduction, and in-depth development of the comprehensive taking up about 59%; we actively promoted the co-development of one major business and diversifed auxiliary businesses; relevant diversifed deepening of reform; we also made constant progress in steady development, and took the lead in making innovations; besides, we also actively industries were developed and optimized in order, and the industry chain was extended effectively. developed markets, strengthened internal management, and worked hard to control cost and reduce consumption. With all these efforts, we fulflled the work objectives of the year satisfyingly. Environment YUDEAN has released its CSR report for seven consecutive years since 2010. The report for this year displays as always our performance of social responsibility management, fulfllment of social responsibility and our shortcomings in the past year to the public and stakeholders; the We actively carried out the plan for energy conservation and emission reduction, and upgrade and transformation of coal power plants (2015- emphasis is placed on the report of our performance in four aspects, namely, safety, economy, environment, society, which sufficiently shows 2020), strengthened energy conservation management and transformation, promoted the building of energy saving units, took an active part in our philosophy and way for strengthening social responsibility performance and regulation and realizing sustainable development, as well as our energy-effcient scheduling, and ensured all energy conservation and emission abatement indicators could meet the requirements for environmental determination and actions to build the brand of YUDEAN in taking responsibilities. protection; we paid great attention to environmental betterment, and actively implemented the ultra-low emission transformation of coal power plants; in 2016, transformation of ultra-low emission was conducted to 13 units in all; among them, transformation of 6 units had been fnished, and transformation, together with overhaul and repair, of 7 units is being conducted in an orderly way; throughout the year, the emission of sulphur Safety dioxide, nitrogen oxide and fue gas declined year-on-year with a rate considerably higher than the average level of national electric power industry; we made great efforts to develop energy-saving units, and units of 600 thousand kilowatts and above accounted for 63.7% of the total installed With intrinsic safety as the basis, we upheld the principle that "both CPC committees and governments are held accountable, officials take capacity; we also accelerated the development of new and renewable energy projects, optimized the power source structure, and installed capacity of responsibility for workplace safety in performing their duties, concerted efforts should be made to fulfll our work, and those committing dereliction clean energy reached 5.1691 million kilowatts. of duty will be held accountable", made intensive efforts to check and eliminate security risks, continued to strengthen safety management of capital construction projects, further strengthened the foundation of work safety management, and maintained a stable situation in work safety comprehensively; we responded actively to the grim situation that the on-grid energy and service hours of generating sets are declining year by year, and tried all means to improve the reliability of generation sets, ensure the safe operation of generating sets, and
Recommended publications
  • The Effect of Continuous Swimming on Physical Health Lu Yanmei1, A, Ye
    Advances in Social Science, Education and Humanities Research, volume 351 4th International Conference on Modern Management, Education Technology and Social Science (MMETSS 2019) The effect of continuous swimming on physical health Lu Yanmei1, a, Ye Huabing2, b 1Heyuan polytechnic, Heyuan, Guangdong, China 2Heyuan sports school, Heyuan, Guangdong, China [email protected], [email protected], Keywords: Swimming, Physical health, Vascular elasticity, Bone density. Abstract: Using the literature, physical fitness test, mathematical statistics and other methods, researchers carried out body test and analysis of the swimming association members who have been swimming all the year round in Heyuan City. The results showed that after annual swimming, the BMI of swimmers was slightly higher than that of all the testers, and the vital capacity and the step index were significantly improved. The grip strength was significantly higher than that of all the testers, and the other qualities were not significantly improved. The two indexes of sitting body flexion and standing on one foot with closed eyes were lower than all testers; The overall physical fitness evaluation score is superior to all testers. The overall vascular elasticity of swimmers is better than that of all testers, and the anti-atherosclerotic ability is enhanced, but the low bone mass ratio of bone density is higher than that of all the testers. The author acknowledges that it is related to the lack of weight exercise in the water, and further research is needed. 1. Introduction Swimming is a physical exercise that is good for your health. Studies have shown that swimming has a good influence on body shape, cardiopulmonary function and various sports qualities [1-4].
