IRRIGATION DEPARTMENT OFFICE OF THE EXECUTIVE ENGINEER, CANAL DIVISION KHUSHAB TENDER NOTICE.

1. Sealed tenders on Market Rates System are invited from approved contractors of Irrigation Department for the work detailed below. 2. The tender documents will be issued to those contractors who have got themselves enlisted/ renewed for the year 2017-2018 on production of original documents of enlistment/ receipt of renewal fee, Professional Tax and registration with Engineering council in the relevant category. 3. The prescribed tender forms IB-389 (Revised) can be purchased by depositing the tender price given below. 4. Earnest money of @ 2% of estimated amount in shape of deposit call payable to Executive Engineer, Khushab Canal Division Khushab, issued by Scheduled Bank of Pakistan must be attached with the tenders. No tender document will be accepted without earnest money. 5. Contract documents, drawings and estimate of the work etc can be seen in the office of the undersigned on any working day during office hours. 6. Tender forms will be issued from this office within office hours immediately after the publication of the invitation to the bid up to 30.03.2018. 7. The tenders will be received in the office of under signed on 31.03.2018 up to 12:00 PM Hours and opened by the Tender Opening Committee on the same day at 12:30 PM Hrs sharp in the presence of contractors or their authorized representatives who may dare to attend. 8. No conditional or their authorized representative who may dare to attend. 9. Any of the total bids can be rejected on the basis of evaluation criteria through:- a. The procuring agency may reject all bids of proposals at any time prior to the acceptance of a bid proposal. b. The procuring agency shall upon requested communicate to any bidder, the grounds for its rejection of all bids or proposals, but shall not be required to justify those grounds. 10. The payment will be made after clearance of work done by the Third Party Monitoring Consultants. 11. The payment will be made only on receipt of funds specified for the work, against accepted work done or provision existing in the technical sanctioned estimate, whichever is less. 12. In Case total tendered amount is less than 5% of approved estimated (DNIT) amount, the lowest bidder will have to deposit additional performance security from any scheduled bank under clause 26 A of contract agreement within 15-days of issuance of notice and in consideration of Government of Finance Department Notification No. RO (Tech) FD 1-2/83 VI(P) dated: 24.01.2006. 13. Deposit calls of 2nd and 3rd lowest bidders will be released after approval of Tenders by competent authority. 14. If two or more contractors / firms become the lowest by quoting the same rates for any item, the decision of authority competent to accept the tender for award of contract will be final. 15. The Acceptance letters to the successful bidders will be issued as per funds available with the Division and after fulfillment all codal formalities. 16. Tender fee will received through Bank challan which will be filled by this Department.

LIST OF WORKS 2017-18.

EXECUTIVE ENGINEER KHUSHAB CANAL DIVISION KHUSHAB Phone No. 0454-711747

Estimated Sr. Earnest Printing Completion Name of Work Cost in T.S No. & Date No. Money Charges Period Rs. 1 2 3 4 5 6 7 2% of Clearing Inner Prism of Khushab XEN No. 4522 /3W(JBD) 1 201927/- Estimated 300/- 20-Days Disty RD: 0+000 to Tail. Dated: 12-12-2017 Cost Repairing Duty Room at Tail 2% of XEN No. 4560 /3W(QBD) 2 regulator Link Channel RD: 320655/- Estimated 300/- 20-Days Dated: 14-12-2017 21+040. Cost 2% of Repairing outlets and civil work in XEN No. 223/3-W (QBD) 3 246424/- Estimated 300/- 20-Days Quaidabad Sub Division. Dated: 17.01.2018 Cost Providing and Fixing Data Boards 2% of XEN No. 1077/3-W 4 / RD Marks in Quaidabad Sub 561336/- Estimated 500/- 20-Days (QBD) Division. Cost Dated: 07.03.2018 Construction of Duty Hut at Head 2% of XEN No. 2979/3-W 5 Regulator RD: 36+000 Hadali 315463/- Estimated 300/- 30-Days (JBD) Disty Head Mitha Tiwana Minor. Cost Dated: 24.02.2018 Construction of Duty Hut at head 2% of XEN No. 2957/3-W 6 Regulator RD: 56+000 Hadli Disty 315463/- Estimated 300/- 30-Days (JBD) Hamoka Section. Cost Dated: 21.02.2018

Executive Engineer Khushab Canal Division Khushab No.______/ Dated.______/2018

Copy of above is forwarded to the:-

1. Superintending Engineer, Thal Canal Circle, Mianwali. 2. Director Legal & Monitoring Punjab Procurement Regularity Authority S&GAD2-E 304 3rd floor Al-Falah Building Mall . 3. Director Gauges PMIU Irrigation Secretariat Lahore. 4. Resident Engineer TPM Consultant (BARQAAB) office of the Chief Engineer Sargodha, Irrigation Zone, Sargodha 5. Executive Engineer, (3) of Thal Canal Circle, Mianwali. 6. Sub Divisional Officer, (3) of Khushab Canal Division Khushab. 7. Revenue Clerk / Notice Board of Khushab Canal Division Khushab. 8. Regional Director, Anti-Corruption Establishment, Sargodha, with reference to his letter No. ACE-SR-2017/7906-24 dated: 13.09.2017. for information and necessary action please.

Executive Engineer Khushab Canal Division Khushab BOQ FOR THE WORK: - CLEARING INNER PRISM OF KHUSHAB DISTY RD: 0+000 TO TAIL. RATE QOTED BY Sr. DESCRIPTION UNIT QUANTITY CONTRACTOR No. IN FIGURES IN WORDS 1 2 3 4 5 6 Earthwork excavation in ashes, 1 sand and soft soil or silt clearance, %O Cft 32622 undressed lead upto 50 ft. Berm trimming both sides of channel 2 P.Mile. 2.30 up to 3 1/2' depth. Jungle clearance and removing 3 % Sft 25920 within 100 ft. Light Jungle. Uprooting sarkanda and disposal 4 % Sft 29325 within 100 ft. Punjab Revenue Authority (PRA )16% Tax

TOTAL IN FIGURES

TOTAL IN WORDS

BOQ FOR THE WORK: - REPEAIRING DUTY ROOM AT TAIL REGULATOR LINK CHANNEL RD: 21+040. RATE QOTED BY Sr. DESCRIPTION UNIT QUANTITY CONTRACTOR No IN FIGURES IN WORDS 1 2 3 4 5 6

Excavation in foundation of building, briges and other structures, including dagbelling, dressing, refilling around 1 structure with excavated earth, watering and ramming lead %o Cft 521.63 upto one chain (30 m) and lift upto 5 ft in ordinary.

Cement concrete brick or stone ballast 1 1/2" to 2" gauge, 2 in foundation and plinth Ratio 1:4:8. % Cft 209.82

Pacca brick work in foundation and plinth in: Cement, sand 3 mortar:. % Cft 326.8 Providing and laying damp proff course of cement, 4 concrete 1:2:4 (using cement, sand and coat bitumen and % Cft 45.37 one coat polythene sheet 500 gauge 1 1/2" thick. Pacca brick work in ground floor. Cement, sand mortar:- 5 Ratio (1:5) % Cft 479.54 Rainforced cement concrete in roof slab, beams, columns lintels, girders and other structural members laid in situ or 6 precast laid in position, or prestressed members cast in P.Cft 87.84 situ, complete in all respects:- Type C ( nominal mix 1:2:4) Fabrication of mild steel reinforcement for cement concrete, including cuttings, bending, laying in position, making joints and fastenings, including cost of binding wire 7 and labour charges for binding of steel reinforcement ( also % Kg 199.22 includes removal of rust from bars):- Deformed bars.Grade 60 8 Cement plaster 1:4 upto 20' height :- 1/2" thick % Sft 731.87 Providing and fixing panelled door of M.S sheet, with forged door leaves of M.S. sheet 22 SWG fittied in hollow frame chowkat 3" x 4 1/2 made of M.S sheet 18 SWG filled 9 with plain cement concrete 1:3:6 ets. Compl ete with all Per Sft 63.00 fittings and hammer painting, including carriage to site and fixing in position. Filling, water and ramming earth under floors:- with new 10 earth excavated from outside lead upto one chain. %o Cft 339.00 11 Dry rammed brick or stone ballast, 1 1/2" to 2" gauge. % Cft 45.86 Provinding and laying topping of cement concrete (1:2:4) 12 including surface finishing and dividing in panel s: 1 1/2 % Sft 138.00 thick Providing and fitting glazed earthen ware water closet, 13 squatter type (Orisa pattern), combined with foot rest P.No 1.00 Coloured. 14 Providing and fitting "P' trap (4) glazed. P.No 1.00 Providing, laying, cutting, jointing, testing and disi nfecting 15 P.V.C. pipe, intrenches, complete in all respects:- 4" P.Rft 12.00 Punjab Revenue Authority (PRA )16% Tax