    [Show full text]
  • The Causal Effect of Urbanisation on Metropolitan Water Consumption: Theoretic Model and Evidence from Guangzhou, China
    Behavioural Science ︱ Dr Yiming He The causal effect of urbanisation on metropolitan water consumption: Theoretic model and evidence from Guangzhou, China The ancient Li Wan area of Guangzhou city. Water treatment plant in Guangzhou. There is an emerging body he literature on water, discussed definitions of water use, of research on the relationship urbanisation and economic the history of water use around the between water and urbanisation. T growth is disjointed. Studies world, problems with collecting and However, there are few studies which have explored the relationship analysing water use data as well as ways that examine the relationship between water consumption and to improve water use efficiency and between water, urbanisation economic growth have largely ignored productivity in different regions and and economic growth. Dr the effect of urbanisation. Studies economic sectors. Such research found Yiming He from South China focused on water consumption and no discernible relationship between Agriculture University aimed urbanisation refer to the link between water withdrawals and income. to address this gap in the the two but not the influence of literature by investigating economic performance on this Other research has developed a growth the impact of urbanisation relationship. Dr Yiming He sought to model which conceptualises water as a and economic performance link these two areas of the literature by productive input for private producers. on water consumption exploring the interactional relationship Water is defined as a congestible non- Bridge across the Pearl River in metropolitan Guangzhou. Xinfengjiang dam in Guangzhou. in Guangzhou, China. between urbanisation, economic excludable good. Congestible goods performance and water consumption are those that act like public goods using aggregated annual data.
    [Show full text]
  • Development of Earthquake Engineering in China
    13th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 5008 DEVELOPMENT OF EARTHQUAKE ENGINEERING IN CHINA Yuxian HU1 SUMMARY In China, there are now national seismic design codes for various kinds of engineering works, such as buildings, industrial structures, hydraulic structures, highways, railways, nuclear power plants, etc., and also national codes for seismic hazard evaluation, zonation, evaluation and strengthening of existing structures. Our current seismic codes require a two-stage limit design: an elastic and an ultimate. The design spectra are given in the zonation maps for the whole nation, and its width varying with both the regional seismicity and the local site condition. The 2001 code for buildings includes also a separate chapter for base isolation and energy dissipation requirements. The current design principle is performance-based, but an idea of consequence-based design principle was suggested a few years ago, which considers the indirect social and economic effects of the local region. Included are also development of studies of structural analysis, disaster mitigation measures, and engineering seismicity problems. 1. INTRODUCTION The development of earthquake engineering in China may be described into three stages. The initial stage in 1950’s – 1960’s was marked with the initiation of this branch of science from its creation in the first national 12-year plan of science and technology by specifying earthquake engineering as a branch item and IEM was one important participant. The first earthquake zonation map and the first seismic design code were completed in the 1950s and used in engineering design. Site effect on ground motion was seriously studied in the second stage in 1960s – 1980s marked with the occurrence of quite a few strong earthquakes in China, from which many lessons were learned and corresponding considerations were specified in our design codes, which are forced to follow in construction practice.
    [Show full text]
  • Earthquakes and Impounded Dams
    Commentary Earthquakes and Impounded Dams P. Loganathan FIGM In a recent article in the “The Star” (13th October, 2014), Dr Harsh K. Gupta, an Indian authority in the field of seismology, had stated that “the filling of a man-made water reservoir can induce tremors in the earth”. He further stated that “there have been at least half a dozen reservoir-triggered earthquakes registering magnitudes 6.0 and larger, causing substantial damage and killing hundreds”. Dr Gupta had pointed out that “When the reservoir is impounded, fluid pressure increases and the accumulated stresses make it possible for ruptures to occur. Globally, there are already more than 150 examples of these provoked earthquakes, such as Koynanagar in India (1967), Xinfengjiang in China (1962), and Kremasta in Greece (1966)”. The Koynanagar earthquake, reported as among the greatest earthquakes of historical times in the Indian peninsula (Berg et al. 1969), occurred near Koynanagar town in Maharashtra, western India on 11 December 1967. The 6.2 (average) magnitude earthquake had occurred near the site of the Koynanagar (or, Koyna) hydro-electric dam (installed capacity 1960 MW) and had intensity of VIII (MM) at Koynanagar (Berg et al. op cit.). In this incident, at least 180 lives were lost and over 1,500 injured. Although more than 80% of the houses in the township were damaged, the dam did not suffer any major damage to the dam except for some cracks which were quickly repaired. The earthquake caused a 10 – 15 cm fissure in the ground over a length of 25 kilometres. The Koyna Dam, constructed in an area underlain by the Deccan Traps, a series of basaltic volcanic flows of Cretaceous – Eocene age, at peak storage impounds some 280,337,000 cu.
    [Show full text]
  • Global Journal of Human Social Sciences
    Economic Development Global Economic Crisis Sustainable Ecotourism Biodiversity Reserve in India Global Journal of Human Social Science : E Economics G lobal Journal of Human Social Sciences :E Economics Vol ume 13 Issue 3 (Ver. 1.0) Open Association of Research Society *OREDO-RXUQDORI+XPDQ *OREDO-RXUQDOV,QF Social Sciences. 2013. $'HODZDUH86$,QFRUSRUDWLRQZLWK³*RRG6WDQGLQJ´Reg. Number: 0423089 6SRQVRUV Open Association of Research Society $OOULJKWVUHVHUYHG 2SHQ6FLHQWLILF6WDQGDUGV 7KLVLVDVSHFLDOLVVXHSXEOLVKHGLQYHUVLRQ RI³*OREDO-RXUQDORI+XPDQ6RFLDO 3XEOLVKHU¶V+HDGTXDUWHUVRIILFH 6FLHQFHV´%\*OREDO-RXUQDOV,QF $OODUWLFOHVDUHRSHQDFFHVVDUWLFOHVGLVWULEXWHG *OREDO-RXUQDOV,QF+HDGTXDUWHUV&RUSRUDWH2IILFH XQGHU³*OREDO-RXUQDORI+XPDQ6RFLDO 6FLHQFHV´ &DPEULGJH2IILFH&HQWHU,,&DQDO3DUN)ORRU1R 5HDGLQJ/LFHQVHZKLFKSHUPLWVUHVWULFWHGXVH WKCambridge (Massachusetts)3LQ0$ (QWLUHFRQWHQWVDUHFRS\ULJKWE\RI³*OREDO -RXUQDORI+XPDQ6RFLDO6FLHQFHV´XQOHVV 8QLWHG6WDWHV RWKHUZLVHQRWHGRQVSHFLILFDUWLFOHV 86$7ROO)UHH 86$7ROO)UHH)D[ 1RSDUWRIWKLVSXEOLFDWLRQPD\EHUHSURGXFHG RUWUDQVPLWWHGLQDQ\IRUPRUE\DQ\PHDQV 2IIVHW7\SHVHWWLQJ HOHFWURQLFRUPHFKDQLFDOLQFOXGLQJ SKRWRFRS\UHFRUGLQJRUDQ\LQIRUPDWLRQ VWRUDJHDQGUHWULHYDOV\VWHPZLWKRXWZULWWHQ Open Association of Research Society , Marsh Road, SHUPLVVLRQ Rainham, Essex, London RM13 8EU 7KHRSLQLRQVDQGVWDWHPHQWVPDGHLQWKLV United Kingdom. ERRNDUHWKRVHRIWKHDXWKRUVFRQFHUQHG 8OWUDFXOWXUHKDVQRWYHULILHGDQGQHLWKHU FRQILUPVQRUGHQLHVDQ\RIWKHIRUHJRLQJDQG QRZDUUDQW\RUILWQHVVLVLPSOLHG 3DFNDJLQJ &RQWLQHQWDO'LVSDWFKLQJ (QJDJHZLWKWKHFRQWHQWVKHUHLQDW\RXURZQ ULVN
    [Show full text]
  • The Heyuan Fault, South China: a Deep Geothermal
    THE HEYUAN FAULT, SOUTH CHINA: A DEEP GEOTHERMAL PROSPECT – THE ROLE OF FAULT INTERSECTION RELATIONSHIPS AND FLUID FLOW Lisa Tannock1 and Klaus Regenauer-Lieb1 1School of Petroleum Engineering UNSW Australia 2052 Sydney Australia [email protected] Keywords: Heyuan fault, geothermal resources, hot While their current geothermal energy production is springs, structural controls, quartz reef. relatively low (28 MWe) in comparison to other countries, e.g. USA (3.5 GWe), Indonesia (1.3 GWe), New Zealand (1 ABSTRACT GWe) and Italy (0.9 GWe) (Bertani 2015), China have This pilot study investigates the Heyuan Fault, Guangdong, demonstrated their greener-energy intentions, and resources, as a potential site for a geothermal power plant. The study by becoming one of the world leaders in direct heat focuses on two principal hypotheses: (i) that there are production (18 GW thermal) closely followed by USA (17 preferred locations of hot spots at fault intersections and (ii) GW thermal), Sweden (6 GW thermal), Turkey and that a combination of processes may be acting to contribute Germany (each 3 GW thermal) (Lund and Boyd, 2015). to the elevated surface heat flow. Although geothermal electric power generation is in its infancy in China, they have ambitious plans to triple their Hot springs manifest at the surface along the Heyuan fault, geothermal power production in the next five years in a bid concentrated in clusters occurring at intersections of cross- to reduce coal consumption and improve air quality cutting faults. Chinese literature attributes the elevated heat (Chinadaily.com.cn, 2016). flux to radioactive decay of a large granite pluton; however, additional heat sources may need to be considered to explain This study focusses on a geothermal prospect situated in the the heat flow maxima above 85 mWm-2.
    [Show full text]
  • Heuristic Methods for Reservoir Monthly Inflow Forecasting: a Case Study of Xinfengjiang Reservoir in Pearl River, China
    Water 2015, 7, 4477-4495; doi:10.3390/w7084477 OPEN ACCESS water ISSN 2073-4441 www.mdpi.com/journal/water Article Heuristic Methods for Reservoir Monthly Inflow Forecasting: A Case Study of Xinfengjiang Reservoir in Pearl River, China Chun-Tian Cheng *, Zhong-Kai Feng, Wen-Jing Niu and Sheng-Li Liao Institute of Hydropower and Hydroinformatics, Dalian University of Technology, Dalian 116024, China; E-Mails: [email protected] (Z.-K.F.); [email protected] (W.-J.N.); [email protected] (S.-L.L.) * Author to whom correspondence should be addressed; E-Mail: [email protected]; Tel./Fax: +86-411-84708768. Academic Editor: Miklas Scholz Received: 24 June 2015 / Accepted: 27 July 2015 / Published: 17 August 2015 Abstract: Reservoir monthly inflow is rather important for the security of long-term reservoir operation and water resource management. The main goal of the present research is to develop forecasting models for the reservoir monthly inflow. In this paper, artificial neural networks (ANN) and support vector machine (SVM) are two basic heuristic forecasting methods, and genetic algorithm (GA) is employed to choose the parameters of the SVM. When forecasting the monthly inflow data series, both approaches are inclined to acquire relatively poor performances. Thus, based on the thought of refined prediction by model combination, a hybrid forecasting method involving a two-stage process is proposed to improve the forecast accuracy. In the hybrid method, the ANN and SVM are, first, respectively implemented to forecast the reservoir monthly inflow data. Then, the processed predictive values of both ANN and SVM are selected as the input variables of a newly-built ANN model for refined forecasting.