TOTAL IN FIGURES

TOTAL IN WORDS

BOQ FOR THE WORK :- REPAIRING OUTLETS AND CIVIL WORK IN QUAIDABAD SUB DIVISION RATE QOTED BY Sr. DESCRIPTION UNIT QUANTITY CONTRACTOR No IN FIGURES IN WORDS Water allowance for constructing outlet or culverts when 1 canal water is not flowing. P.No 10.00 Changing pipe outlet by removing one pipe and replacing it 2 same site with another pipe complete with earth filling and P.Rft 60.00 paddling. Portion under bank. Providing and laying non-reinforced concrete pipe moulded with cement concrete 1:1 1/2:3, conforming to ASTM Specification C-14-73,Class 2, including carriage of pipe from 3 factory to site of work, lowering in trenches to correct alignment and grade, jointing, cutting pipe where necessary, finishing and testing, etc complete. MOHAJIR BRANCH i 119300/R 7.00" dia P.Rft 6.00 ii 126500/R 7.00" dia P.Rft 6.00 iii 132550/R 4.00" dia P.Rft 6.00 LINK CHANNEL i 16490/L 9.00" dia P.Rft 6.00 NOORPUR DISTY i 18500/R 8.00"dia P.Rft 6.00 ii 33834/L 4.50" dia P.Rft 6.00 1-L NOORPUR MINOR i 7000/R 5.50" dia P.Rft 6.00 ii 11500/R 7.50" dia P.Rft 6.00 iii 19800/R 8.00" dia P.Rft 6.00 iv 22200/T.R 8.00"dia P.Rft 6.00 Providing and laying reinforced cement concrete(including prestressed concrete), using coarse sand and screened graded and washed aggerate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete 4 (but excluding the cost of steel reinforcement, its fabrication P.Cft 47.50 and placing in position, etc):- (a) (i) Reinforced cement concrete in roof slab, beams, columns lintels, girders and other structural members laid in situ or precast laid in position, or prestressed members cast in situ, complete all respects. Cement concrete plain including placing, compacting, 5 finishing and curing complete (including screening and P.Cft 189.50 washing of stone aggregate): Ratio 1:2:4. Febrication of mild steel reinforcement for cement concrete, including cutting cost of binding wire and labour charges for 6 binding of steel reinforcement (also includes removal of rust P.kg 115.28 form bars):- © Deformed bars. Grade.60 Pacca brick work other than building upto 10ft Hight. Cement, 7 sand mortar:- Ratio 1:5. % Cft 369.83 Plain wood work sawn, wrought, planed and fixed. Deodar 8 wood. P.Cft 12.99 Punjab Revenue Authority (PRA )16% Tax TOTAL IN FIGURES

TOTAL IN WORDS

BOQ FOR THE WORK: - PROVIDING AND FIXING DATA BOARDS / RD MARKS IN QUAIDABAD SUB DIVISION.

RATE QOTED BY Sr. DESCRIPTION UNIT QUANTITY CONTRACTOR No IN FIGURES IN WORDS 1 2 3 4 5 6

Providing, laying, cutting, jointing, testing and disinfecting G.I. Pipe line in trenches, 1 with socket joints, using G.I. Pipes of B.S.S P. Rft 640.46 1387 - 1967 complete in all respects, with specials and valves. Heavy quality.

Small iron work, such as gusset plates, knees, bends, stirrups, straps, rings, etc. including cutting, drilling, riveting, handling, 2 assembling and fixing; but excluding, % Kg 327.36 erection in position. 16 gauge for board and clamps. Cement concrete brick or stone bal last 1 3 1/2" to 2" gauge, in foundation and pl inth: - % Cft 279.00 Ratio 1:4:8 for hoisting. Painting new surface: Preparing surface and painting of fillets, framing, ski rtings, 4 pipes, gutters, and simi lar linear work not % Rft 542.50 exceeding 6" girth:- Coats. P. Writing lettering of figures on data board 5 height. 2 x 90 x 2 =360 inch. letter 11160.00 P. inch Carrige of Data board to site 1 cart load up 6 to 10 mile. Each 31 No Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling around 7 structure with excavated earth, watering %o Cft 372.00 and ramming lead upto one chain and lift upto 5ft. in ordinary soil Punjab Revenue Authority (PRA )16% Tax

TOTAL IN FIGURES

TOTAL IN WORDS

BOQ FOR THE WORK:-CONSTRUCTION OF DUTY HUT AT HEAD REGULATOR RD: 36+000 HADALI DISTY HEAD MITHA TIWANA MINOR. RATE QOTED BY Sr. CONTRACTOR DESCRIPTION UNIT QUANTITY No IN IN FIGURES WORDS 1 2 3 4 5 6 Excavation in found of building, bridges and other structures, including dagbelling, dressing, refilling around structure with 1 excavated earth, watering and rammiing lead upto one chain %o Cft 501.96 (30m) and lift upto 5ft in ordinary. Cement concrete brick or stone ballast 1 1/2" to 2" gauge, 2 in foundation and plinth Ratio 1:4:8. % Cft 203.50 Pacca brick work in foundation and plinth in:-Cement, sand 3 mortar:-Ratio (1:6). % Cft 309.49 Providing and laying damp proof course of cement concrete 1:2:4 (using cement, sand and shingle), including bitumen 4 coating:- with one coat bitumen and one coat polythene % Sft 41.625 sheet 500 gauge 1 1/2" thick. Pacca brick work in ground floor.cement, sand mortar:- Ratio 5 (1:6). % Cft 453.29

Reinforced cement concrete in roof slab, beams, columns lintes,girders and other structural members laid in situ or 6 precast laid in position,or prestressed members cast in situ, P. Cft 87.84 complete in all respects:- Type C (nominal mix 1:2:4).

Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position,making joints 7 and fastenings, including cost of binding wire and labour % Kg 199.22 charges for binding of steel reinforcement (also includes removal of rust from bars):- Deformed bars (Grade-60). 8 Cement plaster 1:4 upto 20' (6.00)(m) height: 1/2" thick. % Sft 731.87 Providing and fixing panelled door of M.S sheet, with forged door leaves of M.S sheet 22 SWG fitted in hollow frame chowkat 3" x4 1/2" made of M.S.sheet 18 SWG filled with 9 plain cement concrete 1:3:6 etc. compl ete with all fittings P. Cft 63.00 and hammer painting, including carriage to site and fixing in position. Filling, watering and and ramming earth under floors:-with 10 new earth excavated from outside lead upto one chain. % Cft 339.00 11 Dry rammed brick or stone ballast, 1 1/2" gauge. % Cft 45.86 Providing and laying topping of cement concrete (1:2:4) 12 including surface finishing and dividing in panels: 1 1/2" % Sft 138.00 thick. Providing and fitting glazed earthen ware water 13 closet,squatter type (Orisa pattern), combined with foot rest P. No 1.00 Coloured. 14 Providing and fitting "P" trap (4") glazed. P. No 1.00 Providing, laying, cutting, jointing, testing and disi nfecting 15 P.V.C pipe line of B.S.S. with 'B' Class working pressure P. Rft 12.00 pipe, intrenches, complete in all respects:-4"i/d. Punjab Revenue Authority (PRA )16% Tax TOTAL IN FIGURES

TOTAL IN WORDS

BOQ FOR THE WORK:-CONSTRUCTION OF DUTY HUT AT HEAD REGULATOR RD: 56+000 HADALI DISTY HAMOKA SECTION. RATE QOTED BY Sr. DESCRIPTION UNIT QUANTITY CONTRACTOR No IN FIGURES IN WORDS 1 2 3 4 5 6 Excavation in found of building, bridges and other structures, including dagbelling, dressing, refilling 1 around structure with excavated earth, watering and %o Cft 501.96 rammiing lead upto one chain (30m) and lift upto 5ft in ordinary. Cement concrete brick or stone ballast 1 1/2" to 2" 2 gauge, in foundation and plinth Ratio 1:4:8. % Cft 203.50 Pacca brick work in foundation and plinth in:-Cement, 3 sand mortar:-Ratio (1:6). % Cft 309.49 Providing and laying damp proof course of cement concrete 1:2:4 (using cement, sand and shingle), 4 including bitumen coating:- with one coat bitumen % Sft 41.625 and one coat polythene sheet 500 gauge 1 1/2" thick. Pacca brick work in ground floor. Cement, sand 5 mortar: - Ratio (1:6). % Cft 453.29 Reinforced cement concrete in roof slab, beams, columns lintes, girders and other structural members 6 laid in situ or precast laid in position, or prestressed P.Cft 87.84 members cast in situ, complete in all respects:- Type C (nominal mix 1:2:4). Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost 7 of binding wire and labour charges for binding of steel % Kg 199.22 reinforcement (also includes removal of rust from bars):- Deformed bars (Grade-60). Cement plaster 1:4 upto 20' (6.00)(m) height: 1/2" 8 thick. % Sft 731.87 Providing and fixing panelled door of M.S sheet, with forged door leaves of M.S sheet 22 SWG fitted in hollow frame chowkat 3" x4 1/2" made of M.S.sheet 9 18 SWG filled with plain cement concrete 1:3:6 etc. P. Cft 63.00 compl ete with all fittings and hammer painting, including carriage to site and fixing in position. Filling, watering and and ramming earth under floors:- 10 with new earth excavated from outside lead upto one % Cft 339.00 chain. 11 Dry rammed brick or stone ballast, 1 1/2" gauge. % Cft 45.86 Providing and laying topping of cement concrete 12 (1:2:4) including surface finishing and dividing in % Sft 138.00 panels: 1 1/2" thick. Providing and fitting glazed earthen ware water 13 closet, squatter type (Orisa pattern), combined with P. No 1.00 foot rest Coloured. 14 Providing and fitting "P" trap (4") glazed. P. No 1.00 Providing, laying, cutting, jointing, testing and disi nfecting P.V.C pipe line of B.S.S. with 'B' Class 15 working pressure pipe, intrenches, complete in all P. Rft 12.00 respects:-4"i/d. Punjab Revenue Authority (PRA )16% Tax TOTAL IN FIGURES

TOTAL IN WORDS