    [Show full text]
  • Impact of Anthropogenic Activities on Morphological and Deposition Flux
    www.nature.com/scientificreports OPEN Impact of anthropogenic activities on morphological and deposition fux changes in the Pearl River Estuary, China Xing Wei1,2,3*, Shuqun Cai1,2 & Weikang Zhan1,2,3 The evolution of the Pearl River Estuary (PRE), China in recent decades has been dominated by human activities. Historical admiralty charts and remote sensing images indicated that from 1936 to 2017, the tidal fat area and water area decreased by 23.6 × ­107 m2 and 60.7 × ­107 m2, respectively. The average advancing rate of the coastline of the PRE to the sea from 1972 to 2017 reached approximately 64.8 m/year, which is several times or even dozens of times that since the mid- Holocene. Land reclamation was the main reason for the dramatic changes in the water area and coastline. Although the water volume of the PRE showed a decreasing trend from 1936 to 2017, the water volume reduction rates for 1996–2005 and 2005–2017 were only 29% (1.27 × ­107 m3/year) and 12% (0.53 × ­107 m3/year), respectively, of that for 1936–1972. The combined infuences of channel dredging, sand mining, and sediment load reduction caused by dam construction have contributed to this change. From the perspective of the flling up of the estuary, channel dredging, sand mining, and dam construction in the river basin are benefcial for prolonging the life of the estuary. Te estuary and its delta are the most concentrated areas of human activity in the world, with rich natural resources and an important geographical location. More than 500 million people live in the delta area 1, which accounts for less than 1% of the global land area and features an economic output value of several trillions of dollars2.
    [Show full text]
  • Application of Coastal Reservoirs in China and Its Feasibility
    University of Wollongong Research Online Faculty of Engineering and Information Faculty of Engineering and Information Sciences - Papers: Part B Sciences 2017 Application of coastal reservoirs in China and its feasibility Shu-qing Yang University of Wollongong, [email protected] Follow this and additional works at: https://ro.uow.edu.au/eispapers1 Part of the Engineering Commons, and the Science and Technology Studies Commons Recommended Citation Yang, Shu-qing, "Application of coastal reservoirs in China and its feasibility" (2017). Faculty of Engineering and Information Sciences - Papers: Part B. 1119. https://ro.uow.edu.au/eispapers1/1119 Research Online is the open access institutional repository for the University of Wollongong. For further information contact the UOW Library: [email protected] Application of coastal reservoirs in China and its feasibility Abstract China is a water-rich country in terms of rainfall and rivers' size, but its urbanization mainly occurs in the eastern coastal cities. The densely populated coastal cities intensify the water stress. To seal the gap between water demand and supply, many ways have been tested like water diversion projects, desalination plants and wastewater recycling plants etc. Different from these solutions, this paper discusses the strategy of coastal reservoirs in China's coastal cities. Its feasibility of using the available water is investigated and its water quality can be ensured if the second generation coastal reservoirs are applied. The results show that the water shortage problems in China coastal cities can be well solved if CRs are applied. Disciplines Engineering | Science and Technology Studies Publication Details Yang, S. (2017).
    [Show full text]
  • Annex 3 the Visit-Observations, Briefings and Speeches
    Annex 3 Advisory Committee on the Quality of Water Supplies Report on Visit to the Dongjiang Water Supply System (29-30 August 2000) THE VISIT – OBSERVATIONS, BRIEFINGS, DISCUSSIONS AND SPEECHES DAY ONE 1. Huizhou Meihu Sewage Treatment Works ( 惠州市梅湖水質淨化中心) 1.1 The delegation visited the site of the Huizhou Meihu Sewage Treatment Works under construction at (Photo 1). Mr HUANG Chaoqing1 (黃超清) explained the design of the plant and its treatment process comprising a series of screening, nutrient reduction and disinfecting processes (Photos 2 and 3). He expected that the plant would be commissioned in October 2000 after completion of the installation work. An information paper in Chinese on the sewage treatment works is attached in Annex 4. 1.2 Ms LI Yihui2 (李伊惠) also advised that: i. When phase 1 of the treatment works is completed, it will be able to treat 100,000 tonnes of sewage per day. The designed capacities of the Stage 2 and 3 works are 200,000 and 300,000 tonnes per day respectively. ii. The treatment works will treat domestic sewage collected at Huizhou (惠州) before discharging to Dongjiang (東江). iii. Huizhou is located at the middle course of Dongjiang and its source of water is Xizhijiang ( 西支江), not Dongjiang. The purpose of constructing the treatment works in Huizhou is to treat its domestic sewage before discharging to Dongjiang. This in turn aims at meeting the requirements of the environmental protection legislation in order to protect the quality of water in Dongjiang which is the source of water for cities and towns downstream of Huizhou.
    [Show full text]